COLD IN-PLACE RECYCLING
Dennis McElroy - CIR Operations Manager
![Page 2: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/2.jpg)
Specification & Research Papers
![Page 3: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/3.jpg)
Overview
What is CIR?
When to use CIR and the Benefits
CIR Basics/Misc info
Order of Operations
Project Examples
“It is a beautiful thing when the Green Solution is also
the most cost effective one.”
Michael J. Murdter, P.E., Director County of Santa
Clara Roads and Airports Department
![Page 4: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/4.jpg)
What is Cold In-Place Recyling (CIR)?
CIR is the processing and treatment with bitimious
and/or chemical additives of existing HMA
pavements without heating to produce a restored
pavement layer.
![Page 5: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/5.jpg)
Wirtgen – 3800
“Single Unit Recycler”
CIR – Foamed Asphalt
“Welded or Bonded Product”
Oil Pump and Control Unit 12.5’ Down Cutting
Milling Drum
Microprocessor/Computer to
control Oil Percentage and
water delivery
Rear Tamping Screed
Or pickup machine
and paver
![Page 6: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/6.jpg)
CIR – Depths
CIR – Foam
Depth: 3”minimum – 6” maximum
AC, AB, AC/AB blends
Eliminating the potential for reflective cracking = lowers costs in the long run on your Pavement Maintenance System
Typical AC/AB Section Typical AC/CIR/AB
Section
![Page 7: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/7.jpg)
CIR (Foam) – How the mixing Chamber works
12.5’ (fixed)
Down Cutting
Drum
![Page 8: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/8.jpg)
![Page 9: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/9.jpg)
CIR Basics – How it Works
Bitumen (Oil)
PG 64-10 at 170 C
+ Water = Foam
Range 2% - 2.5%
Cement
Portland Type II
Range 1% - 1.5%
![Page 10: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/10.jpg)
When to use it?
Bridging the gap between Maintenance Methods and Complete Reconstruction.
Alternate Method to:
Thick Overlays
Remove and Replace
Over 25% Digouts
![Page 11: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/11.jpg)
Average Production Rates
Urban Environments:
50,000 SF – 70,000
SF per shift
Rural Environments:
65,000 – 130,000 SF
per shift
= 1 – 2 lane miles per shift
= Approximately 30 - 50% reduction in
construction times for the pavement rehabilitation
portion of the project
![Page 12: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/12.jpg)
Benefit: Cost/Trucking/Emissions Savings
Reducing off haul costs/materials associated with conventional Remove and Replace
Emissions Savings from trucking, hot plants, and additional equipment needed during R&R – Environmentally Friendly
![Page 13: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/13.jpg)
Benefit: Lowers User Delays
Immediate access for
pedestrians, vehicles,
driveway access, and
emergency personnel
safe and convenient.
Cold material, wont
pick up on car tires.
![Page 14: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/14.jpg)
Benefit: Lowers User Delays
![Page 15: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/15.jpg)
CIR- Foam (Night Work Acceptable)
![Page 16: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/16.jpg)
Cost Savings (20% - 40%)
An example comparison between conventional rehabilitation with overlay and CIR with foamed asphalt for a project (Catamaran Street, Foster City with 149,600 ft2 paved surface area):
Conventional Rehabilitation:
32,000 ft2 of existing asphalt concrete repair= $176,000
3” asphalt concrete overlay= $252,824
Total = $428,824 (would’ve taken 5 days to complete).
CIR-foam:
4” CIR with foamed asphalt = $157,080
2” asphalt concrete overlay = $171,666
Total = $328,746 (took about 2 days to complete).
This project was bid using conventional methods and Value Engineered delivering a Net saving through using CIR-foam=$100,078 (~23%) while eliminating 3 days of traffic closures.
![Page 17: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/17.jpg)
Where can you CIR?
Collector Roads County Rural Roads Major Arterials
Universities Residential
![Page 18: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/18.jpg)
Order of Work
Preliminary Investigation:
(1) Conduct visual pavement inspection and coring
(2) Perform sampling of existing roadway materials to account for changes in the pavement, and
(3) perform mix design in the laboratory.
![Page 19: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/19.jpg)
Order of Work
Public Notifications
Lower all existing utilities +/- 3” below CIR depth
Wedge Cut / Conforms/ Milling
Trim outside edge of roadway to make room for overlay or other surface treatment
Address Severe Base Failures at this time.
![Page 20: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/20.jpg)
CIR - The Process
Cement spreading- The
cement spreader
is usually ahead of the
equipment train by
about 50 ft spreading
cement over a pre-
dampened pavement
surface, at an average
rate of about 1% by weight
of RAP.
![Page 21: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/21.jpg)
CIR - The Process
During CIR Activities
Single Lane Closure
Pulverize/Process/
Place/Compact
Existing Materials
12.5’ (fixed) Down
Cutting Drum
![Page 22: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/22.jpg)
CIR – The Process
Water Truck with Paver
![Page 23: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/23.jpg)
CIR – The Process
Material is compacted
to a minimum of 98%
using two (2) 12 – ton,
steel drum vibratory
rollers
A 12 – ton pneumatic
(rubber tire) roller is
used to finish the surface
and prepare it for
traffic.
![Page 24: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/24.jpg)
CIR - The Process
Apply Fog Seal (SS1 cut 50/50), Temp Striping, Sand Blotter to treated Surface
Reconstructed Roadway is ready to surface in 2-3 days after initial cure period
No Deflection or Rutting, No Supplemental Compaction
OPEN TO TRAFFIC IMMEDIATELY
Fog Seal Sand Blotter
![Page 25: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/25.jpg)
Example: Monterey Rd., San Jose (2011) Project Specifications
638,040 Sf
Conventional R&R
3” Mill
6” Digouts
Leveling Course / R-HMA Overlay
Total: $2,540,470.00
Cold In-Place Recycling
2” Wedge Cut
Minimal 6” Digouts (Areas
innaccessbible)
4” CIR – EAM (Foam)
2” RHMA Overlay
Total: $2,122,400.00
NET SAVINGS: 16% or $418,070.00
![Page 26: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/26.jpg)
Monterey Rd., San Jose
Existing Pavement Conditions
Alligator Cracked Surface
Years of patching
Raveling/Potholes
Aged Oxidized Pavement
Type II Slurry Seal
Areas of Petro mat
Benefits
Elimination of costs for 780 truckloads of importing and off haul costs of over 15,600 tons of aggregates to and from landfill and/or asphalt plant or quarry.
Conventional R&R method would have taken approximately 18 days, whereas the CIR method took only 9 days.
BEFORE
FINAL CIR SURFACE
![Page 27: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/27.jpg)
Monterey Rd., San Jose
Skid Marks on final CIR
Surface – No Raveling
Foamed CIR
![Page 28: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/28.jpg)
Monterey Rd. Photos Taken on 3/22/2016
![Page 29: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/29.jpg)
R-HMA Overlay was placed in the intersection (without an underlying CIR layer) and it is already showing signs of fatigue, cracking, early failures.
4” CIR – Foam w/ Leveling Course & R-
HMA Overlay Section
![Page 30: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/30.jpg)
Holsclaw Rd – Santa Clara County
Constructed - Sept. 2011
![Page 31: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/31.jpg)
Holsclaw Rd (Leavesley Rd – Gilman Rd, Gilroy CA)
Santa Clara County
6,000’ x 24’ = 144,000 SF Recycled using Foamed Asphalt
X2 Shifts (72,000 SF per Shift)
+/- 3” – 3.5” CIR layer using Foamed Asphalt
Chip Seal wearing course x1 (2’x2’) pothole/driveway scuffed
Pg. 10
x4 small locations chip seal worn, subgrade problems
Pg. 11
![Page 32: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/32.jpg)
Holsclaw Rd – Before
May – 2011 Photo Taken off of
google Earth
![Page 33: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/33.jpg)
Photo Taken 1-2-2013
![Page 34: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/34.jpg)
Photo Taken 3-22-2016
![Page 35: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/35.jpg)
![Page 36: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/36.jpg)
Beginning of CIR Section at Leavesley Rd
3-22-2016
Beginning of CIR Section at Gilman Rd
3-22-2016
![Page 37: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/37.jpg)
Skid marks – CIR layer still intact
![Page 38: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/38.jpg)
Adjusted Utilities – No Settling
Consistent throughout the entire project
![Page 39: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/39.jpg)
CIR Joint
CIR Layer
OLD AC Section, road was
reconstructed with (2) 12’
passes off of centerline.
No shoulder backing was
spec’d by the county
- No separation at the joint
![Page 40: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/40.jpg)
Photo Taken 1-2-2013 Photo Taken 3-22-2016
Scuffed driveway entrance to farm
(1) HMA patched
pothole (2’ x 2’)
![Page 41: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/41.jpg)
(1) location approx 30’
long in the SB lane with
4 small areas where the
chip seal has started to
wear and expose CIR
layer to elements. Soft
subgrade may also be
an issue here.
Note: Sharp Turn,
shaded by trees
![Page 42: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/42.jpg)
Gilman Rd
(Chip Seal placed on top of existing pavement Sept 2011 – NO CIR)
Photo Taken 1-2-2013 Photo Taken 3-22-2016
![Page 43: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/43.jpg)
Gilman Rd – Chip Seal Only
![Page 44: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/44.jpg)
Final –Other Considerations
Work Hour Windows – Need to be
minimum 8 hrs. to be cost effective
Temperature: 50 degrees and rising
Widths outside of 12’ require a
supplemental milling machine
Recommend a discussion with a
contractor during the design
phase
Surface Layer is necessary
HMA / R-HMA Overlay
Chip Seals / Cape Seals in specific
areas
![Page 45: Cold In-Place Recycling (Foamed Asphalt) PowerPoint](https://reader036.vdocument.in/reader036/viewer/2022062317/58ed02e91a28ab443a8b460d/html5/thumbnails/45.jpg)
Questions and Answers
Dennis McElroy
CIR Operations Manager
Cell: 408-639-8063