Connecting Northland Economicaly active | a resilient network | safer journeys

Upload: ernst-z

Post on 16-Apr-2017

106 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Connecting Northland - NLTP 17 July

Connecting NorthlandEconomicaly active | a resilient network | safer journeys

Page 2: Connecting Northland - NLTP 17 July

What we are building on

Page 3: Connecting Northland - NLTP 17 July

The 2015-18 NLTP in Northland

$460m forecast total investment, including…• $194m for local roads maintenance & operations, up 22% (all

NZ up 6%)• WDC 3rd highest increase in NZ, and FNDC 5th highest

• $117m for state highway maintenance & operations, up 24% (all NZ 6%)• 2nd highest regional increase

• $90m for state highway improvements (could be more)• $37m for local road improvements• $6m for public transport services and improvements• $5m for specific cycling and walking improvements• $5m for road safety promotion

A significant investment package to connect Northland:

Page 4: Connecting Northland - NLTP 17 July

• Appropriate levels of service = predictable journeys• Network resilience improvements = more reliable journeys• Network safety improvements = safer journeys• Network efficiency improvements = improved travel times

… which will deliver:

Page 6: Connecting Northland - NLTP 17 July

The small print

Committed – under contract

Probable – going into contract

Proposed – in programme, but needs more development work

Status of projects in the investment business case process

Page 7: Connecting Northland - NLTP 17 July

The small print

Committed – under contract Probable – going into contractProposed – in programme, but needs more development work

Status of projects in investment business case process

Page 8: Connecting Northland - NLTP 17 July

Appropriate levels of service

Page 9: Connecting Northland - NLTP 17 July

Reliable Journeys

• Restoration and rehabilitation

• Prevention• Maintenance• Major works

• Mitigation • Preparedness

The four-part approach

Page 10: Connecting Northland - NLTP 17 July

Safer Journeys

Safety allianceRest area strategy• Loop Road• Springfield to

Mata• Akerama Curves• Whangarei• Brynderwyns

North

Page 11: Connecting Northland - NLTP 17 July

Managing higher density flows

• Improving the operation and relieving congestion of SH1 and at key intersections through Whangarei urban area

• Public transport services are growing• Urban cycleway fund• SH14 hospital access

Page 12: Connecting Northland - NLTP 17 July
Page 13: Connecting Northland - NLTP 17 July

The inland route

• Conditional

agreement to becoming… SH13?!

Next steps• Business case for Loop

Road intersection• Collaboration agreement• Secretary of Transport• Asset hand over• Contract changes• Corridor plan

Page 14: Connecting Northland - NLTP 17 July

Upper North Island connections

• Air • Rail• Road - SH1• SH 12 and SH16• SH14, Inland route

Page 15: Connecting Northland - NLTP 17 July
Page 16: Connecting Northland - NLTP 17 July
Page 17: Connecting Northland - NLTP 17 July

Freight efficiency

• 50 MAX routes• Inland freight route• Whangarei to Port• Dust mitigation

Page 18: Connecting Northland - NLTP 17 July

Getting ready for the next wave of investment….Corridor plans

Page 19: Connecting Northland - NLTP 17 July

Getting ready for the next wave of investment….Corridor plans

Tirohanga stream bridgeWaihou River bridgeTaheke bridge

Page 20: Connecting Northland - NLTP 17 July

Thanks you.

Questions and comments?