KEY PLAN LEGEND TOWPATH TRAIL HEAD TOWPATH TRAIL STAGE 4 TOWPATH TRAIL AOC AREA TOWPATH TRAIL STAGE 3 CUYAHOGA RIVER RAILWAY BRIDGE FORMER INNER-BELT BRIDGE GEORGE V. VOINOVICH BRIDGE& CCG2 BRIDGE IN CONSTRUCTION IMPROVEMENTS PROPOSED TO BE CONSTRUCTED AS PART OF THE TOWPATH STAGE 4 PROJECT IMPROVEMENT WITHIN THE TOW- PATH STAGE 4 CORRIDOR CON- STRUCTED PREVIOUSLY OR BY OTHERS CARTER ROAD + OLD RIVER ROAD + CANAL BASIN PARK IMPROVEMENTS Scranton Rd Carter Rd Carter Rd Canal Rd Columbus Rd Columbus Rd C U Y A H O G A R I V E R CANAL BASIN PARK RTA VIADUCT COLUMBUS ROAD LOOP OLD RIVER ROAD RECONFIGURATION OPEN SPACE AT EAGLE AVE BRIDGE EAGLE AVE BRIDGE AOC PROJECT COMPLETED IN 2014 SCRANTON RD IMPROVEMENTS, SEE SHEET #3 SHARED USE PATH ALONG CARTER RD OLD RIVER RD BRIDGE OLD RIVER RD RECONFIGURATION COLUMBUS RD BRIDGE AND UNDERPASS COLUMBUS RD LOOP REMNANT HISTORIC CANAL SHERWIN WILLIAMS ACCESS RD RECONFIGURATION INTERSECTION RECONFIGURATION

Upload: others

Post on 18-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

KEY PLAN

LEGEND

TOWPATH TRAIL HEAD

TOWPATH TRAIL STAGE 4

TOWPATH TRAIL AOC AREA

TOWPATH TRAIL STAGE 3

CUYAHOGA RIVER

RAILWAY

BRIDGE

FORMER INNER-BELT BRIDGE

GEORGE V. VOINOVICH BRIDGE&

CCG2 BRIDGE IN CONSTRUCTION

IMPROVEMENTS PROPOSED TO BE

CONSTRUCTED AS PART OF THE

TOWPATH STAGE 4 PROJECT

IMPROVEMENT WITHIN THE TOW-

PATH STAGE 4 CORRIDOR CON-

STRUCTED PREVIOUSLY OR BY

OTHERS

CARTER ROAD + OLD RIVER

ROAD + CANAL BASIN PARK

IMPROVEMENTS

Scra

nto

n R

d

Carter Rd

Carte

r Rd

Canal Rd

Colu

mbus R

d

Co

lum

bu

s R

d

C U Y A H O G A R I V E R

CANAL BASIN PARK

RTA

VIA

DU

CT

COLUMBUS ROAD LOOP OLD RIVER ROAD RECONFIGURATION

OPEN SPACE AT

EAGLE AVE BRIDGE

EAGLE AVE BRIDGE

AOC PROJECT

COMPLETED IN 2014

SCRANTON RD IMPROVEMENTS,

SEE SHEET #3

SHARED USE PATH

ALONG CARTER RD

OLD RIVER RD BRIDGE

OLD RIVER RD

RECONFIGURATION

COLUMBUS RD BRIDGE AND UNDERPASS

COLUMBUS RD LOOP

REMNANT HISTORIC CANAL

SHERWIN WILLIAMS ACCESS RD RECONFIGURATION

INTERSECTION RECONFIGURATION

Page 2: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

COLUMBUS ROAD LOOP OLD R

Page 3: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

OLD RIVER ROAD RECONFIGURATION

Page 4: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

OVERLOOK AREA WITH STREETSCAPE AMENITIES S

Page 5: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

SCRANTON ROAD CROSS SECTION---AT PARKING LOCATIONS ON EAST SIDE OF SCRANTON (APPROXIMATELY 20 PARALLEL PARKING STALLS)

SCRANTON ROAD CROSS SECTION---TYPICAL

Page 6: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

SMALL NEIGHBORHOOD PARK WITH DEDICATED PATH

Page 7: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

Towpath Trail – Stage 4 – Project Components

July 30, 2009

1. Tremont/Literary Crossing Component Alternative scenarios to segue from Stage 3 terminus to area west of Literary Rd. a) At grade crossing b) At grade crossing w/closed University; residential driveway access maintained c) Bridge crossing over Literary d) Bridge crossing over Literary w/closed University; driveway access maintained

2. Tremont Ridge Component

a) Issues: i. Slope stability ii. Provide for scenic overlooks

iii. University Inn access & parking issues iv. Relocate/bury utility poles to open view shed v. Ensure viability of sewers & water lines

3. Innerbelt Bridge Component

a) To be developed in conjunction w/ODOT Innerbelt reconstruction project b) ODOT to provide for Towpath Trail construction thru this area c) Phase IV consultant to provide environmental regeneration plan for Towpath

4. Valley Option – Alternate route for Components 2 & 3, above

a) Determine alternate route beneath University Ave. slope b) Issues: i. Slope stability ii. Views & impacts to adjoining property

iii. Vegetation to stabilize slope iv. Property acquisition

5. Scranton Peninsula

Redevelopment of Ferchill & Wolstein properties & riverbank stabilization e) Issues: Environmental Regeneration

i. New bulkheading, riparian & terrestrial plantings, site remediation b) Property acquisition

6. Carter Road Connector

Retrofit the Carter Rd. public right-of-way to accommodate the Towpath Trail alignment a) Issues: i. Utility pole locations ii. Expand sidewalk to accommodate trail

iii. Modifications to Carter Rd. Lfit Bridge steel grate decking iv. 3 options to access Canal Basin Park site from Carter Rd.

Developing Towpath Trail Amenities to coordinate with Trail constructed as part of Cuyahoga AOC Urban Riparian Restoration Project. a) Reconstruct / reconfigure Scranton Road to provide additional green space along river, evaluate commercial and bike traffic uses, provide on-street parking for trail use. b) Utility relocations

June 2011

Page 8: COLUMBUS ROAD LOOP OLD R - Canalway Partnerscanalwaypartners.com/wp-content/uploads/2019/01/... · r i v e r canal basin park duct columbus road loop old river road reconfiguration

KEY PLAN

TREMONT IMPROVEMENTS

LEGEND

TOWPATH TRAIL HEAD

TOWPATH TRAIL STAGE 4

TOWPATH TRAIL AOC AREA

TOWPATH TRAIL STAGE 3

CUYAHOGA RIVER

RAILWAY

BRIDGE

FORMER INNER-BELT BRIDGE

GEORGE V. VOINOVICH BRIDGE&

CCG2 BRIDGE IN CONSTRUCTION

IMPROVEMENTS PROPOSED TO BE

CONSTRUCTED AS PART OF THE

TOWPATH STAGE 4 PROJECT

IMPROVEMENT WITHIN THE TOW-

PATH STAGE 4 CORRIDOR CON-

STRUCTED PREVIOUSLY OR BY

OTHERS

Litera

ry R

d

Litera

ry R

d

University Rd

W 5th S

t

W 6th S

t

W 7th

W 1

0th

St

W 1

1th

St

Abbey Ave

CC

G2 B

RID

GE

IN

CO

NS

TR

UC

TIO

N

GE

OR

GE

V. V

OIN

OV

ICH

BR

IDG

E

W 1

3th

Pl

CONNECTION TO CCG2 IMPROVEMENTS

CAMP CLEVELAND PARK W

OUTDOOR ACTIVITY / BBQ / SEATING AREA

“TEE BOX” OVERLOOK AREA

CAMP CLEVELAND

INTERPRETIVE PLAZA

W 7th ST. RECONFIGURATION

ROADWAY RECONFIGURATION

RETAINED FILL

BRIDGE CROSSING

TOWPATH TRAIL

STAGE 3

SIDEWALK

OVERLOOK AREA W/

STREETSC APE AMENITIES

CCG2 PARK

W/ PARKING LOT

OVERLOOK AREA WITH STREETSCAPE AMENITIES SMALL NEIGHBORHOOD PARK WITH DEDICATED PATH