community outreach meeting september 10, 2015 welcome to santa clara county i-680 corridor study 1

8
Community Outreach Meeting September 10, 2015 Welcome to Santa Clara County I-680 Corridor Study 1

Upload: toby-jenkins

Post on 03-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Community Outreach MeetingSeptember 10, 2015

Welcome to Santa Clara County I-680 Corridor Study

1

PURPOSE OF THIS MEETING

Communicate About The I-680 Corridor Study

Describe Background and Existing Conditions Suggest Different Types of Improvements

Obtain Input from the Local Community to Incorporate into the Study

2

I-680 CORRIDOR BACKGROUND

I-680 from US 101 to Alameda County was constructed in 1970’s.

No significant upgrades since original construction.

Congestion and operational issues have increased over many years.

3

TRAFFIC OPERATIONS ASSESSMENTExisting Conditions: Bottlenecks

AM Northbound between Capitol and Alum Rock

PM Southbound between Berryessa and McKee

4

TRAFFIC OPERATIONS ASSESSMENTExisting Conditions: Travel Speed

AM Northbound less than 35 mph between 101 and Berryessa Rd.

PM Southbound less than 35 mph between Jacklin and McKee Rd.

5

CORRIDOR STUDY DEVELOPMENT

The I-680 Corridor Study Will Consider A Wide Range of Potential Improvements:

Highway Improvements

Local Street and Multi-Modal Improvements

Off-Street Bicycle and Pedestrian Improvements

Transit Upgrades

Soundwalls6

SCHEDULE

September: Obtain Public Input and Finalize Potential Improvement List

October: Evaluate and Rank Potential Improvements and Prepare Draft Corridor Study

November/December: Review of Draft Corridor Study by Caltrans, Cities and County

January/February 2016: Final Corridor Study

7

HOW TO PROVIDE INPUT

Provide Comments Tonight At This Open House Meeting:

Post Your Home or Business Location on Aerial Map

Provide Comment Card or Notes

Participate in I-680 Transportation Survey (Interactive Online Map)

http://i-680corridorstudy.crowdspotmap.com/

8