Page 1: Conference call presentation 2 q10

2Q10 Results

08-13-10

Page 2: Conference call presentation 2 q10

Disclaimer

The material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries

(collectively, “MPX” or the “Company”) as of the date of the presentation. It is information in summary form and does not purport

to be complete. No representation or warranty, express or implied, is made concerning, and no reliance should be placed on, the

accuracy, fairness, or completeness of this information.

This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views

and/or expectations of the Company and its management with respect to its performance, business and future events. Forward

looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results,

performance or achievements, and may contain words like “may”, “plan”, “believe”, “anticipate”, “expect”, “envisages”, “will likely

result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties and

assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans,

objectives, expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its

affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including

investors) for any investment or business decision made or action taken in reliance on the information and statements contained

in this presentation or for any consequential, special or similar damages.

2

in this presentation or for any consequential, special or similar damages.

This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities.

Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever.

Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients

should consult their own advisors in this regard.

The market and competitive position data, including market forecasts, used throughout this presentation were obtained from

internal surveys, market research, publicly available information and industry publications. Although we have no reason to believe

that any of this information or these reports are inaccurate in any material respect, we have not independently verified the

competitive position, market share, market size, market growth or other data provided by third parties or by industry or other

publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such

information.

This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or

in part without MPX’s prior written consent.

Page 3: Conference call presentation 2 q10

Table of Contents

Power Plants Under Construction

MPX 2Q10 Highlights & Subsequent Events

Financial Performance

3

Financial Performance

Natural Gas

Page 4: Conference call presentation 2 q10

Drilling of well OGX-16 in Parnaiba Basin initiated in early July

and gas identified in early August;

Environmental license granted to MPX Parnaíba power

generation complex, to provide up to 1.8 GW of power;

MPX 2Q10 Highlights & Subsequent Events

Power plants under construction (1440 MW): EPC progressing

according to schedule, within contractual deadlines;

Director of Mining and Natural Resources appointed;

Licensing of open-pit mines and port in Colombia progress according to

schedule

Page 5: Conference call presentation 2 q10

Power Plants Under Construction

73%

0%

20%

40%

60%

80%

100%

Jan

/08

Ap

r/0

8

Jul/

08

Oct

/08

Jan

/09

Ap

r/0

9

Jul/

09

Oct

/09

Jan

/10

Ap

r/1

0

Jul/

10

Oct

/10

Jan

/11

Ap

r/1

1

Jul/

11

Oct

/11

Jan

/12

Construction works progressing according to

schedule

Energia PecémEnergia Pecém

Capacity

(MW)

PPA

Start Date

Start-up

Date

Energia Pecém 720 JAN12 3Q11/ 4Q11

MPX Pecém II 365 JAN13 2Q12

MPX Itaqui 360 JAN12 4Q11

5

71%

0%

20%

40%

60%

80%

100%

Jan

/08

Ap

r/0

8

Jul/

08

Oct

/08

Jan

/09

Ap

r/0

9

Jul/

09

Oct

/09

Jan

/10

Ap

r/1

0

Jul/

10

Oct

/10

Jan

/11

Ap

r/1

1

Jul/

11

Oct

/11

Jan

/12

Jan

/08

Ap

r/0

8

Oct

/08

Jan

/09

Ap

r/0

9

Oct

/09

Jan

/10

Ap

r/1

0

Oct

/10

Jan

/11

Ap

r/1

1

Oct

/11

Jan

/12

59%

0%

20%

40%

60%

80%

100%

No

v/0

8

Feb

/09

Ma

y/0

9

Au

g/0

9

No

v/0

9

Feb

/10

Ma

y/1

0

Au

g/1

0

No

v/1

0

Feb

/11

Ma

y/1

1

Au

g/1

1

No

v/1

1

Feb

/12

Ma

y/1

2

Au

g/1

2

No

v/1

2

MPX Pecém IIMPX Pecém IIMPX ItaquiMPX Itaqui

“Early” progress curve “Late” progress curve Actual progress curve OBS: June 2010

Page 6: Conference call presentation 2 q10

Power Plants Under Construction

MPX Itaqui(360 MW)

6

Energia Pecém &

MPX Pecém II (1080 MW)

Energia Pecém &

MPX Pecém II (1080 MW)

Page 7: Conference call presentation 2 q10

Power Plants Under Construction

Power Plant Capex (R$ billion)

Energia Pecém* 1.30

MPX Pecém II 1.28

MPX Itaqui 1.62100%

2%

11%

52%60,0%

80,0%

100,0%

120,0%

Curva de Desembolso de

Capex 2007 - 2012

R$ 4,2 bi

Capex Disbursement

Curve 2007-2012

7

MPX Itaqui 1.62

Total 4.20

100%

20%

1% 15%0,0%

20,0%

40,0%

2007A 2008A 2009A 2010E 2011E 2012E Total *Considering MPX 50% stake in Energia Pecém

Consolidated Gross Debt: R$ 1.8 billion

LT: R$ 1.5 billion

ST: R$ 0.3 billion

(As of March 31, 2010)

Page 8: Conference call presentation 2 q10

In 2Q10, MPX reported a net loss of R$ 53.6 million, mainly due to a net financial loss

of R$ 27.0 million.

Financial Performance

Controladora Consolidado

R$ million 2Q10 2Q09 % Var 2Q10 2Q09 % Var

Net Operating Revenues - - - 22.6 13.0 74.6%

Operating Costs - - - (16.5) (7.7) 114.7%

Operating Expenses (24.1) (22.4) 7.4% (47.2) (44.3) 6.5%

G&A (23.6) (22.3) 5.6% (42.8) (42.8) -0.2%

8

G&A (23.6) (22.3) 5.6% (42.8) (42.8) -0.2%

Depreciation e Amortization (0.1) (0.1) 14.1% (1.8) (1.5) 22.1%

UTE Porto do Açu Rental (0.4) - - (2.6) - -

Net Financial Result 23.0 (16.8) -237.0% (27.0) (51.3) -47.3%

Equity Income (64.6) (37.8) 70.7% (4.1) 0.0 -

Other Revenues/(expenses) 7.0 0.1 13492.2% (12.9) (0.5) 2682.7%

Current and deferred taxes 5.0 (4.2) - 31.8 9.6 230.0%

Minority interests - - - (0.3) 0.0 -

Net Income (53.6) (81.2) -34.0% (53.6) (81.2) -34.0%

Page 9: Conference call presentation 2 q10

Parnaíba Basin: High Potencial for Gas

MPX identified gas in well OGX-16 in the onshore Parnaíba Basin. A drill stem test indicated

high pressure levels.

First 10 meters in the Devonian Section (at 1,654 m) with significant gas shows;

20 new prospects already mapped with seismic data recently acquired;

5 of the new prospects located in the same trend of the discovery;

Drilling of well OGX-16 expected to continue to a maximum depth of 3,450 m

99

Low exploration costs

- Onshore blocks

Low transportation

costs to supply

integrated thermal

plants

Low exploration costs

- Onshore blocks

Low transportation

costs to supply

integrated thermal

plants

Page 10: Conference call presentation 2 q10

The Parnaíba Integrated Gas & Power Project

Ownership StructureOwnership Structure

MPX will develop gas-fired plants that may add up to 1,863 MW, strategically located on the

PN-T-68 block at 50 km from a 500 kW substation and 30 km from water supply.

OGX

OGX

2/31/3

Licensing

Preliminary License

Granted

MPX Parnaíba

Substation

50 Km

River

30 Km

Site MPX

1010

OGXMaranhão

PETRA

Blocos Exploratórios

UTE

70% 30% 30% 70%

Page 11: Conference call presentation 2 q10

Execution of projects contracted in line with initial planning,

with original returns preserved;

Main milestones for establishment of MPX Parnaíba

generation complex accomplished (license + gas identified);

MPX – Closing Remarks

MPX Sul project completely structured (license + EPC +

financing structure) and ready for the sale of power;

Licensing and engineering studies for Phase I of MPX Colombia

progressing as planned (port + 2 open-pit mines).