clampforce and preload in bolted joints
DESCRIPTION
The challenges surrounding bolted joints are many and the costs increase in the event of damage due to improperly dimensioned or assembled bolted jointsTRANSCRIPT
14%
24%
28%
10%
24%
Wrong Preload Poor Design Improper Assembly Bad Parts Parts Damaged in Handling