Key Projects Since 2005
(Till June 2014)
SIRSA
Education
1. The State Government has granted Rs 110.42 crore for the development of infrastructure
and other facilities of Chaudhary Devi Lal University.
2. Two new colleges have been opened in Ellenabad and Dabwali.
3. A female dormitory has been built in Chaudhary Devi Lal Memorial Engineering College
Panniwala Mota for girls at a cost of Rs 6.15 crore. Around Rs 25 crore has been spent on
various development works of the engineering college. About Rs 2.84 crore was spent by
the previous government.
4. A women’s dormitory has been built hostel for girls in Government Polytechnics
Chaupata. Rs 4 crore 21 lakh has been spent on it.
5. A hostel for boys is being built in Government Polytechnic, Sirsa. Its estimated cost is Rs
5.35 crore.
6. An amount of Rs 2,01,77,000 has been spent to set up the Centre of Excellence to ITI in
Sirsa.
7. Skill development centres would be established in Sirsa.
Electricity
8. 36 new sub-stations have been established in Sirsa district, the capacity of 43 existing
sub-stations has been augmented and 486 km long lines laid. An amount of Rs 370.31 crore
was spent on these tasks.
ROB
9. A railway overbridge has been built in Sirsa at a cost of Rs 41 crore.
Water and Sewerage
10. An amount of Rs 138.38 crore has been spent on the improvement of water supply and
sewerage system in Sirsa district.
11. A sewerage and drinking water project costing Rs 120 crore is in progress in Sirsa and
Ellenabad under the Economic Development Promotion.
12. The drinking water supply has been augmented in 217 villages of Sirsa district.
![Page 2: Congress sirsa haryana](https://reader035.vdocument.in/reader035/viewer/2022071911/55cf60b1bb61ebbc5d8b463d/html5/thumbnails/2.jpg)
Irrigation
13. The capacity of Ottu Lake has been increased. More than Rs 45 crore has been spent on
it. A proposal has been made to deepen the lake.
14. An amount of Rs 22.16 crore has been spent on the improvement and expansion of
various canals and small canals (Rajwaha).
Urban Development
15. The Municipal Corporation of Sirsa and other municipalities of the district have spent Rs
57.95 crore on various development works.
Kinnow Grading Plant
16. A Kinnow grading plant has been established in Abubshahar village at a cost of Rs 5.49
crore.
17. The work of establishment of centre of excellence for fruits, under the Indo-Israel
project, in the Mangiana village is almost complete.
Health
18. A Trauma Centre has been established in Sirsa. Dabwali Community Health Center has
been recognized as a General Hospital. Primary Health Center of Ellenabad has been
recognized as Community Health Center. Similarly, The Primary Health Center of Baragudha
has been upgraded to Community Health Center. The Sub-Health Centres of Dadupur and
Ganga Village has been upgraded to Primary Health Center.
Solar Street Lights
19. 6,660 Solar street lights have been installed in 333 villages of Sirsa district at a cost of Rs
12.65 crore.
Tourism
20. The construction work of new motel and rooms is in progress in Surkhab Tourist Resort.
These will cost Rs 3,56,46,000.
Building Construction
21. An amount of Rs 41.44 crore has been spent on the construction of a Judicial Complex,