company profile€¦ · company profile. 2 contents • general information • project references....
TRANSCRIPT
• Established in 1958
• Today: provider of state-of-the-art engineering and consultancy services in the fields of transport & mobility and water & environment
• Distinctive know-how and experience in the implementation of water infrastructure, mobility and transportation projects
• Annual performance 2017: > 70 million EUR
• Quality and reliability at the highest standards
• Preferred partner for national and international donor organizations, for public and private sector
• Projects implemented in more than 100 countries
• More than 600 highly-specialized employees, with over 260 of them working in Germany
• Representations in more than 25 countries
gauff.com
4
Activity fields
5
Water & Environment
Utilities
Transport & Mobility
Rail
Road
Transport &
Mobility
Rail (IT-S)
Road (GT)
Environment
engineering services
products & solutions
▪ Algeria ▪ Austria ▪ Azerbaijan ▪ Burkina Faso ▪ Cambodia ▪ China ▪ Democratic Rep. of the Congo ▪ Ethiopia ▪ Germany ▪ Ghana ▪ Hungary ▪ Ivory Coast ▪ India ▪ Indonesia ▪
▪ Iraq ▪ Jordan ▪ Kenya ▪ Lebanon ▪ Mali ▪ Myanmar ▪ Nigeria ▪ Phillippines ▪ Rep. of the Congo ▪ Russia ▪ Serbia ▪ Switzerland ▪ Tanzania ▪ Turkey ▪ Uganda ▪ Uzbekistan ▪ Zambia ▪
International presence
6
Projektbeispiele (1/5)Project
Consulting Services:
• Feasibility study, preliminary design, tender documents, evaluation of tenders, assistance during contract award,
• Construction supervision: review and approval of detailed plans, financial supervision of contracts, commissioning,
assistance during liability period, program management
Investment Measures:
• Water treatment plants (Q = 23,200 m³/d), 43 Drinking water storage tanks, 22 Booster pumping stations, 11
Water distribution networks (Jalilabad: 4 networks; L = 880 km) + 85 km transmission mains, 11 Wastewater
collection networks (L = 840 km) with 12 sewerage booster pumping stations, 8 Wastewater Treatment Plants with
mechanical and biological treatment stages, and sludge treatment, covering a population of 340,000.
Consulting Services :
• Detailed design, tender documents, evaluation of tenders, assistance during contract award,
• Construction supervision incl.financial supervision of contracts, commissioning, assistance during liability period.
Investment Measures:
• The sewerage system in this region was hydraulically rehabilitated. Collector with a pipe diameter of
DN 3000-DN 2500. Entire rain overflow remained open, so that the protection of the Rednitz river and the water
protection area of the place could be guaranteed
• gauff.com took over the consultation, surveying, all planning phases as well as the object management,
construction supervision and cost calculation
Description
Municipality of
Krusevac/KfW
Development Bank
State Amelioration
and Water Man-
agement Com-
pany, Baku
City of Nurem-
berg, Civil Eng-
ineering Departm.
Client
engineering services
Selected water sector projects (1/2)
New Construction
of Krusevac and
Vranje Wastewater
Treatment Plants,
Serbia
(2013 – 2020)
Second National
Water Supply and
Sanitation
Program,
Azerbaijan
(2010-2019)
South-Western
Main Sewage
Collector 2,
Nuremberg,
Germany
(2016-2019)
8
Consulting Services :
• Feasibility study, preliminary design, tender documents, evaluation of tenders, assistance during contract award,
• Construction supervision: review and approval of detailed plans, financial supervision of contracts, commissioning,
assistance during liability period, program management
Investment measures:
• Rehabilitation of existing sewerage network sections, extension of sewerage network sections and new collectors.
• Rehabilitation of storm water drainage systems in Kruševac and Vranje.
• Construction of 2 new WWTP (90,000 PE / 70,000 PE) aiming at full carbon and nutrient removal, and sludge
treatment by means of anaerobic digestion and recovery of energy through co-generation plant.
Projektbeispiele (1/5)Project
Consulting Services:
• Feasibility study incl. preliminary design, topographical/bathymetric/socio-eco-nomic surveys, environmental &
social impact assessment, climate change assessment, institutional analysis, definition of design criteria, etc.
• Hydrodynamic modelling using 3-way coupling of 1D model for channel flow, 2D hydraulic model for overland flow
and sewage system model.
Proposed investment measures:
• Micro drain system: Rehabilitation of 43,5 km of existing drains, Construction of 264 km of new drains.
• Macro drain system: Construction of new structures including retaining walls, embankments, open channels,
closed culverts, and a system of pumping stations (depending on design rainfall)
Consulting Services:
• Feasibility Study incl. review of existing situation of Astana WWTP (192,000 m³/d), definition of feasible options for
technical and financial comparison and final superposition by means of a “simplified benefit-value analysis“.
• Estimation of required investment and operation cost (“CAPEX” and “OPEX”) for all proposed investment measures
Proposed investment measures:
• Construction of new additional anaerobic digesters and related facilities (gasholder, CHP).
• Construction of a mono sludge incineration plant, which showed a very good ecological balance and it could be
considered as a reliable and proven technology.
Description
Greater Chennai
Corporation(GCC)/
KfW Development
Bank
Astana Su
Arnasy/European
Bank for Recon-
struction & Deve-
lopment
Client
engineering services
Selected water sector projects (2/2)
Chennai Storm-
water Drainage
Programme - M1 &
M2 components of
the Kovalam
Basin, India
(2018-2019)
Astana Water
Modernisation
Feasibility Study
(WWTP Sludge
Management),
Kazakhstan
(2015-2016)
9
Sewerage
Development and
Optimization of
Greater Bandung
(Feasibility Study),
Indonesia
(2018-2019)
Ministry of Public
Works and
Housing/KfW
Development
Bank
Consulting Services:
• Feasibility study incl. preliminary design, EIA, legal framework, implementation concept
Proposed investment measures:
• Extension and optimization of the existing central sewer system (off-site),
• Conversion from a combined sewer system to separated sewer systems in some areas,
• Rehabilitation and extension of septic sludge treatment facilities (on-site),
• Procurement of maintenance equipment such as flushing trucks and sludge tankers,
• Rehabilitation/optimization of Bojongsoang WWTP covering for a population of more than 2.5 million,
• Construction of a new sewerage network in parts of Bandung Regency and connection to the Bojongsoang WWTP.
Please contact
10
H.P. Gauff Ingenieure GmbH & Co. KG -JBG-
Urban Water Management
Frankfurt am Main (Germany)
Dr.-Ing. Joachim Glasenapp
Mobile: +49 151 19558006Internet: www.gauff.comE-mail: [email protected]
Jakarta
Dipl.-Ing. Peter Yan
Mobile: +62 819 7394 9657Internet: www.gauff.comE-mail: [email protected]