ckm mjm uk phipps presentation

34
LIVING BUILDING Christine Mondor, AIA, Principal, evolve environment::architecture Faculty, School of Architecture, Carnegie Mellon University Marc Mondor, AIA, Principal, evolve environment::architecture USGBC LEED Faculty cultivating a

Upload: be2camp-admin

Post on 04-Nov-2014

348 views

Category:

Business


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Ckm mjm uk phipps presentation

LIVING BUILDINGChristine Mondor, AIA, Principal, evolve environment::architectureFaculty, School of Architecture, Carnegie Mellon University

Marc Mondor, AIA, Principal, evolve environment::architectureUSGBC LEED Faculty

cultivating a

Page 2: Ckm mjm uk phipps presentation

Phipps ConservatoryCenter for Sustainable Landscapes

Design & Construction Team The Design Alliance, Andropogon, CJL Engineering, CEC Inc., Consultants evolveEA, 7Group, Turner Construction, Vermeulens

Page 3: Ckm mjm uk phipps presentation

Phipps Conservatory and Botanical GardensPhase One | Welcome Center1

Page 4: Ckm mjm uk phipps presentation

Phipps Conservatory and Botanical GardensPhase Two | Tropical Forest2

Page 5: Ckm mjm uk phipps presentation

Executive Director Richard Piacentini asked:

How can we notdo this better?3

Page 6: Ckm mjm uk phipps presentation

Welcome Center

Greenhouses

Tropical Forest

PROJECT SITE

The D

esi

gn

Alli

ance

Phipps Conservatory and Botanical GardensPhase Three | Center for Sustainable Landscapes4

Page 7: Ckm mjm uk phipps presentation

• 24,000 Gross Square Feet• Administration and Research functions• Conservatory Experience for public• Garden Experience for public• Teaching Experience on Sustainability

Project Parameters

5

Page 8: Ckm mjm uk phipps presentation

A model for multidisciplinary team collaboration

Integrative Design Process

RequiresEVERYBODY[talking about] EVERYTHING

EARLY6

Page 9: Ckm mjm uk phipps presentation

• Project Vision and Board Commitment

• Project Statement• 24,000 Office Building• Building Upon Phipps Work• Living Building Challenge• LEED Platinum

• Design Team Selection• Local to the Pittsburgh Region• Architecture/Engineering/Cost• By Invitation• 4 Finalists

7

Page 10: Ckm mjm uk phipps presentation

• Total Project Cost: $11.8 Million• $7.8 Million for CSL Building ($357 per SF w/o PV array)• $3.5 Million for Site • $0.5 Million for Service Building

• CSL Building MEP Costs• HVAC: $28.98/SF• Controls: $11.67/SF• Electrical: $36.28/SF• PV Array: Additional $20-30 / SF (not in project costs)

• CSL Building Envelope: $101.63/SF

Project Costs

8

Page 11: Ckm mjm uk phipps presentation

Phipps Conservatory and Botanical GardensDesign Concepts9

Page 12: Ckm mjm uk phipps presentation

The D

esi

gn

Alli

ance

10

Page 13: Ckm mjm uk phipps presentation

Andro

pogon A

ssoci

ate

s

11

Page 14: Ckm mjm uk phipps presentation

12

Page 15: Ckm mjm uk phipps presentation

13

Page 16: Ckm mjm uk phipps presentation

14

Page 17: Ckm mjm uk phipps presentation

15

Page 18: Ckm mjm uk phipps presentation

Building Orientation & Massing

Building Envelope

Natural Daylight

Natural Ventilation

Getting to Net Zero:passive design strategies

Ste

wart

B

rand

16

Page 19: Ckm mjm uk phipps presentation

Building Orientation & Massing17

Page 20: Ckm mjm uk phipps presentation

Building Orientation & Massing18

Page 21: Ckm mjm uk phipps presentation

Building Envelope, Daylight & Ventilation19

Page 22: Ckm mjm uk phipps presentation

Building Envelope, Daylight & Ventilation20

Page 23: Ckm mjm uk phipps presentation

Building Envelope, Daylight & Ventilation21

Page 24: Ckm mjm uk phipps presentation

TARGETS:

80% daylight Autonomy

25 fc in work stations

40 fc in classrooms

Natural Daylighting

22

Page 25: Ckm mjm uk phipps presentation

TARGETS:

Percent People Dissatisfied < 20

Building Envelope, Daylight & Ventilation23

Page 26: Ckm mjm uk phipps presentation

Building Envelope, Daylight & Ventilation24

Page 27: Ckm mjm uk phipps presentation

ENERGY INTENSITY TARGETS:

< 20 kBTU per SF per year

ENERGY MODEL:19.2 kBTU per SF per year

TYPICAL OFFICE:39.2 kBTU per SF per year

TYPICAL HOUSE:52.4 kBTU per SF per year

COOLING ENERGY TARGETS:> 800 SF per ton

ENERGY MODEL:779 SF per ton

TYPICAL OFFICE:290-400 SF per ton

TYPICAL HOUSE:502 SF per ton

Energy Strategies25

Page 28: Ckm mjm uk phipps presentation

ENERGY INTENSITY TARGETS:

< 20 kBTU per SF per year

ENERGY MODEL:19.2 kBTU per SF per year

TYPICAL OFFICE:39.2 kBTU per SF per year

TYPICAL HOUSE:52.4 kBTU per SF per year

COOLING ENERGY TARGETS:> 800 SF per ton

ENERGY MODEL:779 SF per ton

TYPICAL OFFICE:290-400 SF per ton

TYPICAL HOUSE:502 SF per ton

TOTAL CSL ENERGY

CONSUMPTION:118,000 kwh per year

TYPICAL OFFICE:

241,730 kwh per year

TYPICAL

HOUSE:35,000 kwh per year

Energy Strategies26

Page 29: Ckm mjm uk phipps presentation

Closed loop

Integrated systems

Getting to Net Zero:active system design strategies

Ste

wart

B

rand

27

Page 30: Ckm mjm uk phipps presentation

Energy Strategies

Page 31: Ckm mjm uk phipps presentation
Page 32: Ckm mjm uk phipps presentation

30

Page 33: Ckm mjm uk phipps presentation

31

Page 34: Ckm mjm uk phipps presentation

32