chs standard house plans
TRANSCRIPT
LIVING = 400.00 SF.PORCH = 0.00 SF.TOTAL = 400.00 SF.
LIVING = 484.00 SF.PORCH = 50.00 SF.TOTAL = 534.00 SF.TOTAL = 1068.00 SF.
LIVING = 627.00 SF.PORCH = 0.00 SF.TOTAL = 627.00 SF.
LIVING = 718.00 SF.PORCH = 42.67 SF.TOTAL = 760.67 SF.
2-BEDROOM W/ PORCH
DATE: MARCH 29, 2010
Factory: 1842 West 169th St., Unit B, Gardena, CA 90247Phone: (310) 635-8263 Fax: (310) 635-8265
E-mail Add: [email protected]
CHS STANDARD HOUSE PLANS
2-BEDROOM
3-BEDROOM
AREA
2300
PLAN NO. DESCRIPTION
2469
3-BEDROOM W/ PORCH
2599
2470
Plan No. 2300
Plan No. 2469
New Hope City, HAITI Plan No.: 2469 Haiti Development Group Sq. Ft. Living: 534 CHS PRODUCT DESCRIPTION Sq. M. Living: 49.62
March 29, 2010, - 4:00 PM
CHS STRUCTURAL KIT CONTENTS: 1. EXTERIOR WALL PANELS
Sill Plates 4” 16 to 14 gauge galvanized steel. Sill washers 3” diameter ¼” thick spaced 3 feet apart around the perimeter. Steel frame structure 4” x 18 gauge studs galvanized screwed together with No. 10 screws x 5/8 all connections (zinc plated corrosion resistant). Shear board with all necessary screws and hardware and electrical holes pre-punched, ready for electricity in the panel. Ready for fiber cement or drywall in interior walls at job site.
OPTION: Insulation for Exterior Wall Panels 2. INTERIOR WALLS
Steel framed structure 4” x 18 gauge galvanized screwed together with No. 10 plated screws x 5/8 at all connection (zinc plated corrosion resistant screws) with all electrical holes pre-punched ready for electrical and wall/fiber cement or drywall at the job site.
3. UTILITY PANELS Steel framed structure 6” x 18 gauge galvanized screwed together with No. 10 screws x 5/8 at all connection (zinc plated corrosion resistant screws) with all electrical holes pre-punched ready for electrical. These walls are the utility plumbing core with all rough plumbing in the core. Add interior fiber cement or drywall board to the wall at the job site.
4. TRUSSES AND LOAD BEAMS
Steel trusses 4” x 16 to 18 gauge galvanized screwed together with No. 10 screws x 5/8 at all connections (zinc plated corrosion resistant screws). All hardware and brackets.
CHS STRUCTURAL KIT CONTENTS: 5. GABLES Built-in the Exterior Wall Panel
6. ROOF PANELS
4” X 18 gauge galvanized steel screwed together with No. 10 screws x 5/8 at all connections (zinc plated corrosion resistant screws). Ready to install Thermal Shield Panel on the roof at the job site. Ready for finished roofing materials – Met-Tile Roofing. Ready for drywall or fiber cement board for interior ceiling at job site.
7. DROP CEILING
All drop ceiling rafters 4” x 20 gauge galvanized steel screwed together with No. 10 screws 5/8 at all connections (zinc plated corrosion resistant screws). All hardware 18 and 20 gauges for drop ceilings. Ready to install Drywall or fiber cement board.
8. HARDWARE
All straps brackets angles and L brackets 20 and 18 gauge galvanized steel. Assortment of screws for assembly of the structure have all the structural approval according to the Uniform Building Code in the United States.
9. ENGINEERING
These houses will have full structural engineering in the United States. The structural calculations will meet seismic 4 earthquake zone and wind loads. Ready to work with your corresponding engineers in your country.
10. CONTAINER LOADING (SEE NOTE)
CHS will load container at CHS’ plant with your representatives monitoring the loading of the unit, and their signature confirming contents in the containers.
TOTAL price for CHS Structural Kit for (1) unit US $16,997.22 Square Feet: 31.83 Square Meters: 342.49
March 29, 2010 ___________________________ _______________________ Tony Borges, CHS President Date
This is valid for 45 days
Plan No. 2599
Plan No. 2470