CONSTRUCTION OF BURMA CAMP ROAD PH. 1 (3.66KM) – LOT 2 TEST FOR ASPHALTIC WEARING COURSE LAID CH1+350 - CH 1+150 LHS & CH 0+800 - CH 0+900 RHS DATE: Tray Test for Prime Coat Spread Rate Marshall Test Test Average Marshall Stability (N) Flow Value (mm) Temparatures Void in total mix Average Departure Temparature oC Voids filled with Bitumen Average Arrival Temparature oC Marshall Density(g/cm3) Average Laying Temparature oC Max S.G Average Compaction Temparature oC Core Test Results Average Core Thickness (mm) Compaction % In place Air Voids % Bitumen Content % GRADING FOR BINDER COURSE MATERIAL 0/14mm Sieve Sizes (mm) Min Mid Point Max 28.0 100 100 100 20.0 100 100 100 14.0 90 95 100 10.0 70 80 90 6.3 55 65 75 4.0 45 54 63 2.0 33 41 48 1.0 23 31 38 0.425 14 20 25 0.300 12 17 22 0.150 8 12 16 0.075 5 8 10 53.8 65.0 80.3 95.3 100.0 100.0 2.396 4.9 9.6 14.6 18.6 30.4 39.3 Percentage of passing Percent by Weight Percentage of Passing (%) 6.5 % 6 - 8% 4.87 % 4.7±0.3% Achieved Specification 43.3 mm 40.0mm Min 97.8 % 96 - 98% 152 o C 2.514 141 o C 120 o C Min 167 o C 170 o C Max 70.40% 65 - 75% 162 o C 2.6 mm 2' - 4 mm Achieved Specification 4.8 % 3 - 5% 5-Aug-15 Achieved Specification Achieved Specification 0.45 l/m2 0.4 - 0.65 l/m2 14430 N 8200 - 18000 N 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 0.0 0.1 1.0 10.0 100.0 Percentage Passing (%) Sieve Size (mm) ASPHALT GRADING CURVE (Wearing Course) Percentage of Passing (%) 6. 3

Upload: kwame-asamoa

Post on 11-Dec-2015

216 views

Category:

Documents


4 download

DESCRIPTION

asedw

TRANSCRIPT

Page 1: Conrete Qqqqqqqq 2

CONSTRUCTION OF BURMA CAMP ROAD PH. 1 (3.66KM) – LOT 2TEST FOR ASPHALTIC WEARING COURSE LAID CH1+350 - CH 1+150 LHS & CH 0+800 - CH 0+900 RHS

DATE:

Tray Test for Prime Coat Spread Rate Marshall Test Test Average Marshall Stability (N)

Flow Value (mm)Temparatures Void in total mix Average Departure Temparature oC Voids filled with BitumenAverage Arrival Temparature oC Marshall Density(g/cm3)Average Laying Temparature oC Max S.G Average Compaction Temparature oC

Core Test Results Average Core Thickness (mm)Compaction % In place Air Voids %Bitumen Content %

GRADING FOR BINDER COURSE MATERIAL 0/14mm

SieveSizes (mm) Min Mid Point Max28.0 100 100 10020.0 100 100 10014.0 90 95 10010.0 70 80 906.3 55 65 754.0 45 54 632.0 33 41 481.0 23 31 38

0.425 14 20 250.300 12 17 220.150 8 12 160.075 5 8 10

53.865.080.395.3100.0100.0

2.396

4.99.6

14.618.630.439.3

Percentage of passing Percent by Weight

Percentage of Passing (%)

6.5 % 6 - 8%4.87 % 4.7±0.3%

Achieved Specification43.3 mm 40.0mm Min97.8 % 96 - 98%

152 oC 2.514141 oC 120oC Min

167 oC 170oC Max 70.40% 65 - 75%162 oC

2.6 mm 2' - 4 mmAchieved Specification 4.8 % 3 - 5%

5-Aug-15

Achieved Specification Achieved Specification0.45 l/m2 0.4 - 0.65 l/m2 14430 N 8200 - 18000 N

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

0.0 0.1 1.0 10.0 100.0

Perce

ntage

Passi

ng (%

)

Sieve Size (mm)

ASPHALT GRADING CURVE (Wearing Course)

Percentage of Passing (%)

6.3