Repowering Older Plants - The HRSG View

International Conference Power Plants 2012

Society of Thermal Engineers of Serbia

Oct 30th – Nov 2nd , 2012

Zlatibor, Serbia

Page 2: Cmi -The View of the HRSG

Power Plants 2012- 2 of 32

Heat Recovery Steam Generators offered by CMI

Page 3: Cmi -The View of the HRSG

Power Plants 2012- 3 of 32

Inherent features Horizontal & Vertical HRSGs

Horizontal Vertical

Accessibility / Maintainability - +

Cleanability - +

Duct firing + =

Arrangement = +

Catalysts + =

Erection cranes = +

Cycling = +

Lets review the specific application of repowering power plants and fuel oil in the following presentation slides

Page 4: Cmi -The View of the HRSG

Power Plants 2012- 4 of 32

Introduction to power plants repowering

In the Balkan and Central Europe, there is a large fleet of old coal fired power plants with a potential for repowering into modern combined cycle power plants.

Compared to green field projects, repowering a steam turbine with a new train of gas turbine and HRSG includes some special challenges.

Most of the time, the HRSGs have to be tailored made to suit limited foot print, and existing repowered steam turbine.

CMI has completed such a large repowering project, like Senoko in Asia or Dunamenti in Hungary. These experience will be the support throughout this presentation to explain these specific repowering challenges.

Besides this main topic, CMI will present the HRSG for heavy oil application, and the most recent references in Central Europe.

Page 5: Cmi -The View of the HRSG

Power Plants 2012- 5 of 32

REMAIN

Concept of Plant Repowering

Pompes alimentaires

HRSG

Turbine à vapeur

Condenseur

1

2

7 6

5

4 3

11

10

8

9

12

13

1 : condensats - 2 : eau alimentaire - 3: eau alimentaire. IP - 4: eau alimentaire HP

5: vapeur HP - 6: retour turbine (Cold reheat) - 7: resurchauffe - 8 : vapeur LP -

9: eau désurchauffe by-pass IP - 10: by-pass IP - 11- by-pass LP

12: eau désurchauffe by-pass LP - 13 : by-pass HP

NEW

OPTION

Page 6: Cmi -The View of the HRSG

Power Plants 2012- 6 of 32

Repowering Senoko - Project background

• Repowering of old 3*120MW steam turbine into efficient CCPP

• Main contractor was Alstom using its gas turbine engine GT26B

• CMI Vertical HRSG 3P+R in natural circulation

• HRSG ‘ tailor designed ’ to suit numerous constraints

• Project challenges:

- limited foot print of old boiler

- existing site very congested

- only 18 months outage

ALSTOM GT26 arrival at site

Page 7: Cmi -The View of the HRSG

Power Plants 2012- 7 of 32

Site limitations

Original fired boiler had to contain new GT+ HRSG.

Available area for HRSG was limited to 30.6*28.1m

HRSG indoor includes main auxiliaries (cargo lift, FWP, feedwater tank, etc)

CMI exchanged with Alstom 3D model to make detailed plant modelling

3D model new boiler

Page 8: Cmi -The View of the HRSG

Power Plants 2012- 8 of 32

GT

Overall boiler length 35 meters

Typical tubes length 20.4 m

Typical

heigth

9 m

Vertical HRSG flexible layout

A Vertical HRSG behind GT class ‘ F ’ for ‘ greenfield ’ is around 35 meters long. In case of Vertical HRSG, tubes length impact directly the overall boiler length. This is not the case for Horizontal HRSGs.

This is a special flexibility feature offered by the Vertical HRSG only.

Page 9: Cmi -The View of the HRSG

Power Plants 2012- 9 of 32

Gas cross sectionGas cross

section

unchanged

Longest

tube

20.4 m

Reduced

tube/boiler

length

FlexibleSlightly

enlarged

boiler

width

To match this repowering limited space (length 30,6 meters), CMI has taken advantage of this flexible arrangement offered by the Vertical HRSG:

CMI used shorter tubes length. For unchanged casing cross section, boiler casing was enlarged in proportion

Vertical HRSG flexibility layout

Page 10: Cmi -The View of the HRSG

Power Plants 2012- 10 of 32

Heating

surface

modules

flexible

arrangement

Standard

'greenfield'

arrangement

Senoko

enlarged

casing width

Vertical HRSG flexibility layout

Considering the installed boiler heating surface, this HRSG was arranged in 3 modules in width by 4 levels in height, instead of 2 modules wide by 5 levels height which would have applied otherwise for a ‘ greenfield ’ site.

Page 11: Cmi -The View of the HRSG

Power Plants 2012- 11 of 32

HRSG was made of 12 heat exchanger modules prefabricated and hydrotested to reduce erection time. The largest module dimensions was 23.6 meters long * 3.9 wide *2.9 heigth.

Modular construction

Heat exchanger modules unloading and transportation

Page 12: Cmi -The View of the HRSG

Power Plants 2012- 12 of 32

Congested existing site

Boiler modules were transported by hydraulic trailer ‘self propelled ’ which reduced convoy length and help to perform precise movements with large angle orientation wheels in congested site

Heat exchanger modules arriving at the gate of the existing power plant (Site very congested)

Page 13: Cmi -The View of the HRSG

Power Plants 2012- 13 of 32

Modules erection using hydraulic jacks

28 hydraulic jacks to lift modules on top of structure

Vertical HRSG:

No large crane was required.

Vertical HRSG Steel structure with jacks on top for module lifting

Page 14: Cmi -The View of the HRSG

Power Plants 2012- 14 of 32

Modules erection using hydraulic jacks

Considering a congested site, the CMI Vertical HRSG erection features: - no module tilting performed

- no large cranes required

Horizontal HRSG typical lifting system

Page 15: Cmi -The View of the HRSG

Power Plants 2012- 15 of 32

Modules erection sequence

The first row of 3 modules was hanged to cables and lifted up just enough to introduce the next row of 3 modules. This operation was repeated until all 4 levels of modules were suspended to one another.

Page 16: Cmi -The View of the HRSG

Power Plants 2012- 16 of 32

Modules erection sequence

Erection cables

Temporary plates (peinted in yellow)

Final suspensions

First row of modules suspended

Page 17: Cmi -The View of the HRSG

Power Plants 2012- 17 of 32

Modules erection sequence

Hydraulic trailer ‘ self propelled ’ had to manoeuvre in limited space.

Introduction of the second row of modules.

Page 18: Cmi -The View of the HRSG

Power Plants 2012- 18 of 32

Modules erection sequence

The module was positioned exactly and it was attached to the module just above it on each support plates. Then, the hydraulic trailer was lowered and released.

Page 19: Cmi -The View of the HRSG

Power Plants 2012- 19 of 32

Modules erection sequence

Erection of last row:

All modules remained flat during the complete erection sequence

Page 20: Cmi -The View of the HRSG

Power Plants 2012- 20 of 32

Modules erection sequence

Completion of 12 modules suspended

Only adjacent header ends were to be welded

Page 21: Cmi -The View of the HRSG

Power Plants 2012- 21 of 32

Modules erection sequence

The complete assembly (1450 tonnes) was then jacked up on top of the steel structure.

Hydraulic jacks were released, dismantled and installed on the next unit.

All modules suspended in final position inside the steel structure

Page 22: Cmi -The View of the HRSG

Power Plants 2012- 22 of 32

Modules erection sequence

Boiler modules erection completed in 6 days only!

Page 23: Cmi -The View of the HRSG

Power Plants 2012- 23 of 32

Indoor HRSG

HRSGs steel structure has been extended to an enclosure wrapped all around for weather protection, noise abatement and aesthetic.

View of completed repowered Senoko Power Plant

Page 24: Cmi -The View of the HRSG

Power Plants 2012- 24 of 32 G3 to be repowered Unit 9 Unit 8

Repowering de Dunamenti G3 in Hungary

Page 25: Cmi -The View of the HRSG

Power Plants 2012- 25 of 32

View of the Repowered Dunamenti Power Plant

The GDF SUEZ Group, majority owner of the Dunamenti power station, Hungary’s second largest power plant, decided to upgrade its G3 unit, a combined-cycle gas turbine (CCGT) block, from 215 MW to 400 MW, commissioning in 2011. In this repowering process, Dunamenti, the existing gas-fired steam turbine and installed a heat recovery steam generator (HRSG) and a gas turbine. This raised the unit’s efficiency from 36% to 57%. The Dunamenti plant accounted for 7% of all electricity generated in Hungary in 2010, producing 2.6 terawatt-hours.

Repowering Dunamenti - Project background

Page 26: Cmi -The View of the HRSG

Power Plants 2012- 26 of 32

Repowering Older Plants - The HRSG View

• Repowering of old conventional plants into new efficient CCPP (new GT-HRSG sets with old ST sets) is a cost effective solution, because existing equipments remains such as steam turbine, electrical distribution, cooling system, etc.

• Permitting is also more easy as this is an existing power plant.

• Compared to ‘greenfield’ plants, repowering of old units always requires ‘ tailor made ’ design to match specific constraints: - remaining equipment's (steam turbine, condenser, etc) - limited available space of the old fired boiler - minimum outage of the existing plant - congested existing site - indoor HRSGs

• The Vertical HRSG has proofed to be very flexible and accommodating for those specific repowering constraints.

Page 27: Cmi -The View of the HRSG

Power Plants 2012- 27 of 32

• Gas turbines are operated typically on natural gas, with no risk of fouling and typical dew point at 60°C. Both Horizontal or Vertical HRSG are suitable for the purpose.

• Heavy fuel oil has high sulfur content with Acid Dew Point (ADP) up to 145°C

• Such high sulfur content requires a special HRSG design because all metallic surfaces must remain above ADP to prevent internal corrosion on tubes and ducting.

• Temperature of condensate water entering finned tubes must be controlled to remain above ADP to avoid acid formation on tubes

It limits the heat recovery in the back end of the HRSG

• Ducting metal must remain above ADP which is not feasible with internal insulation. HRSG must be externally insulated with ducting remaining at inside flue gas temperature.

Design Criteria for HRSG Heavy Fuel Oil Operation

Page 28: Cmi -The View of the HRSG

Power Plants 2012- 28 of 32

Combination of Heat Exchangers arrangement and Sootblowers must maintain permanent industrial cleanliness of finned tubes: • Finned tubes

Maximum height of solid fins Maximum fins density (160 fpm on heavy oil) Staggered or inline arrangement with constant minimum tubes pitches Limitation of tube rows per bank

• Sootblowers Between tubes banks for on-load cleaning Rotary or Rake type parallel to tubes

Boiler design for Fuel Oil is different than Natural Gas. This requires specific boiler expertise with references.

Design Criteria for HRSG Heavy Fuel Oil Operation

Page 29: Cmi -The View of the HRSG

Power Plants 2012- 29 of 32

Proven HRSG design for Distillate Oil

HRSG designed for continuous operation on distillate oil

Page 30: Cmi -The View of the HRSG

Power Plants 2012- 30 of 32

Proven HRSG design for Crude Oil

HRSG designed especially for continuous operation with crude oil and equipped with sootblowers

Page 31: Cmi -The View of the HRSG

Power Plants 2012- 31 of 32

Conclusions

There is real potential for repowering of old steam turbines in the Balkans. In a lot of old conventional plants, fired boilers have exhausted their useful life before its steam turbine. Repowering of those old steam sets into efficient combined cycle with new GTs and HRSG is a cost effective solution. Today, available gas turbines can provide the exhaust energy for steam turbines of 120 -150 MW of which there are many examples in Europe dating back from the 1970’s. These units could be repowered so as to increase power supply with a significant improvement in operating efficiency, flexibility and emissions. CMI has completed the Senoko and Dunamenti plants, which are a very successful example of such repowering. Vertical HRSG has been proofed to be very accommodating for those the specific repowering constraints, which always require a tailor made design to suit limited space. In addition CMI Vertical HRSGs are uniquely fit behind Gas Turbine firing fuel oils.

Page 32: Cmi -The View of the HRSG

Power Plants 2012- 32 of 32

Thank you for your attention

Europe: + 32 430 2810

Email: [email protected] Website: http://www.cmigroupe.com

Question time