1 November 2010 CONFIDENTIAL
Use this area for sub-brand logo, business or initiative
(Maximum height 1.5cm)
Use this area for cover image (height 6.5cm, width 8cm)
Copyright of Shell Projects & Technology
Coaching Plans & Progress
How to plan & measure
progress
Use this area for sub-brand logo, business or initiative
(Maximum height 1.5cm)
Use this area for cover image (height 6.5cm, width 8cm)
-
COACHING PLANS
1.0
2
-
Plan you coaching!
3
Which location will you coach? Familiarise yourself with the location
What is the gap? What is the attitude of the operators and supervisors
Score the PCC33 Determine which item you want to focus on first?
Do not deal with to many items at the same time on 1 location
Make assessments do measure performance. Update PCC33
When item has improved move on to the next. Keep an eye on the old ones
-
PCC33?
4
In Ensure Safer Production we used 33 items to measure progress. This list will be extended to include all OI items
-
The completion criteria
5
Some love it, some hate it.
A list of 33 criteria to measure completion of the
implementation of ESP
List is based on audit like questions
Technique used derives from project
management, e.g. slice and dice
Enables easy tracking of implementation progress
Enables comparing sites and take learning / share
practices / steal with pride
-
A bit of history
Originally there were 66 criteria which were used in Downstream and Gas GAME. In 2009 the list has been simplified to 33 items and is currently used in Downstream and Upstream The original 66 stood symbol for the long road to completion!
-
The structure
Documents in place
Documents in place
Training given
Process embedded
% of the Criteria
-
The PCC 33
Similar structure to 66 Same type of scoring
Description of
requirement
Weighing factor Observation
Score per sub-item
Total Score for the Criteria
-
The pyramid
The pyramid; red < 50%, yellow 50-80%, light green 80-90%, green >90%
-
Scoring per sub-item
10
These scores are grouped and used in the AI-PSM reporting
Sustainability Items
Alarm Management
Items
M&CC Items
-
PCCs as part of the OI and AI-PSM Progress Tracking
11
All Assets have submitted their plans which have been translated in a planned progress score.
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
OI Actual
OI Planned
-
Compare yourself with others
12
0%
20%
40%
60%
80%
100%
120%
SEIC
PD
O H
arw
ee
l
Pe
arl
Alt
amir
a
MLN
G
Bac
ton
SMD
S
Haz
ira
Sctf
rd R
ef
Ch
angb
ei
Bu
en
os
Air
es
Mo
ntr
eal
Re
ich
ste
tt
OLN
G
BLN
G
Cly
de
Sctf
rd U
pgr
Alb
ian
Min
e
Sarn
ia
Rh
ein
lan
d
SNC
-P
ern
is
Ge
elo
ng
Stan
low
NLN
G
Be
rre
Pt C
ou
ron
ne
Fre
de
rici
a
Po
rt D
icks
on
Pe
rnis
No
rco
SNC
-M
oe
rdijk
Go
the
nb
urg
Mo
bile
Pu
lau
Bu
kom
Tab
anga
o
He
ide
DP
CP
No
rco
Sco
tfo
rd
Sera
ya
Ge
ism
ar
Co
nve
nt
DP
R
Po
rt A
rth
ur
Mar
tin
ez
Har
bu
rg
Pu
get s
ou
nd
PCCs
PCCs
Changbei (Nov 2009)
Changbei (Mar 2010)
-
What does the alarm rate vs PCC score look like?
13
What do you think? Alarm Metrics are supposed to be a leading indicator to improved operational performance. Some correlations have been investigated.
-
Alarm rate versus PCC Score
14
0
5
10
15
20
25
0 20 40 60 80 100
ESP Completion (%)
Ala
rm R
ate
Fulfilling PCCs drives the alarm rate down
What you would expect with ISUs gradually being completed
Outlier? (This Site had good Bad Actor Analysis in place
-
Collection of scores will result in total score for UIG
15
Gamba Rabi -------- Okoloma Nembe Forcados Soku Bonny
SPDC Gabon
UIG
-
Reporting
16
16
-
Q & A