  • Portfolio :Conor J Daly m.ARB :

  • Professional

    C o n o r J D a l y | P o r t f o l i o

    Residential Architect/MakespaceArchitects

    Project StewartsLodge, LondonSW4

    Value 17millionapprox.

    Duration 12months

    Tasks-Projectarchitecton66-unitresidentialdevelopmentwithafloorareaofover6,000sq.m-Successfullytookcontrolofprojectpost-planning,developingthedesignanddetailingtoconstructionstage-Producedallcriticalconstructiondetailsandactedaspointofcontactforanyon-sitequeries-Workedandco-ordinateddesignteamandallconsultantdesignsontheschemetoensureaccurateintegrationofallservices-Responsibleforallplanningissuesandestablishedagood-working

    relationshipwithplannerstosolveanddischargeconditions

    RendershowingdevelopmentfromWandsworthRd.

    Rendershowingviewofinternalcourtyard

  • Professional Professional

    C o n o r J D a l y | P o r t f o l i o

    ConciergeDesk

    Bedroom 1

    Balcony5m

    Balcony9m

    Balcony4m

    Balcony10m

    Private Garden20m

    Private Garden37.5 m2

    Private Garden40.9 m2

    Private Garden25.9m2

    Block BPlot 1

    Type A [HA]

    TYPE APLOT G07

    TYPE BPLOT G05

    TYPE APLOT G06

    TYPE EPLOT G04

    TYPE FPLOT G03TYPE E

    PLOT G02

    191

    82

    106

    1570

    200

    360

    0

    1573

    668

    8 389 14

    Block BPlot 2

    Type B [HA]

    Block BPlot 4

    Type D [HA]

    453

    445

    3411209

    5 42

    2 43

    3570

    6000

    400

    0

    ConciergeDesk

    Hall

    Bedroom 1

    Hall

    Bathroom

    Cup'd

    Hall

    1a

    3a

    3k

    D4.AG06.f.1

    D4.AG06.d.1

    D3.EG02.c.1

    D19.A1.a.1

    FD60s

    D19.C3.a.1

    FD20

    FD20

    FD30s

    FD30s

    D29.D5.g.1

    FD30s

    W9.EG04.2

    W9.

    BG

    05.2

    TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat

    TIM

    BE

    RP

    LA

    NTE

    RS4

    000m

    mX

    1000

    mm

    x4

    00m

    m

    TIM

    BE

    RP

    LA

    NTE

    RS4

    000m

    mX

    1000

    mm

    x4

    00m

    m

    TIM

    BE

    RP

    LA

    NTE

    RS4

    000m

    mX

    1000

    mm

    x4

    00m

    m

    TIM

    BE

    RP

    LA

    NTE

    RS4

    000m

    mX

    1000

    mm

    x4

    00m

    m

    21.555

    Shaft

    96

    8301 6638

    3430310334784718

    4353

    3139

    10348 7909

    3307449739542728

    5735

    1979

    4945

    TYPE 1 METAL RAILING @ 1100mmREF DRAWING: 1238-30-5426B

    TYPE 2 METAL RAILING @ 1800mmREF DRAWING: 1238-30-5426B

    TYPE 2 METAL RAILING @ 1100mmREF DRAWING: 1238-30-5426B

    212

    1457

    TIM

    BE

    RP

    LA

    NTE

    RS4

    000m

    mX

    1000

    mm

    x4

    00m

    m

    Marshalls Saxon Slabs Natural colour450x450x35mm or s imilar

    NOTE: Planters located over padfoundations

    Timber benches by Street DesignTimber benches by Street Design

    Timber benches by Street DesignTimber benches by Street Design

    Timber benches by Street Design

    Play Area Equipment Wicks teed Grovec limber or similar approved.Wet poursafety surface beneath N.B. Depth ofImpac t surfac ing beneath equipment tobe appropriate for crit ical fall heightpossible from equipment

    TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat

    TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat

    TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat

    TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat

    TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat

    Marshalls Argent Slabs SmoothLT colour 400x400x35mmor similart

    Tower Sands toneor s imilarin random pattern

    Low maintenance grasson slope interplanted withbulbs & wildf lower plug plants

    Low maintenance grasson slope interplanted withbulbs & wildf lower plug plants

    13290

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]

    [Window to be laminatedglass throughout -see

    w indow schedule1238-50-5506/5510]

    [Window to be laminatedglassthroughout - see window

    schedule 1238-50-5506/5510]

    [Window to be laminatedglassthroughout - see window

    schedule 1238-50-5506/5510]

    [Window to be laminatedglassthroughout - see window

    schedule 1238-50-5506/5510]

    [Window to be laminatedglassthroughout - see window

    schedule 1238-50-5506/5510]

    [Window to be laminatedglassthroughout - see window

    schedule 1238-50-5506/5510]

    [Window to be laminatedglassthroughout - see window

    schedule 1238-50-5506/5510]

    [Window to be laminatedglassthroughout - see window

    schedule 1238-50-5506/5510]

    1800

    2400

    2400

    600

    2400

    600

    2400

    600 200

    200

    1560

    1240

    200

    1560

    1240

    2700

    3600 2080

    600

    970

    PD

    F cr

    eate

    d w

    ith p

    dfFa

    ctor

    y P

    ro tr

    ial v

    ersi

    on w

    ww

    .pdf

    fact

    ory.

    com

    SouthElevation NorthElevation

    GroundFloorPlan FirstFloorPlan

  • Professional

    C o n o r J D a l y | P o r t f o l i o

    SectionB-B

    SectionF-F

    SelectionofcriticaljunctionsthroughexternalbrickslipwallandLightweightsteelstructure

    Gas memebrane by specialist

    T.O.W19.900[T.B.C.]

    EXTERIOR F.F.L = 18.600

    25x50mm batten fixed to retaining wall.

    1515

    250

    PARAPET DETAIL WITH BRICKSLIPS

    VA

    RIE

    S: 1

    0-18

    5MM

    PARAPETTOS

    TOP OFPARAPET

    FINISH

    20

    30

    Allow for 3mm Expansion joints between Cement particle board

    Gebrik panel with prebonded insulation; 10mm mortar jointmin 15mm external grade board by Gebrik

    Vertical railing to form cavity by Gebrik

    SPAN DIRECTION; FIRRINGS CUT TOFORM 1:80 FALL TO DECKING ABOVE 22mm T&G WBP plyboard

    deck laid to fall on timberfirrings. To be primed

    CELOTEX INSULATION TA4000 - 135MMOR SIMILAR APPROVED TO ACHIEVE

    0.16W/m2K U-Value

    WIDOPAN filter fleece

    Growing medium & vegetation /sedum blanket

    Continous Horizontal cavity barrier withintumescent tape by EnvirowallExpansion joint 10mm gap mastic filled

    250 deep lattice joists to structural engineer'sspec; pitched to form slight fall in roof

    VCL tape sealed at joist u/s

    100mm mineral wool; isover apr 1200

    Vapour control layer, proctor procheckPremier 500 or equal approved

    15mm GTEC dB BOARD

    15mm GTEC UNIVERSAL BOARD

    Vertical timber battens 25x50mm toform cavity

    Min 15mm external gradeboard by gebrik

    Gebrik panel with prebondedinsulation; 10mm mortar joint

    Fire Cavity Barrier byRockwool Fire Barrier

    Allow for 3mm Expansion jointsbetween Cement particle board

    100mm mineral wool; isover apr 1200

    1m Ballast acrosswhole perimeter.

    70mm Phenolic insulation byKingspan or similar approved

    Widopan FD applied to primed plywood

    25mm drainage mat

    18mm Plyboard laid to fall

    Aluminium edge capping 75mm x 190mm profile RAL 7015 or similar finish approved by HH

    WiIDOPAN FD membrane to overlap aluminium edge capping.

    36mm Knauf Insulation PolyfoamHigh Impact & Upstand Board

    WIDOPAN membrane with min 50mm overlap under aluminium edge capping

    WIDOPAN filter fleece

    WIDOPAN FD applied to upstand

    Continue WIDOPAN fleece min, 150mmabove finish

    Resilient flanking strip

    300

    WINDOW HEAD AND SILL DETAIL2560 10

    102560 1515

    15

    15

    100

    100

    Allow for 3mm Expansion jointsbetween Cement particle board

    Min 15mm externalgrade board by Gebrik

    or similar approved

    Gebrik panel with prebondedinsulation; 10mm mortar joint

    EPDM

    Deflection strip above window

    Vcl tape sealed at joist u/s

    High density mineral wool batt fullyfilled for flanking sound 33-60kg/m3;extend vertically 600mm belowceiling level; 900 o/a

    Vapour control layer, proctor procheckpremier 500 or equal approved

    15mm GTEC dB Board15mm GTEC universal boardVCL clamped by window build-up on all sides3mm ms galv strip by window installer

    Steel plate by steel frame contractor; toproject 80mm beyond stud

    VCL clamped by window build-up on all sides

    3mm ms galv strip by window installer

    Sill board to match window frame;with timber packer as necessary

    Mastic seal between sill board & drylining

    15mm GTEC universal board

    15mm GTEC dB Board

    Vapour control layer, proctor procheckpremier 500 or equal approved

    100mm mineral wool, isover apr 1200.fully filled in stud & held in place toprevent slumping.

    PU expanding foam by window installer

    Timber packing by window installer

    Compressible seal

    Aluminium flashing

    115

    70mm Phenolic insulation byKingspan K5 or similar approved

    70

    70

    1025 1515

    EXTERNAL WALL / PARTY FLOOR

    1825

    015

    15

    250 DEEP LATTICE JOISTS TOSTRUCTURAL ENGINEER'S SPEC

    100

    70

    600

    2025

    1819

    100

    17

    High density mineral wool batt fullyfilled for flanking sound 100kg/m3;extend vertically 600mm belowceiling level; 900 o/a

    Vapour control layer, proctor procheckpremier 500 or equal approved

    15mm GTEC dB Board

    15mm GTEC universal board, joints to bestaggered with db board beneath

    100mm mineral wool, isover apr 1200.fully filled in stud & held in place toprevent slumping.

    Floor finish

    18mm T&G boarding19mm GTEC plank board25mm rock mineral wool, density 75kg/m3

    18mm plyboard

    100mm rock mineral wool insulationdensity 45kg/m3, laid between joists

    GTEC resilient bar rbg3000 @400 ctrs15mm GTEC dB Board15mm GTEC universal board, joints to bestaggered with db board beneath

    Vcl tape sealed at joist u/s

    VCL to lap down onto floor deck

    Flexible acoustic sealant below plasterboard

    5mm resilient flanking stripAllow for 3mm Expansion joints

    between Cement particle board

    Rockwool insulation fire break

    Continuous horizontal cavity barrierwith intumescent tape by envirowall

    Expansion joint 10mm gap insheathing, mastic filled

    Gebrik panel with prebondedinsulation; 10mm mortar joint

    Resilient flanking strip

    70mm Phenolic insulation byKingspan K5 or similar approved

    650

    PD

    F cr

    eate

    d w

    ith p

    dfFa

    ctor

    y P

    ro tr

    ial v

    ersi

    on w

    ww

    .pdf

    fact

    ory.

    com

  • Professional Professional

    C o n o r J D a l y | P o r t f o l i o

    Residential Architect/MakespaceArchitects

    Project Apartments,CommercialRoad, LondonE2

    Value 3.25millionapprox.

    Duration 14months

    Tasks -Projectarchitecton14-unitresidentialdevelopmentaspartofre-designundernewclient-Undertookafulldesignreviewonbeingappointedtotheprojecttodevelopthedesign/undertakecostanalysisexercisesrespondingtonewclientsneeds-Co-ordinatedallconstructiondrawingswithBuildingControl-Prepareddesignmanualforprojectrolloutandproducedconstructiondetails-Conductedsiteinspectionsandwasreponsibleforvaluationsandissuingcerificates-Liasedwiithcontractorandactedaspointofcontactforallon-siteRFIsandconsultantqueries.

    LongSectionthroughdevelopmentshowing2residentialblocksandcourtyardatriumRenderoffrontelevationfromCommercialRoad

    C O M M E R C I A L R O A D

    LANDSCAPEDCOURTYARD

    FIRST FL.

    SECOND FL.

    THIRD FL.

    BED 1LIVING / DINING

    LIVING / DINING

    LIVING / DININGKITCHEN

    GROUND FL.

    EN-SUITEKITCHEN

    KITCHEN

    LIVING / DINING

    KITCHEN

    BASEMENT FL.

    UNISEX TOILETWC

    BED

    FIRST FL.

    SECOND FL.

    THIRD FL.

    LIVING / DINING KITCHEN KITCHEN LIVING / DINING

    LIVING / DINING

    FOURTH FL.

    LIVING / DINING

    OFFICE

    FIFTH FL.

    FOURTH FL.

    FIFTH FL.

    COMMERCIAL UNIT

    RETAIL UNIT

    KITCHEN

    KITCHEN

    GROUND FL.

    BASEMENT FL.

    COMMERCIAL UNIT

    RETAIL UNIT

    235

    12

    351

    272

    55

    562

    351

    300

    0

    235

    12

    351

    300

    0

    SECTION A-A

    13

    25 mm Timber deck ing on spreaders18 mm spreaders3 layers of 20mm Asphalt22 mm WBP Plyboard

    110mm Celotex insulat ion TD3116 - toachieve U-value of 0.19W/m2k

    Visqueen 1200 gauge - VCL layer

    65mm Structural screed with Rft mesh

    15 mm Floor f inish18 mm T&G Plyboard flooring

    350 mm RC slab

    25mm Insulation to be min 150Kg/m3Visqueen 1200 gauge layer

    40 mm Leveling screed

    113 mm Suspended ceiling

    707

    250mm (min) in-situ concretef loor s lab, 2400kg/m3

    Robus t separating f loor e-fc-2with ff t 2 f loat ing floor system

    18 mm T&G Plyboard

    50x50mm cradle batten res ilient layer system

    250mm (min) in-situ concretef loor s lab, 2400kg/m3

    Handrail @ 1100mmhigh around sky light

    25 mm Timber deck ing on spreaders18 mm spreaders3 layers of 20mm Asphalt22 mm WBP Plyboard

    110mm Celotex insulat ion TD3116 - toachieve U-value of 0.19W/m2k

    Timber firrings cut to falls

    272

    5

    570

    200

    400170

    357

    LIVING / DINING

    20mm Flexcel board +Polysuphide sealant

    2 Layers slip strips

    Water Bar

    20mm Flexcellboard to Eng spec

    Voltex water proofmembrane to Eng spec

    2 layers of Vandex slurry appliedto inner retaining wall. To Engspec

    2 layers of Vandex slurry appliedto inner retaining wall. To Eng

    spec

    50mm Isowool insulation

    Cav ity barrier to f loor /wall junc tion by TDI

    (UK) Limited. Flexiblecavity tray dressed

    behind.

    All voids between s lab & inner leaff illed with f lexible closer or sealent

    All voids between s lab & inner leaff illed with f lexible closer or sealent

    All voids between s lab & inner leaff illed with f lexible closer or sealent

    All voids between s lab & inner leaff illed with f lexible closer or sealent

    All voids between s lab & inner leaff illed with f lexible closer or sealent

    All voids between s lab & inner leaff illed with f lexible closer or sealent

    Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign

    Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign

    Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign

    Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign

    Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.

    Cav ity barrier to f loor / wall junctionby TDI (UK) Limited. Flex ible cavity

    tray dressed behind.

    18mm Plyboard on Timber joists toEng spec - Insulation betweenjoists (to M&E spec). Vapour controllayer 1 layer of Plas terboard withskim & emulsion f inish

    Timber deck ing on spreaders . Insulationand membrane by Axter Wilotek t-Plus -

    subcontractor to install.

    Timber deck ing on spreaders . Insulationand membrane by Axter Wilotek t-Plus -subcontractor to install.

    Timber fillet with Asphalt dressedover. Code 3 Lead f lashing to be

    dressed over Asphalt.

    Timber deck ing on spreaders.Insulat ion and membrane byAxter Wilotek t-Plus -subcontractor to install.

    All handrails @1100mm high

    250mm (min) in-situ concretef loor s lab, 2400kg/m3

    Robus t separating f loor e-fc-2with ff t 2 f loat ing floor system

    18 mm T&G Plyboard

    50x50mm cradle batten res ilient layer system

    250mm (min) in-situ concretef loor s lab, 2400kg/m3

    Robus t separating f loor e-fc-2with ff t 2 f loat ing floor system

    18 mm T&G Plyboard50x50mm cradlebatten resilient layer system

    KITCHEN

    KITCHEN

    KITCHEN

    Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.

    Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.

    Cav ity barrier to f loor /wall junc tion by TDI

    (UK) Limited. Flexiblecavity tray dressed

    behind.

    Cav ity barrier to f loor /wall junc tion by TDI

    (UK) Limited. Flexiblecavity tray dressed

    behind.

    Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.

    Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.

    Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.

    Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.

    NEW TIMBER TERRACE

    NEW TIMBERTERRACE

    226

    ELECTRIC SLIDINGROOF GLAZING

    TOUGHENED

    Plyboard Hoarding withdiagonal battens

    Aluminium capping

    AREA IN ABEYANCE

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.

    Struc tural glassASD ELEGANCE.

    Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallow

    fall within to disperse water.

    Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.

    Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallow

    fall within to disperse water.

    Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallow

    fall within to disperse water.

    Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallowfall within to disperse water.

    Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.

    Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallowfall within to disperse water.

    Balcony supported by Schock insulatedsupports or s imilar, refer to Eng details.

    200

    200

    261

    6

    200

    281

    62

    616

    372

    3

    200

    261

    6

    200

    261

    6

    200

    Ancon f ix ings shot fired to concrete slab.Steel angle of ancon to take externalblockwork wall.

    316

    12mm Thermaline windowsurrour insulat ion.

    Galvanised steel to Eng specwith concrete topping.

    Galvanised steel to Eng specwith concrete topping.

    Balcony to be supported of steelplatform. Eng to detail.

    Balcony to be supported of steelplatform. Eng to detail.

    1 6

    307

    3

    All handrails @ 1100mm highStruc tural glass balcony.

    All handrails @ 1100mm highStruc tural glass balcony.

    Smoked glass toughened

    All handrails @ 1100mm highStruc tural glass balcony.

    All handrails @ 1100mm highStruc tural glass balcony.

    Smoked glass toughened

    All handrails @ 1100mm highStruc tural glass balcony.

    All handrails @ 1100mm highStruc tural glass balcony.

    Smoked glass toughened

    All handrails @ 1100mm highStruc tural glass balcony.

    All handrails @ 1100mm highStruc tural glass balcony.

    Smoked glass toughened

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.

    Brilliant white, 25mm render by Webber.Finish to be Satin silk . Contractor to provide

    1m2 sample to c lient before order. Renderto be self cleaning.

    Brilliant white, 25mm render by Webber.Finish to be Satin silk . Contractor to provide1m2 sample to c lient before order. Renderto be self cleaning.

    Brilliant white, 25mm render by Webber.Finish to be Satin silk . Contractor to provide

    1m2 sample to c lient before order. Renderto be self cleaning.

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. by

    ASD ELEGANCE.

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. by

    ASD ELEGANCE.

    Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. by

    ASD ELEGANCE.

    1652

    39 168

    165

    271

    225

    275

    165 2

    37167

    499

    1

    152

    9

    3483

    PD

    F cr

    eate

    d w

    ith p

    dfFa

    ctor

    y P

    ro tr

    ial v

    ersi

    on w

    ww

    .pdf

    fact

    ory.

    com

  • Professional

    C o n o r J D a l y | P o r t f o l i o

    Renderofrearelevation,NelsonStreet.

    Imageofkitchenasbuilt,CommercialRoadblock

    Floorplans-Ground/First/Second

    19 0 0

    1800

    Residentialrefuse6.5M 2

    2212* 3755 3120 2616*

    420

    04

    830

    313

    06

    000

    662

    0*6

    000

    471

    02

    100

    2212* 3755 3120 2616*

    210

    02

    800

    541

    05

    210

    A

    1000

    BASEMENTENTRANCE

    D10.PU.4

    EXISTINGCROSSOVER

    C. UNIT - C2350 M2

    ENTRANCETO RETAIL UNIT

    ENTRANCETORESIDENTIAL BLOCK

    FD60 FD60W1.C2.01.1D10.PU.2

    D10.PU.1

    ELEV B

    1069

    5173

    1 900

    1800

    GROUND FLOOR PLAN

    2130

    2992

    DISABLED WC3.8M 2C2-02

    C

    SERVICES ZONE INCLUDESVERTICAL DUCTING FORMECHANICAL VENTING TOGROUND FLOOR +BASEMENT - ALLOW FLOORTO BE KNOCKED OUT

    LOADING LIFTTO BASEMENT

    SD

    SD

    E

    ME

    SD

    594 2084 2084 485 875 175 975 61610092

    4117

    4960

    3425

    A

    G G

    125

    16

    3066

    SD

    1325

    6 531

    2309

    31 6 6

    879

    1054

    1656

    2000

    1019

    3241

    3600

    5200

    Commercialrefuse

    LOADING BAY20.0M 2

    Lobby

    BIKES7.8M 2

    D4.PU.2FD60s

    ALLOW FOR A 7.5tDELIVERY TRUCK

    Eng to allow for truck for loading. Min 7.5

    3384

    1840

    Level+11.770

    Level+11.770

    Level+11.770

    Level+12.050

    Level+12.050

    Level+12.050

    Level+12.050

    Level+12.050

    Level+12.050

    Level+11.770

    Handrail to both sides@ 900mm High

    Pavement Level+12.050

    Level+12.543

    Pavement Level+11.770

    SD

    SD

    EF

    EF

    EF

    EF

    EF

    EF

    EF EF

    EF

    EF

    EF

    EF

    EFEF

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E E

    E

    E

    E

    E

    E

    E

    E

    Level+12.050

    RAMP

    F F

    13

    141516

    17

    18

    20

    19

    12

    11

    961123 462

    4805

    181

    1703

    400

    6359

    3351

    5168

    1654

    75 30

    1000 250 1000

    1022

    H

    B

    contrac tor to place louvredpanel within opening.

    contrac tor to ins tall de-mountable f ire resistantsmoke sealed panel for

    access on to service riser

    contrac tor to place louvredpanel within opening.

    contrac tor to ins tall de-mountable f ire resistantsmoke sealed panel for

    access on to service riser

    8992

    1.5M 2

    3651

    1125

    1124

    1900

    Concrete stairs to be @ max170mm risers @ 250mm mingoing. Handrail to both s ides tobe 900mm height.

    Concrete stairs to be @ max170mm risers @ 250mm min

    going. Handrail to both s ides tobe 900mm height.

    E

    SD

    6368

    CONTRACTOR TO INSTALLLETTERBOXES FORCOMMERCIAL RD BLOCK

    CONTRACTOR TO INSTALLLETTERBOXES FORCOMMERCIAL RD BLOCK

    METAL GRILL TO BE AT FFL LEVEL TOALLOW MAX 2 PERSONS TO ENTER ANDWORK ON PLATFORM

    METAL GRILL TO BE AT FFL LEVEL TOALLOW MAX 2 PERSONS TO ENTER ANDWORK ON PLATFORM

    22

    WALL TYPE C FA (FROM ABOVE)

    3

    TOPCRETE DENSEBLOCKWORK TO BE LAID ONSIDE WITH 1 LAYER OF 15MMFIRELINE PLASTERBOARDEACH SIDE WITH SKIM &EMULSION FINISH.

    573

    800

    LOCATION OF DRY RISER SUBJECT TO M+E DESIGN & SPEC.LANDING BOX REQUIREMENT SUBJECT TO MLM APPROVAL

    LOCATION OF DRY RISER SUBJECT TO M+E DESIGN & SPEC.LANDING BOX REQUIREMENT SUBJECT TO MLM APPROVAL

    918

    C22

    1276

    2721

    1272

    2330

    797

    400

    1100

    OPENING INCONCRETE FOR GASVENTILATION TODISCHARGE OUTSIDE

    1010

    STR

    UC

    TURAL

    OPEN

    ING

    2000

    1735

    107

    332

    567

    2 way swing

    1846

    1 63

    1042

    1011

    1188

    1015

    2009

    1117

    3588

    LOCATION OFDRY RISER INLET.

    INSTALLATION OF DROPKEY SWITCH TOMANUALLY OPEN DOORSTO RESI UNITS

    INSTALLATION OF DROPKEY SWITCH TOMANUALLY OPEN DOORSTO RESI UNITS

    ENSURE SCREED IS SCRABBLED DOWNTO MATCH EXTERNAL PAVEMENTLEVEL TO FORM LEVEL THRESHOLD

    ENSURE SCREED IS SCRABBLED DOWNTO MATCH EXTERNAL PAVEMENTLEVEL TO FORM LEVEL THRESHOLD

    W1W1

    255-259CommercialRoad

    10481600115380017222400841

    9563

    C3-02

    DOC M WC5.7M 2

    OFFICE102.6M 2

    C. UNIT -C3 111 M 2

    C3-01

    7367

    120

    29

    831 24001920 16

    00 1302

    8052

    1331

    1578

    UNIT - F13 BED123.0 M2

    W1.F1.05.1W3.F1.06.1

    1349

    5141

    2440

    1859

    900

    1331

    4 943

    W5.F1.02.1 W2.F1.02.1

    W4.F1.02.1

    2007

    2814

    2560

    5994

    1676

    9484

    249CommercialRoad

    SD

    1000

    2212* 3755 3120 2616*

    420

    04

    830

    313

    06

    000

    662

    0*6

    000

    471

    02

    100

    2212* 3755 3120 2616*

    210

    02

    800

    541

    05

    210

    SD

    SVP

    SD

    C

    HD

    SD

    FIRST FLOOR PLAN

    HD

    SD

    SD

    1118

    A

    A

    C

    3661

    2975

    4762

    SERVICES ZONE WITHGOOSE NECK (OR SIMILAR)VENT TO MECHANICALLYVENTILATE GROUND FLOOR+ BASEMENT - ALLOWFLOOR TO BE KNOCKEDOUT

    FD60sD0.PU.4

    926

    Coping Stone on DPC

    FALL

    FALL

    FALL

    FALL

    FALL

    FALL

    A

    ELEV B

    A

    G G

    769

    1536

    9 26

    1 100

    2539

    866

    776

    Level+ 15.833

    926

    Level+ 15.833

    Level+ 15.833

    ALL DRAINAGE OUTLET'S / GULLY'S TO BELOCATED & POSITIONED BY M&E CONSULTANT

    ALL DRAINAGE OUTLET'S / GULLY'S TO BELOCATED & POSITIONED BY M&E CONSULTANT

    LOW ENERGY FLOOR LIGHTSPROJECTING UPWARDS.

    LOW ENERGY FLOOR LIGHTSPROJECTING UPWARDS.

    LOW ENERGY FLOOR LIGHTSPROJECTING UPWARDS.

    SD

    SD

    AREA = 97.2M 2

    F F

    1150

    250 1000

    4860

    1525

    4344

    1637

    B

    All door opeings toA.O.V to be min of

    30min f ire seperating& 2100mm High

    AOV BY SE CONTROLSOR SIMILAR

    1.5M2

    1124

    1900

    Cav ity barrier to f loor /wall junc tion by TDI (UK)

    Limited. Flex ible cavitytray dressed behind.

    2 no. 15mm Soundbloc pb on 50x75 s.ws tuds . finished with sk im & emulsion finish

    Concrete stairs to be @ max170mm risers @ 250mm mingoing. Handrail to both s ides tobe 900mm height.

    Concrete stairs to be @ max170mm risers @ 250mm mingoing. Handrail to both s ides tobe 900mm height.

    800

    BO

    ILE

    R

    1914

    1076

    450

    999

    CORDYLINE BANKSII X 1

    MISCANTHUS X 1

    PHORMIUM X 1

    YUCCA X 1

    CORDYLINE BANKSII X 1

    LOCATION OF DRY RISERSUBJECT TO M+E DESIGN &SPEC. NOT TO BE WITHIN THESAME RISER AS BOILER FLUES.

    LOCATION OF DRYRISER SUBJECT TOM+E DESIGN & SPEC.NOT TO BE WITHINTHE SAME RISER ASBOILER FLUES.

    OPENINGS FOR VENTILATION TO BASEMENTTO BE GRILLED OVER AND SEALED UNTIL ENDUSER IS TO TAKE SHELL & CORE BASEMENT&GROUND. IT WILL BE THE END USER'SRESPONSIBILTY TO COMPLY WITH BUILDINGREGULATIONS AND PLANNING WHENPROPOSING/INSTALLING ANY VENTILATIONUNIT.

    5172

    BALCONY

    BALCONY

    ALL OPENINGS TO BE CAPPED WITH FORMWORKPLYBOARD. TIMBER UPSTAND AROUND OPENING.PLYBOARD TO BE FIXED DIRECTLY TO TIMBER WITH1 LAYER OF FELT.

    ALL OPENINGS TO BE CAPPED WITH FORMWORKPLYBOARD. TIMBER UPSTAND AROUND OPENING.PLYBOARD TO BE FIXED DIRECTLY TO TIMBER WITH1 LAYER OF FELT.

    ALL OPENINGS TO BE CAPPED WITH FORMWORKPLYBOARD. TIMBER UPSTAND AROUND OPENING.PLYBOARD TO BE FIXED DIRECTLY TO TIMBER WITH1 LAYER OF FELT.

    1918

    1100

    1100

    4432

    3858

    2275

    TO BE FINISHED WITH 22MM PLYBOARD FINISH WITHDIAGONAL BRACING. TOO BE PRICED FOR.

    LOC

    AT

    ION

    FO

    RBOILE

    R FLUE'S

    1 2 2 6

    Secure Trellis with plant ing

    WATER

    FEATURE

    1315

    2000

    LANDSCAPED GREEN AREA

    31.8 sq. m

    GRAVEL AREA

    31.9 sq. m

    'STEPPINGSTONE'

    FEATURE

    5142

    Struc tural glazed balconies8274

    FINAL LAYOUT FOR OFFICETO BE CONFIRMED.

    CONTRACTOR TO FIT OUTFLOORING AND CEILING.CEILING VOID ALLOW FOR180MM VOID.

    ADDITIONAL LAYER OFSOUNDBLOCPLASTERBOARD TO BEADDED TO CEILING

    ALLOW FOR WATER PUMPAND WATER FEATURE.

    STUDY

    DW

    1228

    527

    1571

    3054

    1056

    2557

    1494

    239

    2088

    2757

    DISABLEDREFUGE

    1319

    1226

    2139

    5247

    698

    764

    26 6

    2209

    416 926

    1870 1745

    Toughened glasspartition to clients spec

    4562

    7264

    F1-04

    ENSUITE5.7M 2

    KITCHEN

    F1-05

    BED 119M2

    F1-06

    BED 211M 2

    F1-07

    BED 214.2M 2

    LIVING / DINING41.8M 2

    F1-02

    1421

    428

    1019

    Stud wall c reated toc reate x3 openingsequally in height tocontain shelv ing fordisplays.

    2462

    1299

    4007

    1206

    1301

    2537

    3719

    3537

    2388

    1882

    7 65

    720

    1702

    1161

    3565

    2911

    1521

    6864

    2567

    2203

    720

    7591707

    1122

    620

    1423

    ROTATING SPHERE@450KG

    13

    50

    2400

    FD60sD0.PU.3

    FIRST FLOOR PLAN

    Installat ion of Refuge call point bySigtel Disabled refuge Alarm &communication sys tem. to BS 5839Part 9.

    FD60s

    Penetrations made through insulationand f looring for posts to s it on concretepads as per Eng spec & design.

    SD

    SD

    100

    1087

    32643264

    1088

    F5-02

    LIVING / DINING17.0M 2 F5-03

    BED15.2M 2

    KITCHEN9.1M 2

    F5-04

    BATH4.3M 2

    FD30s

    FD20

    W5.F4.04.1 W2.F4.05.1W4.F4.06.1

    UNIT - F51 BED52.9 M2

    F4-02

    BATH5.2M 2F4-03

    KITCHEN6.1M 2

    LIVING / DINING25.0M 2

    UNIT - F42 BED72.3 M2

    F4-04

    F4-01

    HALL9.1M 2

    F4-05

    BED 28.6M 2 F4-06

    BED 111.7M 2

    ENSUITE3.1M 2

    D3.F4.02.1

    FD20D11.F4.04.1

    E

    E

    SD

    SD

    SD

    SD

    HD

    HD

    B

    D

    420

    04

    830

    313

    06

    000

    662

    0*5

    700

    19 0 0

    1800

    2212* 3755 3120 2616*

    420

    04

    830

    313

    06

    000

    662

    0*6

    000

    210

    02

    800

    F3-03

    LIVING / DINING22.6M 2

    KITCHEN7.0M 2

    BATH4.3M 2

    F3-02

    F3-01

    HALL3.5M 2

    F3-04

    BED13.9M 2

    F2-03

    LIVING / DINING20.9M 2

    F2-04

    STUDY11.2M 2 F2-05

    BED 114.0M 2

    UNIT - F21 BED65.4 M2

    UNIT - F31 BED54.0M2

    BATH4.3M 2

    F2-02

    KITCHEN7.2M 2

    F2-01

    HALL5.3 M 2

    W5.F3.03.1

    W1.F2.03.1 W2.F2.04.1 W3.F2.05.1

    FD20

    FD20

    FD30s

    FD30s

    D3.F2.02.1

    FD20

    FD20

    51

    52

    53

    963 2400 1467

    1600 10087438

    176

    59

    5994

    2560

    800 2400 1085 800 2402 1600 1006

    10092

    120

    40

    4517

    2477

    8196

    2677

    1775

    2577

    2018

    600

    1775

    2500

    2600

    85 1 9

    826

    37243010

    4718

    826

    826

    1074

    1470200

    1100

    249CommercialRoad

    255-259CommercialRoad

    SECOND FLOOR PLAN

    ELEV C

    ELEV D

    E

    E

    HD

    HD

    SD

    SD

    SD

    C/B0.5M 2

    565

    A

    G G

    ELEV B

    A

    926

    Level+19.449

    Level+19.449

    Level+19.449

    Level+19.449

    Level+19.449

    Level+19.449

    471

    0

    2212* 3755 3120 2616*

    210

    05

    410

    521

    0

    841 24001722 800 115

    3 16001048

    9563

    9848

    8 098

    821 24001791 800

    1104 16001108

    9624

    7372

    106

    94

    3898

    2675

    3571

    15 9 0

    1790

    3000

    8 264 869

    6766

    1 9 4 9

    2129

    1150

    1800

    1900

    3526

    1899

    2120

    31553195

    3295

    SD

    SD

    54

    BALCONY7.4M 2

    BALCONY11.2M 2

    F F

    750

    E

    SD

    2027

    1984

    1857

    1532

    3456

    3709

    1676

    4343

    999

    15 2 5

    1654

    B

    All door opeings to A.O.V to bemin of 30min fire seperating

    Contrac tor to place louvredpanel within opening.

    Cav ity barrier to f loor / walljunct ion by TDI (UK) Limited.

    Flexible cavity tray dressed behind.

    Cav ity barrier to f loor / walljunct ion by TDI (UK) Limited.

    Flexible cavity tray dressed behind. 1.5M 2

    1124

    1900

    1125

    1900

    Cav ity barrier to f loor /wall junc tion by TDI (UK)

    Limited. Flex ible cavitytray dressed behind.

    Concrete stairs to be @ max170mm riser @ 250mm mingoing. Handrail to both s ides tobe 900mm height.

    FD20

    3103

    1466

    2700

    2100

    826 826

    1606

    2507

    1328

    3154

    27 7 0

    5437

    2866

    3 5015 34

    4035

    826

    826

    1047

    353

    0

    826

    2375

    209

    5051

    1443

    2048

    895

    DW

    FR

    C

    C

    C

    3476

    4613

    600

    1565

    3051

    600

    470

    FR 1000

    926

    2076

    1100

    1100

    1330

    8894

    1331

    600

    SECOND FLOOR PLANHandrail/ railings & glass panels to c lient spec & design.Contrac tor to confirm with client before any orders are placed.

    Handrail @ 1100mm high

    LOC

    AT

    ION

    FO

    RBOILE

    R FLUE'S

    LOC

    AT

    I ON

    FO

    RB

    OILER FLUE

    'S

    FD20D11.F4.04.1

    FD20

    Struc tural glazed balconies8274

    587

    786

    2037

    626

    710

    All door opeings toA.O.V to be min of30min f ire seperating.AOV door to be by SEcontrols or s imilarapproved.

    LOCATION OF DRY RISERSUBJECT TO M+E DESIGN &SPEC. NOT TO BE WITHIN THESAME RISER AS BOILER FLUES.

    LOCATION OF DRY RISERSUBJECT TO M+E DESIGN &SPEC. NOT TO BE WITHIN THESAME RISER AS BOILER FLUES.

    1084

    1085

    1133

    PD

    F cr

    eate

    d w

    ith p

    dfFa

    ctor

    y P

    ro tr

    ial v

    ersi

    on w

    ww

    .pdf

    fact

    ory.

    com

  • Professional Professional

    C o n o r J D a l y | P o r t f o l i o

    Cultural Architect/MakespaceArchitects

    Project HackneyRoadMosque, LondonE2

    Value 1.1million

    Duration 8months

    Tasks -Supervisedprojectconstructionasarchitectondesignteamon contemporaryMosqueextensionandrenovation.-Developedthedesignwiththeclientaroundtheprogrammatic requirementsoftheschemeandtookcontrolofsubsequentplanningpermissionsthrought0successfulgranting.-Responsibleforon-siteinspectionsandinspectionofwork-Involvedinissuingcerificatesandcontractvaluations-Liasedwithcontractorandactedaspointofcontactforallon-site

    RFIsandconsultantqueries.

    RendershowingcomtamporatoryextensioninrelationtoexistingVictorianbuilding

    Southernelevationofexistinghouseandextension RenderofsouthernelevationhighlightingIslamicintervention

  • Professional

    C o n o r J D a l y | P o r t f o l i o

    Residential Architect/MakespaceArchitects

    Project HouseonChalcotRoad LondonNW1

    Value 850,00

    Duration 6months

    Tasks-ProjectarchitectforextensionandrenovationofbasementfloorofGeorgiantownhouse-Successfullyconceivedanddevelopedprojectwithindemandingprogrammeincludingpreparationofallplanningapplications,presentations,and3dvisualisations-Producedfulltender,constructiondrawingsandscheduledocumentationandmanagedtenderingprocess-Liasedwithandensuredco-ordinationbetweenallconsultants,whileoverseeingallworkswithparty-wallsurveyorandbuildingcontrol.

    Flat roof

    Neighbouring Garden No. 30 Chalcot Road

    Neighbouring Garden No. 28 Chalcot Road

    No.29

    Neighbouring Property No. 30 Chalcot Road

    Neighbouring Property No. 28 Chalcot Road

    Proposed Roof Plan

    No. 31

    No. 29

    Boundary

    new rwpSVP1

    SVP2new rwpNewWP

    Boundary

    New skylight - double glazedtinted glass

    Existing WP from f lats aboveWP

    New WP to take waste water fromf lats above with new pipe laid over

    f lat roof

    2243

    560

    2544

    Existing RWP discharge onto f latroof

    Planting Beds

    REA

    R W

    ALL

    TER

    RAC

    ES

    STR

    EET

    ACC

    ES L

    INE

    STR

    EET

    ACC

    ES L

    INE

    2544

    ADJO

    ININ

    G

    CO

    NSE

    RVA

    TOR

    Y

    A

    Vault No. 2

    Vault No. 3

    PLAN Proposed Ground Floor Plan

    BATH

    SHOE STORAGE

    1 2

    2A 2B

    3

    3A

    4 5 6

    A

    H C1

    -930

    0.00

    V

    FIRE-BOX f lue

    -510

    900

    2400

    900

    SHOWER ROOM

    6733 2514 3649 1984 2054 4102 2040 2260

    650

    631

    No. 31

    No. 29

    Boundary

    New boundary wall rebuilt

    NOTE:Refer to drainage plan for details of drainage

    New WP picking up f lats above

    boiler 650

    1050

    KITCHEN

    bench

    bench

    800

    2158

    island 2.2x900

    1050

    716

    skylight 2.2x560

    fridgefrz

    P

    600

    1269

    TAP

    TAP

    1050

    Boundary

    Folding sliding doors

    820

    600

    1800

    2000

    515 300

    650

    1322

    892

    -510

    -930

    UP

    815

    Fixed glass

    1538

    811

    1202

    300

    18001050 82

    8

    5278

    0 500 1 2 3 5m

    YG

    FFL=0.000FFL=-0.510

    MH02-Ref to Drainage plan MH01-Ref to

    Drainage plan

    B

    B

    C

    C

    D

    D

    E

    E

    G

    G

    F

    F

    BBQ

    1800

    Water feature

    1500 3000

    -510-1020

    450

    688

    2400

    ShedFP

    flue

    2779

    flue

    6451

    steps

    Glass door

    Existing staircase retained

    Steel post to SE spec (both sides)Brick nib removed, structurally supported to SE details

    Vault No. 1

    1933

    Existing timber doors replaced with window - toughened glass

    H

    steps

    Relocate gas meter to built in storage unit

    New openings between vaults, structure to SE details

    Vaults fully lined with drained cavity tanking system (Newton or similar) by approved contractor with warranty. Plasterboard + skim f inish

    813

    2278

    1022 99

    0

    Glass door

    312

    Provide gas supply

    sink

    slot

    dra

    in

    3112

    TAP

    New cavity wall - 100mm block internal, 100mm cavity with insulation, brick external skin

    Yard gulley to sumppump to manhole

    In situ concrete benchand planters

    In-situ concrete formed waterfeature, lined with waterproof

    concrete/ screed

    Polished concrete f loor togarden

    Concrete worktop

    fall to floor gulley

    Water proof polished screed f loor throughout - contractor to recommend mix/ sealant to be approved

    TAP

    2800

    oven

    1500

    Concrete worktop and concrete moulded sink

    Grassed area - contractorto ensure effective soak

    away

    WM DRY

    Flue to tap into existing cooks f lue 578

    Steel ships ladder with handrails both sides

    ClientSiteTITLE

    Dwg No.DateScaleSheet size

    Heidi29a Chalcot Rd NW1 8LN

    PROPOSED GROUNDFLOOR + ROOF PLAN

    1180-50-10020.09.12

    1:50A1

    copyright makespace architectsUnit 9 51 Derbyshire St London E2 6JQt: 020 7729 6022 e: [email protected]

    Rev Notes Date By

    FOR TENDER

    Checked

    These drawings have been prepared for Building Regulatiion compliance and Tender purposes only, and SHOULD NOT BE USED FOR CONSTRUCTION. If they are used, any discrepencies / lack of information that results is not the responsibility of the architect.

    All dimensions (especially head heights / clearances of new starcases / windows / doors) to be checked on site prior to any orders being placed & the commencement of any works.

    DO NOT SCALE OFF DRAWING.

    All drainage to contractors / M&E design and to L.A. approval.

    All services supply & installation to be arranged & installed by contractor to LA approval.

    These drawings do not necessarily comply with Local Authority Building Regulations and should be checked & appoved prior to any works on site.

    Planning permission is to be obtained on all relevant works prior to implementation.

    All work to be carried out in accordance with Building Regulations and to DS approval on regular inspections organised by contractor.

    Renderofinternalviewthroughkitchenarea

    Groundfloorplan Cesigndevelopmentmodel

  • Professional Professional

    C o n o r J D a l y | P o r t f o l i o

    Professional

    C o n o r J D a l y | P o r t f o l i o

    PAVEMENT

    PROPOSED FINISHED CELLAR LEVEL

    250

    2

    205

    0

    275

    5

    1623

    EXISTING FLOOR LEVEL

    EXISTING FLOOR LEVELRETAINED

    153

    0

    872

    166

    4

    FLOOR BUILD UP TYPE B -65mm polished screed overunderf loor heating pipework on100mm insulation on tanking onconcrete slab on hardcore to SEspec

    WALL TYPE B - Drained cavitytanking system to walls, ceillingand f loor, by Newton or similar

    Insulation and plasterboard liningto walls and ceiling

    Existing brick corbels cut off to SEspec

    Undepinning + ground slab to SEspec

    Drain channels + sump pumpdetails and location tomanufacturers spec

    Existing timber door replaced withtoughened glass windows, cillraised with stock brick to match

    Existing window replaced withnew, head height reduced andnew lintel installed to SE spec

    Existing door replaced with newexterior hardwood timber door and

    fanlights, toughened glass

    SECTION H - THROUGH NEW FRONT

    WINDOW AND VAULTS

    FLOOR BUILD UP TYPE A -65mm polished screed f inish on

    100mm insulation on concrete slabon DPM on sand blinding on

    hardcore. Screed to have have25mm perimeter insulation all

    around

    WALL TYPE A - 40mm insulationplasterboard on all perimeter walls

    Ceiling build up type A

    10

    12

    17

    73

    Underpinning to SE details

    Delta membrane egg crate tanking system applied to wall / f loor / ceiling of

    vaulted rooms.

    85mm Celotex GA4000 insulation

    12.5mm Gyproc plasterboard with skim f inish

    Removal of corbel foundations subject to SE design and spec

    40mm perimeter drainage channel to be installed

    All channels to be directed to sump pump - Allow for Sump pump externally

    500 Gauge Polythene sheet DPC

    USED FOR CONSTRUCTION. If they are used, any discrepencies /

    lack of information that results is not the responsibility of the

    architect.

    All dimensions (especially head heights / clearances of new

    starcases / windows / doors) to be checked on site prior to any

    orders being placed & the commencement of any works.

    DO NOT SCALE OFF DRAWING.

    All drainage to contractors / M&E design and to L.A. approval.

    All services supply & installation to be arranged & installed by

    contractor to LA approval.

    These drawings do not necessarily comply with Local Authority

    Building Regulations and should be checked & appoved prior to

    any works on site.

    Planning permission is to be obtained on all relevant works prior

    to implementation.

    All work to be carried out in accordance with Building

    Regulations and to DS approval on regular inspections organised

    by contractor.

    EXISTING FLOOR LEVEL

    NEIGHBOURING ENTRANCE

    PAVEMENT

    NEIGHBOURING APARTMENT

    EXISTING FLOOR LEVEL

    PROPOSED FINISHED FLOOR LEVEL

    PROPOSEDFINISHED CELLARLEVEL

    EXISTINGFLOORLEVEL

    Detail 11

    2

    2 A 2 B

    3

    3 A

    4 5 6

    2514 3649 1984 2054 4102 2040 2260

    250

    5

    250

    0

    202

    9

    200

    5

    219

    5

    240

    0

    316

    93

    0

    51

    0

    23

    05

    NOTE:Refer to drainage plan for details of gradients/ sizes/ positions

    Existing drainage runs

    New drainage

    33

    9

    Location of Shower wall

    20

    6

    Code 4 lead f lashing dressedunder brick parapet

    Brick parapet

    Flush glass roof light by theRoof light Company or similar f itted

    to manufacturers instructions

    CEILING TYPE A - Existingceiling lining stripped out,Rockwool Acoustic insulationplaced between existing f loorjoists and 1 layer of 15mmsoundbloc plasterboard liningf itted on resilient bars

    WALL TYPE B

    FLOOR TYPE B

    Form recess for LED srtipdownlight

    MH02 and new drain 150dia @ 1:80

    Existing drain + manhole

    60

    5

    12

    40

    Sand & cement 75mm screed with A142 mesh. Screed to have Polished

    f inish

    FLOOR DETAIL

    Warmaf loor underf loor heating system (wet). Clip rail system with pipes

    at 200mm centres

    85mm Celotex FF4000 insulation

    25mm Celotex XR4000 insulation

    Concrete slab to Eng spec & design

    10mm Movement joint

    300mm hardcore MOT type 1 compacting down ground

    25mm sand blinded hardcore

    TAIL 05

    Sectionthroughlowercellararea Detailthroughstairsjunction Detailthroughcellarfoundation

    LongSectionA-Afromreargardenthroughtocellar

  • Professional

    C o n o r J D a l y | P o r t f o l i o

    Residential ArchitecturalAssistant/MakespaceArchitects

    Project PainesLane, LondonHA5

    Value 275,000

    Duration 5months

    Tasks-Performedroleasjob-runnerthroughoutproject-ManageddesigndevelopmentfromconcepttoRIBAworkstageDofcontemporaryextensiontoArtsandCraftsstylehouse-Produceddesignpresentations,models,rendersanddrawingsforpresentationtobothclientandplanningauthority-Collaboratedextensiveresearchonconservationareaandlocal

    planningpolicyaspartofproductionofplannningapplication.

    SitePlanshowingcontextwithinconservationareaModelproducedduringdesigndevelopmentRendershowingdesigndevelopmentoffacade

    Renderofproposedextensionincontext

  • Professional Professional

    C o n o r J D a l y | P o r t f o l i o

    11309

    4903

    LIVING SPACE21.1M2F1-02

    CHILDREN'S 'DEN'13.2M2F1-05

    LOBBY1.8M2F1-01

    KITCHENETTE2.6M2F1-03

    BATH2.4M2F1-04

    STO

    RAG

    E

    'SIT

    ON

    'STO

    RAG

    E

    9503535668EXISTING OPENING

    1430

    243

    EXISTING OPENING3683

    EXI

    STIN

    GO

    PEN

    ING

    4430

    373

    D2.F1.04.1969

    726

    540 900

    810

    D1.F1.01.1

    1378

    3105

    4333

    4514

    4333

    1668

    700

    292

    863

    SVP

    E

    SD

    HD

    2905

    868

    836

    836

    F1GR. FL. + MEZZ. FL.42.9 + 17.8 = 60.7M2

    11309

    W3.F1.05.1W1.F1.02.1

    W2.

    F1.0

    2.1

    11309

    4903

    75263651

    4398

    373

    11177

    W1.F1.02.1

    W4.

    F1.0

    2.1 STORAGE

    5.2M2F1-06

    MEZZANINE12.2M2F1-07

    BOOK SHELVING

    BOOK SHELVING

    STO

    RAG

    E

    DOUBLE HEIGHTLIVING SPACE

    D3.F1.07.1

    OUT LINE OFROOF LIGHT

    4333

    1642

    863

    848

    2902

    2293

    1967

    1967 1350

    1425

    936

    A

    FD60

    A

    A

    A

    A

    B

    C

    C

    C

    C

    C

    C

    C

    C

    C

    C

    A A

    A

    A

    Level+100.00

    Level+99.34

    Level+102.29

    Level+101.82OUT LINE OF

    ROOF LIGHT

    RWP

    RWP

    RWP

    RWP

    A A

    B

    B

    B

    B

    A A

    C

    C

    C

    C

    1630

    W1.F1.02.1

    294

    836

    868

    672

    250

    N

    Handrail to one side. 900mm high of pitch ofstair. Handrail to be Oak finish, with stainlesssteel fixing to wall.

    1146

    Concrete Lintel above opening. tobear min of 200mm on each end.

    863

    Allow for levelling floor andlaying min 20mm Engineered

    Timber Walnut flooring.

    Allow for levelling floor andlaying min 20mm EngineeredTimber Walnut flooring.

    NEW WALL700

    Structural glassbalustrade @1100mm high

    Allow for DPC within course 150mmabove new concrete slab level.

    D2.F1.04.1

    2090

    LIVING SPACE

    CHILDREN'S 'DEN'

    LOBBY

    1100

    674

    W2.F1.02.1 271

    1

    2235

    891

    165300

    MEZZANINE

    W6.F1.08.1 W6.F1.08.2

    11309

    STO

    RAG

    E

    STORAGE

    25mm Floor finish on18mm chipboard on200mm Joist infilledwith 100mm Rockwoolinsulation on 15mmGyproc plasterboard

    W5.F1.02.1

    EQEQEQ

    BO

    UN

    DAR

    YLI

    NE

    Assumed level of existing footing. Allow forinvestigative works for depth of footing.Underpinning required to contractors/Engineers design. Note this is onneighbours party line, any damage will needto be made good.

    25mm Engineered timber Walnutflooring and build up, placed ontoscreed. Polythene 500 Gaugeseparating layer on Celotex GA400070mm DPM Polythene, 1200 Gaugelayer on concrete. 250mm concrete slabto Contractors spec & Design.Polythene separating layer on 25mmSand blinding on min 300mm MOT type1 Hardcore

    SLAB

    HARDCORE

    Timber stairs. Walnut Riser & goings

    Structural glass balustrade.

    connectors to be concealedwithin floor joists.

    50mm Celotex insulation board

    Foundations to Contractors spec

    DPC

    DPM high performance dressed up Engineering brick.

    2040

    120mm MDF Chamferedskirting. Painted white.

    Allow for x3 coats ifemulsion on skim

    PD

    Fcr

    eate

    dw

    ithpd

    fFac

    tory

    tria

    lver

    sion

    ww

    w.p

    dffa

    ctor

    y.co

    m

    Residential ArchitecturalAssistant/MakespaceArchitects

    Project Outhouse,PainesLane, LondonHA5

    Value 125,000

    Duration 4months

    Tasks -Follow-onprojectfromPainesLaneextensionagainactingasjobrunner-Developedconcepttomaximiseusablespacewithinboundariesofpermitteddevelopmentrights-Producedfullsetofconstructiondrawingsandworkingdetailsforpurposesofbuildingcontrolandtender.Completedfullbuildingscheduletoreadinconjunctionwithdrawings.

    -Managedtenderprocessthroughtoawardingofcontract

    AxonometricofpublicstepsandviewingspaceSection-Constructionset

    Conceptsketchofinternallayout

    FloorPlans-Constructionset

  • Professional

    C o n o r J D a l y | P o r t f o l i o

    Academic / Leisure ArchitecturalAssistant/MurrayOLaoireArchitects

    Project AnTailteann, MaryImmaculateCollege, Ireland

    Value 10.5million

    Duration 3months

    Tasks-Memberoflargemulti-disciplinarydesignteaminvolvedoninternationalawardwinningproject.-Preparedconstructiondetailsandwasresponsibleforexteriorhard-landscapinganddrainagedetails.-Assistedwithrespondingtoon-siteRFIsandprojectsnagging-Produceddesignpresentations,models,rendersanddrawingsforpresentationtobothclientandplanningauthority

    Lower-groundfloorPlan

    Imagefromplayingpitchesshowingnorthelevationandmainplaza

    Axonometricofpublicstepsandviewingspace Imageofmainentranceandpublicplaza

  • Professional Competition

    C o n o r J D a l y | P o r t f o l i o

    Cultural Architect/MakespaceArchitects

    Project FRIDAYSATURDAYSUNDAY

    DesignWorkshoptodesigna Tri-partiteWorshipSpace-Enclosingachurch,mosque,andsynogogueinoneelement-Contemporyspacemaintainingdesignandcustomsofallthree religionsintorunconcurrently-FeaturedinRIBAJournalDecember2011-Involvedindevelopmentofconceptdesignandreponsiblefor

    productionofdrawings,design,presentations,3dvisualizations,n

    e

    119.0

    se

    0m 10m

    friday/ saturday/ sunday

    axis1:100 @ A1

    oct 2011

    Rendershowingmainhall

    FloorPlanExternalRender

    Diagramofaxes

    Diagramaticuseplan

  • Competition

    C o n o r J D a l y | P o r t f o l i o

    Community Architect/MakespaceArchitects

    Project Europan11

    WATERSPACE EastWall,Dublin,Ireland

    -BasedonthethemeofIdentity-thisurbaninfillsitesituatedinthedilapidatedEastWallareaofDublindocklandswithabrieftocreateasustainablecommunity-Interventionformedaroundthere-establishingtraditionalwatercoursesintheregionandintroducingwaterasasustainabledesignelementtointeractwiththesiteondifferentscales-Finalentrycommendedbyjudgesforinnovativeuseoftraditionalnaturalresources.

    Tasks-Leadprojectteamof3members-delegatedallprojecttasksandco-ordinatiatedworkflowofteammembers.-Oversawdevelopmentofdesignconceptandmanagedpresentationandcompetitionsubmissiondocuments.

    Perspectiveviewfromsea-waterspatopublicplazashowingtheinternal/externalinteractionofscheme

    Sectionthroughsunkenpublicplazaintheheartoftheschemeshowinggalleryspaceandsea-waterspa

    Masterplanofscheme

  • Competition Competition

    C o n o r J D a l y | P o r t f o l i o

    RESERVE

    NAVETTE

    CERN

    RESERVE

    NAVETTE

    CERN

    2516

    mm

    1500:PLAN

    fghfgjdghjd

    5 set down space near future CERN building

    10 short stay parking spaces

    5 set down spaces

    3 Disabled parking spaces

    4 shuttle bus set down spaces

    50 communal cycles, 50 cycle spaces

    2 coach set down spaces

    Multi- vehicle turning circle

    2516

    mm

    Cultural Architect/MakespaceArchitects

    Project Internationaldesigncompetition

    CERNpublicspacesmasterplan, Meyrin,Geneva,Switzerland

    -UrbandesigncompetitionmasterplanningpublicspaceonthemaincomponentoftheCERNnuclearresearchcampus,Geneva-Competitionbriefwastoredefinemainvisitorareaandcreate landmarkfocalpointthatrespondstoexistingvisitorreceptionandpublictransportlinksandproposedInnovationcentre

    Tasks-Involvedfromconceptstageanndmanagedthedevelopmentofpreliminarydesignideastofinalpresentation-Establishedbriefandtargetsforcompetitionsubmission-Supervisedandco-ordinatedprojectteamof2juniorstaffmembers

    Imageofphysicalmodelfordesigndevelopment

    Masterplanofpublicspaceincludingfragmentedrouteway

    Renderofinterventionshowingpublicroutewayandreceptionbuilding

  • Academic

    C o n o r J D a l y | P o r t f o l i o

    1 2 3 4 5 6

    A

    p r

    d e t a i l ss e g e m e n t e d s e c t i o n 1:50

    j u n c t i o n w i t h e x i s t i n g w a l l1:50

    s e c t i o n t h r o u g h w o r k i n g y a r d1:50

    g a l l e r y s e c t i o n1:50

    B

    C

    Dc i r c u l a t i o n i n

    Wall Construction [Detail A]Metal flashing Reconstituted stone capping 120mmOn exsiting wallMetal steel C section for drainage 190 x 180 x 15mmInsulation 60mmSteel covering plate welded to Corten beam 12mmIPET parallel corten Steel section 355 x 302mmSelf supporting structural unitized curtain wall system -Fitting bracket bolted to beam

    Floor Construction [Detail D]Weatherproof corten sheet steel 4000 x 2500 x 15mm - 20mm jointsHorizontal fixing, steel angle - connected to sub-structure and faade plates via bolds welded onInsulation 100mmHEM Wide flange heavy duty steel beam 990 x 302mmSlimfloor steel beams w. precast aerated concrete slabs 225mmVapour barrierScreed covering 60mmTimber battens 10mmWooden Floorboards 16mm

    perspective of internal court

    north elevation 1:2000 [approx.]

    StructureDiagram showing dore supporting portalframe to span cantilever

    HEM Wide flange heavy duty steel beamThickness 900mm supporting 225mmslimfloor beams

    Tension cables to tie structure and in collarboration with extended foundations atfulcrum to counteract torsional forces

    perspective of internal court

    north elevation

    series of concept models

    segmented section

    Cultural DublinSchoolofArchitecture

    Project NationalSculptureFactory atCustomHouseQuay,Cork

    ThesisProject, DublinSchoolotArchitecture. DITBoltonStreet

    -ThebriefwasestabvlishedtorejunvenateahistoricyetdilapidatedsiteontheperipheryofCorkcitycentrebystitchingitbackintothedeterioratingbuiltenvironment.-Theclientwasselected-theNationalSculptureFactory-acollectivethatprovideslocalartistswithwork-spaceandfacilitiesfortherealisationoftheirownprojects.-Achallengingprogrammehadtoconsistofbothflexiblework spacestoallowtosculpterstocreatewithoutdistractionalongsideapublicandcompemptoryexhibitionspaces-Anyinterventionhadtoworkwiththeexistingfootprintofthebondedwarehouses-aprotectedstructure-andbesympathectictothearchitecturalstyle.-Are-interpretationoftheinternallayoutcreatedenclosurestodefinedifferentactivitieswhileengagingtheexistingstructureasadevicetogroupanddivideuses,whilethequayperformstheroleofbothpromenadeanddisplaycase

    site context

    Concept sketches : Intergration, permeability, functionality

    National Sculpture FactoryCustom House Quay, Cork

    The main focus of the project is to reju-venate the historic site of the city, where

    the Cork bonded warehouse are situated, while trying to re-intergrate the dock-lands, rapidily declining into a state of

    delapiation, back into the city.

    For the client, the National Sculpture Fac-tory, is it an chance to provide a contem-

    pory and exible space for the realiza-tion of sculptural projects of differing

    scale for artists, and to act as a forum for interaction with the public in the form of

    a venue for events, lectures, discussions and most importantly display

    RenderfromHorgansQuayshowingmainexhibitionspaceextrudingovertheexsitingwarehousewall.

    Seriesofexploratorymodelsinvestigatingtopicssuchasinteractionwithexistingbuiltenvironment,urbanstitchingandrejuvenation

    S

    iteplanwith

    urban

    grainsh

    own

  • Academic Academic

    C o n o r J D a l y | P o r t f o l i o

    00 1:200

    level 0 1:1000 [approx]

    East Section 1:1000 [approx]

    Groundlevelplan

    LongsectionAAthroughsite[Facingeast]

  • Academic

    C o n o r J D a l y | P o r t f o l i o

    1 2 3 4 5 6

    A

    p r

    d e t a i l ss e g e m e n t e d s e c t i o n 1:50

    j u n c t i o n w i t h e x i s t i n g w a l l1:50

    s e c t i o n t h r o u g h w o r k i n g y a r d1:50

    g a l l e r y s e c t i o n1:50

    B

    C

    Dc i r c u l a t i o n i n

    Wall Construction [Detail A]Metal flashing Reconstituted stone capping 120mmOn exsiting wallMetal steel C section for drainage 190 x 180 x 15mmInsulation 60mmSteel covering plate welded to Corten beam 12mmIPET parallel corten Steel section 355 x 302mmSelf supporting structural unitized curtain wall system -Fitting bracket bolted to beam

    Floor Construction [Detail D]Weatherproof corten sheet steel 4000 x 2500 x 15mm - 20mm jointsHorizontal fixing, steel angle - connected to sub-structure and faade plates via bolds welded onInsulation 100mmHEM Wide flange heavy duty steel beam 990 x 302mmSlimfloor steel beams w. precast aerated concrete slabs 225mmVapour barrierScreed covering 60mmTimber battens 10mmWooden Floorboards 16mm

    perspective of internal court

    north elevation 1:2000 [approx.]

    StructureDiagram showing dore supporting portalframe to span cantilever

    HEM Wide flange heavy duty steel beamThickness 900mm supporting 225mmslimfloor beams

    Tension cables to tie structure and in collarboration with extended foundations atfulcrum to counteract torsional forces

    perspective of internal court

    north elevation

    series of concept models

    segmented section

    Renderofpublicenclosurefacingexhibitionspace

    Axon

    ometricdiagram

    ofprogrammaticelem

    entsofprojectSectionalcuttingthroughworkspace/privateenclosure/

    offices/publicenclosuretohighlightkeyjunctions