TRANSCRIPT
![Page 1: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/1.jpg)
CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY MANAGEMENT 2018
JSW STEEL COATED PRODUCTS LTD, TARAPUR WORKS
AMARDEEP SINGH – ENERGY MANAGER [email protected]
SANJEEV JAHAGIRDAR – MANAGER OPERATIONS [email protected]
Better Everyday
![Page 2: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/2.jpg)
JSW GROUP
STEEL
ENERGY
COATED STEEL
CEMENT
INFRASTRUCTURE
VENTURES
SPORTS
Better Everyday
![Page 3: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/3.jpg)
PROCESS FLOWCHART & PLANT FACILITIES
Hot RollingHR Slitter,
PicklingCold Rolling
Galvanizing,
Galvalume Color Coating
Finishing(Cut to length,
Profiling)
TARAPUR
PLANT
FACILITIES
COLD ROLLING GALVANIZING / GALVALUME COLOR COATING 0.72 MTPA 0.761 MTPA 0.276 MTPA
![Page 4: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/4.jpg)
ENERGY CONSUMPTION MAPPING
Cold Rolling24%
Galvanizing/Galvalume56%
Color Coating20%
Cold Rolling53%
Galvanizing/Galvalume41%
Color Coating5%
Others1%
Electricity (%) Thermal (%)
![Page 5: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/5.jpg)
SPECIFIC ENERGY CONSUMPTION
Parameter Unit FY 2015-16 FY 2016-17 FY 2017-18% Reduction
FY 2016-17 FY 2017-18
Coated Production MT 808062 880121 833694 - -
Utilization % 77.92 84.87 80.39 6.95 4.48
Electrical SEC Kwh/MT 199.12 184.64 193.28 - -
Normalized Electrical SEC kWh/MT 199.12 190.76 186.70 4.20 2.13
Thermal SEC Million kCal/MT 0.2478 0.2382 0.2338 3.86 1.88
199.12190.76 186.70
100
130
160
190
220
2015-16 2016-17 2017-18
Normalized Plant Electricity Energy Consumption (kWh/t)
0.24780.2382 0.2338
0.15
0.18
0.21
0.24
0.27
2015-16 2016-17 2017-18
Plant Thermal Energy Consumption (MkCal/t)
![Page 6: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/6.jpg)
BENCHMARKING
193.28
134.07 137.63
0
50
100
150
200
250
Tarapur Vasind Kalmeshwar
Plant Electricity Energy Consumption (kWh/t)
0.2338
0.2449
0.2505
0.22
0.23
0.24
0.25
0.26
Tarapur Vasind Kalmeshwar
Plant Thermal Energy Consumption (MkCal/t)
0.4000.360 0.369 0.367
0.427
0.000
0.150
0.300
0.450
TPR VSD KLM BSL-K UVL
Plant Energy Consumption (GCal/t)
![Page 7: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/7.jpg)
ROADMAP – ENERGY CONSERVATION & MANAGEMENT
❑ 0.8 MTPA PLTCM
❑ Centralized Cooling Tower System
❑ Waste Heat Recovery – CSD5
❑ 100% LED Lighting
❑ Light Pipes
❑ Level- 2 & 3 Automation
❑ Baseline Energy Consumption – Tinning Complex
❑ Compliance to RPO & PAT Cycle - II
❑ Acid Regeneration Plant – 6400 L/h
❑ Effluent Treatment Plant – 2000KLD
❑ Roof Top Solar Panel
❑ Green Co Rating
❑ Tarapur MIDC Waste Management
❑ Skill Development in Roof Top Solar panel
❑ RE Group Captive Power Project
❑ Solar Pump in Check Dam
![Page 8: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/8.jpg)
ENERGY CONSERVATION PROJECTS – FY15-16
Sr. No. Energy Conservation Measures
Annual Energy SavingAnnual Saving
Investment & ROI
Electricity(Lakh kWh)
Thermal(M kCal)
Rs Lakhs Rs Lakhs Months
1 Power Factor Improvement of Captive Power Plant 2.64 - 13.25 Nil Imm.
2 Covering of Zinc pot Surface in CSD Lines to Avoid Heat Loss 0.90 - 4.52 0.5 1
3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1
4 Replacement of Old Pumps by Efficient Pumps – 2 Nos 5.85 - 29.37 4 2
5Replacement of Ceramic Fiber Lining by Pyro bloc Module in CSD-3 Non-Ox Furnace - 1381.1 37.93 22 7
6 Corrocoating of Circulating Cooling Water pump at CPP 0.79 - 3.79 4 12
7 Variable Frequency Drive Installation in Boiler Feed Pump 11.86 - 59.53 60 12
8 Replacement of Conventional lights by LED lights 1.02 - 5.15 9 21
9 Technology Up gradation & Redesigning of CSD-1 Furnace 15.66 3864.7 184.71 446 29
Total 40.99 5245.7 349.64 546 19
![Page 9: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/9.jpg)
ENERGY CONSERVATION PROJECTS – FY16-17
Sr. No. Energy Conservation Measures
Annual Energy SavingAnnual Saving
Investment & ROI
Electricity(Lakh kWh)
Thermal(M kCal)
Rs Lakhs Rs Lakhs Months
1Switching off AC Cooling Tower & Connecting with Main CT at TM5
0.64 - 3.68 Nil Imm.
2Optimization of Cooling Blower in CSD-5 by Installation of Pyrometer
3.40 - 19.58 5 3
3Installation of Quench Tank & Optimization of Cooling Blower in CSD-2
3.09 - 17.80 5 3
4 Operation of Captive Power Plant Cooling Tower Fan by VFD 4.18 - 23.84 5 3
5 Installed VFD in Coolant pump in Cold Rolling Mill - 5 3.05 - 17.39 6 4
6 Installed VFD in Coolant pump in Cold Rolling Mill - 4 2.42 - 13.79 6 5
7 Installed VFD in Coolant pump in Cold Rolling Mill - 6 2.65 - 15.08 6 5
8Variable Frequency Drive Installation in Agitator Motor at TM2
0.16 - 0.92 2 6
![Page 10: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/10.jpg)
ENERGY CONSERVATION PROJECTS – FY16-17
Sr. No.
Energy Conservation Measures
Annual Energy SavingAnnual Saving
Investment & ROI
Electricity(Lakh kWh)
Thermal(M kCal)
Rs Lakhs Rs Lakhs Months
9Optimization of Color Coating line Cooling Tower Pump by Installing of VFD
1.31 - 7.54 4 6
10Replacement of Water Cooled Hearth Roll in Furnace by Ceramic Roll - 1708.6 35.60 22 7
11 Replacement of Conventional lights by LED lights 1.30 - 6.23 10 19
Total 22.29 1708.6 161.45 71 5
![Page 11: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/11.jpg)
ENERGY CONSERVATION PROJECTS – FY17-18
Sr. No. Energy Conservation Measures
Annual Energy SavingAnnual Saving
Investment & ROI
Electricity(Lakh kWh)
Thermal(M kCal)
Rs Lakhs Rs Lakhs Months
1 Optimization of CCL2 Degreasing Section Motor 0.11 - 0.68 Nil Imm.
2 Optimization of CCL1 Degreasing Section Motors 0.34 - 2.20 Nil Imm.
3 Optimization of TM1 & TM4 POR Blower 0.92 - 5.93 Nil Imm.
4 VFD Installation in CSD-1 Cooling Blower-6 1.24 - 7.96 4 3
5 VFD Installation in CSD-1 Cooling Blower-1 2.59 - 16.59 4 6
6 VFD Installation in TM5 Fume Exhaust Blower 1.27 - 8.15 5.5 8
7 Installation of RLNG Fired Process Boiler - 8534 203.53 200 12
8 VFD Installation in CCL1 Purge Air Blower 0.34 - 2.20 3 14
9 VFD Installation in CSD-1 Chromic Dryer 0.40 - 2.56 3 14
10 Installation of Inverted U Tube Furnace in CSD3 56.40 15120 396.75 625 19
11 Installation of LED Lights 1.52 - 9.73 25 31
Total 65.13 23654 656.28 869.5 16
![Page 12: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/12.jpg)
SUMMARY OF ENERGY CONSERVATION PROJECTS
Energy Conservation MeasuresNo of
Measures
Annual Energy SavingAnnual Saving
Investment & ROI
Electricity(Lakh Kwh)
Thermal(M Kcal)
Rs Lakhs Rs Lakhs Months
Nil Investment 5 4.65 - 26 Nil -
< = Rs 5 Lakhs 13 26.52 - 148 44 4
> Rs 5 Lakhs <= 10 Lakhs 6 11.71 - 66 43 8
> 10 Lakhs 7 85.44 30608.3 928 1400 18
Total 31 128.41 30608.3 1167 1487 15
![Page 13: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/13.jpg)
INNOVATIVE PROJECTS - I
Power Consumption Fuel Consumption Annual Saving
Before After Before After Power Fuel Investment
kWh/t mmbtu/t Lakh kWh M kCal Rs in Lakhs
111.7 92.9 0.728 0.528 56.40 15120 625
INSTALLATION OF INVERTED U TUBE FURNACE IN CSD3
Radiant Tube
Non Ox
Exhaust
Exhaust
450 – 500 Deg C
![Page 14: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/14.jpg)
INNOVATIVE PROJECTS - II
Fuel Consumption Annual Fuel Saving
Investment ROIBefore After
GCal/t Gcal/t MkCal Rs in Lakhs Months
0.925 0.769 8534 200 12
INSTALLATION OF RLNG FIRED PROCESS BOILER
Desuperheater
Pressure
Controller
Temperature
Controller
Cooling
Water
Temperature RCV
Pressure RCV
Steam
Supply TS PT
83 Kg/cm2
515 Deg C
10 Kg/cm2
220 Deg C
![Page 15: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/15.jpg)
RENEWABLE ENERGY SOURCES
RPO Compliance – 100%
Financial Year Solar RECs Non Solar RECsREC Cost
(Rs in Lakhs)
FY 15-16 694 11795 201.22
FY 16-17 1479 14786 162.65
FY 17-18 2850 14997 210.00
FY 10-11 to 17-18 7269 88200 1439.15
Solar Roof Top
Panel
Captive RE
ProjectsLight Pipe
RAIN WATER HARVESTING – 20800 KL
TRANSCULENT SHEET IN EACH SHED
![Page 16: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/16.jpg)
SOLAR ROOF TOP SURVEY
Existing – 1.3 MW
Projects – 3.0 MW
![Page 17: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/17.jpg)
UTILIZATION OF WASTE
DESIGN RATING OF RTO FOR VOC FUEL CONSUMPTION
CCL1 – 300 to 700 Kg/Hr CCL2 – 300 to 440 Kg/Hr 30 - 35%
WASTE HEAT UTILIZATION (MT)
FY 15-16 FY 16-17 FY 17-18
1770.59 1912.23 1685.63
![Page 18: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/18.jpg)
GHG EMISSIONS
SCOPE 3 EMISSIONS – Fuel Transportation, Finished Goods Dispatch
FY17-18
Replacement of Coal by
Power Sourcing thru GCPP
FY17-18
Replacement of Coal by
RLNG – Process Steam
FY15-16
Replacement of LPG by
RLNG
0.3261 0.3232
0.0617
0
0.1
0.2
0.3
0.4
2015-16 2016-17 2017-18
Scope1 Emissions (tCO2/t)
0.01410.0079
0.0649
0
0.02
0.04
0.06
2015-16 2016-17 2017-18
Scope2 Emissions (tCO2/t)
28142295 2489
0
1000
2000
3000
2015-16 2016-17 2017-18
Scope3 Emissions (tCO2/t)
FY16-17 & FY17-18
Rake Utilization -
Finished Goods Dispatch
220248 tCO2 125437244 tCO2 21109135 tCO2
146766627 tCO2 6.93%
![Page 19: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/19.jpg)
GREEN SUPPLY MANAGEMENT
REPLACEMENT OF COAL BY RLNG RAKE UTILIZATION - FINISHED GOODS DESPATCH
26.7933.30
37.69
0
20
40
2015-16 2016-17 2017-18
Despatch by Rake (%)
Procurement of Energy Efficient Equipment,Products – LCC / Communication to Vendor
![Page 20: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/20.jpg)
ENERGY AWARENESS & INVOLVEMENT
• Display, Email, Awareness Session
Energy Policy
• Received – 78 Nos for FY 15-18Suggestion
• Display, Email, Awareness Session
Energy Review, SEU, EnPI
• 14th Dec to 20th DecEnCon Week
• Distribution of 8000 LED BulbsDELP - EESL
• Distribution & display of energy saving tips
Pamplets, Display Board
• Training duration – 809 Hrs Internal Training
• PAT, Escerts Trading Awareness, EnMS 50001, Internal Auditor Training, KEP, LA Course
Enternal Training
• Communication - Energy Performance Evaluation Criteria
Vendor - PO
Fee
Reimbursement
Scheme for
Energy Auditor /
Manager Exam
Energy Awareness in ITI
Energy Painting Competition in School
Energy Conservation Week
![Page 21: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/21.jpg)
KAIZEN PROJECTS -I
PURGE BLOWER
RTO CHAMBER
0
500
1000
1500
2000
1 2 3 4 4.5 5.5 6.5 7.5 8 9 10 11
Purge Cycle Trend
Without VFD
With VFD
Purge Time Purge Time
R
p
m
Time in mins
OPTIMIZATION OF PURGE AIR BLOWER
Power Consumption Annual Power Saving
Investment ROIBefore After
kWh kWh Lakh kWh Rs in Lakhs Months
13 7 0.34 3 14
![Page 22: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/22.jpg)
KAIZEN PROJECTS -II
OPTIMIZATION OF TM1 & TM4 POR BLOWER
Power Consumption Annual Power Saving
Investment ROIBefore After
kWh kWh Lakh kWh Rs in Lakhs Months
430 147 0.92 NIL Immediate
Reversible Mill
POR 1
ETR 3,4,5,6
DTR 2,3,4,5,6
![Page 23: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/23.jpg)
ENERGY MONITORING / FORMAT
ABP Require Actual Required Actual Required Actual Required Actual ABP Require Actual Required Actual Required Actual Required Actual
PreRolling
HR Slitter 56,838 3.7 2.6 208,513 145,562 179 125 0.00 0.00 - -
Pickling 59,866 9.0 6.37 6.4 381,107 382,094 328 329 0.01 0.01 - -
ETP+MEE PLANT 59,866 1.9 1.5 113,746 88,762 98 76 0.00 0.00 - -
Steam to Steel Plant (PKL) 59,866 1.0 - 59,866 - 51 - 0.00 - 0.25 0.224 15,218 13,394 3,835 3,375 0.064 0.056
PreRolling 59,866 9.0 12.7 10 763,232 616,417 656 530 0.011 0.009 - 0.25 0.224 15,218 13,394 3,835 3,375 0.064 0.056
Rolling
CRM-1 16,248 114.0 109.3 114.3 1,775,447 1,856,384 1,527 1,596 0.09 0.10 - -
CRM-2 7,841 133.0 138.9 138.4 1,089,112 1,084,876 937 933 0.12 0.02 - -
CRM-4 6,547 157 159.0 159.4 1,246,404 1,043,741 1,072 898 0.14 0.11 - -
CRM-5 20,412 84.0 77.5 76.3 1,582,192 1,558,326 1,361 1,340 0.07 0.02 - -
CRM-6 8,349 157.0 148.2 146.2 1,237,554 1,220,960 1,064 1,050 0.13 0.13 - -
Rolling 59,397 117.0 116.7 114 6,930,708 6,764,287 5,960 5,817 0.100 0.098 - - - - - - - - -
Galvanising (GI/GL)
CSD-1 8806 42.0 46.6 42.8 410,385 376,627 353 324 0.04 0.04 0.630 0.650 0.607 5,724 5347 1,442 1,348 363 0.15
CSD-2 9289 53.0 160.5 157.3 1,490,601 1,460,881 1,282 1,256 0.14 0.02 0.750 0.650 0.664 6,038 6171 1,521 1,555 383 0.17
CSD-3 24550 106 94.7 92.9 2,323,939 2,279,638 1,999 1,960 0.22 0.21 0.680 0.600 0.564 14,730 13857 3,712 3,492 935 0.14
CSD-4 4378 95 86.3 82.7 377,923 362,181 325 311 0.07 0.01 0.430 0.510 0.424 2,233 1855 563 468 142 0.11
CSD-5 17397 131.9 113.9 109.0 1,981,307 1,896,404 1,704 1,631 0.10 0.03 0.610 0.625 0.619 10,873 10776 2,740 2,716 690 0.16
GP Sliter/Alloy F/C 7,884 5.0 5.0 4.1 39,422 32,255 34 28 0.00 0.00 - 0 - - - -
Galvanising (GI/GL) 64,419 96.3 102.8 99 6,623,579 6,407,986 5,696 5,511 0.088 0.086 0.647 0.615 0.590 39,597 38,007 9,979 9,578 0.155 0.149
Colour Coating (PPGI/PPGL)
CCL1 9,888 40.0 39.6 36.2 391,567 357,791 337 308 0.03 0.03 0.700 0.700 0.662 6,922 6548 1,744 1,650 440 0.167
CCL2 10,301 36.0 40.5 35.9 417,562 369,385 359 318 0.03 0.03 0.650 0.650 0.607 6,696 6255 1,687 1,576 425 0.153
Colour Coating (PPGI/PPGL) 20,190 38.0 40.1 36.0 809,129 727,176 696 625 0.034 0.031 0.674 0.674 0.634 13,618 12,803 3,432 3,226 0.170 0.160
Others
Adminstration 0.5 0.5 0.4 33,000 22,583 28 19 0.00 0.00 - - - - -
DG AUX SUPPLY 1.2 1 1.0 75,000 65,627 65 56 0.00 0.00 - - - - -
Store & Canteen 0.1 0.1 0.3 20,000 18,556 17 16 0.00 0.00 - - - - -
Others 64,419 2.0 1.7 128,000 106,766 110 92 0.002 0.001 - - - - - - - - -
G cal/t MMBTU/t , KL/t MMBTU,Mt , KL
Energy Consumption Data of July-18
Power Consumption RLNG / Coal / HSD Consumption Total
Required
G Cal /t
Total
Actual
G Cal /t
Gcal G cal/tEquipment
Productio
n
kwh /t KWH Gcal
0.243 0.234
0.075 0.065
0.100 0.098
0.002 0.001
0.204 0.191
![Page 24: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/24.jpg)
ENERGY MANAGEMENT SYSTEM
![Page 25: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/25.jpg)
ENERGY POLICY / EnMS 50001 CERTIFICATE
![Page 26: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/26.jpg)
MANAGEMENT SYSTEM FOR ENERGY
Plan Do
CheckAct
MANAGEMENT
PLAN- Policy / Objectives / Targets
(4.3, 4.4.6)
- Resources (4.2.1)
DO- Training (4.5.2)
- Communication (4.5.3)
- Document (4.5.4)
CHECK- Corrective / Preventive Action
(4.6.4)
- Internal Audit (4.6.3)
ACT
- Management Review (4.7)
TECHNICAL
PLAN- Energy Baseline (4.4.4)
- EnPI (4.4.5)
DO- Energy Purchasing (4.5.7)
- Design (4.5.6)
- Operational Control (4.5.5)
CHECK- Monitoring (4.6.1)
- Measurement (4.6.1)
ACT- Energy Performance & EnPIs
Review (4.7.2)
ISO 50001 ENERGY MANAGEMENT SYSTEM
BEE CERTIFIED ENERGY MANAGER/AUDITORS – 4NOS
ENERGY PERFORMANCE REVIEW – PLANT HEAD/COATED HEAD/JMD
![Page 27: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/27.jpg)
ENERGY REVIEW
Power RLNG LPG HSD Coal FO Steam RLNG LPG HSD Coal FO Steam Total
% of
Total
Power
% of
Total
Thermal
% of
Total
Energy
Electrical
Energy
Thermal
Energy
Total
Energy
Electrical
Energy
Thermal
Energy
Total
Energy
KWh MMBtu t Kl t t Kg GCal GCal GCal GCal GCal GCal GCal GCal % % %Lakh
kWhGCal GCal % % % Y/N Y/N Y/N
1 TM1 192660 21799832 0 0 0 0 0 0 0 0 0 0 0 0 0 18748 14.1 0 5.6 0.63 0 54 0.29 0 0.29 N N Y 1
2 TM2 92035 12484137 0 0 0 0 0 0 0 0 0 0 0 0 0 10736 8.1 0 3.2 0.24 0 20 0.19 0 0.19 N N
3 TM4 81054 12888688 0 0 0 0 0 0 0 0 0 0 0 0 0 11084 8.3 0 3.3 0.25 0 22 0.20 0 0.20 N N
4 TM5 207590 17444495 0 0 0 0 0 0 0 0 0 0 0 0 0 15002 11.3 0 4.5 0.32 0 28 0.18 0 0.18 N N Y 1
5 TM6 91284 14560799 0 0 0 0 0 0 0 0 0 0 0 0 0 12522 9.4 0 3.8 0.33 0 28 0.23 0 0.23 N N
6 PICKLING -1 258528 1901194 0 0 0 0 0 27040015 0 0 0 0 0 25026 25026 26661 1.2 12.5 8.0 0.37 6475 6507 1.95 25.87 24.41 N N Y 1,2
7 PICKLING -2 415928 2482386 0 0 0 0 0 27040015 0 0 0 0 0 25026 25026 27161 1.6 12.5 8.2 0.37 6475 6507 1.49 25.87 23.96 N N Y 1,2
8 CSD1 86672 3797007 54388 0 0 0 0 0 13706 0 0 0 0 0 13706 16971 2.5 6.9 5.1 1.86 0 160 4.90 0 0.94 N N Y 2
9 CSD2 96763 5188724 74715 0 0 0 0 0 18828 0 0 0 0 0 18828 23291 3.4 9.4 7.0 0 0 0 0.00 0 0 N N
10 CSD3 255053 23923090 188816 0 0 0 0 0 47582 0 0 0 0 0 47582 68155 15.5 23.8 20.5 0.60 4396 4448 0.25 9.24 6.53 N N Y 1,2
11 CSD4 54312 5202169 22722 0 0 0 0 0 5726 0 0 0 0 0 5726 10200 3.4 2.9 3.1 0.11 0 10 0.22 0 0.10 N N
12 CSD5 179613 21498898 111531 0 0 0 0 0 28106 0 0 0 0 0 28106 46595 13.9 14.1 14.0 0 0 0 0 0 0 N N Y 1
13 CCL1 101497 4095076 69671 0 0 0 0 0 17557 0 0 0 0 0 17557 21079 2.6 8.8 6.3 0.81 0 70 1.98 0 0.33 N N
14 CCL2 106359 3907750 66226 0 0 0 0 0 16689 0 0 0 0 0 16689 20050 2.5 8.4 6.0 0.35 703 733 0.90 4.21 3.66 N N Y 2
15 HRS 660246 1329892 0 0 0 0 0 0 0 0 0 0 0 0 0 1144 0.9 0.0 0.3 0 0 0 0 0 0 N N
16 GP SLITTER 37560 246797 0 0 0 0 0 0 0 0 0 0 0 0 0 212 0.2 0.0 0.1 0 0 0 0 0 0 N N
17 Adminstration NA 306711 0 0 0 0 0 0 0 0 0 0 0 0 0 264 0.2 0.0 0.1 0 0 0 0 0 0 N N
18 Stores & Canteen NA 215319 0 0 0 0 0 0 0 0 0 0 0 0 0 185 0.1 0.0 0.1 0 0 0 0 0 0 N N
19 ETP+MEE PLANT NA 1390129 0 0 0 0 0 0 0 0 0 0 0 0 0 1196 0.9 0.0 0.4 0 0 0 0 0 0 N N
20 Pickling Boiler NA 0 0 0 0 0 4.9 0 0 0 0 0 50 0 50 50 0.0 0.0 0.0 0 0 0 0 0 0 N N
21 Alloy Furnace NA 0 4765 16 0 0 0 0 1201 200 0 0 0 0 1401 1401 0.0 0.7 0.4 0 0 0 0 0 0 N N
154663093 592835 16 0 0 4.9 54080030 149394 200 0 0 50 50052 199696 332706 100 100 100 6.2 18049 18586 0.40 9.04 5.59
1 Captive Power Plant (Kwh) 173377500 14210755 0 0 0 110463 0 0 0 0 0 532210 0 0 532210 544431 91.6 91.1 91.1 0 0 0 0 0 0 N Y N 4
2 DG Set & Substation (Kwh) 700776 666643 0 0 0 0 206.3 0 0 0 0 0 2073 0 2073 2647 4.3 0.4 0.4 0 0 0 0 0 0 N N
3 Steam to Steel Plant from CPP 54080 631184 0 0 0 10388 0 0 0 0 0 50052 0 0 50052 50594 4.1 8.6 8.5 0 0 0 0 0 0 N N
174078276 15508582 0 0 0 120851 206.3 0.0 0.0 0.0 0.0 582261 2073 0 584335 597672 100 100 100 0 0 0 0 0 0
2%
TM1
TM5
PICKLING -1
PICKLING -2
CSD1
CSD3
CSD5
CCL2
5 5 5
4 4 4
3 3 3
2 2 2
1 1 1
0 0 0
DCN - JJ-EnMS-PR-01
A) Annual Saving Potential of Energy Consumption in GCal
More than 1000 GCal
More than 500 GCal
More than 250 GCal
More than 100 GCal
Less than 100 GCal
Not Identified
Methodology for deciding the SEU on % Annual Saving Potential of Energy Consumption
C) Required Down Time (excluding lead time of
resources)Less than One day
Less than three days
Less than five days
Less than seven days
More than seven days
Not Identified
B) Investment Required (Rs. In lacs)
Less than 10 lacs
More than 10 lacs
More than 15 lacs
More than 25 lacs
More than 50 lacs
Not Identified
Required
Down Time
Day
1
1
30
0
2
1
1
1
1
5
5
1
0
3
1
4448
0
733
0
15
625
0
20
Annual Saving
Potential of Energy
Consumption
GCal Rs in Lakhs
28
6507
6507
0
100
100
5 25
1 5
Investment
Required
54
160
C
5
5
Required down time Investment
required
B
5
3
25
0
4
5 5
EMT
APPROVED BY
" * " = Priority of SEU to be decided based on above methodology in descending order of score . Eg. P1 top priority and so on…
Annual Saving Potential of
Energy Consumption
Score
A X B X C
50
30
5
0
48
Name of SEU
Annual Saving
Potential of Energy
Consumption (Gcal)
A
2
2
5
-
P2
25
Identification of SEU's For-17-18 Location - Tarapur Process - All
Revision No- 6
Methodology for deciding the SEU's priority
Criteria -1 : More than 10 % of total power or total thermal or total energy used to be considered as Significant. Criteria -2 : % Annual Saving Potential of Energy Consumption
Criteria 3 - Legal requirements other than PAT & RPO Criteria -4 : Top management guidelines .
Selection
Criteria
(Select 1,2
or 3, 4 as
given
below)
Revision Date- 24.08.17
Sr.
No.Process / Equipment
Thermal Consumption/year in Gcal
Production
(t)
Top
Management
guidelines
Legal
requirement
Significan
t Energy
Use (SEU)
TOTAL
TOTAL
P4
P4
P4
Distribution through E-mail to concerned HOD's
% Annual Saving Potential
of Energy ConsumptionTotal
Energy
Consumption in %
% Annual Saving Potential of Energy Consumption in Electrical Energy or Thermal Energy
or Total Energy in respective process
Consumption /Year
0
4
Priority
(P1..P2… etc.,)
*
P1
P3
P5
M.R.
Prepared and Verified by
1
Process
% Energy Consumption /
Annual Energy Saving Potential
SEU
Criteria
Priority
![Page 28: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/28.jpg)
ENVIRONMENT & CSR INITIATIVES
TREE PLANTATION – 13000 Nos / YEAR 3 CHECK DAMS – 215 Mn LTRS
WATER STORAGE BANK – 10 CR. LITRES DISTRIBUTION OF SOLAR HOME LIGHTING SYSTEM – MOKHADA VILLAGE
![Page 29: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/29.jpg)
MAJOR ACHIEVEMENTS / INITIATIVES
ENERGY CONSERVATION AWARD
2008-09 MEDA – Third Prize
2011-12 MEDA – First Prize
2014-15 MEDA – First Prize
2015-16 MEDA – Second Prize
2015-16 BEE – Certificate of Merit
2017 CII – Excellent Energy Efficient Unit
2017 SEEM – Silver Prize
ACHIEVEMENT / INITIATIVES
2017-18 85% LED Lighting
2016-18Fee Reimbursement Scheme–
BEE Certified CEM/CEA Exam
APPRECIATION
2016-17
Zilla Parishad Palghar –
Token of Appreciation for Outstanding
Work in Water & Sanitation – Palghar
District
Zilla Parishad Palghar - Token of Appreciation for Outstanding Work in Water & Sanitation – Palghar District
![Page 30: CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY …€¦ · 3 Operation of Color Coating Line Compressor in Closed Loop 2.27 - 11.39 0.5 1 4 Replacement of Old Pumps by Efficient Pumps](https://reader034.vdocument.in/reader034/viewer/2022042208/5eab284542d177087e17cfda/html5/thumbnails/30.jpg)
THANKS