Project
Construction ManagementTECHNICAL PROPOSALConstruction Camp & Housing FacilitiesCONSTRUCTION OF 555 Nos. HOUSES OF VARIOUS CATEGORIES, 48Nos.OFFICERS FAMILY SUITS AND 60Nos. STAFF FAMILY SUITS INCLUDING EXTERNAL DEVELOPMENT(CIVIL WORKS) & EXTERNAL ELECTRIFICATION WORKS IN KCP COLONY
Construction Camp and Housing Facilities Site preparation including clearing and land preparation
Prior to start construction work at site, site grading, drainage and all other improvements of area will be carried out after the demarcation of buildings. Provision of services (Power, water supply, sewerage system, road)
All the facilities will be established at the mutually agreed area near the Construction site. All arrangements will be carried out to maintain existing access routes, roads and other services until completion of the works.
Brick structure accommodation for Staff and prefabricated structures for labor will be constructed near the construction site.
Storage Yards & Site Store
Open storage for Sand & crush, Steel storage yards, Site Stores and Chemical stores will be established at camp site for storage purposes.
Labor & Staff Accommodations and messing
Accommodation facility for Staff and labor will be arranged in the nearby area. It will be ensured that all residences fulfill the basic minimum requirements with separate bathing and messing facilities. Provision of fresh drinking water and electricity in the accommodation will be ensured.
Furnished accommodation for our staff will also be arranged at the mutually agreed place near the Construction area.
Residential and office areas will be kept dry and free from dense vegetation, any collection of water will be sprayed with oil or other anti-malaria liquid, covered rubbish receptacles will be provided at suitable places in the camps and cleaned daily, open spaces around the buildings will be swept daily and all rubbish will be removed.
Offices, Workshops, First aid, Recreation and shopping facilities
Offices, workshops & First aid facilities for Staff and labor will be established.
All buildings constructed for residential purposes, camps and warehouses will be prefabricated structures.
All these facilities will be equipped with all the basic requirements of the office like furniture, computers, photocopier, telephone/fax, stationary etc. All arrangements will be carried out for provision of drinking water and electricity.
Construction Equipment assembly preparation
We shall furnish all supervision, labor, materials, equipment and services, except for work and services specified to be furnished by the Employer and will perform all work required to install the plant ready for operation. Except for the work and services and ancillaries specified to be furnished by the Employer, everything required to complete and put the plant into operation, although not expressly called for in the specifications, will be performed and furnished by us.
We will provide plant erectors to direct and be responsible for erection, skilled and unskilled labor and technical / non-technical personnel required for erection, testing, maintenance & operation.
We will provide equipment for transporting, lifting, handling, supporting, welding, testing and all other operations necessary for complete installation.
We will make all necessary measures for the protection of plant, erection & testing equipment and maintenance tools including construction of special shelters, application of special coverings & coatings and any other means that may be required.
Site security plan
We will ensure the security of our site facilities & camp and necessary training of our staff and labor will be arranged to avoid any mishap. Site will be completely barricaded. Entry & exit from site will only be through designated points only. All emergency exits will be kept closed during normal / routine working. Clients security procedures will also be followed. Note: All the facilities will remain the property of Contractor after the completion of works.
CONSTRUCTION OF 555 Nos. HOUSES OF VARIOUS CATEGORIES, 48Nos.OFFICERS FAMILY SUITS AND 60Nos. STAFF FAMILY SUITS INCLUDING EXTERNAL DEVELOPMENT(CIVIL WORKS) & EXTERNAL ELECTRIFICATION WORKS IN KCP COLONY