ciclo rotas centro

103

Upload: arlindo-pereira

Post on 29-Jun-2015

186 views

Category:

Design


0 download

DESCRIPTION

Apresentação do Ciclo Rotas Centro no evento Urban data: From fetish object to social object da LSECities http://lsecities.net/media/objects/events/urban-data-from-fetish-object-to-social-object

TRANSCRIPT

Page 1: Ciclo Rotas Centro
Page 2: Ciclo Rotas Centro

Bicycle Mobilityin Rio de Janeiro in Rio de Janeiro downtowndowntown.

Arlindo Pereira, March 2014.

Page 3: Ciclo Rotas Centro

Bicycles are already a reality in Rio de Janeiro's Downtown, despite the lack of cycleways.

Page 4: Ciclo Rotas Centro

The challenge is how to deal with the new situations that arise, with quality and safety for everyone and coherence with local and

user needs.

Page 5: Ciclo Rotas Centro
Page 6: Ciclo Rotas Centro

Rio de Janeiro

Page 7: Ciclo Rotas Centro

Rio de Janeiro downtown

Page 8: Ciclo Rotas Centro

Tram Network (planned for 2016)

Page 9: Ciclo Rotas Centro

Tram + Bus Rapid Transit

Page 10: Ciclo Rotas Centro

And this is what we have had of cycleways!

Page 11: Ciclo Rotas Centro

The original idea was a petition for cycleways in downtown

But why a petition, or a protest, which would probably be ignored, if we can do it better?

Civil Society – NGOs and Cyclists – created acycle network project for

Rio de Janeiro's downtown area

Page 12: Ciclo Rotas Centro

Methodology

Page 13: Ciclo Rotas Centro

Place with data showInvite interested people

Show existent projects and ideas

Page 14: Ciclo Rotas Centro
Page 15: Ciclo Rotas Centro

Centro.

MAM Mauá

Page 16: Ciclo Rotas Centro

Centro.

Pedala Rio - IPP

Page 17: Ciclo Rotas Centro

Centro.

Saens Peña – Praça XV

Page 18: Ciclo Rotas Centro

Centro.

Porto Maravilha

Page 19: Ciclo Rotas Centro

Centro.

Bike Rio

Page 20: Ciclo Rotas Centro

Centro.

Rio Branco

Page 21: Ciclo Rotas Centro
Page 22: Ciclo Rotas Centro
Page 23: Ciclo Rotas Centro
Page 24: Ciclo Rotas Centro
Page 25: Ciclo Rotas Centro
Page 26: Ciclo Rotas Centro
Page 27: Ciclo Rotas Centro
Page 28: Ciclo Rotas Centro
Page 29: Ciclo Rotas Centro

“Olympic Routes” - scheduled for 2016.

Page 30: Ciclo Rotas Centro
Page 31: Ciclo Rotas Centro

Workshop with (big, paper) maps

Place with tables

Asking for online contributions, and mixing them later

Page 32: Ciclo Rotas Centro

Three groups:

- G1 people who use bicycle in the area,

- G2 people who use bicycle somewhere else and would like to use in the area,

- G3 people who don't use bicycle, but would like to.

Four maps:

- M1 Routes used today and desired,

- M2 Origin/destination,

- M3 Bicycle parkings, bicycle shops and support equipment (such as showers, air pumps) existent and desired,

- M4 Existent projects superposed to identify conflict points and connections.

Page 33: Ciclo Rotas Centro

Each group worked for 30 minutes on each map.

Page 34: Ciclo Rotas Centro
Page 35: Ciclo Rotas Centro

Next step, debating the work done and defining points for the support countings.

Page 36: Ciclo Rotas Centro

Now it's time to superpose the maps produced on the workshop with posterior contributions to consolidate the most used and

desired paths.

Page 37: Ciclo Rotas Centro

Antonio

Page 38: Ciclo Rotas Centro

Diogo

Page 39: Ciclo Rotas Centro

Douglas

Page 40: Ciclo Rotas Centro

Edu

Page 41: Ciclo Rotas Centro

Marcos

Page 42: Ciclo Rotas Centro

Marcus

Page 43: Ciclo Rotas Centro

Norton

Page 44: Ciclo Rotas Centro

Tatiana

Page 45: Ciclo Rotas Centro

Thiago

Page 46: Ciclo Rotas Centro

Vinicius

Page 47: Ciclo Rotas Centro

Routes used today

Page 48: Ciclo Rotas Centro

Cleaning the routes the only appeared once

Page 49: Ciclo Rotas Centro

Superposing with the workshop map

Page 50: Ciclo Rotas Centro

Desired routes

Page 51: Ciclo Rotas Centro

Cleaning the routes that only appeared once

Page 52: Ciclo Rotas Centro

Superposing with the workshop map

Page 53: Ciclo Rotas Centro

Used today and desired

Page 54: Ciclo Rotas Centro

Superposing with the workshop map

Page 55: Ciclo Rotas Centro
Page 56: Ciclo Rotas Centro
Page 57: Ciclo Rotas Centro

Workshop result

Page 58: Ciclo Rotas Centro

Simplified workshop result

Page 59: Ciclo Rotas Centro

Downtown of the future

Page 60: Ciclo Rotas Centro

Existent projects superposed to the routes created

Page 61: Ciclo Rotas Centro

“Olympic Routes” superposed to the routes created.

Page 62: Ciclo Rotas Centro

Work

Page 63: Ciclo Rotas Centro

Culture and Leisure

Page 64: Ciclo Rotas Centro

Commerce and Services

Page 65: Ciclo Rotas Centro

Schools

Page 66: Ciclo Rotas Centro

Subway Stations

Page 67: Ciclo Rotas Centro

Mass Transit Stations

Page 68: Ciclo Rotas Centro
Page 69: Ciclo Rotas Centro

Future Bicycle Sharing Stations

Page 70: Ciclo Rotas Centro

Support Counts(counting cyclists for 12h – 7h-19h)

Page 71: Ciclo Rotas Centro

From the 3,000 grand total,only 3% were women :(

Page 72: Ciclo Rotas Centro

40% of the bicycles in downtown area are of services or delivery1 in every 4 bicycles in downtown area are cargo trikes.

Page 73: Ciclo Rotas Centro

Given the big number of trikes found out in downtown area, the cycleway's width must be adequated to these vehicles.

Page 74: Ciclo Rotas Centro

Olympic Routes + Ciclo Rotas Centro

Page 75: Ciclo Rotas Centro

Ciclo Rotas Centro

Page 76: Ciclo Rotas Centro

Field work!

Page 77: Ciclo Rotas Centro

We collected data in 100 points of downtown area, looking for every single segments of the streets.

Page 78: Ciclo Rotas Centro
Page 79: Ciclo Rotas Centro
Page 80: Ciclo Rotas Centro

Different types of bicycle infrastructure

Page 81: Ciclo Rotas Centro
Page 82: Ciclo Rotas Centro
Page 83: Ciclo Rotas Centro
Page 84: Ciclo Rotas Centro

Cycleways

Copacabana

Page 85: Ciclo Rotas Centro

Cyclelanes

Xavier da Silveira street - Copacabana

Page 86: Ciclo Rotas Centro

Urca, Rio de Janeiro

Sharrows

Page 87: Ciclo Rotas Centro

33km for £1.5M

Page 88: Ciclo Rotas Centro

Finished the field work,a new meetup to validate the results.

Page 89: Ciclo Rotas Centro
Page 90: Ciclo Rotas Centro

Study consolidation

Page 91: Ciclo Rotas Centro

Study consolidation

Page 92: Ciclo Rotas Centro

Publicating the work

Page 93: Ciclo Rotas Centro

Exposing the work

Page 94: Ciclo Rotas Centro

Our work in newspapers

Page 95: Ciclo Rotas Centro

Exposing the work in a parking lane that would become is now a cycleway

Page 96: Ciclo Rotas Centro

The project as a book

Page 97: Ciclo Rotas Centro

What is already built

Page 98: Ciclo Rotas Centro
Page 99: Ciclo Rotas Centro

Ciclo Rotas Centro - Rio

Page 100: Ciclo Rotas Centro

Ciclo Rotas Centro - Rio

Page 101: Ciclo Rotas Centro

Ciclo Rotas Centro - Rio

Page 102: Ciclo Rotas Centro

Ciclo Rotas Centro - Rio

Page 103: Ciclo Rotas Centro

[email protected]

Thank you!