A) Customer Information
1. Company
2. Street Address
City / State / Zip
City / State / Zip
2. Street Address
1. Project Name
B) Project Information
3. Contact Info (Name)
Phone Fax e-mail
Date
Nearest Major City
1. Process to be performed in Cleanroom
C) General Cleanroom Design Parameters
Unless otherwise instructed by your product / process specialist, design will be based on vertical airflow projection
Desired project completion Date
Cleanroom Planning Guide (This guide provides us with the necessary information to prepare a reliable proposal) When you have completed the form, you will have the option to print it to submit by fax, or simply use the submit by e-mail button
2. Select Desired Cleanliness Classification
ISO-4 (Class 10)
ISO-5 (Class 100)
ISO-6 (Class 1,000)
ISO-7 (Class 10,000)
ISO-8 (Class 100,000)
Unsure
3. Select Desired Airflow Direction Vertical (Downward) Horizontal
4. Heat Load generated by equipment in Cleanroom (kW or BTU/hr)
5. Duty cycle of heat-producing equipment in Cleanroom
Running 25% of the time
Running 50% of the time
Running 75% of the time
Running 100% of the timeUnsure
Phone: 800-459-6320 e-mail: [email protected]
7. Average number of persons that will be working in the Cleanroom
CFM Exhaust:
Phone: 800-459-6320 e-mail: [email protected]
6. Is any heat-producing equipment in Cleanroom water cooled?
Yes No
8. Are hazardous or Flammable materials used in process?
Yes No
9. Will the Cleanroom have any fume hoods, or process exhaust requirements? If yes, please identify quantity (CFM)
Yes No
10. Desired Airlock / Change room conditions:
c. Relative Pressure (in/W.C.)
a. Temperature (Farenheit) +/-
b. Relative Humidity (Minimum) (Maximum)
c. Relative Pressure (in/W.C.)
11. Desired Cleanroom conditions, Cleanroom #1:
b. Relative Humidity (Minimum) (Maximum)
c. Relative Pressure (in/W.C.)
12. Desired Cleanroom conditions, Cleanroom #2: (if applicable)
b. Relative Humidity (Minimum) (Maximum)
a. Temperature (Farenheit) +/-
a. Temperature (Farenheit) +/-
13. Desired Lighting Level (typically 80/100 FC)
15. If special light condition desired, please specify:
Photo Resist Yellow Light? Yes No
14. Are hazardous location light fixtures required? Yes No
16. Lighting control preference:
At entry to each room
At entry to Airlock(s)
From Distribution Panel
Other (Please Specify)
D) Room Details and accessories
a: Airlock / Change Room (width) X (length) X (ceiling height)
b: Cleanroom #1 (width) X (length) X (ceiling height)
c: Cleanroom #2 (width) X (length) X (ceiling height)
1. Room Sizes
i: Airlock #2 (width) X (length) X (ceiling height)
2. Doors (Standard finish on doors is Anodized Aluminum, custom finishes available on request)
Standard 3' x 7' Doors Quantity If special size, please identify:
Motorized Sliding Doors Quantity
Double 6' x 7' Doors Quantity
If special size, please identify:
If special size, please identify:
Phone: 800-459-6320 e-mail: [email protected]
d: Additional Airlock between Change Room and Cleanroom? Yes No
3. Windows (Standard Windows are 36" x 36", clear safety glass)
Please list any special features, if any, required for pass-thru's
Quantity
Quantity
Photo Resist Yellow Glass? Yes No
Mechanically Interlocked Doors Electrically Interlocked Doors(Requires Power source)
Stainless Steel Finish White Laminate Finish with Clear Polycarbonate Doors
4. Pass-thru (s) (Standard Pass-thru cabinet is 20"W x 20"H x 20"D interior dimensions. Custom sizes are available)
5. Wall finish color: Standard is easy-clean White Aluminum. If other is desired, please specify below
Sheet Vinyl
Sheet Rubber
Epoxy-Coated
Anti-Static
Computer-room style raised
Other (Please specify below)
6. Flooring preference:
Please specify any other special flooring requirements below - if none, leave blank
7. Electrical power in Cleanroom
120V Duplex Receptacles Quantity Spaced every Feet
120V Quadplex Receptacles Quantity Spaced every Feet
220-230V Specialty Receptacles Specify Amperage:
480V Specialty Receptacles Specify Amperage:
Other: Please specify
8. Data / telecommunications in Cleanroom
Data / Ethernet connections Quantity
Telephone connections Quantity
Intercom connections Quantity
Other: Please specify
9. Process or Utility piping requirements in Cleanroom
Compressed air Quantity
Quantity
Quantity
Phone: 800-459-6320 e-mail: [email protected]
Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference
Vacuum Quantity
Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference
Nitrogen Quantity
Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference
Argon Quantity
Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference
Other Quantity
Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference
Type?
Natural Gas, Please specify quantity, size and flow requirements
Housekeeping Central Vacuum System (typically supplied with a single 25' hose, and quantity of connections to allow entire cleanroom to be reached )
Please list any additional piping requirements.
11. Safety (check all that apply)
Building has existing fire sprinkler system
Cleanroom will require fire sprinklers
Fire alarm and/or pull stations required in cleanroom
Fire alarm remote tie-in required
Smoke detector remote tie-in required
Please list any other safety systems required (if none, leave blank)
E) Site Information
1. Project will be located on the floor of story buildingfeet from outside wall
2. What is the clear height from floor to roof joists or other structural steel at cleanroom location?
3. What is the height of the roof joists?
4. What is the spacing between the roof joists?
5. What is the height to the roof or other remaining overhead obstructions?
Phone: 800-459-6320 e-mail: [email protected]
6. Access to the cleanroom area from loading dock area is Easy Difficult
7. How many feet from cleanroom area to loading area?
8. How wide are access hallways between cleanroom area and loading area?
9. A/C Equipment is / will be located on
10. Controls
What control system is currently installed in building?
Simple Heat-Cool Thermostat Stand-alone economical control and monitor panel Monitor panel only
PC or Building automation system interface? (required) Yes No
Roof Ground outside Other (Please describe below)
Gravel / Tar
Rubber Membrane
Metal Not Sure
Other (Please Describe)
10. Existing roof type
11. Are existing building area drawings available? Yes No
If yes, at what temperature?
17. Conditions in space surrounding cleanroom (inside building)
Summer Temperature
Summer Humidity
Winter Temperature
Winter Humidity
18. Conditions outside building
Summer Temperature
Summer Humidity
Winter Temperature
Winter Humidity
19. Electrical service available in building (check any / all that apply)
460-480V (3-phase) 220-240V (3-phase) 120-208V (1-phase) 277V (1-phase) for lighting
21. Please list any other site conditions (if none, leave blank)
Please either scan and e-mail, or fax a sketch of the proposed cleanroom. One of our sales representatives will contact you as soon as this planning guide is received and reviewed. Thank you.
Phone: 800-459-6320 e-mail: [email protected]
12. Is year round chilled water available? Yes No
13. Is year round cooling tower water available? Yes No
If yes, at what temperature?14. Is year round boiler hot water available? Yes No
15. Is year round steam available? If yes, at what presure?Yes No
16. Is there a city drain for A/C condensate located near the cleanroom? Yes No
20. Is union labor required? Yes No