columbus road loop old r - canalway partnerscanalwaypartners.com/wp-content/uploads/2019/01/... ·...
TRANSCRIPT
KEY PLAN
LEGEND
TOWPATH TRAIL HEAD
TOWPATH TRAIL STAGE 4
TOWPATH TRAIL AOC AREA
TOWPATH TRAIL STAGE 3
CUYAHOGA RIVER
RAILWAY
BRIDGE
FORMER INNER-BELT BRIDGE
GEORGE V. VOINOVICH BRIDGE&
CCG2 BRIDGE IN CONSTRUCTION
IMPROVEMENTS PROPOSED TO BE
CONSTRUCTED AS PART OF THE
TOWPATH STAGE 4 PROJECT
IMPROVEMENT WITHIN THE TOW-
PATH STAGE 4 CORRIDOR CON-
STRUCTED PREVIOUSLY OR BY
OTHERS
CARTER ROAD + OLD RIVER
ROAD + CANAL BASIN PARK
IMPROVEMENTS
Scra
nto
n R
d
Carter Rd
Carte
r Rd
Canal Rd
Colu
mbus R
d
Co
lum
bu
s R
d
C U Y A H O G A R I V E R
CANAL BASIN PARK
RTA
VIA
DU
CT
COLUMBUS ROAD LOOP OLD RIVER ROAD RECONFIGURATION
OPEN SPACE AT
EAGLE AVE BRIDGE
EAGLE AVE BRIDGE
AOC PROJECT
COMPLETED IN 2014
SCRANTON RD IMPROVEMENTS,
SEE SHEET #3
SHARED USE PATH
ALONG CARTER RD
OLD RIVER RD BRIDGE
OLD RIVER RD
RECONFIGURATION
COLUMBUS RD BRIDGE AND UNDERPASS
COLUMBUS RD LOOP
REMNANT HISTORIC CANAL
SHERWIN WILLIAMS ACCESS RD RECONFIGURATION
INTERSECTION RECONFIGURATION
COLUMBUS ROAD LOOP OLD R
OLD RIVER ROAD RECONFIGURATION
OVERLOOK AREA WITH STREETSCAPE AMENITIES S
SCRANTON ROAD CROSS SECTION---AT PARKING LOCATIONS ON EAST SIDE OF SCRANTON (APPROXIMATELY 20 PARALLEL PARKING STALLS)
SCRANTON ROAD CROSS SECTION---TYPICAL
SMALL NEIGHBORHOOD PARK WITH DEDICATED PATH
Towpath Trail – Stage 4 – Project Components
July 30, 2009
1. Tremont/Literary Crossing Component Alternative scenarios to segue from Stage 3 terminus to area west of Literary Rd. a) At grade crossing b) At grade crossing w/closed University; residential driveway access maintained c) Bridge crossing over Literary d) Bridge crossing over Literary w/closed University; driveway access maintained
2. Tremont Ridge Component
a) Issues: i. Slope stability ii. Provide for scenic overlooks
iii. University Inn access & parking issues iv. Relocate/bury utility poles to open view shed v. Ensure viability of sewers & water lines
3. Innerbelt Bridge Component
a) To be developed in conjunction w/ODOT Innerbelt reconstruction project b) ODOT to provide for Towpath Trail construction thru this area c) Phase IV consultant to provide environmental regeneration plan for Towpath
4. Valley Option – Alternate route for Components 2 & 3, above
a) Determine alternate route beneath University Ave. slope b) Issues: i. Slope stability ii. Views & impacts to adjoining property
iii. Vegetation to stabilize slope iv. Property acquisition
5. Scranton Peninsula
Redevelopment of Ferchill & Wolstein properties & riverbank stabilization e) Issues: Environmental Regeneration
i. New bulkheading, riparian & terrestrial plantings, site remediation b) Property acquisition
6. Carter Road Connector
Retrofit the Carter Rd. public right-of-way to accommodate the Towpath Trail alignment a) Issues: i. Utility pole locations ii. Expand sidewalk to accommodate trail
iii. Modifications to Carter Rd. Lfit Bridge steel grate decking iv. 3 options to access Canal Basin Park site from Carter Rd.
Developing Towpath Trail Amenities to coordinate with Trail constructed as part of Cuyahoga AOC Urban Riparian Restoration Project. a) Reconstruct / reconfigure Scranton Road to provide additional green space along river, evaluate commercial and bike traffic uses, provide on-street parking for trail use. b) Utility relocations
June 2011
KEY PLAN
TREMONT IMPROVEMENTS
LEGEND
TOWPATH TRAIL HEAD
TOWPATH TRAIL STAGE 4
TOWPATH TRAIL AOC AREA
TOWPATH TRAIL STAGE 3
CUYAHOGA RIVER
RAILWAY
BRIDGE
FORMER INNER-BELT BRIDGE
GEORGE V. VOINOVICH BRIDGE&
CCG2 BRIDGE IN CONSTRUCTION
IMPROVEMENTS PROPOSED TO BE
CONSTRUCTED AS PART OF THE
TOWPATH STAGE 4 PROJECT
IMPROVEMENT WITHIN THE TOW-
PATH STAGE 4 CORRIDOR CON-
STRUCTED PREVIOUSLY OR BY
OTHERS
Litera
ry R
d
Litera
ry R
d
University Rd
W 5th S
t
W 6th S
t
W 7th
W 1
0th
St
W 1
1th
St
Abbey Ave
CC
G2 B
RID
GE
IN
CO
NS
TR
UC
TIO
N
GE
OR
GE
V. V
OIN
OV
ICH
BR
IDG
E
W 1
3th
Pl
CONNECTION TO CCG2 IMPROVEMENTS
CAMP CLEVELAND PARK W
OUTDOOR ACTIVITY / BBQ / SEATING AREA
“TEE BOX” OVERLOOK AREA
CAMP CLEVELAND
INTERPRETIVE PLAZA
W 7th ST. RECONFIGURATION
ROADWAY RECONFIGURATION
RETAINED FILL
BRIDGE CROSSING
TOWPATH TRAIL
STAGE 3
SIDEWALK
OVERLOOK AREA W/
STREETSC APE AMENITIES
CCG2 PARK
W/ PARKING LOT
OVERLOOK AREA WITH STREETSCAPE AMENITIES SMALL NEIGHBORHOOD PARK WITH DEDICATED PATH