checklist form pdc 8d for final inspection - sewerage treatment plant form pdc 8d (200)
TRANSCRIPT
Form PDC 8d
C NC
3.0 INLET WORKS (Primary Screen, Wet Well and Dry Well)
INLET WORKS STP Type: ____________ No of NPS: ____________
INLET WORKS Design PE: ____________ Design PE: ____________
3.01 DRAWING NUMBER: ________________
3.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
3.03 QUALITY OF CONSTRUCTION
3.04 DIMENSIONS AND LEVELS
3.05 INCOMING PIPE
3.06 PENSTOCK
3.07 STOPBOARD
3.08 BASKET SCREEN
3.09 BAR SCREEN
3.10 MECHANICAL SCREEN
a) Type:
b) Brand:
c) Model:
3.11 BAR SPACING
3.12 ARRANGEMENT FOR DISPOSAL OF SCREENINGS
3.13 CONVEYORS
3.14 BIN
3.15 PUMPS
a) Numbers:
b) Brand:
c) Model:
3.16 PUMP STOOL, BRACKET AND SUPPORT
3.17 VALVES
C NC
3.18 PUMP PIPING AND JOINTS
3.19 GUIDE RAILS / LIFTING CHAIN
3.20 EQUIPMENT IDENTIFICATION
3.21 HANDRAIL
3.22 GRATING / COVER
3.23 LIFTING FACILITY
3.24 LEVEL CONTROLS
3.25 SUB/SUPER STRUCTURE
3.26 LADDERS / STAIRCASE
3.27 AIR VENTILATION
3.28 PANEL, LIGHTING, LIGHNING ARRESTOR, BEACON LIGHT
3.29 EMERGENCY OVERFLOW
3.30 ACCESS / WALKWAY / PLATFORM
3.31 WATER SUPPLY / TAP POINT
3.32 OPERABILITY
3.33 HEALTH & SAFETY
3.34 OTHERS
NO. DESCRIPTIONSATISFACTORY
COMMENTS
SECTION CCHECKLIST FOR FINAL INSPECTION - SEWAGE TREATMENT PLANT
NO. DESCRIPTION COMMENTSSATISFACTORY
C NC
4.0 SECONDARY SCREEN / GRIT / GREASE CHAMBER
4.01 DRAWING NUMBER: ________________
4.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
4.03 QUALITY OF CONSTRUCTION4.04 DIMENSIONS AND LEVELS
4.05 SCREEN TYPE
4.06 BAR SPACING
4.07 DISPOSAL OF SCREENINGS
4.08 GRIT CHAMBER TYPE
4.09 GRIT REMOVAL - PUMP / CLASSIFIER / CONVEYOR
4.10 OIL & GREASE SKIMMING MECHANISM / REMOVAL
4.11 COVERS / GRATING
4.12 PIPING / CHANNEL
4.13 BIN
4.14 ACCESS / WALKWAY / PLATFORM
4.15 HANDRAIL
4.16 OPERABILITY
4.17 HEALTH & SAFETY
4.18 OTHERS
5.0 BALANCING TANK
5.01 DRAWING NUMBER: ________________
5.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
5.03 QUALITY OF CONSTRUCTION
5.04 DIMENSIONS AND LEVELS
5.05 AERATION
5.06 PUMPS
a) Numbers:
b) Brand:
c) Model:
5.07 PUMP PIPING / VALVES / JOINTS / SUPPORT
5.08 LIFTING DEVICES
5.09 OPERABILITY
5.10 HEALTH & SAFETY
5.11 ACCESS / WALKWAY / PALTFORM / HANDRAILS
5.12 OTHERS
6.0 AERATION TANK
6.01 DRAWING NUMBER: ________________
6.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
6.03 QUALITY OF CONSTRUCTION
6.04 DIMENSIONS AND LEVELS
6.05 TANK SIZE :
a) Length
b) Width
c) Water Depth
d) Free Board
6.06 AERATION EQUIPMENT
a) Type:-
b) Number:-
6.07 MECHANICAL AERATOR
a) Brand:-
b) Model:-
6.08 IF BLOWER
a) Brand:-
b) Model:-
c) Air Flow Distribution:-
d) No of diffuser used:-
e) Diffuser Piping/Spacing:-
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NC
6.09 ANOXIC TANK
a) Tank Size:-
b) Mixer Brand & Model:-
6.10 MLSS PUMPS
6.11 RC STRUCTURES
6.12 DO METERS
6.13 ACCESS / WALKWAY / PALTFORM / HANDRAILS
6.14 HANDRAIL
6.15 LIFTING FACILITY
6.16 CHAIN / GUIDE RAILS
6.17 CONTROL VALVE / PIPING
6.18 PIPE JOINTS / SUPPORT
6.19 PIPING MARKING
6.20 DIFFUSERS / ACCESSIBILITY
6.21 WEIR
6.22 OPERABILITY
6.23 HEALTH & SAFETY
6.24 OTHERS
7.0 ROTATING BIOLOGICAL FILTER
7.01 DRAWING NUMBER: ________________
7.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
7.03 QUALITY OF CONSTRUCTION
7.04 DIMENSIONS AND LEVELS
7.05 MOTORS
7.06 MOUNTING
7.07 BEARING / COUPLING / SHAFTS
7.08 DISC TYPE
7.09 PUMPS AND CONTROL
7.10 CHANNELS AND PIPEWORK
7.11 OPERABILITY
7.12 HEALTH & SAFETY
7.13 OTHERS
8.0 BIOLOGICAL FILTER
8.01 DRAWING NUMBER: ________________
8.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
8.03 QUALITY OF CONSTRUCTION
8.04 DISTRIBUTION ARM
8.05 MEDIA
8.06 PUMPS AND RECYCLE
8.07 CHANNELS AND PIPEWORK
8.08 MOTORS, SHAFTS AND BEARINGS
8.09 BIOFILTER FEEDING SUMP
8.10 AIR CIRCULATION
8.11 ACCESS / WALKWAY / PALTFORM / HANDRAILS
8.12 DIMENSION & LEVELS
8.13 OPERABILITY
8.14 HEALTH & SAFETY
8.15 OTHERS
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NC
9.0 SEQUENCING BATCH REACTOR
9.01 DRAWING NUMBER: ________________
9.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
9.03 QUALITY OF CONSTRUCTION
DIMENSION & LEVELS
DIAMETER (CIRCULAR)
SIDE WATER DEPTH
HOPPER DEPTH
HOPPER SLOPE
BOTTOM WIDTH
NO OF HOPPER
9.04 DIMENSION & LEVELS
WEIR LOADING RATE
9.05 AERATION EQUIPMENT
a) Type:-
c) Settle ________ min
9.08 PLC
a) Brand:-
b) Model:-
9.09 DECANTER
a) Type:-
b) Brand:-
c) Model:-
d) Weir Length:-
9.10 PIPING /JOINTS / SUPPORTS
9.11 VALVES
9.12 D.O. METERS
9.13 ACCESS / PLATFORM / WALKWAY / HANDRAILS
9.14 OPERABILITY
9.15 HEALTH & SAFETY
9.16 OTHERS
10.0 CLARIFIER
10.01 DRAWING NUMBER: ________________
10.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
10.03 QUALITY OF CONSTRUCTION
10.04 DIMENSION & LEVELS
10.05 WEIR / BAFFLE INSTALLATION
10.06 RETURN SLUDGE PUMPS
a) Pumps Type:-
b) Brands & Model:-
c) No of Pump:-
d) If Air Lift: Valve/Piping
10.07 SLUDGE RETURN PIPING AND VALVE
10.08 SCRAPPER / MECHANISM / MOTOR
a) Type:-
b) Brand:-
c) Model:-
10.09 SKIMMER PUMP / PIPING
10.10 SCUM BOX / REMOVAL
10.11 LIFTING FACILITY
10.12 PLATFORM / WALKWAY / ACCESS
10.13 RC STRUCTURES
10.14 HANDRAIL
10.15 EFFLUENT WEIR (LENGTH)
10.16 EFFLUENT CHANNEL
10.17 OPERABILITY
10.18 HEALTH & SAFETY
10.19 OTHERS
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NC
11.0 HOLDING TANK / STORAGE TANK
11.01 DRAWING NUMBER: ________________
11.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
11.03 QUALITY OF CONSTRUCTION
11.04 DIMENSION & LEVELS
11.05 DESLUDGING PUMP PIPING
11.06 LIFTING DEVICE
11.07 COVERS
11.08 HANDRAIL / WALKWAY / PLATFORM
11.09 SUPERNATANT OVERFLOW
11.10 TANKER ACCESS
11.11 DESLUDGING PUMPS
11.12 RC STRUCTURES
11.13 LEVEL CONTROL
11.14 WATER SUPPLY / TAP POINT
11.15 OPERABILITY
11.16 HEALTH & SAFETY
11.17 OTHERS
12.0 SLUDGE TREATMENT
12.01 DRAWING NUMBER: ________________
12.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
12.03 QUALITY OF CONSTRUCTION
12.04 DIMENSION & LEVELS
12.05 DRYING BED / MEDIA DEPTH
a) Sand
b) Aggregrate
c) Gravel
d) Splash Pad
e) Stop Log
f) Piping and Valves
12.06 THICKENER
a) Type:-
b) Brand:-
c) Numbers:-
12.07 MECHANICAL DEWATERING
a) Type:-
b) Brand:-
c) Numbers:-
12.08 SLUDGE TRANSFER PUMPS
a) Type:-
b) Brand:-
c) Numbers:-
12.09 FILTRATE PUMP / PIPING / SUMPS / RETURN
12.10 CONVEYOR
12.11 PIPING JOINTS / SUPPORT
12.12 SLUDGE STORAGE FACILITY
12.13 RC STRUCTURES
12.14 WATER SUPPLY / TAP POINT
12.15 ACCESS / WALKWAY / PALTFORM / HANDRAILS
12.16 OPERABILITY
12.17 HEALTH & SAFETY
12.18 OTHERS
COMMENTSNO. DESCRIPTIONSATISFACTORY
C NC
13.0 DIGESTER
13.01 DRAWING NUMBER: ________________
13.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
13.03 QUALITY OF CONSTRUCTION
13.04 DIMENSION & LEVELS
13.05 TYPE: AEROBIC / ANAEROBIC
13.06 TANK SIZE
13.07 AERATOR / MIXER
a) Number:-
b) Brand:-
c) Model:-
13.08 PIPING / VALVES
13.09 ACCESS / WALKWAY / PALTFORM / HANDRAILS
13.10 STRUCTURES
13.11 OPERABILITY
13.12 HEALTH & SAFETY
13.13 OTHERS
13.0 M & E CHECKLIST
13.01 LIFTING / FITTING
TNB POWER SUPPLY
TNB METER AND METER PANEL
STANDBY GENERATOR SET (>20,000PE)
13.02 MAIN SWITCHBOARD
MAIN ISOLATOR F/S, S/F, SWITCHGEAR (ACB, MCCB,
ELCB, ETC)
POWER AND LIGHTING DISTRIBUTION BOARD
MAIN VOLTMETER
MAIN AMMETER
SUB-MAIN ISOLATOR F/S, S/F, MCCB, ETC
PHASE SEQUENCE RELAY
POWER FACTOR METER 100AMPS
ALARM LIGHT / BEACON LIGHT
13.03 SWITCHBOARD AND MOTOR CONTROL PANEL
HOUSING / PANEL BOARD
ISOLATOR SWITCH
SWITCHGEAR (MCCB, MCB, ETC)
14.16 OTHERS
15.0 FLOW MEASUREMENT
15.01 DRAWING NUMBER: ________________
15.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
15.03 QUALITY OF CONSTRUCTION
15.04 DIMENSION & LEVELS
15.05 MEASUREMENT / EQUIPMENT TYPE:
15.06 ACCESS / WALKWAY / PALTFORM / HANDRAILS
15.07 FIXED WEIRS / FLUMES
15.08 INSTRUMENTATION
15.09 CALIBRATION
15.10 OPERABILITY
15.11 HEALTH & SAFETY
15.12 OTHERS
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NC
16.0 GENERAL
16.01 DRAWING NUMBER: ________________
16.02 COMPLIANCE WITH DRAWINGS AND SPECIFICATION
16.03 QUALITY OF CONSTRUCTION
16.04 DIMENSION & LEVELS
16.05 EXTERNAL ACCESS / SERVICE ROAD
16.06 PARKING AREA
a) Tankers ______ nos
a) Car ______ nos
a) Motorcycle ______ nos
16.07 PERIMETER FENCING / GATE
16.08 PERIMETER DRAIN
16.09 FUNGUS RESISTANCE PAINTING / GREEN & BLUE STRIPE
16.10 WATER SUPPLY / TAP POINT & 30 m HOSE
16.11 WASHROOM / TOILET FACILITIES
16.12 COVERS / GRATING FOR SUMPS
16.13 WATER METER
16.14 TNB METER
16.15 GUARD ROOM (IF APPLICABLE)
16.16 COMPOUND LIGHTING _______ NOS
16.17 WARNING SIGNAGE
16.18 FIRE EXTINGUISHER _______ NOS
16.19 LANDSCAPING
a) Boundary Hedges - species
b) Grass
16.20 HOUSE KEEPING
16.21 BUFFER ZONES
16.22 INTERNAL ROAD
a) Width / Turning Radius
b) Thickness
16.23 KEYS - 2 SETS
16.24 SPARE PARTS
16.25 CIRCUIT / PROCESS FLOW & EMERGENCY SAFETY DIAGRAMS
16.26 OVERALL BUILDING / SUPERSTRUCTURES
16.27 FIRST AID KIT
16.28 MESS FACILITIES (IF APPLICABLE)
16.29 OTHERS
17.0 MECHANICAL AND ELECTRICAL
17.01 ELECTRICAL SUPPLY
TNB Power Supply
(If no supply, Developer to liaise with TNB)
(Generator if necessary)
TNB Meter and Meter Panel
(Near fence / gate)
(For 100A installation flush to the fence / gate) kWh Meter Reading:
17.02 MAIN SWITCHBOARD
Main Isol F/S, S/F, Switchgear (ACB, MCCB, ELCB, etc)
(Approved & Lockable Type): < 100 Amps - 10 kA
> 100 Amps < 1,200 Amps - 43 kA
Power and Lighting Distribution Board (DB)
(Check on functional)
Main Voltmeter
(Correct Type and Range - check for operational)
Main Ammeter
(Correct Type and Range - check on operational)
Sub-Main Isol F/S, S/F, MCCB, etc
(Correct Type and Range - check on operational)
Phase Sequence Relay c/w Protection Relay
(Check on operational)
Power Factor Meter > 100 Amps
(Check on operational)
COMMENTSSATISFACTORY
NO. DESCRIPTION
C NC17.03 SWITCHBORAD AND MOTOR CONTROL PANEL
Housing / Panel Board / Compartmentalised
(Approved type - check on compliance)
Isolator Switch
(Approved and Lockable Type - check on functional)
Switchgear (MCCB, MCB, etc)
(Correct Type and Range - check on operational)
Individual Ammeter (Correct Type and Range)
(Check on operational)
Hour Run Counter
(Check on operational)
Control Fuses / MCB
(Check on functional)
Incoming and Outgoing Cable; PVC ARM. Cable Installation
(Used : Cable Tray , Conduit , Trunking , Underfloor duct)
Motor Rating Fuses / MCCB
(Motor Starting Fuse - check rating)
Man / Off / Auto Selector Switch
(Check on functional)
1 / 0 / 2 Selector Switch
(Check on functional)
Push Button Switches (Start, Stop, Alarm Reset P.B)
(Check on functional and test)
Signal Lighting (On, Off, Trip, Alarm, etc)
(Check on functional)
PLC System and Accessories
(Ladder diagram, console, E-prom, battery, etc..)
17.04 PUMP AUTO MODE SYSTEM
Step-down Transformer (AC / DC / 24V / 12V)
(Check on Type and Output Voltage)
Auto Changeover Relay
(Check Type - Latching / Rotary)
Multipurpose / Auxiliary Relay (11 Pin / 8 Pin / Boths)
(Check Type and on functional)
Level Regulator
(Type : Float S / Electrodes / Multi Trodes / Ultrasonic / Others - please specify)
Type & Model : ………………………………….…..
(Check on functional)
Alarm System (Type: Beacon Light / Siren / Others)
(Check on functional)
17.05 PUMPING STATION & SCREEN CHAMBER
Screen Chamber / Screening System
(Check Type: Bar / Basket / Mechanical / Others)
Lifting Facilities (Screen Chamber)
(Check Lifting Structures, Beam, Lifting Davit, etc)
[SWL: ………………..…………]
Pump Sump / Wet Well
(Check condition and cleanliness)
Lifting Facilities (Pumping Station)
(Check Lifting Structures, Beam, Lifting Davit, etc)
[SWL: ………………..…………]
Note : Greater than 4 tons design calculation and certificate of fitness required
(Check Type - Electrical / Manual)
Waterproof Lighting. ( No. of Unit: ……..……/…..……. Watt)
( Fluorescent / Globe / Spotlight)
( Check on functional)
Pump Protection Sensor (If Provided)
(Ensure connection to control circuit)
Raw Sewage Pump ( No. of Unit: ……..…… x ……….... kW )
(Check Type : Vertical Dry Pit / Submersible WW / DW)
(Carry Out Operational Test)
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NCAMPS HRC
Sewage Pump No. 1
Sewage Pump No. 2
Sewage Pump No. 3
Sewage Pump No. 4
Sewage Pump No. 5
Sewage Pump No. 6
Starters (DOL / S-D / Autotrans / Others)
(Check components, carry out functional test)
Testing: Main Contractors
Delta/Transformer Contractor
Star Contractor
Autotransformer
Thermal Overload Relay
(Check Correct Setting)
Setting: DOL Starter - 100% FL Current
S-D Starter - FL Current x 0.58
Autotransformer Starter - 100% FL Current
Others : To Clarify
Electrical Power & Control Circuit Wiring
(Check Internal Wiring / Color Coding / Circuit Numbering, etc)
Pipe Works and Valves
(Check Pipeworks and Fitting Arrangement)
Suction and Discharge Pipes
Suction and Discharge Gates Valves
Check Valves / Non-Return Valves
(Check Type - Approved and Correct Type)
Dewatering Sump Pump (Dry Well)
(Check Type and Discharge Piping Arrangement)
0.75 - 1.5 kW Automatic Dewatering Pump
Discharge pipe above Wet Well flood / high water level.
17.06 PRE-TREATMENT EQUIPMENT
Macerator/Muncher/Communitor (No. of Unit …………………)
(Visual Inspection, installation and mounting, operational test)
Fine / Micro Screen
(Visual Inspection, installation and mounting, operational test)
Grit Remover System
(Visual Inspection, installation and mounting, operational test)
Grit Pump (No. of Unit: ……………………… x …………. kW)
(Check on operational)
Grease Remover System
(Visual Inspection, installation and mounting, operational test)
Penstock (No. of Unit: ……………………….)
(Visual Inspection, installation and mounting, operational test)
17.07 AERATION EQUIPMENT & ACCESSORIES
Aeration Equipment (No. of Unit …………………… x …………. kW)
(Type : Blower / Aerator / Submersible Mixer / Ejector / Other Please Specify)
Type: ………………………………………… Model: ………………………………
(Visual Inspection, installation and mounting, operational test)
AMPS HRC
Equip. No. 1
Equip. No. 2
Equip. No. 3
Equip. No. 4
Equip. No. 5
Equip. No. 6
Starters (DOL / S-D / Autotrans / Others)
(Check on components, carry out functional test)
Testing: Main Contractors
Delta/Transformer Contractor
Star Contractor
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NCAutotransformer
Thermal Overload Relay
(Check Correct Setting)
Setting: DOL Starter - 100% FL Current
S-D Starter - FL Current x 0.58
Autotransformer Starter - 100% FL Current
Electrical Power & Control Circuit Wiring
(Check on Internal Wiring / Color Coding / Circuit Numbering, etc)
Auto System Setting (Type: Timer / Others)
(Check on operational setting)
Diffusers (Approx. No. of Unit: …………………….. pcs)
(Visual Inspection, installation and mounting, operational test)
Pipe Works, Valves and Fitting
(Check Pipeworks and Fitting Arrangement & Specification)
Suction and Silencer System
Discharge Pipe Gates Valves
Check Valves / Non-Return Valves
(Check Type - Approved and Correct Type)
Safety Valve (For Blowers)
(Check on functional and operational setting)
17.08 SECONDARY CLARIFIER
Sludge Pump (RAS) (No. of Unit ………………….. x ………………. kW)
(Type : Submersible / Airlift / Other Please Specify)
Type: ………………………………………… Model: ………………………………
(Size of Blower: …………………. x ………………. kW)
(Visual Inspection, installation and mounting, operational test)
AMPS HRC
Sludge Pump No. 1
Sludge Pump No. 2
Sludge Pump No. 3
Sludge Pump No. 4
Sludge Pump No. 5
Sludge Pump No. 6
Starters (DOL / S-D / Autotrans / Others)
(Check on components, carry out functional test)
Thermal Overload Relay
(Check on Correct Setting)
Electrical Power & Control Circuit Wiring
(Check Internal Wiring / Color Coding / Circuit Numbering, etc)
Auto System Setting (Type: Timer / Others)
(Check on operational setting)
Pipe Works, Valves and Fitting
(Check Pipeworks and Fitting Arrangement)
Safety Valve (For Blowers)
(Check on functional and operational setting)
Scum Skimmer (No. of Unit …………………….. x ……………. kW)
(Type : Submersible / Airlift / Other Please Specify)
Type: ………………………………………… Model: ………………………………
(Size of Blower: …………………. x ………………. kW)
(Visual Inspection, installation and mounting, operational test)
AMPS HRC
Scum Pump No. 1
Scum Pump No. 2
Starters (DOL / S-D / Autotrans / Others)
(Check on components, carry out functional test)
Clarifier Mechanical Scrappers
(Assembly To Inspect: Centre Bearing / Turn Table / Gearbox / Drive Motor / Gear Reducer / Torque Gauge)
(Visual Inspection, installation and mounting, operational test)
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NCAMPS HRC
Clarifier No. 1
Clarifier No. 2
Starters (DOL / S-D / Autotrans / Others)
(Check on components, carry out functional test)
17.09 SLUDGE HOLDING TANK
Sludge Pump (WAS) (No. of Unit ………………….. x ………………. kW)
(Type : Submersible / Airlift / Other Please Specify)
Type: ………………………………………… Model: ………………………………
(Size of Blower: …………………. x ………………. kW)
(Visual Inspection, installation and mounting, operational test)
AMPS HRC
Sludge Transfer Pump No. 1
Sludge Transfer Pump No. 2
Sludge Transfer Pump No. 3
Sludge Transfer Pump No. 4
Starters (DOL / S-D / Autotrans / Others)
(Check on components, carry out functional test)
Thermal Overload Relay
(Check on Correct Setting)
Auto System Setting (Type: Timer / Manual / Others)
(Check on operational setting)
Pipe Works, Valves and Fitting
(Check Pipeworks and Fitting Arrangement)
Diffusers (Approx. No. of Unit: …………………….. pcs)
(Visual Inspection, installation and mounting, operational test)
Sludge Discharge Coupler 4" (Female Discharge)
(Check on functional)
17.10 EARTHING & LIGHTNING PROTECTION SYSTEM
Lighting Arrestor (Impedance Less than 5 Ohms)
Earthing System (Impedance Less than 1 Ohms)
Pre Cast Chamber ( 6 meter apart)
17.11 FLOW METER (IF PROVIDED)
(Visual Inspection, installation and mounting, operational test)
17.12 OTHER M&E ITEM
Artifical Respiration Boards
(Needs to be displayed as required)
Rubber Mat
(Comply with requirement minimum of 12 mm thickness)
Panel Heater
(For floor standing and outdoor panel)
BAHAYA" & "DILARANG MASUK Notice
(Displayed at Entrance / Door)
Capacitor/Capacitor Bank (If provided)
(Check on requirement (c/w regulator for >150A and functional)
Panel Ventilation
(Check on requirement (for >100A and functional)
Power Points (13A SSO, etc)
(Check on functional)
Lighting System For Blower /Pump Control Room
(Fluorescent, Spotlight, etc)
(Check on functional)
Ventilation System (Wet Well / Dry Well / Pump House)
(Check on requirement (mini. 0.5HP and functional)
Fire Extinguisher (CO2 type of capacity 2.27 kg)
(Check on validity of BOMBA certificate)
Compound Lighting ( No. of Unit:…………:/ ………. Watt)
Type of Control : ( 24 Hr. Timer / Photocell / Others )
(Check on functional)
NO. DESCRIPTIONSATISFACTORY
COMMENTS
C NCSecurity :
Main Gate/Gates Pad Lock
Pump Station Door Lock
Signboard "LOJI PENGOLAHAN KUMBAHAN"
TAMAN …………………………………………
17.13 WATER SUPPLY
Water Supply Available
(Check on serviceable) Water Meter Reading:
17.14 TECHNICAL DOCUMENTATION
Operation and Maintenance Manual - for all equipment
c/w Designed Calculation and Performance Curve
(Check for compliances for all equipment)
Electrical Control / Single Line Drawing
(Check for As Built Drawing)
Treatment Plant and Pump Station Drawing
(Check for As Built Drawing)
Spare Parts for Sewage Pump / Equipment
Minimum Part for Pump:
Mech Seal
Bearing Set
(Check for compliances and for all equipment)
Submission for DOSH Approval
(Check for Akcnowledge Receipt)
NO. DESCRIPTIONSATISFACTORY
COMMENTS
17.15 OTHER PROCESS AND SUPPORT EQUIPMENT
No. Qty
1
2
3
4
5
6
7
8
9
10
17.16 OTHER COMMENTS (PLEASE SPECIFY)
1
2
3
4
5
6
7
8
9
10
(Signature)
Professional Engineer* Licence ContractorY
Name: NameI/C: I/CPE No.: SSD Licence No. :
Expiry Date :
* The Professional Engineer who supervises the works and declares that it is fit for final inspection.Y The Licence shall be valid throughout the period of construction.
FOR OFFICIAL USE ONLY
Date of Inspection :
Signature
1.
2.
3.
4.
5.
6.
7.
Equipment Remarks
Developer ( )
Consultant ( )
Licence Contractor ( )
DGSS's Authorised Representative (IWK)
(Signature)
I/We hereby confirm that we have jointly inspected the sewerage works and confirm that the works are in accordance to JPP requirements and is fit for final inspection and handover. I also understand that by signing these documents, I/we take responsibil
Name
Sewerage Service Department
Attendees from
DGSS's Authorised Representative (IWK)
DGSS's Authorised Representative (IWK)