TRANSCRIPT

  • 8/16/2019 Compro & Project List Ezone

    1/14

    3/29/2016

    1

    R3

     The Winner ofINDONESIA ENERGY 2013

     and ASEAN ENERGY AWARDS 

    2004 ~2014 

    Berdiri Tahun 1997

    Start Production 2000

    Men-spesialisasi-kan pada HVAC

    Kondisi Daerah Tropis

    RUMAH SAKIT / LABORATORIUM / BSL 1~ 3

    FACTORY PHARMACY/ F&B /

    SERVER COMPUTER / MALL /

    OFFICE / HOME

    Comply DEPKES 2012

    INDOOR UNIT

    Comply ASHRAE 2007 ~ 2012

    Comply JCI (Joint Commission International)

    INPRES No.13/2011 (Konservasi Energy)

    by  :[email protected]

    R3

    Parameter Clean Room

     The Winner ofINDONESIA ENERGY 2013

     and ASEAN ENERGY AWARDS 

    2004 ~2014 

    1. Temperature

    2. Humidity

    3. Class Cleanness

    4. Pressure Room

    5. Air Ventilation (Outside Air)

    6. Air Distribution (Laminar)

    7. Vibration / Sound8. Light

    UNIT AHU

    Negative

    by  :[email protected]

  • 8/16/2019 Compro & Project List Ezone

    2/14

    3/29/2016

    2

    R3

    AC CONVENTIONAL

    TIDAK DAPAT DI PAKAIPADA RUANG CLEAN ROOM

    (RUANG OPERASI / KHUSUS)

    - Temperature (Only)  di Control

    - Humidity, Tidak di control

    - Class Cleanness 

    Tidak di control

    - Pressure Room  Tidak di control

    - Outside Air    Tidak di control

    - Kekuatan Daya Dorong Fan Indoor < 500 Pascal

    Untuk Clean RoomKebutuhan daya dorong Fan >1000 Pascal, agar 

    bisa menembus hambatan di:

    a. Pre Filter 

    b. Medium Filter 

    c. Hepa Filter 

    d. Cooling Coil

    e. Saluran udara (Ducting) & Belokkan-belokkan-nya

    ILLUSTRASI

    AC CONVENTIONAL

    by  :[email protected]

    PEMBAGIAN ZONE SARANA RUANG

    OPERASI RUMAH SAKIT

    by  :[email protected]

  • 8/16/2019 Compro & Project List Ezone

    3/14

    3/29/2016

    3

    by  :[email protected]

    R3

    Professional ExperiencePENYUSUN

    Pedoman Teknis Ruang Operasi Rumah Sakit 2012

    KEMENKES RI - Bandung

    NARASUMBER

    1. Kongres Himpunan Ahli Teknik PerumasakitanIndonesia

    (HATPI) 2014-Bidakara untuk Tata Udara Rumah Sakit

    2. Seminar Pedoman Teknis Prasarana Tata Udara

    Rumah Sakit 2014 Hotel Harris-Jakarta

    - Balai PengamananFasilitas Kesehatan (BPFK)

    - KEMENKES

    a. Permenkes RI NO. 530 Tahun 2007

    b. UUD RI. No. 44 Tahun 2009 Tentang Rumah Sakit

    c. Permenkes RI. No. 2351/Menkes/PER/2011

    Salah satunya mengenai Pengujuan & Kalibarasi

    Sarana & Prasarana Kesehatan

    ORGANIZATION

    - ASHRAE Indonesia Chapter - As a Founder 

    - IAFBI (IkatanAhli Fisika & Bangunan Indonesia) - As a Founder 

    - HATUR (Associate of Indonesia Air Cond’ Eng’)- As a Founder 

    - Green Building Council Indonesia (GBCI) – As a Core Founder 

    - Present Indonesia as aboard of Judge for ASEAN Energy Awards

    AWARDS:

    - INDONESIA ENERGY AWARD 2013

    - ASEAN ENERGY AWARD 2004, 2007, 2008, 2009, 2011, 2012, 2014

    - Lain-lain

     The Winner ofINDONESIA ENERGY 2013

     and ASEAN ENERGY AWARDS 

    2004 ~2014 

    UNIT AHU

    by  :[email protected]

  • 8/16/2019 Compro & Project List Ezone

    4/14

    3/29/2016

    4

    PATENTS

    Passive Heat Pipe

    Functions:

    - Cooling & Dehumidifying

    - Menurunkan Humidity

    Application:

    - for System AHU & DX

    - for Comfort Zone

    Active Heat PipeFunctions:

    - Cooling & Dehumidifying

    - Mengendalikan Humidity &

    Temperature

    Application:

    - for System DX Only

    - for Comfort Zone & Special Design

    AHU VariableFunctions:

    - Cooling & Dehumidifying

    - Mengendalikan Humidity &

    Temperature

    Application:

    - for System AHU Only

    - for Comfort Zone & Special Designby  :[email protected]

    FAN INDOOR 

    (PLUG FAN)PLUG FAN

     ADVANTAGES

    ‐  High

     Efficiency 

     > 70%

    ‐   No Fan Belt‐   Clean Operation‐   Low Maintenance‐   Variable Speed Drive‐   Pressure Transducer

    by  :[email protected]

  • 8/16/2019 Compro & Project List Ezone

    5/14

    3/29/2016

    5

    EquatorialZone FRESH THE WORLD

    HEAT PIPEPRE-COOL

    COOLINGCOIL

    AIR CONDITIONING WITH HEAT PIPE

    1st 

    Patent No. P 002 004 00227

    WATER

    CONDENSATION

    COOL&

    DRY AIR

    I N27°C

    RH 50%

    17°CRH 80%

    HEAT PIPERE-HEAT

    13°CRH 95%

    23°CRH 60%

    EquatorialZone FRESHTHEWORLD ACTIVE-HEAT PIPE

    PRE-COOL

    COOLINGCOIL

    AIR CONDITIONING WITH ACTIVE HEAT PIPE

    2nd 

    Patent No. P 002 005 00234

    WATER

    CONDENSATION

    COOL&

    DRY AIR

    I N27°C

    RH 50%

    17°CRH 80%

    ACTIVE-HEAT PIPERE-HEAT

    13°CRH 95%

    23°CRH 60%

    SELENOIDVALVE

    COMPARISON

    AC CONVENTIONAL, AC with ELECTRIC HEATTER

    AC with PASIVE HEAT PIPE & AC with ACTIVE HEAT PIPE

    KONSERVASI

    ENERGYI

    KONSERVASI

    ENERGYI

    I N

    27°C

    RH 50%

    COOL

    &

    HUMID AIR

    15°C

    RH 90%

    CONVENTIONAL AIR CONDITIONING

    WATER

    CONDENSATION

    COOLING

    COIL

    SAVING

    ENERGY

    UP TO 20%

    SAVING

    ENERGY

    UP TO 40%

    by  :[email protected]

    EquatorialZone FRESH THE WORLD

    HEAT PIPEPRE-COOLH E A T P I P E

    R E - H E A T

    COOLINGCOIL

    SHF= 0.6

    SensibleHeat60%

    LatenHeat40%

    Pre-CoolRe-Heat

    Temperature INLETHOT & HUMID

    (High Moisture Content)

    Temperature OUTLETCOOL & DRY

    (Low Moisture Content) DEW POINT

    LOAD DIAGRAM (Ezone - HEAT PIPE)

    Equatorial Zone FRESHTHE WORLD

    SensibleHeat80%

    LatenHeat20%

    Temperature INLETHOT & HUMID

    (High Moisture Content)

    Temperature OUTLETCOOL & Humid

    (High Moisture Content)

    DEWPOINT

    (With Heat-Pipe)

    LOAD DIAGRAM (Conventional Air-Con)

    COOLINGCOIL

    SHF= 0.8

    DEWPOINT

    (Conventional)

    Conventional

    Load diagram

    General Air Conditioning

    Load diagram

     Air Conditioning

    With ACTIVE HEAT PIPE

    Load diagram

     Air Conditioning

    With ACTIVE HEAT PIPE

    SAVING ENERGY

    UP TO 40%

    BLUE Line :

    RED Line :

    by  :[email protected]

  • 8/16/2019 Compro & Project List Ezone

    6/14

    3/29/2016

    6

    illustrasi System AC Conventional

    Clean Room (Class 100.000 atau lebih )

    AC + PORTABLE Dehumidifier 

    by  :[email protected]

    illustrasi System AC Conventional

    Clean Room (Class 100.000 atau lebih )

    AC + DEHUMIDIFIER

  • 8/16/2019 Compro & Project List Ezone

    7/14

    3/29/2016

    7

    illustrasi System AC Conventional

    Clean Room (Class 100.000 atau lebih )

    AC + ELECTRIC HEATER

    by  :[email protected]

    illustrasi System AC MODERN

    Clean Room (Class 100.000 atau lebih )

    AC + ACTIVE HEAT PIPE (Tanpa Elec’ Heater & Tanpa Dehunidifier)

    SAVING

    ENERGY

    UP TO 40%

  • 8/16/2019 Compro & Project List Ezone

    8/14

    3/29/2016

    8

    No Name Application Room (Actual) Cleanness TahunTEMP(°C) RH (%) Pressure Class

    1 RS. Jantung Harapan Kita OT-1, 2, 3 Preparation 20 ~ 23 53 ~ 58 Positive 100K 2005

    2 RSUD. Dr. Soetomo Phase 1 23 ~ 25 55 ~ 60 - General 2006

    3 RSUD. Dr. Soetomo Phase 2 23 ~ 25 55 ~ 60 - General 2007

    4 RSUD. Dr. Soetomo Phase 3 23 ~ 25 55 ~ 60 - General 2008

    5 RSCM MRI 19 ~ 23 51 ~ 57 Positive - 2006

    6 RS. Sari Asih OT-1 22 ~ 23 52~ 56 Positive 100K 2004

    7 RS. Mayapada OT-1 21 ~ 23 52 ~ 57 Positive 100K 2004

    8 RSUD Abdoel Muloek All Building (OT-1, 2, 3 ,4) 22 ~ 25 50 ~ 60 Positive 100K 2007

    9 RS. Eka Hospital-BSD OT-1, 2,3,4, MRI, Angio 19 ~ 23 48 ~ 57 Positive 100K 2008

    10 RS. Eka Hospital-RIAU OT-1, 2,3,4, MRI, Angio 20 ~ 23 48 ~ 57 Positive 100K 2008

    11 RS. A.W. SJAHRANIE OT-1 & OT-2 18 ~ 23 48 ~ 57 Positive 100K 2007

    12 KMN - Kebon Jeruk Lasik, OT-1, OT-2 20 ~ 22 50 ~ 58 Positive 100K 2005

    13 KMN - Manado Lasik, OT-1, OT-2 20 ~ 22 50 ~ 57 Positive 100K 2007

    14 KMN - Semarang Lasik, OT-1, OT-2 20 ~ 22 50 ~ 58 Positive 100K 2010

    15 KMN - Lebak Bulus Lasik, OT-1, OT-2, OT-3 20 ~ 22 50 ~ 57 Positive 100K 2012

    16 RS. Pantai Indah Kapuk Office 23 ~ 25 55 ~ 60 - General 2006

    17 RS Medistra OT-1 21 ~ 23 52 ~ 57 Positive 100K 200718 BPOM LAB-1, 2,3 22 ~ 23 52 ~ 58 Positive 100K 2012

    19 RS Wahidin - Makasar   LAB BSL-3 23 ~ 24 54 ~ 58 Negative 100K 2008

    20 RS Wahidin - Makasar OT-1, OT2, OT3 OT4 22 ~ 23 56 ~ 58 Positive 100K 2009

    21 RS Hasanudin LAB BSL-3 23 ~ 24 54 ~ 58 Negative 100K 2010

    22 RS Cinere OT-1 22 ~ 23 52~ 56 Positive 100K 2006

    23 RS. Omni OT-1 & OT-2 20 ~ 23 52~ 56 Positive 100K 2007

    24 RS ST Carolus - BSD All Building (OT-1, OT2) 22 ~ 23 52~ 56 Positive 100K 2012

    25 Bio Farma Vaksin Flue Burung 21 ~ 23 53 ~ 56 Positive 10K 2008

    26 Dankos Penychilin, Non Betalactam 20 ~ 24 50~ 55 Positive 100K 2008

    Project List for Clean Room (Heat Pipe)

    by  :[email protected]

    Project List for Clean Room (Heat Pipe)Cleanness Tahun

    TEMP(°C) RH (%) Pressure Class

    27 Vision Indonesia Optical Factory - Clean Room 20 ~ 23 20 ~ 40 Positive 100, 10K, 100K 2012

    28 J E C- Kedoya 2 LASIK & 7 OT 20 ~ 23 45 ~ 55 Positive 10K & 100K 2012 - JCI

    29 BIMCHospital-BALI 3 OT, 2 ISOLATION 21 ~ 23 50 ~ 55 Positive 100K 2012 - JCI

    30 RS Betshaida-Serpong 4 OT& 1 CSSD 20 ~ 22 51 ~ 55 Positive 100K 2012

    31 Kopi Kapal Api - Phase 1 Mixer, Weighing, Mixing, 24 ~ 25 45 ~ 55 Positive 100K 2012

    32 Kopi Kapal Api - Phase 2 Filling, Top Pack 23 ~ 25 46 ~ 55 Positive 100K 2013

    33 Klinik Mata Solo (JEC) 1 LASIK 20 ~ 23 45 ~ 55 Positive 10K & 100K 2013

    34 Jakarta Heart Centre OT-1, OT2, Cathlab 1,2,3 21 ~ 24 46 ~ 55 Positive 10K & 100K 2013

    35 BBPHSOH Basler & Hofmann Labs BSL -3 20 ~ 23 45 ~ 55 Negative 100K 2013

    36 RS Siloam-Lippo Vilage RSUS-OT-5 20 ~ 22 50 ~ 53 Positive 100K 2014

    37 RS Siloam-Balikpapan 2 x Mayor, Minor, ICU, Recov 20 ~ 22 49 ~ 52 Positive 100K 2014

    38 RS Siloam-Cinere OT1 20 ~ 22 49 ~ 52 Positive 100K 2014

    39 RS Colombia ASIA OR1,2,3, ORDept, ICU, MRI, CT 19 ~ 22 51 ~ 55 Positive 100K 2014

    40 RSUDJawa Timur OT1 ~ OT7 included Spolhook Positive 100K 2014

    41 RSUP Hadilukito-Yogyakarta All Building Positive 100K 2014

    42 Mayora Beverages Positive 100K 2014

    43 RSUDDharmais Rawat Inap & Clean Room Positive 100K 2014

    44 RS Siloam-Purwakarta OT1, 2, 3, Corridor, Clean R 22 ~ 23 53 ~ 55 Positive 100K 2014

    45 RS Al Irsyad-Surabaya OT1 19 ~ 22 51 ~ 55 Positive 10K 2014

    46RSUD Mata Nasiaonal

    Cicendo-Badung

    OK Isolasi, OK 2, 3, 4, 5, 6, 7, 8, 9,

     Ante, Coridoor, Steril, Anastesi,

    Recovery, Admin

    19.5 ~ 22 50 ~ 53Positive &

    Negative100K 2014

    Under Installation

    Under Installation

    Under Design

    No Name ApplicationRoom(Actual)

    Tender Ezone Design

    by  :[email protected]

  • 8/16/2019 Compro & Project List Ezone

    9/14

    3/29/2016

    9

    Project List for Clean Room (Heat Pipe)

    C leann ess T ah un

    TEMP(°C) RH (% ) Pressure Class

    47 RSUP Jantung Harapan Kita OK C 21 ~ 22 52 ~ 56 Positive 100K 2014

    48 RSUD Jakarta Selatan Cooridor, Preparations & Others 22 ~ 23 52 ~ 58 Positive - 2015

    49 RSUD CIAWI ICU 23 ~ 23 53 ~ 58 Positive - 2016

    50 RSUD CIAWI ISOLATION (NEGATIVE) + ANTE Negative - 2016

    51 MMC - JAKARTACath Lab, OT Mayor, OT Minor, Kor

    Bersih21 ~ 22 50 ~ 56 Positive 100K 2016

    52 RSUD KOJA 4 OT, Korifor bersih, Pre & Post Op Positive 100K 2016

    53 RS UD A RIF IN A CHMA D-P KU 6 OT Mayor dan & IS OLA SIPositive &

    Negative100K 2016

    54Others Factory, Hospital, Lab,

    Food, PharmacyClean Room

      Positive

    &

    Negative

    10K ~ 100K

      2016

    ~

    2017

    Ezone Design (Tender)

    No Name ApplicationRoom (Actual)

    Under Instalatation

    Under Instalatation

    Under Instalatation

    UNITINDOOR 

     www.ac‐ezone.com

    by  :[email protected]

    RS Limijati‐Bandung

    3 Ruang OK 

    RuangFertilisasi

    RuangEmbryology

  • 8/16/2019 Compro & Project List Ezone

    10/14

    3/29/2016

    10

    JAKARTA EYE CENTRE

    KEDOYA

    Terdapat 9 Ruang OT

    JAKARTA EYE CENTRE

    KEDOYA

    Corridor

    OT Room

  • 8/16/2019 Compro & Project List Ezone

    11/14

    3/29/2016

    11

     AC - R. ISO

    R. ISOPanel ACT: 23.8⁰C

    RH: 54%

    AC-R.OTR.OT

    (under Installation) R. Preparation

    Nusa DuaBali

    - 3 R.OT,

    - 2 Sterile

    - 2 ISO

    OK-1

    Ruang

    - OK1, 20HP

    - OK2 ,18HP

    - CATLAB, 18HP

    OK-2

  • 8/16/2019 Compro & Project List Ezone

    12/14

    3/29/2016

    12

    EKA HOSPITAL-BSD EKA HOSPITAL-PEKANBARU

    Ruang MRI

    OK 

    OK 

    Serpong

    Depan Belakang

    OK   ANGIO

    Controol AC

     AHU- DX -Active Heat Pipe-Plug Fan Indoor

    Positive Pressure

    CT Scan

    DANKOS ‐ JAKARTA

  • 8/16/2019 Compro & Project List Ezone

    13/14

    3/29/2016

    13

    PT. GARUDA FOOD

    SURABAYA

    Replacement Roof TopFor SWGR –Room

    BP-West Java

    (Class 1 Div 2, Group C&D)

  • 8/16/2019 Compro & Project List Ezone

    14/14

    3/29/2016

    14

    BP West JavaZulu F/S

     Air Conditioning

    BP West JavaPapa F/S

    BP West JavaPapa F/S

    BP West JavaMMC SWGR-ROOM

    Terima Kasih