chapter 08 2

64
Regular Views and Auxiliary Views. Figure 8-1 © 2003, Prentice-Hall, Inc. Giesecke Technical Drawing, 12e

Upload: subhi-mohamad

Post on 13-Apr-2015

144 views

Category:

Documents


16 download

DESCRIPTION

auxaliary views

TRANSCRIPT

Page 1: Chapter 08 2

Regular Views and Auxiliary Views.

Figure 8-1

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 2: Chapter 08 2

An Auxiliary View.

Figure 8-2

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 3: Chapter 08 2

Drawing an Auxiliary View—Folding-Line Method.

Figure 8-3

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 4: Chapter 08 2

Drawing Parallel or Perpendicular Lines.

Figure 8-4

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 5: Chapter 08 2

Position of the Reference Plane.

Figure 8-5

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 6: Chapter 08 2

Drawing an Auxiliary View—Reference-Plane Method.

Figure 8-6

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 7: Chapter 08 2

Depth Auxiliary Views.

Figure 8-7

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 8: Chapter 08 2

Height Auxiliary Views.

Figure 8-8

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 9: Chapter 08 2

Width Auxiliary Views.

Figure 8-9

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 10: Chapter 08 2

Revolving a Drawing.

Figure 8-10

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 11: Chapter 08 2

Dihedral Angles.

Figure 8-11

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 12: Chapter 08 2

Plotted Curves.

Figure 8-12

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 13: Chapter 08 2

Reverse Construction.

Figure 8-13

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 14: Chapter 08 2

Primary Auxiliary Views.

Figure 8-14

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 15: Chapter 08 2

Partial Views.

Figure 8-15

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 16: Chapter 08 2

Half Views.

Figure 8-16

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 17: Chapter 08 2

Auxiliary Sections.

Figure 8-17

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 18: Chapter 08 2

Auxiliary Section.

Figure 8-18

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 19: Chapter 08 2

Auxiliary Section.

Figure 8-19

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 20: Chapter 08 2

True Length of a Line by Means of an Auxiliary View.

Figure 8-20

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 21: Chapter 08 2

Successive Auxiliary Views.

Figure 8-21

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 22: Chapter 08 2

True Size of Oblique Surface—Folding-Line Method.Figure 8-22

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 23: Chapter 08 2

True Size of Oblique Surface—Reference-Plane Method.

Figure 8-23

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 24: Chapter 08 2

Secondary Auxiliary View with Oblique Direction of Sight Given.

Figure 8-24

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 25: Chapter 08 2

Secondary Auxiliary View—Partial Views.

Figure 8-25

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 26: Chapter 08 2

Ellipses.

Figure 8-26

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 27: Chapter 08 2

RH Finger. Given: Front and auxiliary views. Required: Completefront, auxiliary, left-side, and top views (Layout A–3 or A4–3 adjusted).

Figure 8-27

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 28: Chapter 08 2

V-Block. Given: Front and auxiliary views. Required: Complete front,top, and auxiliary views (Layout A–3 or A4–3 adjusted).

Figure 8-28

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 29: Chapter 08 2

1 2 3 4 5 6

7 8 9 10 11

12

13 1415 16

1817

19 20 21 22 23 24

25 26 2728 29

30

Auxiliary View Problems. Make freehand sketch or instrument drawing of selected problem as assigned.Draw given front and right-side views, and add incomplete auxiliary view, including all hidden lines(Layout A–3 or A4–3 adjusted). If assigned, design yourown right-side view consistent with given frontview, and then add complete auxiliary view.

Figure 8-29

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 30: Chapter 08 2

Figure 8-30

Anchor Bracket. Draw necessary views or partialviews (Layout A–3 or A4–3 adjusted).*

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 31: Chapter 08 2

Centering Block. Draw complete front, top, and right-side views,plus indicated auxiliary views (Layout B–3 or A3–3).*

Figure 8-31

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 32: Chapter 08 2

Clamp Slide. Draw necessary views completely(Layout B–3 or A3–3).*

Figure 8-32

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 33: Chapter 08 2

Guide Block. Given: Right-side and auxiliary views. Required: Right-side,auxiliary, plus front and top views—all complete (Layout B–3 or A3–3).*

Figure 8-33

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 34: Chapter 08 2

Angle Bearing. Draw necessary views, including acomplete auxiliary view (Layout A–3 or A4–3 adjusted).*

Figure 8-34

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 35: Chapter 08 2

Guide Bracket. Draw necessary views or partialviews (Layout B–3 or A3–3).*

Figure 8-35

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 36: Chapter 08 2

Rod Guide. Draw necessary views, including complete auxiliary viewshowing true shape of upper rounded portion (Layout B–4 or A3–4 adjusted).*

Figure 8-36

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 37: Chapter 08 2

Figure 8-37

Brace Anchor. Draw necessary views, including partial auxiliary viewshowing true shape of cylindrical portion (Layout B–4 or A3–4 adjusted).*

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 38: Chapter 08 2

45º Elbow. Draw necessary views, including a broken section and twohalf views of flanges (Layout B–4 or A3–4 adjusted).*

Figure 8-38

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 39: Chapter 08 2

Angle Guide. Draw necessary views, including a partial auxiliary viewof cylindrical recess (Layout B–4 or A3–4 adjusted).*

Figure 8-39

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 40: Chapter 08 2

Holder Block. Draw front and right-side views (2.80” apart) andcomplete auxiliary view of entire object showing true shape ofsurface A and all hidden lines (Layout A–3 or A4–3 adjusted).*

Figure 8-40

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 41: Chapter 08 2

Control Bracket. Draw necessary views, including partial auxiliaryviews and regular views (Layout C–4 or A2–4).*

Figure 8-41

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 42: Chapter 08 2

Tool Holder Slide. Draw given views, and add complete auxiliary viewshowing true curvature of slot on bottom (Layout B–4 or A3–4 adjusted).*

Figure 8.42

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 43: Chapter 08 2

Adjuster Block. Draw necessary views, including complete auxiliary viewshowing true shape of inclined surface (Layout B–4 or A3–4 adjusted).*

Figure 8-43

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 44: Chapter 08 2

Guide Bearing. Draw necessary views and partial views, including twopartial auxiliary views (Layout C–4 or A2–4).*

Figure 8-44

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 45: Chapter 08 2

Drill Press Bracket. Draw given views and add complete auxiliary viewshowing true shape of inclined face (Layout B–4 or A3–4 adjusted).*

Figure 8-45

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 46: Chapter 08 2

Brake Control Lever. Draw necessary views andpartial views (Layout B–4 or A3–4 adjusted).*

Figure 8-46

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 47: Chapter 08 2

Shifter Fork. Draw necessary views, including partial auxiliary view showing true shapeof inclined arm (Layout B–4 or A3–4 adjusted).*

Figure 8-47

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 48: Chapter 08 2

Cam Bracket. Draw necessary views or partialviews as needed. (Layout B–4 or A3–4 adjusted).*

Figure 8-48

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 49: Chapter 08 2

RH Tool Holder. Draw necessary views, including partial auxiliary views showing105º angle and square hole true size. (Layout B–4 or A3–4 adjusted).*

Figure 8-49

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 50: Chapter 08 2

Draw secondary auxiliary views, complete, which (except Prob. 2) will show the truesizes of the inclined surfaces. In Prob. 2 draw secondary auxiliary view as seen in directionof arrow (Layout B–3 or A3–3).*

Figure 8-50

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 51: Chapter 08 2

Control Bracket. Draw necessary views including primary and secondaryauxiliary views so that the latter shows true shape of oblique surfaceA (Layout B–4 or A3–4 adjusted).*

Figure 8-51

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 52: Chapter 08 2

Holder Block. Draw given views and primary and secondary auxiliary views so that thelatter shows true shape of oblique surface (Layout B–4 or A3–4 adjusted).*

Figure 8-52

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 53: Chapter 08 2

Dovetail Slide. Draw complete given views and auxiliary views, including view showingtrue size of surface 1–2–3–4 (Layout B–4 or A3–4 adjusted).*

Figure 8-53

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 54: Chapter 08 2

Dovetail Guide. Draw given views plus completeauxiliary views as indicated (Layout B–4 or A3–4 adjusted).*

Figure 8-54

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 55: Chapter 08 2

Adjustable Stop. Draw complete front and auxiliary views plus partial right-side view.Show all hidden lines (Layout C–4 or A2–4).*

Figure 8-55

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 56: Chapter 08 2

Tool Holder. Draw complete front view, and primary and secondary auxiliary viewsas indicated (Layout B–4 or A3–4 adjusted).*

Figure 8-56

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 57: Chapter 08 2

Box Tool Holder for Turret Lathe. Given: Front and right-side views. Required: Front and left-sideviews, and complete auxiliary view as indicated by arrow (Layout C–4 or A2–4).*

Figure 8-57

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 58: Chapter 08 2

Pointing Tool Holder for Automatic Screw Machine. Given: Front and right-side views. Required:Front view and three partial auxiliary views (Layout C–4 or A2–4).*

Figure 8-58

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 59: Chapter 08 2

R 1.25R 1.00

2xR.875 2xØ.875

Ø 1.25

4.00

2.75

5.50

Print Roller. Given: Right-side view. Design your own front and auxiliary view(Use Layout A–3 or A4–3 adjusted). If assigned, use CAD to create a partial auxiliary view.

Figure 8-59

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 60: Chapter 08 2

FRON

T VIEW

45°

.38

R.75TYP.

2.5

1.0

2X:.6

8TH

RU

Clamp. Draw all required views. Include at least oneauxiliary view (Layout A-3 or A4-3 adjusted).*

Figure 8-60

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 61: Chapter 08 2

RIO - 2 PLACES

R5 TYP

10

10

:60

:40

50

20 40

75

Plastic Spacer. Draw all necessary views. Make at leastone auxiliary view (Layout A-3 or A4-3 adjusted).*

Figure 8-61

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 62: Chapter 08 2

METRIC

44 15

54

:30,THRU:44

88

RIO(TYP.)

RIO

(22)

42

Plastic Spacer. Draw all necessary views. Include at least one auxiliary view (Layout A-3or A4-3 adjusted).* 8.63 Plastic Slide. Draw all required views. Include at least one

Figure 8-62

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 63: Chapter 08 2

FRON

TVIE

W

2.0

3.5

60°

1.751.25

.50

.50

Plastic Slide. Draw all required views. Include at least oneauxiliary view (Layout A-3 or A4-3 adjusted).*

Figure 8-63

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e

Page 64: Chapter 08 2

R.62

1.25.62

(2.43)

R.28

R.56

.06

.12

:.62THRU

1.12

.50

0.6

FRON

TVIE

W

1.501.0

R.21R.50

.501.0

32

Mounting Clip. Draw all required views. Include at least oneauxiliary view (Layout A-3 or A4-3 adjusted).*

Figure 8-64

© 2003, Prentice-Hall, Inc.GieseckeTechnical Drawing, 12e