chevron’s power performance monitoring solution presented by: ken yoss roy blanco

26
Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

Upload: noreen-pierce

Post on 18-Dec-2015

222 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

Chevron’s Power Performance Monitoring Solution

Presented by:Ken YossRoy Blanco

Page 2: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

2

Agenda

–Power Support Center Overview–PSC Performance Monitoring Solution–PSC Workflow Process–El Segundo Refinery CHP Overview–Case Studies–Q&A

Page 3: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

Power Support Center Capabilities

3

Monitoring & Diagnostics

Center

Monitoring & Diagnostics

Center

Power Solutions Network Business planning support Operations philosophy and tools Maintenance philosophy and tools Engineering and technical solutions Performance monitoring/trip analysis Training/OC development Equipment modifications and upgrades

Page 4: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

4

Power Support Center Organization

Major Inspection

Management

PerformanceMonitoring & Diagnostics

TurbineParts

QA/QCManagement:

Turbine Metallurgist

Expertise

PIAdministration

EngineeringAnalysis

ProjectManagement

O&M Philosophy & Tools: OE Compatible

Equipment Assessment &

Upgrades

Oil & Gas Operations

Refineries

BusinessPlan

Development

KPITracking

Page 5: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

PSC Performance Monitoring Solution

OSIsoft EA for data infrastructure • ProcessBook• Datalink• To come:

o MDo RT Webparts via SharePointo AF2.0 & Notificationso Etc.

SmartSignal for predictive analytics• SmartSignal EPI*Center• SmartSignal participates in the performance monitoring portion of the

weekly PSC/ES teleconference.• To come:

o Transition to Chevron hosted, monitored and maintained instance of EPI*Center.

Page 6: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

6

El Segundo Refinery CHP OverviewLocated on the Pacific coast in El Segundo, CA just south of LAX.

• 3 - Cogeneration Trains (GE Frame 6Bs, dual pressure HRSGs), + 170,000 hrs.• 1 - Steam Turbine Generator• 1 - Auxiliary Boiler• 2 - Sets of BFWPs

Page 7: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

7

Case Study: High Steam Drum Conductivity

Page 8: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

8

Case Study: High Steam Drum Conductivity

Page 9: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

9

Case Study: High Steam Drum Conductivity

Page 10: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

10

Case Study: High Steam Drum Conductivity

Page 11: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

11

Case Study: High Steam Drum Conductivity

Page 12: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

12

Case Study: High Steam Drum Conductivity

Value delivered:• Long term reliability• Confirmation of equipment issues

Page 13: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

13

PSC Performance Monitoring Workflow

APC

PSC Ops Engineer

Weekly Calls

Summary Reports

SmartTrackingPortal & Log

EmailDirect Calls

PlantEngineer

Chevron Power Facilities

PSC Ops Engineer

OSIsoftEA

Page 14: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

14

Case Study: NH3 Over Injection

11/7/2008: PSC received phone call from SmartSignal APC informing of a NH3/air ratio High Rule posting on the WatchList.

Page 15: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

15

Case Study: NH3 Over Injection

Page 16: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

16

Case Study: NH3 Over Injection

16

Page 17: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

17

Case Study: NH3 Over Injection

17

Value delivered:• Decrease in NH3 release

to atmosphere• $ decrease in NH3 purchases• Operational procedures/training modified

Page 18: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

18

PSC Performance Monitoring Workflow

APC

PSC Ops Engineer

Weekly Calls

Summary Reports

SmartTrackingPortal & Log

EmailDirect Calls

PlantEngineer

Chevron Power Facilities

PSC Ops Engineer

OSIsoftEA

Page 19: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

19

Case Study: NH3 Control Valve

Page 20: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

20

Case Study: NH3 Control Valve

Page 21: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

21

Case Study: NH3 Control Valve

Page 22: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

22

Case Study: NH3 Control Valve

Page 23: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

23

Case Study: NH3 Control Valve

Path forward:• Find optimal NOx ppm setpoint for SCR efficiency and operability• Upgrade the SCR system

Page 24: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

24

PSC Performance Monitoring Workflow

APC

PSC Ops Engineer

Weekly Calls

Summary Reports

SmartTrackingPortal & Log

EmailDirect Calls

PlantEngineer

Chevron Power Facilities

PSC Ops Engineer

OSIsoftEA

Page 25: Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

25

Performance Monitoring Value– PI (1 year)

• Confirmed – 3 trip avoidances• Potential – 6 trip avoidances• Equipment Abnormalities – Over 70 abnormalities monitored - - - > long term reliability

– SmartSignal (3 months)

• Equipment Abnormalities - 14 identified that either returned to normal or communications to plant lead to corrective actions. - - - > long term reliability

• Instrumentation Issues – Over 35 identified resulting in a potential increase of plant reliability. - - - > long term reliability

• Efficiency - 2 efficiency catches resulting in the scheduling of a water wash and NH3 injection reduction.

– Culture Change • PSC has noticed plant personnel are more cognizant of equipment abnormalities that are

not yet urgent.• Operational procedures have been modified to prevent less than optimal operational

conditions.