cicloq

30
Non-motorized mobility in Quito By Diego Puente Corral [email protected]

Upload: pablo-palacios

Post on 19-Jun-2015

489 views

Category:

Sports


0 download

DESCRIPTION

Presentación de Ciloq – Alcaldía de Quito sobre la ciclo vía en la ciudad.Creado en: Quito, septiembre 2007

TRANSCRIPT

Page 1: Cicloq

Non-motorized mobility in Quito

By Diego Puente [email protected]

Page 2: Cicloq

• 2.800 m.a.s.l.• More than 300

thousand cars• 2 million

inhabitants• Contamination

issues

QUITO

Page 3: Cicloq

• Air Pollution: generates a loss of $34 million yearly (Jurado y Southgate, 1999)

• Accidents: 7,464 fatalities in last six years

• $180 million in material losses per year. (El Comercio 04 marzo 2006)

• Less public space• Noise• Aggression towards bikers,

handicapped and pedestrians• Traffic Jams

Impacts

Page 4: Cicloq

The Most Vulnerable:

ElderlySick ChildrenPregnant womenPeople that work in the streets (Street sellers, policemen, pedestrians)

AIR QUALITY = LIFE QUALITY

0 20 40 60 80 100 120 140

Tráfico vehicular vehículos a gasolina

Tráfico vehicular vehículos a diesel

Vegetación

Industrias combustión térmicas

Industrias combustión otras

Industrias proceso

Disolventes ámbito doméstico comercial

Estaciones de servicios

Rellenos sanitarios

Tráfico aéreo

Incendios forestales

Asaderos

Consumo doméstico comercial GLP

Ladrilleras

Erosión y resuspensión de vías no pavimentadas

Canteras

kt a-1

NOx

COV

CO

SO2

MP

Sources

Page 5: Cicloq

NATURAL SETTING

• Altitude (2800 masl) Less efficient

combustion

• Topography Less wind

• Equatorial High radiation levels

• Active volcanos High natural emissions (2

in last 6 years)

Page 6: Cicloq

Motor use ratio

# of active vehicles per year- (Total DMQ) and motor use ratio (# cars/1000inhab), 1982 - 2006

0

50000

100000

150000

200000

250000

300000

350000

40000019

82

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

0

20

40

60

80

100

120

140

160

180

200

Tot_DMQ

#vehic/1000hbt

Page 7: Cicloq

1996: Urban bikers take over the streets the last Friday of every month

(Critical Mass)

A CITIZEN PROPOSAL

Page 8: Cicloq

FIRST WAVE

September, 2001: We take to the centro histórico

on bike

Page 9: Cicloq

10 km. - 5 000 bikers

FIRST CICLOPASEO

27th of April, 2003

Page 10: Cicloq

BENEFITS OF THE BICYCLE

• ECOLOGICAL• HUMANE• HEALTHY• ATHLETIC• ECONOMICAL• RECREATIONAL• DEMOCRATIC• INCLUSIVE• SILENT• ACCESIBLE• LIBERATING

Page 11: Cicloq

The Bicycle Today (2007)

Page 12: Cicloq

CORREDOR SUR OCCIDENTALRAMAL SUR ORIENTAL

AMPLIACIÓN TROLE SUR

AMPLIACIÓN ECOVÍA

CORREDOR CENTRAL NORTE

CORREDOR SUR ORIENTAL

RAMAL CENTRAL NORTE

AMPLIACIÓN TROLE NORTE

AMPLIACIÓN CENTRAL NORTE

Ecovía

Metropolitan Transport System

Page 13: Cicloq

SISTEMA METROBUS

SISTEMA TROLEBUS

SISTEMA ECOVÍA

CICLOVÍA

CICLOPASEO

Alternative Transportation in Quito

Page 14: Cicloq

Northern route

Page 15: Cicloq

Parque Alameda

Page 16: Cicloq

El Congreso

Page 17: Cicloq

Park El Ejido

Page 18: Cicloq

Avenue Amazonas

Page 19: Cicloq

Avenue Amazonas

Page 20: Cicloq

Military high school

Page 21: Cicloq

Ministerio de Agricultura

Page 22: Cicloq

Parque La Carolina

Page 23: Cicloq

Puente ciclopeatonal NNUU

Page 24: Cicloq

Iñaquito

CORTE TIPO

Page 25: Cicloq

San Cristóbal – Isla Tortuga

Page 26: Cicloq

Isla Tortuga

Page 27: Cicloq

Cicloparqueaderos

Page 28: Cicloq

Cicloparqueaderos

Page 29: Cicloq

Integración Modal

Page 30: Cicloq

Thanks

Quito, september 2007