COMPLETE THE SECURITY CLASSIFICATION USING THE SLIDE MASTER VIEW. ARIAL 9PT BOLD COMPLETE THE SECURITY CLASSIFICATION USING THE SLIDE MASTER VIEW. ARIAL 8PT BOLD Use this slide format to add your own title slide image Please use a single landscape image avoid the use of clip art or multiple images. Using the Slide Master View, place your image in this white space. Use the feint line below as a guide to ensure you leave a clear white line across the bottom of the image. Send your image ‘to the back’ and if needed, change the Security Classification text colour to ensure it can be read. Please do not use the ‘Format Background’ menu option on this slide. Delete this instruction box. And close the Slide Master View when done. Firming up the business case: A systems approach to wind-plus-storage solutions Sindhu Shankar Wind Industry Forum, 21/03/2019 Source: https://www.esdnews.com.au

Upload: others

Post on 10-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

COMPLETE THE SECURITY CLASSIFICATION

USING THE SLIDE MASTER VIEW. ARIAL 9PT BOLD

COMPLETE THE SECURITY CLASSIFICATION

USING THE SLIDE MASTER VIEW. ARIAL 8PT BOLD

Use this slide format to add your own title slide image

Please use a single landscape image – avoid the use of clip art or multiple images.

Using the Slide Master View, place your image in this white space.

Use the feint line below as a guide to ensure you leave a clear white line across the bottom

of the image.

Send your image ‘to the back’ and if needed, change the Security Classification text

colour to ensure it can be read.

Please do not use the ‘Format Background’ menu option on this slide.

Delete this instruction box. And close the Slide Master View when done.

Firming up the business case: A systems approach to wind-plus-storage solutions

Sindhu Shankar

Wind Industry Forum, 21/03/2019Source: https://www.esdnews.com.au

© Frazer-Nash Consultancy Ltd. All rights reserved.

What is Wind Firming?

“Firm capacity” is capacity that will

be available when it is needed the

most.

Capacity firming can be

physical

economic/contractual

2

© Frazer-Nash Consultancy Ltd. All rights reserved.

Complexities of Wind Firming

3

Source: abc.net.au

© Frazer-Nash Consultancy Ltd. All rights reserved.

Cross-Industry Innovation: A Systems Engineering Approach

4

Different Demands,

Same Journey

Source: www.globirdenergy.com.au

Source: https://www.slideshare.net

© Frazer-Nash Consultancy Ltd. All rights reserved.

A Systems Engineering Approach

5

RequirementsSystem

ArchitectureUse case

Business Case Development

Concept of

Operations

Requirements

Engineering

© Frazer-Nash Consultancy Ltd. All rights reserved.

CONOPS/ Use Case Definition

6

Complex use cases including time shifting, FFR requirements, islanding.

Kennedy Energy Park Hornsdale Power Reserve Lincoln Gap Wind Farm

Lake Bonney BESS Dalrymple Battery Project Bulgana Green Power Hub

Source: https://www.qmeb.com.au Source: https://www.esdnews.com.au

Source: https://reneweconomy.com.au Source: https://www.escri-sa.com.au/ Source: https://reneweconomy.com.au

Source: https://reneweconomy.com.au

System Architecture – Functional/

Organisational Layer

Sub-Contractor Organisations

Asset Owner and Operator

External Organisations

Commercial/Contractual Relationship

Information/Data Flow

Legend

5

Gov. & Regulators

Market Participant

Asset Manager

AEMO

Market Management

Energy Market Management

Asset Portfolio

Battery

O&M Contractor

Asset Maintenance and Operations

Bid SupervisionPortfolio Management

Bid Submission

Asset Management

Wind

NEM Market Info.

Dispatch RequirementsBid

Asset Tech. Info.

Ass

et T

ech

In

fo.

BidOptimisedBidWeather

Dispatch DetailsMarket Participant Registration

Asset Tech Info.

Transmission Network

Transmission Management

Connection & Access Fee

Government, Regulators & Councils

Permits/ Approvals

Policy

O&M Contract

Operational Input

Mx Schedule

Regulations

Regulations

Operational Data

Asset Management Strategy

© Frazer-Nash Consultancy Ltd. All rights reserved.

System Architecture – Systems Layer

5

Portfolio Management

System

Plant Control System

Energy Management

System

System Alert

Sensitivities

PriceForecast Price

State of ChargeDischarge/Charge Power (MW)

Energy (MWh)

Power Dispatch Signal

TemperatureCurrent Capacity

Market Management

System

Weather Bidding System

Bid

System Architecture – Business Process Layer

9

Bid Supervision & Submission

Bidding SystemTraderTimescale

1Receive

Optimised Bid

2Display

Optimised Bid

3Review

Optimised Bid

4Edit Bid

5Register

Edited Bid

6Submit Bid

Change Optimised

Bid?

Yes

No

<HMI>

<HMI>

0

30 sec

3:45 min

5 min

© Frazer-Nash Consultancy Ltd. All rights reserved.

Requirements Definition - Bid Supervision

Bid Supervision Requirements

ID Number Requirement Work Package Delivery Mode

1.1 The bidding system shall receive optimised bids produced by the

battery bidding algorithm

Develop bidding

system

Bidding software

1.2 The bidding system shall display optimised bids produced by the

battery bidding algorithm for trader review

Develop bidding

system

Bidding software

1.3 The bidding system shall allow the trader to review the bid

▪ The bidding system shall display market information to the

trader

Develop bidding

system

Business process

Trader

Bidding Software

1.4 The bidding system shall allow a trader to edit bids Business process Trader

1.6 The bidding system shall submit bids Develop bidding

system

Bidding Software

10

© Frazer-Nash Consultancy Ltd. All rights reserved.

A Systems Engineering Approach

11

RequirementsSystem

ArchitectureUse case

Business Case Development

Concept of

Operations

Requirements

Engineering

Validation

Verification

www.fncaustralia.com.au

Thank you.

Sindhu Shankar, Consultant

[email protected]

(03) 9037 2200

12www.fncaustralia.com.au Source: https://www.esdnews.com.au