CONTACT US Calcutta Techno Heaters PVT. LTD. 22/A DUM DUM ROAD, KOLKATA - 700 002 , INDIA TELE FAX: (033) 2556-8158, 2556-8706, 2532-9533, 2532-9537 e-mail: Website: www.cthkolkata.com [email protected]

Upload: truongquynh

Post on 03-May-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

CONTACT USCalcutta Techno Heaters PVT. LTD.

22/A DUM DUM ROAD, KOLKATA - 700 002 , INDIA

TELE FAX: (033) 2556-8158, 2556-8706, 2532-9533, 2532-9537

e-mail:

Website: www.cthkolkata.com

[email protected]

Page 2: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

Content

Home PageNo.

¥About Us

¥ISO 9001 Certification ............................................................................................ 3

¥Services ............................................................................................ 4

¥Projects ............................................................................................ 5

¥Industries Served ............................................................................................ 10

¥Our Equipments & Instruments ............................................................................................ 11

¥Our Human Resources ............................................................................................ 13

¥Our Customers ............................................................................................ 17

¥Name of our Inspection Authority ............................................................................................ 17

¥Future Expansion Plan ........................................................................................... 18

¥Financials ............................................................................................ 18

________cd________

............................................................................................ 1

Page 3: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

Page No. [ 1 ] Page No. [ 18 ]

Continued...

ABOUT USBrief History:

Techno Heaters started its journey in Kolkata (formerly Calcutta) dedicated to serve in the field of heat treatment in 1974. The company worked in various project sites like oil refineries, fertilizers, petrochemicals and power plants in the field of pre and post weld heat treatment since 1976. By the year 1985, the company successfully expanded its field of work to radiography, ultrasonic flaw detection test, magnetic particle inspection test, ultrasonic thickness measurement test along with other non destructive testing processes.

In order to serve its clients with best possible ways as a multidiscipline service provider, Techno Heaters incorporated into a private limited company under the name and style of Calcutta Techno Heaters (India) Pvt. Ltd. in 1991.

The company has the latest state of the art equipments and instruments as per the international standard, including X-ray machines of 250 KVA and 300 KVA. It also has the facility of full stress relieving of tanks, vessels and towers etc. in-situ with the help of high velocity oil/gas fired burners under the inspection of renowned agencies like M/S EIL., PDIL, Llyods, Bureau Veritas, DNV etc.

Calcutta Techno Heaters do have the facilities of very sophisticated and critical nature of component heat-treatment at their workshop. Here the services of heat-treatment in different types of furnaces, for direct hardening and tempering of carbon and alloy steel, liquid carburising of mild steel and low carbon alloy steel, flame hardening, normalising and annealing martempering, solution annealing and precipitation hardening of aluminium and other non-ferrous alloys, hardness testing arrangements in different ranges and scales like Rockwell 'A', 'B', 'C' and 'D' scales, Brinell hardness testing, Shore and Vickers hardness testing have been provided.

With the dedication to emerge as one of the leading companies specialized in heat treatment and non destructive testing services, Calcutta Techno Heaters has been successfully serving a number of clients from all parts of India. In addition, the company has successfully worked for projects abroad. Recently, Calcutta Techno Heaters has worked under Punj Llyod Kazakhstan LLP for Tengiz Chevroyl Oil [TCO] Company at Tengiz, Kazakhstan in the field of pre and post weld heat treatment. As we grow from strength to strength, Calcutta Techno Heaters looks forward to work both in India and abroad and provide the best services to its clients.

Calcutta Techno Heaters is an ISO-9001-2000 certified company with effect from 2007.

Our Vision:

To be the most preferred company for heat treatment and non destructive testing services.

Our Mission:

To provide quality heat treatment and non destructive testing services with complete client satisfaction.

Future Expansion PlansAs an ISO 9001:2000 certified company, we are always in pursuit of further development and serving our customers in the best possible way with the help of consistent work performance. We have taken in some carefully thought out plans to bring about modernization and expansion of Calcutta Techno Heaters. We are on the verge of expanding our Heat Treatment unit equipped with bigger size of boggie type furnace, liquid nitriding plants, gas carburizing plants and induction heat treatment plants. One unit will be established at our existing premises at Madyamgram and for the other unit we are looking for the suitable land at Howrah industrial belt. More so, we are planning to own Digital Radiography unit and Crawler mounted equipments to serve the cross country pipe line projects.

Financials

07-08 06-07 05-06 SALE : India Rs. 3,06,37,185.26 Rs. 2,43,59,597.41 Rs. 2,75,59,794.27 Abroad Rs. 6,85,878.60 Rs. 36,47,128.55 Rs. 13,97,279.35 Total Sale Rs. 3,13,23,063.86 Rs. 2,80,06,725.96 Rs. 2,89,57,073.62 Expenses Rs. 3,06,61,620.31 Rs. 2,74,47,512.93 Rs. 2,84,00,089.99 Profit Before Tax Rs. 6,61,443.55 Rs. 5,59,213.03 Rs. 5,56,983.63 Profit After Tax Rs. 3,62,991.57 Rs. 4,82,364.71 Rs. 3,47,947.72

Page 4: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

Page No. [ 2 ] Page No. [ 17 ]

SI. N o .

N am e of the C lien t SI. N o .

N am e of the C lien t

1. ABB ABL P ro jects L td. 24 . N IC C O C orpora tion L im ited , Ko lkata

2 . A ls tom Power Bo ile r 25 . O rissa Construction C orpn. L im ited , Bhubaneswar,

O rissa .

3 . Anwesha C om tech Engineering (P )L td .

Vadodara . 26 . P .E . E rectors Pvt. L td . C alcu tta .

4 . Bhara t H eavy P la te & Vesse ls L td .,

V isakhapatnam , A .P . 27 . PC P In te rnationa l L td ., Chandigarh .

5 . BO C Ind ia Ltd ., Ko lka ta 28 . Petron Eng ineering C onstn. L im ited , M um bai.

6 . B ra ithwa ite & C o. L td. C a lcu tta. 29 . Power M ax (Ind ia ) Pvt. L td . Kolka ta .

7 . B ridge & Roof C o. (I) L td . 30 . Power M ech P ro jects Pvt.L td ., H yderabad.

8 . Burn S tandard Co. L td ., H owrah, W est Bengal. 31 . P ro ject & D eve lopm ent Ind ia Ltd ., C a lcu tta .

9 . D odsal L im ited 32 . Pun j L lyod Lim ited

10 . G annon D unkerley & C o. L im ited . 33 . R e liance Petro leum L im ited

11 . Ind ian O il C orpora tion L td . 34 . SP IC JEL Eng ineering C onstn. L im ited , C henna i

12 . Indwell C onstruction (P ) L td ., V ijayawada, A .P . 35 . Sun il H i Tech Eng ineers L td ., Beed

13 . IO T Eng ineering P rojects Pvt. L td ., M um bai 36 . TA TA P ro jects L td., H yderabad

14 . IVR C L In frastructu res & P rojects L td . 37 . TEC H N IP , ITALY, D e lh i P ro ject O ffice

15 . Jessop & C o. Ltd .,C alcutta 38 . Tecn im ont Spa India

16 . K ine tics Technology Ind ia L td ., N ew D e lh i. 39 . Texm aco L im ited , Ko lka ta

17 . Kurup Engg. C om pany. 40 . The Tata Iron & S tee l C o. L td., T isco G rowth

Shop, Jharkhand

18 . Larsen & Toubro L td . 41 . T IL L im ited , C alcu tta

19 . Larsen & Toubro L td ., Kansbaha l W orks. 42 . Toyo Engg. India Ltd ., Bom bay

20 . LG Eng ineering & C onstruction C orp . 43 . Triven i S tructura ls L td ., N a in i, A llahabad, U .P .

21 . M cna lly Bhara t Eng ineering Co. L td . D hanbad. 44 . U B Eng ineering L td ., Pune, M aharashtra

22 . M is .Pun j L loyd L td ., N ew D e lh i. 45 . V ijay Tanks & Vessels

23 . N eo S tructo C onstruction Ltd .

Our Quality Policy:

We at Calcutta Techno Heaters (India) Pvt Ltd. ensure quality job work / services in the field of heat treatment and non-destructive testing as per the requirement of customers just in time [JIT].

Our services take care of functional, aesthetic, statutory and regulatory requirements besides environmental and safety aspects with added consideration for welfare of the society.

We are committed to comply with requirements and continually improve the effectiveness of our quality management system.

Our Quality Objectives:

1. To complete 99% of the job works within the time schedule

2. To provide quality job as per National & International codes, specifications and standards under third party inspection

3. To reduce customer complaint up to a maximum of 1%

4. To comply all statutory requirements from BARC for radiography operation & ASNT/ISNT certification for ultrasonic flaw detection and magnetic particle testing

5. To train and develop skilled human resources for achieving quality job work as per the policy of the organization.

Name of Inspection Authority

Our Customers

SI.No .

Inspecting Authority S I.N

o . Inspecting Authority

1 . E .I.L . 7 . Bureau V eritas

2 . D ept o f A tom ic Energ y. 8 . M EC O N

3. H um phry’s & G lasgow 9. L lyods

4. P .D .I.L . 10. Jackob

5. Boiler D irectorate 11. H ALD AR T O PSO

6. D N V

Page 5: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

ISO 9001 CertificationThe management system of Calcutta Techno Heaters ( India ) Pvt. Ltd. has been awarded with the prestigious ISO 9001:2000 certificate on 02 May, 2007 for providing services related to Heat Treatment & NDT. The certificate validates from 02 May, 2007 to 01 May,2010.

Page No. [ 3 ] Page No. [ 16 ]

ORGANISATION CHART

Page 6: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

Page No. [ 15 ]Page No. [ 4 ]

ServicesWe, at Calcutta Techno Heaters ( India ) PVT.LTD. endeavour to serve our clients excellent off-site and on-site heat treatment support and other NDT services like radiography, ultrasonic flaw detection and MPI thickness gauging by implementing our world class technical resource. The following are the exhaustive list of services we are able to provide with the help of our highly skilled professionals and state of the art technological expertise.

a) Heat treatment of components(ferrous and non-ferrous) at workshop by the following operations

¥Hardening¥Tempering, normalizing, annealing¥Stress relieving¥Case hardening by liquid carburising method¥Liquid nitriding¥Gas carburising¥Induction hardening¥Solution annealing¥Martempering¥Hardness Test arrangements by Rockwell 'A', 'B', 'C' & 'D' scale,

Vickers & Brinell hardness tester

b) Heat treatment work at project sites in India and overseas by the following operation

¥Pre-heating and post heating of weld joints by electrical resistance heating method

¥Post weld heat treatment (PWHT) of weld joints of pipes, tubes, pressure vessels and tanks by electrical resistance heating method

¥Post weld heat treatment by induction heating method for specific special steels.

¥Full stress relieving of bigger sizes of tanks and vessels by internally firing with the help of high speed diesel in-situ

¥Hardness test by digital integrated hardness tester

c) Radiography and X-ray job of weld joints and of different components by using

d) Ultrasonic flaw detection

e) Ultrasonic thickness measurement

f) Magnetic particle test

g) Dye penetrant test

h) Residual life analysis of plants and equipments

PWHT Work at Kaazakhstan

PWHT Work at Kaazakhstan

c) Pre and Post Weld Heat Treatment

Site-in-Charge: (With 15/20 years experience)Skilled Technicians: (With 12 Years experience)Semi-Skilled Technicians: (With 2/6 Years experience)

Name Qualification Technical Qualification Years of Experience

Shri Srikrishna Paul (Chief Technician)

Appear Madhyamik -

20 years experience in heat treatment job at Cooperheat India. 4 years experience for Calcutta

Techno Heaters at different project sites.

Shri Sankarlal Sur (Senior Technician)

B. A. -

15 years experience in heat treatment job at Cooperheat India. 4 years experience for Calcutta

Techno Heaters at different project sites.

Shri Bhajan Sarkar Das (Senior Technician)

Madhyamik - 12 years experience in heat treatment job for

Calcutta Techno Heaters at different project sites.

Shri Kajal Das (Senior Technician)

B. A. - 22 years experience in heat treatment job for

Calcutta Techno Heaters at different project sites.

Shri Kartic Dey (Senior Technician)

Madhyamik - 18 years experience in heat treatment job for

Calcutta Techno Heaters at different project sites.

Shri M. K. Mahapatra (Senior Technician)

Matrc - 23 years experience in heat treatment job for

Calcutta Techno Heaters at different project sites.

Page 7: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

Page No. [ 14 ]Page No. [ 5 ]

PROJECTsCompleted Projects

Continued…

Certified Radiographer Name Qualification Technical Qualification Years of Experience

Shri B. D. Ghosh School Final Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 20 years in Industrial

Radiography job.

Shri Sanjeet Kumar Intermediate School Certificate,

from B.A.R.C., Mumbai Passed Industrial Radiography Certificate

Course (RT Level-1) 7 years in Industrial Radiography job.

Shri S. P. Bera Secondary School Certificate. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 11 years in Industrial

Radiography job. Shri Jitendra Prasad

Mahato Secondary School Certificate.

Passed Industrial Radiography Certificate Course (RT Level-1) From B.A.R.C., Mumbai

5 years in Industrial Radiography job.

Shri Debabrata Banerjee H. S. C. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 8 years in Industrial Radiography job.

Shri Bijoy Shankar Singh Intermediate Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 7 years in Industrial Radiography job.

Shri Ujjwal Kumar Paria Higher Secondary Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 3 years in Industrial Radiography job.

Shri Chandan Kr. Ghosh School Final Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 15 years in Industrial

Radiography job.

Shri Debabrata Ghosh B.Sc. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 1½ years in Industrial

Radiography job.

Shri Jay Prakash B. Sc. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 1 year in Industrial Radiography job.

Shri Basudev Chakraborty H.S. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 2 Years in Industrial

Radiography job.

Shri Chandan Jana B.Sc. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 1½ Years in Industrial

Radiography job.

Shri Debasis Das H.S. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 1½ Years in Industrial

Radiography job.

Shri Narottam Parida H.S. Passed Industrial Radiography Certificate

Course (RT Level-1) From B.A.R.C., Mumbai 1½ Years in Industrial

Radiography job.

Name Qualification Technical Qualification Years of Experience

Shri Surojit Sarkar Diploma in Mechanical

Passed UT ASNT Level-II from Industrial Quality Concepts, Chennai.

9 years in Ultrasonic Flaw Detection, Ultrasonic Thickness Gauging &

Magnetic Particle Testing.

Shri Abhijit Saha H. Sc. Passed UT ASNT Level-II, MPT ASNT Level-II

& Penetrant Testing from Industrial Quality Concepts, Chennai.

9 years in Ultrasonic Flaw Detection, Ultrasonic Thickness Gauging, Magnetic

Particle Testing & Penetrant Testing.

Shri Sadhan Kumar Dutta

H. Sc.

Passed UT ASNT Level-I from Institute of Non-Destructive Testing, Calcutta & MPT

ASNT Level-II from Industrial Quality Concepts, Chennai.

8 years in Ultrasonic Flaw Detection, Ultrasonic Thickness Gauging &

Magnetic Particle Testing.

Shri Supriya Das S. S. C.

Passed UT ASNT Level-II from Mechanical Engg. Research & Development Organisation,

MPT Level-II & Penetrant Testing from Industrial Quality Concepts, Chennai.

12 years in Ultrasonic Flaw Detection, Ultrasonic Thickness Gauging, Magnetic

Particle Testing & Penetrant Testing.

Shri Ananda Mohan Ghosh

B. Sc. Passed UT ASNT Level-II from Industrial

Quality Concepts, Chennai.

10 years in Ultrasonic Flaw Detection, Ultrasonic Thickness Gauging.

Shri Suman Chakraborty Higher

Secondary

Passed MPT ASNT Level-II from IITA Institute of NDT & Welding, Calcutta.

6 years in Magnetic Particle Testing.

Shri Sanjoy Roy S. S. C. Passed MPT & PT ASNT Level-II from Sigma

NDT Services, Chennai.

4 years in MPT & PT job.

Shri Ajit Kumar Dutta B. Com. Passed MPT & PT ASNT Level-II from Sigma

NDT Services, Chennai.

4 years in MPT & PT job.

Shri Sajal Roy B. Com. Passed UT ASNT Level-II from Institute of

Non-Destructive Testing, Calcutta.

9 years in Ultrasonic Flaw Detection, Ultrasonic Thickness Gauging Job.

b)Ultrasonic Testing, Magnetic Particle and Penetrant Testing

SI. No.

Name of the Client Name of the Project Site Nature of the job Inspecting Authority

Year of Completion

1. M/s. P.E. Erectors Pvt. Ltd.

Calcutta Bokaro Steel Plant, Bokaro,

Bihar Pre & Post-heating and Stress

Relieving of weld joints. I.B.R. 1999

2. M/s. Texmaco Ltd.,

Sodepur, West Bengal

Sodepur Works, B.T. Road, Sodepur, 24-Parganas (N),

W.B.

Normalising, Annealing, Stress Relieving & Radiography of Dished

End.

PDIL/ SAFESS

2000

3. M/s. Spic JeI Engineering Constn. Limited, Chennai

ARU Revamp at IOCL Mathura Refinery site, U.P.

Radiography, Dye Penetration MPT & Stress Relieving work.

E.I.L. 2000

4. M/s. Dodsal Limited,

Mumbai

Ahmedabad Municipal Corporation Water Works

Project, Ahmedabad, Gujarat Ultrasonic Testing. A.M.C. 2000

5. M/s. Burn Standard Co.

Ltd., Howrah, West Bengal Howrah Works, West Bengal

Radiography of weld joints of Barrel of BTPGLN Wagons as per is: 2825-

1961. P.D.I.L. 2001

6. M/s. Burn Standard Co.

Ltd., Howrah, West Bengal Howrah Works, West Bengal

BTPGLN Wagon Stress Relieving of weld joints P.D.I.L. 2001

7. M/s. Orissa Construction

Corpn. Limited, Bhubaneswar, Orissa

Upper Indravati Penstock Project Mukhiguda

Stress Relieving of Circumferential seam welding jts. of Penstock

piping. O.C.C. 2001

8. M/s. Shrinivas Plates & Structuturals Co. Ltd.

IOCL/Toyo Haldia Project, Haldia Midnapore, W.B.

Radiography & Magnetic Partide Testing for LPG Double Wall Tank.

P.D.I.L./ Toyo

2001

9. M/s. Spic JeI Engineering Constn. Limited, Chennai

SRU Standby Unit at Panipat Refinery Site

Radiography, Dye Penetration MPT & Stress Relieving work for Pipe

joints. E.I.L. 2001

10. M/s. Indian Oil Corporation

Ltd., Panipat IOCL, Panipat Refinery.

Panipat, Haryana Ultrasonic Thickness Gauging of

metals. I.O.C.L. 2001

11. M/s. Newton Engineering &

Constn. Limited

IOCL, Haldia Oil Refinery, Haldia, Midnapore, West

Bengal

Stress Relieving, Pre-heating & Post-heating work.

E.I.L. 2001

12. M/s. Power Mech Projects

Pvt. Ltd., Hyderabad IOCL, Panipat, Haryana

Radiography, Pre-heating & Stress Relieving of weld joints.

B.H.E.L. 2001

13. M/s. TIL Limited, Calcutta Calcutta Workshop Stress Relieving of Tilt Beam

Structure. TIL. 2001

14. M/s. Punj Lloyd Limited,

New Delhi

AAU/ARU, SWS & SRU and Offisite/ Utilities(LSTK-2) at

Guwahati Refinery

Stress Relieving work of Piping at Sulphur Block.

E.I.L. 2001

15. M/s. Neo Structo Construction Ltd

Guwahati Refinery Project site, Noonmati, Assam

Full Stress Relieving of Tanks Radiography, X-Ray, Pre-heating & Stress Relieving of Pipe weld joints.

ElL/TECHNIP ITALY

2001

16. M/s. Larsen & Toubro

Limited. ECC Constructin Group, Hyderabad

NTPC, Simhadri Site Pre-heating & PWHT works for P-91

Piping. BHEL/Boiler Directorate

2001

17. M/s. TECHNIP, ITALY,

Delhi Project Office Hydrotreater Project (LSTK-l)

of IOCL, Guwahati Heating of flushing oil for

Compressors. TECHNIP

ITALY 2002

18. M/s. Spic Jel Engineering Constn. Limited, Chennai

Simadri Unit-II 500X2 MW Thermal Power Project Site,

Visakhapatnam

Stress Relieving, Pre-heating & Post-heating of Boiler as well as P-

91 piping through Induction Heating. B.H.E.L. 2000

19. M/s. NICCO Corporation

Limited, Kolkata IOCL, Guwahati Refinery,

Assam. Stress Relieving of Clean Out Doors

of 600x600 mm. Tankage. EIL 2002

20. M/s. Engenius Erectors

Pvt. Ltd. Chennai TG Unit-3 & 4,250 MW STPS,

Suratgarh Radiography, Stress Relieving, Pre

& Post heating of weld joints B.H.E.L. 2001

21. LG Engineering & Construction Corp.

Catalytic Dewaxing Project, Haldia

Stress Relieving of Pipe Joints. EIL 2002

Page 8: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

SI. No.

Name of the Client Name of the Project Site Nature of the job Inspecting Authority

Year of Completion

22. M/s. Petron Engineering

Constn. Ltd., Mumbai Catalytic Dewaxing Unit, IOCL,

Haldia Stress Relieving, Pre-heating &

Solution Annealing. EIL 2002

23. M/s. Alstom Power Boiler Durgapur Works, Durgapur,

West Bengal Pre-heating & Magnetic Particle

Testing of Sub-Panel.

Boiler Directorate/ ALSTOM

2001

24. M/s. SPIC JEL Engineering Constn. Limited, Chennai

Second Launch Pad Project at Sriharikota, A.P.

X-Ray Radiography works. ISRO 2002

25. M/s. Teesta Agro Industries Limited

Rajganj, Jalpaiguri, W.B. Thickness gauge testing of

equipments Self 2002

26. M/s.P.E.S.Engineers Pvt.

Ltd., Hyderabad. Sardar Sarovar Narmade

Nigam Ltd., Project Pre-heating of weld joints of Spiral

Casing of 6x204 MW T.G.Sets. - 2002

27. M/s. PCP International Limited, Chandigarh

Unit - 7 CPP, Nalco, Angul Pre-heating & Stress Relieving of P-

91 joints. BHEL/CPP 2002

28. M/s. TATA PROJECTS

LTD., Hyderabad

Power Cycle Piping Unit-II Of 2x500 MW at Simhadri

Thermal Power Project for BHEL NTPC, Visakhapatnam

Stress Relieving, Pre-heating & Ultrasonic Testing of Pipe weld

joints. TPL/BHEL 2002

29. M/s. Larsen & Toubro

Limited ECC Constructin Group, Kolkata

Power Cycle Piping Unit-III Of 4x500 MW at Kanhia

SuperThermal Power Project for BHEL NTPC, Talcher,

Orissa

Pre-heating, Post-heating Stress Relieving, U.T. & M.P.T work for pipe weld Joints as well as P-91

piping.

L&T/BHEL 2002

30. M/s. Petron Engineering Constn. Limited, Mumbai

BHEL, 210 mw Boiler at Suratgarh, Rajasthan

Pre-heating, Stress Relieving & Radiography work.

B.H.E.L. 2003

31. M/s. B.H.P.V.,

Vishakhapatnam LO.C.L. Digboy Refinery

Expansion Project, Assam Full Stress Relieving for Sour Water

Day Tank by Oil fired process E.I.L. 2003

32. M/s. Punj Lloyd Ltd., New

Delhi CPCL, Chennai Refinery

Full Stress Relieving of Tanks by Internal Oil Fired method

E.I.L. 2003

33. M/s. RMEC Projects

Limited, Pune Ramagundam Super Thermal

Power Project, Unit-VII Stress Relieving, Pre-heating, Post--

heating of Ceiling Girders. BHEL/

L&T/RPL 2002

34. M/s. Bhavani Erectors

(Pvt.) Ltd., Raichur, Karnataka

UNIT-VII, NTPC, Ramagundam Site

Stress Relieving & Pre-heating of pipe weld Joints of Boiler Pressure

Parts.

NTPC/ BHEL/L&T

2003

35. M/s. SPIC JEL Engineering

Constn. Ltd., Chennai

CPCL Manali site in Refinery III Project, Part BHCU II and

Merox Unit

Stress Relieving of weld joints & Full Stress Relieving of Tanks by internal

Oil Fired method. EIL 2003

36. M/s. P.E.S. Engineers Pvt.

Ltd., Hyderabad Khopoli Hydro Electric Project,

Raigarh, Maharashtra Pre-heating & Post-heating of weld

jts. of Steel Liner (Penstock). TATA

POWER 2004

37. M/s. Newton Engineering

and Chemical Limited, Baroda

BPCL, Mahul Project, Maharashtra

Radiography & Stress Relieving work of pipe weld joints.

EIL 2004

38. M/s. Petron Engineering

Constn. Ltd. Mumbai 2x250 MW Boiler work at

BHEL, Panipat Thermal Stn. Radiography, Pre-heating, Stress

Relieving & Ultrasonic Testing. BHEL/IBR 2004

39. M/s. Indwell Construction

Ltd. UNIT - VII at NTPC

Ramagundam

Stress Relieving, Pre & Post heating of pipe weld joints. Stress Relieving

& Pre-heating of P-91 materials.

BHEL/ NTPC/IBR

2004

40. M/s. TAT A Projects Ltd.,

Hyderabad

UNIT-III 500 MW Boiler BHELINTPC Rihand TPS.

Rihand Nagar, Sonebhadra, U.P.

Pre & Post heating, Stress Relieving of weld Joints of Ceiling Girders, Pressure Parts, Tubes and other

items.

BHEL/ NTPC/IBR

2004

41. M/s. Punj Lloyd Ltd., New

Delhi HCU Project, Panipat Refinery,

Panipat, Haryana Radiography, Stress Relieving & X-

Ray of pipe weld joints. IOCL/EIL/ DAELIM

2005

Page No. [ 13 ]Page No. [ 6 ]

Continued…

Our Human ResourcesHuman Resource Management

To keep pace with current technologies, we provide dual training (both in-house and external training programs) to our workforce. Our senior engineers regularly train the junior engineers and apprentices to develop their working skills. In addition, our employees participate in various industrial training programs and receive industrial certifications like ASNT [Level (i), Level (ii) etc.] which help in their professional works.

Safety Management

We adopt and adhere to strict safety guidelines as followed in international industrial sites. Our safety managers keep a close eye that the field workers use proper safety gear while working. In addition, we also conduct workshops to sensitize our workers regarding the necessity of safety measures and how to adopt them.

a) Radiography TestingSite-in-Charge

Name Qualification Technical Qualification Years of Experience

Shri Surojit Sarkar Diploma in Mechanical

Engineering

Passed Industrial Radiography Site-in-Charge Course (RT Level-2). From B.A.R.C., Mumbai.

12 years in Industrial Radiography job.

Shri P. K. Sarkar L. M. E. Passed IRG-1 Certificate Course (Equivalent to RT

Level-2). From B.A.R.C., Mumbai.

16 years in Industrial Radiography job.

Shri A. M. Ghosh B.Sc

Passed Industrial Radiography Site-in-Charge Course (IRG-1, Equivalent to RT Level-2 Course).

From B.A.R.C., Mumbai.

18 years in Industrial Radiography job.

Shri Susil Ghosh Diploma in Electrical

Engineering.

Passed Industrial Radiography Site-in-Charge Course (RT Level-2). From B.A.R.C., Mumbai.

10 years in Industrial Radiography job.

Shri Ashis Das Gupta B.Sc (Hons) Passed Industrial Radiography Site-in-Charge Course (RT Level-2). From B.A.R.C., Mumbai.

10 years in Industrial Radiography job.

Shri Swapan Kumar Das B.Sc Passed Industrial Radiography Site-in-Charge Course (RT Level-2). From B.A.R.C., Mumbai.

9 years in Industrial Radiography job.

Shri Debashis Kundu B. Sc (Hons. Phy) Passed Industrial Radiography Site-in-Charge Course (RT Level-2). From B.A.R.C., Mumbai.

15 years in Industrial Radiography job.

Shri Sadhan Kumar Dutta Intermediate Passed Industrial Radiography Site-in-Charge Course (RT Level-2). From B.A.R.C., Mumbai.

10 years in Industrial Radiography job.

Shri Jayanta Kumar Ghosal B.Sc (Pure) Passed Industrial Radiography Site-in-Charge Course (RT Level-2). From B.A.R.C., Mumbai.

3 years in Industrial Radiography job.

PWHT Work at Kazakhstan

Page 9: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

SI. No.

Name of the Client Name of the Project Site Nature of the job Inspecting Authority

Year of Completion

42. M/s. Vijay Tanks & Vessels

Ltd., Baroda IOCL Panipat Refinery Project,

Panipat, Haryana

Full S.R. of Vacuum Column, Coker Drum Fractionator, Caustic Storage

Tank etc. by Internal Oil Fired method and Pre-heating, Post-

heating, S.R. work for equipments.

L&T/ISGEC/LRS/EIL

2005

43. M/s. Engenius Erectors

Pvt. Ltd., Chennai Rihand S.T.P.P. Site

Pre-heating and Stress Relieving of pipe weld joints at Tarbine.

NTPC/ BHEL/IBR

2005

44. M/s. Neo Structo

Construction Ltd., Surat

DHDT Project Unit, IOCL, Panipat Refinery Panipat,

Haryana

Pre-heating, Post-heating, & Hardness Testing work at DHDT

Unit. EIL 2005

45. M/s. Petron Engineering

Constn. Ltd., Mumbai Unit-III & IV 500 MW Boiler at

BHEL/NTPC Rihand site

Pre & Post-heating, Stress Relieving, Hardness Testing, M.P.T.

& S.R. of P-91 material at Power Cycle Piping.

BHEL/ NTPC

2005

46. M/s. PCP International

Ltd., Chandigarh 4th Boiler Unit at Rihand Super

Thermal Project Stress Relieving, Pre & Post Heating ofT-91 & P-91 joints.

BHEL/ NTPC

2005

47. M/s. Das Offshore Engg.

Pvt.Ltd., Mumbai Das Offshore Workshop.

Mumbai Stress Relieving & Hardness Testing of pipe weld joints.

Das Offshore

2005

48. M/s. Anwesha Comtech Engg. Pvt.Ltd., Baroda

IOCL Panipat Refinery Expn. Project, Haryana

Radiography of weld joints on Tankages.

EIL 2005

49. M/s. Precision

Engineering, Korba Unit-III NTPC/ISTPP, Kaniha

Site, Angul, Orissa

Stress Relieving, Pre & Post-heating of weld joints at Reheater Coil

Circuit modification.

NTPC/ BHEL

2005

50. M/s. SPIC JEL Engineering Construction Ltd., Chennai

Akrimota 2x 125 MW Thermal Power Project, Gujarat

Radiography, Stress Relieving & Pre-heating jobs at 2x125 MW

Thermal power Project.

ALSTOM/ GMDC/IBR

2006

51. M/s. Petron Engineering

Construction Ltd., Mumbai BHEL, TaIcher, Orissa

Pre-heating, Post-heating, Stress Relieving, hardness testing & MPT of weld joints & P-91 by induction

heating method.

BHEL/ NTPC/IBR

2006

52. M/s. Texmaco Limited,

Kolkata Agarpara Works, Kolkata

PWHT of Vessels by Internal Oil Firing method

PDIL 2005

53. M/s. Bridge & Roof Co.

(India) Ltd., Panipat IOCL Panipat Refinery Expn.

Project Panipat, Haryana PWHT of Cone Roof Tanks by

Internal Oil Firing method. EIL/IOCL 2005

54. M/s. Mesuka Engineering Co. Pvt.Ltd., Navi Mumbai

2x 125 MW Akrimota Thermal Power Project, GMDC Site,

Bhuj

Radiography of weld joints and other NDT services.

IBR/ GMDC

2005

55. M/s. Indwell Construction

Ltd., Vijayawada. Telcher, Kaniha Project.

Stress Relieving, Pre & Post heating of pipe weld joints. Stress Relieving

& Preheating of P-91 materials.

ElL/BHEL/ NTPC/lBR

2005

56. M/s. Resin India Water

Treatment Pvt. Ltd., Kolkata

Sanjib Sarani, Durgapur Works, West Bengal

Full Stress Relieving by internally oil Firing method for heating chamber

of hot water generator. Birla Tyres 2005

57. M/s. Bridge & Roof Co.

(India) Ltd., Panipat

CDU/VDU/NSU-Il Site, Panipat Refinery Expn. Project of

Indian Oil Corporation Ltd. at Panipat

PWHT of Caustic Solution Tank by internal Oil Firing method.

EIL/IOCL 2005

58. M/s. Bridge & Roof Co. (I)

Ltd., Kolkata Offsite-II, CDU/VDU/NSU-II of M/s. IOCL at Panipat, Haryana

Radiography & Stress Relieving Pipe weld joints.

EIL 2006

59. M/s. Punj Lloyd Limited,

New Delhi

PX-2 Project of M/s. IOCL Panipat Refinery, Panipat,

Haryana

Radiography & Stress Relieving of Pipe weld joints.

EIL 2006

60. M/s. Punj Lloyd Limited,

Delhi

LPG Cryogenic Storage Tank - II at Reliance Refinery Site,

Jamnagar

Radiography work for Cryogenic RIL/DNV Tank.

RIL/DNV 2006

61. Furnace Fabrica (India) Ltd. Ranchi, Jharkhand

Chotamuri Site, Ranchi, Stage-3

Full Stress Relieving of Separator Client by Direct Oil Firing method.

Client 2006

Page No. [ 12 ]Page No. [ 7 ]

Continued…

Name of the Instrument, Their Make, Type & Model. Capacity/Rating Quantity

G)

Control Panel (automatic), Make: Self 3 Pointer. 40 A. each

capacity 95 Nos.

H)

Tong Tester 0- 500 Amp.

0-3000V. 7 Nos.

I) Rockwell hardness testing machine in A.B.C. Scale (Make: Blue Star & Avery, U.K.).

A, B, C Scale 4 Nos.

J) Shore Hardness Tester - 1 Nos.

K) Poldi Hardness tester BHN 2 Sets.

L) Brinel Hardness Tester, Make: FIE, Maharashtra BHN 2 Sets.

M) Thermocouple attachment Unit - 35 Nos.

N)

Digital Thermometer Range -

50°C. to l400°C. 2 Nos.

O) Motorised Hydrotest Pump Upto 50 Kg./ cm2 2 Nos.

P) Water Meter 500 Ltr./Hr. Capacity 2 Nos.

Q) Integrated Hardness Tester, Portable type Make: Optel Make: Times Make: Fine Test Equipment (P) Ltd.

HRC, HRB, HRA, HV, HB, HS, HL.

4 Nos. 4 Nos. 2 Nos.

Page 10: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

SI. No.

Name of the Client Name of the Project Site Nature of the job Inspecting Authority

Year of Completion

62. Petron Engineering

Constn.Ltd., Mumbai MSQU Project at IOCL,

Vadodara

Stress Relieving of Thin Walled 3 Nos. EIL/IOCL Tanks by Electric

Resistance Method. EIL/IOCL 2006

63. Jessop & Co. Ltd., Kolkata Dum Dum Works Stress Relieving of Beams by Electrical Resistance Heating

Method. Client 2006

64. M/s. Punj Lloyd Ltd., Delhi IOCL Paradip Refinery, Jagatsinghpur Orissa

Radiography & Stress work of Tanks PLL/IOCL/

IOTL 2005

65. M/s. BRIDGE & ROOF CO. (I) LTD., Mumbai

IOCL Crude Tankages at Paradeep Crude Tankages at

Paradeep Refinery Project, site, Orissa

Radiography & Stress Relieving job of Crude Tankages

IOCL 2005

66. Metalex, Kolkata Vedanta Alumina Project,

Lanjigarh

Full Stress Relieving of 1 No. Caustic Cleaning Batch Tank by

Internal Oil Firing method. EIL 2006

67. Texmaco Limited, Kolkata Agarpara Works, Kolkata X-Ray of Pressure Vessel Lloyd 2006

68. M/s. P.E.S. Engineers Pvt.

Ltd., Hyderabad Tala Hydro Electric Project,

Bhutan Pre & Post-heating, Stress

Relieving, U.T. & M.P.T. job. BHEL 2005

69. BOC India Ltd., Kolkata Taratala, Kolkata Works X-Ray of weld joints. BOCI/LRA 2006

70. Sunil Hi Tech Engineers

Ltd., Beed Parli TPS, Parli Vaijnath, Dist.

Beed

Stress Relieving, Pre & Post heating of P-91 material by induction heating

method. BHEL 2006

71. M/s. PUNJ LLOYD Kazakhsthan, LLP

Tengiz Chevvirllo, Kazakhstan LLP

Post Weld Heat Treatment work for Large & Small Bore Pipelines & Mechanical Off Plots Project.

- 2005

72. Petron Engineering

Constn.Ltd., Mumbai Essar Jamnagar CCR/NHT

Project Radiography & PWHT of weld joints. EIL 2006

73. Bridge & Roof Co. (India)

Ltd., Mangalore MRPL Site, Mangalore,

Karnataka

Full Stress Relieving of HCU - SWS Storage Tank by Internal Oil Firing

method. MRPL 2007

74. The Tata Iron & Steel Co. Ltd., Tisco Growth Shop,

Jharkhand

TISCO Growth Shop, Jharkhand

Pre heating for H.Blast Stove Sheel Plates welding.

TISCO 2007

75. M/s. Tata Projects Limited,

Hyderabad 500 MW Unit No.9 Boiler at BHEL/NTPC Vindhyachal

Pre & Post heating, Stress Relieving of weld Joints of Ceiling Girders, Pressure Parts, Tubes and other

items.

BHEL/ NTPC/IBR

2007

76. M/s. Tata Projects Limited,

Hyderabad

1x500 MW(Stage-II) Unit-1 & 1 x55 TPH Aux. Boiler for SIPAT

Project

Pre & Post Heating and Stress Relieving of weld joints for Ceiling Girders, Pressure Parts and other

items.

NTPC/ BHEL

2007

77. M/s. Petron Engineering

Constn. Ltd. 500 MW Unit No.9 Boiler for BHEL/NTPC at Vindhyachal

Pre-heating, Post-heating & Stress Relieving.

NTPC/ BHEL

2007

78. IVRCL Infrastructures &

Projects Ltd. Jindal STPP, Raigarh

Radiography of weld joints for MS Cross Country pipe line.

BHEL 2007

79. Tata Projects Ltd.,

Hyderabad

IND 629 SUGEN 1100 MW BoP Piping Package,

Akhakhol, Surat, Gujarat

Radiography & Ultrasonic Flaw Detection

Siemens 2007

80. Power Max (India) Pvt.

Ltd., Kolkata Unit No.1 of NTPC, Rihand

Pre-heating & Stress Relieving of weld jts.for super heater and reheater coil of 58 mm. OD x

4.5mm. thk. as shut down basis.

BHEL/ NTPC

2007

81. Tata Projects Ltd.,

Hyderabad WBPDCL at Sagardighi TPS

Murshidabad Dist. W.B.

Radiography, Ultrasonic & Stress Relieving of weld joints of Pressure Parts for 2x300 MW Unit I Boiler.

BHEL/ NTPC

2008

Page No. [ 11 ]Page No. [ 8 ]

Continued…

Particulars of Inspection and Testing Equipments Available with us

Name of the Instrument, Their Make, Type & Model. Capacity/Rating Quantity 1) Radiography Camera, Model: GAMMARID

Make: AlI - Union Company "Isotope". SI. No. i) 83 ii) 84 iii) 65 iv) 55 v) 91 vi) 40

120 Ci 6 Nos.

2) Radiography Camera, Model: ROLI-I Make: B.R.I.T., Mumbai Sl. No. i) 94198, ii) 94225, iii) 98279, iv) 98314

40Ci. 4 Nos.

3) Radiography Camera Model: SPEC-2T Make: Fluoroscopy Techniques Laboratory Sl. No. i) 1372, ii) 1261

120 Ci 2 Nos.

4) Radiation Survey Meter, Model: Minirad Make: PULSECHO SYSTEMS (BOMBAY) PVT. LTD., Sl. No. i) L-066 ii) LK-51 iii) LK-93. iv) 051 v) LL-96 vi) LA-84 vii) LA-95 viii) LB-I1. ix) L-825

0 - 5 mR/Hr. 9 Nos.

5) Radiation Dosimeter, Model: Dosirad Make : PULSECHO SYSTEMS (BOMBAY) PVT. LTD., Sl. No. i) S332 ii) S390 iii) SA-57 iv) SA-66 v) SA-74.

0 - 9999.99 mR 5 Nos.

6) Radiation Dosimeter, Stephen make Sl. No. i) 865583 ii) 874859 iii) 875147 iv) 865579. v) 408377

0 - 500 mR 5 Nos.

A)

7) X-Ray Machine, Andrex make Model No: 2121, Sl. No.-26162 Make: Model: XXQ 2505

8MA - 200 KVA

250 KVA

1 No.

2 Nos.

1) Ultrasonic Digital Thickness Gauge, Micro D-Meter, Pulsecho make Sl. No. U 517. Modsonic make

0- 300 mm. 2 Nos.

2) Ultrasonic Flaw Detector, Make: ECC, Model: EX-lO

0- 300 mm. 3 Nos.

B)

3) Digital Ultrasonic Flaw Detection, Einstein-II, Memory of 200A-Scan

200A 3 Nos.

C) Magnetic Crack Detector, Yoke type and Prode type. 0-1000 Amp. 4 Nos.

D) 8 Million BTU High Velocity Burner Ignition Unit, Blowers, Oil Pumping Unit, Air Compressor & Control Panel along with all other accessories and instruments.

8 Million BTU 6 Sets.

Multi-point Temperature Recorder

a) Mahindra & Mahindra make

Each capacity 6 pointer.

0 - l600°C. 0 - 1200°C. 0 - 1000°C. 0 - 800°C.

40 Nos.

b) Sietex make Each capacity 6

pointer. 0 - 1200°C.

33 Nos.

c) Recol 0 - 1200°C. 17 Nos..

d) R.R. Electronics 0 - 1200°C. 29 Nos..

E)

e) R.R. Electronics Each capacity 12

pointer. 4 Nos..

F) Microprocessor Based PID Controller - 23 Nos.

Our Equipments and Instruments

Continued…

Page 11: CONTACT US - Coroflots3images.coroflot.com/user_files/individual_files/309588_4xtjv0... · Home PageNo. ¥About Us ¥ISO 9001 ... liquid carburising of mild steel and low carbon alloy

List of the work-in-hand as on 30.04.2009 indicating Name of Client, Project site & Nature of Services for NDT & PWHT Job

SI. No.

Name of the Client Name of the Project Site Nature of the job Inspecting Authority

1. M/s. Mangalore Refinery and

Petrochemicals Limited, Mangalore MRPL Phase-II, Mangalore

Annual Rate Contract for Stress Relieving, Pre-heating & Post-Heating.

MRPL

2. M/s. Larsen & Toubro Ltd.,

Hyderabad NTPC Sipat 3x660 MW Super

Thermal Power Project

Pre-heating, Post-heating & PWHT of weld joints and P-91 weld joints by Induction Heating method & UT of P-91

weld joints. L&T/NTPC

3. Larsen & Toubro Ltd. ECC Divn.

Jamnagar FCCU Unit, Jamnagar Export

Refinery Project Pre & Post Weld Heat Treatment of weld joints. RIL

SI. No.

Name of the Client Name of the Project Site Nature of the job Inspecting Authority

Year of Completion

82. Anwesha Comtech

Engineering (P) Ltd., Vadodara

HPCL, Vizag Project Full Stress Relieving of 4 Nos. Cone

Roof Tanks by Oil Firing method. EIL 2008

83. Mcnally Bharat

Engineering Co. Ltd., Dhanbad

Kumardhubi-II Works Full Stress Relieving of Separators

by Internally Oil Firing Method. Self 2008

84. Resindia Watertreatment

Pvt.Ltd., Kolkata Kharagpur Workshop

Full Stress Relieving of Pressure Vessels for Hot Water Generator by

Internally Oil firing method. EIL 2008

85. Indwell Construction Pvt.

Ltd., Vijayawada.

UNIT-7-500 MW Boiler at VTPS - Ibrahimpatnam,

Vijaywada.

Radiography, Pre-heating, Post-heating, Stress Relieving &

Hardness testing of Weld joints & P-91, T-91 weld joints.

BHEL 2008

86. Indian Oil Corporation Ltd.,

Mathura Mathura Refinery

Full Stress Relieving of Caustic Storage Tank by Internal Firing

Method. EIL 2008

87. National Thermal Power

Corporation Ltd. Sipat STPP, Bilaspur Radiography testing of weld joints. Self 2008

88. M/s. Petron Engineering

Constn. Ltd.

Sipat, BHEL, NTPC-SSTPP, (500 MW Boiler), Bilaspur,

Chhattisgarh.

Radiography, Stress Relieving, Pre-heating, Post-heating & MPT job of

Pressure Parts, Ceiling Girder & Buck Stay and T-91 Material

NTPC/BHEL 2009

89. Spic Jel Engineering

Constn. Ltd., Chennai Sulphur Recovery Unit in JERP-Jamnagar, Gujarat.

Stress Relieving & Radiography for Piping job.

RIL 2009

90. Bridge & Roof Co. (I) Ltd.,

Kolkata MCCPTA at Haldia, W.B.

Radiography & Post Weld Heat Treatment of weld joints.

Toyo/Mitsubishi

2009

91. Anwesha Comtech

Engineering (Pvt.) Ltd., Vadodara.

Naphtha Cracker Project, Panipat, Haryana.

Radiography on Tankage job. EIL 2009

92. Mukund Engineers Ltd.,

Thane. IOCL Project Naptha Cracker

Panipat, Haryana

Radiography of mechanical works for Offsites IOCL Project, Naptha

Cracker Panipat, Haryana EIL 2009

93. Va Tech Wabag Ltd.,

Chennai. RO/DM Plant at IOCL Panipat

Site. PWHT works for 3 Nos. Caustic

Tank by Internal Oil firing method. EIL/Client 2009

94. Petron Engg. Constn. Ltd.,

Mumbai RPL Site, Jamnagar.

Stress Relieving, Pre-heating, Post-heating, & Hardness Testing

RIL 2009

95. Petron Engg. Constn. Ltd.,

Mumbai NCU Project, IOCL, Panipat,

Naphtha Cracker Project.

Pre-heating, Post-heating, Stress Relieving, Hardness Testing & Heat

Treatment of P-91 job. EIL 2009

96. Larsen & Toubro Ltd.,

Kakinada

RIL Kankinada Project Site. On-shore Gas Processing

facility.

MPT, Stress Relieving, Pre-heating, Post-heating & Hardness Testing including P-91 & T-91 material.

RIL 2009

97. EDAC Engineering

Ltd.,Chennai Sulphur unit in JERP-Jamnagar Radiography & PWHT job. IBR 2009

Page No. [ 10 ]Page No. [ 9 ]

Ongoing Projects

Continued…

Industries served¥Oil Refineries and Petrochemical projects¥Oil Fields and Gas Fields¥Thermal Power Projects & Nuclear Power Projects¥Hydel Power Projects¥Fertilizer Projects¥Chemical Plants & Projects¥Railways and Defense¥Automobile Industries¥Heavy Engineering Industries PWHT Work at Kazakhstan

SI. No.

Name of the Client Name of the Project Site Nature of the job Inspecting Authority

4. Bridge & Roof Co. (I) Ltd.

RIL, Mumbai VGO, OSBL in JERP- Jamnagar,

Gujarat Stress Relieving & Radiography for Piping job RIL

5. PUNJ LLOYD LTD.,

Gurgaon EPCC-8, Naphtha Cracker Project, Panipat, Haryana

Radiography of Atmospheric Tanks. EIL

6. IOT Engineering Projects

Pvt. Ltd. Naphtha Cracker Project, Panipat, Off Site piping

Radiography, X-Ray, Pre-heating & Stress Relieving of weld joints.

EIL

7. EDAC Engineering Ltd.,

Chennai

2x300 MW Coal based Thermal Power Project at JSWEL,

Toranagallu Bellary, Karnataka

Pre-heating, Post-heating & Stress Relieving of pipe weld joints, P-91 & T-91 job.

EIL

8. Reliance Industries Ltd.,

Jamnagar JERP-Jamnagar, Gujarat Pre-heating, Post-heating & Stress Relieving job. RIL

9. UB Engineering, Pune.

Panipat Refinery (Haryana)

EPCC-4 Captive Power Plant, IOCL at Panipat Naptha Cracker

Project

Pre-heating, Post-heating, Stress Relieving & Hardness Testing of pipe weld joints & Pre-heating, Post-heating & Stress Relieving of P-91 material.

EIL

10. Indwell Constructions Pvt.

Ltd., Vijayawada Unit 6-490 MW Boiler at Dadri

NCPP, NTPC - Dadri

Pre-heating, Stress Relieving, U.T., M.P.T. & Hardness Testing of Ceiling Girder & Pressure Parts & Pipe weld

joints of Boiler including P-91 material. NTPC

11. Punj Lloyd Ltd., Haldia HGU Project, IOCL, Haldia, W.B Stabilization job for Heater works. EIL

12. Larsen & Toubro Ltd.,

ECC, New Delhi Toyo Job EPCC1, PNCP IOCL

Panipat Naptha Cracker Project X-Ray, Pre-heating, Post-heating, Stress Relieving &

Hardness Testing & Heat Treatment of P-91 job. EIL

13. Punj Llyod Limited,

Gurgaon

IOCL Haldia Refinery Expansion Project for Hydrogen & Hydro

Cracker Unit

Full Stress Relieving work of Tankages by Oil Firing method

LURGI

14. Punj Llyod Limited,

Gurgaon

IOCL Haldia Refinery Expansion Project for Hydrogen & Hydro

Cracker Unit Pre-heating, Post-heating & PWHT of pipe weld joints. LURGI

15. Tata Projects Ltd.

Secunderabad

Unit # 1 & 4 at SEPCO 2X600MW Project, Jharsuguda,

Orissa.

Pre-heating, Post, heating, Stress Relieving of pipe weld joints including P-91 & T-91 material,

Radiography & Ultrasonic Testing job. NTPC/BHEL

16. Tata Projects Ltd. Secunderabad.

Unit # 1 & 4 at SEPCO 4x135 MW Project, Jharsuguda, Orissa

Pre-heating, Post, heating, Stress Relieving, of pipe weld joints including P-91 & T-91 materials,

Radiography & Ultrasonic Testing NTPC/BHEL

17. Tega Industries Ltd.,

Kolkata Tega’s Workshop at

Thakurpukur, Kolkata Stress Relieving of Trommel Structure Tega

18. Petron Enggineering. Constn. Ltd., Mumbai

DHDT & HGU Units for Gujarat Refinery Expansion Project,

IOCL, Vadodara

Radiography, Stress Relieving, Pre-heating, Post heating, Hardness Testing of Pipe weld joints.

JACKOB

19. Mcnally Bharat

Engineering Co. Ltd., Dhanbad.

Kumardhubi Works Stress Relieving of Separator Vessels by Internal

Firing method Lloyd/EIL

20. Punj Lloyd Ltd.,

Vadodara. Gujarat Refinery, Vadodara.

Radiography job of weld joints for C.S., S.S. & A.S. piping.

JACKOB/TOYO

21. Larsen & Toubro Limited,

Kolkata. 2x525 MW Boiler at Maithon

Power Plant, Jharkhand. Radiography & Stress Relieving job of weld joints.

BHEL/Tata Consultancy