2Q10 Results
08-13-10
Disclaimer
The material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries
(collectively, “MPX” or the “Company”) as of the date of the presentation. It is information in summary form and does not purport
to be complete. No representation or warranty, express or implied, is made concerning, and no reliance should be placed on, the
accuracy, fairness, or completeness of this information.
This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views
and/or expectations of the Company and its management with respect to its performance, business and future events. Forward
looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results,
performance or achievements, and may contain words like “may”, “plan”, “believe”, “anticipate”, “expect”, “envisages”, “will likely
result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties and
assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans,
objectives, expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its
affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including
investors) for any investment or business decision made or action taken in reliance on the information and statements contained
in this presentation or for any consequential, special or similar damages.
2
in this presentation or for any consequential, special or similar damages.
This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities.
Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever.
Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients
should consult their own advisors in this regard.
The market and competitive position data, including market forecasts, used throughout this presentation were obtained from
internal surveys, market research, publicly available information and industry publications. Although we have no reason to believe
that any of this information or these reports are inaccurate in any material respect, we have not independently verified the
competitive position, market share, market size, market growth or other data provided by third parties or by industry or other
publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such
information.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or
in part without MPX’s prior written consent.
Table of Contents
Power Plants Under Construction
MPX 2Q10 Highlights & Subsequent Events
Financial Performance
3
Financial Performance
Natural Gas
Drilling of well OGX-16 in Parnaiba Basin initiated in early July
and gas identified in early August;
Environmental license granted to MPX Parnaíba power
generation complex, to provide up to 1.8 GW of power;
MPX 2Q10 Highlights & Subsequent Events
Power plants under construction (1440 MW): EPC progressing
according to schedule, within contractual deadlines;
Director of Mining and Natural Resources appointed;
Licensing of open-pit mines and port in Colombia progress according to
schedule
Power Plants Under Construction
73%
0%
20%
40%
60%
80%
100%
Jan
/08
Ap
r/0
8
Jul/
08
Oct
/08
Jan
/09
Ap
r/0
9
Jul/
09
Oct
/09
Jan
/10
Ap
r/1
0
Jul/
10
Oct
/10
Jan
/11
Ap
r/1
1
Jul/
11
Oct
/11
Jan
/12
Construction works progressing according to
schedule
Energia PecémEnergia Pecém
Capacity
(MW)
PPA
Start Date
Start-up
Date
Energia Pecém 720 JAN12 3Q11/ 4Q11
MPX Pecém II 365 JAN13 2Q12
MPX Itaqui 360 JAN12 4Q11
5
71%
0%
20%
40%
60%
80%
100%
Jan
/08
Ap
r/0
8
Jul/
08
Oct
/08
Jan
/09
Ap
r/0
9
Jul/
09
Oct
/09
Jan
/10
Ap
r/1
0
Jul/
10
Oct
/10
Jan
/11
Ap
r/1
1
Jul/
11
Oct
/11
Jan
/12
Jan
/08
Ap
r/0
8
Oct
/08
Jan
/09
Ap
r/0
9
Oct
/09
Jan
/10
Ap
r/1
0
Oct
/10
Jan
/11
Ap
r/1
1
Oct
/11
Jan
/12
59%
0%
20%
40%
60%
80%
100%
No
v/0
8
Feb
/09
Ma
y/0
9
Au
g/0
9
No
v/0
9
Feb
/10
Ma
y/1
0
Au
g/1
0
No
v/1
0
Feb
/11
Ma
y/1
1
Au
g/1
1
No
v/1
1
Feb
/12
Ma
y/1
2
Au
g/1
2
No
v/1
2
MPX Pecém IIMPX Pecém IIMPX ItaquiMPX Itaqui
“Early” progress curve “Late” progress curve Actual progress curve OBS: June 2010
Power Plants Under Construction
MPX Itaqui(360 MW)
6
Energia Pecém &
MPX Pecém II (1080 MW)
Energia Pecém &
MPX Pecém II (1080 MW)
Power Plants Under Construction
Power Plant Capex (R$ billion)
Energia Pecém* 1.30
MPX Pecém II 1.28
MPX Itaqui 1.62100%
2%
11%
52%60,0%
80,0%
100,0%
120,0%
Curva de Desembolso de
Capex 2007 - 2012
R$ 4,2 bi
Capex Disbursement
Curve 2007-2012
7
MPX Itaqui 1.62
Total 4.20
100%
20%
1% 15%0,0%
20,0%
40,0%
2007A 2008A 2009A 2010E 2011E 2012E Total *Considering MPX 50% stake in Energia Pecém
Consolidated Gross Debt: R$ 1.8 billion
LT: R$ 1.5 billion
ST: R$ 0.3 billion
(As of March 31, 2010)
In 2Q10, MPX reported a net loss of R$ 53.6 million, mainly due to a net financial loss
of R$ 27.0 million.
Financial Performance
Controladora Consolidado
R$ million 2Q10 2Q09 % Var 2Q10 2Q09 % Var
Net Operating Revenues - - - 22.6 13.0 74.6%
Operating Costs - - - (16.5) (7.7) 114.7%
Operating Expenses (24.1) (22.4) 7.4% (47.2) (44.3) 6.5%
G&A (23.6) (22.3) 5.6% (42.8) (42.8) -0.2%
8
G&A (23.6) (22.3) 5.6% (42.8) (42.8) -0.2%
Depreciation e Amortization (0.1) (0.1) 14.1% (1.8) (1.5) 22.1%
UTE Porto do Açu Rental (0.4) - - (2.6) - -
Net Financial Result 23.0 (16.8) -237.0% (27.0) (51.3) -47.3%
Equity Income (64.6) (37.8) 70.7% (4.1) 0.0 -
Other Revenues/(expenses) 7.0 0.1 13492.2% (12.9) (0.5) 2682.7%
Current and deferred taxes 5.0 (4.2) - 31.8 9.6 230.0%
Minority interests - - - (0.3) 0.0 -
Net Income (53.6) (81.2) -34.0% (53.6) (81.2) -34.0%
Parnaíba Basin: High Potencial for Gas
MPX identified gas in well OGX-16 in the onshore Parnaíba Basin. A drill stem test indicated
high pressure levels.
First 10 meters in the Devonian Section (at 1,654 m) with significant gas shows;
20 new prospects already mapped with seismic data recently acquired;
5 of the new prospects located in the same trend of the discovery;
Drilling of well OGX-16 expected to continue to a maximum depth of 3,450 m
99
Low exploration costs
- Onshore blocks
Low transportation
costs to supply
integrated thermal
plants
Low exploration costs
- Onshore blocks
Low transportation
costs to supply
integrated thermal
plants
The Parnaíba Integrated Gas & Power Project
Ownership StructureOwnership Structure
MPX will develop gas-fired plants that may add up to 1,863 MW, strategically located on the
PN-T-68 block at 50 km from a 500 kW substation and 30 km from water supply.
OGX
OGX
2/31/3
Licensing
Preliminary License
Granted
MPX Parnaíba
Substation
50 Km
River
30 Km
Site MPX
1010
OGXMaranhão
PETRA
Blocos Exploratórios
UTE
70% 30% 30% 70%
Execution of projects contracted in line with initial planning,
with original returns preserved;
Main milestones for establishment of MPX Parnaíba
generation complex accomplished (license + gas identified);
MPX – Closing Remarks
MPX Sul project completely structured (license + EPC +
financing structure) and ready for the sale of power;
Licensing and engineering studies for Phase I of MPX Colombia
progressing as planned (port + 2 open-pit mines).