City of Surrey PLANNING & DEVELOPMENT REPORT
File: 7913-0010-00
Planning Report Date: September 9, 2013
PROPOSAL:
• Development Permit
to permit an industrial warehouse in Campbell Heights.
LOCATION: 3338 - 190 Street
OWNER: 0940380 BC Ltd.
ZONING: CD
OCP DESIGNATION: Industrial
LAP DESIGNATION: Business Park
Staff Report to Council File: 7913-0010-00
Planning & Development Report
Page 2 RECOMMENDATION SUMMARY • Approval to draft Development Permit. DEVIATION FROM PLANS, POLICIES OR REGULATIONS • None. RATIONALE OF RECOMMENDATION • The proposal complies with the Official Community Plan (OCP) and the Campbell Heights
Local Area Plan (LAP).
• The development is consistent with the design guidelines outlined in the general Development Permit and Design Guidelines approved for Campbell Heights North.
Staff Report to Council File: 7913-0010-00
Planning & Development Report
Page 3 RECOMMENDATION The Planning & Development Department recommends that: 1. Council authorize staff to draft Development Permit No. 7913-0010-00 generally in
accordance with the attached drawings (Appendix II). 2. Council instruct staff to resolve the following issues prior to final approval:
(a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering;
(b) submission of a landscaping plan and landscaping cost estimate to the
specifications and satisfaction of the Planning and Development Department; and (c) resolution of all urban design issues to the satisfaction of the Planning and
Development Department, including signage package. REFERRALS Engineering: The Engineering Department has no objection to the project
subject to the completion of Engineering servicing requirements as outlined in Appendix III.
SITE CHARACTERISTICS Existing Land Use: Adjacent Area:
Direction Existing Use OCP/LAP Designation Existing Zone
North:
Pulley manufacturing facility under construction (7912-0254-00)
Industrial/Business Park CD By-law 17146
East:
Food warehouse/processing facility (7912-0063-00)
Industrial/Business Park CD By-law 17146
South (Across 33 Avenue):
Vacant Industrial Land Industrial/Business Park CD By-law 17146
West (Across 190 Street):
Under application for subdivision (Phase II Campbell Heights North 7912-0160-00)
Industrial/Business Park CD By-law 17146
Staff Report to Council File: 7913-0010-00
Planning & Development Report
Page 4 DEVELOPMENT CONSIDERATIONS Background
• The development site is located at the northeast corner of 190 Street and 33 Avenue in
Campbell Heights. The property measures approximately 9,352 m2 (2.3 acres) in area and was created by the applicant through an internal lot line cancellation in December 2012.
• The property is designated "Industrial" in the Official Community Plan (OCP) and "Business
Park" in the Campbell Heights Local Area Plan (LAP). • In May 2012, the property was rezoned to "Comprehensive Development Zone (CD)" from
"General Agricultural Zone (A-1)" (Application No. 7910-0032-000), and later subdivided into two separate lots (13, 14) as part of the Campbell Heights North (Phase I) development (Application No. 7910-0179-00), prior to being consolidated.
• The CD By-law (No. 17146) governing the site allows for light impact industry and warehouse
uses, distribution centres, along with limited office, transportation industry and other ancillary uses, forming part of a comprehensive design.
• Under the original rezoning and subdivision applications, the site was cleared and serviced for
development. There are no trees or vegetation on the site.
Proposal • The proposed Development Permit (DP) will allow Valley Power Line Contracting Ltd. to
develop a new warehouse operation with office space in Surrey. Valley Power Line provides services to the Canadian power industry, as well as residential, commercial and industrial services, focusing on the design, installation, maintenance and repair of high voltage infrastructure.
• The company currently has a presence at 102 – 19050 25 Avenue in Campbell Heights. The new
building will allow the company to consolidate its operations and provide opportunities for future expansion. In all, the new building will provide employment space for 8 office staff and 15 operations staff, on-site at one time.
• The proposed industrial building is in compliance with the provisions of the CD zone (By-law No. 17146). Specifically, the 787 m2 (8,465 ft2) building will consist of 502 m2 (5,403 ft2) of warehouse space, serviced by loading bays, and a 285m2 (3062.9 ft2) two storey office/ administration area. The applicant advises that the warehouse will be primarily used to store installation trucks and equipment.
• The DP will also provide 547m2 (5,884 ft2) of temporary outdoor storage, north of the proposed
warehouse. This area will be screened by a 4.5 metre (15 foot wall) attached to the proposed warehouse. Under the CD Zone, outdoor storage is permitted on the lot subject to screening to a height of at least 2.5 metres [8 feet] by buildings, solid decorative fencing or substantial landscaping strips. Ultimately, the outdoor storage area will be superseded by a future addition to the warehouse.
Staff Report to Council File: 7913-0010-00
Planning & Development Report
Page 5 • Under the proposal a little less than half of the site will remain undeveloped. The empty land,
which will be fenced off from the active site, will likely be used for a multi-tenant building in the future.
Site Layout and Design
• The proposed building, which covers approximately 7% of the lot, will be located at the
southwest corner of the site. The office itself will be sited closest to the intersection of 190 Street and 33 Avenue to help animate streetscape and anchor the site. From a CPTED perspective, the location of the two-story office area at the site’s corner will provide unobstructed views of the parking area, main entrance and grounds and the street.
• The site will provide employee and visitor parking stalls as well as an internal gated warehousing and storage area. A total of 18 parking stalls will be located along 190 Street, at the west side of the warehouse, while the six truck bays servicing the warehouse will be located at the east side of the warehouse.
• Collectively the internal loading bays and outdoor storage area will be screened with walls,
fencing and landscaping along the perimeter of the site and will be fenced from the front parking area by 7.5 m (25 foot) wide chain link gates.
• The temporary outdoor storage area will be screened by a 4.5 metre (15 foot) large concrete wall
connected to the warehouse. The outside storage area will remain until a future 633 m2 (6,811 ft2) addition to the proposed warehouse is built.
• Two (2) vehicular accesses will serve the site. The 33 Avenue entrance will be used by trucks
accessing the warehouse and outdoor storage area; while the 190 Street entrance will provide vehicular access to parking stalls fronting 190 Street as well as the gated warehousing/storage area.
Design Proposal and Review • The proposed building is generally consistent with the design guidelines outlined in the
Campbell Heights North Design Guidelines and reflective of the existing standards within the area. The development concept behind Campbell Heights is a high quality, sustainable industrial business park.
• Overall the building will have a modern linear appearance. In keeping with the company’s
corporate colours centering on ‘power tool’ theme, the building will use a palette of black, dark and warm grey colours with deep yellow accents.
• The office component of the building, at the corner of the property, will be finished in dark grey
with a combination of grey spandrel glass and vision glass, black flashing and reveals, while the remainder of the building, comprised of concrete tilt up walls will be finished in a combination of warmer grey tones with angular swatches and reveals to break up the volume of space.
• The walls of the warehouse and outdoor storage area will be further broken up by the addition of living, hanging vines supported by metallic wire suspended between deep yellow coloured buttresses. The wire is a type of non-corroding wire that would normally be employed for transmitting electricity.
Staff Report to Council File: 7913-0010-00
Planning & Development Report
Page 6
• Deep yellow will also be used as an accent colour on the elevation of the building and
throughout the building’s signage.
Landscaping • The landscaping plan for the site reflects the registered restrictive covenant for landscaping
and storm water management and will provide 3 metres (10 feet) of landscaped bioswales along 190 Street and 33 Avenue.
• Altogether the plan calls for 10 new trees (including Japanese maples, hornbeam, dogwood and ash), along with shrubs and vines and groundcover to be planted along the perimeter of the site.
• The site will also include pathways directing pedestrian traffic to the building’s main entrance,
which is accessed from the north side of the office adjacent to the parking lot.
• A decorative concrete patio or outdoor amenity area equipped with benches will be located at the southwest corner of the building, while a second stamped concrete patio along the south side of the office building will be available for employees.
• As noted the building will incorporate living green areas and utilize hanging vines of evergreen hydrangea to add further visual interest to the grey shaded concrete walls.
PRE-NOTIFICATION • A development sign was posted on the site in May 2013 and the project was referred to the
Little Campbell Watershed Society (LCWS) for review and comment. The LCWS has provided comments indicating that they do not object to the proposal.
SUSTAINABLE DEVELOPMENT CHECKLIST On June 16, 2013 the applicant prepared and submitted a sustainable development checklist for the subject site. The table below summarizes the applicable development features of the proposal based on the seven (7) criteria listed in the Surrey Sustainable Development Checklist.
Sustainability Criteria Sustainable Development Features Summary
1. Site Context & Location (A1-A2) • The development application is consistent with the prescribed use (Land Use Designations and Zoning) and site context.
2. Density & Diversity (B1-B7) • The project density is in keeping with the Zoning By-law 3. Ecology & Stewardship (C1-C4) • The project will incorporate bio-swales and provisions
for recycling and waste management as per the Campbell Heights guidelines.
4. Sustainable Transport & Mobility (D1-D2)
• The project will include preferential carpool parking and showers and change facilities for cyclists
5. Accessibility & Safety (E1-E3) • The site will utilize CPTED ( Crime Prevention through Environmental Design) principles
6. Green Certification (F1) • None
Staff Report to Council File: 7913-0010-00
Planning & Development Report
Page 7
7. Education & Awareness (G1-G4) • None ADVISORY DESIGN PANEL • The project was not referred to the Advisory Design Panel (ADP), but was reviewed internally by
the City’s design staff. Staff are generally supportive of the proposed project but will require additional details concerning signage, lighting, landscaping and street furniture.
INFORMATION ATTACHED TO THIS REPORT The following information is attached to this Report: Appendix I Lot Owners, Action Summary and Project Data Sheets and Survey Plan Appendix II Proposed Site Plan, Building Elevations, Landscape Plans and Perspective Appendix III Engineering Summary
original signed by Nicholas Lai Jean Lamontagne General Manager Planning and Development HP/da \\file-server1\net-data\csdc\generate\areaprod\save\22591980047.doc DRV 9/4/13 3:23 PM
Page 1
\\file-server1\net-data\csdc\generate\areaprod\save\22591980047.doc DRV 9/4/13 3:23 PM
APPENDIX I
Information for City Clerk Legal Description and Owners of all lots that form part of the application: 1. (a) Agent: Name: Teri Hudson
Teck Construction LLP Address: 5197 - 216 Street Langley, BC V3A 2N4 Tel: 604-534-7917 - Work 604-534-7917 - Cellular
2. Properties involved in the Application
(a) Civic Address: 3338 - 190 Street Owner: 0940380 BC Ltd Inc No 0940380 Director Information: Darlene Olivier Clayton Olivier No Officer Information Filed PID: 029-031-737 Parcel C (Being Consolidation of Lots 13 and 14, See CA3027818) Section 28 Township 7
New Westminster District Plan BCP 50753
3. Summary of Actions for City Clerk's Office
Page 2
\\file-server1\net-data\csdc\generate\areaprod\save\22591980047.doc DRV 9/4/13 3:23 PM
DEVELOPMENT DATA SHEET
Existing Zoning: CD By-law 17146
Required Development Data Minimum Required / Maximum Allowed
Proposed
LOT AREA* Gross Total 9,358.71 m2 (2.31 acres) 9,358.71 m2 (2.31 acres) Road Widening area - - Undevelopable area - - Net Total 9,358.71 m2 (2.31 acres) 9,358.71 m2 (2.31 acres) LOT COVERAGE (in % of net lot area) Buildings & Structures 60% 6.89% Paved & Hard Surfaced Areas 38.36% Total Site Coverage 45.25% SETBACKS ( in metres) Front 7.5 m (25 ft.) 7.6 m (25 ft.) Rear 7.5 m (25 ft.) 15.2 m (50 ft.) Side Flanking Street (190 Street (W)) 7.5 m (25 ft.)*
9.0 m (30 ft) 7.6 m (25 ft.) 15.8 m (52 ft)
Interior Side (E) 7.5 m (25 ft.) 17.4 m (57 ft.) BUILDING HEIGHT (in metres/storeys) Principal 14 m (45 ft) 8.8 m (29 ft) Accessory 6 m (20 ft) - NUMBER OF RESIDENTIAL UNITS - - Bachelor - - One Bed - - Two Bedroom - - Three Bedroom + - - Total - - FLOOR AREA: Residential - - FLOOR AREA: Commercial - - Retail - - Office - - Total - - FLOOR AREA: Industrial 786.41 m2 (8,465 ft2) 786.41 m2 (8,465 ft2) FLOOR AREA: Institutional - - TOTAL BUILDING FLOOR AREA 786.41 m2 (8,465 ft2) 786.41 2 (8,465 ft2) *The side yard setback on a flanking street may be reduced to 7.5 metres (25 feet) if the area between the flanking street face of any building or structure and a highway is not used for parking and is landscaped. Development Data Sheet cont'd
Page 3
\\file-server1\net-data\csdc\generate\areaprod\save\22591980047.doc DRV 9/4/13 3:23 PM
Required Development Data Minimum Required /
Maximum Allowed
Proposed
DENSITY # of units/ha /# units/acre (gross) - - # of units/ha /# units/acre (net) - - FAR (gross) 1.00 .084 FAR (net) 1.00 .084 AMENITY SPACE (area in square metres) - - Indoor - - Outdoor - - PARKING (number of stalls) Commercial - - Industrial 8 18 Residential Bachelor + 1 Bedroom - - 2-Bed - - 3-Bed - - Residential Visitors - - Institutional - - Total Number of Parking Spaces 8 18 Number of disabled stalls - 1 Number of small cars - - Tandem Parking Spaces: Number / % of
Total Number of Units - -
Size of Tandem Parking Spaces width/length
- -
Heritage Site NO Tree Survey/Assessment Provided NO
PARKING REQUIREMENTS:
BUILDING AREAS:
SITE INFORMATION:
MUNICIPAL ADDRESS:
LEGAL DESCRIPTION:
BUILDING FOOTPRINT:
LEGEND:
3 3 r d A V E
1 9
0 t
h
S T
R E
E T
11
'-6"
[35
05
mm
]3
6'-0
"[1
09
73
mm
]
25
'-0"
[76
20
mm
]
25'-0"[7620 mm]
25
'-0"
[76
20
mm
]
18'-0"[5486 mm]
49'-0"[14935 mm]
59'-8"[18187 mm]
11
0'-0
" [3
35
28
mm
]
28'-4"[8636 mm]
34'-5"[10490 mm]
25'-0"[7620 mm]
5'-0"[1524 mm]
20'-4 1/2"[6210 mm]
9'-6
" [2
89
6 m
m]
117'-4"[35764 mm]
36'-0"[10973 mm]
26
'-6 3
/8"
[80
88
mm
]2
86
'-0"
[87
17
3 m
m]
25
'-5 3
/4"
[77
66
mm
]
90'-0"[27432 mm]
29'-0"[8839 mm]
20'-4 1/2"[6210 mm]
5'-0"[1524 mm]
26'-0 1/2"[7937 mm]
52'-0"[15850 mm]
19
6'-5
3/8
"[5
98
77
mm
]
195'-1 1/2"[59475 mm]
30
'-0"
[91
44
mm
]
28'-11"[8814 mm]
3
6
6
4
89° 56' 37"154.199' (47.000m)
134° 58' 07"
13.914' (4.241m)
35
9° 5
9' 3
7"
32
5.4
46
' (9
9.1
96
m)
35
9° 5
9' 3
7"
33
8.0
15
' (1
03
.02
7m
)
89° 25' 20"164.049' (50.002m)
89° 56' 37"135.335' (41.250m)
89° 25' 20"135.341' (41.252m)
3m
COV
RES
3m WIDE
COVENANTRESTRICTED
SET
BA
CK
SETB
ACK
SETBACK
2 STOREY
1,531 S.F.
WAREHOUSE5,403 S.F.
O.H. DR14'x14'
O.H. DR14'x14'
O.H. DR14'x14'
O.H. DR14'x14'
O.H. DR14'x14'
EACH FLOOR(3,062 S.F.)
OFFICE
6
6
WAREHOUSEADDITION
FUTURE
6,811 S.F.
6
IS BUILT
O.H. DR14'x14'
O.H. DR14'x14'
GG
43.20m MBE
(5,884 S.F.)
SETBACK
WALLSCREEN
TYP
O.H. DR14'x14'
OUTSIDESTORAGEUNTIL ADDITION
THIS SHEETSEE DETAILS
FUTUREMULTI-TENANT
POSSIBLE
BUILDNG21,447 S.F.
25' WIDE SLIDINGCHAINLINK GATE
FENCECHAINLINKTEMPORARY
18 CARS8 CARSPARKING REQUIRED =
8,465 S.F / 1,075 S.F.PARKING @ 1 SPACE PER 1,075 S.F.
PARKING PROVIDED =
5,403 S.F.WAREHOUSE:
CD6.89%SITE COVERAGE:
ZONING:
SITE AREA:
SURREY, B.C.
3338 - 190th STREETCAMPBELL HEIGHTS
1,531 S.F.OFFICE MAIN FLR:
8,465 S.F.TOTAL:OFFICE 2ND FLR: 1,531 S.F.
6,934 S.F. (644.18 sq m)
(501.95 sq m)(142.23 sq m)(142.23 sq m)(786.41 sq m)
2.31 Acres (100,737 S.F.)(9358.71 sq m)
= BUILDING SETBACKS= PROPERTY LINE
= STAMPED CONCRETE
= SOFT LANDSCAPESEE LANDSCAPE PLAN
= CONCRETE SIDEWALK
= ASPHALT PAVING
= OUTSIDE STORAGE
= BINNIE R/C= DECORATIVE CONRETE
FENCE
42.25
43.00 43.00 43.00
QUEING
= APPROXIMATELOCATION OF STORMCHAMBERS
OF PAVEMENTEXTENT
AREAUNDEVELOPED
SETBACK
SIDEWALK SIDEWALK
SID
EWA
LK
OF LOTS 13 & 14, SEE CA3027818)SEC 28, TWP 7, NWD,
PART C (BEING A CONSOLIDATION
QUE
UIN
G
(ZONING BYLAWPART 5, 3(b) TABLE)
= 4.0m x 9.2m (13'x30')LOADING SPACE(ZONING BYLAW PART 5,3(b) TABLE) TYP OF 6
ONLY REQUIRES7.5m (25'-0") AISLE
CONCRETE
PLAN BCP 50753
23A7
21
A7
22A7
24
A7
1
C
2
34
A B
2A9
32
A8 31
A8
25'-0 5/8"
15
'-7 1
/2"
STAMPEDCONCRETE, TYP
A2
2
2A0
3A0
APPROXIMATE LOCATIONOF CHN NEIGHBOURHOODSTONE ENTRY SIGN
CONCRETE BENCHES
STAMPED CONCRETESIDEWALKS
STAMPED CONCRETESIDEWALK
COVERED ENTRY OVER
A1
2
25
'-0" S
ETB
ACK
SETB
ACK
25
'-0"
APPROXIMATE LOCATIONOF EXISTING HYDROKIOSK
17
.37
m
R 1
0'-0
"
16" W CONCRETERAISED BENCH SEATING
STAMPED CONCRETE
3A1
PEDESTALSUNDER
22.50°
1'-6
"
1'-4" ±
CONCRETEPEDESTAL
1'-0" ±
CONCRETEBENCH SEAT
CONCRETE PATIOON GRADE
REV
REVISIONS
TECK CONSTRUCTION LLP
OF -
PROJECTNUMBER
5197 -- 216th STREETLANGLEY •
SHEETTITLE
B.C.
SCALE
PROJECT
COPYRIGHT RESERVED
EVERYTHING SHOWN HEREON IS FOR USE ONTHIS PROJECT ONLY AND MAY NOT BEREPRODUCED WITHOUT WRITTEN PERMISSION.WRITTEN DIMENSIONS SHALL HAVE PRECEDENCEOVER SCALED DIMENSIONS.
SHEET NO.
DATE
CHK'D BY
DR'N BY
DATE DESCRIPTION
200-1687 West BroadwayVancouver, B.C. V6J 1X2
TEL: (604) 736-3730 FAX: (604) 736-3771
As indicated
VALLEYPOWERLINE
3338 190th STREETCAMPBELL HEIGHTSSURREY, B.C.
A1
SITEPLAN
-
FEB.7-12
--
Author
1" = 20'-0"A1
1 SITE PLAN
5 23 JUL 2013 REVISED DP APPLICATION
1/8" = 1'-0"A1
2 PATIO FEATURE
1/2" = 1'-0"A1
3 PATIO BENCH SECTION
UP
1
C
2
3
4
A B
2A9
30'-0" 48'-4 1/2" 4'-0" 4'-8" 18'-0"
78'-4 1/2"
3'-0" 3'-0"
23'-4 1/2"
29'-4 1/2"
5'-0
"4
7'-0
"6
3'-0
"
63
'-0"
49'-0"
4'-0" 3'-0" 3'-0" 14'-0" 5'-0" 14'-0" 6'-0"
49'-0"
29'-4 1/2" 49'-0"
3'-0
"1
4'-0
"4
'-0"
14
'-0"
4'-0
"1
4'-0
"4
'-0"
14
'-0"
4'-0
"1
4'-0
"4
'-0"
14
'-0"
3'-0
"
19
'-0"
18
'-0"
18
'-0"
18
'-0"
18
'-0"
19
'-0"
11
0'-0
"
2'-6 1/2" 4'-9" 5'-1"
16
'-0"
3'-4
"2
2'-1
0"
3'-4
"1'-6
"
13
'-8"
6'-1
"7
'-4"
5'-1
1"
6'-1
1"
3'-6
"3
'-7"
6'-1
"1
8'-4
" STA
IR R
UN
4'-6
"
14'-5" 4'-4" 4'-4" 5'-6"
11'-11"
DA8
DA8
CA8
CA8
AA8
AA8
BA8
BA8
1A9
WAREHOUSE101
WAREHOUSE
SHOP OFFICE102
SHOP OFFICE
LOBBY103
LOBBY
STAIR
104
HALL105
HALL
MEETING / LUNCH106
MEETING / LUNCH
TOILET107
TOILET
HALL108
HALL
DRY ROOM109
DRY ROOM SHOP W/R110
SHOP W/R
9A3
12
20
19
1817
1516
05
06
07
08
09
11
02
03 04
10
13
14
5'-0
"1
3'-6
"1
5'-0
"1
8'-6
"
POSSIBLE FUTUREMEZZANINE OVER
5A9
6A9
7A9
8A9
5'-0" GANGSINK
STUD WALLBEHIND GLAZING
RWL
STEEL CANOPYOVER
BUILT IN GUTTEROVER
PROVIDE FIRE CAULKINGTO ALL PANEL JOINTS COMMONTO WAREHOUSE & OFFICES
W8
W3W1
W2W4
W4
W8
W5
W6
W8
W8
W7
W3
W7
W1
W3aW1
W5
W5
W5
W8
W2a
W3
W3
W3
W5
A3
1
DOUBLE GLAZED WINDOWSIN PRESSED STEEL FRAMES
RWL
RWL
RWL
RWL
5'-1
1"
6'-0" 6'-0" 6'-0"
A9
101
A9
102
A9
103 5'-3"
7'-0
"
6'-0"
6'-0"
1'-0"
MAST
1
B
3A9
4A9
16
'-0"
25
'-0"
16
'-0"
25
'-0"
16
'-0"
25
'-0"
16
'-0"
8'-1 1/2"
7'-6"
2'-0"
WAREHOUSE101
WAREHOUSE
PARKING LOT
GARBAGECONTAINERS
PARKING LOT
MAIN ENTRANCE
4'-1
1"
WALL LEGEND
W1
W2
W3
REINFORCED CONCRETE TILT-UP PANELS THICKNESS VARIES (SEESTRUCTURAL DRAWINGS).
2x4 WOOD STUDS @ 16" O.C.1 LAYER 1/2" GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
2x4 WOOD STUD FURRING @ 16" o.c.R-10 BATT INSULATION.6 MIL. VAPOR BARRIER1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
W4
3 5/8" STEEL STUDS @ 16" O.C.1 LAYER 1/2" GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
W5
6" STEEL STUDS @ 16" O.C.1 LAYER 1/2" GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
W6
6" STEEL STUDS @ 16" O.C.1 LAYER 1/2" GWB ON 1 SIDE. PAINT AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
W7
3/4 HR FRR WALL3-5/8" STEEL STUDS @ 16" O.C.1 LAYER 1/2" TYPE 'X' GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
2-1/2" STEEL STUD FURRING @ 16" o.c.R-10 BATT INSULATION6 MIL. VAPOR BARRIER1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
W8
W2a 2x4 WOOD STUD FURRING @ 16" o.c.1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
W3a 2-1/2" STEEL STUD FURRING @ 16" o.c.1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
CURTAIN WALL SYSTEM6" OVERALL FRAME DEPTHC/W DOUBLE GLAZED UNITS AND2 1/2" FRAMES ON CONCRETE RECESSC/W SPANDEREL GLASS
W9
BASE & FINISHES EXTENDTO U/S DECK
BASE EXTENDS TO U/S DECK.FINISHES TO 6" ABOVE CEILING.
BASE AND FINISHES EXTENDTO 6" ABOVE CEILING
BATT INSULATIONTO STUD SPACE
WX
WX
WX
SEE CEILING PLANSFOR EXTENT ANDDESCRIPTION OF FIRERESISTANCE RATINGS
WALL KEYNOTE SYMBOLS
REV
REVISIONS
TECK CONSTRUCTION LLP
OF -
PROJECTNUMBER
5197 -- 216th STREETLANGLEY •
SHEETTITLE
B.C.
SCALE
PROJECT
COPYRIGHT RESERVED
EVERYTHING SHOWN HEREON IS FOR USE ONTHIS PROJECT ONLY AND MAY NOT BEREPRODUCED WITHOUT WRITTEN PERMISSION.WRITTEN DIMENSIONS SHALL HAVE PRECEDENCEOVER SCALED DIMENSIONS.
SHEET NO.
DATE
CHK'D BY
DR'N BY
DATE DESCRIPTION
200-1687 West BroadwayVancouver, B.C. V6J 1X2
TEL: (604) 736-3730 FAX: (604) 736-3771
As indicated
VALLEYPOWERLINE
3338 190th STREETCAMPBELL HEIGHTSSURREY, B.C.
A2
MAIN FLOOR
-
04 JUN 2013
--
Author
1/8" = 1'-0"A2
1 MAIN FLOOR
1/16" = 1'-0"A2
2 SCREEN WALL NORTH
NORTH
5 23 JUL 2013 REVISED DP APPLICATION
DN
DN
1
C
2
3
4
A B
2A9
23'-4 1/2"
52
'-0"
13'-0" 16'-4 1/2"
5'-1"
2'-6" 3'-0" 6'-5"
13'-0" 16'-4 1/2" 0'-7 1/2"
24'-0"
30'-0"
5'-0
"1
2'-4
"9
'-4"
18
'-0"
12
'-4"
CLEAR4'-7".
4'-6"OUT TO OUTSTRINGERS
TREADS4'-0"
4'-0
"5
'-4"
CANOPY SUPPORTSSPACING
MULLIONSPACING
20
'-2"
MULLIONSPACING
DA8
CA8
CA8
AA8
AA8
BA8
BA8
1A9
9A3
OFFICE201
OFFICEBOARD ROOM
202
BOARD ROOM
OPEN OFFICE203
OPEN OFFICE
STAIR
204
W/R205
W/R
OFFICE206
OFFICE??
?
UPPERWAREHOUSE
21 22
23
24
2526
17
'-1"
3'-4
"
3'-6
"
5'-0"
KNOCK OUT FORFUTURE MAN DOOR
POSSIBLE FUTUREMEZZANINE AT2ND FLOOR LEVEL
4'-2 1/2"5
A9
6A9
7A9
8A9 DUCT SHAFT
W3
W5
W5
W8
W8
W5
W5
W7
W1
W1
W3W3
W3
W8W5
ROOF ACCESSLADDER
A3
1
3/4" PLYWOOD DECK, PAINTED2"x8" WOOD JOISTS @ 18" O.C.1/2" GWB, PAINTED
W3a
W5W5
5'-1
1/2
"
W5
W3a
W3a
27
W5
W5
W5
W5
RWL
RWL
RWL
RD
FUTURE STAIR TO MAINFLOOR FROM MEZZANINE
DN
CLOSET1
5'-1
0"
B9
A3
2'-6
"1
'-0"
20
TR
EAD
S @
11
"1
8'-4
"0
'-11
"1'-0
"
4'-6"
0'-3" 4'-0" 0'-3" HANDRAILEXTENTIONS
HANDRAILEXTENTION
TACTILEWARNINGSTRIP
2" TREADEDGE / NOSING
MAIN FLOOR
100'-0"
U/S DECK
125'-4"
SECOND FLOOR
112'-2"
2
TOILET107
TOILETHALL108
HALL LOBBY103
LOBBY
STAIR204
STAIR BOARD ROOM202
BOARD ROOM
13
'-2"
12
'-2"
12
'-2"
A9
210
AB
OVE
NO
SIN
G L
INE
7'-0
"
7'-7 9/16"
9'-0
"3
'-2"
9'-0
"2
1 R
ISER
S @
6.9
5"
12
'-2"
9'-0
"
0'-1
0 3
/4"
2'-1
1"
3'-5"
SPRAYEDFIREPROOFING TOU/S DECK & STAIR
W8
W5
W8
W8
WALL LEGEND
W1
W2
W3
REINFORCED CONCRETE TILT-UP PANELS THICKNESS VARIES (SEESTRUCTURAL DRAWINGS).
2x4 WOOD STUDS @ 16" O.C.1 LAYER 1/2" GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
2x4 WOOD STUD FURRING @ 16" o.c.R-10 BATT INSULATION.6 MIL. VAPOR BARRIER1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
W4
3 5/8" STEEL STUDS @ 16" O.C.1 LAYER 1/2" GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
W5
6" STEEL STUDS @ 16" O.C.1 LAYER 1/2" GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
W6
6" STEEL STUDS @ 16" O.C.1 LAYER 1/2" GWB ON 1 SIDE. PAINT AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
W7
3/4 HR FRR WALL3-5/8" STEEL STUDS @ 16" O.C.1 LAYER 1/2" TYPE 'X' GWB EACH SIDE. PAINT BOTH SIDES AS SPECIFIED.SEE SCHEDULE FOR HEIGHTS AND INSULATION REQUIREMENTS.
2-1/2" STEEL STUD FURRING @ 16" o.c.R-10 BATT INSULATION6 MIL. VAPOR BARRIER1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
W8
W2a 2x4 WOOD STUD FURRING @ 16" o.c.1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
W3a 2-1/2" STEEL STUD FURRING @ 16" o.c.1 LAYER 1/2" GWB TO INTERIOR. PAINT AS SPECIFIED.
CURTAIN WALL SYSTEM6" OVERALL FRAME DEPTHC/W DOUBLE GLAZED UNITS AND2 1/2" FRAMES ON CONCRETE RECESSC/W SPANDEREL GLASS
W9
BASE & FINISHES EXTENDTO U/S DECK
BASE EXTENDS TO U/S DECK.FINISHES TO 6" ABOVE CEILING.
BASE AND FINISHES EXTENDTO 6" ABOVE CEILING
BATT INSULATIONTO STUD SPACE
WX
WX
WX
SEE CEILING PLANSFOR EXTENT ANDDESCRIPTION OF FIRERESISTANCE RATINGS
WALL KEYNOTE SYMBOLS
REV
REVISIONS
TECK CONSTRUCTION LLP
OF -
PROJECTNUMBER
5197 -- 216th STREETLANGLEY •
SHEETTITLE
B.C.
SCALE
PROJECT
COPYRIGHT RESERVED
EVERYTHING SHOWN HEREON IS FOR USE ONTHIS PROJECT ONLY AND MAY NOT BEREPRODUCED WITHOUT WRITTEN PERMISSION.WRITTEN DIMENSIONS SHALL HAVE PRECEDENCEOVER SCALED DIMENSIONS.
SHEET NO.
DATE
CHK'D BY
DR'N BY
DATE DESCRIPTION
200-1687 West BroadwayVancouver, B.C. V6J 1X2
TEL: (604) 736-3730 FAX: (604) 736-3771
As indicated
VALLEYPOWERLINE
3338 190th STREETCAMPBELL HEIGHTSSURREY, B.C.
A3
SECOND FLOOR
-
04 JUN 2013
--
Author
1/8" = 1'-0"8
SECOND FLOOR
1/4" = 1'-0"1
STAIR PLAN
1/4" = 1'-0"A2
9 WALL SECTION 9
5 23 JUL 2013 REVISED DP APPLICATION
MAIN FLOOR
100'-0"
U/S DECK
125'-4"
SECOND FLOOR
112'-2"
1234
AA8
BA8
CONCRETE TILT PANELSPAINTED
STEEL PANELO/H DOORSPAINTED
EXTERIOR LIGHTS
BLACK CAPFLASHING
EXTERIOR LIGHTS EXTERIOR LIGHTS
P2P4P3 P4 P3 P4 P4 P3P2P3P4P3P3P4P3P4P3P4 P2
P1 P1 P1 P1 P1
P1
P5
P1
YELLOW BUTTRESS
MAIN FLOOR
100'-0"
U/S DECK
125'-4"
SECOND FLOOR
112'-2"
C AB
2A9
DA8
CA89
A3
CONCRETE TILT PANELS, PAINTED
OPENINGS INCONCRETE PANELS
1 1/2" DIA. TENSION CABLESUPPLIED BY OWNER
STEEL PANELO/H DOOR,PAINTED
13
'-2"
P5P2
VISION GLASS P1
VISIONGLASS
SPANDRELGLASS
P1
P1P2P4 P3P4 P3P3 P2
P1P1P1
P5
MAIN FLOOR
100'-0"
U/S DECK
125'-4"
SECOND FLOOR
112'-2"
CA B
2A9
DA8
CA8
1A9
CONCRETE TILT PANELS, PAINTED
OPENINGS INCONCRETE PANELS
1 1/2" DIA. TENSION CABLESUPPLIED BY OWNER
11'-2" 6'-0" 9'-11"KNOCK OUTPANEL
KNOCK OUTPANEL
KNOCK OUTPANEL
4'-0"
12'-4" 2'-10"3'-0"
P5
P2P1 P2 P4 P3 P4 P3P3
P3
P4
P1 P1 P5 P5 P1 P3
18" ADDRESS INDENTIFIER: PAINT P5
P4
MAIN FLOOR
100'-0"
U/S DECK
125'-4"
SECOND FLOOR
112'-2"
12 3 4
13
'-2"
12
'-2"
VISION GLASS
SPANDREL GLASSGREY
TILT UP CONCRETEWITH REVEALS
SPANDREL GLASSGREY
OPERABLE WINDOW VENT
SPANDREL GLASS
BLACK ANODIZEDALUMINUM MULLIONS
VISION GLASS
31
'-9"VISION GLASS
PAINTED METAL &GLASS CANOPY
CONRETE BUTTRESSPAINTED YELLOW
METAL LATTICEFOR VINES
REVEALS IN TILT WALLS
P2
P1
P3
P4
P3 P4 P4 P3 P4
P5
P2P5
P1
P5
BLACK CAP FLASHING
ADDRESS: PAINT P5
P5P5 P1 P1 P1P3 P4
26
'-2"
REV
REVISIONS
TECK CONSTRUCTION LLP
OF -
PROJECTNUMBER
5197 -- 216th STREETLANGLEY •
SHEETTITLE
B.C.
SCALE
PROJECT
COPYRIGHT RESERVED
EVERYTHING SHOWN HEREON IS FOR USE ONTHIS PROJECT ONLY AND MAY NOT BEREPRODUCED WITHOUT WRITTEN PERMISSION.WRITTEN DIMENSIONS SHALL HAVE PRECEDENCEOVER SCALED DIMENSIONS.
SHEET NO.
DATE
CHK'D BY
DR'N BY
DATE DESCRIPTION
200-1687 West BroadwayVancouver, B.C. V6J 1X2
TEL: (604) 736-3730 FAX: (604) 736-3771
1/8" = 1'-0"
VALLEYPOWERLINE
3338 190th STREETCAMPBELL HEIGHTSSURREY, B.C.
A7
ELEVATIONS
-
04 JUN 2013
--
Author
1/8" = 1'-0"A1
21 EAST ELEVATION
1/8" = 1'-0"A1
22 NORTH ELEVATION
1/8" = 1'-0"A1
23 SOUTH ELEVATION
1/8" = 1'-0"A1
24 WEST ELEVATION
5 23 JUL 2013 REVISED DP APPLICATION
FINISH SCHEDULE
MAT'L DESCRIPTION
P1 ICI PAINTS 'SEAL GREY'P2 ICI PAINTS 'DEEP ONYX'P3 ICI PAINTS 'SONG SPARROW'P4 ICI PAINTS 'SILVER CLOUD'P5 ICI PAINTS 'SUNNY SIDE UP'
FINISH SCHEDULE
MAT'L DESCRIPTION
P1 ICI PAINTS 'SEAL GREY'P2 ICI PAINTS 'DEEP ONYX'P3 ICI PAINTS 'SONG SPARROW'P4 ICI PAINTS 'SILVER CLOUD'P5 ICI PAINTS 'SUNNY SIDE UP'
OO
OO
OO
OOOO
OOOO
OO
OO
OO
OOOO
OO
OO
OOOO
OO
OOOO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OOOO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OOOO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OOOO
OO
OO
OOOO
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVVVVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVVVVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVVVVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
VVVVV
FFF
FFF
FFFFFF FFF
FFF
FFF
FFF
FFFFFF
FFF
FFF
FFF
FFF
FFF
FFFFFF
FFFFFF
FFF
FFF
FFF
FFFFFF FFFFFF
FFF
FFF
FFF
FFFFFF
FFFFFF
FFF
FFF
FFFFFF
FFF
FFFFFF
FFFFFF
FFF
FFF
FFFFFF
FFF
FFF
FFFFFFFFFFFFFFF FFFFFF FFF FFF FFF FFF FFF FFF FFF FFF FFF FFF FFF FFF FFF FFF FFF LLLLLLLLLL LL
LL LLLL
LLLL LL LL
LL LL LL LL LL LL
LL LL LL LL LL LL LL LL LL LL LLLLLLLLLL
LL LL LL LL LL LL LLLL LL LL LL
LL LL LL LL LL LL LLLL LL LL
LLLL LL LL LL LL LL LL
LL LLLLLL
LLLLLL LL LLLL
GGGGG
GGGGG
GGGGGGGGGG
GGGGGGGGGG
GGGGG
GGGGG
GGGGG
GGGGG
GGGGGGGGGG
GGGGG
GGGGG
GGGGG
GGGGGGGGGG
GGGGGGGGGGGGGGG
GGGGG
GGGGG
GGGGG
GGGGGGGGGGGGGGGGGGGG
GGGGG
GGGGG
GGGGG
GGGGGGGGGG
GGGGG
GGGGGGGGGG
GGGGGGGGGG
GGGGGGGGGG
GGGGG
GGGGGGGGGG
GGGGG
GGGGG
GGGGG
GGGGG
GGGGGGGGGG
GGGGG
GGGGG
GGGGGGGGGG
GGGGG GGGGGGGGGG
GGGGGGGGGG
GGGGG
GGGGGGGGGG
GGGGG
GGGGG
GGGGGGGGGG
GGGGGGGGGG
GGGGGGGGGG
GGGGGGGGGG
GGGGG
GGGGGGGGGG
GGGGGGGGGG
GGGGG
GGGGGGGGGG GGGGGGGGGG
GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG GGGGG
GGGGGGGGGGGGGGGGGGGG
GGGGG
GGGGGGGGGGGGGGGGGGGGGGGGG
GGGGG
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1 B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1 B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1 B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1 B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1 B1B1B1B1B1
B1B1B1B1B1 B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1 B1B1B1B1B1 B1B1B1B1B1 B1B1B1B1B1 B1B1B1B1B1 B1B1B1B1B1 B1B1B1B1B1 B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
B1B1B1B1B1
UUUUUUUUUU
UUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUU UUUUUUUUUU UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU UUUUUUUUUU UUUUU
UUUUUUUUUU
UUUUUUUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUUUUUUUUUUUUUUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUUUUUUU
UUUUU UUUUU UUUUU UUUUU UUUUU UUUUU
UUUUUUUUUUUUUUU
UUUUU
UUUUU
UUUUU UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU
UUUUUUUUUUUUUUUUUUUUUUUUUUUUUU UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU
UUUUU
UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUU
UUUUUUUUUU
UUUUU
UUUUUUUUUU
UUUUUUUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUUUUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUU
UUUUUUUUUU
UUUUUUUUUU
UUUUUUUUUU
UUUUU
BBBBBBBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBB
BBBBBBBBBB BBBBB
BBBBBBBBBBBBBBB
BBBBB
BBBBBBBBBB
BBBBBBBBBB BBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB
BBBBBBBBBBBBBBB
BBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBBBBBBB
BBBBB BBBBB BBBBB
BBBBB BBBBB BBBBB BBBBB BBBBB BBBBBBBBBB
BBBBB
BBBBB BBBBBBBBBB
BBBBB BBBBB BBBBB BBBBB BBBBB
KKBBBBB BBBBB
BBBBB BBBBB BBBBB BBBBB BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
BBBBB
KK KK KK KK KK KK KK KK KK KKKK KK KK KK KK KK KK KKKK KK KKKKKKKK
KKKK
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJJJ
JJJJJJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJ
JJJJ
JJ
JJ
JJ
JJ
JJJJJJJJJJJJJJJJ
JJJJJJJJJJJJ
JJ
JJJJJJ JJ
CCCC
CCCC
CCCCCCCC
CCCCCCCCCCCC
CCCCCCCC
CCCCCCCCCCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCCCCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC CCCC CCCC CCCC CCCC CCCC CCCC CCCC
CCCC
CCCC
CCCC
CCCCCCCCCCCC
CCCC
CCCC
CCCC
CCCCCCCC
CCCCCCCC
CCCC
CCCC
CCCC
CCCC CCCCCCCC CCCC CCCC CCCC CCCC CCCC
CCCC CCCCCCCCCCCC CCCC CCCC
CCCC CCCC CCCC CCCC CCCC
CCCC CCCC CCCC CCCC CCCC CCCC CCCC CCCC CCCC
CCCC CCCC CCCC CCCCCCCC
CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC CCCC CCCCCCCCCCCCCCCCCCCC
CCCCCCCC
CCCC
CCCCCCCCCCCCCCCC
CCCCCCCC
CCCCCCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
PPPPPPPPPPPPPP PP PP PP PP PP PP PP PP
PP PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
DD
DDDD
DD
DDDD
DD DD
DDDD
DD
DDDD
DD
DDDDDDDD
DDDD
DD
DD DDDDDD
DDDD
DDDD
DDDD
DD
DD
DDDDDD
DDDD
DD
DD
DD
DDDD
DD
DDDD
DD
DD
DD
DD
DD DD DD DD DD DD
DD DD DD DD DD DD DD DD DD DD DD DD DD DD
DDDD
DDDDDD
DDDD DD DD
DDDDDD
DDDD
DD
BOULDERS TO SLOW FLOWAND COLLECT SEDIMENT
APPROX LOCATION OFCHN NEIGHBOURHOODSTONE ENTRY SIGN
COBBLE BIOSWALE
DRAIN OUTLET
COBBLE BIOSWALE
PLLAWN
COBBLE CHANNEL
DRAIN OUTLET(TBD)
ACER CIRCINATUM
AMELANCHIER X GRANDIFLORA'AUTUMN BRILLIANCE'
ROCKS TO SLOW FLOWAND COLLECT SEDIMENT
SIDEWALK
LAWN
LAWN
COBBLE CHANNEL
ROCKS TO SLOW FLOWAND COLLECT SEDIMENT
DRAIN OUTLETAMELANCHIER X GRANDIFLORA
'AUTUMN BRILLIANCE'
L1
LANDSCAPEPLAN
ACT
1"=20'-0"
SURREY, B.C.
33rd AVENUE
DENCE OVER SCALED DIMENSIONS.WRITTEN DIMENSIONS SHALL HAVE PRECE-REPRODUCED WITHOUT WRITTEN PERMISSION.THIS PROJECT ONLY AND MAY NOT BEEVERYTHING SHOWN HEREON IS FOR USE ON
VALLEYPOWERLINE
11 SEPT '12
1. Issued For Development PermitJan 10/13
REV.DATE DESCRIPTION
PROJECT:
REVISIONS
PROJECTNUMBER
B.C.LANGLEY5197-216th STREET
COPYRIGHT RESERVED
TECK CONSTRUCTION LTD.
DR'N. BYCHK'D BYPLOTSCALE
TITLESHEET
SHEET No.
LANDSCAPE ARCHITECT
2.
3.
4.
5.
6.
7.
CAMPBELL HEIGHTS
Reissued For Development PermitApr 04/13
Reissued For Development Permit(with vines)May 29/13
Reissued For Development Permit(per city: cedar change, stamp conc)July 19/13
Reissued For Dev Permit (city review)July 24/13
Sep 03/13 Reissued For Development Permit(per city: patio detail)
3m W
IDE
CO
VE
NA
NT
RE
STR
ICTE
D
3m WIDE
COVENANTRESTRICTED
2 STOREY
WAREHOUSE
OFFICE
WAREHOUSEADDITION
FUTURE
IS BUILT
GG
43.20 MBE
CHAINLINK GATE
WALLSCREEN
CANOPYOVER
OUTSIDESTORAGEUNTIL ADDITION
FUTUREMULTI-TENANT
POSSIBLE
BUILDNG
25' WIDE SLIDING
FENCECHAINLINKTEMPORARY
OF PAVEMENTEXTENT
AREAUNDEVELOPED
OF EXISTING HYDRO KIOSKAPROXIMATE LOCATION
SIDEWALK SIDEWALK
SID
EW
ALK
CONCRETE
WALLSCREENCONCRETE
FEATURE(See Detail)
PATIO
3
6
6
4
H
H
H
H
H
H
PLANTED SIZE / REMARKSCOMMON NAMEBOTANICAL NAME
PLANT SCHEDULE - BIOSWALE TYPES: B, C & 190 St.KEY QTY 'B'
TREE3 ACER CIRCINATUM VINE MAPLE 1.5M HT; B&B; 3 STEM CLUMP3 AMELANCHIER X GRANDIFLORA 'AUTUMN BRILLIANCE' AUTUMN BRILLIANCE SERVICEBERRY 1.5M HT; B&B
N/A FRAXINUS AMERICANA 'AUTUMN PURPLE' AUTUMN PURPLE ASH 6CM CAL / St. Trees By Others
SHRUB6 CORNUS SERICEA 'KELSEYI' KELSEY DOGWOOD #3 POT; 80CM
GRASS34 CAREX 'ICE DANCE' SILVER VARIEGATED SEDGE #1 POT19 JUNCUS EFFUSUS COMMON RUSH #1 POT
GC- BLECHNUM SPICANT DEERFERN #1 POT; 20CM
36 GAULTHERIA SHALLON SALAL #1 POT; 20CM15 LONICERA PILEATA PRIVET HONEYSUCKLE #1 POT; 25CM22 POLYSTICHUM MUNITUM WESTERN SWORD FERN #3 POT; 20CM- WALDSTEINIA TERNATA BARREN STRAWBERRY #1 POT; 30CM
DD
JJ
CCCC
VVVVV
FFF
LL
GGGGG
BBBBB
- ARCTOSTAPHYLOS UVA-URSI KINNICKINICK #1 POT; 20CMUUUUU
17 PHILADELPHUS X VIRGINALIS 'DWARF SNOWFLAKE' DWARF SNOWFLAKE MOCK ORANGE #3 POT; 60CMPP
43
N/A
20
58-
-62-
QTY 'C'
-
35
18
NOTE: BIOSWALE INFORMATION DERIVED FROM DMG/BINNIE SOURCE AND ADOPTED TO SITE PER GUIDELINES.
121
-
83
N/A
68
7322
84-
40
QTY '190th'
96
- KOELERIA CRISTATA26 - JUNE GRASS #1 POTK
21 CORNUS CANADENSIS BUNCHBERRY #1 POT; 20CMB1 - 101
- MALUS 'RED JEWEL' CRAB APPLE 1.5M HT; B&B- RHAMNUS PURSHIANA CASCARA BUCKTHORN 1.5M HT; B&B
--
35
27 149
- GALIUM ODORATUM SWEET WOODRUFF #1 POT; 20CM- 113O
-
SSYMBOL QQTY. BBOTANICAL NAME CCOMMON NAME SSIZE
SShrubs Continued ...
17 Potentilla fruticosa 'Snow ake' Shrubby Cinquefoil Var. #2 pot
77 Prunus l. 'Otto Luyken' Otto Luyken Laurel #2 pot
9 Rhododendron 'Christmas Cheer' Rhododendron (medium var.) #3 pot
6 Rhododendron 'Anna Rose Whitney' Rhododendron (tall var.) #7 pot
24 Rosa meidiland 'Carefree Delight' Hardy French Rose var. #2 pot
19 Spirea x bumalda 'Anthony Waterer' Spirea Var. #2 pot
35 Thuja occidentalis 'smaragd' Emerald Cedar 2.5m (8') ht / 1.5m o.c.
21 Viburnum davidii David's Viburnum #2 pot
6 Weigelia 'Bristol Ruby' Weigelia #3 pot
VVines / Ground Cover
6 Hydrandea anomala petiolaris Climbing Evergreen Hydrandea #5 pot / stake to wall
30 Arctostaphylos uva-ursi Vancouver Jade 10cm pot / 45cm o.c. / heavy
8 Cotoneaster 'Lowfast' Cotoneaster var. #1 pot / heavy
NNotes:
1. Speci cation as per most recent BCSLA/BCLNA 'Landscape Standards' and
LandSpace Design Inc. 'Spec Notes'.
2. The Contractor must satisfy the City Landscape Inspector for Completion Acceptance Approval
PPLANT LIST
SSYMBOL QQTY. BBOTANICAL NAME CCOMMON NAME SSIZE
TTrees
1 Acer palmatum 'Osakasuki' Japanese Maple 3m ht. / s-stem
2 Carpinus betulus European Hornbeam 6cm cal. / 2m stnd
3 Cornus x nutalli 'Starlight' Dogwood Var. 5cm cal. / 2m stnd
3 Fraxinus americana 'Autumn Purple' Ash 6cm cal. / 2m stnd
1 Liquidambar styraci ua 'Worpleston' Sweet Gum 5cm cal. / 2m stnd
SShrubs
10 Azalea japonica 'Rosebud' Japanese Azalea #2 pot
10 Hydrangea macrophylla 'Blue Wave' Hydrangea #5 pot
86 Lonicera pileata 'Red Tip' Evergreen Honeysuckle #2 pot
6 Photinia fraserii Photinia #5 pot
13 Pieris japonica 'Temple Bells' Japanese Andromeda #5 pot
H
TYPE B BIOSWALE TYPE C BIOSWALE
TYP
E 1
90 S
T. B
IOS
WA
LE
NOTE: INTEGRATE LANDSCAPE BUFFER (BIOSWALE) WITH ON SITE LANDSCAPE
SID
EW
AL
K
LA
WN
LA
WN
HEDGE CEDARSCREEN PLANTING
HEDGE CEDAR PLANTING ON ADJACENT SITE
GR
OU
ND
CO
VE
R
3 3 r d A V E
19
0th
ST
RE
ET
EVERGREENVINE TO COVER WALL FEATURE
EVERGREENVINE TO COVER WALL FEATURE
EVERGREENVINE TO COVER WALL FEATURE
EVERGREENVINE TO COVER WALL FEATURE
EVERGREENVINE TO COVER WALL FEATURE
EVERGREENVINE TO COVER WALL FEATURE
SOD LAWN
STAMPCONC (Typ)
STAMPCONC (Typ)
STAMPCONC (Typ)
PATIO DETAIL (See Arch)
lt_sURREY ~ the fvture lives here.
INTER-OFFICE MEMO
TO: Manager, Area Planning & Development - South Surrey Division Planning and Development Department
FROM: Development Services Manager, Engineering Department
DATE: August 16, 2013 PROJECT FILE:
RE: Engineering Requirements (Commercial/Industrial) Location: 3338-190 Street & 19025-33 Avenue
Dedication requirements and frontage works for this site have been provided through completion of City of Surrey project 781o-o179-oo.
DEVELOPMENT PERMIT
The following issues are to be addressed as a condition of issuance of the Development Permit: • Provide landscaping plans as per Restrictive Covenant which includes on-site stormwater
management features and provide corresponding Landscaping Security Deposit.
BUILDING PERMIT
The following issues are to be addressed as a condition of issuance of the Building Permit:
• Provide an n.o metre access complete with 6.o metre queuing; • Remove and abandon all service connections not required for the consolidated lot; • Calculations are to be submitted to confirm the size of the metered domestic service
connection and the size of the fire service required for the proposed development; and • Address Permit requirements (ESC Permit, City Road Right of way Permit, etc)
associated with the Building Permit.
Remi Dube, P.Eng. Development Services Manager