Page 1: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020PROJECT UPDATEDIRECTION BRIEF

September 19 2017

1

2017 IN REVIEWbull January 17th ndash Deficiencies Space Needsbull February 28th ndash Buildings amp Assets Presentationbull May 23rd ndash Options Schedules Budgetbull June 19th ndash City Hall 2020 Video Clipbull June 26th ndash First Public Sessionbull June 27th ndash Options Limited to Municipal Centerbull July 26th ndash Second Public Session Facebook Livebull August 23rd ndash Third Public Sessionbull September 1st ndash Public Information Session Info

2

WHERE ARE WE Building deficiencies well documentedProgram (space needs analysis) developed

through 2070 and re-validatedCIP 3-072 City Hall Replacement Approved

bull $50250000 for Planning Design ConstructionDeveloped 6 options to either renovate the

existing building or build a new buildingConducted citizen engagement

3

CITY HALL SPACE NEEDS

November 2016bull Existing B-1 80000 SFbull Current Need 128431 SFbull 2020 134310 SFbull 2030 139664 SFbull 2040 144572 SFbull 2070 149089 SF

August 201780000 SF

134161 SF139607 SF144210 SF147344 SF149939 SF

4

Need 70000 SF more than we have now to meet 2070 requirement

Letrsquos Review Our Options

5

CITY HALL 2020 ndash OPTION 1A Addition to and Renovation of B-1 our current City Hall

2

CITY HALL 2020 ndash OPTION 1A ADVANTAGES

Reuses an existing City-owned building Maintains B-1 the current City Hall as the future City Hall Does not displace any existing parking

DISADVANTAGES Does not provide sufficient space for the known additional space needs Requires use of temporary facilities (swing space) ndash some departments would move twice Longest City Hall construction schedule by about 4 months Limits implementation of the lsquomall of servicesrsquo concept Construction activities immediately adjacent to City Hall would be disruptive

DESIGN COSTS $4930000

NEW CITY HALL CONSTRUCTION $37500000

TEMPORARY FACILITY COSTS $3070000

SITE CONSTRUCTION $1550000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42120000

FFampE $4640000

PROJECT BUDGET CONTINGENCY $5170000

TOTAL CITY HALL BUDGET $56860000

TOTAL BUILDING CONSTRUCTION COST PER SF $25153SF3

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 2: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

2017 IN REVIEWbull January 17th ndash Deficiencies Space Needsbull February 28th ndash Buildings amp Assets Presentationbull May 23rd ndash Options Schedules Budgetbull June 19th ndash City Hall 2020 Video Clipbull June 26th ndash First Public Sessionbull June 27th ndash Options Limited to Municipal Centerbull July 26th ndash Second Public Session Facebook Livebull August 23rd ndash Third Public Sessionbull September 1st ndash Public Information Session Info

2

WHERE ARE WE Building deficiencies well documentedProgram (space needs analysis) developed

through 2070 and re-validatedCIP 3-072 City Hall Replacement Approved

bull $50250000 for Planning Design ConstructionDeveloped 6 options to either renovate the

existing building or build a new buildingConducted citizen engagement

3

CITY HALL SPACE NEEDS

November 2016bull Existing B-1 80000 SFbull Current Need 128431 SFbull 2020 134310 SFbull 2030 139664 SFbull 2040 144572 SFbull 2070 149089 SF

August 201780000 SF

134161 SF139607 SF144210 SF147344 SF149939 SF

4

Need 70000 SF more than we have now to meet 2070 requirement

Letrsquos Review Our Options

5

CITY HALL 2020 ndash OPTION 1A Addition to and Renovation of B-1 our current City Hall

2

CITY HALL 2020 ndash OPTION 1A ADVANTAGES

Reuses an existing City-owned building Maintains B-1 the current City Hall as the future City Hall Does not displace any existing parking

DISADVANTAGES Does not provide sufficient space for the known additional space needs Requires use of temporary facilities (swing space) ndash some departments would move twice Longest City Hall construction schedule by about 4 months Limits implementation of the lsquomall of servicesrsquo concept Construction activities immediately adjacent to City Hall would be disruptive

DESIGN COSTS $4930000

NEW CITY HALL CONSTRUCTION $37500000

TEMPORARY FACILITY COSTS $3070000

SITE CONSTRUCTION $1550000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42120000

FFampE $4640000

PROJECT BUDGET CONTINGENCY $5170000

TOTAL CITY HALL BUDGET $56860000

TOTAL BUILDING CONSTRUCTION COST PER SF $25153SF3

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 3: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

WHERE ARE WE Building deficiencies well documentedProgram (space needs analysis) developed

through 2070 and re-validatedCIP 3-072 City Hall Replacement Approved

bull $50250000 for Planning Design ConstructionDeveloped 6 options to either renovate the

existing building or build a new buildingConducted citizen engagement

3

CITY HALL SPACE NEEDS

November 2016bull Existing B-1 80000 SFbull Current Need 128431 SFbull 2020 134310 SFbull 2030 139664 SFbull 2040 144572 SFbull 2070 149089 SF

August 201780000 SF

134161 SF139607 SF144210 SF147344 SF149939 SF

4

Need 70000 SF more than we have now to meet 2070 requirement

Letrsquos Review Our Options

5

CITY HALL 2020 ndash OPTION 1A Addition to and Renovation of B-1 our current City Hall

2

CITY HALL 2020 ndash OPTION 1A ADVANTAGES

Reuses an existing City-owned building Maintains B-1 the current City Hall as the future City Hall Does not displace any existing parking

DISADVANTAGES Does not provide sufficient space for the known additional space needs Requires use of temporary facilities (swing space) ndash some departments would move twice Longest City Hall construction schedule by about 4 months Limits implementation of the lsquomall of servicesrsquo concept Construction activities immediately adjacent to City Hall would be disruptive

DESIGN COSTS $4930000

NEW CITY HALL CONSTRUCTION $37500000

TEMPORARY FACILITY COSTS $3070000

SITE CONSTRUCTION $1550000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42120000

FFampE $4640000

PROJECT BUDGET CONTINGENCY $5170000

TOTAL CITY HALL BUDGET $56860000

TOTAL BUILDING CONSTRUCTION COST PER SF $25153SF3

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 4: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL SPACE NEEDS

November 2016bull Existing B-1 80000 SFbull Current Need 128431 SFbull 2020 134310 SFbull 2030 139664 SFbull 2040 144572 SFbull 2070 149089 SF

August 201780000 SF

134161 SF139607 SF144210 SF147344 SF149939 SF

4

Need 70000 SF more than we have now to meet 2070 requirement

Letrsquos Review Our Options

5

CITY HALL 2020 ndash OPTION 1A Addition to and Renovation of B-1 our current City Hall

2

CITY HALL 2020 ndash OPTION 1A ADVANTAGES

Reuses an existing City-owned building Maintains B-1 the current City Hall as the future City Hall Does not displace any existing parking

DISADVANTAGES Does not provide sufficient space for the known additional space needs Requires use of temporary facilities (swing space) ndash some departments would move twice Longest City Hall construction schedule by about 4 months Limits implementation of the lsquomall of servicesrsquo concept Construction activities immediately adjacent to City Hall would be disruptive

DESIGN COSTS $4930000

NEW CITY HALL CONSTRUCTION $37500000

TEMPORARY FACILITY COSTS $3070000

SITE CONSTRUCTION $1550000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42120000

FFampE $4640000

PROJECT BUDGET CONTINGENCY $5170000

TOTAL CITY HALL BUDGET $56860000

TOTAL BUILDING CONSTRUCTION COST PER SF $25153SF3

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 5: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

Letrsquos Review Our Options

5

CITY HALL 2020 ndash OPTION 1A Addition to and Renovation of B-1 our current City Hall

2

CITY HALL 2020 ndash OPTION 1A ADVANTAGES

Reuses an existing City-owned building Maintains B-1 the current City Hall as the future City Hall Does not displace any existing parking

DISADVANTAGES Does not provide sufficient space for the known additional space needs Requires use of temporary facilities (swing space) ndash some departments would move twice Longest City Hall construction schedule by about 4 months Limits implementation of the lsquomall of servicesrsquo concept Construction activities immediately adjacent to City Hall would be disruptive

DESIGN COSTS $4930000

NEW CITY HALL CONSTRUCTION $37500000

TEMPORARY FACILITY COSTS $3070000

SITE CONSTRUCTION $1550000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42120000

FFampE $4640000

PROJECT BUDGET CONTINGENCY $5170000

TOTAL CITY HALL BUDGET $56860000

TOTAL BUILDING CONSTRUCTION COST PER SF $25153SF3

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 6: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 1A Addition to and Renovation of B-1 our current City Hall

2

CITY HALL 2020 ndash OPTION 1A ADVANTAGES

Reuses an existing City-owned building Maintains B-1 the current City Hall as the future City Hall Does not displace any existing parking

DISADVANTAGES Does not provide sufficient space for the known additional space needs Requires use of temporary facilities (swing space) ndash some departments would move twice Longest City Hall construction schedule by about 4 months Limits implementation of the lsquomall of servicesrsquo concept Construction activities immediately adjacent to City Hall would be disruptive

DESIGN COSTS $4930000

NEW CITY HALL CONSTRUCTION $37500000

TEMPORARY FACILITY COSTS $3070000

SITE CONSTRUCTION $1550000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42120000

FFampE $4640000

PROJECT BUDGET CONTINGENCY $5170000

TOTAL CITY HALL BUDGET $56860000

TOTAL BUILDING CONSTRUCTION COST PER SF $25153SF3

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 7: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 1A ADVANTAGES

Reuses an existing City-owned building Maintains B-1 the current City Hall as the future City Hall Does not displace any existing parking

DISADVANTAGES Does not provide sufficient space for the known additional space needs Requires use of temporary facilities (swing space) ndash some departments would move twice Longest City Hall construction schedule by about 4 months Limits implementation of the lsquomall of servicesrsquo concept Construction activities immediately adjacent to City Hall would be disruptive

DESIGN COSTS $4930000

NEW CITY HALL CONSTRUCTION $37500000

TEMPORARY FACILITY COSTS $3070000

SITE CONSTRUCTION $1550000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42120000

FFampE $4640000

PROJECT BUDGET CONTINGENCY $5170000

TOTAL CITY HALL BUDGET $56860000

TOTAL BUILDING CONSTRUCTION COST PER SF $25153SF3

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 8: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 1B Larger addition to B-1 to create a completely new City Hall

4

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 9: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 1BADVANTAGES

Connection of the new City Hall to the existing B-1 allows more departments to be housed in contiguous space

Removal of the tunnel connecting B-1 and B-2 (Operations) alleviates an ongoing maintenance issue

DISADVANTAGES Would require the relocation of volunteer park and gazebo Construction activities immediately adjacent to City Hall would be disruptive With multiple entrances and the main entrance to City Hall not facing a major road

there will be way-finding challengesDESIGN COSTS $4310000

NEW CITY HALL CONSTRUCTION $40850000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $1830000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42680000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5080000

TOTAL CITY HALL BUDGET $55800000

TOTAL BUILDING CONSTRUCTION COST PER SF $27400SF5

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 10: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 2 New 3 story building between B-1 and B-2

6

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 11: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 2ADVANTAGES

Provides improved pedestrian connectivity between the new City Hall B-1 and B-2 Removal of the tunnel connecting B-1 and B-2 alleviates an ongoing maintenance

issue

DISADVANTAGES Would require relocation of volunteer park and gazebo Increases distance from visitor parking to the front door of the building

DESIGN COSTS $4090000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2230000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42740000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5060000

TOTAL CITY HALL BUDGET $55620000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

7

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 12: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 3A New 3 story building between Building 2 and the School

Administration Building

8

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 13: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 3AADVANTAGES

Creates a new City Hall with its entrance on George Mason Drive with service entrances co-located with B-2

Centralizes City Hall within the municipal campus

DISADVANTAGES Minimal stand-off distance from Mattaponi Road

DESIGN COSTS $4080000

NEW CITY HALL CONSTRUCTION $40510000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2070000

NEW CITY HALL CONSTRUCTION SUBTOTAL $42580000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5040000

TOTAL CITY HALL BUDGET $55430000

TOTAL BUILDING CONSTRUCTION COST PER SF $27172SF

9

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 14: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 3B New 3 story building adjacent to B-2

10

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 15: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 3BADVANTAGES

Locates City Hall near Building 2 while creating a distinguished City Hall presence on George Mason Drive

Provides improved pedestrian connectivity to Building 2 Leaves the Building 3 site available for future development

DISADVANTAGES Obstructs the front door to B-2

DESIGN COSTS $4150000

NEW CITY HALL CONSTRUCTION $40520000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $2770000

NEW CITY HALL CONSTRUCTION SUBTOTAL $43290000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5120000

TOTAL CITY HALL BUDGET $56290000

TOTAL BUILDING CONSTRUCTION COST PER SF $27178SF

11

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 16: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 3C New 3 story building adjacent to Building 2 and the School

Administration Building

12

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 17: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

CITY HALL 2020 ndash OPTION 3CADVANTAGES

Provides opportunity for a pedestrian friendly City Square in front of the City Hall by closing Mattaponi Road

Centralizes City Hall to the Municipal Campus improving pedestrian access

DISADVANTAGES Requires the closing of Mattaponi Road restricting vehicular movement on campus

DESIGN COSTS $4190000

NEW CITY HALL CONSTRUCTION $40770000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $3240000

NEW CITY HALL CONSTRUCTION SUBTOTAL $44010000

FFampE $3730000

PROJECT BUDGET CONTINGENCY $5200000

TOTAL CITY HALL BUDGET $57130000

TOTAL BUILDING CONSTRUCTION COST PER SF $27346SF

13

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 18: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

PUBLIC INFORMATION SESSIONS

bull Citizen Engagement Initiativendash Inform the publicndash Solicit feedback regarding options

bull Dedicated Webpage ndash info survey 114 respondents

bull Public Sessions ndash briefs surveys 99 attendees 43 surveys

bull 2 City Employee Meetings ndash 95 surveysbull Virtual Meeting ndash 2506 views

18

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 19: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

PUBLIC ENGAGEMENT TAKEAWAYSbull Option 2 was the alternative preferred by mostbull Ease of Access Security

ndash Parking ADA Security EMS Access Signagebull Architectural Considerations

ndash Efficiency of space Integrity of Municipal Center Incorporate Technology

bull Logistical Considerations (Program Desires)ndash Kiosks for Zoning Permits amp Inspectionsndash Community spaces Computer labndash Space for a historian and virtual tour of Cityndash Library book drop work-out spaces food services

bull What does the future hold for Building 119

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 20: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

MUNICIPAL CENTER ndash Reuse of Building 1 Construction of a new ldquoB-3rdquo for Public Utilities and IT has been discussed

for about 10 years 2011 planning study identified a space requirement of 76904 SF New B-3 construction would cost $36M Since B-1 provides 80000 SF we have an opportunity to renovate B-1 for

PU and IT Renovation could be done for $24M A $24M CIP will be presented in the FY19 program to facilitate design in

2021 and renovation in 2022

DESIGN COSTS $2230000

NEW CITY HALL CONSTRUCTION $17310000

TEMPORARY FACILITY COSTS $0

SITE CONSTRUCTION $350000

NEW CITY HALL CONSTRUCTION SUBTOTAL $17660000

FFampE $2160000

PROJECT BUDGET CONTINGENCY $2210000

TOTAL CITY HALL BUDGET $24610000

TOTAL BUILDING CONSTRUCTION COST PER SF $20052SF

3

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 21: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

PATH FORWARD

bull Discussion of options

bull Selection of preferred option via City Council Resolution

21

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 22: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

BACK-UP SLIDES

22

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 23: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

MUNICIPAL CENTER ndash Reuse of Building 1ADVANTAGES OF CONSOLIDATING IT amp PUBLIC UTILITIES Consolidation of dispersed IT and PU staff enhances

effectiveness and efficiency IT Data Center in the basement of B-2 is susceptible to

flooding An upper floor in B-1 is a safer location Space would be available in B-2 to enable floor-by-floor

remodeling of B-11 (Public Safety) without having to buildlease swing space Ultimately Public Works could consolidate dispersed staff into

the 2nd and 3rd floors of B-2 Planning could better serve the public utilizing the Basement and 1st floors of B-2 Repurposing or possibly demolition of 3 buildings B-4 B-17 amp

B22 Reduction of overall Municipal Center square footage via targeted demolition reduces maintenance and utility expenses 3

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 24: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

City Hall Milestone Schedule

bull Design services (full plans and specifications)ndash October 2017 ndash October 2018

bull Construction contractor solicitation selectionndash November 2018 ndash April 2019

bull Constructionndash May 2019 ndash May 2021ndash May 2019 ndash September 2021 (Option 1A)

bull Furnishing and Move-inndash June 2021 ndash August 2021ndash September 2021 ndash October 2021 (Option 1A)

24

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 25: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

bull IT Department ndash Needs additional SF now and long-termndash Data Center is in the basement of B-2 susceptible to floodingndash IT staff is dispersed in 9 different Municipal Center buildings

bull Public Utilities Department ndash Needs additional SF now and long-termndash PU staff is dispersed in 3 different Municipal Center buildings

bull A ldquocombined PU IT facilityrdquo would require 77000 gross SFndash Renovating and repurposing B-1 for this function looks like an opportunity

bull Public Safety Police Department B-11ndash Condition of B-11 is very similar to that of City Hallndash Basement and 2nd Floor of B-2 would make great swing space for B-11 renovation

bull Public Works Department ndash Needs more SF now and long-term in B-2ndash PW staff is dispersed in 4 different Municipal Center buildingsndash Could consolidate using 2nd and 3rd floor of B-2

bull Planning Department ndash Needs more SF now and long-term in B-2ndash Could provide better public service using entire 1st floor and basement of B-2 25

Other Benefits of a New City Hall

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 26: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

Space Needs ndash November 2016

26

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 15 2731 16 2893 17 2979 20 3390 23 3800CITY ATTORNEY 43 11166 48 12014 50 12497 54 13302 54 13410CITY AUDITOR 7 2741 8 2903 11 3475 16 4344 18 4641CITY CLERK 6 2205 6 2205 6 2205 6 2205 6 2237CITY MAYORCITY COUNCILCITY MANAGER 21 17203 21 17268 22 17532 22 17662 22 17921COMMISSIONER OF THE REVENUE 65 12663 70 13230 70 13642 71 14106 71 15004FINANCE 59 17110 70 18622 74 19113 74 19113 74 19113MEDIA AND COMMUNICATIONS 17 6446 19 6743 22 7464 23 7599 25 8145POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 72 13538 86 14629 102 15881 116 16994 129 18058SHARED SUPPORT SPACES 16727 16727 16727 16727 16727

TOTAL PERSONNEL NSF 306 102744 345 107448 375 111731 403 115657 423 119271CURRENT REQUIRED GROSS SQ FT 128431 134310 139664 144572 149089Required gross square footage calculation above is determined using an efficiency of 80

NEEDS NEEDS NEEDS NEEDS2020 2030 2040 2070

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 27: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

Space Needs ndash August 2017

27

CITY OF VIRGINIA BEACH - NEW CITY HALL

SPACE REQUIREMENTS CURRENT

SUMMARY NEEDS

PERS NSF PERS NSF PERS NSF PERS NSF PERS NSF

CITY HALL BUDGET AND MANAGEMENT SERVICES 14 2699 15 2861 17 3082 19 3406 23 3951CITY ATTORNEY 43 11441 48 12289 50 12772 54 13577 55 13921CITY AUDITOR 7 2741 8 2903 10 3313 12 3723 12 3723CITY CLERK 6 2277 7 2392 7 2399 9 2473 9 2627CITY MAYORCITY COUNCILCITY MANAGER 19 17238 20 17238 21 17346 21 17346 21 17346COMMISSIONER OF THE REVENUE 65 13219 70 13786 70 14265 73 15094 73 15992FINANCE 59 16519 67 17558 71 18001 71 18001 71 18001COMMUNICATIONS OFFICE 20 7625 20 7625 24 8432 24 8432 26 8735POLICE AND SECURITY 1 216 1 216 1 216 1 216 1 216TREASURER 74 14658 90 16122 99 16845 100 16910 99 16743SHARED SUPPORT SPACES 17132 17132 17132 17132 17132VOLUNTEER OFFICE 4 1565 4 1565 4 1565 4 1565 4 1565

TOTAL PERSONNEL NSF 312 107329 350 111686 374 115368 388 117875 394 119952CURRENT REQUIRED GROSS SQ FT 134161 139607 144210 147344 149939Required gross square footage calculation above is determined using an efficiency of 80

2020 2030 2040 2070NEEDS NEEDS NEEDS NEEDS

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
Page 28: CITY HALL 2020 - VBgov.com · CITY HALL 2020 PROJECT UPDATE/DIRECTION BRIEF. September 19, 2017. 1. 2017 IN REVIEW • January 17. th ... • $50,250,000 for Planning / Design / Construction

Cost Models ndash Options 1A ndash 3C

28

CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C

DESIGN 4930000$ 4310000$ 4090000$ 4080000$ 4150000$ 4190000$

37500000$ 40850000$ 40510000$ 40510000$ 40520000$ 40770000$

3070000$ -$ -$ -$ -$ -$

1550000$ 1830000$ 2230000$ 2070000$ 2770000$ 3240000$

SITE ACQUISITION -$ -$ -$ -$ -$ -$

NEW CITY HALL CONSTRUCTION SUBTOTAL 42120000$ 42680000$ 42740000$ 42580000$ 43290000$ 44010000$

FFampE 4640000$ 3730000$ 3730000$ 3730000$ 3730000$ 3730000$

PROJECT BUDGET CONTINGENCY 5170000$ 5080000$ 5060000$ 5040000$ 5120000$ 5200000$ TOTAL CITY HALL BUDGET 56860000$ 55800000$ 55620000$ 55430000$ 56290000$ 57130000$ TOTAL BUILDING CONSTRUCTION COST PER SF 25153$ 27400$ 27172$ 27172$ 27178$ 27346$ TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089

FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)

BUILDING 3 35690000$ -$ -$ -$ -$ -$

BUILDING 1 RENOVATION Inc Above 24610000$ 24610000$ 24610000$ 24610000$ 24610000$

TOTAL BUDGET INC FUTURE FACILITIES PROGRAM 92550000$ 80410000$ 80230000$ 80040000$ 80900000$ 81740000$

Renovation of Building 1 86327 86327 86327 86327 86327 86327Construction of Building 3 86327 0 0 0 0 0New City Hall 62762 149089 149089 149089 149089 149089TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416

NEW CITY HALL CONSTRUCTION

TEMPORARY FACILITY COSTS

SITE CONSTRUCTION

Option1a

Option1b

Option2

Option3a

Option3b

Option3c

Option4a

Option4b

Building 3

RenoBldg1

ParkingDeck

MoveInfo

SUMMARY SHEET

SUMMARY SHEET ROUNDED

image1jpeg

image2jpeg

image3png

image4jpeg

image5jpeg

image6jpeg

image7jpeg

  • CITY HALL 2020
  • 2017 IN REVIEW
  • WHERE ARE WE
  • CITY HALL SPACE NEEDS
  • Letrsquos Review Our Options
  • Slide Number 6
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • PUBLIC INFORMATION SESSIONS
  • PUBLIC ENGAGEMENT TAKEAWAYS
  • Slide Number 20
  • PATH FORWARD
  • BACK-UP SLIDES
  • Slide Number 23
  • City Hall Milestone Schedule
  • Other Benefits of a New City Hall
  • Space Needs ndash November 2016
  • Space Needs ndash August 2017
  • Cost Models ndash Options 1A ndash 3C
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C
DESIGN $ 4930000 $ 4310000 $ 4090000 $ 4080000 $ 4150000 $ 4190000
NEW CITY HALL CONSTRUCTION $ 37500000 $ 40850000 $ 40510000 $ 40510000 $ 40520000 $ 40770000
TEMPORARY FACILITY COSTS $ 3070000 $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1550000 $ 1830000 $ 2230000 $ 2070000 $ 2770000 $ 3240000
SITE ACQUISITION $ - $ - $ - $ - $ - $ -
NEW CITY HALL CONSTRUCTION SUBTOTAL $ 42120000 $ 42680000 $ 42740000 $ 42580000 $ 43290000 $ 44010000
FFampE $ 4640000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000
TOTAL CITY HALL BUDGET $ 56860000 $ 55800000 $ 55620000 $ 55430000 $ 56290000 $ 57130000
TOTAL BUILDING CONSTRUCTION COST PER SF $ 25153 $ 27400 $ 27172 $ 27172 $ 27178 $ 27346
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089
FUTURE CONSTRUCTION (BEYOND 6 YEARS - NOT INCLUDED IN FY18-23 CAPITAL IMPROVEMENT PROGRAM)
BUILDING 3 $ 35690000 $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24610000 $ 24610000 $ 24610000 $ 24610000 $ 24610000
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM $ 92550000 $ 80410000 $ 80230000 $ 80040000 $ 80900000 $ 81740000
Renovation of Building 1 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416
CITY HALL CONSTRUCTION OPTION 1A OPTION 1B OPTION 2 OPTION 3A OPTION 3B OPTION 3C OPTION 4
DESIGN $ 4925500 $ 4309500 $ 4089750 $ 4074000 $ 4140750 $ 4186200 ERRORREF
NEW CITY HALL CONSTRUCTION ERRORREF ERRORREF $ 40509656 $ 40507656 $ 40514656 $ 40769656 ERRORREF
TEMPORARY FACILITY COSTS $ 3063220 $ - $ - $ - $ - $ - $ -
SITE CONSTRUCTION $ 1542871 $ 1670018 $ 1910082 $ 1645035 $ 1933438 $ 2197914 ERRORREF
PARKING CONSTRUCTION $ - $ 150500 $ 318500 $ 420000 $ 833000 $ 1039500 ERRORREF
NEW CITY HALL CONSTRUCTION SUBTOTAL ERRORREF ERRORREF $ 42738238 $ 42572691 $ 43281094 $ 44007070 ERRORREF
FFampE $ 4636240 $ 3730000 $ 3730000 $ 3730000 $ 3730000 $ 3730000 ERRORREF
PROJECT BUDGET CONTINGENCY $ 5170000 $ 5080000 $ 5060000 $ 5040000 $ 5120000 $ 5200000 ERRORREF
TOTAL CITY HALL BUDGET ERRORREF ERRORREF $ 55617988 $ 55416691 $ 56271844 $ 57123270 ERRORREF
TOTAL BUILDING CONSTRUCTION COST PER SF ERRORREF ERRORREF $ 27171 $ 27170 $ 27175 $ 27346 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 149089 149089 149089 149089 149089 149089 ERRORREF
FUTURE CONSTRUCTION
BUILDING 3 $ 35683491 $ - $ - $ - $ - $ - $ -
BUILDING 1 RENOVATION Inc Above $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462 $ 24252462
TOTAL BUDGET INC FUTURE FACILITIES PROGRAM ERRORREF ERRORREF $ 79870450 $ 79669153 $ 80524306 $ 81375732 ERRORREF
Renovation of Building 1 86327 86327 86327 86327 86327 86327 86327
Construction of Building 3 86327 0 0 0 0 0 0
New City Hall 62762 149089 149089 149089 149089 149089 ERRORREF
TOTAL SQUARE FOOTAGE PROVIDED 235416 235416 235416 235416 235416 235416 ERRORREF
Option 1 - Renovation of Building 1
Department Approximate Office SF in B-1 B-1 Staff Count Portable Trailer TrailerUtilities Installation CostsYear Building Lease SF Lease CostYear Buildout Cost Move Mgmt of Moves ComIT Cost 5 Year Access Control FFampE per Employee Total Cost
Budget amp Management Services 3100 15 X X $ 30 $2 2 $3500
$ 93000 $12400 $ 5225200 $ 3500000 $52500 $ 245152 NEED MOSELEY TO PROVIDE COST
City Attorneys Office 9300 30 X X $ 30 $2 2 $3500
$ 279000 $18600 $ 7286500 $ 3500000 $105000 $ 510465
City Auditor 1257 7 X X $ 30 $2 2 $3500
$ 37710 $5028 $ 3058000 $ 3500000 $24500 $ 132818
City Clerk 1732 6 X $ 30 $2 2 $3500
$ 51960 $6928 $ 3058000 $ 3500000 $21000 $ 145468
City Council Chambers 2400 0 $2 2 $0 At the Sandler Center only as a set up cost
$9600 $ 25000000 $ - 0 $ 259600
City Managers Office 7500 16 X $ 30 $2 2 $3500
$ 225000 $30000 $ 5225200 $ 3500000 $56000 $ 398252
City Treasurer 11000 63 X $ 30 $2 2 $3500 lease SF 13657
$ 330000 $44000 $ 14388700 $ 3500000 $220500 $ 773387 Trailer SF 23732
Media amp Communications 1000 5 X $ 30 $2 2 $3500
$ 30000 $4000 $ 5225200 $ - 0 $17500 $ 103752
Commissioner of Revenue 11000 65 X $ 30 $2 2 $3500
$ 330000 $44000 $ 14388700 $ 3500000 $227500 $ 780387
Finance 8500 25 X X $ 30 $2 2 $3500
$ 255000 $34000 $ 7286500 $ 3500000 $87500 $ 484365
Volunteers Office 473 4 $2 2 $3500
(Central Library) $1892 $ 1734400 $ - 0 $14000 $ 33236 $30sf IS BASED ON THE TOWN CENTER LEASE SPACE
57262 236 $ 1631670 $208556 $ 91876400 $ 28000000 $826000 $ 3866882 PUT THESE NUMBERS IN THE MA BUDGET ESTIMATES
Year 1
Trailer Year 2 Lease Year 2 2 $ 166430340
Trailer Year 3 Lease Year 3 2 $ 169758947
Trailer Year 4 Lease Year 4 2 $ 173154126
Trailer Year 5 Lease Year 5 2 $ 176617208
$ 10726488
WORKSTATION IS $150-$250MONTH
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - PARKING DECK
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $432000
Boundary and Topographic Survey $1500
Geotechnical Study $24000
Design Costs Subtotal $457500 $460000
CONSTRUCTION COSTS
Parking Deck 500 SP $18500 $9250000
Site work 10 AC $250000 $250000 $250000 $9350000
Testing and Inspections $93000 ERRORREF
Moving Expenses Allowance Not included 10350000
Commissioning Not included
DataTelephoneAV Allowance Not included
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $9593000 $9600000
Furniture Allowance Not included ERRORVALUE
Recommended Project Budget Contingency (5) $510000 $510000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $10560500 ERRORVALUE $10570000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - RENOVATE BUILDING 1
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2180000
Boundary and Topographic Survey $1500
Geotechnical Study $45000
Design Costs Subtotal $2226500 $2230000
CONSTRUCTION COSTS
AbateDemo Existing City Hall 86327 SF $6 $517962
Renovate Existing City Hall 86327 SF $185 $15928025
Site work 10 AC $344937 $344937 $350000 $17310000
Testing and Inspections $160000 $20052
DataTelephoneAV Allowance $1036000
Moving Expenses Allowance $100000
Commissioning $87000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $17655962 $17660000
Furniture Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $2210000 $2210000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $24252462 $24610000
Total Space
One double wide 24 x 56 1344 22157
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 17
1200 $19800 year
$0 $336600
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - BUILDING 3
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $2550000
Boundary and Topographic Survey $9000
Geotechnical Study $70000
Design Cost Subtotal $2629000 $2630000
CONSTRUCTION COSTS
New City Hall 86327 SF $276 $23826252 $35690000
Site work 60 AC $375000 $2250000
Testing and Inspections $261000
DataTelephoneAV Allowance $976140 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $87000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $27644491 $25400000 $26817
Furniture (FFampE) Allowance ($25 per square foot) $2160000 $2160000
Recommended Project Budget Contingency (10) $3250000 $3250000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $35683491 $33440000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $36208491
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4b (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4098000
Boundary and Topographic Survey $5250
Geotechnical Study $108000
Design Cost Subtotal $4211250 $4212000
CONSTRUCTION COSTS
New City Hall (7 stories) 149089 SF $272 $40552208
Open first floor 36000 $15 $540000
Testing and Inspections $406000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $42993522 $42994000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5220000 $5220000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Construction of Columbus Road Not included
Financing Expenses Not included
TOTAL $57396901 $51944000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57571901
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 4a (TOWN CENTER)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3990000
Boundary and Topographic Survey $5250
Geotechnical Study $104000
Design Cost Subtotal $4099250 $4100000
CONSTRUCTION COSTS
New City Hall 149089 SF $264 $39359496
Testing and Inspections $394000
DataTelephoneAV Allowance $1145000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 Assume reuse of existing meters Increase from 15 to 2
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $41248810 $41249000
SITE WORK COSTS
Site work - Town Center 35 AC $354894 $1242129
Site Work Subtotal $1242129 $1250000
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 52631578947 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55360189 $50019000
Additional parking required by zoning
Standard Parking Space 50 EA $3500 $175000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $55535189
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3c (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4068000
Boundary and Topographic Survey $16200
Geotechnical Study $102000
Design Costs Subtotal $4186200 $4187000
CONSTRUCTION COSTS
New City Hall 149089 SF $250 $38231557
Testing and Inspections $415000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Close Mattaponi Road $250000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40769656 $40770000
SITE WORK COSTS
Site work 108 AC $203511 $2197914
Parking 2970 SP $3500 $1039500
Site Work Subtotal $3237414
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5200000 $5200000
OTHER COSTS
Property Acquisition Allowance Not required $53887000
Legal Expenses Not included
Financing Expenses Not included
TOTAL $57123270
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $57648270
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3b (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4026000
Boundary and Topographic Survey $12750
Geotechnical Study $102000
Design Costs Subtotal $4140750 $4141000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $410000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40514656 $40515000
SITE WORK COSTS
Site work 85 AC $227463 $1933438
Parking 2380 SP $3500 $833000
Site Work Subtotal $2766438
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5120000 $5120000
OTHER COSTS $53506000
Property Acquisition Allowance Not included
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56271844
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56796844
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 3a (3 STORYBUILDING 3 SITE)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3963000
Boundary and Topographic Survey $9000
Geotechnical Study $102000
Design Costs Subtotal $4074000 $4074000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $403000
DataTelephoneAV Allowance $1479000
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included $40508000
Construction Cost Subtotal $40507656
SITE WORK COSTS
Site work 60 AC $274173 $1645035
Parking 1200 SP $3500 $420000
Site Work Sbutotal $2065035
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5040000 $5040000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55416691 3717020772827 $53352000
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING BUILDING 1 AND ADDITIONAL PARKING $55941691
CITY OF VIRGINIA BEACH
NEW CITY HALL
BUDGET ESTIMATE - OPTION 2 (3 STORYBTW BLDG 1 AND 2)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $3978000
Boundary and Topographic Survey $9750
Geotechnical Study $102000
Design Costs Subtotal $4089750 $4090000
CONSTRUCTION COSTS
New City Hall 149089 SF $256 $38231557
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 TOO LOW TO BE PROVIDED BY TIM AND KEVIN
Moving Expenses Allowance $200000
Building Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $44099 no irrigation (909 extra)
Permitting and Utility Connection Fees Not included TO BE PROVIDED BY TIMMONS
Construction Cost Subtotal $40509656 $40510000
SITE WORK COSTS
Site work 65 AC $293859 $1910082
Parking 910 SP $3500 $318500
SITEWORK SUBTOTAL $2228582 $2228582
FURNITURE (FFampE)
Furniture (FFampE) Allowance ($25 per square foot) $3730000 $3730000
Recommended Project Budget Contingency (10) $5060000 $5060000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL PROJECT COST $55617988 $53390000
Additional parking required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL INCLUDING ADDITIONAL SURFACE PARKING $56142988
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4196000
Boundary and Topographic Survey $10500
Geotechnical Study $103000
Design Cost Subtotal $4309500
CONSTRUCTION COSTS
City Hall expansion 149089 SF $259 $38614051
Testing and Inspections $405000
DataTelephoneAV Allowance $1479000 ERRORREF
Moving Expenses Allowance $200000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $40848365
SITE WORK COSTS
Site Work 7 AC $238574 $1670018
Parking 43 SP $3500 $150500
Site Work Subtotal $1820518
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000
Furniture (FFampE) Subtotal $3730000
Recommended Project Budget Contingency (10) $5080000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $55788383 14784
Additional parking if required by zoning
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $56313383
trailers Total Space
One double wide 24 x 56 1344 13657
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 11
1200 $19800 year
$0 $217800
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920
CITY OF VIRGINIA BEACH
CITY HALL EXPANSION
BUDGET ESTIMATE - OPTION 1 (3 STORY ADD TO BLDG 1)
April 27 2017
DESIGN COSTS
ArchitecturalEngineering Services $4867000
Boundary and Topographic Survey $7500
Geotechnical Study $51000
Design Cost Subtotal $4925500
Temporary Facility Costs
Temporary Trailers (24192 square feet 24 months) $712800 22157
Temporary Trailer Pad and Ramps $242000 35105
Temporary Utilities $90000
Temporary COMMIT $919000
Temporary Access ControlSecurity Costs $280000
Temporary Lease Space (14000 square feet 24 mos $30sf) $819420 $30sfyear
Temporary Facility Costs $3063220
CONSTRUCTION COSTS
City Hall expansion 62762 SF $296 $18549357
Abate Existing City Hall 86327 SF $6 $517962 $3063220 $34427438
Renovate Existing City Hall 86327 SF $185 $15928025
Testing and Inspections $366000
DataTelephoneAV Allowance $1479000 99202489788
Moving Expenses Allowance (2 moves) $500000
Commissioning $150000
Water Meter HRSD Fire Service Connection Fees $314 upgrade existing meter (existing meter assumed to be 15) round to 1000
Permitting and Utility Connection Fees Not included
Construction Cost Subtotal $37490658 3085742
Site work 5 AC $308574 $1542871
Parking 0 SP $3500 $0
Sitework Subtotal $1542871
FURNITURE (FFampE)
Furniture Allowance ($25 per square foot) $3730000 ``` `
Temporary Furniture $906240
Furniture (FFampE) Subtotal $4636240
Recommended Project Budget Contingency (10) $5170000
OTHER COSTS
Property Acquisition Allowance Not required
Legal Expenses Not included
Financing Expenses Not included
TOTAL $56828489 24192
Additional parking if required by zoning 24192
Standard Parking Space 150 EA $3500 $525000
TOTAL BUILDING 1 AND ADD PARKING $57353489
trailers Total Space
One double wide 24 x 56 1344 23732
custom trailer Monthly rate 1200month $14400 12 mo lease
increased monthly Set up $3000 one time of trailers
from 800 to Take down $2400 one time 18
1200 $19800 year
$0 $356400
temp furniture
workstations cost per month months total rent
236 160 24 906240
1920