IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 1 Commercial Plan Review Colorado Code Consulting, LLC Colorado Code Consulting, LLC” is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request. This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. © 2015 Colorado Code Consulting, LLC 2 Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited. © Colorado Code Consulting, LLC, 2015 © 2015 Colorado Code Consulting, LLC 3 Instructor: Bill Clayton, CBO Builder designer 14 years Over 28 years of Code Administration and enforcement experience ICC/IBC General Committee 2015 cycle ICC/IEBC Committee 2009 & 2012 cycle Code Consultant, inspector, plans examiner, instructor with CCC 5+ Years RCBO! © 2015 Colorado Code Consulting, LLC 4 1 2 3 4

Upload: others

Post on 02-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 1

Commercial Plan Review

Colorado Code Consulting, LLC

“Colorado Code Consulting, LLC” is a Registered Provider with The

American Institute of Architects Continuing Education Systems

(AIA/CES). Credit(s) earned on completion of this program will be

reported to AIA/CES for AIA members. Certificates of Completion for

both AIA members and non-AIA members are available upon request.

This program is registered with AIA/CES for continuing professional

education. As such, it does not include content that may be deemed

or construed to be an approval or endorsement by the AIA of any

material of construction or any method or manner of handling, using,

distributing, or dealing in any material or product.

Questions related to specific materials, methods, and services will be

addressed at the conclusion of this presentation.

© 2015 Colorado Code

Consulting, LLC

2

Copyright Materials

This presentation is protected by US and International

Copyright laws. Reproduction, distribution, display and use of

the presentation without written permission of the speaker is

prohibited.

© Colorado Code Consulting, LLC, 2015

© 2015 Colorado Code

Consulting, LLC

3

Instructor:Bill Clayton, CBO

◼ Builder designer 14 years◼ Over 28 years of Code Administration

and enforcement experience◼ ICC/IBC General Committee 2015 cycle◼ ICC/IEBC Committee 2009 & 2012 cycle◼ Code Consultant, inspector, plans

examiner, instructor with CCC 5+ Years◼ RCBO!

© 2015 Colorado Code Consulting, LLC 4

1

2

3

4

Page 2: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 2

Class Summary

◼ Plan Review Techniques– Personal Preparation– Tools/Equipment

◼ Based on small commercial project

◼ 2018 IBC◼ Applicable to small or large

department◼ Not a code introductory

class

5© 2015 Colorado Code Consulting, LLC

Professionalism

◼ Professional manner

◼ Courteous

◼ Prompt

◼ Good frame of mind

◼ Refrain from criticism

◼ Work to limit complaints

6© 2015 Colorado Code Consulting, LLC

Develop a Reputation

◼ Tough◼ Knowledgeable◼ Fair◼ Reasonable◼ Understands

construction

◼ A jerk◼ Hard to work with◼ Unreasonable◼ Arrogant◼ Doesn’t know the code◼ #&*@$@&#%

7© 2015 Colorado Code Consulting, LLC

Paperwork

◼ Keep good records

◼ Keep work up to date

◼ Be consistent with paperwork

◼ Streamline forms

8© 2015 Colorado Code Consulting, LLC

5

6

7

8

Page 3: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 3

Records

◼ Follow basic criteria for developing reports, letters, field cards, notes

– Keep legal action in mind

◼ Set up efficient file system

◼ Destroy old files when permitted

9© 2015 Colorado Code Consulting, LLC

Time Management

◼ Plan Reviews– Number per day

– Difficult projects

– Dealing /unskilled persons

◼ Phone calls, messages– Set time of day

◼ Report writing– Completeness

– Quality information

◼ Meetings– Staff, designers,

contractors

10© 2015 Colorado Code Consulting, LLC

Public Relations

◼ Resolve differences without argument

– Maintain professionalism

– Don’t raise your voice

– Leave if your safety is in question

– Notify your superior

11© 2015 Colorado Code Consulting, LLC

Public Relations

◼ Unskilled people

– Be patient

– Expect to spend more time

– Use opportunity to educate person about codes

12© 2015 Colorado Code Consulting, LLC

9

10

11

12

Page 4: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 4

Tools/Equipment

◼ Drafting Table

◼ Calculator

◼ Architect/Engineer Scale

◼ Red Pen

13© 2015 Colorado Code Consulting, LLC

Tools/Equipment

◼ Computer

– Electronic Review

– Internet

– I-Quest

14© 2015 Colorado Code Consulting, LLC

Tools/Equipment

◼ Miscellaneous

– Highlighters

– Sticky Notes

– Straight edge

– Rolling scale

15© 2015 Colorado Code Consulting, LLC

Tools/Equipment

◼ Code Book!

16© 2015 Colorado Code Consulting, LLC

13

14

15

16

Page 5: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 5

Tools/Equipment

◼ Code References

17© 2015 Colorado Code Consulting, LLC

Submittal Documents107.1

◼ Submittal documents consisting of construction documents , statement of special inspections , geotechnical report and other data shall be submitted in two or more sets with each permit application.

18© 2015 Colorado Code Consulting, LLC

Submittal Documents107.1

◼ The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed.

19© 2015 Colorado Code Consulting, LLC

Submittal Documents107.1

◼ Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional.

20© 2015 Colorado Code Consulting, LLC

17

18

19

20

Page 6: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 6

Submittal Documents107.1

◼ Exception: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with this code.

21© 2015 Colorado Code Consulting, LLC

Information On Construction Documents – 107.2.1

◼ Construction documents shall be dimensioned and drawn upon suitable material.

◼ Electronic media documents are permitted to be submitted where approved by the building official.

22© 2015 Colorado Code Consulting, LLC

Information On Construction Documents – 107.2.1

◼ Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the building official.

23© 2015 Colorado Code Consulting, LLC

Fire Protection System Shop Drawings – 107.2.2

◼ Shop drawings for the fire protection system(s) shall be submitted to indicate conformance with this code and the construction documents and shall be approved prior to the start of system installation.

◼ Shop drawings shall contain all information as required by the referenced installation standards in Chapter 9.

24© 2015 Colorado Code Consulting, LLC

21

22

23

24

Page 7: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 7

Means Of Egress 107.2.3

◼ The construction documents shall show in sufficient detail the location, construction, size and character of all portions of the means of egress in compliance with the provisions of this code. In other than occupancies in Groups R-2, R-3, as applicable in Section 101.2, and I-1, the construction documents shall designate the number of occupants to be accommodated on every floor, and in all rooms and spaces.

25© 2015 Colorado Code Consulting, LLC

Exterior Wall Envelope107.2.4

◼ Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with this code.

26© 2015 Colorado Code Consulting, LLC

Exterior Wall Envelope107.2.4

◼ The construction documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane and details around openings.

27© 2015 Colorado Code Consulting, LLC

Exterior Wall Envelope107.2.4

◼ The construction documents shall include manufacturer’s installation instructions that provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall envelope.

28© 2015 Colorado Code Consulting, LLC

25

26

27

28

Page 8: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 8

107.2.5 Exterior balconies and elevated walking surfaces

◼ Where balconies or other elevated walking surfaces are exposed to water from direct or blowing rain, snow, or irrigation, and the structural framing is protected by an impervious moisture barrier, the construction documents shall include details for all elements of the impervious moisture barrier system.

◼ The construction documents shall include manufacturer’s installation instructions.

© 2015 Colorado Code Consulting, LLC 29

Site Plan107.2.6

◼ The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey.

30© 2015 Colorado Code Consulting, LLC

Structural information107.2.7

◼ The construction documents shall provide the information specified in Section 1603.

© 2015 Colorado Code Consulting, LLC 31

1603.1Construction Documents◼ Construction documents

shall show the size, section and relative locations of structural members with floor levels, column centers and offsets dimensioned. The design loads and other information pertinent to the structural design required by Sections 1603.1.1 through 1603.1.9 shall be indicated on the construction documents.

◼ Floor live load◼ Roof live load◼ Roof snow load data◼ Wind design data◼ Earthquake design

data◼ Geotechnical

information◼ Flood design data◼ Special loads◼ Roof rain load data

© 2015 Colorado Code Consulting, LLC 32

29

30

31

32

Page 9: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 9

107.2.8 Relocatable buildings

◼ Construction documents for relocatable buildings shall comply with Section 3112.

© 2015 Colorado Code Consulting, LLC 33

Examination of documents107.3

◼ The building official shall examine or cause to be examined the accompanying submittal documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances.

34© 2015 Colorado Code Consulting, LLC

Approval Of Construction Documents - 107.3.1

◼ When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as "Reviewed for Code Compliance."

35© 2015 Colorado Code Consulting, LLC

Approval Of Construction Documents - 107.3.1

◼ One set of construction documents so reviewed shall be retained by the building official.

◼ The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative.

36© 2015 Colorado Code Consulting, LLC

33

34

35

36

Page 10: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 10

Phased Approval107.3.3

◼ The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of this code.

37© 2015 Colorado Code Consulting, LLC

Phased Approval107.3.3

◼ The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder’s own risk with the building operation and without assurance that a permit for the entire structure will be granted.

38© 2015 Colorado Code Consulting, LLC

Design Professional In Responsible Charge - 107.3.4

◼ The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building.

39© 2015 Colorado Code Consulting, LLC

Deferred Submittals107.3.4.1

◼ Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official.

40© 2015 Colorado Code Consulting, LLC

37

38

39

40

Page 11: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 11

Deferred Submittals107.3.4.1

◼ Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official.

41© 2015 Colorado Code Consulting, LLC

Amended Construction Documents 107.4

◼ Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents.

42© 2015 Colorado Code Consulting, LLC

Retention of construction documents - 107.5

◼ One set of approved construction documents shall be retained by the building official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws.

© 2015 Colorado Code Consulting, LLC 43

Plan Review Process

◼ Develop personal/department style

– Checklist

– Page by page

– Computer Programs

– Other styles?

44© 2015 Colorado Code Consulting, LLC

41

42

43

44

Page 12: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 12

The Plan Review Report

◼ Be specific

◼ Reference the code

◼ Reference sheet with problem

◼ Proofread the report

◼ Be sure of your comments

© 2015 Colorado Code Consulting, LLC 45

Example Comments

◼ Arch. Dwg. A501 Review Comments: Specify the width/ riser / treads for the new stair to the Mech. Room. Specify a guardrail at the floor opening. Address the incidental use separation at the Mech equipment (furnace) per IBC, Table 508.2.5.

◼ Confirm / document that fire alarms shall be provided per IBC, Section 907.2.9.1 and address the 1-Hour firestopping at the plumb penetrations at the 1-hour F-C assembly (specify applicable UL assemblies or equivalent) per IBC, Section 713.4.1.1.2 and electrical membrane penetrations per IBC, Section 713.4.1.2.

© 2015 Colorado Code Consulting, LLC 46

Example Comments

◼ Refer to Sheet A13.7. Please provide the specific listing for the sprayed applied fireproofing. The listing should include the thickness of the fireproofing for the specific ratings. (Section 704.13)

◼ Refer to Sheet A11.2, Section A. The two-hour enclosure around the exit stair is not continuous. The horizontal assemblies separating the basement from the stair enclosures and the basement, and the adjacent exit passageway. (Section 1022.1)

© 2015 Colorado Code Consulting, LLC 47

The Second Review

◼ Just check for original comments

– No new comments

◼ Confirm corrections

◼ Prefer architect provide written response with change reference

48© 2015 Colorado Code Consulting, LLC

45

46

47

48

Page 13: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 13

Effective Use of the Code(Based on UBC)

◼ Classify the building

◼ Review occupancy requirements

◼ Review type of construction requirements

◼ Review means of egress requirements

◼ Review detailed code requirements

◼ Review structural & material requirements

49© 2015 Colorado Code Consulting, LLC

Effective Use of the Code

◼ Classify the building

– Occupancy Classification

– Type of Construction

– Allowable floor area

– Height & Number of Stories

– Location on Property

50© 2015 Colorado Code Consulting, LLC

Classifying the Building

◼ Calculate Building Area– The area included within

surrounding exterior walls (or exterior walls and firewalls) exclusive of vent shafts and courts.

– Areas of the building not provided with surrounding walls shall be included in the building area if such areas are included within the horizontal projection of the roof or floor above.

© 2015 Colorado Code Consulting, LLC 51

Classifying the Building

◼ Occupancy Classification– A Assembly

– B Business

– E Educational

– F Factory/Industrial

– H Hazardous

– I Institutional

– M Mercantile

– R Residential

– S Storage

– U Utility/Misc.

52© 2015 Colorado Code Consulting, LLC

49

50

51

52

Page 14: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 14

Classifying the Building

◼ Type of Construction

– Building Materials

◼ Noncombustible Materials

◼ Combustible Materials

53© 2015 Colorado Code Consulting, LLC

Classifying the Building

◼ Type of Construction

– Fire Resistance of Building Elements

54© 2015 Colorado Code Consulting, LLC

© 2015 Colorado Code Consulting, LLC 55

© 2015 Colorado Code Consulting, LLC 56

53

54

55

56

Page 15: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 15

Classifying the Building

◼ Allowable Height

57© 2015 Colorado Code Consulting, LLC

Allowable Building HeightTable 504.3

58© 2015 Colorado Code Consulting, LLC

Allowable Building HeightTable 504.4

© 2015 Colorado Code Consulting, LLC 59

© 2015 Colorado Code Consulting, LLC 60

57

58

59

60

Page 16: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 16

Classifying the Building

◼ Allowable Floor Area

61© 2015 Colorado Code Consulting, LLC

Allowable Building AreasTable 506.2

62© 2015 Colorado Code Consulting, LLC

Allowable area Determination506

◼ Single-Occupancy, one story

◼ Equation 5-1

– Aa = Allowable building area per

story

– At = Tabular building area per

story in accordance with Table

506.2

– NS = Tabular allowable area

factor in accordance with Table

506.2 for nonsprinklered building

– If = Area increase factor due to

frontage (506.2)

Aa = At + [NS X If]

63© 2015 Colorado Code Consulting, LLC

Frontage Increase506.3.2

◼ To qualify for an area factor increase based on frontage, the public way or open space adjacent to the building perimeter shall have a minimum distance (W) of 20 feet measured at right angles from the building face to any of the following:

1. The closest interior lot line.

2. The entire width of a street, alley or public way.

3. The exterior face of an adjacent building on the same property.

64© 2015 Colorado Code Consulting, LLC

61

62

63

64

Page 17: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 17

Width Limits506.3.2

◼ Where the value of W is greater than 30 feet, a value of 30 feet shall be used in calculating the building area increase based on frontage, regardless of the actual width of the public way or open space.

◼ Where the value of W varies along the perimeter of the building, the calculation performed in accordance with Equation 5-5 shall be based on the weighted average calculated in accordance with Equation 5-4.

65© 2015 Colorado Code Consulting, LLC

Weighted Average Calc.506.3.2 – Eq. 5-4

◼ Given:

– Restaurant

– Type V-B Construction

– One-Story

– 40’ Street

– (100 * 30 + 75 * 20 + 100 * 30) / 275

– (3000 + 150 + 3000)/275

– 6150/275 = 22

10

ft

50 ft

35 ft

100 ft. X 75 ft.

20

ft

fire

lan

e

66© 2015 Colorado Code Consulting, LLC

Amount of Increase506.3.3

◼ Equation 5-5– If = Area increase due to frontage

– F = Building perimeter which

fronts on a public way or open

space having minimum distance

of 20 feet.

– P = Perimeter of entire building.

– W = Minimum width of public

way or open space per Section

506.3.2

If = [F/P -0.25] W/30

67© 2015 Colorado Code Consulting, LLC

Frontage Increase506.3.3

◼ Given:

– Restaurant

– Type V-B Construction

– One-Story

– 40’ Street

◼ Frontage increase

If = [(275/350) - 0.25] * 22/30

If = 0.54 * 0.73

If = 0.39

10

ft

50 ft

35 ft

100 ft. X 75 ft.

20

ft

fire

lan

e

68© 2015 Colorado Code Consulting, LLC

65

66

67

68

Page 18: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 18

506.2.1 Single-occupancy, one-story buildings

◼ Given:

– Restaurant

– Type V-B Construction

– One-Story

– 40’ Street

◼ Equation 5-2

– Aa=[At+ (NS× If)]

Aa = 6,000 + (6,000 * 0.39)

Aa = 6,000 + 2,340

Aa = 8,340

7,500< 8,340

OK

10 f

t

50 ft

35 ft

100 ft. X 75 ft.20 f

t fi

re l

ane

69© 2015 Colorado Code Consulting, LLC

Single-occupancy, multistory buildings - 506.2.3

◼ Equation 5-2

◼ Aa=[At+ (NS× If)] × Sa

◼ Aa = Allowable area (square feet).◼ At = Tabular allowable area factor in

accordance with Table 506.2.◼ NS = Tabular allowable area factor in

accordance with Table 506.2 for a nonsprinklered building.

◼ If = Area factor increase due to frontage as calculated in accordance with Section 506.3.

◼ Sa = Actual number of building stories above grade plane, not to exceed three. For buildings equipped sprinkler system installed in accordance with Section NFPA 13R, use the actual number of building stories above grade plane, not to exceed four.

© 2015 Colorado Code Consulting, LLC 70

Mixed-occupancy, one-story buildings - 506.2.2 ◼ The allowable area of a

mixed-occupancy building with no more than one story above grade plane shall be determined in accordance with the applicable provisions of Section 508.1 based on Equation 5-1 for each applicable occupancy.– Nonseparated

occupancies– Separated occupancies

© 2015 Colorado Code Consulting, LLC 71

Mixed-occupancy, multistory buildings506.2.4

◼ Each story of a mixed-occupancy building with more than one story above grade plane shall individually comply with the applicable requirements of Section 508.1.

◼ For buildings with more than three stories above grade plane, the total building area shall be such that the aggregate sum of the ratios of the actual area of each story divided by the allowable area of such stories, determined in accordance with Equation 5-3 based on the applicable provisions of Section 508.1, shall not exceed three.

Group R-2

Group R-2

Group B Group A-2

Group M Group B

Type VA Construction, sprinklered,

Nonseparated Occ.72© 2015 Colorado Code Consulting, LLC

69

70

71

72

Page 19: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 19

Floor Occupancy

Actual

Area

Allowable

Area Ratio

First M 40,000 42,000 0.95

Second A-2 25,000 43,125 0.58

Third R-2 25,000 45,000 0.56

Fourth R-2 20,000 45,000 0.44

0.95+0.58+0.56+0.44 = 2.75 < 3

Mixed-occupancy, multistory buildings506.2.4

73© 2015 Colorado Code Consulting, LLC

Classifying the Building

◼ Location on Property

74© 2015 Colorado Code Consulting, LLC

Fire Separation DistanceDefinition - 202

◼ The distance measured from the building face to one of the following: – the closest interior lot line– To the centerline of a

street, alley or public way; or

– To an imaginary line between two buildings on the property.

◼ The distance shall be measured at right angles from the face of the wall

75© 2015 Colorado Code Consulting, LLC

Exterior Walls Fire RatingTable 602

a. Load-bearing exterior walls shall also comply with the fire-resistance rating requirements of Table 601.

b. See Section 706.1.1 for party walls.

c. Open parking garages complying with Section 406 shall not be required to have a fire-resistance rating.

d. The fire-resistance rating of an exterior wall is determined based upon the fire separation distance of the exterior

wall and the story in which the wall is located.

e. For special requirements for Group H occupancies, see Section 415.6.

f. For special requirements for Group S aircraft hangars, see Section 412.4.1.

g. Where Table 705.8 permits nonbearing exterior walls with unlimited area of unprotected openings, the required

fire-resistance rating for the exterior walls is 0 hours.

76© 2015 Colorado Code Consulting, LLC

73

74

75

76

Page 20: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 20

© 2015 Colorado Code Consulting, LLC 77

© 2015 Colorado Code Consulting, LLC 78

Parapets at Exterior Walls705.11

◼ Parapets shall be provided on exterior walls of buildings.

◼ Exceptions

79© 2015 Colorado Code Consulting, LLC

Effective Use of the Code

◼ Classify the building

◼ Review occupancy requirements

◼ Review type of construction requirements

◼ Review means of egress requirements

◼ Review detailed code requirements

◼ Review structural & material requirements

80© 2015 Colorado Code Consulting, LLC

77

78

79

80

Page 21: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 21

Accessory Occupancies508.2

◼ Ancillary to the main occupancy of the building or portion thereof.

◼ Individually classified as to occupancy

◼ Code requirements shall apply to each portion based on the occupancy classification

81© 2015 Colorado Code Consulting, LLC

Accessory Use Area and Height - 508.2.3

◼ The allowable building area and height of the building shall be based on the allowable building area and height for the main occupancy in accordance with Section 503.1.

◼ Must be less than 10% of the building area of the story in which it is located, (508.2.1).

82© 2015 Colorado Code Consulting, LLC

Separation of Accessory Occupancies - 508.2.4

◼ No separation is required between accessory occupancies and the main occupancy.

Exceptions: 1. Group H-2, H-3, H-4 and H-5

occupancies shall be separated from all other occupancies in accordance with Section 508.4.

2. Incidental accessory occupancies required to be separated or protected by Section 508.2.5.

3. Group I-1, R-1, R-2 and R-3 dwelling units and sleeping units shall be separated from other dwelling or sleeping units and from accessory occupancies contiguous to them in accordance with the requirements of Section 420.

83© 2015 Colorado Code Consulting, LLC

Nonseparated Occupancies508.3

◼ Nonseparated occupancies shall be individually classified

◼ Code requirements shall apply to each portion of the building based on the occupancy classification of that space

◼ Most restrictive provision of 403 and Chapter 9 shall apply to entire building.

◼ No Separation required between occupancies– Exceptions for H & R

Occupancies84© 2015 Colorado Code Consulting, LLC

81

82

83

84

Page 22: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 22

Separated Uses508.4.1

◼ Separated occupancies shall be individually classified.

◼ Each fire area shall comply based on the occupancy classification of that portion of the building.

85© 2015 Colorado Code Consulting, LLC

Required SeparationTable 508.4

86© 2015 Colorado Code Consulting, LLC

S = Buildings equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1.NS = Buildings not equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1.N = No separation requirement.NP = Not permitted.a. See Section 420.b. The required separation from areas used only for private or pleasure vehicles shall be reduced by 1 hour but not to less than 1

hour.c. See Section 406.3.4.d. Separation is not required between occupancies of the same classification.e. See Section 422.2 for ambulatory care facilities.

Table 509 – Incidental Uses

87© 2015 Colorado Code Consulting, LLC

509 – Incidental Uses

◼ Not permitted to be individually classified for occupancy

◼ Part of the main occupancy

◼ Limited to 10% of building area in the story in which they are located.

88© 2015 Colorado Code Consulting, LLC

85

86

87

88

Page 23: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 23

Separation and Protection509.4

◼ The incidental uses listed in Table 509 shall be separated from the remainder of the building or equipped with an automatic sprinkler system, or both, in accordance with the provisions of that table.

◼ Fire-resistance-rated separation?

◼ Nonfire-resistance-rated separation

◼ Sprinklers?

89© 2015 Colorado Code Consulting, LLC

Special Detailed Requirements Based On Use And OccupancyChapter 4

90© 2015 Colorado Code Consulting, LLC

Atriums404

✓ Automatic sprinklers✓ Fire alarm system✓ Smoke control✓ Atrium Enclosure

✓ Exceptions

✓ Standby power✓ Interior Finishes✓ Travel Distance

91© 2015 Colorado Code Consulting, LLC

Motor-Vehicle-Related Occupancies 406

◼ Private garages/carports

◼ Parking structures

◼ Open parking garages

◼ Enclosed parking garages

◼ Automotive motor fuel-dispensing facility

◼ Repair garages

92© 2015 Colorado Code Consulting, LLC

89

90

91

92

Page 24: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 24

Motor-Vehicle-Related Occupancies 406

◼ Area and height increases

◼ Separation

◼ Ventilation

◼ Canopies

93© 2015 Colorado Code Consulting, LLC

Chapter 4

◼ 407 Group I-2◼ 408 Group I-3◼ 409 Motion Picture Projection Rooms◼ 410 Stages & Platforms◼ 411 Special Amusement Buildings◼ 412 Aircraft Related Occupancies◼ 413 Combustible Storage◼ 414 Hazardous Materials◼ 415 Groups H-1, H-2, H-3, H-4, & H-5◼ 416 Application of Flammable Finishes◼ 417 Drying Rooms◼ 418 Organic Coatings

94© 2015 Colorado Code Consulting, LLC

Effective Use of the Code

◼ Classify the building

◼ Review occupancy requirements

◼ Review type of construction requirements

◼ Review means of egress requirements

◼ Review detailed code requirements

◼ Review structural & material requirements

95© 2015 Colorado Code Consulting, LLC

Construction ClassificationTable 601

96© 2015 Colorado Code Consulting, LLC

93

94

95

96

Page 25: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 25

Effective Use of the Code

Classify the building

Review occupancy requirements

Review type of construction requirements

Review means of egress requirements

Review detailed code requirements

Review structural & material requirements

97© 2015 Colorado Code Consulting, LLC

Occupant Load Calculations

1004.1

Actual number of

occupants

Number by Table

1004.1.2

◼ Gross Floor Area

◼ Net Floor Area

Number by

combination

◼ Accessory space

through primary

space

98© 2015 Colorado Code Consulting, LLC

Floor Area per Occupant

Table 1004.1.2

99© 2015 Colorado Code Consulting, LLC

MOE System Sizing

Stairways

◼ 0.3” per occupant

◼ 0.2” with NFPA 13/13R

and EVACS

Except H and I-2

Other components

◼ 0.2” per occupant

◼ 0.15” with NFPA 13/13R

and EVACS

Except H and I-2

100 © 2015 Colorado Code Consulting, LLC

97

98

99

100

Page 26: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 26

Egress from spaces

1006.2

Two exits or exit access

doorways from any space shall

be provided where the design

occupant load or the common

path of egress travel distance

exceeds the values listed in

Table 1006.2.1.

101© 2015 Colorado Code Consulting, LLC

That portion of exit access travel distance measured from the most remote point of each room, area or space to that point where the occupants have separate and distinct access to two exits or exit access doorways.

Common Path of Egress Travel

202

102© 2015 Colorado Code Consulting, LLC

Minimum Number of Exits

1006.3.2

Each story and occupied roof shall have the minimum number of separate and distinct exits, or access to exits, as specified in Table 1006.3.2.

A single exit or access to a single exit shall be permitted in accordance with Section 1006.3.3.

The required number of exits, or exit access stairways or ramps providing access to exits, from any story or occupied roof shall be maintained until arrival at the exit discharge or a public way.

103© 2015 Colorado Code Consulting, LLC

© 2015 Colorado Code Consulting, LLC 104

101

102

103

104

Page 27: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 27

© 2015 Colorado Code Consulting, LLC 105

Exit or Exit Access Doorways

1007.1.1

Two exits

◼ A distance apart equal

to not less than 1/2 the

longest diagonal

◼ Exception 2

sprinklered building

1/3 diagonal

X

Room or Area

106© 2015 Colorado Code Consulting, LLC

Exit Access Travel Distance

Table 1017.2

Measured from most

remote point to

entrance of exit

along natural and

unobstructed path

Unenclosed

stairways & ramps

included

107© 2015 Colorado Code Consulting, LLC

Means of Egress Illumination

1008

Includes exit discharge

1 foot-candle at floor

Emergency power

108© 2015 Colorado Code Consulting, LLC

105

106

107

108

Page 28: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 28

Accessible Means of Egress

1009

Accessible spaces shall be

provided with not less than one

accessible means of egress.

Where more than one means of

egress are required by Section

1006.2 or 1006.3 from any

accessible space, each

accessible portion of the space

shall be served by not less than

two accessible means of

egress.

109© 2015 Colorado Code Consulting, LLC

Continuity and Components

1009.2

Continuous to public way

consist of one or more components◼ Accessible routes

◼ Interior exit stairways

◼ Exit access stairways

◼ Exterior exit stairways

◼ Elevators

◼ Platform lifts

◼ Horizontal exits

◼ Ramps

◼ Areas of refuge

◼ Exterior areas of assisted rescue

110© 2015 Colorado Code Consulting, LLC

Doors

1010.1

Size of Doors

Side-hinged swinging

Swing in direction of egress

travel > 50 occupants or

hazardous occupancies

Special doors

Floor elevation

111© 2015 Colorado Code Consulting, LLC

Door Operations

1010.1.9

Hardware Schedule?

Type of locks/latches

Bolt locks

Special latches

Panic & fire exit hardware

112© 2015 Colorado Code Consulting, LLC

109

110

111

112

Page 29: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 29

Stairway Width

1011.2

Minimum 44”

Calculated Width

(Occupant load)

Exceptions:

◼ occupant load 50 or less -

36” permitted

◼ spiral stairways

◼ aisle stairs

◼ stairway lift in dwelling units

113© 2015 Colorado Code Consulting, LLC

Headroom

1011.3

Stairways shall have a

minimum headroom

clearance of 80 inches

measured vertically from a

line connecting the edge

of the nosings.

◼ spiral stairways may have

78” headroom

114© 2015 Colorado Code Consulting, LLC

Stair Treads & Risers

1011.5

Riser heights ◼ 7 inches maximum and 4

inches minimum.

Tread depths◼ 11 inches minimum.

Profile

© 2015 Colorado Code Consulting, LLC 115

Stairway Landings

1011.6

Floor or landing at the top and bottom of each stairway

Width not less than stairway served

Length same as width of stairway

Straight runs need not exceed 48” max.

Doors shall not reduce width more than 1/2 required width nor project more than 7” when fully open

116© 2015 Colorado Code Consulting, LLC

113

114

115

116

Page 30: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 30

Vertical Rise

1011.8

A flight of stairs shall

not have a vertical

rise greater than 12

feet between floor

levels or landings

117© 2015 Colorado Code Consulting, LLC

Handrails

1014

Handrail both sides of stair

34” - 38” above nose of tread

Graspability

Continuity

Handrail extensions

Intermediate handrails

118© 2015 Colorado Code Consulting, LLC

© 2015 Colorado Code Consulting, LLC 119

Ramps

1012

Means of Egress

◼ one unit vertical in 12

units horizontal (8%)

Other Ramps

◼ one unit vertical in 8 units

horizontal (12.5%)

Cross Slope

◼ one unit vertical in 48

units horizontal (2%)

120© 2015 Colorado Code Consulting, LLC

117

118

119

120

Page 31: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 31

Ramps

1012

The rise for any ramp

run shall be 30 inches

maximum.

Width

Headroom

Landings

Ramp construction

Handrails

121© 2015 Colorado Code Consulting, LLC

Ramp Landings

1012.6

Located at top, bottom, points of turning, entrance, exit and doors

◼ maximum slope 1:48

◼ width same as ramp

◼ minimum length 60”

◼ 60” X 60” at change of direction

◼ Doors per ANSI A117.1

122© 2015 Colorado Code Consulting, LLC

Exit Signs

1013.1

Readily visible from any direction

In cases where the exit or path of egress travel is not immediately visible to the occupants

Place so no point in exit access corridor is more than 100 feet from nearest sign or the listed viewing distance

123© 2015 Colorado Code Consulting, LLC

Illumination/Power Source

1013.5/1013.6

Internally Illuminated

◼ Listed/labeled

◼ Installed per

manufacturers instructions

Externally illuminated

◼ 5 foot-candles

Illuminated at all times

90 minute standby

124© 2015 Colorado Code Consulting, LLC

121

122

123

124

Page 32: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 32

Guards

1015

Open sided walking

surfaces more than 30

inches above floor or

grade below

Includes screened

porches

Mechanical equipment

within 10 ft. of roof edge

125© 2015 Colorado Code Consulting, LLC

Guard Height

1015.3

Required guards shall

be not less than 42

inches high, measured

vertically above the

adjacent walking

surfaces, or the line

connecting the leading

edges of the treads.

126© 2015 Colorado Code Consulting, LLC

Guard Opening Limitations

1013.3

127© 2015 Colorado Code Consulting, LLC

Exit Access Components

Aisles

Corridors

Egress Balconies

128© 2015 Colorado Code Consulting, LLC

125

126

127

128

Page 33: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 33

Aisles

1018

Aisles shall be provided

from all occupied portions of

the exit access which

contain seats, tables,

furnishings, displays, and

similar fixtures or

equipment.

Aisles serving assembly

areas, other than seating at

tables, shall comply with

Section 1028

129© 2015 Colorado Code Consulting, LLC

Egress Balconies

1021

Balconies used for

egress purposes shall

conform to the same

requirements as

corridors for width,

headroom, dead ends

and projections.

130© 2015 Colorado Code Consulting, LLC

Corridor Construction

1020.1

Corridors shall be fire-resistance rated in accordance with Table 1020.1.

The corridor walls required to be fire-resistance rated shall comply with Section 708 for fire partitions.

131© 2015 Colorado Code Consulting, LLC

Corridor Width

1020.2

The required capacity of corridors shall be determined as specified in Section 1005.1, but the minimum width shall be not less than that specified in Table 1020.2.

◼ Exception: In Group I-2 occupancies, corridors are not required to have a clear width of 96 inches in areas where there will not be stretcher or bed movement for access to care or as part of the defend-in-place strategy.

132© 2015 Colorado Code Consulting, LLC

129

130

131

132

Page 34: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 34

Dead Ends

1020.4

Where more than one exit or exit access doorway is required, the exit access shall be arranged such that there are no dead ends in corridors more than 20 feet in length.◼ some I-3 occupancies

◼ Group B, E, F, I-1, M, R-1, R-2, S and U w/sprinklers permitted to be 50’

◼ unlimited length = 2.5 times width

133© 2015 Colorado Code Consulting, LLC

Corridor Continuity

1020.6

Fire-resistance-rated corridors

shall be continuous from the point

of entry to an exit. Fire-resistance-

rated corridors shall not be

interrupted by intervening rooms.

◼ Foyers, lobbies, reception rooms

constructed as required for

corridors shall not be construed

as intervening rooms

134© 2015 Colorado Code Consulting, LLC

Exits

1022.1

Exits shall comply with Sections 1022 through 1027 and the applicable requirements of Sections 1003 through 1015.

An exit shall not be used for any purpose that interferes with its function as a means of egress.

Once a given level of exit protection is achieved, such level of protection shall not be reduced until arrival at the exit discharge.

Exits shall be continuous from the point of entry into the exit to the exit discharge.

135© 2015 Colorado Code Consulting, LLC

Interior Exit Stairways

1023

Interior exit stairways and

ramps shall be enclosed

◼ 4+ stories - 2 hr. fire rated

◼ < 4 stories - 1 hr. fire rated

◼ all floor levels used to

compute stories, including

basements

excluding mezzanines

136© 2015 Colorado Code Consulting, LLC

133

134

135

136

Page 35: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 35

Exit Passageway

1024

Width per Section 1005.1, minimum 44 inches◼ Occupant load <50 –

36”

Walls, floors & ceilings 1-hour fire-resistance rated, and not less than exit enclosure rating

Openings & penetrations restricted

137© 2015 Colorado Code Consulting, LLC

Horizontal Exits

1026

A path of egress travel from one building to an area in another building on approximately the same level, or a path of egress travel through or around a wall or partition to an area on approximately the same level in the same building, which affords safety from fire and smoke from the area of incidence and areas communicating therewith.

Warehouse

Offices Offices

138© 2015 Colorado Code Consulting, LLC

Exterior Exit Ramps & Stairways

1027

Not permitted to be used

in I-2

Open on at least one side

◼ Minimum 35 sq. ft., 42”

above floor level

◼ open areas yards, courts,

public ways

Separated per 1019.1

139© 2015 Colorado Code Consulting, LLC

Exit Discharge

1028

Exits shall discharge

directly to the exterior of

the building.

The exit discharge shall

be at grade or shall

provide direct access to

grade.

The exit discharge shall

not re-enter a building.

140© 2015 Colorado Code Consulting, LLC

137

138

139

140

Page 36: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 36

Effective Use of the Code

Classify the building

Review occupancy requirements

Review type of construction requirements

Review means of egress requirements

Review detailed code requirements

Review structural & material requirements

141© 2015 Colorado Code Consulting, LLC

FIRE RESISTANCE-RATED

CONSTRUCTION

CHAPTER 7

142© 2015 Colorado Code Consulting, LLC

Fire Resistance Rating of

Structural Members - 704

The fire-resistance rating of structural members and assemblies shall comply with the requirements for the type of construction and shall not be less than the rating required for the fire-resistance-rated assemblies supported

143© 2015 Colorado Code Consulting, LLC

Bldg 1

Bldg 2Fire Wall

Fire Walls

706

Each portion of a building

separated by one or more

fire walls that comply with

the provisions of this

section shall be considered

a separate building

144© 2015 Colorado Code Consulting, LLC

141

142

143

144

Page 37: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 37

Fire Barriers

707 Shaft enclosures

Interior exit stairways

Enclosures of exit access stairways

Exit passageways

Horizontal exits

Atriums

Incidental uses

Control areas

Separated occupancies

Separate a single occupancy into different fire areas

145© 2015 Colorado Code Consulting, LLC

Fire Partitions

708

Dwelling/Sleeping unit

separations in I-1, R-1, R-2 &

R-3

Tenant separations in mall

buildings

Corridor walls

Elevator lobby separation

Egress balconies

146© 2015 Colorado Code Consulting, LLC

Smoke Barriers

709

1-hour fire-resistance rated

Continuous from outside wall to outside wall and slab to floor/roof deck above

Supporting structure the same

20 minute opening protectives

Except I-2 occupancies where doors are installed across the corridors

147© 2015 Colorado Code Consulting, LLC

Horizontal Assemblies

711

Floor and roof

assemblies required to

have a fire-resistance

rating

148© 2015 Colorado Code Consulting, LLC

145

146

147

148

Page 38: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 38

712 – Vertical Openings

Should always be

referenced first.

Contains option for

dealing with vertical

openings.

◼ Escalator

◼ Atrium

◼ Two-story opening

149 © 2015 Colorado Code Consulting, LLC

713 – Shaft Enclosures

Referenced from Section

712.1.1

◼ Always start code

assessment in 712!

◼ One-hour – less than 4

stories

◼ Two-hour – 4 or more

stories.

707 Fire Barrier walls

711 Horizontal assemblies

for horizontal shafts

150 © 2015 Colorado Code Consulting, LLC

© 2018 Colorado Code Consulting, LLC 151

ASTM E 119 or UL 263

Documentation

© 2018 Colorado Code Consulting, LLC 152

Tables 721.1

footnotes

Generic fire-resistance ratings (those not

designated as PROPRIETARY* in the listing) in the

GA 600 shall be accepted as if herein listed.

149

150

151

152

Page 39: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 39

© 2018 Colorado Code Consulting, LLC 153

GA Proprietary Systems Where the word "proprietary“ appears in system descriptions either the

system or one or more of its components is considered proprietary.

Each proprietary system shall be built utilizing the components specified by the company or companies listed under the detailed description for that system.

All other systems are generic.

Generic systems are applicable to the products of any manufacturer, whether a member of the gypsum association or not, provided the products meet the appropriate standards.

© 2018 Colorado Code Consulting, LLC 154

1. Floor and Ceiling Runners Steel channels, 1 in. deep by 2-1/2 in. wide, fabricated from No. 25 MSG galv steel, attached to concrete or masonry with fasteners 24 in. on centers.

2. Steel Studs 2-1/2 in. wide with 1-3/8 in. legs, 1/4 in. flange in legs, fabricated from No. 25 ga galv steel, 1-1/2 in. wide by 1-3/4 in. high conduit cutouts spaced 24 in. OC. Studs 1/2 in. less in length than assembly height.

3. Gypsum Board* 1/2 in. thick, paper or vinyl surfaced. Wallboard sheets applied vertically or horizontally with vertical joints located over studs attached to studs with 1 in. self-drilling, self-tapping steel screws located 12 in. OC in the field and 8 in. OC at joints. Joints covered with paper

tape and joint compound. Exposed screw heads covered with joint compound. NATIONAL GYPSUM CO — Types FSW-1, FSW-G and FSW-C.

4. 4. Batts and Blankets* 2 in. thick batts, supplied in 24 in. widths, placed to fill interior of wall. Any

mineral wool batt bearing the UL Classification Marking as to Fire Resistance. See Batts and Blankets (BZJZ) Category For Names of Classified Companies.

5. 4A. Fiber, Sprayed* As an alternate to Batts and Blankets (Item 4) — Spray applied cellulose

insulation material. The fiber is applied with water to completely fill the enclosed cavity in accordance with the application instructions supplied with the product. Nominal dry density of 3.0 lb/ft3.

U S GREENFIBER L L C — Cocoon stabilized cellulose insulation.

UL V401, 1 hr. nonbearing

Reprinted from the Online Certifications directory with permission from Underwriters Laboratories Inc.Copyright © 2005 Underwriters Laboratories Inc.®

Penetrations

714 Fire-resistance walls

◼ Through penetrations

F rating

◼ Membrane penetrations

Horizontal assemblies

◼ Through penetrations

F & T rating

(Special Inspection required for high rise buildings and Risk Category III & IV)

155© 2015 Colorado Code Consulting, LLC

Fire-Resistant Joint System -

715

Joints in or between fire-resistance-rated walls, floor or floor/ceiling assemblies and roofs or roof/ceiling assemblies

Protected by an approved fire-resistant joint system designed to resist the passage of fire for a time period not less than the required fire-resistance rating of the wall, floor or roof in or between which it is installed.

156© 2015 Colorado Code Consulting, LLC

153

154

155

156

Page 40: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 40

Opening Protectives

Table 716.1(2)

157© 2015 Colorado Code Consulting, LLC

Fire Window Assemblies

Table 716.1(3)

158© 2015 Colorado Code Consulting, LLC

Fire/Smoke Dampers

717.5

Fire Walls◼ Fire damper

◼ Horizontal Exit –Fire/Smoke damper

Fire Barriers◼ Fire damper*

◼ Horizontal Exit –Fire/Smoke damper

Shaft Enclosures◼ Fire/smoke damper*

Fire Partitions◼ Fire damper*

Corridors

◼ Smoke damper*

Smoke Barriers

◼ Smoke damper*

Horizontal Assemblies

◼ Shaft enclosure*

*contains exceptions

159© 2015 Colorado Code Consulting, LLC

Where Sprinklers are Required -

903.2

Approved automatic sprinkler systems in new buildings and structures shall be provided in the locations described in this section◼ Specific Occupancies

◼ Fire Area

◼ Level above exit discharge

160© 2015 Colorado Code Consulting, LLC

157

158

159

160

Page 41: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 41

Installation Requirements

903.3 903.3.1.1

◼ NFPA 13

903.3.1.2

◼ NFPA 13 R

903.3.1.3

◼ NFPA 13 D

161© 2015 Colorado Code Consulting, LLC

Fire Alarm & Detection

Systems - 907

An approved fire alarm system installed in accordance with the provisions of this code and NFPA 72 shall be provided in new buildings and structures in accordance with Sections 907.2.1 through 907.2.23 and provide occupant notification in accordance with Section 907.5, unless other requirements are provided by another section of this code.

Not fewer than one manual fire alarm box shall be provided in an approved location to initiate a fire alarm signal for fire alarm systems employing automatic fire detectors or waterflow detection devices. Where other sections of this code allow elimination of fire alarm boxes due to sprinklers, a single fire alarm box shall be installed.

162© 2015 Colorado Code Consulting, LLC

Accessibility

Chapter 11

Design

1102.1

Buildings and facilities

shall be designed and

constructed to be

accessible in accordance

with this code and ICC

A117.1.

164© 2015 Colorado Code Consulting, LLC

161

162

163

164

Page 42: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 42

Accessible Routes

1104

Site arrival points

◼ At least one accessible

route within the site shall

be provided from public

transportation stops,

accessible parking,

accessible passenger

loading zones, and public

streets or sidewalks to the

accessible building

entrance served.

165© 2015 Colorado Code Consulting, LLC

ANSI A117.1 – Accessible Route

404 Doors and Doorways

404.2.4.4 Recessed Doors

If recessed >8”, then front approach clearances required.

© 2015 Colorado Code Consulting, LLC

166

Accessible Entrances Required

1105.1

At least 60 percent all

public entrances shall be

accessible.

Exceptions

◼ Areas not required to

be accessible

◼ Loading & service

entrances

167© 2015 Colorado Code Consulting, LLC

Parking & Passenger Loading

Facilities – 1106.1

Where parking is

provided, accessible

parking spaces shall

be provided in

compliance with

Table 1106.1 except

as required by

Sections 1106.2 and

1106.3.

168© 2015 Colorado Code Consulting, LLC

165

166

167

168

Page 43: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 43

Groups I-1, R-1, R-2, R-3 & R-4

1106.2

1. In Group R-2, R-3 and R-4 occupancies that are required to have Accessible, Type A or Type B dwelling units or sleeping units, at least 2 percent, but not less than one, of each type of parking space provided shall be accessible.

2. In Group I-1 and R-1 occupancies, accessible parking shall be provided in accordance with Table 1106.1.

3. Where at least one parking space is provided for each dwelling unit or sleeping unit, at least one accessible parking space shall be provided for each Accessible and Type A unit.

4. Where parking is provided within or beneath a building, accessible parking spaces shall also be provided within or beneath the building.

169© 2015 Colorado Code Consulting, LLC

Van Spaces

1106.5

For every six or fraction of six accessible parking spaces, at least one shall be a van-accessible parking space.

◼ Exception: In Group U private garages that serve Group R-2 and R-3 occupancies, van-accessible spaces located within private garages shall be permitted to have vehicular routes, entrances, parking spaces and access aisles with a minimum vertical clearance of 7 feet

170© 2015 Colorado Code Consulting, LLC

Group R Accessible Spaces

1107.3

Rooms and spaces available

for the use of the residents of

accessible sleeping

accommodations shall be

accessible.

Accessible spaces shall

include toilet and bathing

rooms, kitchen, living and

dining areas, and any exterior

spaces, including patios,

terraces and balconies.

171© 2015 Colorado Code Consulting, LLC

Group R-1

1107.6.1.1

172© 2015 Colorado Code Consulting, LLC

169

170

171

172

Page 44: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 44

Group R-2

1107.6.2

> 20 dwelling units

◼ 2% - Type A

≥ Four dwelling units in single structure

◼ Every unit – Type B

Dwelling units required to be Type B dwelling units are permitted to be designed and constructed as Type A dwelling units.

173© 2015 Colorado Code Consulting, LLC

Toilet & Bathing Facilities

1109.2 Each toilet room and bathing

room shall be accessible.

Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing facilities provided within the facility shall not be located on the inaccessible floor.

At least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing facility shall be accessible.

◼ Exceptions

174© 2015 Colorado Code Consulting, LLC

Water Closet Compartments

1109.2.2

At least one wheelchair-accessible compartment shall be provided.

Where the combined total water closet compartments and urinals provided in a toilet room or bathing facility is six or more, at least one ambulatory-accessible water closet compartment shall be provided in addition to the wheelchair-accessible compartment. Wheelchair-accessible and ambulatory-accessible compartments shall comply with ICC/ANSI A117.1.

175© 2015 Colorado Code Consulting, LLC

Sinks

1109.3

Where sinks are provided, at

least 5% but not less than one,

provided in accessible spaces

shall comply with ICC/ANSI

A117.1.

Exceptions:

◼ Mop or service sinks

176© 2015 Colorado Code Consulting, LLC

173

174

175

176

Page 45: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 45

© 2015 Colorado Code Consulting, LLC

177

ANSI A117.1

Section 603 – Toilet and Bathing Rooms

603.2 Clearances:

Wheelchair turning

space provided per

Section 304

© 2015 Colorado Code Consulting, LLC

178

ANSI A117.1

Section 305 – Clear Floor Space

30” x 48”

Slope = 1:48 max.

May include knee and

toe space per 306

One side on

accessible route

© 2015 Colorado Code Consulting, LLC

179

ANSI A117.1

Section 306 – Knee and Toe Clearance

306.2 - Toe Clearance

1. Located between

floor and 9”

2. Max. Depth = 25”

3. Min. Depth = 17” if

toe depth is required

for a fixture

4. Min. 30” width

© 2015 Colorado Code Consulting, LLC

180

ANSI A117.1

Section 306 – Knee and Toe Clearance

306.3 Knee Clearance

1. Located between 9”

and 27”

2. Max. Depth = 25”

3. Min. Depth = 11” at

9” high and 8” at

27” high

4. Min. 30” width

177

178

179

180

Page 46: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 46

© 2015 Colorado Code Consulting, LLC

181

ANSI A117.1 604 – Water Closets & Toilet Compartments

604.2 Location

Shall have a wall on

the rear and on the

side.

16-18” from centerline

to side wall

© 2015 Colorado Code Consulting, LLC

182

ANSI A117.1 604 – Water Closets & Toilet Compartments

604.3.1 Clearance Size

◼ 60” back wall

◼ 56” forward

NO other fixtures or

obstructions shall be

within the WC clear

space!!!!

Overlap of other clear

space OK

© 2015 Colorado Code Consulting, LLC

183

ANSI A117.1 604 – Water Closets & Toilet Compartments

604.5.1 Grab bars – side

wall

Start 12” max. from back

wall

Extend 54” min. from

back wall

18” min. vertical w/

bottom and centerline

between 39-41” AFF

© 2015 Colorado Code Consulting, LLC

184

ANSI A117.1 604 – Water Closets & Toilet Compartments

604.5.2 Grab bars –

rear wall

24” centered

36” when

“space permits”

181

182

183

184

Page 47: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 47

Signage

1111

International Symbol of

Accessibility

◼ Parking spaces

◼ Passenger loading zones

◼ Accessible rooms with

multiple single-user

toilet/bathing rooms are

clustered at single

location

185© 2015 Colorado Code Consulting, LLC

Signage

1111

Accessible entrances where

not all entrances accessible

Accessible check-out aisles

where not all aisles accessible

Unisex toilet/bathing rooms

Accessible dressing, fitting,

and locker rooms

Accessible areas of refuge

Exterior areas for assisted

rescue

186© 2015 Colorado Code Consulting, LLC

Interior EnvironmentChapter 12

Ventilation

1202.1

Buildings shall be

provided with natural

ventilation in accordance

with Section 1202.5, or

mechanical ventilation in

accordance with the

International Mechanical

Code.

188© 2015 Colorado Code Consulting, LLC

185

186

187

188

Page 48: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 48

Attic Spaces

1202.2

Enclosed attics and enclosed rafter spaces◼ Minimum 1” air space

between insulation and sheathing

◼ 1/300 of the area of the space ventilated, with 50 % of the required ventilating area provided by ventilators located in the upper portion of the space to be ventilated at least 3 feet above eave or cornice vents with the balance of the required ventilation provided by eave or cornice vents.

189© 2015 Colorado Code Consulting, LLC

Under-Floor Ventilation

1202.4

The space between the

bottom of the floor joists

and the earth under any

building except spaces

occupied by basements or

cellars shall be provided

with ventilation in

accordance with Section

1202.4.1, 1202.4.2 or

1202.4.3.

190© 2015 Colorado Code Consulting, LLC

Lighting

1204.1 Every space intended for human

occupancy shall be provided with

natural light by means of exterior

glazed openings in accordance

with Section 1205.2 or shall be

provided with artificial light in

accordance with Section 1205.3.

Exterior glazed openings shall

open directly onto a public way or

onto a yard or court in accordance

with Section 1206.

191© 2015 Colorado Code Consulting, LLC

Minimum Ceiling Heights

1207.2

Occupiable spaces, habitable spaces and corridors shall have a ceiling height of not less than 7 feet 6 inches above the finished floor.

Bathrooms, toilet rooms, kitchens, storage rooms and laundry rooms shall have a ceiling height of not less than 7 feet above the finished floor.

192© 2015 Colorado Code Consulting, LLC

189

190

191

192

Page 49: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 49

Access to Unoccupied Spaces

1208

Crawl Spaces

◼ 18”X24”

Attic Spaces

◼ 20”X30” to any attic with

clear height of 30”

◼ 30” clear headroom shall

be provided at access

opening

Mechanical Appliances

◼ International Mechanical

Code

193© 2015 Colorado Code Consulting, LLC

Toilet and Bathroom Floor Finish

1209.2.1

In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface.

The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.

194© 2015 Colorado Code Consulting, LLC

Walls

1209.2.2 Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.

Exceptions:

◼ Dwelling Units and sleeping units

◼ Toilet rooms not accessible to public with one water closet

195© 2015 Colorado Code Consulting, LLC

Showers

1209.2.3

Shower compartments

and walls above bathtubs

with installed shower

heads shall be finished

with a smooth,

nonabsorbent surface to

a height not less than 72

inches above the drain

inlet.

196© 2015 Colorado Code Consulting, LLC

193

194

195

196

Page 50: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 50

Exterior Walls

1402.2

Exterior walls shall provide the building with a weather resistant exterior wall envelope.

The exterior wall envelope shall be designed and constructed in such a manner as to prevent the accumulation of water within the wall assembly ◼ water-resistive barrier

behind the exterior veneer,

◼ A means for draining water that enters the assembly to the exterior of the veneer,

197© 2015 Colorado Code Consulting, LLC

Flashing

1404.4 Flashing shall be installed in

such a manner so as to prevent moisture from entering the wall or to redirect it to the exterior.

◼ Perimeters of exterior door and window assemblies

◼ Penetrations and terminations of exterior wall assemblies

◼ Exterior wall intersections with roofs, chimneys, porches, decks, balconies and similar projections

◼ Built-in gutters and similar locations where moisture could enter the wall.

198© 2015 Colorado Code Consulting, LLC

Roofing

1503.1

Roof decks shall be covered with approved roof coverings secured to the building or structure in accordance with the provisions of this chapter.

Roof coverings shall be designed in accordance with this code, and installed in accordance with this code and the manufacturer’s approved instructions.

199© 2015 Colorado Code Consulting, LLC

Flashing

1503.2

Flashing shall be installed

in such a manner so as to

prevent water from

entering the wall and roof

through joints in copings,

through moisture-

permeable materials and

at intersections with

parapet walls and other

penetrations through the

roof plane.

200© 2015 Colorado Code Consulting, LLC

197

198

199

200

Page 51: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 51

Fire Classification

1505

The minimum roof coverings installed on buildings shall

comply with Table 1505.1 based on the type of

construction of the building.

201© 2015 Colorado Code Consulting, LLC

Hazardous Locations

2406.4.2

Within 24-inch arc of door in closed positionExceptions:◼ Intervening wall or other

permanent barrier between the door and the glazing.

◼ Where access through the door is to a closet or storage area 3 feet or less in depth.

◼ Glazing in walls perpendicular to the plane of the door in a closed position, other than the wall towards which the door swings when opened, in dwelling units

202© 2015 Colorado Code Consulting, LLC

Safety Glazing

2406.4.5

Glazing in walls, enclosures or fences containing or facing hot tubs, spas, whirlpools, saunas, steam rooms, bathtubs, showers and indoor or outdoor swimming pools where the bottom exposed edge of the glazing is less than 60 inches measured vertically above any standing or walking surface shall be considered a hazardous location. This shall apply to single glazing and all panes in multiple glazing.

◼ Exception: Glazing that is more than 60 inches, measured horizontally and in a straight line, from the water’s edge of a bathtub, hot tub, spa, whirlpool, or swimming pool.

203© 2015 Colorado Code Consulting, LLC

Hazardous Locations

2406.4.6 & 2406.4.7

Glazing where the bottom exposed edge of the glazing is less than 60 inches above the plane of the adjacent walking surface of stairways, landings between flights of stairs, and ramps shall be considered a hazardous location.

Glazing adjacent to the landing at the bottom of a stairway where the glazing is less than 36 inches above the landing and within 60 inches horizontally of the bottom tread shall be considered a hazardous location.

204© 2015 Colorado Code Consulting, LLC

201

202

203

204

Page 52: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 52

Effective Use of the Code

Classify the building

Review occupancy requirements

Review type of construction requirements

Review means of egress requirements

Review detailed code requirements

Review structural & material requirements

205© 2015 Colorado Code Consulting, LLC

Special Inspections

1704

Where application is made to the building official for construction as specified in Section 105, the owner or the owner’s authorized agent, other than the contractor, shall employ one or more approved agencies to provide special inspections and tests during construction on the types of work specified in Section 1705 and identify the approved agencies to the building official.

These special inspections and tests are in addition to the inspections by the building official that are identified in Section 110.

206© 2015 Colorado Code Consulting, LLC

Statement of special inspections

1704.2.3

The applicant shall submit a statement of special inspections in accordance with Section 107.1 as a condition for permit issuance. This statement shall be in accordance with Section 1704.3.

◼ Exception: A statement of special inspections is not required for portions of structures designed and constructed in accordance with the cold-formed steel light-frame construction provisions of Section 2211.7 or the conventional light-frame construction provisions of Section 2308.

© 2015 Colorado Code Consulting, LLC 207

Special Inspections

Inspection of fabricators

Steel Construction

◼ Table 1705.2.2

Concrete Construction

◼ Table 1705.3

Masonry Construction

Wood Construction

◼ Fabricated materials

Soils

Pile Foundations

Pier Foundations

Wall Panels & veneers

Sprayed fire-resistant materials

EIFS

◼ Except when installed over water-resistive barrier or installed over masonry of concrete

Special Cases

Smoke Control Systems

208© 2015 Colorado Code Consulting, LLC

205

206

207

208

Page 53: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 53

Soils & Foundation

Chapter 18

Foundation & Soils Investigation

1803.1

Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6.

Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional.

210© 2015 Colorado Code Consulting, LLC

Subsoil Drainage System

1805.4

Where a hydrostatic pressure condition does not exist, dampproofing shall be provided and a base shall be installed under the floor and a drain installed around the foundation perimeter.

◼ Prescriptive requirements Base course

Foundation Drain

Drainage Discharge

211© 2015 Colorado Code Consulting, LLC

Concrete

Chapter 19

Structural concrete shall be designed and constructed in accordance with the requirements of this chapter and ACI 318 as amended in Section 1905 of this code.

Except for the provisions of Sections 1904 and 1907, the design and construction of slabs on grade shall not be governed by this chapter unless they transmit vertical loads or lateral forces from other parts of the structure to the soil.

212© 2015 Colorado Code Consulting, LLC

209

210

211

212

Page 54: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 54

Construction Documents

1901.5

1. The specified compressive strength of

concrete at the stated ages or stages

of construction for which each

concrete element is designed.

2. The specified strength or grade of

reinforcement.

3. The size and location of structural

elements, reinforcement and anchors.

4. Provision for dimensional changes

resulting from creep, shrinkage and

temperature.

5. The magnitude and location of

prestressing forces.

6. Anchorage length of reinforcement

and location and length of lap splices.

7. Type and location of mechanical and

welded splices of reinforcement.

8. Details and location of contraction or

isolation joints specified for plain

concrete.

9. Minimum concrete compressive

strength at time of posttensioning.

10. Stressing sequence for posttensioning

tendons.

11. For structures assigned to Seismic

Design Category D, E or F, a

statement if slab on grade is designed

as a structural diaphragm (see Section

21.12.3.4 of ACI 318).

213© 2015 Colorado Code Consulting, LLC

Masonry

Chapter 21

Masonry shall comply with

the provisions of TMS

402/ACI 530/ASCE 5 or TMS

403 as well as applicable

requirements of this chapter.

214© 2015 Colorado Code Consulting, LLC

Steel

Chapter 22

The design, fabrication and erection of structural steel for buildings and structures shall be in accordance with either the AISC 360

215© 2015 Colorado Code Consulting, LLC

Wood

Chapter 23

The design of structural elements or systems, constructed partially or wholly of wood or wood-based products, shall be based on one of the following methods.

◼ Allowable Stress Design

◼ Load & Resistance Factor Design

◼ Conventional Light-Frame Construction

216© 2015 Colorado Code Consulting, LLC

213

214

215

216

Page 55: Commercial Plan Review - ICC...IBC Commercial Plan Review © 2019 Colorado Code Consulting, LLC 7 Means Of Egress 107.2.3 The construction documents shall show in sufficient detail

IBC Commercial Plan Review

© 2019 Colorado Code Consulting, LLC 55

Colorado Code Consulting,

LLC

4610 S Ulster, Suite 150

Denver, CO 80237

Ph. 303-400-6564

Fax 303-693-0630

www.coloradocode.net

[email protected]

© 2015 Colorado Code Consulting, LLC 217

217