consents and minor variances - vaughan...todd coles, bes, mcip, rpp manager of development services...

8
Form 9 COMMITTEE OF ADJUSTMENT 2141 Major Mackenzie Drive, Vaughan, Ontario, L6A 1T1 Tel [905] 832-2281 Fax [905] 832-8535 FILE NUMBERS: B004/16, B005/16, A092/16 and A093/16 APPLICANT: MEINHARD KEHREN PROPERTY: Part of Lot 25, Concession 3 (Block B, of Registered Plan M-1699) municipally known as 2175A & 2175 Teston Road, all respectively, Maple. ZONING: The subject lands are zoned M2, General Industrial Zone, subject to Exception 9(25), under By-law 1-88, as amended. PURPOSE B004 /16: The purpose of this application is to request the consent of the Committee of Adjustment to convey the parcel of land for the CREATION of a NEW LOT marked "A" on the attached sketch, for industrial purposes, together with all required easements and right-of-ways, if required, and retain land marked "B" on the attached sketch for industrial purposes. Currently there is an existing industrial on the subject lands and two industrial buildings located on the retained lands. PURPOSE B005 /16: To request the consent of the Committee of Adjustment to grant a parcel of land marked "A" on the attached sketch as an EASEMENT in favour of the lands to the EAST (being 2175 Teston Road) and retain the lands marked “B” on the attached sketch as vacant lands. Currently there are two existing industrial buildings on the subject lands. PURPOSE A092/16 & A093/16: To facilitate the severance of the total lands B004/16 (Subject and Retained lands) and permit the maintenance of an existing industrial buildings. PROPOSAL 1. To permit a minimum rear yard setback of 11.52 m (A092/16). To permit a minimum rear yard setback of 13.64 m (A093/16). 2. To permit a minimum interior side yard setback of 4.14m (A093/16). 3. To permit a parking aisle width of 5.15 metres. (A093/16) BY-LAW REQUIREMENT: 1. A minimum rear yard setback of 15 m is required. 2. A minimum interior side yard setback of 6 m is required 3. A minimum parking aisle width of 6.0 metres is required. BACKGROUND INFORMATION: Other Planning Act Applications The land which is the subject in this application was also the subject of another application under the Planning Act: MINOR VARIANCE APPLICATION: A327/13 - APPROVED – Dec 12/13 (permits four (4) open storage areas to be unenclosed by fencing (3.1% of lot area)). A152/93 - APPROVED - November 25, 1993 ( 0% lot area devoted to sewage disposal area). SITE PLAN APPLICATION: DA.12.070 - APPROVED - Application for outdoor storage areas. A sketch is attached illustrating the request. This application will be heard by the Committee of Adjustment on the date and time shown below. DATE: THURSDAY, JULY 7, 2016 TIME: 6:00 PM LOCATION: COMMITTEE ROOM 242/243 (2 nd Floor) VAUGHAN CITY HALL 2141 MAJOR MACKENZIE DRIVE VAUGHAN, ONTARIO L6A 1T1 You are invited to attend this public hearing in person to express your views about this application or you may be represented by counsel for that purpose. If you do not attend at the hearing it may proceed in your absence and, except as otherwise provided in the Planning Act, you will not be entitled to any further notice of the proceedings. If you wish to be notified of the decision of the Committee of Adjustment with respect to this application, you must complete the attached “Request for Decision” form and submit it to the Secretary- Treasurer. 1 of 2 NOTICE OF APPLICATION CONSENTS AND MINOR VARIANCES

Upload: others

Post on 21-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available

Form 9

COMMITTEE OF ADJUSTMENT2141 Major Mackenzie Drive, Vaughan, Ontario, L6A 1T1

Tel [905] 832-2281 Fax [905] 832-8535

FILE NUMBERS: B004/16, B005/16, A092/16 and A093/16 APPLICANT: MEINHARD KEHREN PROPERTY: Part of Lot 25, Concession 3 (Block B, of Registered Plan M-1699) municipally known

as 2175A & 2175 Teston Road, all respectively, Maple. ZONING: The subject lands are zoned M2, General Industrial Zone, subject to Exception 9(25),

under By-law 1-88, as amended. PURPOSE B004 /16:

The purpose of this application is to request the consent of the Committee of Adjustment to convey the parcel of land for the CREATION of a NEW LOT marked "A" on the attached sketch, for industrial purposes, together with all required easements and right-of-ways, if required, and retain land marked "B" on the attached sketch for industrial purposes. Currently there is an existing industrial on the subject lands and two industrial buildings located on the retained lands.

PURPOSE B005 /16:

To request the consent of the Committee of Adjustment to grant a parcel of land marked "A" on the attached sketch as an EASEMENT in favour of the lands to the EAST (being 2175 Teston Road) and retain the lands marked “B” on the attached sketch as vacant lands. Currently there are two existing industrial buildings on the subject lands.

PURPOSE A092/16 & A093/16:

To facilitate the severance of the total lands B004/16 (Subject and Retained lands) and permit the maintenance of an existing industrial buildings.

PROPOSAL

1. To permit a minimum rear yard setback of 11.52 m (A092/16). To permit a minimum rear yard setback of 13.64 m (A093/16). 2. To permit a minimum interior side yard setback of 4.14m (A093/16). 3. To permit a parking aisle width of 5.15 metres. (A093/16)

BY-LAW REQUIREMENT:

1. A minimum rear yard setback of 15 m is required. 2. A minimum interior side yard setback of 6 m is required 3. A minimum parking aisle width of 6.0 metres is required.

BACKGROUND INFORMATION:

Other Planning Act Applications The land which is the subject in this application was also the subject of another application under the Planning Act: MINOR VARIANCE APPLICATION: A327/13 - APPROVED – Dec 12/13 (permits four (4) open storage areas to be unenclosed by

fencing (3.1% of lot area)). A152/93 - APPROVED - November 25, 1993 ( 0% lot area devoted to sewage disposal area). SITE PLAN APPLICATION: DA.12.070 - APPROVED - Application for outdoor storage areas.

A sketch is attached illustrating the request. This application will be heard by the Committee of Adjustment on the date and time shown below.

DATE: THURSDAY, JULY 7, 2016 TIME: 6:00 PM LOCATION: COMMITTEE ROOM 242/243 (2nd Floor)

VAUGHAN CITY HALL 2141 MAJOR MACKENZIE DRIVE VAUGHAN, ONTARIO L6A 1T1

You are invited to attend this public hearing in person to express your views about this application or you may be represented by counsel for that purpose. If you do not attend at the hearing it may proceed in your absence and, except as otherwise provided in the Planning Act, you will not be entitled to any further notice of the proceedings. If you wish to be notified of the decision of the Committee of Adjustment with respect to this application, you must complete the attached “Request for Decision” form and submit it to the Secretary-Treasurer.

1 of 2

NOTICE OF APPLICATION CONSENTS AND MINOR VARIANCES

Page 2: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available

COMMITTEE OF ADJUSTMENT VARIANCE B004/16, B005/16, A092/16 & A093/16

Form 9

Additional information is available from the Committee of Adjustment staff between 8:30 a.m. and 4:30 p.m. Monday to Friday at the Committee of Adjustment, Clerks Department: Tel:(905) 832-8585/Fax: (905) 832-8535. If you wish to make written comments on this application they may be forwarded to the Secretary - Treasurer of the Committee of Adjustment PRIOR TO THE MEETING. Your comments are collected under the legal authority of the Planning Act, R.S.O. 1990,Chapter c. P.13, as amended. Your comments in respect to this application becomes the property of the City of Vaughan and will become part of the decision making process of the application as noted on this form. Pursuant to Section 27 of the Municipal Freedom of Information and Protection of Privacy Act, R.S.O. 1990, c. M.56, as amended, public feedback to planning proposals is considered to be a public record and will be disclosed to any individual (including being posted on the internet) upon request in accordance with Section 27 of the Municipal Freedom of Information and Protection Privacy Act, R.S.O. 1990, c. M.56, as amended. Questions about this collection should be directed to the Secretary-Treasurer, Vaughan Committee of Adjustment, Clerk’s Department, 2141 Major Mackenzie Drive, Vaughan, Ontario; L6A 1T1 (905) 832-8585 x.8332.

DATED JUNE 22, 2016.

Todd Coles, BES, MCIP, RPP Manager of Development Services and

Secretary-Treasurer to Committee of Adjustment

Agenda packages will be available prior to hearing at: Vaughan.ca/CofA

2 of 2

Page 3: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available
providel
Text Box
B004/16
providel
Typewritten Text
A
providel
Typewritten Text
providel
Typewritten Text
B
providel
Typewritten Text
providel
Typewritten Text
providel
A's
providel
B's
Page 4: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available
providel
Typewritten Text
B005/16
providel
Typewritten Text
MAY 12, 2016
providel
Typewritten Text
NEW
colest
Sticky Note
providel
A's
Page 5: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available
providel
Text Box
A092/16
providel
Typewritten Text
providel
Typewritten Text
providel
Typewritten Text
providel
Line
providel
Line
providel
Oval
providel
Typewritten Text
11.52
providel
Typewritten Text
providel
Typewritten Text
providel
Typewritten Text
providel
Typewritten Text
providel
Typewritten Text
providel
Typewritten Text
A092/16
providel
Typewritten Text
A093/16
Page 6: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available

10A

PARKING REQUIREMENTS RETAINED AREA BUILD

INGS A&B

SITE STATISTICS

PARKING REQUIREMENTS SEVERED AREA BUILD

ING C

12.97m

20.53m

7.16m

6.58m

32.76m

12.97m

11.61m

12.48m

6.00m

6.00m

6.00m

18.00m

18.00m

18.00m

42.72m

52.98m

2.70m

6.00m

6.92m6.40m

6.23m

6.03m

6.33m 6.03m

8.36m

6.00m

6.09m

6.22m

6.15m

6.06m

2.70m

6.00m

6.58m

7.00m

20.00m

20.00m

0.60m

EXISTING

2 STOR

EY OFFIC

EW

/ BASEM

ENT

EXISTING

1 STOR

EY WAR

EHO

USE

W/ BAS

EMEN

T

EXISTING

1 STOR

EYS

HIP

PIN

G R

OO

MW

/ BASEM

ENT

EXISTING

2 STOR

EY OFFIC

E

EXISTING

1 STOR

EY BUILD

ING

EXISTING

1 STOR

EYSH

IPPING

W.H

OU

SEW

/ BASEM

ENT

EXISTING

1 STOR

EY BUILD

ING

EXIST.SILO

EX

ISTIN

G R

AM

P EX

ISTIN

G R

AM

P

EX

IST. R

AM

P

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

RETAIN

ING

WA

LL

RETAIN

ING

WALL

EXIST.SILO

A

B

C PR

E-ENG

SHED

FOR

MATER

IALP

AC

KA

GIN

G - 146.99 M

. SQ

.

FIRE H

YDR

ANT

EXIST. FIRE H

YDR

ANT

TESTON

RO

AD

RAILROAD

CB

BIN

BIN

BIN

OU

TSIDE

STO

RAG

EO

UTSID

ES

TOR

AGE

OU

TSIDE

STO

RAG

E

OUTSIDE STORAGE

OU

TSIDE STO

RAG

E

OUTSIDE STORAGEOUTSIDE STORAGE

OUTSIDE STORAGE

6M.RAD.

12M.RAD.

WASTE C

OLLEC

TION

RO

UTE

WASTE COLLECTION ROUTE

12 M. RAD.6 M. RAD.

WASTE C

OLLEC

TION

RO

UTE

0% G

RAD

E

0% G

RAD

E

0% G

RAD

E

LOAD

ING

AREA

LOAD

ING

AREA

LOADINGAREA

112 SPACES PROVIDED (IN

C. 1 HC)

(1,176.73 / 100) x 1.5

=18

(3,700 / 100) x 2 = 74

4,876.73 - 3,700 = 1,17

6.73

GFA = 4,876.73

LOT AREA: 2.63 HECTARES

6.5 ACRES

EXISTING BUILD

ING AREAS (FOOTPRINTS):

BUILD

ING A

1,923.33 sq. m.

BUILD

ING B

715.87 sq. m.

BUILD

ING C

4,392.40 sq. m.

TOTAL EXISTING COVERAGE

7,031.6

0 sq. m.

EXISTING BUILD

ING GFA's:

BUILD

ING A

4,16

0.86 sq. m.

BUILD

ING B

715.87 sq. m.

BUILD

ING C

4,986.40 sq. m.

TOTAL EXISTING GFA

9,863.13

sq. m.

TOTAL

TOTAL COVERAGE

7,031.6

0 sq. m.

TOTAL GFA

9,863.13

sq. m.

74 + 18 = 92 SPACES REQUIRED

N

HC

HC

6M

ETERLAN

DSC

APESTR

IP

REM

OVE E

XISTING

ASPH

ALT, CU

RBS

& GR

ANU

LAR W

ITHIN

6 M. LAN

DSC

APE S

TRIP

& RESTO

RE SO

D O

N M

IN. 100 m

m TO

PSO

IL

OUTSIDESTORAGE

NEW

CED

AR

BO

ARD

FEN

CE

EXIST. SOD

& PLAN

TING

S

LANDSCAPED AREA: .214 HECTARES (8.1%

OF LOT)

LOAD

ING

AREA

LOADING AREA

LOAD

ING

AREA

95 SPACES PROVIDED (IN

C. 1 HC)

(1,286.4 / 100) x 1.5

=20

(3,700 / 100) x 2 = 74

4,986.40 - 3,700 = 1,2

86.4

GFA = 4,986.40

74 + 20 = 94 SPACES REQUIRED

6 EX.

10 EX.

4 EX.

5 EX.

13 EX.

13 EX.

13 EX.

19 EX.

12 EX.

17 EX.17 EX.

13 EX.13 EX. 5 EX.

9 NEW

9 NEW

10 NEW

10A

PARKING REQUIREMENTS RETAINED AREA BUILD

INGS A&B

SITE STATISTICS

PARKING REQUIREMENTS SEVERED AREA BUILD

ING C

12.97m

20.53m

7.16m

6.58m

32.76m

12.97m

11.61m

12.48m

6.00m

6.00m

6.00m

18.00m

18.00m

18.00m

42.72m

52.98m

2.70m

6.00m

6.92m6.40m

6.23m

6.03m

6.33m 6.03m

8.36m

6.00m

6.09m

6.22m

6.15m

6.06m

2.70m

6.00m

6.58m

7.00m

20.00m

20.00m

0.60m

EXISTING

2 STOR

EY OFFIC

EW

/ BASEM

ENT

EXISTING

1 STOR

EY WAR

EHO

USE

W/ BAS

EMEN

T

EXISTING

1 STOR

EYS

HIP

PIN

G R

OO

MW

/ BASEM

ENT

EXISTING

2 STOR

EY OFFIC

E

EXISTING

1 STOR

EY BUILD

ING

EXISTING

1 STOR

EYSH

IPPING

W.H

OU

SEW

/ BASEM

ENT

EXISTING

1 STOR

EY BUILD

ING

EXIST.SILO

EX

ISTIN

G R

AM

P EX

ISTIN

G R

AM

P

EX

IST. R

AM

P

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

RETAIN

ING

WA

LL

RETAIN

ING

WALL

EXIST.SILO

A

B

C PR

E-ENG

SHED

FOR

MATER

IALP

AC

KA

GIN

G - 146.99 M

. SQ

.

FIRE H

YDR

ANT

EXIST. FIRE H

YDR

ANT

TESTON

RO

AD

RAILROAD

CB

BIN

BIN

BIN

OU

TSIDE

STO

RAG

EO

UTSID

ES

TOR

AGE

OU

TSIDE

STO

RAG

E

OUTSIDE STORAGE

OU

TSIDE STO

RAG

E

OUTSIDE STORAGEOUTSIDE STORAGE

OUTSIDE STORAGE

6M.RAD.

12M.RAD.

WASTE C

OLLEC

TION

RO

UTE

WASTE COLLECTION ROUTE

12 M. RAD.6 M. RAD.

WASTE C

OLLEC

TION

RO

UTE

0% G

RAD

E

0% G

RAD

E

0% G

RAD

E

LOAD

ING

AREA

LOAD

ING

AREA

LOADINGAREA

112 SPACES PROVIDED (IN

C. 1 HC)

(1,176.73 / 100) x 1.5

=18

(3,700 / 100) x 2 = 74

4,876.73 - 3,700 = 1,17

6.73

GFA = 4,876.73

LOT AREA: 2.63 HECTARES

6.5 ACRES

EXISTING BUILD

ING AREAS (FOOTPRINTS):

BUILD

ING A

1,923.33 sq. m.

BUILD

ING B

715.87 sq. m.

BUILD

ING C

4,392.40 sq. m.

TOTAL EXISTING COVERAGE

7,031.6

0 sq. m.

EXISTING BUILD

ING GFA's:

BUILD

ING A

4,16

0.86 sq. m.

BUILD

ING B

715.87 sq. m.

BUILD

ING C

4,986.40 sq. m.

TOTAL EXISTING GFA

9,863.13

sq. m.

TOTAL

TOTAL COVERAGE

7,031.6

0 sq. m.

TOTAL GFA

9,863.13

sq. m.

74 + 18 = 92 SPACES REQUIRED

N

HC

HC

6M

ETERLAN

DSC

APESTR

IP

REM

OVE E

XISTING

ASPH

ALT, CU

RBS

& GR

ANU

LAR W

ITHIN

6 M. LAN

DSC

APE S

TRIP

& RESTO

RE SO

D O

N M

IN. 100 m

m TO

PSO

IL

OUTSIDESTORAGE

NEW

CED

AR

BO

ARD

FEN

CE

EXIST. SOD

& PLAN

TING

S

LANDSCAPED AREA: .214 HECTARES (8.1%

OF LOT)

LOAD

ING

AREA

LOADING AREA

LOAD

ING

AREA

95 SPACES PROVIDED (IN

C. 1 HC)

(1,286.4 / 100) x 1.5

=20

(3,700 / 100) x 2 = 74

4,986.40 - 3,700 = 1,2

86.4

GFA = 4,986.40

74 + 20 = 94 SPACES REQUIRED

6 EX.

10 EX.

4 EX.

5 EX.

13 EX.

13 EX.

13 EX.

19 EX.

12 EX.

17 EX.17 EX.

13 EX.13 EX. 5 EX.

9 NEW

9 NEW

10 NEW

LINE OF SEVERANCE

15.28 Meters

7.49 M

11.52 METERS

12.33 METERS

9.73M

6.84M

6.00

2.7 M TYP.

8.39

6.92M

5.91 M

7.80M

4.14M

13.69 METERS

13.64 METERS

6.33 M

6.83M

7.58M

11.34 M

8.06

6.33

18.74

6.908.11

6.67

336.49M

SQ.

100.61M

SQ.

HC

HC

HC

6.10

7.50

2NEW

11 NE

W

4

HC

HC

HC

1094

91.02MSQ.

173.07 M SQ.

76.5M

SQ.

41.31 M SQ.

5.35

ProjectNo:

Project:

DwgTitle:

Address:

DrawnBy:

ChkdBy:

Scale:

Date:

1.)THESE

DRAWINGS

MUST

BECHECKED

BYTHE

CUSTOMER

ORCON

TRACTOR.ANY

ERRORS

OR

OMISSIO

NSMUST

BEREPO

RTEDIN

WRITIN

GTO

NUTIMA

ARCHITECTURE

INC.PRIOR

TOCO

MMENCEM

ENTOF

CONSTRUCTIO

N.

2.)OWNER

ORCO

NTRACTO

RMUST

CHECKAND

VERIFYALL

SITECO

NDITIONSBEFO

REPROCEEDING

WITH

THEWORK.

3.)ALL

DIMENSION

SSHO

WNON

THESEDRAW

INGS

MUST

BECHECKED

AGAINSTALLOTHER

PROJECTDRAW

INGS.

ALLDISCREPANCIES

MUST

BEREPORTED

TOTHE

CONSULTANT

BEFORE

PROCEEDING

WITH

THEWORK.

4.)FOR

CONSTRUCTIO

NPU

RPOSES,U

SEONLY

THELATEST

APPROVED

DRAWINGS

LABELLED'ISSU

EDFO

RCO

NSTRUCTION

'.

5.)DO

NOT

SCALETHE

DRAWINGS.

Drawing

No.:

NUTIM

AARCHITECTU

REINC.

INFO@

NUTIM

AARCHITECTURE.COM

289327

1311

WWW.NUTIM

AARCHITECTURE.COM

Seal:

Revision:

ProjectStatus:

ISSUED

FOR

PERMIT

2175ATESTO

NRD.

1/32"=1'0"

5

\\psf\Home\Desktop\2016 12 SITE PLAN TESTON.rvt

MAR

2016

201612

FABCOPLASTICS

SITE PLAN

S.P.

Scale:1/32"=

1'0"1

SITEPLAN

RevisionSchedule

No.

DescriptionDate

1Issued

toClient

1703

162

Issuedto

Client24

0316

3Issued

toClient

2903

164

ISSUEDPER

COMMEN

T21

0416

5ISSUED

PERCOM

MEN

T10

0516

THISSITE

PLANWAS

PRODU

CEDREFREN

CINGTHE

ORIGIN

ALSU

RVEYPREPARED

BYLLO

YDAN

DPU

RCELLLTD.DATED

MARCH

12,2015

A093/16

4.14m13.64m

5.35m

NEW MAY 12, 2016

MAY 13, 2016REVISED

colest
Rectangle
colest
Typewritten Text
5.15m
Page 7: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available

The City of Vaughan makes every effort to ensure that this map is free of errors but does not warrant that the map or its features are spatially,

tabularly, or temporally accurate or fit for a particular use. This map is provided by the City of Vaughan witthout warranties of any kind, either

expressed or implied.

0 0.1 0.20.05 Kilometers

±

Location Map

City of Vaughan

B004/16, B005/16, A092/16, A093/16

Page 8: CONSENTS AND MINOR VARIANCES - Vaughan...Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment Agenda packages will be available

Form 10B

REQUEST FOR DECISION

Addressing the Committee of Adjustment: Petitions: Please Note:

File No. B004/16, B005/16, A092/16 & A093/16 Date:

PLEASE PRINT: NAME: ADDRESS: POSTAL CODE: A completed form is required from anyone wanting to receive a decision of the Committee of Adjustment. Completion of this form will entitle you to the following: 1. A copy of the Committee of Adjustment decision. 2. An opportunity to address the Committee of Adjustment during the Public Hearing, if

desired. 3. Notification of a hearing and decision of any Ontario Municipal Board hearing, should the

decision of the Committee of Adjustment be appealed.

Once completed, this form must be submitted to the Secretary-Treasurer or Committee of Adjustment staff, on or before the hearing date. A completed form should also be attached to any correspondence filed with the Committee of Adjustment regarding the application.

When addressing the Committee of Adjustment during the hearing, please state your name and address at the beginning of your presentation. Presentations to the Committee are generally limited to 5 minutes in length.

If you wish to submit a petition regarding an application, please make reference to the File Number and name of the Applicant on your petition. ALL NAMES MUST BE PRINTED CLEARLY ALONG WITH THEIR SIGNATURES AND ADDRESSES IN FULL, INCLUDING POSTAL CODE. Failure to do so will result in illegible names and incomplete addresses not receiving the notices. If you wish the petitioner(s) to receive a copy of the decision, you must attach this form with “a decision is requested for each petitioner on the attached petition” written across the space provided for the mailing address. This will also entitle the petitioner(s) to notification of any additional hearings pertaining to the application, if applicable.

The Committee of Adjustment meetings are audio recorded. Your name, address, comments and any other personal information is being collected and maintained for the purpose of sending correspondence relating to matters before the Committee of Adjustment and creating a record that is available to the general public, in a hard copy format, and on the internet, in an electronic format, pursuant to Section 27 of the Municipal Freedom of Information and Protection of Privacy Act. Questions about this collection should be directed to the Secretary-Treasurer.