Company profile Good fortune for New Talisma as mine revival ed T he geld and sil 5 ' S near the town of Pa bou es'drive southeast ()f Au and. The original mine was first worked from 1875 to the early 1920s, then intermittently to about 1992, and in that time tJroduceli'f about 1Mez of gold at a grade of 28gtt. The company, t'JewTalisman Gold Mines Ltd, with new chairman Robert Pearce and new executive director Paul Griffin, is reviving the old mine into a modern underground gold-silver project and focused on restarting mining in 2014. A recently completed scoping study with a SO,OOOozlyscenario showed a cash cost of about US$63010z and total attributable cost of about US$l ,000/0z of gold are indicated. The Talisman Project has a granted mining licence and project development work required for approval and consents from the New Zealand authorities is now under way. A high regard for environmental, community and scenic values underpins the company's work. The Talisman Resource is estimated at 204,0000z of gold (JORC inferred, indicated and measured) with a conceptual geological potential an order of magnitude greater. The Rahu exploration discovery at depth to the north is the anticipated future of the Talisman mine. be located wherever possible on the many vertical gold-bearing reefs in the mine, minimising the non-payable development. Cemented backfill will be integral to the mining method, and will also be used to restore haulage access where the ore is mined. Developments in engine technology of the small underground equipment now allows renewable and biodegradable 100% biofuel to be used, bringing benefits of lower fire hazard, lower exhaust toxicity, and zero carbon emissions. 'underground monorail train haulage, compatible with the small truck haulage, is an option being considered. The electric-powered train has productivity matched to the mine output, and it can provide economic vertical haulage capacity using a rack-and-pinion drive. Talisman will use modern processing methods. The ore will be concentrated to a gold- and silver-rich sand (a third of the tonnage) to be transported elsewhere for sale or further toll-based processing. The remaining 'The Talisman Project is blessed with very good infrastructure" The scale of the underground operation The new mine will be an underground operation, to be worked on a small scale with ore mining rates of around lSO,OOOtly. Tunnel sizes will be 3m x 3m with small loaders and trucks to suit. The development tunnels will // .. /i Top: the Rahu Ridge exploration discovery extends southwards (from lower left) towards the Talisman Mine underneath Mt Karangahake, the highest peak on the skyline (left of the power pylon). Above: a long section of the company's tenements, looking east, showing the original Talisman mine workings (in blue) with conceptual exploration targets illustrated in yellow r ' . ire, two-thirds of non-valuable residue will be delivered using concrete pumps back underground as cemented backfill. This approach avoids cyanide-based processing and, apart from perceived environment benefits, it saves the capital and operating costs of fine grinding and attendant tailings storage. The processing plant will be a secure facility because of the high grade being processed, with throughput of 20t hourly, and based on modules housed in a single-storey shed. The company is evaluating techniques such as ore sorting with colour or X-ray sensors, gravity separation and flotation. These processing options are possible because of the low tonnage and high grade being planned. The Talisman Project is blessed with very good infrastructure. State Highway 2,just a few kilometres from the mine, leads to the major container terminal at PortTauranga, only 80km away. Power lines pass nearby, and 100% renewable electricity from hydroelectric and geothermal sources can power the mine. Within lSkm are two substantial and attractive towns - the mining town ofWaihi (home to the 8Moz Martha mine), and the farming service town of Paeroa. The international mining skills shortage will have small influence because highly skilled and well educated people are available and living locally or working in mines overseas and looking to come back to New Zealand. CONTACT New Talisman Gold Mines Limited Company code: NTL (ASX & NZSX) E-mail: [email protected] Website: www.newtalismangoldmines.co.nz NEW TALISMAN GOLD www.newtalismangoldmines.co.nz

Upload: others

Post on 12-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Company profile Goodfortune for New Talisma asmine revival ed · 2014-03-25 · Company profile Goodfortune for New Talisma asmine revival ed T he geld and sil 5 ' S near the town

Company profile

Good fortune for New Talismaas mine revival ed

The geld and sil 5 ' S nearthe town of Pa bou es'drivesoutheast ()f Au and. The original mine wasfirst worked from 1875 to the early 1920s,then intermittently to about 1992, and in that

time tJroduceli'f about 1Mez of gold at a grade of 28gtt.The company, t'JewTalisman Gold Mines Ltd, with

new chairman Robert Pearce and new executivedirector Paul Griffin, is reviving the old mine into amodern underground gold-silver project and focusedon restarting mining in 2014. A recently completedscoping study with a SO,OOOozlyscenario showed acash cost of about US$63010z and total attributablecost of about US$l ,000/0z of gold are indicated.

The Talisman Project has a granted mining licenceand project development workrequired for approval and consentsfrom the New Zealand authorities isnow under way. A high regard forenvironmental, community and scenicvalues underpins the company's work.

The Talisman Resource is estimatedat 204,0000z of gold (JORC inferred,indicated and measured) with aconceptual geological potential an order of magnitudegreater. The Rahu exploration discovery at depth to thenorth is the anticipated future of the Talisman mine.

be located wherever possible on the many verticalgold-bearing reefs in the mine, minimising thenon-payable development. Cemented backfill will beintegral to the mining method, and will also be used to

restore haulage access where the ore ismined. Developments in enginetechnology of the small undergroundequipment now allows renewable andbiodegradable 100% biofuel to beused, bringing benefits of lower firehazard, lower exhaust toxicity, andzero carbon emissions.'underground monorail train

haulage, compatible with the small truck haulage, is anoption being considered. The electric-powered train hasproductivity matched to the mine output, and it canprovide economic vertical haulage capacity using arack-and-pinion drive.

Talisman will use modern processing methods. Theore will be concentrated to a gold- and silver-rich sand(a third of the tonnage) to be transported elsewhere forsale or further toll-based processing. The remaining

'The TalismanProject is blessedwith very goodinfrastructure"

The scale of the underground operationThe new mine will be an underground operation, to beworked on a small scale with ore mining rates of aroundlSO,OOOtly. Tunnel sizes will be 3m x 3m with smallloaders and trucks to suit. The development tunnels will

// ../i

Top: the Rahu Ridge exploration discovery extendssouthwards (from lower left) towards the TalismanMine underneath Mt Karangahake, the highest peakon the skyline (left of the power pylon).Above: a long section of the company's tenements, lookingeast, showing the original Talisman mine workings (in blue)with conceptual exploration targets illustrated in yellow

r'.•ire,

two-thirds of non-valuable residue will be deliveredusing concrete pumps back underground as cementedbackfill. This approach avoids cyanide-based processingand, apart from perceived environment benefits, itsaves the capital and operating costs of fine grindingand attendant tailings storage.

The processing plant will be a secure facility becauseof the high grade being processed, with throughput of20t hourly, and based on modules housed in asingle-storey shed. The company is evaluatingtechniques such as ore sorting with colour or X-raysensors, gravity separation and flotation. Theseprocessing options are possible because of the lowtonnage and high grade being planned.

The Talisman Project is blessed with very goodinfrastructure. State Highway 2, just a few kilometresfrom the mine, leads to the major container terminal atPortTauranga, only 80km away. Power lines pass nearby,and 100% renewable electricity from hydroelectric andgeothermal sources can power the mine.

Within lSkm are two substantial and attractivetowns - the mining town ofWaihi (home to the 8MozMartha mine), and the farming service town of Paeroa.The international mining skills shortage will have smallinfluence because highly skilled and well educatedpeople are available and living locally or working inmines overseas and looking to come back to NewZealand.

CONTACTNew Talisman Gold Mines LimitedCompany code: NTL (ASX & NZSX)E-mail: [email protected]: www.newtalismangoldmines.co.nz

NEW TALISMAN GOLD

www.newtalismangoldmines.co.nz