Schedule No. 1
1.4.1.1.5 LV/33
Substation, related
accessories and 33
kV evacuation line
in Section 6
& Section – 4 Page
48 of 56
Conflicted requirement of Capacity of 33/0.40
kV auxiliary transformer
(100KVA?150KVA?200KVA)
Please confirm the Capacity of Auxiliary Transformer.
2 X 100 kVA. Or bidder can
suggest but total kVA rating
should be higher than 200
kVA
2Annex A - 02 PV
Plant LayoutCluster information Is the bidder allowed to change the model capacity of single panel and inverter?
Yes. Inverter (25-60)KW and
module efficiency must be
equal to or higher than 16.5%
and must be greater than or
equals to 320WP in capacity
3
2.4.1.1.5 LV/33
Substation, related
accessories and 33
kV evacuation line
Section – 6 , Page
23 of 81 &
2.7 Subcontractors
Step-
upTransformers,250
0 kVA
Section – 3, Page 10
of 11&
Form ELI - 3:
Mandatory
Compliance
TransformerLV/M
V
Section – 4, Page 34
of 56
LT Switch Gear:(For 2500 KVA Transformer)
Must have at least 2 (two) years
reliableoperating history of the proposed
model.
must have at least 5(five) years
reliableoperating history ofthe
proposedtransformer model
1. 2500KVA Transformer is comparatively new product and could be impossible to satisfy 5
years operation history requirement. Is the bidder allowed to lower the capacity?
2. We would propose to change the operating history to be 2 years rather than 5. Please confirm.
Manufacturer needs to have 5 yrs experience but the model should have 2 yrs operating
experience.
Manufacturing Experience of 5
years and 2years of successful
field experience for the offered
model
4
Annex B - 01 Single
Line Diagram of the
Plant&
2.4.1.2 Delivery
station
Section – 6, Page 31
of 81
The proposed 33 kV switchgear is a double
bus bar system
Is Single bus bar sectionalized configuration acceptable? This design will serve the same purpose
and saves cost.
We prefer double bus
system.
5
22.2.7 Health and
Safety
Section – 8, Page 4
of 5
The program shall also include provision of a
detailed cost estimate with supporting
documentation. Payment to the Contractor for
preparation and implementation this program
shall not exceed the Provisional Sum dedicated
for this purpose.
Please confirm the Provisional Sum dedicated for this purpose.
There is no provisional fund to
conduct the program. Bidder
will carry out in his own cost.
6
7
Submission and
Opening of Bids
Section – 2, Page 3
of 3
The deadline for bid submission is Date &
Time: 24-07-2017, Time: 11:00 AM (BST)The bidder request to extend the deadline for bid submission.
Yes , 21 days has been
extended. New deadline of the
submission of bids is 17th
August, 2017 Thursday at 4.00
PM (BST)
8
2.4.1.1.7 Power and
control cables
Section – 6, Page 28
of 81
2.4.1.1.5 LV/33
Substation, related
accessories and 33
kV evacuation line
Section – 6, Page 26
of 81
The 33 kV devices and 33 kV Evacuation line
shall be designed to withstand the energy
evacuation through one feeder at PV Plant’s
maximum rating.
10KM From Power Plant supply
switchyard to Kaliganj Substation receiving
switchyard ( 15M SPC (SPUN PRE-
STRESSED CONCRETE)POLE with
Double circuit Grosbeak conductor complete
with required accessories as per BPDB
Standard, pole muffling is required for each
poles).
1. Large section is required to evacuate Plant’s maximum rating if Grosbeak conductor is to be
used; Is the aluminum conductor with reinforced core of carbon fiber(ACCC), which has bigger
evaluation capacity, allowed instead?
2. Is the bidder allowed to used steel tower instead of SPC Poles?
1. Conductor should be
grossbeak 2. ( 15M SPC
(SPUN PRE-STRESSED
CONCRETE)POLE with
Double circuit Grosbeak
conductor complete with
required accessories as per
BPDB Standard, pole muffling
is required for each poles).
9
Construction
Schedule
Section – 4, Page 18
of 56
&
Time Schedule
Section – 4, Page 31
of 56
Construction Schedule:
Work Plan. Propose the main assignment
activities, their content and duration, phasing
and interrelations, milestones, and delivery
dates for there ports. The proposed work plan
should be consistent with the technical
approach and methodology, showing
understanding of the TOR and ability to
translate them into a feasible working plan.
Include a list of the final documents, including
reports, drawings, and tables to be delivered as
final output. Construction schedule shall be
consistent with mobilization schedule.
Time Schedule (Bidder should supply)
As an experience contractor, we understand that Time Schedule is to be used by Bidder when
alternative Time for Completion is invited (usually not, as in the case of this project), like the
bidding documents of BPDB Kaptai 7.4MW solar project. In fact, all milestone dates will be
provided in construction schedule.
Please clarify in view of the construction schedule, shall the bidder fill out the Time Schedule. If
yes, what information shall the bidder provide in the Time Schedule?
Bidder can propose their own
time schedule & Milestone but
bidder should satisfy project
completeion schedules.
10Section 6 (ERQ)
ISPL
The installed capacity shall be equal or higher
than 40MWp. The PV plant will consist of the
deployment of higher efficiency PV generation
technology and three phase string inverters.
Cosnidering the wind speed, Is the bidder allowed to bid with central inverters or it needs to bid
with string inverters only?
Only String Inverter (25KW -
60KW )
11Section 6 (ERQ)
ISPL
Metallic and non-metallic materials shall be
UV resistantUV resistant property will be applicable to selected exposed equipment only. ok
12Section 6 (ERQ)
ISPL
Tariff metering shall be at the HT side of the
transformer and inside control room building
Tariff meter at HT side of Transformer but place inside the control building may increase the
burden on CT/PT and hence recommended to place at the switchyard. Please confirm.
Outdoor Tariff meter. But
another meter should be at the
control room.
13Section 6 (ERQ)
ISPL
For O&M purposes at 33 kV switchgear in
Delivery Station and in auxiliary system
(operational metering).
Please elaborate the requirement. Please specify the question
14Section 6 (ERQ)
ISPL
For the oil type transformers the following
temperature rise shall not be exceeded:
maximum oil temperature 60 ºC
average winding temperature: 65 ºC
Standard industry practice for temp rise over ambient:
maximum oil temperature 50 ºC
average winding temperature: 55 ºC
Please confirm if acceptable.
As per bid document
15Section 6 (ERQ)
ISPL
Buchholz relay with alarm and tripping
contacts. Pipes connecting the Buchholz relay
with tank and oil conservator to have slide
check valves to enable dismantling of the relay.
Bucholz Relay is applicable to transformer greater than 500kVA. Sl, if ratings crosses 500kVA,
shall provide else not. Please confirmOk. Ignore this clause.
16Section 6 (ERQ)
ISPLGeneral Bidder proposes to use distributed auxiliary system. Please confirm!!
Ok. But in this case Bidder
needs to provide Justification
and the total capacity should
not be less than 200 kVA.
17Section 6 (ERQ)
ISPL
PV Plant Control and monitoring system and
performance calculation (in case of central
inverters)
Bidder propsoes to use Zone monitoring (if Central inverters are acceptable). Please confirm
Central Inverter is not
applicable
18Section 6 (ERQ)
ISPL
The settlement meter (bidirectional) will be
located at the evacuation switchyard.
The Bidder has to provide the bidirectional
operational meter located in the PV Plant
Delivery Station according to the national
regulations and norms
Please confirm between point number 2.4.1.2.1 and 2.4.3.8. Bidder understands that there will be
one tariff meter with main & check meters and the same shall be installed at the HT side of
Power Transformer located at switchyard. Please confirm. Delivery stations will have MFM
(Multi function Meters)
Please see the Extract of PPA
(Metering). Bidders need to
comply with the PPA clause.
19Section 6 (ERQ)
ISPLGeneral Please share the latest grid code Attached
20Section 6 (ERQ)
ISPLGeneral
Kindly confirm grid reactive power requirement. If reactive power compensation not required
then the active power shall drop during reactive power requirement from grid. Please confirm?
According to the PPA, No
reactive power is required.
21 Drawings GeneralAssuming the prosed tilt angle and layout are indicative. Bidder is free to optimize and design.
Please confirm?
Confirmed. If alternate design
is proposed then Justification
need to be provided with
simulated yield calculation.
22Section 6 (ERQ)
ISPLGeneral Bidder is free to choose the DC/AC ratio? No. Cumulative AC power of
the Inverters over PV plant
capacity in Wp at STC must be
greater than or equals to 85%.
23Section 6 (ERQ)
ISPLTransmission Interconnection Is it under bidder's scope. ROW shall not be in bidder's scope. Please confirm
Bidder will identify the line
route along with employer and
employer will organize the right
of way. The evacuation line
should not be more than 10
kM.
24Section 6 (ERQ)
ISPLTransmission Interconnection Is there a bay extension work in the connecting subststaion?
Bidders Scope
25Section 6 (ERQ)
ISPLTransmission Interconnection
If bay extension is under the scope of bidder then the connecting substaion equipment
specification is needed. Kindly share the same?
Bidders Scope. For further
specification, you are requested
to visit the site along with
substation.
26Section 6 (ERQ)
ISPLTransmission Interconnection
If bay extension is under the bidder scope, then please confirm that land is abvalable for the
same. If not, land procurement shall not be in bidder's scope. Please confirm
If it is necessary to procure
land, Employer will do that.
But bidders will responsible for
the bay extension & rest of the
works.
27Section 6 (ERQ)
ISPL5kWp Solar PV (Roof Top)
Is it to be included in the total grid connected capacity or it is completely separate?? Please
cofirrm
Completely Separate.
28Section 6 (ERQ)
ISPL
Inspection, Commissioning and Acceptance
Testing: InspectionIR thermographic inspection shall be done at site post installation of modules.
If Bidder feel necessary to
conduct the same, Bidder can
do so
29Section 6 (ERQ)
ISPLDefinition
Independent lab shall be identified based on module manufacturing plant so as to avoid
shipment delays. Besides, it shall be mutually agreed.As per the Bid Document
30Section 6 (ERQ)
ISPL
Definition of the Yield at the Provisional
Acceptance Test: The adjustments for
mismatch and module quality losses in
accordance with the values of the
manufacturer flash list and the results of the
Counter Flash Tests).
Bidder propses, No adjustments for mismatch and module quality losses based on flash data of
modules.As per Bid Document
31Section 6 (ERQ)
ISPL
If the Installed Capacity will be higher than the
Nominal Peak Power, this will be reflected by
means of adjusting the module quality losses
of the original parameter setting of the PVsyst
simulation
No adjustment in module quality loss required based on flash data. As per Bid Document
32Section 6 (ERQ)
ISPL
GLPAC = guarantee level provided by the
Contractor (minimum value of 95%) [%]Is GLpac fixed at 95%? Please confirm As per Bid Document
33Section 6 (ERQ)
ISPL
Provisional Acceptance Test Calculation:
Formula to be referred
As Ymeter is in kWh, formula suggests Yt at Gpoa,t). Hence, Yt is not multiplied with Gpoa,t.
Please clarify.Yes multiplied by t (here t =1)
34
35Section 6 (ERQ)
ISPL
The PRmeasured will be corrected with the
actual ambient temperature,
as per IEC 61724 & NREL references, measured PR is adjusted based on module temperature
not ambient temperature.yes, cell temperature.
36
37Section 6 (ERQ)
ISPLRefer Formula
It shall be based on module temperature measured & module temperature from weather file.
Can we share our PR test procedure?Yes.
38Section 6 (ERQ)
ISPLRefer Formula
Bidder requests to consider 2% as tolerance between PRcorrected & PRguaranteed for plant
acceptance due to modelling error & instrumentation errorAs per Bid Document
39Section 6 (ERQ)
ISPL
Compare Final PRcorrected with Final
PRGuarantee: Refer Formula
Bidder requests to consider 2% as tolerance between PRcorrected & PRguaranteed for plant
acceptance due to modelling error & instrumentation errorAs per Bid document
40Section 6 (ERQ)
ISPL
(1) Installed Capacity = Σ Flash Peak Power as
adjusted hereunder
Bidder proposes that Installed capacity shall be sum of nameplate rating of modules installed.
Flash test data as provided by module manufacturer shall be submitted for verification. Please
confirm
As per BID Document
41Section 6 (ERQ)
ISPL
Performance Guarantee: performance ratio
(PR) ≥ 77% (at metering point that is the HT
side of step-up transformers) at the time of
commissioning regardless the month the Plant
is commissioned
But at the time of commissioning, RFP mentions to calculate yield not PR. Hence, why is this
requirement of PR 77% at the time of commissioning? Kindly confirm. As per Bid Document.
42Section 6 (ERQ)
ISPL
Wind Condition:(page 66) mentions 225 km/h
(62.5 m/s) as the Basic Wind Speed for
location Gangachara, Rangpur
225 km/h wind speed is a serious concern for module manufacturers. As per IEC, modules are
designed for 130km/h wind speed. Please confirm??
Highest designed wind spped is
to be 62.5 m/s as per BNBC.
43General: As per Google earth imagery, there
are ponds in the area which needs to be filled. Bidder assumes these works are not in bidder's scope. Please confirm Land filling work is not in
bidder's (Lot 2) scope.
44Section 6 (ERQ)
ISPL
PV Plant Control and Monitoring System
(DCS – Digital Control System) / Supervisory
Control and Data Acquisition (SCADA) for
the PV Plant, including all necessary software
licenses
Bidder proposes PLC base SCADA system with necessary software licenses
Need to be comply with local
requirement / standard.
45Section 6 (ERQ)
ISPLCCTV
There are no co-relation between CCTV and SCADA, however CCTV Monitoring will have
separate software and hardware.As per bid document; advised
to see the DCS conceptual
Drawing.
46Section 6 (ERQ)
ISPL
RAID Station (Redundant Arrays of
Inexpensive Disks) for Long Term Data
Server router
Bidder proposes 1 operator station, 1 operator/engineering station with RAID 5 configuration Accepted
47There were some No. that we can’t find in the bidding documents, such as Invitation for Bid
No, Bid Security No, Alternative No, ICB No marked in the attachment with yellow colour. I’m
kindly you can send these No. to me.
ICB no: ISPL/2017/06/1/L2
48
1. What is the relationship between the elevation of the contour map in Annex 4 of Tender book
and the elevation FGL38.50 of the PV site in the road & protection drawing before the tender?
How does 8.22 m belong to the elevation of the tenders? The rough view of the floor from
Google Maps is 36-37m.
2. Bidding documents Annex 04 Contours Water Level 8.342 is a flood water level for 20 years
or 50 years?
3. How many people are allowed to labor in Bangladesh? Is there a requirement for the
proportion of Chinese workers?
4. Is there a prefabricated concrete pile or tubular pile in Bangladesh?
1. 2. Bidders do not need to
worry about that. Employer will
provide the ready to build land
to the bidder. Pls refer to the
conceptual drawings.
3. No limitation.
4. Yes. You need to source.
49 Inverter voltage 1000V/ 1500V both are accepted.
50 Inverter Working Temperature 42 or 50maximum operating
temperature +60 degrees C
51Section 1 of
“Section 6 (ERQ)
ISPL”: Section 2.4.6
For the simulation of the expected yield of the
PV plant, which is the basis for the guaranteed
performance, the NASA SEE data set shall be
considered
if the NASA SEE data set for this project can be provided by Owner?Bidder should organize and
submit the simulation result.
52
Please refer to the
drawing “Annex A -
02 PV Plant
Layout” in the File
Folder named Fw_
Drawing & Design.
Some mistakes are observed in the said
conceptual drawing
(eg. 1>No side space between PV tables,
nomally 0.8m distance should be reserved at
both side ; 2> layout of some modules are out
of Set boundaries ; )
Do we need to follow the said conceptual design?
Pls see Fig Annex C 01 for
details of mounting structure
gap.
* Yes. If you have better design
you can provide.
53
Please refer to
section 1 of the file
“Section 3 (EQC)
ISPL”
It indicated that in both the cases the
inclination angle must be 25° (facing towards
south) and the spacing of adjacent PV clusters
should be more than or equal to the ratio
mentioned in the conceptual drawing of PV
mounting structure (L/H≥2)
1)The defined inclination angle (25°)may not the optimized angle,can we change it as per
our own design ?
2)As per the design data get from dawing “Annex C
- 01 Mounting Structure of Solar PV Module”,the spacing of adjacent PV rows is 3.32m,
which may not the optimized distance, can we make the
modification?3)once we make modification according to our design, then the land size may not enough
for a capacity of 40MWp(≥40MWp),please advise.
1. You can change the
inclinational angle but you need
to provide yield comparison
and need to take approval at
the time of design submission
to the Employer (ISPL)
2. Its only conceptual drawing,
You can suggest better design
but the ration mentioned inhe
drawing (L/H must be greater
than or equal to 2). But
propoer explanation should be
there with simulation result.
3. You need to submit the
design within the given land. If
you have alternate design you
can provide so as alternate
design. Employer has the right
to accept or reject the modified
design. You can also use higher
efficient panels for space
optimization.
54Section 1 of
“Section 6 (ERQ)
ISPL
Scope of Supply of Plant and Services: Bidder
needs to construct the 33 kV overhead
evacuation line from the PV power plant
evacuation switchyard to the nearby 33 kV
substation at Kaliganj, Lalmonirhat which is
approximately 10kM away
As per the data get from drawing “Annex A - 01 PV Plant Layout with Location Photo”, the
distance of the 33 kV overhead evacuation line from the PV power plant evacuation switchyard
to the nearby 33 kV substation at Kaliganj, Lalmonirhat is 7.5kM, which not 10kM.
please clarify which value mentioned above is correct?
Actually our Transmission line
is 33KV double circuit line.
***Google Map shows that the
total line will be 7.5 km along
the road. We are considering
the evacuation line not more
than 10 km. Bidder is
responsible for selection of
proper line route. It is advisable
to consider 10 km of
tranmission line.
55Section 1 of
“Section 6 (ERQ)
ISPL
Scope of Supply of Plant and Services:
The work “Supply, Installation, Construction
and Commissioning of 40MWp ISPL Solar
Power Plant” at Gangachara, Rangpur is
divided into three Lots, which are Lot-
1,Lot-2 and Lot-3.
All of the three lots are within the scope of Bidder or Just Lot-2 is within the scope of bidder?\
Please Clarify accordingly.
Total work is divided into three
lots: Lot-1: Land
Development, Boundary wall,
Embankment, Village Road.
Lot-2: EPC part ( Panel,
Inverter, Transformer,
Mounting Structure,
Transmission
line,SCADA,Substation, Office
Building etc)
Lot-3: Helipad, Guest House,
Play Ground, Staff quarter.
Scope of works of different
Lots are completely different.
THis tendering process is only
for Lot 02. If you are interested
you can participate other lots
but that will be considered as
seperate work.
56Regarding the MV&LV cables, except the PV cables, if aluminum alloy cable is acceptable?(eg.
LV Cables from combiner box to transformer)
We prefer to use Cu cables
upto the evacuation SS.
57
Please refer to
Section 1 of
“Section 6 (ERQ)
ISPL”:
Scope of Supply of Plant and Services:
A 5 kWp solar PV system (on the roof of control room and office building) with Li-ion based
battery for backup power supply of the plant. Excess power should share the load of the plant.
Our question:
1> 5kWp herein is refer to DC or AC power?
2> What is the capacity requirement of Li-ion based battery?3>It has come to our notice that this is a roof mounted grid connected PV system, please
indicate the location of the interconnection point
4> What is the function of this system? Please share more details in this regard.
1. AC power for the plant use
andf emergency back up.
2. We need four (4hours
backup) 3. yes you should
implement the back up system
on the roof of the office
building and the inter
connection point also in the
building for backup electricity
at the time of load sheding
4. Its back up for security
premises. After the battery is
fully charged the additional
power will be feed into the
local AC distribution board to
share with the grid power.
58Clause 2.4.2.10 of
"Section6 (ERQ)
ISPL"
PV module mounting structure (Solar Arrays)--
To avoid and minimize effects of flooding the
minimum height of the modules at any point
shall be
higher than one meter above the recorded
flood level as indicated in the general layout
drawings. There is no information about flood level indicated in the general layout drawing. Please confirm
and provide the value accordingly.
The employer will developed
the land upto the recorded
flood level. You are to design
such that the lower part of the
PV panels are 1 meter above
the ground level. The
transformers base will also need
to be raised by 1 meters from
the filled gound level.
59
We just compared the NASA SEE, and we
found that the MeteoNorm Data 7.1 is much
more accurate than NASA SEE, so please
clarify if we can use MeteoNorm Data 7.1 to
instead of NASA SEE.
could we use the MeteoNorm 7.1 attached in software PVsyst. This data MeteoNorm is more
accurate than NASA SEE. Please clarify it.
Ok you can use meteo norm
data.
60According to
Section 6
(ERQ),page10,
the Bidder shall consider the possibility of cyclones during its design.Please provide the basic
wind pressure of the cyclones.
The design should withstand a
maximum a wind speed of 62.5
m/s
61 Referring to
Section 6 Clause
2.3.5.3
“The minimum coating shall be specified during detailed design for a minimumlifetime of 50
years in use, in any case minimum 80 µm are required”, normally the design lifetime for the
mounting structure is 25 years. How to consider this difference?
Minimum lifetime is 25 years
62Referring to the
wind conditions at
Section 6 page 8,
the basic wind speed is 62.5m/s, and this record is for 50 years, however the normal design
lifetime for PV plant is around 25years. Thus, we shall conform to the basic wind speed for 50
years or for 25 years? This wind speed has a big effect on our mounting structure design and
cost.
Bidders need toConsider the
basic wind speed of 62.5 m/s
63 Our design shall consider the high water level, please provide the recorded flood level in the PV
plant area.
Employer will develop the land
considering the recorded flood
level
64 Please provide the Annex E,Soil test report. Attached
65 How many peoples shall be considered for office and staff dormitory capacity?
Satisfying the minimum
requirement given in the
conceptual design, Bidder can
propose their design
(Considering minimum 20
numbers of Office staff). Staff
dormitory is not the scope of
Lot-2 works
66Is there any requirement for the 33 kV overhead line? For the supporting structure, we can use
Concrete pole,wooden pole, or iron tower?
Follow the clause 2.4.1.1.5 of
section 6(Employer's
Requirement). The pole would
be SPC pole.
67In the Section 3
EQC PAGE 10,
the subcontractors, Item No.4,it shows that we need the 33kV switchgear.Usually the switchgear
means the Switch cabinet which is indoor type.However, referring to section 6 ERQ page 23,the
33kV equipment is outdoor type.Which one shall be complied with?
Bidder can propose their own
design.
68 How many people are allowed to labor in Bangladesh? Is there a requirement for the proportion
of Chinese workers? No Limitation
69
Refer to Section 6 ERQ Clause 2.4.1.5, the 33KV equipment shall adopt out door
type, however the drawing “Annex C - 02 Service Building Details” has the MV
room. Please confirm that the 33KV equipment shall adopt out door type or in
door type?As per Tender Document
70
Refer to “Annex B – 01Single Line Diagram of the Plant”, the power supply of
the two Auxiliary transformers all come from the bus. If the bus is breakdown,
there is no backup for this mode of connection. Please confirm whether it should
be designed as the Annex B – 01?In Annex B-01 double bus bar
system is suggested.So there is
always an option incase of
breakdown.
71
There is no mention of diesel generator within “Annex B - 01 Single Line
Diagram of the Plant”, however, the tender documents Section 6 2.4.1.2.16
mentions 200KVA diesel generator, please confirm if the diesel generator is used?
Please follow the clause
2.4.1.2.16 of Section 6 and it is
for back up power only.
72Please confirm that whether the lighting is adopted within PV area?
Yes Required
73
74 Please confirm the dispatch requirement for communication system.Please refer to Annex
D-04
75
What’s the requirement of supporting structure of 33KV line, whether the iron
tower or other supporting structure types shall be adopted? If the iron tower type
is adopted, the type of double circuits on the same tower or single circuit iron
tower, which one shall be adopted?Please refer to clause 2.4.1.1.5
of section 6
76
Refer to Section 6 ERQ 2.3.5.3, “The minimum coating shall be specified during
detailed design for a minimum lifetime of 50 years in use, in any case minimum
80 µm are required”. Normally, the design lifetime for the mounting structure is
around 25 years, please confirm whether 25 years lifetime of mounting structure
could be used?
Minimum 80 µm is required
and The minimum lifetime is
25years.
77 There has a conflict between Section 6 Clause 2.4.5.1, Table 2-2 and Section 4
Schedule No.1 Plant (including Mandatory Spare Parts) Supplied from Abroad,
Mandatory Spare Parts, which one shall be complied?
Please follow the section 4
schedule -1.
78
Section 6, Page 86,
According to the description of Wind condition in page 8, section 6, the basic wind speed for
the location Gangachara, Rangpur is 62.5 m/sec, Please confirm the accuracy of the data
provided in the bidding document
This is according to
Bangladesh National Building
Code 2014. Pls note that "the
Basic Wind Speed" is
measured as 3 second gust
speed at 10 metres above the
mean ground level
79 Section 6 (ERQ)
ISPL, Clause
2.4.1.1.1.5
In the component list in section 6, clause 2.4.1.1.5, it is mentioned that some outdoor
disconnecting switches, circuit breakers etc. is the 33KV power equipment is required to be
desined in accordance with the open structures?? Are metal enclosed assembles (cabinet
structures) considers? state clearly? Yes.
80
Annex B-01, Single
Line Diagram,
Section 4, Page 6
Accordaing to the single line diagram, the capacity of Auxiliary Transformer is 100KVA. How
ever in the schedules of rates and price , the price of auxiliary transformers is 200 KVA.
Please clarify the capacity of Auxiliary Transformers.
1X200 kVA or 2X100 kVA or
you can propose according to
your design, but the total
capacity should not be less
than 200 kVA
81 Are you going to deduct any taxes from the foreign currency payment? Are you going to
deduct any taxes from the local currency payment?
No. Employer is responsible
for all local taxes and import
duties.
82 Is transport of Offshore items from destination port to site ISPL's scope? Yes.
83
In the 33kV system we can see many isolators. We understand you need redundancy. Some
isolators can be avoided but redundancy can still be there. Can we redesign the system
maintaining the redundancy? yes
84
Clause 2.3.9,
Section 6 -
Employer’s
Requirements,
The scope EPC Contractor needs to
construct 33 kV double circuit overhead
transmission lines from PV power plant to
the nearby 33/11 kV substation at Kaliganj,
Lalmonirhat. The substation and conceptual
evacuation system is outlined in the
diagrams. The Bidder shall include with their
Bid a complete and detailed description of
the interfaces.
Please inform of the length of 33KV DC transmission lines
The distance of the
mentioned SS along the road
is 7.5 kM. We are considering
a maximum of 10 kM. Bidders
needs to determine th eline
route along with employer
and employer will be
responsible for the right of
way.
85
Chapter 4.
Supplementary
Information,Sectio
n 6 - Employer’s
Requirements,
The following documents are provided to
the Bidder for his information: Additional
reference publications: Annex E – 01 Soil
Test Report Annex F – 01 PPA between ISPL
and BPDB
Annex F is not found in tender document, please provide. Pls find attached
86
clause 14 Taxes
and Duties, section
8-SCC
b) Bangladesh Income tax and VAT
The Employer shall pay all taxes and value
added tax (VAT) at the prevailing rule of the
Government from all payments of foreign
currency & local currency (except on CIF
price mentioned in Price schedule -1)
please confirm that all VAT applicable to the Contract Price regardless of currency will be
paid by the Employer.
Employer is responsible for
local duties and VAT
87
Article 3 of
Contract
Agreement
3.1 The Effective Date upon which the
period until the Time for Completion of the
Facilities shall be counted from is the date
when all of the following conditions have
been fulfilled: (a) This Contract Agreement
has been duly executed for and on behalf of
the Employer and the Contractor; (b) The
Contractor has been advised that the
documentary credit referred to in Article 2.2
above has been issued in its favor.
the following clause shall also be one of conditons for contract effective date:
(c) The advance payment is made to the Contractor;
No advance payment
88
Appendix 1 -Terms
and Procedures of
Payment
In schedule No. 1
Eighty percent (80%)of the total or pro rata
CFR amount upon Incoterm “CFR” or “C&F”
within forty-five (45) days after receipt of
invoice and shipping documents. In the
event that shipping is delayed upon the
written instruction of the Employer for more
than twenty-eight (28) days beyond the date
shown in the Program of Performance
provided in accordance with GCC Sub-Clause
18.2, the Contractor may make application
for this part of the payment against
warehouse receipts, provided always that
the plant and equipment are ready for
shipment on the date shown in the said
Program.
Eighty percent (80%) of the total or pro rata
CFR amount upon delivery to Site within
forty-five (45) days after receipt of invoice,
less seventy percent (70%) of the CFR
amount already paid or authorized for
payment.
(1) Advance payment being 15% of Contract Price is recommended to be maid to Contractor
within 28 days after contract signing date.
(2) Please confirm that Eighty percent (80%)of the total or pro rata CFR amount upon
Incoterm “CFR” or “C&F” within forty-five (45) days after receipt of invoice and shipping
documents, and the last paragraph cited shall be deleted.
1. No Advance Payment.
2. Ammendment will be made
and circulated
89
ITB 19.1,BDS b)The prices for the Goods and Services
which the Bidder will supply from within
Bangladesh shall have to be quoted in
Bangladesh Taka.
Please confirm that bidder can quote both in foreign and local currency for civil work and
installation.
All the price will be converted
to US$.
90
Tender sucurity
Please kindly clarify the tender security opening method, it's shall be issued by any schedule
bank of bangladesh or foreign bank duly endorsed by a scheduled bank in bangladesh?
First portion isn't understood
properly. In both way bidder
can provide tender security.
91
BDS ITB 22.2 Authenticated board resolution? The authenticated by company's corporate representative is acceptable or not?
If the representative is
authorized by the
management, then it will
work
92 Please confirm the design wind speed of the line is 225km/h. Whether it is 3 seconds gust? Yes.
93
Please provide the meteorological data for the transmission line(include maximum
temperature、 minimum temperature、annual average temperature、ice thickness)
Maximum ambient
temperature= 45°C, Minimum
=5°C, Average temperature= ,
No ice,
94 Please provide the pollution class or creep distance(mm/kV) Bidder's responsibility
95 Whether the line needs ground wire? Yes
96
In the SL. NO.21 in clause 2.4.1.15 of section 6, it's described as "10km from power plant
supply switchyard to Kaliganj substation receiving switchyard (15m SPC Pole …as per BPDB
standard…)". (1.) Does the SPC Pole mean the pre-stressed concrete pole? And it will be
better if any reference drawings or pictures can be supplied. (2.) It's said that the pole's
design should be according with the BPDB standard. Whether the IEC standard or similar
standards can be applied? (3.) The span now is designed preliminarily as 50m-60m. Please
confirm whether that issuitable? Or more requirements should be supplied.
1) SPC= Spun Pre-stressed
Concrete, 2) BPDB standard,
3) It depends on the line
route, generally for straight
line double circuit it is around
35 m.
97Please confirm the 33kV equipment of PV Plant delivery station at plant location are GIS or
outdoor equipment. Not GIS.
98 According to REQ section-6 2.4.1.1, The incoming feeder from the LV/33 kV transformer
consists ofcircuit breaker and an earthing switch. Please confirm the circuit breaker and
earthing switch are outdoor equipment or included in the LV/33 kV transformer. Bidders are free to offer any.
99
According to EQC page2:“In both the cases the inclination angle must be 25°(facing towards
south) and the spacing of adjacent PV clusters should be more than or equal to the ratio
mentioned inthe conceptual drawing of PV mounting
structure(L/H≥2).What is the meaningL/H≥2?Whether the inclination angle must be
25°?
Pls see the drawing (Annex- C
01)
100
101 Please confirm whether the grid side equipment are included in our scope of work. The
equipment of grid side are outdoor or switchgear.
Bidders responsibility is upto
the evacuation substation at
Kaliganj 33/11kV substation.
102Please confirm the quantity and capacitor of auxiliary transformer. 1 set or 2 set , 100kVA or
200 kVA.
1X200 kVA or 2X100 kVA or
you can propose according to
your design, but the total
capacity should not be less
than 200 kVA
103 The annex B-01 single line diagram of the plant is only conceptual design. Can we design the
scheme according to our own design philosophy?
Yes. You can do but needs to
keep the redundancies.
104According to ERQ page 45 “Fixed Mounting System”, Please provide the specific
requirements of the spacing of the north and south pv assembly?
Pls see the drawing (Annex- C
01)
105
The area as shown in the drawings“Annex A - 03 Topographical Survey”is much smaller than
that given in the tender documents“The selected area for the photovoltaic installation has
approximately 150 acres. ”Please provide the red line inflection point coordinate or the
correct CAD red line diagram. CAD drawing is provided
106
General: As per Google earth imagery, there are ponds in the area which needs to be filled.
Land filing is the scope of Lot
01.
Lot 2 bidder will get the filled
land.
107
2.4.3.1----Section 6
(ERQ) ISPL
PV Plant Control and Monitoring System
(DCS – Digital Control System) / Supervisory
Control and Data Acquisition (SCADA) for
the PV Plant, including all necessary
software licenses
Bidder proposes PLC base SCADA system with necessary software licensesCan do that but should meet
BPDB and PGCB Standard /
requirement.
108 2.4.3.1----Section 6
(ERQ) ISPL
CCTV There are no co-relation between CCTV and SCADA, however CCTV Monitoring will have
separate software and hardware.Separate is acceptable
109
110
A 5kWp solar PV system (onn the roof of
control room and office building ) with Li-ion
based battery for backup power supply of
the plant. Excess power should share the
load of the plant.
Kindly Clarify the detailed requirement for 5Kwp solar PV system. Provide Lead Acid battery
in place of Li-ion Battery .Kindly accept.
Pls refer to page 3 & 36 of
section 6.
111
Provisison of temporary security rooms
according to the authorities requirements.
Kindly Clarify the scope of the requirement. Scope of Lot 3
112
Site services as required for the construction
and commissioning of the Plant such as
electricity supply, potable water, instrument
and service air, fuel supply,
telecommunication etc.
Construction of power & water to be provided by Employer FREE OF COST Bidder's responsibility.
113
Provisison of web cam for site & progress
supervision form start of construction
including GPRS
communtication system wide angle, tilt and
roatation capbilty , HD quality and remote
control features at light poles , as well
appropriate record and storage capabilites.
We have provide CCTV Camera's for site survallience in place of web cam. Kindly accept. OK
114
The selected area for the photovoltaic
installation has approximtely 150acres.
Offered land is not sufficient to install 40MWp Dc capacity, As per Solar Power Plant
standard minimum require land 4.5Acre/MWp. So kindly confrim the availabilty for the
same.
Pls use higher efficient panels
to accommodate.
Accommodate your design
within th egiven boundary.
115
Site Description The project site at
Gangachara (located at 25.9061oN and
89.2201oE) in district of Rangpur, at the
Eastern bank of Tista River
Kidly share the auto cad drawing for offered land to furnished the tantitive moduole layout. Shared.
116Mentioned Wind Speed 225 km/hr. As we have considered the IS 873 part- 3 for wind speed calculation, So kinldy accept the
same.
Pls refer to the answer of
query number 78
117
The nominal power ratio (maximum input
power of the inverter/nominal power of PV
array at STC) of the inverter should be equal
to or greater than 85%.
Kindly confrim the AC capacity. Nominal AC power of the
inverters/PV panel capacity in
Wp at STC 85%
118
The delivery station will connect the PV
Plant to a dedicated 33 kV double circuit
overhead transmission line upto Kaliganj
33/11kV Substation
kindly confirm the distance and share the specific requirement at the connection point(if
any)
Pls refer to the answer of
query number 84
119
There will be redundant bidirectional energy
meters for metering export and import
energy. The billing meters will be located at
the plant‟s 33kV switchyard.
Offer ABT merter panel with Main & check meter to comply the redundancy at the plant
end switchyard.Kindly confirm.
Pls send the specification.
120
Thermal and acoustic insulation of buildings,
structures and equipment shall be provided
as appropriate to conserve energy and to
minimize the noise impact, provide
personnel protection, provide protection
against freeze or overheating.
Offered building with proper ventilation to avoid overheating. In addition to that equipment
mount in the building not source of any kind of noise. Hence thermal insulation and acoustic
insulation is nt required . Kindly accept it
Control room should be
equipped with air
conditioning system.
121
As mentioned steel work shall be designed
to acceptable international Standards.
Steel Strucures of MMS shall be design as per IS standard in Staad, Kinldy accept . IS stands for Indian Standard
or International Standard?
122
The string length of modules connected in
series depends on the voltage of single
modules in order to not surpass open circuit
string voltages of 1,500 V under extreme
environmental conditions (low temperatures
and high irradiation).
Kindly confirm to use 1000V DC as maximum input voltage of invertor and correspondingly
rest of the equipment will be based on invertor input voltage.
1000V and 1500 V both are
acceptable. Safety and
protection scheme should be
designed accordingly.
123
The incoming feeder from the LV/33 kV
transformer consists of circuit breaker and
an earthing switch. The outgoing feeder for
the connection between PV transformer
stations and delivery station consists of
switch-dis-connector and an earthing switch.
Offered Transformer station is per proposed SLD. Kindly accept As per Bid Document.
124
PV DC connectors for string interconnection
shall be of the same brand and type as used
PV module manufacturer.In no case
connectors for different brand are to be
used in the same condition (male-
female).Under no circumstances it is
allowed to cut the PV module cables and to
install other than oroginal connectors.
MC4 equivant make connector to be provided.Kindly accept the same As per Bid document
125
EARTHING OF TOTAL SUBSTATION (YARD
PLANT SITE & GRID SIDE) that individual&
total mashed system earthing value will be
less than 0.5 ohm. (Bidder have to submit
the earthing diagram with details drawing
for earthing system evaluation. Individual
earthing without mash have to done for
Lighting Arrestor & Transformer Neutral.(
Total Earthing system have to comply with
National earthing system of grid substation)
As per IS 3043,system earthing value less then 1 Ohm. Kindly accept the same. As per bid document
126
Supply of oil-immersed, natural air cooled, 3-
phase, 50-Hz, 0.415KV/33 KV ,2500KVA,
YND11, Indoor/outdoor type distribution
transformer
Kindly allow us consider three winding transformer of inverter duty to decrease the BOS of
the plant. Please accept.
As per bid document
127
Construction of switch yard for 4 nos. of
VCB, 5 Nos. of Isolator, 5 Set Lightening
arrestor with required conductor,
accessories, structure etc.& ground should
be gravel(2"/3") finished(Complete) (Follow
SLD)
Offer 33kV HT panel with 7 incomer from Transformer station,1no. Aux. transformer
incomer,1 tie beaker & 2 nos. outgoing. 2 nos switchyard with isolator CT,PT ABT Meter
.Kindly accept the same.
As per bid document
128
Construction of switch yard for 6 nos. of
VCB, 18 Nos. of Isolator, 4 set. PT, 6 set CT, 6
Set Lightening arrestor, 2 Nos. 100KVA
Auxiliary transformer, with required
conductor, accessories, structure etc.&
ground should be gravel(2"/3")
finished(Complete) (Follow SLD)
Offer 33KV HT panel with 7 incomer from Transformer station,1no. Aux. transformer
incomer,1 tie beaker & 2 nos. outgoing. 2 nos switchyard with isolator CT,PT ABT Meter
.Kindly accept the same.
As per bid document
129
Construction of switch yard for 2 nos. of
VCB, 2 Nos. of Isolator, 2 set. PT, 2 set CT, 2
Set Lightening arrestor with required
conductor, accessories, structure etc.&
ground should be gravel(2"/3")
finished(Complete) (Follow SLD)
Offer 333KV HT panel with 7 incomer from Transformer station,1no. Aux. transformer
incomer,1 tie beaker & 2 nos. outgoing. 2 nos switchyard with isolator CT,PT ABT Meter
.Kindly accept the same.
As per bid document
130
LV AC and control cables:
Conductors - Stranded annealed copper. The
grade and quality of the copper used for the
conductor shall have purity of the order of
min. 99.5%.
Kidly allow us to consider Aluminum cable batween inverter to inverter tansformer to
reduce BOS cost.
As per bid document
131
The maximum voltage drop in the cables of
any AC circuit from the inverter output to
the MV switchgear shall be < 1.50% at STC.
Amendment of maximum voltage drop
for each type of cable from 1.5% to 2%.
As per bid document
132
A lightning and overvoltage concept shall be
designed according to the IEC 62305 (all
parts). PV Plant shall be equipped with
lightning protection system LPS I according
to the IEC 62305. If the result of risk
assessment (according to the IEC 62305-2)
proposes is different, LPS class than this is
also acceptable.
As per solar Application ESEe type of Lighting aresster protection for PV array is used
complying with NFC 102 standard .Kindly acept
As per bid document
133
The digital control system (DCS) shall be
supplied from a 24 V DC system. Redundant
24 V DC distribution system shall be
provided.
we have provide 230v ac supply to SCADA. 24V DC Power pack is inbuilt part of SCADA. As per bid document
134
The 110/24 V DC/DC converters serve as
supply for I&C cabinets and other
consumers requiring 24 V DC supply. Each
DC/DC converter is supplied via coupling
diodes from both sections of the110 V DC
main distribution.
we have provide 230v ac supply to SCADA. 24V DC Power pack is inbuilt part of SCADA. As per bid document
135
For the DC system, the Bidder shall supply Li-
ion type batteries designed according to
Standard EUROBAT 15 with a life expectancy
of 20 years or more
Kindly allow us to consider VRLA/Ni-cad battery in place of Li-ion battery Li based battery
136
A 200 kVA generator should be installed in
the plant location for emergency use. The
generator will be equipped with ATS and
sound proof canopy.
Kindly share the requirement and also specify the connection detail in tender SLD The generator will be
connected to the distribution
board of the plant power
supply for back up power.
137Avg. send filling height =2.977mtr Has compection test been done at site after send filling?Please share the result Not done.
138
As per summary sheet at site report ,the soil
parameter the C AND ø value obtained from
direct share test . Our provide at 100 feet
level and no value before it
does it signify that minimum pile boaring depth shall be 150.
No.
139 Bid submission date is 24/07/2017 Please confirm if any extension for submission is provided. No further extension
140
The installed capacity shall be equal or
higher than 40MWp. The PV plant will
consist of the deployment of higher
efficiency PV generation technology and
three phase string inverters.
Cosnidering the wind speed, Is the bidder allowed to bid with central inverters or it nees to
bid with string inverters only?As per bid document
141Metallic and non-metallic materials shall be
UV resistant UV resistant property will be applicable to selected exposed equipment only. ok
142
Tariff metering shall be at the HT side of the
transformer and inside control room
building
Tariff meter at HT side of Transformer but place inside the control building may increase the
burden on CT/PT and hence recommended to place at the switchyard. Please confirm. ok
143PV Plant Control and monitoring system and
performance calculation (in case of central
inverters) Bidder propsoes to use Zone monitoring (if Central inverters are acceptable). Please confirm String inverters
144 Transmission Interconnection Is it under bidder's scope. ROW shall not be in bidder's scope. Please confirm Employer will organize RoW
145 Transmission Interconnection Is there a bay extension work in the connecting subststaion? Yes
146 Transmission Interconnection
If bay extension is under the scope of bidder then the connecting substaion equipment
specification is needed. Kindly share the same? Bidders scope
147Transmission Interconnection
If bay extension is under the bidder scope, then please confirm that land is abvalable for the
same. If not, land procurement shall not be in bidder's scope. Please confirm
If land is needed employer
will organize
148The system of SDH or PDH within the optical fiber communication mode, which one is
correct
SDH optical fiber
communication mode
149 Neutral Grounding method?? Mesh connection
150
What is the requirement of supporting structure types shall be adopted? The Iron tower
type is adopted, the type of double circuits on the same tower or single circuit iron tower,
which one shall be adopted?
Double circuit, SPC pole is
required
151 what is the interface point of water supply & drainage system Bidder will design
152 Is there any detail requirement for PV modules cleaning system
No, Bidder can design their
own
153 What is the use of the erosion protection within " AnnexA-02 PV plant Layout" It’s the requirement for Lot 1
154
there is a conflict between section 6 clause 2.4.5.1, table 2-2 and section 4 schedule no 1
plant ( Including mandatory parts) supplied from abroad, Mandatory Spare Parts, which one
shall be complied Follow chapter 4
155
f. In Section 6 of the tender, the equipment and quantities of meteorological stations
include:
1)1 "Pyranometer for the global horizontal irradiance ";
2)2 "Pyranometers for the global inclined irradiance at 25º ";
3)1 "Shielded ventilated thermocouple to measure ambient temperature with a
measurement accuracy of ± 1
℃
(
℃
= Degree Celsius) ";
4)2 "Resistance thermometer (e.g. Pt100, Pt1000) or equivalent to measure the
temperature of modules (on the back of the PV modules) with a measurement accuracy of ±
1
℃
",
5)1 "An anemometer to measure the wind speed and wind direction sensor at the site."。
Is it according to the quantity supplied above, or is it the quantity supplied and quoted
above each item multiplied by 5?
Follow chapter 4
156 The deterrent sensor in the pv region's red line, because the fence is not within the scope
of the bid, shall the deterrent sensor be ordered in LoT-2? Scope of Lot 2
157The diesel generator has a contradiction between 250kVA in Section 4 and 200kVA in
Section 6, choosing that power generator? 200 KVA
158
There are three items for the spare parts in Schedule No. 1of item 8, item 16-22 and
Schedule No. 6 of Section 4. The quantity and requirements of spare parts are inconsistent
in P66 of Section 6. How is it considered?Follow chapter 4