clc whats new 4.1.0

22
What’s New in CLC version 4.1.0

Upload: mike-byrne

Post on 10-May-2015

121 views

Category:

Technology


0 download

DESCRIPTION

Learn what we have included in the latest version of our LMS, CLC 4.1.0 Including: Tin Can Compliance UI Design Improvements Massive Import Improvements Course Page Improvements

TRANSCRIPT

Page 1: CLC whats new  4.1.0

What’s New in CLC version 4.1.0

Page 2: CLC whats new  4.1.0

What has been improved?

01

Page 3: CLC whats new  4.1.0

01 What has been improved?

• 13 Bugs solved

TS-1140 When the sessions are created manually on activities with prerequisites, the users appear to be blocked, even when they have passed the required activity session

TS-1178 Login page is not displayed well on IE 8TS-1200 The variables added through buttons in configurable front page are not being transformed into the corresponding valuesTS-1234 In the advanced search of “Session Gradebook” section, the "type of activity“ filter does not workTS-1239 The app logs the user out and tries to redirect him to the log in page - error in the redirectionTS-1251 Progress graph is using only information from the users listed in current page, when it should be using all the studentsTS-1338 When displaying course results, the pie chart does not update properly. This example shows that 10% of learners have

passed the module when in fact 23% of learners have actually passed (see attachment)TS-1354 There are 2 active discussion forums on the Digicel site. One of them ( Cloud Telephony) is displaying to screen (Chrome)

perfectly, the other is not. This is the problem discussion forum on the Digicel Vehicle Services moduleTS-1367 When importing users on the platform with an extension file other than xls 97-2003, the message “Oh, something went

wrong” appears on screen (see video)TS-1376 In the welcome mail for platform users, "Platform Name“ appears instead of the platform name. (see attachment)TS-1405 Error in the student export fileTS-1413 Error in the group searchTS-1501 From the admin console, on the home page, in section “Plans and courses about to be finished”, the message “Oops,

something went wrong” appears when accessing the second page

3

Page 4: CLC whats new  4.1.0

01 What has been improved?

TS-1143 Video player has to work on apple devices and on the rest of devicesTS-1150 Session status should be automatically updatedTS-1292 User requests that reports show information on extended fields in “Users” sectionTS-965 Create/edit user - role field should be mandatory, and if there is some validation error message, role values should not be

hiddenTS-1296 It's necessary to add a configuration parameter to increase the maximum size of the body of COURSE MESSAGESTS-1556 URL that appears when selecting “Support on the platform” needs to be modified.TS-1125 When there are no published announcements, the announcements component should not be displayed on student and

trainer portalTS-1353 “Plans and courses about to be finished”

• 8 small improvements included

4

Page 5: CLC whats new  4.1.0

• The estimated time assigned to activities is established in minutes and it is displayed in HH:MM format

01 What has been improved?

Creating or editing activities

Viewing activity details

5

Page 6: CLC whats new  4.1.0

• Access from Catalog to training for students is easier now

01 What has been improved?

When a student is enrolled in a course or a plan, a big button is displayed, which goes directly to the same

course or plan under training section.

6

Page 7: CLC whats new  4.1.0

• Massive user import is done in the background (I)

Import users is an action launched in the background

01 What has been improved?

7

Page 8: CLC whats new  4.1.0

• Massive user import is done in the background (II)

01 What has been improved?

When the action finishes successfully or an error happens,a notification message is sent to the administrator

who launched the process

8

Page 9: CLC whats new  4.1.0

• Massive user import is done in the background (III)

01 What has been improved?

New notifications can be configuredto be sent by email or to the inbox

9

Page 10: CLC whats new  4.1.0

02What have we

added?

Page 11: CLC whats new  4.1.0

02 What have we added?• Import and export with extended fields

Extended fields are included in reports

11

Page 12: CLC whats new  4.1.0

02 What have we added?• Inclusion of extended fields at massive user import

When creating users,extended fields can be included in the Excel file.

They are updated at the same time users are created

12

Page 13: CLC whats new  4.1.0

• Images of courses and plans are displayed on the student’s Catalog

02 What have we added?

13

Page 14: CLC whats new  4.1.0

• Design improvements on details page of courses and plans, in student’s Catalog

02 What have we added?

Course information and activitiesare displayed using simple

and attractive design

Details on plans page has been also redesigned

14

Page 15: CLC whats new  4.1.0

02 What have we added?• Tin Can API 1.0 compliance

The new Tin Can API version 1.0 is more stable and secure (HTTPS)

Mike Rustici, Rustici Sw. President

15

Page 16: CLC whats new  4.1.0

03What are we

working on?

Page 17: CLC whats new  4.1.0

03 What are we working on?

17

• CLC version 4.2.0 (August 2013)• PENS Standard compliance

Package Exchange Notification Services

Page 18: CLC whats new  4.1.0

03

18

• CLC version 4.2.0 (August 2013)• New «Enrolment» reports

What are we working on?

Page 19: CLC whats new  4.1.0

03

19

• CLC version 4.2.0 (August 2013)• New «Administrator» role for courses

Configured in a similar way than the course tutors

Similar to administrators but with restricted permissions

What are we working on?

Page 20: CLC whats new  4.1.0

03

20

• CLC version 4.2.0 (August 2013)

• Direct enrolment of groups into sessions, courses and plans

• Sending messages and notifications directly to groups

• New detailed report about training at session level

• CLC version 4.3.0 (October 2013)

• Creation of custom pages for student portal

• Multi-organisational support

• Viewer for Tin Can statements

• Technical requirements checking when the user signs in

What are we working on?

Page 21: CLC whats new  4.1.0

03

21

• CLC version 4.4.0 (December 2013)

• Calendar

• Advanced library

• Activity stream at home page

• CLC version 5.0.0 (February 2014)

• Skills and jobs management

• Learning communities

What are we working on?

Page 22: CLC whats new  4.1.0

SPAIN | UK | INDIA | MEXICOwww.netexcompany.com | [email protected] | +34 902 21 66 21