CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #1 FORM ITB #2020-005 Renovation of Leased Space Upon receipt, please print and add to your proposal I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: ZIP: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE

Upload: others

Post on 15-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

CITY OF TUCKER

ACKNOWLEDGE RECEIPT OF ADDENDUM #1 FORM

ITB #2020-005 Renovation of Leased Space

Upon receipt, please print and add to your proposal I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME:

CONTACT PERSON:

ADDRESS:

CITY: STATE: ZIP:

PHONE: FAX:

EMAIL ADDRESS:

SIGNATURE DATE

Page 2: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

ADDENDUM #1

ITB #2020-005

Renovation of Leased Space Questions Received:

1. Can the City please post the pricing sheet? a. Yes, the pricing sheet is now posted with the answers.

2. Will the bid include appliances? a. No, those will be done separately.

3. The plans indicate that there will be a wheelchair lift. Is that the case and if so, where. Is the lift located.

a. No wheelchair lifts. 4. Are there any pictures of the existing interior space?

a. No 5. Will there be a schedule time to visit the site?

a. A time has not been scheduled for the site visit. 6. The ITB lists that the work will include work to the fire sprinkler system. Is there

an approved vendor that must be used? a. The preferred sprinkler company Fire Sprinkler System - Century Fire

Protection, Ben Colbert, Office – 770-506-2388; Cell# 770-876-3040 7. Is low voltage cabling to be included or is that being handled separately, and if so

by whom? a. The low voltage cabling will be handled by the City of Tucker.

8. The ITB indicates matching the existing doors. What are the type of doors and veneer?

a. Not known at this time. 9. What is the existing key system? Will it be included or handled separately?

a. This will be handled separately by the City of Tucker. 10. Are there specific subcontractors that have to be used?

a. The following subcontractors are approved to work in the building. Contractors will state the subcontractor being used in their proposal. The building property manager or tenant project manager will have to approve use of non-approved subcontractors. The only subcontractor that must be used is Mitec for fire alarm.

i. Electrical Contractor - Allison Smith, Craig Vandiver, Office – 404-351-6430 cell# 404-456-9281

ii. Fire Alarm Systems – Mitec, Matt Ording, Office – 770-813-5959 Cell# 404-472-7600

iii. Fire Sprinkler System - Century Fire Protection, Ben Colbert, Office – 770-506-2388, Cell# 770-876-3040

Page 3: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

iv. Plumbing Contractor - Art Plumbing, Marty Carrol, Office – 770-3232 Cell # 404-316-5214

v. HVAC Contractor - McKenney’s, Tracy Venters, Office- 404-624-8600 Cell# 404-557-6400

11. The document indicates use of roller shades. Where are those located and what is the scope of the shades for inclusion?

a. No roller shades in the project. 12. It looks like the last sheet might be missing as there are references to roller shades

and other items not included? a. No roller shades in the project.

13. The included schedule includes only 2 months. This is a short amount of time for award and buildout considering long lead times on some items. Will the City consider lengthening the project timeline?

a. No 14. It appears that the sheets in the general notes indicates fire alarm demo with the

approved subcontractor. Who is the subcontractor? Done separately or with this bid?

a. Mitec must be used for the fire alarm. 15. What is the reference to Mitec on page 3?

a. This if the company that must be utilized for the fire alarm. 16. Will the City cover the permit fees?

a. Yes 17. Are the Inspections all performed by the City?

a. No some are City, and some are County. 18. When the City moves to the new space, will it be fully occupied.

a. Yes, the space is full except for a few growth offices. 19. Will the City be starting operations immediately?

a. Yes, the startup will be end of June. 20. Is there a budget set?

a. No, it has not specifically set. 21. Can the bid submission be electronic?

a. Yes 22. Has the project been funded by the City?

a. Yes 23. How can the drawings be obtained?

a. Email [email protected]. 24. Will the Q&A post the list the attendees?

a. Yes, to the best of my ability I will include what I heard on the phone. The attendees could please email for better listing.

25. Are the hours to work restricted? a. No

26. Are there any noise restrictions? a. No

27. Is there any indication of the facility being shut down and if so, how will the City address the issue?

Page 4: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

a. Currently, there is no indication of a shutdown. However, if the City/State/Federal government shut down this type of work the City would have to address the timeline accordingly.

28. There are some items that have long lead times. Would the City pay for storage on these items.

a. No, the City would not pay for storage. However, that can be included in the bid.

29. Are the bathrooms operational? a. Yes

30. Is there an area that can be used in parking lot for lay down/storage containers on site?

a. Yes, but this would need to be coordinated with the Tenant Project Manager.

31. Is there ample parking for the contractors? a. Yes

32. Who attended the pre-bid conference: Todd Salmon, Green Heart Enterprises Richard Murrah, Diversified Construction Marc Johnson, Multiplex Jan Phillips, Striker contracting Bryan Haynes, BMK Construction Robb Dean, McCallan Group Maish Paryani, Paryani Construction Avinash Karnati, Stryker Contracting Kevin Door, Green Heart Enterprises Wesley, Lovern Construction Jeremiah Johnson, Merit Construction Serkan Saglam, Buildline Construction Robert Morrison, BE Guthrie Construction Gary Frantz, Prime Contractors Inc. Uriah Bullard, Cloud Construction Terrell Lews, FS360 Rob Wasserman, Macallan Works

33. Have the drawings already been permitted and approved? a. The plans have been submitted for permit and pending review and

approval. 34. Is there ample parking in the existing parking lot for workers and a dumpster

location: a. Yes

35. Will the project schedule be adjusted for any delays caused by any mandated City or Government shutdowns?

a. Currently, there is no indication of a shutdown. However, if the City/State/Federal government shut down this type of work the City would have to address the timeline accordingly.

36. Can the City pay for stored materials to help expedite delivery of any long lead time items?

Page 5: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

a. No, the City would not pay for storage. However, that can be included in the bid.

37. Is the existing building space already sprinkled? a. Yes

38. Is there anyway to take pictures of the existing electrical panel box, space conditions, and/or flooring?

a. The City does not currently have plans to include these items. 39. Do the drawings show the existing deck height?

a. No 40. Is the FFE package part of our price proposal?

a. No 41. Who is handling the A/V Cabling?

a. City of Tucker 42. What appliances are we pricing?

a. Listed in appliance schedule on sheet A2.08. Reference elevations for counts.

43. Are there existing window treatments? a. Yes

44. What is the existing wood door finish to be matched? a. All existing doors will be painted.

45. What is the City of Tucker door core standard? a. Door core will be building standard.

46. Who will inspect the building prior to occupation? a. The inspections will be conducted by both the City of Tucker and Dekalb

County. 47. Can you confirm cashier stations 212 and 213 are in our scope? Plans show it both

ways. a. Yes, see sheets issued with answers.

48. The chambers desk is shown in the elevations but there is no additional information or cross sections. Can we get more information on this?

a. See sheets issued with answers. 49. More information is needed on the feature wall.

a. The feature wall has standard lumber trim pieces to be painted.

Page 6: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

DRAWING ABBREVIATIONS SHEET NUMBERING BUILDING SUMMARY

LEGEND

AAC AIR CONDITIONINGACT ACOUSTICAL CEILING TILEADD ADDENDUMADD'L ADDITIONALADJ ADJACENTAFF ABOVE FINISHED FLOORALT ALTERNATEANOD ANODIZEDAPPROX APPROXIMATEARCH ARCHITECTURAL

BBETW BETWEENBF BACKFACEBLKG BLOCKINGBOT BOTTOMBW BEARING WALL

CC COMPACT PARKING SPACECC CUBICK CURTAINCDR CARD READERCL CENTER LINECLG CEILINGCLR CLEARCOL COLUMNCONN CONNECTIONCONST CONSTRUCTIONCONT CONTINUOUSCOORD COORDINATECOOR CORRIDORCT CERAMIC TILECTD CENTEREDCTR CENTERCW CURTAIN WALL

DD DEPTHDET DETAILDF DECORATIVE FILMDIA DIAMETERDIM DIMENSIONDN DOWNDRG DRAWINGDWGS DRAWINGS

EEA EACHEF EACH FACEEL ELEVATIONELEC ELECTRICEQ EQUALEQUIP EQUIPMENTEW EACH WAYEWC ELECTRIC WATER COOLEREXIST EXISTINGEXT EXTERIOR

FFD FLOOR DRAINFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOORFHC FIRE HOSE CABINETFIN FINISHFLR FLOORFS FAR SIDEFT FOOTFT FLOOR TRANSITIONFV FIELD VERIFY

GGA GAUGEGALV GALVANIZEDGEN GENERALGI GALVANIZED IRONGL GLASSGND GROUNDGR GRADEGRG GLASS-REINFORCED GYPSUMGYP BD GYPSUM BOARD

HHDW HARDWAREHDWD HARDWOODHK HOOKHM HOLLOW METALHOR HORIZONTALHP HIGH POINTHR HOURHS HEADED STUDHT HEIGHTHW HAND WASHHW HEAD OF WALL

IIBC INTERNATIONAL BUILDING

CODEID INSIDE DIAMETERINSUL INSULATIONINT INTERIOR

KKP KICKPLATEKPD KEYPAD

LL ANGLELAV LAVATORYLG LONGLKB LOCKABLELLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLOC LOCATIONLP LOW POINTLT LIGHT

MMAT'L MATERIALMAX MAXIMUMMECH MECHANICALMEMB MEMBRANEMEP MECHANICAL, ELECTRICAL

AND PLUMBINGMFG MANUFACTURERMIN MINIMUMMISC MISCELLANEOUSMOD MODIFIEDMTL METAL

NNA NOT AVAILABLENIS NOT IN SCOPENOM NOMINALNS NEAR SIDENTS NOT TO SCALE

OOA OVER ALLOC ON CENTEROD OUTSIDE DIAMETEROD OVERFLOW DRAINOFCI OWNER FURNISHED,

CONTRACTOR INSTALLEDOFOI OWNER FURNISHED, OWNER

INSTALLEDOH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEOSF OUTSIDE FACE

PP LAM PLASTIC LAMINATEPCF POUNDS PER CUBIC FOOTPL PLATEPLUMB PLUMBINGPLYWD PLYWOODPP PUSH PLATEPOL POLISHEDPR PAIRPREFAB PREFABRICATEDPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POINTPTD PAINTED

RR RISERRAD RADIUSRCP REFLECTED CEILING PLANREBAR REINFORCING BARRECP RECEPTACLEREF REFER OR REFERENCEREINF REINFORCINGRELOC RELOCATE/RELOCATEDREQ'D REQUIREDRM ROOMRO ROUGH OPENING

SAB SOUND ATTENUATION BLANKET

SBC STANDARD BUILDING CODESCHED SCHEDULES/H SINGLE HUNGSHWR SHOWERSIM SIMILARSO STRUCTURAL OPENINGSOG SLAB ON GRADESPA SPACE, SPACINGSPEC SPECIFICATIONSQ SQUARESS STAINLESS STEELSSF SOLID SURFACESTA STATIONSTC SOUND TRANSMISSION

CLASSSTD STANDARDSTIFF STIFFENERSTL STEELSTRUC STRUCTURALSYM SYMMETRICALSYS SYSTEM

S

TT TREAD T&B TOP AND BOTTOMTC TOP OF CURBTEL TELEPHONETEMP TEMPERATURETHK THICKTLT TOILETTO TOP OFTOB TOP OF BEAMTOF TOP OF FOOTINGTOS TOP OF SLABTOSTL TOP OF STEELTW TOP OF WALLTYP TYPICAL

UU/C UNDER COUNTER U/G UNDERGROUNDUNO UNLESS NOTED OTHERWISE

VAR VARIES VCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVWC VINYL WALL COVERING

V

W/ WITHW/C WHEEL CHAIRW/O WITHOUTW WIDTHWP WATERPROOF(ING)WD WOODWF WIDE FLANGEWL WIND LOADWP WORK POINTWPO WORK POINT - POINT OF

ORIGINWP1 WORK POINT - NUMBERED

W

NUMBERING SYSTEM:

A2.10/01

DISCIPLINE:C - CIVILL - LANDSCAPEA - ARCHITECTUREM - MECHANICALE - ELECTRICALP - PLUMBINGS - STRUCTURALK - FOOD SERVICE

SERIES NUMBER

SHEET NUMBER WITHIN SERIES

NUMBER OF PLAN, DETAIL, ETC. ON SHEET

CONCRETE/ PRECAST CONCRETE

SAND, EIFS FINISH COAT, OR CEMENT PLASTER

GLASS MINERAL FIBER BATT INSULATION

GYPSUM BOARD

COATED GLASS MAT WATER RESISTANT GYP BD

PLYWOOD

MATERIALS

FIRE RESISTANTCONSTRUCTION/FIREPROOFING SCHEDULE

INDEX OF DRAWINGS

GENERAL NOTES

ROOM NAME ABBREVIATIONS

AADMIN ADMINISTRATION

CCOMM COMMUNITYCONF CONFERENCE

MMED MEDIUM

RM ROOM

R

WWK RM WORKROOM

SSTOR STORAGE

DDEV DEVELOPMENT

1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISTICTION.

2. ALL WORK SHALL BE PREFORMED IN ACCORDANCE WITH PROCEDURES SET FORTH BY THE PROPERTY MANAGMENT. SEE BUILDING'D CONTRACTOR REGULATIONS.

3. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS.

4. CONTRACTOR IS RESPONSIBLE FOR EXAMINGING ALL CONTRACT DOCUMENTS, FIELD CONDITIONS, AND CONFIRMING THAT WORK IS BUILDABLE AS HOWN BEFORE SUBMITTING PRICING AND PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY QUESTIONS REGARDING THESE OR OTHER COORDINATION ITEMS, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT AND/OR CONSTRUCTION MANAGER BEFORE PROCEEDING WITH PRICING, WORK IN QUESTION OR RELATED WORK.

5. CONTRACTOR FOR THE PROJECT SALL BE RESPONSIBLE FOR OBTAING ALL REQUIRED BUILDING PERMITS.

6. CONTRACTOR SHALL SUBMIT CONFIRMATIONS WITH DELIVERY DATED FOR ORDERS OF LONG LEAD ITEMS.

7. CONTRACTOR SHALL SUBMIT ELECTRONIC SETS OF SHOP DRAWINS AS REQUIRED BY THE PROJECT SEPCIFICATIONS. SHOP DRAWINGS SHOULD INCLUDE DETAILS FABRICATION AND REECTION DRAWINGS, SETTING DRAWINGS, DIAGRAMATIC DRAWINGS AND MATERIAL SCHEDULES. LOCATION AND ORIENTATION OF ALL ITEMS SHALL BE CLEARLY INDICATED. BEGIN FABRICATION ONLY AFTER RECIEVING ARCHITECT'S OR CONSTRUCTION MANAGER'S FINAL REVIEW OF SHOP DRAWINGS.

8. SUBSTITUTION REQUESTS WILL BE CONSIDERED DURING THE PRICING PERIOD AND THEREAFTER ONLY WHEN A PRODUCT BECOMES UNAVAILABLE. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN WRITING WITH THOROUGH PRODUCT AND ENGINEERING DATA FOR ARCHITECT'S REVIEW. WILL

BE CONSIDERED ONLY IF BETTER SERVICE FACILITIES, A MORE ADVANTAGEOUS DELIVERY DATE, OR A LOWER PRICE WITH CREDIT TO THE OWNER WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE, AND FUNCTION. UNDER NO CIRCUMSTANCE WILL THE ARCHITECT BE REQUIRED TO PROVE THAT A PRODUCT PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE PRODUCT SPECIFIED.

9. ALL WORK INDICATED ON DRAWINGS AND SPECS SHALL BE INCLUDED BY CONTRACTOR UNLESS SPECIFICALLY EXCLUDED OR NOTED N.I.C. PRICING SHALL INCLUDE ALL WORK REQUIRED FOR COMPLETE, THOROUGH AND PROFESSIONAL INSTALLATION.

10. "ALIGN" AS USED IN THESE DOCUMENTS SHALL MEAN TO ACCURATELY LOCATE FINISHES IN THE SAME PLANE.

11. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, UNO.

12. ALL VERTICAL DIMENSIONS SHOWN TO FLOOR ARE TO FINISH FLOOR, UNO

13. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS.

14. ALL PARTITION LOCATIONS, DIMENSIONS AND TYPES AND ALL DOOR AND WINDOW LOCATIONS SHALL BE SHOWN ON FLOOR PLANS. IN CASE OF CONFLICT, NOTIFY ARCHITECT.

15. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF A JOB AFTER IT'S COMPLETION. CLEANING SHALL INCLUDE INTERIOR OF THE BUILDING AND PATH OF TRAVEL TO THE JOB SITE AND SHALL INCLUDE THE PARKING LOT, ELEVATORS, LOBBIES AND CORRIDOR CARPET.

16. CONTRACTOR SHALL PROVIDE RECORD DOCUMENTS AND SHALL PROVIDE SAID DOCUMENTATION TO THE ARCHITECT FOR TRANSMISSION TO THE OWNER UPON COMPLETION OF CONSTRUCTION.

17. CONTRACTOR SHALL PROTECT AREA OF WORK, PUBLIC AREA IN PATH TO WORK AND ADJACENT AREAS FROM DAMAGE.

18. CONTRACTOR SHALL MAINTAIN A SECURE AND LOCKABLE WORK ARE DURING CONSTRUCTION. COORDINATE WITH AFFECTED TENANTS AND LANDLORD TO ENSURE SECURITY.

19. REQUIED EXIT WAYS, INCLUDING STAIRS, LANDINGS, RAMPS, AND SIDEWALKS SHALL BE CLEAR OF ALL OBSTRUCTIONS.

20. FOR METAL FABRICATIONS, CONTRACTOR SHALL VERIFY SCREW ANCHOR ATTACHMENTS TO EXISTING SLAB OR COLUMNS DOES NOT CUT OR DAMAGE EXISTING REINFORCEMENT OR POST TENSTIONED STRANDS.

LOCATION PLAN

PROJECT INFORMATIONPROJECT NAME: TUCKER CITY HALLADDRESS: 1975 LAKESIDE PARKWAY, TUCKER, GA 30084SUMMARY: NEW INTERIOR OFFICE BUILD-OUT WITHIN EXISTING COMMERCIAL OFFICE BUILDING.

APPLICABLE CODES

BUILDING PLANNINGOCCUPANCY: BUSINESS / ASSEMBLY A-3MIXED OCCUPANCY: YES REQUIRED FIRE SEPARATION: B / A-3 1 HR

TYPE OF CONSTRUCTIONCONSTRUCTION TYPE: I-A

GENERAL BUILDING LIMITATIONS

ESSENTIAL FACILITY (CHAPTER 16, IBC)ESSENTIAL FACILITY: NO (IBC CHPTR. 16)

ITEM ALLOWED / REQUIRED ACTUAL / PROVIDED

HEIGHT OF BUILDING

NUMBER OF STORIES

MAX SINGLE FLOOR AREA

TOTAL AREA OF BUILDING

UNLIMITED 100' - 4'

UNLIMITED 6

UNLIMITED 15,840 SF GROSS

UNLIMITED 187,220 SF GROSS

HIGH RISE: NO

MANDATORY CODES: INTERNATIONAL BUILDING CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2014) (2015) (2017) (2018)INTERNATIONAL FIRE CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2014)INTERNATIONAL PLUMBING CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2014) (2015)INTERNATIONAL MECHANICAL CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2014) (2015)INTERNATIONAL FUEL GAS CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2014) (2015)NATIONAL ELECTRICAL CODE, 2017 EDITION (NO GEORGIA AMENDMENTS)INTERNATIONAL ENERGY CONSERVATION CODE, 2009 EDITION, WITH GEORGIA SUPPLEMENTS AND AMENDMENTS (2011) (2012)

PERMISSIVE CODES: INTERNATIONAL PROPERTY MAINTENANCE CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2015)INTERNATIONAL EXISTING BUILDING CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2015)NATIONAL GREEN BUILDING STANDARD, 2008 EDITION, WITH GEORGIA AMENDMENTS (2011)

ACCESSIBILITY:GEORGIA ACCESSIBILITY CODE 120-3-20 (“GAC”)AMERICANS WITH DISABILITIES ACT, ACCESSIBILITY GUIDELINES - STANDARDS FOR ACCESSIBLE DESIGN 2010 EDITION

LIFE SAFETYLIFE SAFETY CODE (NFPA 101), 2012 EDITION WITH GEORGIA AMENDMENTSINTERNATIONAL FIRE CODE, 2012 EDITION, WITH GEORGIA AMENDMENTS (2014)NFPA 13, 2013 EDITION

FIRE PROTECTION SYSTEMS- FIRE EXTINGUISHING SYSTEM: YES

- STANDPIPE SYSTEM: YES

- SMOKE CONTROL: NO

TYPE: 13

FIRE RESISTANT CONSTRUCTION/FIREPROOFING SCHEDULEITEM REQ'D RATING / HR UL/FM # WHERE APPLICABLE

- EXTERIOR WALLS: LOAD BEARING

- EXTERIOR WALLS: NON-LOAD BEARING

- FIRE/PARTY WALLS

- SHAFTS

- TENANT SEPARATION

- INTERIOR WALL: LOAD BEARING

- INTERIOR WALL: NON-LOAD BEARING

- COLUMNS

- BEAMS

- FLOOR/CEILING

- ROOF/CEILING

3 HRS

1 HR

1 HR

1 HR

1 HR

3 HRS

0 SEE PARTITION TYPE SHEETS

3 HRS

3 HRS

2 HRS

1.5 HRS

FIRE PROOFING NOTES1. ALL FIRE RESISTIVE RATINGS ARE ASSUMED TO BE THERMALLY RESTRAINED.

2. ALL BEAMS AND COLUMNS SHALL BE ADJUSTED USING W/D OR A/P RATIOS TO DETERMINE THE CORRECT FIREPROOFING THICKNESS.

LOCATION MAP1975 LAKESIDE PARKWAYTUCKER, GA 30084

1975 LAKESIDE PARKWAY

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE:

ISSUE

© 2019 HKS, INC.

TEM

PLAT

E VE

RSI

ON

:

BARRETT, WOODYARD & ASSOCIATES, INC.

NORCROSS, GA 30092

MEP ENGINEER

3495 HOLCOMB BRIDGE ROAD

CIT

Y O

F TU

CK

ER,

CIT

Y H

ALL

AT

1975

LA

KES

IDE

PAR

WA

Y

HKS, INC.

ATLANTA, GA 30303

ARCHITECT

191 PEACHTREE STREET, NE SUITE 5000

23789.000

LAKESIDE CENTERPROPERTY ADDRESS

1975 LAKESIDE PARKWAYTUCKER, GA 30084

CITY OF TUCKEROWNER

4119 ADRIAN STREETTUCKER, GA 30084

3/27

/202

0 12

:57:

35 P

M

A0.01

PROJECTINFORMATION

03/12/2020

ISSUED FORCONSTRUCTION

3.0.

0.20

1706

23

INDEX OF DRAWINGS

SHEET NAME SHEET ISSUE DATE

GENERALCOVER 03/12/2020LIFE SAFETY PLAN 03/12/2020PROJECT INFORMATION 03/12/2020SPECIFICATIONS 03/12/2020SPECIFICATIONS 03/12/2020SPECIFICATIONS 03/12/2020ARCHITECTUREDEMOLITION PLAN 03/12/2020FLOOR PLAN 03/12/2020ENLARGED TOILET PLANS AND ACCESSORIES 03/12/2020REFLECTED CEILING PLAN 03/12/2020ENLARGED CEILING PLANS AND DETAILS 03/12/2020POWER & COMMUNICATION PLAN 03/12/2020FINISH PLAN 03/12/2020FINISH SCHEDULE & TRANSITION DETAILS 03/12/2020PARTITION TYPE & FRAMING 03/12/2020CABINET DETAILS 03/12/2020DOOR, SAFETY GLAZING AND SCHEDULE INFORMATION 03/12/2020INTERIOR ELEVATIONS 03/12/2020INTERIOR ELEVATIONS 03/12/2020INTERIOR ELEVATIONS 03/12/2020MILLWORK SECTIONS & DETAILS 03/12/2020SPECIALTY MILLWORK DETAILS 03/26/2020FURNITURE PLAN - FOR REFERENCE ONLY 03/12/2020MECHANICALABBREVIATIONS, LEGEND, & SCHEDULES - MECHANICAL 03/12/2020DETAILS - MECHANICAL 03/12/2020SPECS - MECHANICAL 03/12/2020SEPECS - MECHANICAL 03/12/2020SPECS - MECHANICAL 03/12/2020LEVEL 01 - DEMO PLAN - MECHANICAL 03/12/2020LEVEL 01 FLOOR PLAN - MECHANICAL 03/12/2020ELECTRICALLEGENDS & NOTES - ELECTRICAL 03/12/2020FIRE STOPPING DETAILS 03/12/2020ELECTRICAL SPECIFICATIONS 03/12/2020ELECTRICAL SPECIFICATIONS 03/12/2020LIGHT FIXTURE SCHEDULE & COM CHECK REPORT 03/12/2020LEVEL 01 FLOOR PLAN - ELECTRICAL 03/12/2020LEVEL - MECHANICAL CONNECTIONS 03/12/2020PLUMBINGABBREVIATIONS, LEGEND, SCHEDULES & DETAILS - PLUMBING 03/12/2020SPECS - PLUMBING 03/12/2020SPECS - PLUMBING 03/12/2020LEVEL 01 FLOOR PLAN - PLUMBING 03/12/2020

1

NO. DESCRIPTION DATE

1 PERMITCOMMENTS

03/26/2020

Page 7: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

J

DOCK+2'-0"

RAMP

0'-0"

PROBATION209

OFFICE121

HUDDLE205

HUDDLE206

GCIC STOR.207

CASHIER212

CASHIER213

UNISEX TOILET215

UNISEX TOILET216

STORAGE214

LOBBY201

COURTCHAMBERS

163

WAITING AREA202

HUDDLE208

A5.01

08

A5.01

04

A5.01

09

A5.01 05

A5.02

02

A5.02 01

A5.02

A5.0209

A5.02

11

A5.02 1312

01

02

A5.02

07

05

03 A5.0204

A5.0208

OFFICE124

OFFICE125

OFFICE126

OFFICE127

OFFICE152

OFFICE151

OFFICE150

OFFICE129

OFFICE130

OFFICE131

OFFICE132

OFFICE154

OFFICE159

OFFICE160

HUDDLE161

OFFICE149

OFFICE148

OFFICE147

ELECTRICAL157

SERVER RM123

MED CONF125

OFFICE120

COM ADMIN133

LARGECONFERENCE

135

MED CONF134

PERMITINTAKE

104

HUDDLE137

OFFICE138

OFFICE139

OFFICE140

OFFICE141

OFFICE142

OFFICE143

OFFICE144

OFFICE107

MED CONF108

OFFICE109

OFFICE110

OFFICE111

OFFICE112

OFFICE113

OFFICE115

OFFICE116

OFFICE114

PRINT/COPY117

BREAK ROOM118

OFFICE119

AV204

OPEN OFFICE158

CORRIDOR153

STOR146

STOR145

CORRIDOR136

CORRIDOR122

COM DEVINTAKE

102

OFFICE106OFFICE

105

HUDDLE155

IDF156

CORRIDOR203

EXECUTIVECONF

128

A5.01 10

11

A5.0107

10

06

A5.03

02

A5.03

01

A5.03 03

A5.03

05

A5.03

04

1' - 0"

1' - 0"

2' - 6"

3' - 0"

3' - 0"

4' - 11 1/2"12' - 0"

1' -

0"

1' - 0"

1' -

0"

1' - 0"1' - 0"

1' -

6"

14' -

10

1/4"

12' - 4 1/4"

A5.01

03

LOBBY101

ALIG

N

12' - 4 7/8" 5' - 4 7/8" 12' - 4 7/8" 5' - 10 7/8" 12' - 4 7/8" 47' - 2 3/8"

2' -

11 1

/8"

5' -

7 7/

8"10

' - 6

5/8

"58

' - 3

3/4

"12

' - 4

3/8

"

8' - 4 7/8" 8' - 4 7/8" 14' - 2 1/2" 8' - 0"2' - 9 1/4"

5' - 4 7/8"

8' -

2 1/

8" 2' -

6 5/

8"

8' -

4 7/

8"7'

- 10

1/2

"8'

- 4

7/8"

8' -

4 7/

8"16

' - 9

3/4

"8'

- 4

7/8"

10' - 6 1/4" 10' - 6 1/4" 10' - 8 3/4"8' - 5 1/2" 8' - 5 1/2" 8' - 5 1/2" 8' - 5 1/2"

ALIG

N

12' -

1 1

/2"

8' -

10 1

/2"

7' -

5 1/

4"12

' - 4

7/8

"5'

- 4

7/8"

12' -

4 7

/8"

8' - 5 3/4" 8' - 5 3/4" 8' - 5 3/4" 8' - 5 3/4" 8' - 5 3/4" 8' - 5 3/4" 8' - 5 3/4"

7' -

0 1/

8"

8' -

4 7/

8"8'

- 4

7/8"

8' -

4 7/

8"12

' - 5

5/8

"

10' -

4 7

/8"

8' -

7 3/

4"10

' - 4

7/8

"7'

- 10

1/2

"8'

- 8

1/8"

8' -

5 3/

4"8'

- 8

1/8"

7' - 11 3/4" 6' - 5 1/2"

4' -

11 7

/8"

133°

7' -

4 1/

8"

96°

18' - 4 7/8" 21' - 7 1/8" 7' - 7 1/4" 12' - 4 7/8"

15' - 8"

6' - 4 7/8"

4' - 8 1/8"

2' - 8"

10' - 4 7/8"

11' -

8 1

/4"

ALIGN

124°

146°

12' - 9 1/8" 5' - 0 3/8"

ALIGN

/A2.03 05

COM DEV WKRM103

SECURITYVESTIBULE

200

WAITING AREA210

PROBATION211

ALIGN

8' -

0"

ALIGN

8' -

5 7/

8"

ALIGN

ALIG

N

7' - 2 3/4"

ALIG

N

ALIG

N

ALIG

N2'

- 11

1/8

"

ALIG

N

ALIG

N

1' - 0"

ALIG

N

90°

90°

87°

90°

13' -

0"

8' - 4 7/8"

15' - 4 7/8" 90°

ALIGN

12' -

2 5/8"

1' - 7"

90°

9' - 2

3/8"

1' - 3 3/4"

ALIGN

1' - 0"

1' - 0"

6"

R 11

1' - 4

1/4

"11

3/8

"

8 7/8"

5' - 7 3/8"

7' -

8"

7"

ALIG

N

84°

R 1

05' -

0 5

/8"

6' - 8 1/2"

130° 2' - 6 1/2"

9' - 6

3/8"

8' - 5 1/2"1' - 0 1/8"

15' - 8 5/8"

137

2' -

10 1

/2"

ALIGN

16' - 2 1/2"

138

139

140

141

143

144

116

115

114

113

112

111

110

109

108

107

105

106

104A

136104B

135A

134A

155

161

103

158

142

156

157

13316

015

9

154

131

130

129

132

152

127

126

151

125

150 124

149

148

147

146 145

121A

123

203

216

215

214A

213

128A

125

204

205

206

207

208

201

211A

209A

128B

101

135B

134B

209B

211B

121B

119B

153

8"

6' -

0"6'

- 0"

8"

120B

/A5.05 01

ALIGN

ALIGN8"

8"

214B

A3

A3

A3A3A3

A3

A3

A3

A3

A3

A3

A3

A3

H3

A3A3

A3

A3

A3

A3

A3

A3

A3

A3

A3

H3

A3

A3 A3

A3

A3

A3 A3

A3A3

A3

06

140°

14' - 11 1/4"6' - 11 1/4"

2' - 7 1/8"

7' - 0"

2' - 7 1/8"

3' - 11"

H3

H3

H3

H3

15' -

2"

2' - 9 1/8"

H3

H3

H3

H3

H3

H3H

3

H3

H3

H3

H3H3

H3

H3H3

H3

8' - 6"

3' -

7 3/

4"

H3

H3

H3

H3

ALIGNALIGN

H3H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3H3 H

3

H3

H3 H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3

H3 H3

H3

H3

H3

B

B

B B

B

B

B

B

B

B

B

B B

BB

B

B

B B B B

B

B

B

B

STEP+0'-6"

+0'-6"

UP

6' -

0"

R 44' - 10"

14' -

0"

14' -

0"

RAM

P

53' - 5"

29' -

4 3

/8"

3' - 8"

A5.03 06 A5.0307

120A

119A

217

2' -

7"

1

ROOM NAMEXXXXX

X

A0.XX

X

A3

A3

ROOM NAME/NUMBER

EXISTING COLUMN CENTERLINE

KEYED NOTES

BUILDING WALL SECTION

SECTION DETAIL

PLAN, BLOW-UP DETAIL

PARTITION TYPE WITH NO SOUND ATTENUATION

PARTITION TYPE WITH SOUND ATTENUATION

NEW WALL

EXISTING WALL

DRAWING SYMBOLS

01

A0.XX01

A0.XX01

SEMI-RECESSED FIRE EXTINGUISHER CABINET

FEC

AX.XXXX ELEVATION

MILLWORK

NOT IN SCOPE

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE:

ISSUE

© 2019 HKS, INC.

TEM

PLAT

E VE

RSI

ON

:

BARRETT, WOODYARD & ASSOCIATES, INC.

NORCROSS, GA 30092

MEP ENGINEER

3495 HOLCOMB BRIDGE ROAD

CIT

Y O

F TU

CK

ER,

CIT

Y H

ALL

AT

1975

LA

KES

IDE

PAR

WA

Y

HKS, INC.

ATLANTA, GA 30303

ARCHITECT

191 PEACHTREE STREET, NE SUITE 5000

23789.000

LAKESIDE CENTERPROPERTY ADDRESS

1975 LAKESIDE PARKWAYTUCKER, GA 30084

CITY OF TUCKEROWNER

4119 ADRIAN STREETTUCKER, GA 30084

3/27

/202

0 12

:57:

36 P

M

A2.02

FLOOR PLAN

03/12/2020

ISSUED FORCONSTRUCTION

3.0.

0.20

1706

23

1/8" = 1'-0"1 LEVEL 1 - FLOOR PLAN

LEGEND GENERAL NOTES KEY NOTES

1. ALL WALLS TO BE TYPE C, UNLESS OTHERWISE NOTED2. FUR OUT ALL COLUMNS WHERE STRUCTURE IS EXPOSED.3. REFER TO SHEET A3.01 FOR PARTITION TYPES, GRAPHIC AND

SYMBOLIC DESIGNATIONS, NOTES, AND DETAILS.4. REFER TO SHEET A2.03 FOR TYPICAL TOILET LAYOUTS AND TOILET

ACCESSORY MOUNTING DIAGRAMS.5. REFER TO SHEET A3.04 FOR DOOR INFORMATION, SCHEDULES AND

DETAILS.6. REFERE TO SHEET 2.08 FOR ALL APPLIANCE SPECIFICATIONS7. REFERE TO ELEVATIONS FOR ALL APPLIANCE LOCATIONS

RESUSE DOORS WHERE INDICATED ON PLAN. SAND, PRIME AND PAINTA

NO. DESCRIPTION DATE

1 PERMITCOMMENTS

03/26/2020

Page 8: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

OPEN TO BEYOND

RB-01

IPT-01

4"4"

4"4"

2 1/2" 2 1/2"

IPT-03

EQEQ

2 1/

2"2

1/2"

2 1/2" 2 1/2"

2 1/

2"2

1/2"

EQEQ

2 1/2"

2 1/

2"2

1/2"

2 1/2"2 1/2"2 1/2"

4"4"

2' -

0"2'

- 0"

EQEQ

EQ EQ EQ4' - 2 7/8" 4' - 1 7/8"

EQ EQ EQ EQ

4"

2 1/2" 2 1/2" 2 1/2" 2 1/2" 2 1/2"

2' -

0"2'

- 0"

IPT-03

2 1/

2"4"

2 1/2"

2' -

10"

PL-02

FILE CABINETS BY OTHERS

10

A5.04

SIM

VIF

PL-03

SS-01

IPT-03

8"2'

- 9"

2"

ALIG

N

ALIG

N

ALIG

N

ALIG

N

SECURITY GLASS

PL-02

3' - 0"3' - 0"3' - 0"

CONSEALED SUPPORTS AS REQUIRED

09

A5.04

SIM

SS-01

PL-03

SECURITY GLASS

1' - 6"1' - 6"

1'

1' - 6" 1' - 6"

1'

1' - 6" 1' - 6"

ø 6"

2' -

6"1'

- 0"

4' - 0"

EQEQ

2' - 0"

ALIG

N

ALIG

N

ALIG

N

ALIG

N

ALIG

N

VIF

EQ EQ EQ

06

A5.05

07

A5.05

EQ EQ

2 1/2" 2 1/2" 2 1/2"

2' -

0"5'

- 2

1/2"

1' -

9 1/

2"

4"2

1/2"

2 1/

2"4"

IPT-03

AMAZON, DESIGNSTYLES WALL HANGING 3 TIER FILE HOLDER -WALL MOUNTED METAL WIRE MAGAZINE RACK -OFFICE FOLDER ORGANIZER WITH NAME TAG SLOT, COPPER

EQ EQ

1' - 9" 1' - 9"

5' -

6"

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE:

ISSUE

© 2019 HKS, INC.

TEM

PLAT

E VE

RSI

ON

:

BARRETT, WOODYARD & ASSOCIATES, INC.

NORCROSS, GA 30092

MEP ENGINEER

3495 HOLCOMB BRIDGE ROAD

CIT

Y O

F TU

CK

ER,

CIT

Y H

ALL

AT

1975

LA

KES

IDE

PAR

WA

Y

HKS, INC.

ATLANTA, GA 30303

ARCHITECT

191 PEACHTREE STREET, NE SUITE 5000

23789.000

LAKESIDE CENTERPROPERTY ADDRESS

1975 LAKESIDE PARKWAYTUCKER, GA 30084

CITY OF TUCKEROWNER

4119 ADRIAN STREETTUCKER, GA 30084

3/27

/202

0 12

:57:

37 P

M

A5.01

INTERIORELEVATIONS

03/12/2020

ISSUED FORCONSTRUCTION

3.0.

0.20

1706

23

3/8" = 1'-0"04 LOBBY 101 - FEATURE WALL

3/8" = 1'-0"03 LOBBY 101 - MED CONFERENCE FRONT3/8" = 1'-0"02 LOBBY 101 - CONFERENCE ROOM FRONTS

3/8" = 1'-0"01 LOBBY 101 - HUDDLE ROOM FRONT

3/8" = 1'-0"05 LOBBY 101 - FEATURE WALL - NORTH SOUTH

3/8" = 1'-0"10 LARGE CONFERENCE 135 - DRAWING STORAGE

3/8" = 1'-0"08 COM ADMIN 133 - RECEPTION COUNTER FRONT3/8" = 1'-0"07 COM ADMIN 133 - COMPUTER INPUT COUNTER

3/8" = 1'-0"11 COM ADMIN 133 - RECEPTION COUNTER BACK3/8" = 1'-0"09 COM ADMIN 133 - FEATURE WALL WRAP

3/8" = 1'-0"06 COM ADMIN 133 - ENTRY WALL

1

1

NO. DESCRIPTION DATE

1 PERMITCOMMENTS

03/26/2020

Page 9: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

2' -

10"

PL-03

8 EQ DOORS12' - 0"

PL-0203

A5.04

SIM

OPEN TO BEYONDOPEN TO BEYONDOPEN TO BEYOND

1' -

10"

5' -

1 3/

4"1'

- 8"

4"

8' - 6 3/4" 1' - 2 1/2" 7' - 11 1/2" 1' - 2 1/2"

7'-0" A.F.F

IPT-03

7'-0" A.F.F 7'-0" A.F.F

7' - 2 1/2"

2 1/2"

2 1/

2"

4"

IPT-03

2' -

0"

2 1/2"

4"2

1/2"

2 1/

2"

2' -

0"

OPEN TOBEYOND

SS-01

2' -

10"

5' -

2"

1' - 0"4' - 6"

PL-02

PL-03

1 1/2"

02

A5.04

SIM

1 1/2"

14 EQ DOORS17' - 0 5/8"

1"

OPEN TOBEYOND

2' -

10"

PL-03

1 1/2"

8 EQ DOORS11' - 1 7/8"

ALIG

N

PL-01

PL-02

06

A5.04

SIM

01

A5.04

SIM

1 1/2"

ALIG

N

PL-01

PL-02

PL-03

06

A5.04

SIM

01

A5.04

SIM

1 1/2"11 EQ DOORS

13' - 9"

1"

ALIG

N

PL-03

6' -

2"1

1/2"

2' -

8 1/

4"

09

A5.04

SIM

3' - 0"3 EQ DOORS

6' - 0"

PL-01

SS-01

PL-03

IM

2' -

10"

MW

MW

REFREF

DW

SINK

FAUCET

1' - 6"2' - 3 7/8"

06

A5.04

SIM

04

A5.04

SIM

08

A5.04

SIM

07

A5.04

SIM05

A5.04

SIM

PL-02

12' - 0"

2' -

10"

PL-03

03

A5.04

SIM

OPEN TOBEYOND

2' -

10"

5' -

2"

4' - 6"

SS-01

1 1/2" 1 1/2"

6 EQ DOORS9' - 10 1/2"

PL-02

PL-03

01

A5.04

SIM

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE:

ISSUE

© 2019 HKS, INC.

TEM

PLAT

E VE

RSI

ON

:

BARRETT, WOODYARD & ASSOCIATES, INC.

NORCROSS, GA 30092

MEP ENGINEER

3495 HOLCOMB BRIDGE ROAD

CIT

Y O

F TU

CK

ER,

CIT

Y H

ALL

AT

1975

LA

KES

IDE

PAR

WA

Y

HKS, INC.

ATLANTA, GA 30303

ARCHITECT

191 PEACHTREE STREET, NE SUITE 5000

23789.000

LAKESIDE CENTERPROPERTY ADDRESS

1975 LAKESIDE PARKWAYTUCKER, GA 30084

CITY OF TUCKEROWNER

4119 ADRIAN STREETTUCKER, GA 30084

3/27

/202

0 12

:57:

39 P

M

A5.02

INTERIORELEVATIONS

03/12/2020

ISSUED FORCONSTRUCTION

3.0.

0.20

1706

23

3/8" = 1'-0"03 COM DEV WK RM 103 - MILLWORK FRONT3/8" = 1'-0"01 COM DEV INTAKE 102 - FRONT

3/8" = 1'-0"02 COM DEV 102 - PARTITION

3/8" = 1'-0"06 PERMIT INTAKE 104 - INTAKE WINDOW3/8" = 1'-0"07 PERMIT INTAKE 104 - MILLWORK

3/8" = 1'-0"12 PRINT/COPY 117 -3/8" = 1'-0"13 PRINT/COPY ELEVATION 14 - B

3/8" = 1'-0"10 BREAK ROOM 118 - WINDOW LEDGE3/8" = 1'-0"09 BREAK ROOM 118 - WORK WALL

3/8" = 1'-0"04 COM DEV WK RM 103 - MILLWORK BACK

3/8" = 1'-0"05 COM DEV INTAKE 102 - INTAKE WINDOW

3/8" = 1'-0"08 CORRIDOR 136 - PRINT STATION3/8" = 1'-0"11 PRINT/COPY 117 - CORRIDOR

NO. DESCRIPTION DATE

1 PERMITCOMMENTS

03/26/2020

Page 10: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

SS-01

2' -

6"

PL - 03

08

A5.03

09

A5.03

2' - 0" 2' - 0"

SS-01

PL-03

SECURITY GLASS

EQEQ EQEQ

09

A5.03

PL-03

PL-02

1 1/2" 7' - 3" 1 1/2"

IPT-05

01

A5.04

SIM

FILES BY OTHERS

7' -

0"

1 1/2"6 EQ DOORS

7' - 10 1/2"

01

A5.04

SIM

1 1/2"

PL-02

PL-03

IPT-03

EQ EQ

EQ EQ

2 1/2"2 1/2" 2 1/2"

4"2

1/2"

2 1/

2"4"

2' -

0"2'

- 0"

IPT-03

4"2

1/2"

2 1/

2"4"

2 1/2" 2 1/2" 2 1/2"

2' -

0"2'

- 0"

EQ EQ

PLASTIC LAMINATE DRAWER FRONTS

3/4"

1 1/

2"

4"

2'

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

SLIDING DRAWER HARDWARE

SOLID SURFACE COUNTERTOP

2' - 6"

3"

1 1/

2"

SOLID SURFACE COUNTERTOP

SECURITY GLASS

2' -

6"

2' - 6"

4"

3"

EQ EQ

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE:

ISSUE

© 2019 HKS, INC.

TEM

PLAT

E VE

RSI

ON

:

BARRETT, WOODYARD & ASSOCIATES, INC.

NORCROSS, GA 30092

MEP ENGINEER

3495 HOLCOMB BRIDGE ROAD

CIT

Y O

F TU

CK

ER,

CIT

Y H

ALL

AT

1975

LA

KES

IDE

PAR

WA

Y

HKS, INC.

ATLANTA, GA 30303

ARCHITECT

191 PEACHTREE STREET, NE SUITE 5000

23789.000

LAKESIDE CENTERPROPERTY ADDRESS

1975 LAKESIDE PARKWAYTUCKER, GA 30084

CITY OF TUCKEROWNER

4119 ADRIAN STREETTUCKER, GA 30084

3/27

/202

0 12

:57:

39 P

M

A5.03

INTERIORELEVATIONS

03/12/2020

ISSUED FORCONSTRUCTION

3.0.

0.20

1706

23

3/8" = 1'-0"04 CASHIER 212 & 213 - RECEPTION COUTNER BACK3/8" = 1'-0"05 CASHIER 212 & 213 RECEPTION COUNTER FRONT

3/8" = 1'-0"01 OPEN OFFICE PRINT STATION3/8" = 1'-0"02 OPEN OFFICE FILING NICHE

3/8" = 1'-0"03 CORRIDOR 153 - HOSPITALITY STATION

3/8" = 1'-0"06 SECURITY VESTIBULE 200 - FEATURE WALL3/8" = 1'-0"07 WAITING AREA 210 - FEATURE WALL

1 1/2" = 1'-0"08 CASHIER'S - STORAGE1 1/2" = 1'-0"09 CASHER'S - TRANSATION COUNTER

1

11

NO. DESCRIPTION DATE

1 PERMITCOMMENTS

03/26/2020

Page 11: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

PLASTIC LAMINATE DOOR FRONTS

SHELF PINS

PLASTIC LAMINATE TOEKICK

3/4"

1 1/

2"

4"

4"

REF

ER T

O E

LEVA

TIO

N

2' - 1"

SOLID SURFACE COUNTERTOP AND BACKSPLASH

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

SOLID SURFACE COUNTERTOP AND BACKSPLASH

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

PLASTIC LAMINATE DOOR FRONTS

SHELF PINS

PLASTIC LAMINATE TOEKICK

3/4"

1 1/

2"

4"

4"

REF

ER T

O E

LEVA

TIO

N

2' - 1"MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

PLASTIC LAMINATE DOOR FRONTS

SHELF PINS

PLASTIC LAMINATE TOEKICK

2' - 6"

3/4"

3"

4"

REF

ER T

O E

LEVA

TIO

N

1 1/

2"

SOLID SURFACE COUNTERTOP AND BACKSPLASH

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

PLASTIC LAMINATE DOOR FRONTS

SHELF PINS

PLASTIC LAMINATE TOEKICK

3' - 0"

3/4"

3"

4"

REF

ER T

O E

LEVA

TIO

N

1 1/

2"

SOLID SURFACE COUNTERTOP AND BACKSPLASH

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

PLASTIC LAMINATE DOOR FRONTS

SHELF PINS

3/4"

REF

ER T

O E

LEVA

TIO

N

1' - 3"

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

PLASTIC LAMINATE COUNTER TOP AND VALENCE ON CONTINUOUS WALL CLEAT; TWO LAYERS PLYWOOD CLAD IN PLASTIC LAMINATE AND VALENCE

2' -

10"

1' - 6".

1 1/

2"

PLASTIC LAMINATE COUNTER TOP CONTINUOUS WALL CLEAT; TWO LAYERS PLYWOOD CLAD IN PLASTIC LAMINATE AND VALENCE

2' -

10"

3' - 0"

1 1/

2"

MAX

5 1/

2".

SOLID SURFACE COUNTEROP

SEALANT AROUND EDGE OF SINK

ACCESSIBLE FAUCET

ACCESSIBLE UNDERMOUNT SINK

4"

PLASTIC LAMINATE DOOR FRONT

WHITE MELAMINE INTERIOR, TYP.

INTERGRAL PLASTIC LAMINATE TOEKICK

WRAP EXPOSED PLUMBING

AT F

LOO

R1/

2" C

LR

3"

REF

ER T

O E

LEVA

TIO

N

19"

FLOORING TO CONTINUE INTO CABINET

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

PLASTIC LAMINATE DOOR FRONTS

SHELF PINS

3/4"

3' - 0"

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

REF

ERE

TO E

LEVA

TIO

N

PLASTIC LAMINATE DOOR FRONT

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

MICROWAVE TRIM KIT

MICROWAVE

4"

3"

VAR

IES

- REF

. ELE

VATI

ON

WHITE MELAMINE INTERIOR TYP.

3' - 0"

SHELF PINS

2' -

8 1/

2"

1' -

3 1/

4"

3' - 0"

MICROWAVE

SHELF PINS

DRYWALL HEADER

PLASTIC LAMINATE DOOR FRONT

DOOR PULL

SELF CLOSING, FULL OVERLAY, CONCEALED HINGES W/ HINGE BASE PLATES (2 PER DOOR)

WHITE MELAMINE INTERIOR TYP.

MICROWAVE TRIM KIT

1' -

3 1/

4"

PLASTIC LAMINATE TOEKICK

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE:

ISSUE

© 2019 HKS, INC.

TEM

PLAT

E VE

RSI

ON

:

BARRETT, WOODYARD & ASSOCIATES, INC.

NORCROSS, GA 30092

MEP ENGINEER

3495 HOLCOMB BRIDGE ROAD

CIT

Y O

F TU

CK

ER,

CIT

Y H

ALL

AT

1975

LA

KES

IDE

PAR

WA

Y

HKS, INC.

ATLANTA, GA 30303

ARCHITECT

191 PEACHTREE STREET, NE SUITE 5000

23789.000

LAKESIDE CENTERPROPERTY ADDRESS

1975 LAKESIDE PARKWAYTUCKER, GA 30084

CITY OF TUCKEROWNER

4119 ADRIAN STREETTUCKER, GA 30084

3/27

/202

0 12

:57:

40 P

M

A5.04

MILLWORKSECTIONS &DETAILS

03/12/2020

ISSUED FORCONSTRUCTION

3.0.

0.20

1706

23

1 1/2" = 1'-0"01 BASE CABINET - 24" P-LAM SURFACE1 1/2" = 1'-0"04 BASE CABINET - 24" SOLID SURFACE

1 1/2" = 1'-0"02 BASE CABINET - 30" PLAM SURFACE1 1/2" = 1'-0"03 BASE CABINET - 36" PLAM SURFACE

1 1/2" = 1'-0"06 UP CABINET - 15" P-LAM SURFACE

1 1/2" = 1'-0"09 COUNTER - 18" PLAM SURFACE1 1/2" = 1'-0"10 COUNTER - 36" PLAM SURFACE

1 1/2" = 1'-0"08 SINK COUNTER 24"1 1/2" = 1'-0"07 UP CABINET - 36" PLAM SURFACE

1 1/2" = 1'-0"05 MICROWAVE CABINET

NO. DESCRIPTION DATE

1 PERMITCOMMENTS

03/26/2020

Page 12: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

A5.050204

A5.05

05

A5.05

STEP+0'-6"

UP03

A5.05

WITNESSSTAND

CITY COUNCIL PLATFORM

RAMP+0'-6"

CLR5' - 6"

2' - 6"

6' -

0"

5' - 0"

2' -

7"

PL-03

ML-01

IPT-3

SEAL BY OTHERSPROVIDE BLOCKING AS REQUIRED

ADD ALTWC-04 04

A5.05

COUNTER SUNK FASTNERS

3' - 3"

1'

PLASTIC LAMINATE COUNTERTOP

PLASTIC LAMINATE TOEKICK

1 1/

2"

SOLID SURFACE

SOLID SURFACE

SAFETY GLASS

3"

3' - 6"

8"

REF

ER T

O E

LEVA

TIO

N

STRUCTURE AS REQUIRED

PL - 03

2"1/2"

2' -

6"

4"

3"

1' -

0"

2"

9"

4"

6"

2"

3' - 0"

FLOORING AS SCHEDULED

STRUCTURE AS REQUIRED

PLASTIC LAMINATE COUNTERTOP

PLASTIC LAMINATE DRAWER FRONTS

PLASTIC LAMINATE TOEKICK

3/4"

1 1/

2"

4"

REF

ER T

O E

LEVA

TIO

N

2'

3'

3"

4"

SAFETY GLASS

MOCKETT - DP3B - 90DP3 SERIES - TAB DRAWER PULL - 1-1/2" PROFILE

3"

SLIDING DRAWER HARDWARE

4"

3"

3' -

0"

2"

3' - 0"

2' -

6"

4"

3"

5' - 6"

3"

2"

9"

4"

2"

3' - 0"

3' -

0"1'

- 0"

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE:

ISSUE

© 2019 HKS, INC.

TEM

PLAT

E VE

RSI

ON

:

BARRETT, WOODYARD & ASSOCIATES, INC.

NORCROSS, GA 30092

MEP ENGINEER

3495 HOLCOMB BRIDGE ROAD

CIT

Y O

F TU

CK

ER,

CIT

Y H

ALL

AT

1975

LA

KES

IDE

PAR

WA

Y

HKS, INC.

ATLANTA, GA 30303

ARCHITECT

191 PEACHTREE STREET, NE SUITE 5000

23789.000

LAKESIDE CENTERPROPERTY ADDRESS

1975 LAKESIDE PARKWAYTUCKER, GA 30084

CITY OF TUCKEROWNER

4119 ADRIAN STREETTUCKER, GA 30084

3/27

/202

0 12

:57:

40 P

M

A5.05

SPECIALTYMILLWORK DETAILS

03/12/2020

ISSUED FOR PERMIT

3.0.

0.20

1706

23

1/4" = 1'-0"01 COURT DAIS ENLARGED PLAN3/8" = 1'-0"02 COURT CHAMBERS ELEVATION 9 - A

1 1/2" = 1'-0"06 COM DEV RECEPTION DESK - TRANSACTION COUNTER

1 1/2" = 1'-0"04 DAIS - CENTER SECTION DETAIL

1 1/2" = 1'-0"07 COM DEV RECEPTION DESK - STORAGE1 1/2" = 1'-0"05 DAIS - WITNESS END SECTION DETAIL

1 1/2" = 1'-0"03 DAIS - LOWER LEVEL SECTION DETAIL

NO. DESCRIPTION DATE

1 PERMITCOMMENTS

03/26/2020

Page 13: CITY OF TUCKER - tuckerga.gov...wpo work point - point of origin wp1 work point - numbered w numbering system: a2.10/01 discipline: c - civil l - landscape a - architecture m - mechanical

PROJECT BID FORM RSF 22,078.00 City of Tucker - 1975 Lakeside Parkway $/SF

DIV WORK ITEM COST SUBCONTRACTOR01 General Requirements

PermitsGeneral ConditionsBondsContractors Fee

02 Demolition03 Concrete04 Masonry05 Metals06 Wood, Plastic, & Laminates

Carpentry/MillworkRough Carpentry

07 Thermal & Moisture ProtectionRoofing

08 OpeningsDoors, Frames, HardwareGlass & Glazing

09 FinishesDrywallAcousticalCeramic, Stone, TileFlooringPainting, Wallcoverings

10 SpecialtiesToilet Partitions & Accessories

11 Equipment12 Furnishings

AppliancesWindow Treatments

13 Special Construction14 Conveying Equipment21 Fire Supression

SprinklerFire Extinguishers

22 Plumbing23 HVAC25 Integrated Automation26 Electrical27 Communications28 Electronic Safety & Security

Fire AlarmOther(Please specify):

/----/TOTAL CONSTRUCTION -

ALTERNATES (List Below) COST123

Company Name:

Address:

Contact Person:

Phone Number:

eMail Address:

Signature: