ADDENDUM NO. 5 COG2022-04 Elevated Water Tank Page 1of 1 CITY OF GERMANTOWN ADDENDUM NO.5 COG2022-04 ELEVATED WATER TANK The attached items on the above-named Project will be updated and adjusted (if required) by this Addendum No. 5 so as to reflect the revision to the Request for Bids: Clarification: Funding: There is a good possibility some of this project will be funded with ARP money, the awarded contractor will be required to provide their DUNS number and be registered with SAM.gov Questions: The following questions have been submitted: Question: What level of containment is required for this project? Answer: Due to the proximity of the tank in relation to surrounding structures and roads, full containment with top cap will be required. The Contractor shall supply, install, operate and maintain a Class 3A shroud conforming to SSPC Guide 6. Question: Will there be a laydown area identified? Answer: A laydown area of approximately 150 feet by 100 feet will either be utilized on the City of Germantown property to the east of the site or on the adjacent subdivision property. The final location will be somewhat dependent on the state of development of the subdivision at the time the laydown area is needed. Question: Could the number of load tests required be verified? Answer: Based on the recommendation of the Geotechnical Engineer, if auger cast piles are utilized with a Factor of Safety of 3, then a static load test is not required. Plans: E0-1 Electrical Legend and Notes E1-0 Electrical Site Plan E1-1 Electrical Building Plans E2-1 0 Electrical Details In some cases, the above items may be clarifications and further explanations of the Specifications in the Request for Bid. However, any changes to the Specifications will be incorporated in the Contract Documents for this Project. All CONTRACTORS must acknowledge receipt of this Addendum No. 5 on the attached Addendum Acknowledgement form when submitting a Bid for consideration. Lisa A. Piefer October 4, 2021 Lisa A. Piefer Date Procurement & Risk Director

Upload: others

Post on 11-Nov-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CITY OF GERMANTOWN

ADDENDUM NO. 5 – COG2022-04 Elevated Water Tank

Page 1of 1

CITY OF GERMANTOWN ADDENDUM NO.5

COG2022-04 ELEVATED WATER TANK

The attached items on the above-named Project will be updated and adjusted (if required) by this Addendum No. 5 so as to reflect the revision to the Request for Bids: Clarification: Funding: There is a good possibility some of this project will be funded with ARP money, the awarded contractor will be required to provide their DUNS number and be registered with SAM.gov Questions: The following questions have been submitted: Question: What level of containment is required for this project? Answer: Due to the proximity of the tank in relation to surrounding structures and roads, full containment with top cap will be required. The Contractor shall supply, install, operate and maintain a Class 3A shroud conforming to SSPC Guide 6. Question: Will there be a laydown area identified? Answer: A laydown area of approximately 150 feet by 100 feet will either be utilized on the City of Germantown property to the east of the site or on the adjacent subdivision property. The final location will be somewhat dependent on the state of development of the subdivision at the time the laydown area is needed. Question: Could the number of load tests required be verified? Answer: Based on the recommendation of the Geotechnical Engineer, if auger cast piles are utilized with a Factor of Safety of 3, then a static load test is not required.

Plans: E0-1 – Electrical Legend and Notes E1-0 – Electrical – Site Plan E1-1 – Electrical – Building Plans E2-1 0 Electrical Details

In some cases, the above items may be clarifications and further explanations of the Specifications in the Request for Bid. However, any changes to the Specifications will be incorporated in the Contract Documents for this Project. All CONTRACTORS must acknowledge receipt of this Addendum No. 5 on the attached Addendum Acknowledgement form when submitting a Bid for consideration.

Lisa A. Piefer October 4, 2021 Lisa A. Piefer Date Procurement & Risk Director

Page 2: CITY OF GERMANTOWN

ADDENDUM ACKNOWLEDGEMENT

Page 1 of 1

ADDENDA ACKNOWLEDGEMENT FORM

Bidder acknowledges receipt of the following addenda (as applicable): Addendum No. 1 __________________________ Dated ________________________ Addendum No. 2___________________________ Dated ________________________ Addendum No. 3 __________________________ Dated ________________________ Addendum No. 4 __________________________ Dated ________________________ Addendum No. 5 __________________________ Dated ________________________ Addendum No. 6 __________________________ Dated ________________________ (Name of Bidder) By: Title:

Page 3: CITY OF GERMANTOWN

ELECTRICAL GENERAL NOTES:

1. PROVIDE LABOR AND MATERIALS NECESSARY FOR A COMPLETE AND FULLY OPERATIONAL ELECTRICAL SYSTEM/INSTALLATION.

2. MATERIALS AND INSTALLATION TO COMPLY WITH CODES, LAWS, AND ORDINANCES OF FEDERAL, STATE, AND LOCAL GOVERNING BODIES HAVING JURISDICTION.

3. MATERIALS AND EQUIPMENT TO BE LISTED AND/OR LABELED BY U.L., ETL, CSA, OR ANOTHER RECOGNIZED TESTING LABORATORY.

4. SECURE AND PAY FOR PERMITS, GOVERNMENTAL FEES, TAXES AND LICENSES NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL ELECTRICAL WORK.

5. PREPARE AND SUBMIT TO GOVERNMENTAL AGENCIES, UTILITY COMPANIES, AND LOCAL CODE OFFICIALS, SHOP DRAWINGS AND/OR INSTALLATION DETAILS WHICH ARE REQUIRED BY THESE AGENCIES FOR THEIR APPROVAL.

6. NOTIFY THE ARCHITECT, ENGINEER, AND PROJECT MANAGER IN WRITING OF ANY MATERIALS OR APPARATUS BELIEVED TO BE INADEQUATE, UNSUITABLE, IN VIOLATION OF LAWS, ORDINANCES, RULES, OR REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION.

7. INSTALL ELECTRICAL WORK AS INDICATED ON THE ELECTRICAL CONSTRUCTION DOCUMENTS. SUBMIT SHOP DRAWINGS OF EQUIPMENT TO BE INSTALLED INDICATING FLOOR PLAN LAYOUT, ELEVATIONS, AND DIMENSIONS FOR APPROVAL OF THE ENGINEER PRIOR TO INSTALLATION. MAINTAIN CODE REQUIRED CLEARANCES IN FRONT OF ALL ELECTRICAL EQUIPMENT.

8. CAREFULLY EXAMINE THE CONTRACT DOCUMENTS, MAKE A SCHEDULED ARRANGEMENT WITH THE PROJECT MANAGER TO VISIT THE SITE, AND THOROUGHLY BECOME FAMILIAR WITH THE BUILDING STANDARDS AND LOCAL CONDITIONS RELATING TO THE WORK.

9. PROVIDE TEMPORARY POWER AND WIRING FOR THE PERFORMANCE OF OTHER TRADES, FOR THE ENTIRE PERIOD OF CONSTRUCTION AND REMOVE TEMPORARY WIRING AT THE COMPLETION OF CONSTRUCTION. INCLUDE COSTS FOR ESTABLISHING AND REMOVING TEMPORARY POWER IN BID.

10. ALL MATERIALS AND EQUIPMENT SHALL BE ERECTED, INSTALLED, TOOLED, CONNECTED, CLEANED, ADJUSTED, TESTED, CONDITIONED, AND PLACED IN SERVICE IN ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS AND RECOMMENDATIONS.

11. UNDER NO CONDITIONS MAY STRUCTURAL WORK BE CUT, EXCEPT AT THE DIRECTION OF THE ARCHITECT/ENGINEER OR THEIR REPRESENTATIVE.

12. SHOP DRAWINGS TO INCLUDE MANUFACTURER'S NAMES, CATALOG NUMBERS, CUTS, DIAGRAMS, AND OTHER SUCH DESCRIPTIVE DATA AS MAY BE REQUIRED TO IDENTIFY AND REVIEW THE EQUIPMENT. SUBMITTALS TO BE IN LOGICAL GROUPS (FOR EXAMPLE ALL LUMINARIES). PARTIAL SUBMITTALS WILL NOT BE REVIEWED.

13. PROVIDE "AS-BUILT" DOCUMENTATION AND HARD COPY REPRODUCIBLE DRAWINGS AT THE COMPLETION OF THE PROJECT AND SUBMIT TO THE ARCHITECT AND THE ENGINEER. AS-BUILT DRAWINGS SHALL INDICATE EXACT CIRCUIT NUMBERS, LOCATIONS OF ALL DEVICES, CEILING FIXTURES, AND RACEWAY FOR LIGHTING, TELECOMMUNICATIONS AND POWER DISTRIBUTION SYSTEMS AS INSTALLED.

14. ALL MATERIAL, EQUIPMENT, WIRING DEVICES, ETC. SHALL BE NEW AND OF COMMERCIAL GRADE UNLESS SPECIFICALLY INDICATED AS EXISTING TO BE REUSED ON DRAWINGS.

15. EXCEPT AS NOTED OTHERWISE, WORK REQUIRED FOR THE ELECTRICAL INSTALLATION AS SHOWN ON DRAWINGS SHALL INCLUDE ALL LABOR, INSTALLATION METHODS, EQUIPMENT, AND MATERIALS AND SHALL BE IN STRICT COMPLIANCE WITH ALL BUILDING STANDARDS.

16. PROVIDE A COMPLETE METAL RACEWAY SYSTEM, FITTINGS AND ENCLOSURES FOR ALL ELECTRICAL WIRING SYSTEMS TO BE INSTALLED FOR THE PROJECT. SYSTEMS SHALL INCLUDE, BUT NOT BE LIMITED TO POWER, COMMUNICATIONS, SECURITY, AND PAGING.

17. MINIMUM CONDUIT SIZE SHALL BE 3/4 INCH FOR GENERAL LIGHTING AND POWER CIRCUITRY UNLESS OTHERWISE INDICATED AND/OR REQUIRED BY CODE.

18. FLEXIBLE CONDUIT CONNECTIONS TO RECESSED LIGHTING FIXTURES SHALL BE MADE WITH FLEXIBLE STEEL CONDUIT, 1/2 INCH MINIMUM, INCLUDING AN INSULATED COPPER GREEN EQUIPMENT GROUNDING CONDUCTOR.

19. WIRE NUMBER 8 AND SMALLER FOR USE IN INTERIOR DRY LOCATIONS SHALL BE TYPE THWN THERMOPLASTIC 600 VOLT INSULATED COPPER CONDUCTORS. FEEDERS AND POWER WIRING NUMBER 6 AND LARGER SHALL BE TYPE THW 600 VOLT INSULATED COPPER. WIRE WHICH IS INSTALLED IN RACEWAY IN MOIST OR DAMP LOCATIONS SHALL BE THW, 600 VOLT INSULATED COPPER CONDUCTORS. NO WIRE SMALLER THAN NUMBER 12 AWG SHALL BE USED FOR LIGHTING OR POWER.

20. BRANCH CIRCUIT HOMERUN WIRING:

A. GENERAL PURPOSE BRANCH CIRCUIT HOMERUNS CONSISTING OF TWO NETWORKS SHALL HAVE PHASE, NEUTRAL AND GROUND CONDUCTORS INCREASED TO NUMBER 10 AWG, THWN AS A MINIMUM. WHERE HOMERUN (ONE OR MORE NETWORKS) EXCEEDS 100 LINEAR FEET, CONDUCTOR SIZE SHALL BE INCREASED ONE TRADE SIZE.

B. ALL BRANCH CIRCUITS, FEEDERS, AND HOMERUNS SHALL BE PROVIDED WITH AN INSULATED COPPER GREEN GROUNDING CONDUCTOR ROUTED IN THE SAME CONDUIT. GROUNDING CONDUCTOR SHALL BE SIZED PER THE REQUIREMENTS OF NEC SECTION 250.

C. HOMERUN LENGTH SHALL BEGIN AT THE CENTRAL POINT OF ALL DISTRIBUTED CIRCUITS TO THE PANELBOARD CIRCUIT BREAKER.

21. ALL CIRCUIT BREAKERS SHALL BE BOLT ON TYPE. AIC RATING OF CIRCUIT BREAKER SHALL MATCH AIC RATING OF PANELBOARD IN WHICH IT IS INSTALLED. THE CONTRACTOR SHALL PROVIDE A TYPEWRITTEN PANEL DIRECTORY FOR EACH PANEL AT THE COMPLETION OF THE PROJECT. EACH CIRCUIT BREAKER SHALL BE LABELED TO IDENTIFY LOAD TYPE AND LOCATION.

22. VERIFY THE CEILING CONSTRUCTION TYPE WITH ARCHITECTURAL DETAILS BEFORE ORDERING LIGHTING FIXTURES IN ORDER TO CONFIRM PROPER MOUNTING.

23. EACH SWITCH, LIGHT, RECEPTACLE, OR OTHER MISCELLANEOUS DEVICE SHALL BE PROVIDED WITH A GALVANIZED OR SHERARDIZED PRESSED STEEL OUTLET BOX OF THE KNOCKOUT TYPE, OF NOT LESS THAN NUMBER 14 U.S. GAUGE STEEL. CONDUITS SHALL BE FASTENED WITH LOCKNUTS AND BUSHINGS AND ALL UNUSED KNOCKOUTS SHALL BE LEFT SEALED. THERE SHALL BE SUFFICIENT ROOM FOR WIRES AND BUSHINGS AND DEEP BOXES SHALL BE INSTALLED WHERE REQUIRED. BOXES SHALL BE SECURELY AND ADEQUATELY SUPPORTED.

24. IN SUSPENDED CEILINGS, SUPPORT CONDUITS AND JUNCTION BOXES DIRECTLY FROM THE STRUCTURAL SYSTEM, DECK OR FRAMING PROVIDED FOR THAT PURPOSE. LIGHTING BRANCH CIRCUIT CONDUITS SHALL NOT BE CLIPPED TO THE CEILING SUPPORT WIRES OR SPLINE UNLESS THE CEILING SYSTEM HAS BEEN SPECIFICALLY DESIGNED FOR THAT PURPOSE AND APPROVAL HAS BEEN GRANTED BY THE ARCHITECT AND THE ENGINEER.

25. NUMBERED CIRCUITS SHOWN ON PLAN ARE FOR THE CONVEYANCE OF DESIGN INTENT ONLY. ACTUAL FIELD CONDITIONS WILL AFFECT CIRCUITRY. INDICATE THE ACTUAL CIRCUIT NUMBERS INSTALLED ON THE "AS-BUILT" DRAWINGS.

26. ALL HANGER AND/OR ROD SUPPORT SYSTEMS SHALL BE SUPPORTED TO THE BOTTOM RIB OF THE METAL DECK, WHERE APPLICABLE.

27. PROVIDE ALL NECESSARY PROPERLY SIZED WALL OR MILLWORK MOUNTED BOXES, RINGS, SUPPORTS, AND DEVICES AS REQUIRED VIA COORDINATION WITH ARCHITECTURAL WALL SECTIONS, AND MILLWORK DETAILS.

28. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE DRAWINGS. WHERE MORE STRINGENT REQUIREMENTS THAN THOSE DESCRIBED HEREIN OR AS SET FORTH UNDER CODES, LAWS, AND ORDINANCES OF FEDERAL, STATE, AND LOCAL GOVERNING BODIES HAVING JURISDICTION, THOSE GREATER REQUIREMENTS SHALL BE ADHERED TO.

29. EMERGENCY LUMINARIES SHALL BE PROVIDED WITH AN INTEGRAL EMERGENCY BACKUP TO ILLUMINATE THE FIXTURES IN THE EVENT OF A POWER FAILURE. ALL COMPONENTS SHALL BE IN COMPLIANCE WITH NFPA 101 AND NFPA 70 SECTION 700. THE BATTERY SHALL MAINTAIN 87.5% OF THE NOMINAL BATTERY VOLTAGE AFTER 1.5 HOURS TO COMPLY WITH NEC SECTION 700 AND UL 924.

30. REFER TO MECHANICAL AND PLUMBING ENGINEERING DRAWINGS FOR EXACT LOCATIONS OF ALL MECHANICAL AND PLUMBING EQUIPMENT

STRIP LIGHT.

SYMBOL DESCRIPTION

EMERGENCY LIGHTING UNIT.

LED INTERIOR LIGHTING LETTER ADJACENT TO LUMINAIRE DENOTES TYPE. SEE LUMINAIRE SCHEDULE.

SYMBOL DESCRIPTION

WALL PACK

LED EXTERIOR LIGHTING LETTER ADJACENT TO LUMINAIRE DENOTES TYPE. SEE LUMINAIRE SCHEDULE.

AREA LIGHT ON POLE.

TOGGLE SWITCH - SPST, 20A, 125V.

TOGGLE SWITCH - VACANCY SENSING. SENSOR SWITCH WSX WH OR APPROVED EQUAL

SYMBOL DESCRIPTION

OS

LIGHTING CONTROL DEVICES

DS OUTDOOR RATED PHOTOSWITCH

OSETOGGLE SWITCH - VACANCY SENSING. SENSOR SWITCH WSX 2P FAN WH OR APPROVED EQUAL

SYMBOL DESCRIPTION

POWER DISTRIBUTION

PANELBOARD, 240/120V 1PH 3W

SAFETY SWITCH, NON-FUSED, SIZE AS INDICATED ON PLAN

DIRECT CONNECTION TO EQUIPMENT.

SYMBOL DESCRIPTION

CONDUCTORS, CABLES, BOXES, AND GROUNDING

CONDUCTORS IN CONDUIT CONCEALED IN OR ABOVE CEILING OR IN WALL

CONDUCTORS IN CONDUIT CONCEALED BELOW FLOOR OR BELOW GRADE.

EQUIPMENT GROUNDING CONDUCTOR.

CONDUCTORS IN CONDUIT EXPOSED ON CEILING OR WALL

JUNCTION BOXJ

TELECOM GROUND BARTGB

SYMBOL DESCRIPTION

TOGGLE SWITCH, MOTOR RATED, WITH POLES FOR LOAD SERVED.

SUBSCRIPT: WP - WEATHERPROOF

RECEPTACLE, DUPLEX, GFCI, NEMA 5-20R.

RECEPTACLE, DUPLEX, GFCI, NEMA 5-20R, COUNTERTOP HEIGHT.

WIRING DEVICES

WP

RECEPTACLE, DUPLEX, NEMA 5-20R.

M

SYMBOL DESCRIPTION

COMMUNICATIONS AND SECURITY

DATA OUTLET WITH 3/4"C AND CAT6 CABLE.

TH

IS D

OC

UM

EN

T IS

TH

E P

RO

PE

RT

Y O

FA

2H

, IN

C.,

AN

D A

LL C

OM

MO

N L

AW

, S

TA

TU

TO

RY

AN

D O

TH

ER

RE

SE

RV

ED

RIG

HT

S S

HA

LL B

E R

ET

AIN

ED

BY

SA

ME

.

AN

Y C

HA

NG

ES

MA

DE

TO

TH

IS D

OC

UM

EN

T W

ITH

OU

T

HE

EX

PR

ES

S W

RIT

TE

N C

ON

SE

NT

OF

A2H

, IN

C.,

SH

ALL B

E P

RO

HIB

ITE

D A

ND

AR

E S

UB

JE

CT

TO

LE

GA

L

PR

OS

EC

UT

ION

. IF

CH

AN

GE

S A

RE

MA

DE

WIT

HO

UT

CO

NS

EN

T,

TH

E L

IAB

ILIT

Y O

F A

NY

CLA

IM IS

AC

CE

PT

ED

BY

TH

E R

ES

PO

NS

IBLE

PA

RT

Y M

AK

ING

TH

E C

HA

NG

E.

A2H, INCORPORATEDENGINEER:

DEVELOPER:

A2H, INC.

SCALE:

PROJECT:

REVIEWED:

LOCATION:

DATE:

DRAWN BY:

CHECKED BY:

REVISIONS

SURVEY:

DIVISION OF ENGINEERING

DATE:

DATE:

GERMANTOWN, TENNESSEE

ELEVATED WATER TOWER

GERMANTOWN, TENNESSEE

GERMANTOWN PUBLIC WORKS

ITEM NO.

DESCRIPTION OF CHANGEAPPROVAL DATE

AS INDICATED

DESIGN REVIEW COMMISSION

DWG NO.

CITY ENGINEER DATE DEPUTY CITY ENGINEER DATE

07/06/19

PLANS NOT VALID FOR CONSTRUCTION UNTIL SIGNED BY CITY ENGINEER

C:\

Use

rs\m

ichae

lla\D

ocum

ents

\19

457

- E

lectr

ical_

mic

ha

ellJ

4V

FV

.rvt

9/2

9/2

02

1 4

:44

:44 P

M

ELECTRICAL LEGEND AND NOTES

MCL

CDR

19457

E0.1

7/30/21

B1N.T.S.

ELECTRICAL LEGEND

LUMINAIRE SCHEDULE

TYPE DESCRIPTION MANUFACTURER MODEL NUMBER CCT INPUT WATT FIXTURE MOUNTINGA 4FT STRIP LIGHT LITHONIA LIGHTING CSS L48 MVOLT 35K 80CRI 35K 44 VA CEILING/SURFACE MOUNT

E EMERGENCY LIGHTING UNIT LITHONIA LIGHTING ELM2L M12 N/A 1 VA WALL MOUNT 7' AFF

SP POLE MOUNTED SITE LUMINAIRE LITHONIA LIGHTING DSX1 LED P2 40K T4M MVOLT 40K 70 VA MOUNT TO 15' SQUARE POLE WITH 3' CONCRETE BASE. POLE: LITHONIA SSS 15' 4G DM19AS DDBXD

SW WALL PACK LITHONIA LIGHTING WDGE2 LED P3 80CRI VW 40K 40K 23 VA WALL MOUNT 9' AFF

D1N.T.S.

LIGHTING FIXTURE SCHEDULE

SUBSTITUTION PACKAGE REQUIREMENTS:

1. MANUFACTURER'S TRADE NAMES OR CATALOG NUMBERS USED IN THIS SCHEDULE DENOTE TYPE, SIZE, QUALITY, AND DESIGN OF EQUIPMENT REQUIRED.

2. WHERE A SUBSTITUTE LIGHTING PACKAGE IS SUBMITTED FOR ENGINEER REVIEW, PROVIDE ALL FIXTURE CUTSHEETS WITH OPTIONS CLEARLY INDICATED. PROVIDE AN ELECTRONIC COPY OF PHOTOMETRIC CALCULATIONS FOR EACH SPACE WITH VISUAL LIGHTING SOFTWARE.

3. FURNISH SPECIFIED MATERIALS WHERE SUBSTITUTIONS ARE NOT APPROVED.

N.T.S.

C4 GENERAL NOTES

1 ADD #1 08/06/2021

2 SINGLE PHASE SERVICE 09/30/2021

2

Page 4: CITY OF GERMANTOWN

CITY OF GERMANTOWN(PARCEL 2)2.63 ACRES

CITY OF GERMANTOWN(PARCEL 1)2.37 ACRES

PROPOSED WILDER PUDZONING: R - RESIDENTIAL

DS

OHE

OHE

OHE

UG

S

UG

S

UG

S

UG

S

UG

S

UG

S

UG

S

UG

S

UG

S

UG

S

UG

S

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

UG

T

UG

T

UG

TU

GT

UG

TU

GT

UG

TU

GT

UG

TU

GT

UG

TU

GT

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

GG

GG

GG

1

A

2

B

C

D

SP

SP

SW

SW

2#10,#10G,1"CLP-9

MOUNT PHOTOSWITCH ON ROOF. SEE DETAIL B5 THIS SHEET

MOUNT TO INSIDE OF WATER TOWER 4' AFF

WP

WP

LP-7

2#10,#10G,1"C

POPLAR PIKE

EXISTING UTILITY POLE

UNDERGROUND SECONDARY (UGS) SEE RISER DIAGRAM

UNDERGROUND TELECOM (1) 4" C TO TELECOM PEDESTAL. COORDINATE WITH TELECOM UTILITY PROVIDER FOR LOCATION AND ROUTING

WPLP-16

DEHUMIDIFIER.MOUNT TO INSIDE OF WATER TOWER 4' AFF(VERIFY LOCATION)

WP

SP

PROVIDE #2 BARE COPPER GROUND WIRE BELOW GRADE. BOND TO WATER TOWER, LIGHT POLES, FENCE, TGB, AND MAIN SERVICE GROUND

2#10,#10G,1"C

WATER TOWER HEATER7.5KW240V

LP-10,12

2#8,#10G,1"CWP

EXISTING OVERHEAD ELECTRICAL (OHE)

LP

2

2

EXISTING UTILITY POLE

2

PVC TO R.G.S.

COUPLING

60"

24"

3".

3"

MIN.

STEEL CONDUIT

RIGID GALVANIZED

AND WIRING

CONCRETE BASE

FINISH GRADE

3000 PSI

POLE MANUFACTURER

RECOMMENDED BY

ANCHOR BOLTS (AS

45° CHAMFER

STUB CONDUIT UP 6" MIN.

FIXTURE SCHEDULE)

LIGHT POLE (SEE

36"

2"

24"

BASE COVER

(4) #5 VERTICAL W/ #3 TIES, TOP (4) @ 6" O.C. REMAINING @ 12" O.C.

LUMINARIES

PANELBOARD

NEUTRAL

UNSWITCHED HOT

SPST SWITCH

PHOTO SWITCH

SWITCHED HOT

SWITCHED HOT

NEUTRAL

TH

IS D

OC

UM

EN

T IS

TH

E P

RO

PE

RT

Y O

FA

2H

, IN

C.,

AN

D A

LL C

OM

MO

N L

AW

, S

TA

TU

TO

RY

AN

D O

TH

ER

RE

SE

RV

ED

RIG

HT

S S

HA

LL B

E R

ET

AIN

ED

BY

SA

ME

.

AN

Y C

HA

NG

ES

MA

DE

TO

TH

IS D

OC

UM

EN

T W

ITH

OU

T

HE

EX

PR

ES

S W

RIT

TE

N C

ON

SE

NT

OF

A2H

, IN

C.,

SH

ALL B

E P

RO

HIB

ITE

D A

ND

AR

E S

UB

JE

CT

TO

LE

GA

L

PR

OS

EC

UT

ION

. IF

CH

AN

GE

S A

RE

MA

DE

WIT

HO

UT

CO

NS

EN

T,

TH

E L

IAB

ILIT

Y O

F A

NY

CLA

IM IS

AC

CE

PT

ED

BY

TH

E R

ES

PO

NS

IBLE

PA

RT

Y M

AK

ING

TH

E C

HA

NG

E.

A2H, INCORPORATEDENGINEER:

DEVELOPER:

A2H, INC.

SCALE:

PROJECT:

REVIEWED:

LOCATION:

DATE:

DRAWN BY:

CHECKED BY:

REVISIONS

SURVEY:

DIVISION OF ENGINEERING

DATE:

DATE:

GERMANTOWN, TENNESSEE

ELEVATED WATER TOWER

GERMANTOWN, TENNESSEE

GERMANTOWN PUBLIC WORKS

ITEM NO.

DESCRIPTION OF CHANGEAPPROVAL DATE

AS INDICATED

DESIGN REVIEW COMMISSION

DWG NO.

CITY ENGINEER DATE DEPUTY CITY ENGINEER DATE

07/06/19

PLANS NOT VALID FOR CONSTRUCTION UNTIL SIGNED BY CITY ENGINEER

C:\

Use

rs\m

ichae

lla\D

ocum

ents

\19

457

- E

lectr

ical_

mic

ha

ellJ

4V

FV

.rvt

9/2

9/2

02

1 4

:44

:45 P

M

ELECTRICAL - SITE PLAN

MCL

CDR

19457

E1.0

7/30/21

1" = 20'-0"

D1 ELECTRICAL SITE PLAN

NORTH

N.T.S.

C5 POLE BASE DETAIL RAISED

N.T.S.

B5 PHOTOSWITCH WIRING DIAGRAM

1 ADD #1 08/06/2021

2 SINGLE PHASE SERVICE 09/30/2021

Page 5: CITY OF GERMANTOWN

UG

T

UG

T

UG

T

1

A

2

B

C

D

STORAGE

100

TLT

101

BREEZEWAY

C100

OS

OS-E

A

A

A

E

LP-3

E

1

A

2

B

C

D

STORAGE

100

TLT

101

BREEZEWAY

C100

LP-6

LP-2

WP

METER

TGB

TELECOM GROUND BAR

TO TELECOM PEDESTAL. SEE SITE PLAN

EF

1

EF

6

EUH

1

120V1/16 HP

LP-4

LP-8

120V1/8 HP

240V4000W

LP-25,27

WATER TOWER CONTROL PANEL(VERIFY LOCATION)

LP-13

LP-5

2#10, #10G, 3/4"C

TIE INTO LIGHT SWITCH SERVING SPACE

WP

30W HEATER FOR BACKFLOW ASSEMBLY

LP-1

LP

2

TH

IS D

OC

UM

EN

T IS

TH

E P

RO

PE

RT

Y O

FA

2H

, IN

C.,

AN

D A

LL C

OM

MO

N L

AW

, S

TA

TU

TO

RY

AN

D O

TH

ER

RE

SE

RV

ED

RIG

HT

S S

HA

LL B

E R

ET

AIN

ED

BY

SA

ME

.

AN

Y C

HA

NG

ES

MA

DE

TO

TH

IS D

OC

UM

EN

T W

ITH

OU

T

HE

EX

PR

ES

S W

RIT

TE

N C

ON

SE

NT

OF

A2H

, IN

C.,

SH

ALL B

E P

RO

HIB

ITE

D A

ND

AR

E S

UB

JE

CT

TO

LE

GA

L

PR

OS

EC

UT

ION

. IF

CH

AN

GE

S A

RE

MA

DE

WIT

HO

UT

CO

NS

EN

T,

TH

E L

IAB

ILIT

Y O

F A

NY

CLA

IM IS

AC

CE

PT

ED

BY

TH

E R

ES

PO

NS

IBLE

PA

RT

Y M

AK

ING

TH

E C

HA

NG

E.

A2H, INCORPORATEDENGINEER:

DEVELOPER:

A2H, INC.

SCALE:

PROJECT:

REVIEWED:

LOCATION:

DATE:

DRAWN BY:

CHECKED BY:

REVISIONS

SURVEY:

DIVISION OF ENGINEERING

DATE:

DATE:

GERMANTOWN, TENNESSEE

ELEVATED WATER TOWER

GERMANTOWN, TENNESSEE

GERMANTOWN PUBLIC WORKS

ITEM NO.

DESCRIPTION OF CHANGEAPPROVAL DATE

AS INDICATED

DESIGN REVIEW COMMISSION

DWG NO.

CITY ENGINEER DATE DEPUTY CITY ENGINEER DATE

07/06/19

PLANS NOT VALID FOR CONSTRUCTION UNTIL SIGNED BY CITY ENGINEER

C:\

Use

rs\m

ichae

lla\D

ocum

ents

\19

457

- E

lectr

ical_

mic

ha

ellJ

4V

FV

.rvt

9/2

9/2

02

1 4

:44

:45 P

M

ELECTRICAL - BUILDING PLANS

MCL

CDR

19457

E1.1

7/30/21

1/4" = 1'-0"

C1 LIGHTING - FIRST FLOOR PLAN1/4" = 1'-0"

C3 POWER - FIRST FLOOR PLAN

NORTHNORTH

1 ADD #1 08/06/2021

2 SINGLE PHASE SERVICE 09/30/2021

Page 6: CITY OF GERMANTOWN

COUNTER HEIGHT DUPLEX RECEPTACLE

DUPLEX RECEPTACLE4'-0"

FINISHED FLOOR

DATA OUTLET

FACEPLATE

WALL SWITCHMULTI-GANG

18"

CEILING

240/120V 1PH 3W PANELBOARD SERVICE ENTRANCE RATED NEMA 3R ENCLOSURE

UNDERGROUND SECONDARY -3#1/0, 2.5"C SCH 40 PVC TO RIGID STEEL CONDUIT ABOVE GRADE

MLGW POLE MOUNTED TRANSFORMER

MLGW UTILITY POLE

GRADE

BUILDING

MLGW FEED THROUGH METER

RISER NOTES:

1. TRANSFORMER PROVIDED BY MLGW.

2. METER FURNISHED BY MLGW AND INSTALLED BY CONTRACTOR.

3. COORDINATE CONTRACTOR REQUIREMENTS WITH MLGW PRIOR TO BEGINNING WORK.

4. RUN RIGID STEEL CONDUIT 10FEET UP UTILITY POLE FROM GRADE. PROVIDE 20 FEET OF SLACK CONDUCTORS FROM WEATHERHEAD CONDUIT STANDOFF. WEATHERHEAD AND FINAL CONNECTIONS TO TRANSFORMER BY MLGW.

5. SEE C4 THIS SHEET FOR SERVICE GROUNDING.

6. THE STORAGE/RESTROOM BUILDING IS AN ADDITIVE ALTERNATE. IF ALTERNATE IS NOT ACCEPTED, MOUNT PANELBOARD AND METER TO UNISTRUT WITH CONCRETE BASE AT SAME LOCATION.

3#1/0, 2.5"C

COPPER GROUND ROD5/8" DIAMETER 8FT LENGTH

SEE NOTE 4

2

INTERSYSTEM GROUND BAR

#6 CU

2

2

GENERAL NOTES:

A. REFER TO ELECTRICAL SPECIFICATIONS FOR ADDITIONAL GROUNDING REQUIREMENTS.

B. INSTALL ALL GROUNDING IN ACCORDANCE WITH NEC 250.

C. PROVIDE #2 GROUNDING CABLES UNLESS NOTED OTHERWISE

#2 BARE COPPER GROUNDING ELECTRODE CONDUCTOR (NEC 250.66)

BUILDING STRUCTURAL STEEL (NEC 250.52(A)(2))

CADWELD

MINIMUM OF 20'-0" OF 1/2" REBARIN BUILDING WALL FOOTING (NEC 250.52(A)(3))

GROUND ROD (NEC 250.52(A)(5))

COLD WATER SERVICE ENTRANCE (PROVIDESIMILAR CONNECTION TO FIRE PROTECTIONWATER SERVICE ENTRANCE) NEC 250.52(A)(1)

MAIN SERVICE GROUNDING

(1)#2 TO TGB PER NEC 800.100(D)

PIPE CLAMP (TYP.)

SUPPLY SIDE

JUMPER

CADWELD

CADWELD

VALVE,METEROR UNION

GROUND BUS

NEUTRAL BUS

BONDING JUMPER TO PANELBOARD ENCLOSURE SIZE PER NEC 250.53(C).

MAIN BONDING JUMPER #2BARE COPPER CONDUCTION

TH

IS D

OC

UM

EN

T IS

TH

E P

RO

PE

RT

Y O

FA

2H

, IN

C.,

AN

D A

LL C

OM

MO

N L

AW

, S

TA

TU

TO

RY

AN

D O

TH

ER

RE

SE

RV

ED

RIG

HT

S S

HA

LL B

E R

ET

AIN

ED

BY

SA

ME

.

AN

Y C

HA

NG

ES

MA

DE

TO

TH

IS D

OC

UM

EN

T W

ITH

OU

T

HE

EX

PR

ES

S W

RIT

TE

N C

ON

SE

NT

OF

A2H

, IN

C.,

SH

ALL B

E P

RO

HIB

ITE

D A

ND

AR

E S

UB

JE

CT

TO

LE

GA

L

PR

OS

EC

UT

ION

. IF

CH

AN

GE

S A

RE

MA

DE

WIT

HO

UT

CO

NS

EN

T,

TH

E L

IAB

ILIT

Y O

F A

NY

CLA

IM IS

AC

CE

PT

ED

BY

TH

E R

ES

PO

NS

IBLE

PA

RT

Y M

AK

ING

TH

E C

HA

NG

E.

A2H, INCORPORATEDENGINEER:

DEVELOPER:

A2H, INC.

SCALE:

PROJECT:

REVIEWED:

LOCATION:

DATE:

DRAWN BY:

CHECKED BY:

REVISIONS

SURVEY:

DIVISION OF ENGINEERING

DATE:

DATE:

GERMANTOWN, TENNESSEE

ELEVATED WATER TOWER

GERMANTOWN, TENNESSEE

GERMANTOWN PUBLIC WORKS

ITEM NO.

DESCRIPTION OF CHANGEAPPROVAL DATE

AS INDICATED

DESIGN REVIEW COMMISSION

DWG NO.

CITY ENGINEER DATE DEPUTY CITY ENGINEER DATE

07/06/19

PLANS NOT VALID FOR CONSTRUCTION UNTIL SIGNED BY CITY ENGINEER

C:\

Use

rs\m

ichae

lla\D

ocum

ents

\19

457

- E

lectr

ical_

mic

ha

ellJ

4V

FV

.rvt

9/2

9/2

02

1 4

:44

:46 P

M

ELECTRICAL DETAILS

MCL

CDR

19457

E2.1

7/30/21

N.T.S.

B4 DEVICE MOUNTING HEIGHT DETAIL

N.T.S.

D1 RISER DIAGRAM

N.T.S.

C4 MAIN SERVICE GROUNDING DETAIL

1 ADD #1 08/06/2021

2 SINGLE PHASE SERVICE 09/30/2021

Notes:

Total Est. Demand: 51 A

RECEPTACLE 3720 VA 100.00% 3720 VA Total Conn.: 51 A

POWER 8130 VA 100.00% 8130 VA Total Est. Demand: 12262 VA

Other 210 VA 100.00% 210 VA Total Conn. Load: 12217 VA

LIGHTING 178 VA 125.00% 223 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 48 A 54 A

Total Load: 5706 VA 6512 VA

29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30

27 500 VA 0 VA 1 20 A SPARE 28

25EUH-1 25 A 2

500 VA 0 VA 1 20 A SPARE 26

23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24

21 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 22

19 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 20

17 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 18

15 SPARE 20 A 1 0 VA 1920 VA 1 20 A DEHUMIDIFIER 16

13 WATER TOWER CONTROL PANEL 15 A 1 500 VA 0 VA 1 20 A SPARE 14

11 SPARE 20 A 1 0 VA 3000 VA 12

9 SITE LIGHTING 20 A 1 252 VA 3000 VA2 40 A WATER TOWER HEATER

10

7 WATER TOWER RECEPTACLES 20 A 1 360 VA 400 VA 1 20 A EF-6 8

5 STORAGE RM RECEPTACLE 20 A 1 180 VA 900 VA 1 20 A STORAGE RM RECEPTACLES 6

3 INTERIOR LIGHTING 20 A 1 132 VA 200 VA 1 15 A EF-1 4

1 BACKFLOW ASSEMBLY HEATER 15 A 1 30 VA 360 VA 1 20 A RESTROOM RECEPTACLE 2

CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT

Notes: SERVICE ENTRANCE RATED; INTEGRAL SURGE PROTECTION; COPPER BUS, DOOR-IN-DOOR NEMA 3R

Enclosure: Type 1 MCB Rating: 150 A

Mounting: Surface Wires: 3 Mains Rating: 250 A

Supply From: UTILITY TRANSFORMER Phases: 1 Mains Type: MCB

Location: Volts: 120/240 Single A.I.C. Rating: 10K

Branch Panel: LP2