comprehensive service & operational analysis (csoa) · and bus sure, the software will...

61
Comprehensive Service & Operational Analysis (CSOA)

Upload: others

Post on 24-Mar-2020

12 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

Comprehensive Service amp Operational Analysis (CSOA)

1 LUMIPLAN GROUP

Page 2

LUMIPLAN 40 YEARS PROVEN EXPERIENCE

Page 3

Who we are

Lumiplan designs develops and supports

Dynamic Information Solutions for

Public Transports Cities

and public spaces

One of the First

ITS project for

public

information

1st ever

laquo Full colour raquo

outdoor

display

About us

On-board PIS

Planning amp

Scheduling

Smartphone

applications

1 million

downloads

1st

Integrated

maps for

ski resorts

Innovations for Public Transport

First Planning amp Scheduling

projects in India (KSRTC BMTC)

OUR ADVANTAGE

Page 4 ITE - KSRTC

Worldwide expert on ITE related projects

Proven Planning and Scheduling Solution with 100 customer loyalty 100+ successful projects since 20+ years 8 Group Turn Over invested in RampD

Successful Proven Prior pilot project in Mysore Some customizations already done Understanding of STU special requirements

Expertized Teams based in Bangalore Planning and Scheduling team in Bangalore speaking Kannada RampD Centre in Bangalore

Unique usage of latest technologies Google Map Statistical Engine Web Dashboard

Page 5

On-ground Passenger Information

Onboard passenger information and

Fleet management systems

30 000 active LED destination boards

1 500 on-board multimedia screens

6 000 on-ground displays

Lumiplan leader in

public transportation

since 1972

TRANSPORT MOBILITY MADE SIMPLE

Innovations for Public Transport

Better Services to Passenger

Better Security Sustainability

Page 6

TRANSPORT MOBILITY MADE SIMPLE

Lumiplan leader in

dynamic information

since 1972

Innovations for Public Transport

CSOA - PROJECT BACKGROUND

CSOA is the first of its kind implemented in India

Page 7

Comprehensive Services amp Operations Analysis (CSOA) is a World Bank funded project- a part of the GEF funded Technical Assistant Program implemented for

Mysore City Transport Division (MCTD)

Study amp Analysis (6 months)

Implementation amp Monitoring (6 months)

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 2: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

1 LUMIPLAN GROUP

Page 2

LUMIPLAN 40 YEARS PROVEN EXPERIENCE

Page 3

Who we are

Lumiplan designs develops and supports

Dynamic Information Solutions for

Public Transports Cities

and public spaces

One of the First

ITS project for

public

information

1st ever

laquo Full colour raquo

outdoor

display

About us

On-board PIS

Planning amp

Scheduling

Smartphone

applications

1 million

downloads

1st

Integrated

maps for

ski resorts

Innovations for Public Transport

First Planning amp Scheduling

projects in India (KSRTC BMTC)

OUR ADVANTAGE

Page 4 ITE - KSRTC

Worldwide expert on ITE related projects

Proven Planning and Scheduling Solution with 100 customer loyalty 100+ successful projects since 20+ years 8 Group Turn Over invested in RampD

Successful Proven Prior pilot project in Mysore Some customizations already done Understanding of STU special requirements

Expertized Teams based in Bangalore Planning and Scheduling team in Bangalore speaking Kannada RampD Centre in Bangalore

Unique usage of latest technologies Google Map Statistical Engine Web Dashboard

Page 5

On-ground Passenger Information

Onboard passenger information and

Fleet management systems

30 000 active LED destination boards

1 500 on-board multimedia screens

6 000 on-ground displays

Lumiplan leader in

public transportation

since 1972

TRANSPORT MOBILITY MADE SIMPLE

Innovations for Public Transport

Better Services to Passenger

Better Security Sustainability

Page 6

TRANSPORT MOBILITY MADE SIMPLE

Lumiplan leader in

dynamic information

since 1972

Innovations for Public Transport

CSOA - PROJECT BACKGROUND

CSOA is the first of its kind implemented in India

Page 7

Comprehensive Services amp Operations Analysis (CSOA) is a World Bank funded project- a part of the GEF funded Technical Assistant Program implemented for

Mysore City Transport Division (MCTD)

Study amp Analysis (6 months)

Implementation amp Monitoring (6 months)

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 3: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

LUMIPLAN 40 YEARS PROVEN EXPERIENCE

Page 3

Who we are

Lumiplan designs develops and supports

Dynamic Information Solutions for

Public Transports Cities

and public spaces

One of the First

ITS project for

public

information

1st ever

laquo Full colour raquo

outdoor

display

About us

On-board PIS

Planning amp

Scheduling

Smartphone

applications

1 million

downloads

1st

Integrated

maps for

ski resorts

Innovations for Public Transport

First Planning amp Scheduling

projects in India (KSRTC BMTC)

OUR ADVANTAGE

Page 4 ITE - KSRTC

Worldwide expert on ITE related projects

Proven Planning and Scheduling Solution with 100 customer loyalty 100+ successful projects since 20+ years 8 Group Turn Over invested in RampD

Successful Proven Prior pilot project in Mysore Some customizations already done Understanding of STU special requirements

Expertized Teams based in Bangalore Planning and Scheduling team in Bangalore speaking Kannada RampD Centre in Bangalore

Unique usage of latest technologies Google Map Statistical Engine Web Dashboard

Page 5

On-ground Passenger Information

Onboard passenger information and

Fleet management systems

30 000 active LED destination boards

1 500 on-board multimedia screens

6 000 on-ground displays

Lumiplan leader in

public transportation

since 1972

TRANSPORT MOBILITY MADE SIMPLE

Innovations for Public Transport

Better Services to Passenger

Better Security Sustainability

Page 6

TRANSPORT MOBILITY MADE SIMPLE

Lumiplan leader in

dynamic information

since 1972

Innovations for Public Transport

CSOA - PROJECT BACKGROUND

CSOA is the first of its kind implemented in India

Page 7

Comprehensive Services amp Operations Analysis (CSOA) is a World Bank funded project- a part of the GEF funded Technical Assistant Program implemented for

Mysore City Transport Division (MCTD)

Study amp Analysis (6 months)

Implementation amp Monitoring (6 months)

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 4: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

OUR ADVANTAGE

Page 4 ITE - KSRTC

Worldwide expert on ITE related projects

Proven Planning and Scheduling Solution with 100 customer loyalty 100+ successful projects since 20+ years 8 Group Turn Over invested in RampD

Successful Proven Prior pilot project in Mysore Some customizations already done Understanding of STU special requirements

Expertized Teams based in Bangalore Planning and Scheduling team in Bangalore speaking Kannada RampD Centre in Bangalore

Unique usage of latest technologies Google Map Statistical Engine Web Dashboard

Page 5

On-ground Passenger Information

Onboard passenger information and

Fleet management systems

30 000 active LED destination boards

1 500 on-board multimedia screens

6 000 on-ground displays

Lumiplan leader in

public transportation

since 1972

TRANSPORT MOBILITY MADE SIMPLE

Innovations for Public Transport

Better Services to Passenger

Better Security Sustainability

Page 6

TRANSPORT MOBILITY MADE SIMPLE

Lumiplan leader in

dynamic information

since 1972

Innovations for Public Transport

CSOA - PROJECT BACKGROUND

CSOA is the first of its kind implemented in India

Page 7

Comprehensive Services amp Operations Analysis (CSOA) is a World Bank funded project- a part of the GEF funded Technical Assistant Program implemented for

Mysore City Transport Division (MCTD)

Study amp Analysis (6 months)

Implementation amp Monitoring (6 months)

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 5: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

Page 5

On-ground Passenger Information

Onboard passenger information and

Fleet management systems

30 000 active LED destination boards

1 500 on-board multimedia screens

6 000 on-ground displays

Lumiplan leader in

public transportation

since 1972

TRANSPORT MOBILITY MADE SIMPLE

Innovations for Public Transport

Better Services to Passenger

Better Security Sustainability

Page 6

TRANSPORT MOBILITY MADE SIMPLE

Lumiplan leader in

dynamic information

since 1972

Innovations for Public Transport

CSOA - PROJECT BACKGROUND

CSOA is the first of its kind implemented in India

Page 7

Comprehensive Services amp Operations Analysis (CSOA) is a World Bank funded project- a part of the GEF funded Technical Assistant Program implemented for

Mysore City Transport Division (MCTD)

Study amp Analysis (6 months)

Implementation amp Monitoring (6 months)

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 6: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

Better Services to Passenger

Better Security Sustainability

Page 6

TRANSPORT MOBILITY MADE SIMPLE

Lumiplan leader in

dynamic information

since 1972

Innovations for Public Transport

CSOA - PROJECT BACKGROUND

CSOA is the first of its kind implemented in India

Page 7

Comprehensive Services amp Operations Analysis (CSOA) is a World Bank funded project- a part of the GEF funded Technical Assistant Program implemented for

Mysore City Transport Division (MCTD)

Study amp Analysis (6 months)

Implementation amp Monitoring (6 months)

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 7: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

CSOA - PROJECT BACKGROUND

CSOA is the first of its kind implemented in India

Page 7

Comprehensive Services amp Operations Analysis (CSOA) is a World Bank funded project- a part of the GEF funded Technical Assistant Program implemented for

Mysore City Transport Division (MCTD)

Study amp Analysis (6 months)

Implementation amp Monitoring (6 months)

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 8: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

OBJECTIVE OF CSOA

CSOA is intended to set up a platform for a new window approach to improve efficiency of KSRTCrsquos operations at

MCTD Mysore

CSOA- Overview Page 8

Help MCTD to increase ridership in the longer run

Offer better services to citizens of Mysore for the future

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 9: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

CSOA DELIVERABLES

CSOA

Understand Operations

Monitor Service

Performance

Analyze Identify amp Address Issues

Arrive at most

effective model

Enhance amp Improve

Efficiency

Provide most Optimal Service

Understand Mysore Operations- Inception Report Data Collection and Surveys- Data Collection amp Survey

Reports Develop OampM Cost amp Revenue Allocation Model- Cost

Model Report

Develop and Monitor Key Performance Indicators (KPI)- Operations Report

Analysis of Routes- Travel Time amp Route Analysis Report

Review and Optimise Key Business Processes- Business Process Report

Develop Public Transport Model- PT Model Report

Draft Implementation Plan- Implementation Plan Report

Pilot amp Implementation Phase- Final Implementation Report

Page 9

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 10: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

INCEPTION REPORT amp DATA COLLECTION

Page 10

The Inception report was prepared detailing our understanding about MCTD operations and approach to the various tasks

The data collection report included bull Junctions Report

bull Outer Cordon Counts Report

bull OD Report

bull Road Inventory Survey Methodology

bull Road Inventory Survey Report

bull Screen Line Survey Report

bull Speed amp Delay Report

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 11: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

OPERATIONS STUDY

Page 11

Analyze and Understand existing operations

Identify areas which requires fine-tuning

Evolve indicators

Define a systematic workflow

Assist KSRTC to implement recommended KPIs

OB

JE

CT

IVE

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 12: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

PROPOSED INDICATORS

Page 12

Operations related

bull Service Reliability (bench-mark)

bull Service Availability (bench-mark)

bull CBS Departures(bench-mark)

bull Revenue Analysis(bench-mark) Accident Incident and Breakdown Management (trigger values)

bull Passenger Comfort(Assessor Manual)

Vehicle amp Crew related

bull Fuel Efficiency-Vehicle wise KMPL (trigger value)

bull Vehicle Availability (trigger value)

bull Crew Availability (trigger value)

Opera

tio

ns s

tudy

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 13: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

SAMPLE KPI FORMAT amp WORKFLOW

Page 13

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 14: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

Study and understand existing operations

Page 14

KEY TAKEAWAYS

What does this mean to MCTD KPIrsquos suggested are intended for an effective approach for better performance of existing operations and increase operational efficiency Some of the indicators suggested are fine-tuned through User friendly amp Simple formats KPI are designed such that the defined workflows for each of these indicators with appropriate trigger values will help track and monitor operations efficiently These are intended to come out as an effective output of the existing ITS system

EvolveRecommend Key Performance Indicators (KPI)

Opera

tio

ns s

tudy

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 15: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

FULLY ALLOCATED COST amp REVENUE MODEL

15

The objective was to study and arrive at the Operations and Maintenance (OM) cost amp revenue model for operations at

Mysore

The Model was designed to help MCTD determine and monitor scheduleroute-wise operational viability

OB

JE

CT

IVE

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 16: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

TYPICAL MODEL OUTPUT

16

Cost amp

Revenue M

odel

Typical model output showing schedule-wise cost and revenue break-up for a particular month

Various scenarios tested- exceeding project requirements

Schedule-wise operational viability optimum bus type Impact of new route added to sector effect of salary hike and farefuel price variations

Variable Cost

Fixed Cost

CPKM

EPKM

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 17: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

KEY TAKEAWAYS

17

Cost amp

Revenue M

odel To prepare a Fully Allocated Operation and Maintenance Cost amp Revenue

Model for MCTD Mysore

What does this mean to MCTD Currently MCTDKSRTC do not have an operating ldquocostrevenue modelrdquo The model would serve as a tool to track ldquooperational viabilityrdquo at the schedule

level Effects of change in serviceaddition of new route to sector could be tested ldquoTrade offsrdquo between SingleDouble crew can be tested Impacts of Salary hike FareFuel price variations could also be tested Performance of each Depot and the Division as a whole is available on a single

sheet Can act as an effective ldquoOperationalFinancial Dashboardrdquo

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 18: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

ROUTE PROFILE ANALYSIS

OB

JE

CT

IVE

Analyze all routes and schedules

Classify routes as performing and non-performing

Give suitable recommendations

Test recommendations by implementation

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 19: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

SAMPLE OUTPUTS FOR ROUTE 51 IN MAY 2014

19

0

200

400

600

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

No

of

Trip

s

Hours of the day

Hourly variation of No of Trips in May 2014

0

50000

100000

150000

200000

50

0

70

0

90

0

11

00

13

00

15

00

17

00

19

00

21

00

Re

ven

ue

Hours of the day

Hourly variation of Revenue in May 2014

0200400600800

1000

No

of

Trip

s

No of Trips for all days of week for May 2014

0

100000

200000

300000

400000

Re

ven

ue

Revenue for all days of week for May 2014

0

20

40

60

EPK

M

Hours of the day

Hourly variation of EPKM in May 2014

01020304050

EPK

M

EPKM for all days of week for May 2014

Route

pro

file

analy

sis

The routes and schedules are analyzed for each hour of the day to days across the week wrt their indicators

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 20: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

Screenshot of sector profile of routes catering from City Bus Stand (CBS) to south -Mysore named as the ldquoJP Nagarrdquo sector

20

Route

pro

file

analy

sis

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 21: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

KEY TAKEAWAYS

Page 21

Route

pro

file

analy

sis

To assist KSRTCMCTD on how to analyze and improve sector performance and efficiency

What does this mean to MCTD All routessub-routesschedules categorized into ldquosectorsrdquo based on their geographical location Each sector is analyzed individually and routes within are classified as performing and non-performing routes Optimization ldquosolution-toolkitrdquo recommended based on a detailed analysis of each schedule sector wise A new indicator called ldquoConsistency Indexrdquo developed to monitor consistency in sector performance over a period

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 22: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

BUSINESS PROCESS RE-ENGINEERING

22

OB

JE

CT

IVE

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 23: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

23

STRATEGY MAP

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 24: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

RECOMMENDATIONS- SHORT TERM

24

Busin

ess p

rocess r

e-e

ngin

eering

Planning amp Operations- Efficient planning tools

Information base- MIS reports

Operational aspects- improvements in reliability cancellation reduction punctuality

Human resources- training of personnel

Infrastructure- New proposals (bus stops) Depot level changes

Branding and communication- Advertising Sector Maps timetables- Information dissemination

Financial- Use of Cost ModelPT Model

Suggestions on new routes

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 25: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

RECOMMENDATIONS-MEDIUM TERM

Integrate ITS and Depot Computerization System (DCS) to bring about fundamental change from the current manual system to a system entirely based on GPS based inputs of computing vehicle kilometers and all other dependent processes of day to day operations

Staff training for the transition from manual systems to ITS based systems

Page 25

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 26: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

RECOMMENDATIONS-MEDIUM TERM

Designing a simple but effective dashboard for Depot Managers and Divisional Office authorities to follow operations statistics in a user friendly manner

Page 26

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 27: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

RECOMMENDATIONS-MEDIUM TERM

Consultations with RTO MCC MUDA Police

Regular interactions between major

stakeholders and consultants to improve

efficiency of operations

Stakeholder Interactions

Page 27

Busin

ess p

rocess r

e-e

ngin

eering

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 28: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

RECOMMENDATIONS ndash LONG TERM

Complaints and feedback mechanism - this can be worked out by providing online data-sheets and as well as Kiosks with touch screen mechanism with details of the trip bus no route no and timings and as well as ticket number

The smart card usage in fare collection process to be progressively introduced The key areas would be student passes various types of monthly passes etc

Page 28

Busin

ess p

rocess r

e-e

ngin

eering

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 29: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

PUBLIC TRANSPORT (PT) MODEL

Page 29

Links land use with transportation

Models city wide transportation-includes cars 2-wheelers auto-rickshaws and buses

Entire road network is included in the model on which all bus routes are coded

Conventional four stage transport modelling

Model tests changes in alignment merging of routes new routes extensions

Forecasts travel demand for future based on land use and employment development

Final set of recommendations to improve ridership

OB

JE

CT

IVE

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 30: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

OPTIONS TESTED

Page 30

Public

Tra

nspo

rt (

PT

) M

odel

Recommendation from Route

Analysis report

ABC Report ndash Performing amp Non-Performing Routes

MergingLinking of Routes

Testing of New Routes

Augmentation of Buses (2019)

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 31: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

KEY TAKEAWAYS

Page 31

Public

Tra

nspo

rt (

PT

) M

odel

The objective of the Public Transport Model is to predict the travel patterns and modal shares under different land-use and public transport scenarios

in order to test various options

What does this mean to MCTD Currently there is no ldquoModelling Toolrdquo available to plan the existing operations

and forecast the same to cater future needs This model considers changes in land use and travel patterns and also considers

the travel and competition from other modes and street congestion

This Planning tool gives an understanding of the ldquoOn-Groundrdquo situation both in the present and future

The model is capable of testing various scenarios which otherwise seem challenging to test in practical conditions

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 32: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

CSOA OUTPUTS

Page 32

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 33: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

NETWORK DIGITALISATION amp MANAGEMENT

Page 33 Innovations for Public Transport

Digitalize configure routes using mapping technology

Optimize non-commercial KMs and connectivity

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 34: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

TRAFFIC ANALYSIS

Page 34 Innovations for Public Transport

Statistical analysis of travel times depending on hour of the day

Based on real-time actual data (GPS or Manual)

-gt integrated into schedules production

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 35: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

DEMAND AND REVENUE ANALYSIS

Page 35 Innovations for Public Transport

Based on data collected from other sources (ticketing ITShellip)

Cross analysis to produce general dashboards

Detailed analysis to produce recommendations

Secured Web Access

Tablet smart phone for Managers

Full screen for presentations

Interactive features for planners

MIS and printing facilities

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 36: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

FEEL THE OUTPUT

Daily Operations result and control on your fingertips

Sector wise revenue performance on that day

Sector wise crew performance on that day

Sector wise vehicle performance on that day

Sector wise EPKM KMPL performance on that day

And much morehelliphelliphelliphellip

Page 36 Innovations for Public Transport

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 37: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

KEY PERFORMANCE INDICATORS

Page 37 Innovations for Public Transport

KPIs dashboards

(Revenue EPKM schedule adherencehellip)

Check latest data on real-time basis

By depot service route etchellip

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 38: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

DETAILED ANALYSIS FOR PLANNERS

Page 38 Innovations for Public Transport

Passenger traffic analysis

Bus load ridership per hour of the day

Calculate ideal frequencies based on actual data

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 39: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

SERVICES PRODUCTION

Page 39 Innovations for Public Transport

A world-wide standard for producing services to passengers

Visual and Automatic features

Scientific approach

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 40: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

RESOURCE ALLOCATION

Page 40 Innovations for Public Transport

Optimize allocation process

Streamline daily management

Advanced roster algorithms (to be customized for STUrsquos)

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 41: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

ENTERPRISE INTEGRATION (ERP)

Page 41 Innovations for Public Transport

Example of SAP Integration for Kuala Lumpur (2500 vehicles)

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 42: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

SYSTEM INTEGRATION

Page 42 Innovations for Public Transport

ITS PIS Ticketing CCTV

Real-time information alerts to central

Unique intelligent system on-board

Simple to use for driver conductor

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 43: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

AN EXAMPLE IN USING THE FEATURES

What do you need Solution

I need max revenue possible today with this crew and bus

Sure the software will calculate and analyse and will provide the route and schedule number and time to accomplish the objective

I need normal shifts only for this crew and bus Sure the software will calculate and analyse and provide the timings and route and schedule details accordingly

I need more EPKM with this crew and bus today Sure the software will calculate and analyse and provide the route and schedule details accordingly

I need to infuse this crew and bus in this particular route without negative equiilibrium in existing operation

Sure the software will help in producing the start time and end time along with expected travel time at sectional lengths in the route

I have a challenge I need to cater to a specific contract operation to carry x number of people and load factor between strong timelines with

Sure the software will produce the number of buses required for the lsquoxrsquo load factor with constant or needed frequency

I have challenge My dead run for 3000 buses is very high resulting with high loses

The software will help in reducing these significantly by easily calculating the last trip end location with the nearest night haltdepotetc with simulations and give options for effective precise decision

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 44: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

MCTD IMPLEMENTATION

Page 44

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 45: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

ROUTE 201

Mixed Volvo Ordinary

Revenues EPKM were good before implementation

Page 45

Route 201 Before After Savings

Vehicles 18 15 3 16

Crew 12 11 1 8

Overtime (hours) 26 6 20 77

Duty hours 170 145 25 15

kilometres 1570 1400 170 11

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 46: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

ROUTE 201 REVENUES AND EPKM

SL

MONTH YEAR

NOOF

DESTINATION

EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 16

Chamundi Hill

94000 4352228 4630 1354

2012 17 100612 4102745 4078

2 JUNE 2013 14

Chamundi Hill

85856 3766165 4387 1840

2012 17 99954 3703189 3705

3 JULY 2013 14

Chamundi Hill 91859 4039295 4397

2919 2012 17 107041 3643469 3404

4 AUGUST 2013 13

Chamundi Hill 82414 3565672 4327

4207 2012 17 106054 3229813 3045

Page 46

First scenario

Second scenario

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 47: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

CROSS-ROUTE FREQUENCIES

Frequencies rationalized at all important nodes sections detected with ticketing analysis

-gt Cross-route schedule rationalization is impossible manually

Page 47

CBS

KRS

Srirangapathna 303

307

Pump house Important nodes for frequency rationalization

303 307

Central section

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 48: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

ROUTE 303 REVENUES AND EPKM

Page 48

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 23

KRSagara 181691 4593397 2528

722 2012 21 169804 4003892 2358

2 JUNE 2013 23

KRSagara 186765 4603817 2465

1442 2012 21 161725 3484251 2154

3 JULY 2013 23

KRSagara 194134 5050910 2602

2257 2012 21 170368 3616356 2123

4 AUGUST 2013 23

KRSagara 195228 5013988 2568

2152 2012 21 167336 3536454 2113

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR THE WEEK

2013 20 KRSagara

40300 1169931 2903 2251

2012 21 39045 925173 2370

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 49: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

ROUTE 307 REVENUE AND EPKM

Page 49

KSRTC MYSORE CITY TRANSPORT DIVISIONMYSORE SL

MONTH YEAR NOOF

DESTINATION EFF

REVENUE EPKM EPKM

GROWTH NO SCH KMS

1 MAY 2013 11

PallahalliSRPatana 78924 1930422 2446

212 2012 10 72617 1739209 2395

2 JUNE 2013 11

PallahalliSRPatana 84763 2059990 2430

755 2012 11 77436 1749859 2260

3 JULY 2013 11

PallahalliSRPatana 88056 2094276 2378

1012 2012 10 73345 1584069 2160

4 AUGUST 2013 11

PallahalliSRPatana 87315 2104108 2410

1832 2012 10 71651 1459243 2037

AFTER IMPLEMENTATION OF LUMIPLAN FORECASTED RESULTS FOR WEEK

2013 10

PallahalliSRPatana 18763 490952 2617

2847 2012 10 16718 340490 2037

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 50: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

INITIAL PROJECT EXPECTATIONS - KSRTC

This innovative system to be demonstrated for first time in India

To understand if such solution could be integrated into KSRTC

operations

To understand if the system could bring value to the organization

A measurable growth in terms of revenue EPKM and optimization

expected to be in the range of 2-5

A measurable enhancement of Passenger Service in terms of

waiting times and schedule adherence

To assist Traffic team and develop scientific based route process

50

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 51: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

5 RESULTS ACHIEVED

Page 51

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 52: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

PROJECT BENEFITS ACHIEVED ON THREE

ROUTES ONLY

28 loss making crew members saved and utilized in higher potential areas

7 loss making buses saved and utilized in higher potential areas

Vehicle utilization increased from 2475km to 2517km

Crew utilization increased from 663kmemployee to 682kmemployee

Daily 2000 additional km generated fetching an average EPKM of INR 30

resulting in daily increased revenue of atleast INR 60000

10 new general shifts explored in new potential areas with existing

resources

37 OT hours reduced (approx INR 7000day)

52

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 53: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

PROJECT BENEFITS ACHIEVED CONTD

Kilometers saved ndash 1555 non earning KMs saved (approx INR 15550day)

CPKM reduced because of increase in avg vehicle amp crew utilization

Operational cost saved on 7 schedules

A Minimum of at least INR 85000day for three routes generated directly

from Lumiplanrsquos Innovative solution

53

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 54: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

BMTC PHASE 1 RESULTS

Page 54

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 55: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

BMTC RESULTS FOR 3 ROUTES

Page 55

Total Abstract of Revenue Achievement for the month of October 2014

Route No No of

Schedules Increase in Revenue

per month (INR) Increase in Revenue

per day (INR) Remarks

401M 28 93531931 3017159 October-14

298M 15 50710812 2414801 October -14

500D (O) 34 117715614 3797277 October-14

500D (V) 50 194009424 6258368 October-14

Total 127 455967781 1548760

Increase in Revenue per Bus per Day (INR) 121950

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 56: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

5 STAFF REACTION

Page 56

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 57: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

5 ASRTU EMPANELMENT

Page 57

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 58: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

CENTRAL EMPANELMENT

ASRTU ndash The umbrella corporation where most of the Public bus road transport corporations are members

Key Points

The empanelment is a proven and official route where many transport corporations

procure solutions and award projects through the empanelment window

This empanelment by ASRTU has taken nearly 6 months going through a thorough

exercise by the industry experts IISC professors RTC members and other

experienced staff in choosing the solution providers

EMPANELMENT

58

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 59: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

RECOGNITIONS FOR INNOVATIONS IN INDIA

59

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 60: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

Commuter related

1 Corporation providing more service to commuters with existing resources

2 Buses available as per commuter demand and need

3 New routes explored through saved buses thereby reaching out to new destinations with wider bus network coverage

4 Bus bunching avoided

5 Reduction in travel time

6 Schedule adherence efficiency and reliability increased

7 Better planned life using BMTC buses

8 General Traffic reduced

RouteSchedule related

1Route Optimization with existing resources achieved with immediate results

2 New Route coverage and connectivity

3 Increased RouteSchedule revenue with immediate results

4 Clear Headway Limits

5 Minimised operating costs on route with immediate results

6 Route Overlap utilised and optimised to better productivity with existing resources itself

7 Excellent tool for the traffic team in utilising resources (both bus and staff) through simulation techniques

DivisionDepot related

1 Immediate effect of reduction in losses increase in profits

2 Project Payment on financial perfomance

3 Vehicle utilisation enhanced

4 Crew utilisation enhanced

5 Over time minimised

4 EPKM increased

5 Revenue to Cost Ratio increased

7 Diesel consumption for same number of routes reduced

8 Wider coverage network with existing buses and staff

9 Overall optimisation increased significantly

Project advantages

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves

Page 61: Comprehensive Service & Operational Analysis (CSOA) · and bus Sure, the software will calculate and analyse and will provide the route and schedule number and time to accomplish

THANK YOU

Page 61

Shan Venkat

Lumiplan ndash CEO

Mobile = +91 9741 969696 Email = shanvenkatlumiplancom

Public transport can play a stronger role with a brighter future when it understands the market it serves