8 October 2009 Prague ASE XXII Congress Space – Opportunities for all Columbus Operations Columbus Control Centre An Overview to Columbus Operations Reinhold Ewald ESA Astronaut Columbus Control Centre Oberpfaffenhofen near Munich

Upload: clyde-rogers

Post on 11-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

An Overview to Columbus Operations

Reinhold EwaldESA Astronaut

Columbus Control CentreOberpfaffenhofen near Munich

Page 2: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Dr. J. Kehr

Deutsches Zentrum für Luft- und Raumfahrt e.V.

DLR

ESA Ministerial Conference, Rome 1985 (input)

Page 3: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Dr. J. Kehr

Deutsches Zentrum für Luft- und Raumfahrt e.V.

DLR

Decisive Events

1987 Challenger Accident Co-orbiting Platforms cancelled (The Hague)1988 Start of MSCC construction (advanced contribution)1992 Hermes and MTFF cancelled (Munich) 1993 USSR dissolved and MoU with Russia “Freedom” survives with 216:215 in US Congress D-2 Mission, MSCC qualification1994 Size of Columbus module reduced to half (6m) NASA approves “bulkhead” approach for partners 1995 COF and ATV officially approved for ISS (Toulouse) 1998 After 20 Ph-B studies: Col-CC DDI contract to DLR Launch of the first ISS module (Zarya)2003 Columbia accident2004 Col-CC “Inauguration””

Page 4: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Page 5: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

1E STS 122 Mission Parameters:• duration 11+1+2 days, 7 crew (1up/1 down• 3 EVA´s,• Cargo: Columbus, ICC with

Ext. P/L SOLAR and EUTEFView into Shuttle Cargo Bay

Page 6: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

SOLAR 3 Instruments

EuTEF 9 Experiments

FluidphysicsBiology

EuropeanTransportCarrier

PhysiologyModules

MSGMicrogra-vity ScienceGlovebox

NASA Experiment

FacilitiesEuropeanDrawerRack

PCDFCrystal Growth

HRFHumanPhysiologyRackFacilities

Page 7: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

After successful mating and leak check

Col-CC • supported commanding of Columbus

into Berthed Survival Mode • performed Columbus final activation• provided support to the on-board crew

for Columbus and rack outfitting • started commissioning of system and

payloads• supported activation of external

payloads EuTEF and SOLAR

STS 122 1EFebruary 2008

Page 8: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Col-CC started operations of the Columbus module

in February 2008 and performs the following tasks:

• Controls Columbus around the clock: 24 hours per day, 7 days per week

• Performs communications to the on-board crew for activities performed in the Columbus module

• Controls stowage in Columbus• Coordinates operations with Mission

Control Centre Houston and Huntsville• Plans all activities performed in

Columbus• Performs payload coordination with

USOCs (User Support and Operations Centres) distributed throughout Europe

• Col-CC is supported by engineering teams at Col-CC, Bremen and Turino and by ground system operations

Page 9: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Col-CC • controls the Columbus on-board systems to provide a safe and

comfortable environment for the crew and to provide necessary support for the ESA and NASA payload facilities

• This is achieved by monitoring and configuring, by remote command, the following subsystems: – Power System– Environmental Control and Life Support System

• Air conditioning (oxygen)• Temperature control for cabin• Humidity regulation• Shell heaters

– Thermal System• Water loop, water pump to cool equipment and racks

– Data Management System– System to Payload interfaces

• Col-CC performs preventive system maintenance• Supports repair and replacement of system components

Page 10: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Col-CC performs Columbus system reconfiguration to support docking / undocking of visiting vehicles

• ATV docking 3 Apr 08, undocking 5 Sep 08

• STS 122-128 except 125• Activation of the Japanese modules • Soyuz docking• Progress docking• HTV

Page 11: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

• Upgrade of Columbus on-board software to the next revisions (Cycle 11 in 2008, Cycle 12 in Oct 2009) in close cooperation with the crew, engineering teams, and the other MCC

• Supported repair of ESA payloads in Columbus • Supported payload operations and performed payload

monitoring

Page 12: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

One year of operations resulted in

• 36500 commands to Columbus

• 2.2 million lines of code

• 213 CHITs

• 41 integrated anomalies• 420 Columbus anomalies

• Col-CC Stand-alone Simulations: 25

• European Simulations: 70

• Simulations with NASA: 50

Page 13: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

DMS/Comms

Columbus Flight Director

Command

Systems

Cosmo

Operations Coordinator/Columbus Planner

ESA Mission Director

Eurocom

(EAC)

Page 14: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

HoustonTRU, SVF,IGS

MadridCD-MCS, IGS,ViDS, VoCS

TorinoCD-MCS,IGS, ViDS,VoCS

NaplesCD-MCS,HRDP-2,IGS, ViDS.VoCS

Oberpf.CD-MCS, MCS,TQVS, DaSS,DFS, IGS (R&N,WAN), IMS,INFRA-GEN/SAN, TREK/ISP, ViDS,VoCS, OST

ToulouseCD-MCS,ATV, AGCS,DaSS, HRDP-1, IGS, ViDS,VoCS

ZurichCD-MCS,IGS,ViCS,VoCS

CologneCD-MCSTRE, ATV Fac.,StandaloneModels, HRDP,IGS, Mockups,ViCS, VoCSBrussels

CD-MCSIGS, VIDS,VoCS

NoordwijkCD-MCS,HRDP-4,IGS, ViDS,VoCS

TrondheimCD-MCS,IGS, ViDS,VoCS

CopenhagenCD-MCS, IGS,ViDS, VoCS Bremen

CD-MCS, INT-1/INT-2SRF, ETM/RLTF, MCSRef, SDDF, AGCS-Ref,ATV STF Ref, DaSS SADFS, GSS, HRDP-RefIGS, OTRS, SDDF, ViDS,VoCS Moscow

IGS, VoCS,Routers, VSAT

HuntsvilleDaSSDemux,IGS

Page 15: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

DMS VITAL LAYER

DMS NOMINAL LAYER

System Layer

Payload Layer

SUBSYSTEMS

PAYLOADS

C&C Bus 1&2

Vital Bus

System Bus

I/O

PayloadBus

Telemetryto Ground

Ethernet

Bitstream Data

ISS DMS

I/O

I/O

I/O

• Activation/Deactivation• Reconfiguration• Safety Critical Function Monitoring and Commanding• supervised by ISS DMS

• Subsystems Monitoring and Control• Fault Management Support• Support of Vital Layer functions• Ground Communication• Crew Interface• Provision of Mass Memory for System and P/L• Basic P/L Monitoring and Control• Master Time Line Storage and Execution

Payload Services, dependent on• Mission• MTL• Particular P/L

Columbus DMS Architecture

Page 16: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

SSMB

ICS

ICS

ICS

ICST

VTC 1MAL

PANEL 1MAL

PANEL 2

ICST

VTC 2

ICS ICS ICS ICS ICS

ICS ICS

ICS

ICS

CMU 1 CMU 4

MMU 1

MMU 2

APM LAN

ICS

ICS ICS

T

T

HRM

LANSwitch

DMC(SPC)

MMC(SPC)

Spare(SPC)

T

T

ICS ICS ICS ICS

Nominal DMS Layer

Vital DMS Layer

ICST

APM P/L BUS

PLCU ISPR 1 - 10INTERFACE(SPC)

ICS T

APM

LAPTOP

APMLAPTOP

USLAPTOP

ACTIVATION, C & WVITAL MONITORING

SYSTEM MONITORING, CONTROL,AND RECONFIGURATION

HARDWIREDINTERFACES

SSMB C&CI/F BUSSES

1

12

Rate DataVideo/ High

ICS ICS T

US P/L BUS

JEM

NODE 2

Payload Section

(red.)

US LAN

SSMB APM

1

2

XCMU

PEHG

ICS

DOWNLINK

DOWNLINK

ICS ICS

T TICSICS

ICS

ICS

Ext. P/L 1..4

INTERFACE

ICS

VITAL 1553 BUS

SYSTEM 1553 BUS

ColumbusTerminalInterface

ICS

ICS

ICS

OPS LAN

Center Aisle P/LSUP I/F

ISL I/F

(P/L LAN-2)

(STD P/L BUS)

ACTIVATION, C & WVITAL MONITORING

Page 17: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Page 18: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Legacy Ops Concept Columbus

Computer System

Communication System

Motion Control System

Power System

Thermal System

Life Support System

Computer & Communication Systems

Power & Thermal Systems

Life Support

Page 19: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Legacy Ops Concept New Ops Concept

Computer System

Communication System

Motion Control System

Power System

Thermal System

Life Support System

Computer & Communication Systems

Motion Control System

Power & External Thermal Systems

Life Support & Internal Thermal Systems

Page 20: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Columbus New Ops Concept

Computer & Communication Systems

Motion Control System

Power & External Thermal Systems

Life Support & Internal Thermal Systems

Computer & Communication Systems

Power & Thermal Systems

Life Support

Page 21: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

Page 22: Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold

8 October 2009Prague

ASE XXII CongressSpace – Opportunities for all

Columbus Operations Columbus Control Centre

During Increment 20:

COLUMBUS has become the most used science module on board ISS!