ukm · completed sites as of december 31st 2015… december 2015 prepared for ukm managed wifi 3 no...
TRANSCRIPT
UKM
JANUARY 2016
PROGRESS REPORT
Current status…
1. Completed site marking activities for UKM Bangi campus – 10 kolej and 1 mesjid and report submitted to Maxis.
2. Currently conducting fiber trace activity for fiber connectivity from PTM to each kolej (out of scope).
3. KBH, KAB and KKM installation completed. 4. Fiber backbone activated from PTM to KBH, KAB and
KKM. 5. Next installation works;
KIZ: January 4th KUO and KRK: January 11th
KDO and KPZ: January 18th
December 2015 Prepared for UKM Managed WiFi 2
Completed sites as of December 31st 2015…
December 2015 Prepared for UKM Managed WiFi 3
No Name of Building
No
of B
loc
ks
/
Are
a
Tota
l N
o o
f A
P
Dis
trib
utio
n
Sw
itc
h 2
4P
ort
L3
Ac
ce
ss S
witc
h -
8
Po
rt P
oe
L2
Wire
less
Brid
ge
(U
nit)
6U
Eq
uip
me
nt
Ra
ck
Ast
ro P
ole
1.1 Kolej Burhanuddin Helmi 34 29 1 7 10 8 10
1.2 Kolej Aminuddin Baki 40 40 1 11 14 12 14
1.3 Kolej Keris Mas 9 39 1 8 16 9 16
TOTAL INSTALLED 83 108 3 26 40 29 40
Deployment deliverables to complete at 7 kolej and 1 mosque
December 2015 Prepared for UKM Managed WiFi 4
No Name of Building
No
of B
loc
ks
/
Are
a
Tota
l N
o o
f A
P
Dis
trib
utio
n
Sw
itc
h 2
4P
ort
L3
Ac
ce
ss S
witc
h -
8
Po
rt P
oe
L2
Wire
less
Brid
ge
(U
nit)
6U
Eq
uip
me
nt
Ra
ck
Ast
ro P
ole
1.4 Kolej Antarabangsa Ibu Zain 12 29 1 10 10 11 10
1.5 Kolej Ungku Omar 36 60 1 10 11 11 11
1.6 Kolej Rahim Kajai 24 43 1 9 6 10 6
1.7 Kolej Dato' Onn 13 36 1 7 4 8 4
1.8 Kolej Pendeta Zaaba 21 63 1 9 18 10 18
1.9 Kolej Tun Hussein Onn 24 39 1 7 0 8 0
1.10 Kolej Ibrahim Yaakub 27 45 1 9 6 10 6
1.11 Mesjid UKM 1 5 0 1 0 0 0
TOTAL FOR UKM BANGI 158 320 7 62 65 68 65
Next Installation plan dates: • KIZ: January 4th • KUO and KRK: January 11th
• KDO and KPZ: January 18th
Fiber backhaul connectivity…
December 2015 Prepared for UKM Managed WiFi 5
UKM
JANUARY 2016
DEPLOYMENT AT KOLEJ WITH
FLATLETS…
Challenges for installation at kolej with flatlet…
1. High number of buildings… KAB – 40 blocks (completed) KUO – 36 blocks (to start on January 11th) KBH – 34 blocks (completed) KIY -- 27 blocks (to determine start date) KRK -- 24 blocks (to start on January 18th)
2. Inter-block connectivity involve massive civil / earth work.
3. Approved budget for UTP cable is 40 meter per AP. 4. Placement of new access switch and equipment rack
as we could not locate equivalent number of JARING rack.
December 2015 Prepared for UKM Managed WiFi 7
Civil work at KBH and later at kolej with flatlets…
December 2015 Prepared for UKM Managed WiFi 8
…continued
December 2015 Prepared for UKM Managed WiFi 9
KBH solution placement for 34 blocks - completed
December 2015 Prepared for UKM Managed WiFi 10
KAB solution placement for 40 blocks - completed
December 2015 Prepared for UKM Managed WiFi 11
KUO solution placement for 36 blocks: to start work January 11th
December 2015 Prepared for UKM Managed WiFi 12
KRK solution placement for 24 blocks – to start work on January 11th
December 2015 Prepared for UKM Managed WiFi 13
KIY solution placement for 27 blocks – to determine start date
December 2015 Prepared for UKM Managed WiFi 14
UKM
JANUARY 2016
THE OTHER 5 KOLEJ WITHOUT
FLATLETS...
Work expectation…
1. Kolej in the light of KKM, it took less than 14 working days to complete with 4 team of 4-man each.
2. Our estimation for KPZ, KTHO, KDO and KIZ will be faster than installation works at kolej with flatlet as there is no civil / earth work required.
3. Hostel blocks with multiple levels – between 3 to 5 floor.
4. Inter-block connectivity to use covered walk-way – no civil / earth work required.
5. Each hostel block will have between 4 to 6 wireless AP.
6. Most of the block currently have JARING equipment rack.
7. Kolej that does not have start date as we are looking at possibility to increase man-power, from current 25 pax.
December 2015 Prepared for UKM Managed WiFi 16
KKM solution placement for 9 blocks - completed
December 2015 Prepared for UKM Managed WiFi 17
KIZ solution placement for 12 blocks: started January 4th.
December 2015 Prepared for UKM Managed WiFi 18
KDO solution placement for 13 blocks – to determine start date
December 2015 Prepared for UKM Managed WiFi 19
KPZ solution placement for 22 blocks – to determine start date
December 2015 Prepared for UKM Managed WiFi 20
KTHO solution placement for 8 blocks – to determine start date
December 2015 Prepared for UKM Managed WiFi 21