Construction Industry Development Board
development through partnership
Implementing the CIDB Standard for Uniformity in Construction Procurement
3a
Aligning SCM processes to facilitate implementation
Construction Industry Development Board
development through partnership
STANDARDIZED CONSTRUCTION PROCUREMENT DOCUMENTS FOR
ENGINEERING AND CONSTRUCTION WORKS
NB Employers should develop their own standardised procurement document using this generic document as a base.
STANDARDIZED PROCUREMENT DOCUMENTS FOR ENGINEERING AND CONSTRUCTION WORKS
Construction Industry Development Board
development through partnership
Principal activities associated with the procurement process1 Establish what is to be procured2 Decide on procurement strategies3 Solicit tender offers4 Evaluate tender offers5 Award contract6 Administer contracts and confirm compliance with requirements
A need triggers the procurement process
Provision of works, services, supplies
concludes the procurement process
Components of a procurement system
Methods
Procedures
Policy
Construction Industry Development Board
development through partnership
Outline of procurement process
1. Establish what is to be procured
• Clarify what is to be procured
2. Decide on procurement strategies
• Determine how the procurement is to take place
3. Solicit tender offers
• Solicit tender offers in terms of a set of procedures
@cidb
Construction Industry Development Board
development through partnership
4. Evaluate tender offers
• Evaluate tender offers in terms of undertakings and parameters established in procurement documents.
5. Award contract
• Enter into contract with the successful tenderer.
6. Administer contract and confirm compliance with requirements
• Act in terms of the contract and confirm that procurement is in accordance with all requirements.Register award and cancellation, if any on cidb website
Construction Industry Development Board
development through partnership
2. Advertise using iTender, indicating approximate contractor grading requirements
Registers & Procurement Interactions
1. Establish
what is to be
procured
5. Award contract
2. Determine Procurement
strategy
3. Solicit tender
offers
3.a Tender Offers by
contractors
4. Tender Evaluation
& Contractor selection
6. Manage contractor
3. Validate CIDB Registration
4. Validate Contractor GradeReg Con
5. Register Award
Reg Proj6. Register Completion (optional)
1. Determine approximate contractor grading requirements e.g 5 GB
Construction Industry Development Board
development through partnership
Activity 1: Establish what is to be procured
• Prepare broad scope of work for procurement
• Estimate financial value of proposed procurement
Control point : Obtain permission to start with the procurement process
Construction Industry Development Board
development through partnership
Activity 2: Decide on procurement strategies
Establish applicable
•preferential procurement policy
•contract and pricing strategy
•targeting strategy
•procurement procedure Control point: obtain approval for procurement strategies that are to be adopted
What BEE goals are to be pursued?
How are the risks, liabilities and obligations of the
parties to be structured?How is the contractor to be
paid?
What procedure is required to solicit tender offers?
What are the preferencing arrangements?
Construction Industry Development Board
development through partnership
Choosing a procurement strategy is similar to developing a business plan
In cases where procurement is routine and occurs regularly, standard procedures can be developed and used.
NB Procurement documents need to be aligned with chosen procurement strategy
Construction Industry Development Board
development through partnership
Activity 3: Solicit tender offers
• Prepare procurement documents
• Invite contractors to submit tender offers (or expressions of interest) advertise on
• Receive tender offers (or expressions of interest)
• Evaluate expressions of interests
• Prepare evaluation report on short listing process
• Invite tender offers from short list
Control points
•obtain approval for procurement documents
•confirm that budget in place
Control point : confirm short-list
Procurement procedure
Construction Industry Development Board
development through partnership
A procurement system may be considered to be transparent if:
• the terms upon which the procurement process are to be conducted and the criteria upon which any decisions are to be made are properly documented and made widely available;
• the eventual procurement award decision, and where appropriate, any intermediate decisions, is made publicly available as are the reasons given for these decisions; and
• it is possible to verify that the documented procedures and criteria were indeed applied.
Construction Industry Development Board
development through partnership
Standardised procurement documentsTendering procedures
T1.1 Tender Notice and Invitation to Tender
T1.2 Tender Data
Returnable documents
T2.1 List of Returnable Documents
T2.2 Returnable Schedules
Part 1: Agreements and contract data
C1.1 Offer and Acceptance
C1.2 Contract Data
Part 2: Pricing data
C2.1 Pricing Instructions
C2.2 Activity Schedule / Bill of Quantities
Part 3: C3 Scope of Work
Part 4: C4 Site information
Example in CIDB Standard for Uniformity
Examples in CIDB Standard of Uniformity
CIDB Standard conditions of tender
CIDB Standard of Uniformity
Standard Industry Form of Contract with contract specific data
Project specific
SANS 10403 (SANS 1921, SANS 2001 and 1914)
Project specific (SANS 10403)
Construction Industry Development Board
development through partnership
T1.1 Tender Notice and Invitation to Tender (sample)Tenders are invited for the provision of . . . . . . . The Employer is …………..The physical address for collection of tender documents is: …………... Documents may be collected during working hours after 09:00 on …..A non-refundable tender deposit of R……payable by cheque made out in favour of the Employer is required on collection of the tender documents. Queries relating to the issues of these documents may be addressed to Mr/Ms . . . . ., Tel No. . . . . . . , Fax No. . . . . . . e mail . . . . . . A compulsory pre tender meeting with representatives of the Employer will take place at . . . . . . on . . . . .. starting at . . . . hrs. The closing time for receipt of tenders is . . . . . . hrs on . . . . . . .Requirements for sealing, addressing, delivery, opening and assessment of tenders are stated in the Tender Data.
@cidb generates this notice
Construction Industry Development Board
development through partnership
T1.2 Tender Data
The conditions of tender are the Standard Conditions of Tender as contained in Annex F of the CIDB Standard for Uniformity in Construction Procurement.The standard conditions of tender for procurements make several references to the tender data for details that apply specifically to this tender. The tender data shall have precedence in the interpretation of any ambiguity or inconsistency between it and the standard conditions of tender.Each item of data given below is cross-referenced to the clause in the standard conditions of tender to which it mainly applies.
Clause number
F.1.1 The employer is ………
Construction Industry Development Board
development through partnership
Annex F Standard conditions of tender
CIDB Standard for Uniformity in Construction Procurement
1 General• Tender Documents• Interpretation• Communication and employer’s agent• The employer’s right to accept or reject any
tender offer 2 Tenderer’s obligations
3 Employer’s undertakingsNB Conditions facilitate compliance with several
requirements of MFMA - SCM Regulations
Impacts on SCM processes
Construction Industry Development Board
development through partnership
Tenderer’s obligationsEligibility Cost of tenderingCheck documents Confidentiality and
copyright of documentsReference documents Acknowledge addendaSite visit and clarification meeting Seek clarificationInsurance Pricing the tender offerAlterations to documents Alternative tenders Information and data to Submitting a tender offer be completed in all respectsClosing time Tender offer validityClarification of tender offer after Provide other materialsubmission Submit securities, Inspections, tests and analysis bonds, policies, etc.Check final draft Return of other tender documents Certificates
Construction Industry Development Board
development through partnership
The Employer’s undertakingsRespond to clarification Issue AddendaReturn late tender offers Opening of tender
submissionsTwo-envelope system Non-disclosureGrounds for rejection and Disqualification Test for responsivenessArithmetical errors Clarification of a tender
offerEvaluation of tender offers Insurance provided by
the employerAcceptance of tender offer Notice to unsuccessful
tenderersPrepare contract documents Issue final contractComplete adjudicator's Provide copies of the contract contracts
Construction Industry Development Board
development through partnership
List of returnable documents
Returnable Schedules required for tender evaluation purposes
Other documents required for tender evaluation purposes
Tax Clearance Certificate / Application for a Tax Clearance Certificate
Returnable Schedules that will be incorporated into the contract
Preference schedules
Other schedules and affidavits that will be incorporated into the contract
Construction Industry Development Board
development through partnership
CIDB Standard for Uniformity in Construction Procurement
Preferencing schedules
Annex D: Direct Preferencing
Annex E: Participation Goals
BEE
Construction Industry Development Board
development through partnership
Standard returnable documents
-Compulsory Enterprise Questionnaire
Requires tenderers to:
Provide name , VAT, Tax, Company and CIDB registration numbers
Record involvement of principals in the service of the state (current and within the last 12 months)
Record of spouses, children and parents in the service of the state
NB Facilitates compliance with SCM Regulation 21 c) re the compelling of tenderers to declare any conflict of interest and provide certain particulars
Construction Industry Development Board
development through partnership
CIDB Standard for Uniformity in Construction Procurement
C1.1 Form of offer and acceptance
1 Offer
2 Acceptance
Schedule of deviations
Note: Tenderer signs offer and employer signs acceptance to form the contract.
The schedule of deviations records the items that have changed between offer and acceptance
Impacts on SCM processes
Construction Industry Development Board
development through partnership
1.The agreement comes into effect on the date when the tenderer receives the signed agreement (offer and acceptance), complete with schedule of deviations.
2.The tenderer (now contractor) has a specified number of working days from the date of receipt of signed agreement to advise the employer why he cannot accept the contents of this agreement (eg schedule of deviations does not reflect what was agreed) , failing which agreement constitutes a binding contract between the parties.
Principles
Construction Industry Development Board
development through partnership
Option 1- tenderer comes in and collects signed contract
Option 2- employer submits documentation to a courier-to-counter delivery / counter-to-counter delivery / door-to-counter delivery /door-to-door delivery /courier service
On what date does the contract come into effect?
When tenderer receives the signed agreement
2 working days after the employer submits the signed agreement to the service provider, provided that the employer notifies the tenderer of the tracking number within 24 hours of such submission
Construction Industry Development Board
development through partnership
C1.2 Contract DataExample
The General Conditions of Contract for Construction Works (2004) published by the South African Institution of Civil Engineering, is applicable to this contract.
Copies of these conditions of contract may be obtained from the South African Institution of Civil Engineering (tel 011-805 5947)
Part 1: Contract Data completed by the Employer(see guidance on essential data and optional data provided in GCC 2004)Part 2: Contract Data completed by the Contractor(see guidance on essential data and optional data provided in GCC 2004)
Construction Industry Development Board
development through partnership
Part 2 :Pricing Data
Formulate around the pricing strategy that is adopted, typically Bill of Quantities.
Other strategies include:
Activity schedules
Cost reimbursable Target cost
Time-based contract Retainer and / or contingency contract
Percentage contract Indefinite Delivery Contract
Note: The terms of payment and the provisions for price adjustment for inflation, if applicable, are established in the contract data.
Construction Industry Development Board
development through partnership
C2.1 Pricing Instructions The method of measurement published by the South African
Bureau of Standards in clause 8 of the Standardised Specifications for Civil Engineering Construction is applicable, subject to the variations and amendments contained in the section “Applicable SABS 1200 standardised specifications”.
Descriptions in the Schedule of Quantities are abbreviated and comply generally with those in the Standardised Specifications. Clause 8 of each Standardised Specification, read together with the relevant clauses of the Scope of Work, set out what ancillary or associated activities are included in the rates for the operations specified. Should any requirements of the measurement and payment clause of the applicable Standardised Specification, or the Scope of Work, conflict with the terms of the Schedule, the requirements of the Standardised Specification or Scope of Work, as applicable, shall prevail.
Construction Industry Development Board
development through partnership
Bill of quantitiesItem.
Ref Description Unit Quantity
Rate Price
Total for section carried forward to the summary of Bill
Construction Industry Development Board
development through partnership
The Scope of Work specifies and describes the engineering and construction works which are to be provided and any other requirements and constraints relating to the manner in which the contract work is to be performed
e.g. 1. building will be occupied during upgrading
2. Other contractors will be on site simultaneously
Construction Industry Development Board
development through partnership
The Standard for Uniformity in Construction Procurement (see clause 4.4.7) requires that the scope of work shall, wherever possible be:
a) described in terms of performance rather than the design or
descriptive characteristics, andb) based on national or international
standards, where such exist.e.g. the building shall maintain
an ambient day time temperature of 20 to 24 degrees
Construction Industry Development Board
development through partnership
SANS 1921 family of standards for Construction and Management RequirementsConstruction
Works specificationsPlant and materialsConstruction EquipmentExisting servicesSite establishmentSite usagePermits and way leavesAlterations, additions, extensions and modifications to existing worksInspection of adjoining propertiesWater for construction purposesSurvey control and setting out of the works
ManagementManagement of the worksHealth and safety
Each part of SANS 1921 standardizes an aspect of requirements
separation ofmanagement from
construction
Construction Industry Development Board
development through partnership
SANS 1921 family of standards for Construction and Management requirements for Works Contracts
Part 1 General engineering and construction works
Part 2 Accommodation of traffic on public roads
Part 3 Structural steelwork
Part 4 Third-party management support in works contracts
Part 5 Earthworks activities which are to be performed by hand
Part 6 HIV/AIDS Awareness
EPWP requirement
Construction Industry Development Board
development through partnership
Under development
SANS 2001 family of Construction Works Standards Site clearance Earthworks Earthworks (small Earthworks (pipe trenches) Earthworks (small dams) works)Gabions and pitching Earthworks (roads, Earthworks (railway Structural aluminum work subgrade) sidings)Piling Concrete (small works)) Concrete (structural)Precast concrete (structural) Prestressed concrete Installation of Masonry walling Foundations for masonry glazing in window Cladding and sheeting walls and door framesFixing of roofs tiles and Structural steel work Structural steelwork Sheeting Corrosion protection of (sundry items)Structural timberwork structural steelwork Timber flooringMedium pressure pipelines Bedding (pipes) Cable ducts Sewers Stormwater drainage Erf connections Pipe jacking Cement –mortar lining (water) Roads (general) of pipes and pipelines Subbase Base Bituminous surface Asphalt base and Segmented paving treatment surfacing Kerbing and channeling Ancillary roadworks Base-heavy Base (light pavement structure) Supply of crushed stone base pavement Railway sidings (trackwork) Cement plaster structures
Construction Industry Development Board
development through partnership
Part 4 : Site Information
Describe the site and access to the site as at the time of tender to enable the tenderer to price his tender offer and to decide upon his method of working and programming.
examples
1. report on founding conditions
2. Building will be occupied during upgrading contract
NB Forms basis of claims if situation is different from what is described.
Construction Industry Development Board
development through partnership
Activity 4: Evaluate tender offers
• Open and record tender offers received
• Determine whether or not tenders offers are complete
• Determine whether or not tender offers are responsive
• Evaluate tender submissions
• Perform a risk analysis on preferred tenderer.
• Prepare a tender evaluation reportControl point: Confirm recommendations contained in the tender evaluation report.
Construction Industry Development Board
development through partnership
Standard Conditions of Tender: employer’s undertakings
Opening of tenders
• Record particulars
-name of tenderer
-the total of prices
-preferences claimed
• Make information available
to interested parties
F.3.5.2
Register contractaward
cidb website
Construction Industry Development Board
development through partnership
Standard Conditions of Tender: employer’s undertakings
Disqualify tenderer if corrupt or fraudulent practices are detected
F.3.7
Links to Code of Conduct
Construction Industry Development Board
development through partnership
Standard Conditions of Tender: employer’s undertakings
Test for responsiveness
A responsive tender submission is one whicha) satisfies the requirement of the tender data;b) has been properly and fully completed and signed; andc) conforms to all the terms, conditions, and specifications of the procurement documents without material deviation or qualification which, in the organization’s opinion, would
-detrimentally affect the scope, quality, or performance of the works, services or
supply identified in the scope of work,-change the employer's or the tenderer's risks and responsibilities under the contract, or-affect the competitive position of other tenderers presenting responsive tenders, if it were to be rectified.
F.3.8
SCM processes
Construction Industry Development Board
development through partnership
Standard Conditions of Tender: employer’s undertakings
Arithmetical errors
Check responsive tender offers for arithmetical errors, correcting them in the following manner:•Amount in words govern.•In a bill of quantities (or schedule of quantities or schedule of rates) the line total applies and the rate shall be corrected. Where there is an obviously gross misplacement of the decimal point in the unit rate, the unit rate will be corrected.•The total of the prices applies and the tenderer will be asked to revise selected item prices (and their rates if a bill of quantities applies) to achieve the tendered total of the prices.
F.3.9
SCM processes
Construction Industry Development Board
development through partnership
Ranking and scoring of responsive tenderers
Do so in terms of method nominated in Tender Data
F.3.11
SCM processes
Construction Industry Development Board
development through partnership
Method 1: Financial offere.g. emergency
1) Rank tender offers from the most favourable to the least favourable comparative offer.
2) Recommend highest ranked tenderer for the award of the contract, unless there are compelling and justifiable reasons not to do so.
Construction Industry Development Board
development through partnership
Method 2:Financial offer and preferences
1) Score tender evaluation points for financial offer.
2) Confirm that tenderers are eligible for the preferences claimed and if so, score tender evaluation points for preferencing
3) Calculate total tender evaluation points.
4) Rank tender offers from the highest number of tender evaluation points to the lowest.
5) Recommend tenderer with the highest number of tender evaluation points for the award of the contract, unless there are compelling and justifiable reasons not to do so.
Construction Industry Development Board
development through partnership
Method 3:Financial offer and
quality (when appropriate)
1) Score quality, reject all tender offers that fail to score the minimum number of points for quality stated in the Tender data, if any.
2) Score tender evaluation points for financial offer.
3) Calculate total tender evaluation points.
4) Rank tender offers from the highest number of tender evaluation points to the lowest.
5) Recommend tenderer with the highest number of tender evaluation points for the award of the contract, , unless there are compelling and justifiable reasons not to do so.
Construction Industry Development Board
development through partnership
Method 4: Financial offer, quality and preferences
1) Score quality, reject all tender offers that fail to score the minimum number of points for quality stated in the Tender data, if any.
2) Score tender evaluation points for financial offer.
3) Confirm that tenderers are eligible for the preferences claimed, and if so, score tender evaluation points for preferencing.
4) Calculate total tender evaluation points.
5) Rank tender offers from the highest number of tender evaluation points to the lowest.
6) Recommend tenderer with the highest number of tender evaluation points for the award of the contract.
Construction Industry Development Board
development through partnership
Highest price (or discount)
))(
(1m
m
P
PP
))(
(1m
m
P
PP
Lowest price (or percentage commission/fee)
Pm = comparative offer of the most favourable
P = comparative offer of the offer being scored
F.3.11.2
Construction Industry Development Board
development through partnership
Scoring price and preference
Ps = 80 (1- (Pt – Pmin)) Pmin
WherePs = Points scored for financial offer of tender under considerationPt = Rand value of financial offer under consideration Pmin = Rand value of lowest acceptable financial offer
Total points
= Points for financial offer + points for preference
or 90 depending upon the value
Construction Industry Development Board
development through partnership
Scoring financial offer, quality and preference
Quality scorescore for quality (Sq) using the following formula:
Sq = W2 x So/Ms
where W2 is the percentage score given to quality (remainder allocated to financial offer eg 60% quality and 40% to financial offer)So is the score for quality allocated to the submission under considerationMs is the maximum possible score for quality in respect of a submission
Construction Industry Development Board
development through partnership
Financial offer
Score financial offer using the following formula:
Ss = Pmin X W3 or (1- (Pt – Pmin)) X W3 Pt Pmin
Where Ss = the percentage scored for price of the tender
submission under consideration;Pmin = the lowest acceptable tender submission Pt = the price of the tender submission under
considerationW3 = percentage allocated for price
Note: negative numbers result if Pt > 2 x P min
Construction Industry Development Board
development through partnership
Preferential Procurement Policy Framework Act
Act does not make reference to functionality. The regulations, however, do. The Act only provides for tender price + preference.
• Total points not equal to price + quality + preference
• Total points equals tender price (combination of points for quality and financial offer) + preference
Construction Industry Development Board
development through partnership
Combine quality and financial offerThe score for quality and financial offer is to be combined, before the addition of the score for
preference, as follows:
WC = W3 x (1+(S-Sm)) Sm
Where W3 is the number of tender evaluation points for quality and financial offer and equals 80 / 90S is the sum of score for quality and financial offer of the submission under consideration Sm is sum of the score for quality and financial offer of the submission scoring the highest number of points
Standard method
Construction Industry Development Board
development through partnership
Risk analysis
Does any of the following present an unacceptable commercial risk?:
a)unduly high or unduly low tendered rates or amounts in the tender offer;
b)contract data provided by the tenderer; or
c) the content of tender returnables which are to be included in the contract.
If so overlook tenderer (justifiable reason)
Construction Industry Development Board
development through partnership
Tenderers (reasons for not awarding):
• may not be subject to restrictions eg listed on Register of Tender Defaulters
• must have the capability and capacity to perform the contract.
• must have legal capacity to enter into the contract.
• must be solvent• must satisfy all legal requirements, eg no
tax clearance.• may be disqualified due to conflicts of
interest.
Construction Industry Development Board
development through partnership
Tender evaluation report
Prepare report as per employer’s requirements
Remember that written reasons must be given for decisions taken. State reasons for rejecting a tender so that tender evaluation committee can confirm / overturn decisions.
Construction Industry Development Board
development through partnership
Activity 5: Award contract
• Notify successful tenderer and unsuccessful tenderers
of outcome
• Compile contract document
• Capture contract award data
Control point:
formally accept tender offer
Contract concluded
Suitable point for capturing of data pertaining to the
procurement
Construction Industry Development Board
development through partnership
CIDB Standard for Uniformity in Construction Procurement
Form of offer and acceptance
1 Offer
2 Acceptance
Schedule of deviations
Note: Tenderer signs offer and employer signs acceptance to form the contract.
The schedule of deviations records the items that have changed between offer and acceptance
Employer signs acceptance
portion
Construction Industry Development Board
development through partnership
Register contractAward
cidb website
Register of projects
(deemed to satisfy provisions)
Construction Industry Development Board
development through partnership
Activity 6: Administer contracts and confirm compliance with requirements
• Administer contract in accordance with the terms and
provisions of the contract
• Ensure compliance with requirements
Control point: capture contract completion / termination data
Register cancellation of contract
cidb website
Construction Industry Development Board
development through partnership
Contact personsPlease contact the following people at the
CIDB for: Procurement related issues Nomaphoso Mkhonza Lerato Molefe
Contractor Registration issues: Wisane Maluleke Busang Tjale
Tel: 0860 10 33 53
Construction Industry Development Board
development through partnership
Thank You