community directed development council
TRANSCRIPT
![Page 1: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/1.jpg)
COMMUNITY DIRECTED DEVELOPMENT COUNCIL
November 12, 2019
Susan Nordstrom LopezPresident
Tim TraceySmithGroup
![Page 2: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/2.jpg)
PROJECT OVERVIEW
In 2012, Advocate Illinois Masonic Medical Center presented a proposal to amend their existing PD for the campus. PD 50 was approved in November 2012.
A multi-phased project to be constructed on Sub-Area C was approved as part of this amendment.
Phase 1, the Center for Advanced Care, was built and opened in April of 2015.
2 smithgroup.com
AAH-IMMC CIRCA 2012
![Page 3: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/3.jpg)
SHEFFIELD BUILDING
![Page 4: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/4.jpg)
SITE AND ZONING
IDPH Approval August 6
DPD review complete— Targeting November Plan
Commission and City Council approval
4 smithgroup.com
AAH-IMMC CIRCA 2019
New Sub-Area D
New Sub-Area E
![Page 5: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/5.jpg)
PROJECT OVERVIEW
Timeline:— Introduced project in March
— Presented to CLVN & CDDC in May and July
— Met with CLVN Planning & Zoning Committee in August
— Presented to CLVN & CDDC in September
— Met with CLVN Planning & Zoning Committee in September
5 smithgroup.com
AAH-IMMC CIRCA 2019 - MULTI PHASE CAMPUS IMPROVEMENTS
![Page 6: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/6.jpg)
PROJECT OVERVIEW
Feedback— Building Height
— SW Corner of the building
— Potential Light Spill
— Glass at street level
— Lighting at the top level
— Incorporating Art along the south elevation
— SE Corner of the building (DPD)
— Bike racks (CDOT)
— Cross walk at north west corner (CDOT)
6 smithgroup.com
SHEFFIELD BUILDING
![Page 7: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/7.jpg)
PROJECT OVERVIEW
7 smithgroup.com
5.5 levels required to meet Parking Garage Need
Physical Therapy Services on First floor
Main Building Entry for Pedestrians on Sheffield
— Drop-off Zone at Main Entry
Vehicular Entry and Exit for Parking Garage at Nelson
Loading to occur along alley @ Elevated Tracks
Zero lot line building
SHEFFIELD BUILDING
![Page 8: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/8.jpg)
PARKING STUDY
Current Parking Inventory:— 1,645 stalls
Inventory Reduction: — 242 spaces
Existing Peak Parking Demand — 1,490 stalls
New Garage — Reduced size of garage to
408 stalls
Parking Surplus — 138-229 spaces— 9%-15% surplus— 1%-1.5% yearly increase over 10-
years
8 smithgroup.com
EXISTING PARKING INVENTORY
BARRY LOT45 SPACES
overflow
EXISTING PARAKING GARAGE MOC380 - VISITORS + PHYSICIANS
(RESERVED)
CANCER CENTER LOT26 SPACES
EXISTING PARKING DECK476 - EMPLOYEES
EXISTING PARKING DECK476 - VISITORS + PHYSICIANS
(RESERVED)
WILTON LOTRENTED CONTRACTOR
PARKING - 22
EXISTING SHEFFIELD SURFACE LOT70 SPACES
OFFSITE PARKINGVIC GARAGE – 25 SPACES
CENTURY MALL – 125 SPACES
![Page 9: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/9.jpg)
ENVIRONMENTAL STUDY
9 smithgroup.com
ACOUSTICAL CONDITIONS
Locations 2 & 3 chosen because they are a similar distance from the train tracks
The only difference in obstruction is the existing parking garage versus an open path.
We expect a similar reduction for the residential buildings with the addition of the new parking garage.
The results show an average noise level 10 dBA lower from Location 1 to Location 3.
81 dBa is twice as loud as 71 dBa
![Page 10: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/10.jpg)
BUILDING DESIGN
Presentation Name10 smithgroup.com
NEIGHBORHOOD CONTEXT
![Page 11: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/11.jpg)
BUILDING SECTION
11 smithgroup.com
SHEFFIELD BUILDING
50’-0”
PR OPOS E D 0’ -0” S E TB ACK
0’ -0” S E TB ACK R E QUIR E D PE R ZONING
74’-0”
62’-0”
51’-0”
![Page 12: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/12.jpg)
BUILDING DESIGNNORTHWEST CORNER
![Page 13: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/13.jpg)
BUILDING DESIGN
13 smithgroup.com
SOUTHWEST CORNER
![Page 14: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/14.jpg)
BUILDING DESIGN
Light Control - Headlights blocked by
Concrete structure
- Perforated Metal Screens further filter the light
14 smithgroup.com
SHEFFIELD BUILDING
![Page 15: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/15.jpg)
LIGHTING DESIGN
15 smithgroup.com
10’-0
” Lighting on Sensors & Dimmer control
Limited accessibility at night
LIGHTING AT ROOF TOP – PERIMETER POLES
![Page 16: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/16.jpg)
BUILDING DESIGN
16 smithgroup.com
SHEFFIELD BUILDING
![Page 17: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/17.jpg)
BUILDING DESIGN
Presentation Name17 smithgroup.com
STREETSCAPE
![Page 18: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/18.jpg)
BUILDING DESIGN
Presentation Name18 smithgroup.com
ENTRY PLAZA
![Page 19: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/19.jpg)
BUILDING DESIGN
19 smithgroup.com
EAST FACADE
![Page 20: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/20.jpg)
WELLINGTON BUILDING
![Page 21: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/21.jpg)
PROJECT OVERVIEW
Timeline:— Introduced project in March
— Presented to CLVN & CDDC in May
— Creticos Demolition complete in October 2019
— Issued for City of Chicago Building Permit November in 2019
— Building will house outpatient services Pediatric Developmental Center
Counselling Center
Shell Space
21 smithgroup.com
AAH-IMMC CIRCA 2019 - MULTI PHASE CAMPUS IMPROVEMENTS
![Page 22: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/22.jpg)
SITE PLAN
Building is following all Sub-Area A requirements as set forth n PD50
Building character to match existing campus
Surface parking lot to be used during construction. Will remain parking long term.
22 smithgroup.com
WELLINGTON BUILDING
GREEN ROOF
W WELLINGTON AVE
EXISTING SURFACE PARKING LOT
N MILDRED AVE
EXISTINGPARKING GARAGE
ENTRY
![Page 23: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/23.jpg)
BUILDING DESIGNNORTH FAÇADE
![Page 24: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/24.jpg)
BUILDING DESIGNMAIN ENTRY
![Page 25: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/25.jpg)
BUILDING DESIGNNORTHEAST CORNER
![Page 26: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/26.jpg)
BUILDING DESIGN
26 smithgroup.com
SOUTHEAST CORNER
![Page 27: COMMUNITY DIRECTED DEVELOPMENT COUNCIL](https://reader033.vdocument.in/reader033/viewer/2022051204/627832f652c4261b863313cb/html5/thumbnails/27.jpg)
QUESTIONS? THANK YOU