COMPANY PROFILE
PT VENTURINDO ENGINEERINGJl. By Pass Jomin No.46 Cikampek, Karawang, West JavaTelp : 0264 8385523 Fax. 0264 8385523Mobile : 0811129423, 0811142243Email : [email protected] : www.venturindo.id The Path Toward Sustainable Energy
COMPANY OVERVIEW
PT. VENTURINDO ENGINEERING, Established in June 13th 2006 under the name of CV.
VENTURI TECH in the early stage of corporate operation. In the year 2008 PT. Venturindo
Engineering was incorporate as a private company located in Cikampek, West Java
Indonesia.
In the year 2006 the company started for Mechanical and Rotating installation, boiler repair,
steam turbine, condenser, cooling tower etc. Our expertise in fabrication and applied rotating
equipment bring forward to apply our knowledge to wide range of Power Plant Projects.
In order to meet part of the energy and power requirements, the company expansion and
established EPCC (Engineering Procurement Construction Commissioning) Power Plant
Company. Standing behind we provide is an engineer dedicated to ensuring all the basic design
requirements are meet. Our typical services begin from basic design, engineering , construction
and commissioning Power Plant base from Steam base (Coal, Biomass) PLTBS, Gas Turbine,
Dual Fuel Engine (PLTMG) and Hydro.
PT VENTURINDO ENGINEERING
Incorporated in the year 2008 as a private company
in Cikampek – West Java Indonesia.
Specialist in every aspect of Detailed Engineering, Procurement Construction, Workshop Fabrication, Steam Turbine Package
Assembly, Power Plant Industry including a comprehensive range of general and specialty services.
Certified
OUR VALUES
Best QualityShortest TimeHighest MoraleLowest CostSustainable SafetyCSR
OUR VALUES
We provide skilled engineer dedicated to ensure all the basic design requirements are meet. Our typical services begin from basic design, engineering , procurement , construction, fabrication and commissioning.
Design Engineering
Product and Services
Construction
procurement
commissioning
fabrication
We provide skilled engineer dedicated to ensure all the basic design requirements are meet. Our typical services begin from basic design, engineering , construction and commissioning.
Design Engineering
Steam Turbine Assembly
✓ Steam Turbine condition monitoring dataanalysis and support
✓Overhaul service Steam turbine, Gear box
✓ Reliability improvement program
✓ In-Plant man power supply
Overhaul & Maintenance
STEAM SEPARATOR
Type of Separator, moisture drop
condensate, coal ester, and shy
phone. Applicable for superheated or
saturated steam, depend on steam
requirement.
EXPANSION JOINT
We ready to serve your requirement
for expansion joint unit. designed and
manufactured fully in accordance with
the respective EJMA standard and in
conformity with the pressure and
temperature rating as per ANSI, JIS
and DIN.
OUR PRODUCTS
CONSTRUCTION & INSTALLATION
We meet the requirement for construction, steel structure erection and mechanical services.
The range of services covers shop and field engineering for industrial manufacturing, Palm kernel oil plant, Petrochemicals, Pulp and paper, Fertilizer, Palm oil mill, Refinery and Power generation.
Fully prepared to assist you to build Power Generation project in Coal base power plant, Biomass, Gas Turbine, Dual Fuel Engine and Hydro power energy.
STEAM TURBINE POWER GENERATOR
Galleries
Biomass Power Plant 2x2 MW Bengkulu, PT. Pamor Ganda
Power Plant 1,8 MW CikampekPT. Indo Raya Kimia
Biomass Power Plant 2,6 MW Kaltim PT. Swakarsa
Biomass Power Plant 2x3,5 MW Medan PT.PN III Sei Mangke, Medan
PLTU 2x3MW PLN Talaud, North-Sulawesi
Construction :• Boiler• Steam Turbine• Condenser• Cooling tower, Piping
Galleries
Biomass power plant 3MW Sampoerna AgroKep Meranti Riau Sumatera
Galleries
GalleriesWuxi Hua Hua BOILER Cap 3 x 80TPH
Steam Turbine and Condenser Erection
GE Jenbacher 2x1000KW
Galleries
Gas Engine and gas Turbine
KAWASAKI Gas Turbine 5,7MWcompleted with Heat Recovery Boiler
Gas Engine MWM 15 x 3MW
PLTMHPTP 6 Kayu Aro Kerinci Jambi
Micro hydro construction :• Intake• Weir• Forebay and spillbay• Head race• Penstock• Tail race• Power house
Galleries
Prestigious Project, Successfully EPC to Build Power
Plan Within 6 Month From Scratch (Jul-Dec 2016).Location : Belitung, SumatraFuel : Crude Palm Oil 5MW
Galleries
Galleries
Storage and Day Tank base Construction, 2500m3 Vol.
Power Plant 20MWTual Maluku
GalleriesEngine Base Construction
Power Plant 20MWTual Maluku
Galleries
Projects Location surrounding Indonesia
PROJECT EXPERIENCES
Power Plant Capacity 1.4MW PT Indo Raya Kimia Cikampek West Java.
Fuel : Steam recovery from process
Power plant, Biomass Capacity 2.6 MW PT. Swakarsa, Muara
Wahau, Kal-Tim Fuel : Mixed shell and fiber
Power Pant, Coal base Capacity 5.6 MW Install Turbine
PT. Medco Ethanol Indonesia.
Lampung, Sumatera
Power Plant, Biomass Capacity 2x3.5 MW
PT. Wijaya Karya. PTPN III MedanFuel : Mixed shell, fiber and EFB
Power Plant, Biomass Capacity 2x2 MW
PT. Pamor Ganda. Bengkulu.Fuel : Mixed coal and shell
Power Plant, Biomass Capacity 2.6 MW PT. Amarta Karya.
PTPN III MedanFuel : Mixed shell, fiber and EFB
Microhydro Power 0.9 MW PT.BARATA MEDAN
PTPN VI Kayu Aro Kerinci Jambi Sumatera
Power Plant ,Gas turbine 5,7 MW
PT. Summi Rubber Indonesia. Cikampek West JavaFuel : Gas CH4
Power Plant, Capacity 1,8MW
PT.Astra Agro Lestari, Kumai Kalimantan
Fuel : Mixed shell and fiber
Power plant, Biomass Capacity 3MW
PT.Sampoerna Agro, Kep.Meranti Riau
Fuel : Mixed shell and sagoo barkPrestigious Project, Successfully EPC to Build Power Plan Within 6 Month From Scratch (Jul-Dec 2016).
Location : Belitung, SumatraFuel : Crude Palm Oil 5MW
Power Plant, Capacity 2x3MW
Pt.Bousted Maxitherm, PLN Talaud Sulawesi
Fuel : Coal
Power Plant Dual Fuel PLTMG 20MW PT Wijaya Karya KSO Wika Rekonstruksi
Dullah Darat Tual Maluku
Power Plant Dual Fuel PLTMG 20MW
PT Wijaya Karya KSO Wika Rekonstruksi
Masohi Seram Maluku
Galleries