Combined Modelling and Wellbore Network MeetingPerth, 27 – 29 April 2011
![Page 2: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/2.jpg)
In Salah – Reservoir Engineering and then?Bert van der Meer, Senior Reservoir Engineer
10 januari 20111
![Page 3: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/3.jpg)
Outline
• Introduction• In Salah the project• Reservoir Engineering• Geomechanics• Conclusions
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
2
![Page 4: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/4.jpg)
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
3
InSAR, Observation Tool
Frac, Fault, Permeability
Geomechanics
Publications• Philip Ringrose, first break.• Philip Ringrose, et al., (GHGT-10)• Allan Mathieson, et al., (GHGT-9)• Allan Mathieson, et al., (GHGT-10)• Takumi Onuma, et al., (GHGT-9)• Takumi Onuma, et al., (GHGT-10)• Jonny Rutqvist, ppt presentation
• D. Vasco, LBNL Paper • Sevket Durucan, et al., (GHGT-10)• Martin Iding, et al., (GHGT-9)• R. Bissell, et al., (GHGT-10)• James Smith, et al., (GHGT-10)
• J. Morris, et al., (GHGT-10)• Jonny Rutqvist, et al., (GHGT-9)
CO2ReMoVe Project (Research, Monitoring, Verification)
Monitoring In Salah performance
![Page 5: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/5.jpg)
In Salah CCS (Algeria)
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
4
By: Wright (2006)
![Page 6: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/6.jpg)
In Salah Top Structure
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
5
By: Wright (2006)
![Page 7: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/7.jpg)
Vertical Displacement
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
6
By: Onuma (2008)
![Page 8: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/8.jpg)
Two Models
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
7
By Schlumberger (natural fractured)
KB-5
KB-502
KB-5
KB- 502
By Statoil (fault)
![Page 9: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/9.jpg)
The Schlumberger Model
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
8
•History Matched with estimated BHP from THP.
•Problems with ECLIPSE 300
•Version 2009.2 problems resolved
![Page 10: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/10.jpg)
The Statoil Model
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
9
150
200
250
300
350
400
450
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
Bot
tom
hole
Pre
ssur
e [b
arsa
]
KB-501W-STATOIL
KB-501W-SLB
0
200000
400000
600000
800000
1000000
1200000
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
CO
2 Inj
ectio
n R
ate
[Sm
3 /d]
KB-501W-STATOIL
KB-501W-SLB
150
170
190
210
230
250
270
290
310
330
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]B
otto
mho
le P
ress
ure
[bar
sa]
KB-502Z-STATOIL
KB-502Z-SLB
0
200000
400000
600000
800000
1000000
1200000
1400000
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
CO
2 Inj
ectio
n R
ate
[Sm
3 /d]
KB-502Z-STATOIL
KB-502Z-SLB
150
200
250
300
350
400
450
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
Bot
tom
hole
Pre
ssur
e [b
arsa
]
KB-503Z-STATOIL
KB-503Z-SLB
0
200000
400000
600000
800000
1000000
1200000
1400000
1600000
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
CO
2 Inj
ectio
n R
ate
[Sm
3 /d]
KB-503Z-STATOIL
KB-503Z-SLB
e: KB-501W - BHP
c: KB-502Z - BHP
a: KB-503Z - BHP b: KB-503Z – CO2 Inj. Rate
d: KB-502Z – CO2 Inj. Rate
f: KB-501W – CO2 Inj. Rate
150
200
250
300
350
400
450
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
Bot
tom
hole
Pre
ssur
e [b
arsa
]
KB-501W-STATOIL
KB-501W-SLB
0
200000
400000
600000
800000
1000000
1200000
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
CO
2 Inj
ectio
n R
ate
[Sm
3 /d]
KB-501W-STATOIL
KB-501W-SLB
150
170
190
210
230
250
270
290
310
330
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]B
otto
mho
le P
ress
ure
[bar
sa]
KB-502Z-STATOIL
KB-502Z-SLB
0
200000
400000
600000
800000
1000000
1200000
1400000
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
CO
2 Inj
ectio
n R
ate
[Sm
3 /d]
KB-502Z-STATOIL
KB-502Z-SLB
150
200
250
300
350
400
450
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
Bot
tom
hole
Pre
ssur
e [b
arsa
]
KB-503Z-STATOIL
KB-503Z-SLB
0
200000
400000
600000
800000
1000000
1200000
1400000
1600000
1-1-2004 31-12-2004 31-12-2005 31-12-2006 1-1-2008 31-12-2008
Time [date]
CO
2 Inj
ectio
n R
ate
[Sm
3 /d]
KB-503Z-STATOIL
KB-503Z-SLB
e: KB-501W - BHP
c: KB-502Z - BHP
a: KB-503Z - BHP b: KB-503Z – CO2 Inj. Rate
d: KB-502Z – CO2 Inj. Rate
f: KB-501W – CO2 Inj. Rate
1/ Model made larger
2/ History Matched SLB data
3/ history extended
![Page 11: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/11.jpg)
The Statoil HM
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
10
![Page 12: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/12.jpg)
KB-502Z
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
11
![Page 13: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/13.jpg)
KB-502Z (2)
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
12
![Page 14: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/14.jpg)
Conclusions from simulation
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
13
• Well configurations not responsible surface movement humps
• Fault as such not responsible surface movement humps
• Reservoir description not suitable• Engineered permeability distribution not the solution
(Vasco, Durucan)
Against! = Solution Engineering
No geological justification
![Page 15: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/15.jpg)
Geomechanics?
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
14
• 3 problems to solve– Shape (2 humps)– Impact (largest vertical displacement rate)– Not reversible? (vs. KB-501 and KB-503)
• Further considerations:– Amplification mechanism?– Close to gas reservoir (pressure depletion)– Pressure drop after shut-in – Must be reservoir + overburden effects
![Page 16: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/16.jpg)
Est. FBHP vs. Min. Horizontal Stress(σh)
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
15
295σh0
295σh0
σhσh
pf
)()(0 pT hhhh σσσσ Δ+Δ+=
![Page 17: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/17.jpg)
Modeling exercise
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
16
Geomechanical modeling (TNO
semi-analytical model AEsubs)
Surface uplift due to reservoir
pressurization
Surface movement due to fault
pressurization:
depression plus two-lobe uplift
![Page 18: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/18.jpg)
Conclusions and Remaining questions
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
17
Combined pore pressurization and fault pressurization
Initial surface movement too small with used history match + elastic modulus
Non-linearity between surface movement and history-matched reservoir
pressures
Surface movement depression seems too narrow for fracture at reservoir
depth
Pressure drop in well pressure
![Page 19: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/19.jpg)
Conclusions (2)
10 januari 2011Bert van der Meer, Senior Reservoir Engineer
18
If geomechanics no influence on flow properties i.e. de-coupled simulationIs INSAR data a monitoring tool?Better geology needed of reservoir and overburden Geomechanical properties total spaceMore realizations with simulation solutions/tools
![Page 20: Combined Modelling and Wellbore Network Meeting](https://reader030.vdocument.in/reader030/viewer/2022012803/61bd216a61276e740b0faa93/html5/thumbnails/20.jpg)
Questions?
10 januari 2011Bert van der Meer, Senior Reservoir Engineer