conversion cycle
TRANSCRIPT
![Page 1: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/1.jpg)
CONVERSIONCYCLE
Group 4:
ManguinNocilladoPuyoSagunSambatSamiling
![Page 2: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/2.jpg)
CONVERSION CYCLE
consists of two subsystems:
• Production System
• Cost Accounting System
![Page 3: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/3.jpg)
THE TRADITIONAL MANUFACTURING ENVIRONMENT
![Page 4: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/4.jpg)
PRODUCTION METHODS
• Continuous Processing
• Make-to-Order Processing
• Batch Processing
![Page 5: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/5.jpg)
DOCUMENTS IN THE BATCH PROCESSING SYSTEM
• Production Schedule• Bill of Materials (BOM)• Route Sheet• Work Order• Move Ticket• Materials Requisition
![Page 6: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/6.jpg)
Production Schedule
![Page 7: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/7.jpg)
Bill of Materials (BOM)
![Page 8: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/8.jpg)
Route Sheet
![Page 9: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/9.jpg)
Work Order
![Page 10: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/10.jpg)
Move Ticket
![Page 11: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/11.jpg)
Materials Requisition
![Page 12: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/12.jpg)
QUESTION No. 1 It records the work done in each work center.
a. Move Ticketb. Work Orderc. Route Sheetd. Bill of Materials
![Page 13: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/13.jpg)
QUESTION No. 2 The storekeeper releases raw materials based on the
a. Move Ticketb. Production Schedule c. Materials Requisitiond. Bill of Materials
![Page 14: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/14.jpg)
QUESTION No. 3 It is the formal plan and authorization to begin production.
a. Move Ticketb. Production Schedule c. Materials Requisitiond. Bill of Materials
![Page 15: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/15.jpg)
BATCH PRODUCTION ACTIVITIES1. Production Planning and Control
a. Materials and Operations Requirement b. Product Scheduling
2. Work Centers and Storekeeping3. Inventory Control
Objective: "Minimize total inventory cost while ensuring that adequate inventory exist of production demand."
-How much inventory should be purchased? Economic Order Quantity= square root of (2DS/H)
-When should inventory purchased?ReOrder Point= Ixd+S
![Page 16: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/16.jpg)
Production Planning and ControlR1:
Uncalculated production(surplus)
C1: PPC authorizes production activity via formal work orderR2: Production
without formal documents
C2: PPC separated from work centers. Actual productions are initiated upon receipt of control documents by work centers
1
![Page 17: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/17.jpg)
Work Centers and StorekeepingR3: Improper allocation of labor
C3: Use of time cards and job tickets, together with supervision of managers
R4: Issuance of excess materials
C4: Before actual production takes place, obtaining RM from storekeeping in exchange of Material Requisition is needed.
![Page 18: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/18.jpg)
Inventory ControlR5: Validity of RM and FG Inventory records
C5: Periodically updating of inventory records; periodically verification through physical count by auditorsR6: Collusion
between employees from record keeping to asset inventory
C6: Inventory Control maintains RM and FG inventory, separated from Materials Storeroom and FG warehouse
![Page 19: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/19.jpg)
Question No. 1
Inventory control performs all of the following tasks except it
a. provides production planning and control with the inventory status report of finished goodsb. updates the raw material inventory recordsc. prepares a materials requisition for each production batchd. records the completed production as an increase to finished goods inventory
![Page 20: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/20.jpg)
Question No. 2
Which of the following is not an assumption of the Economic Order Quantity model?
a. demand for the product is known with certaintyb. total cost per year of placing orders is fixedc. lead time is known and is constantd. there are no quantity discounts
![Page 21: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/21.jpg)
Question No. 3
What is the economic order quantity if the annual demand is 60,000 units, set up cost of placing each order is $900 and the holding cost per unit per year is $1200?
a. 300b. 200c. 100d. 450
![Page 22: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/22.jpg)
CONTROLS IN TRADITIONAL ENVIRONMENT
• TRANSACTION AUTHORIZATION• Work order, move ticket, materials requisition
• SEGREGATION OF DUTIES• IC separate from RM & FG inventory custody
• SUPERVISION• ACCESS CONTROLS• ACCOUNTING RECORDS
• Cost sheets, job tickets, WIP records, FG inventory file• INDIVIDUAL VERIFICATION
• Cost accounting function reconciles all cost of production
![Page 23: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/23.jpg)
WORLD-CLASS COMPANY
✓Maintain strategic agility✓Motivate and treat employees like
appreciating assets✓Meet the needs of its customer✓Philosophy of customer satisfaction✓Philosophy of lean manufacturing
![Page 24: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/24.jpg)
LEAN MANUFACTURINGPRINCIPLES:
❖PULL PROCESSING-pulling products from consumer end
❖PERFECT QUALITY-to meet consumers’ demand❖WASTE MINIMIZATION-eliminate non-value
activities❖INVENTORY REDUCTION-reduce inventory costs❖PRODUCTION FLEXIBILITY-to produce diversity of
products❖ESTABLISHED SUPPLIER RELATIONS-reliable
vendors❖TEAM ATTITUDE-attitude as a whole of all
employees
![Page 25: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/25.jpg)
Question No. 1
Production in lean manufacturing is initiated by:
a. Pushb. Pull
![Page 26: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/26.jpg)
Question No. 2
Goal of lean manufacturing:
a. Minimize controlb. Improved efficiency and effectivenessc. Lessen production
![Page 27: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/27.jpg)
Question No. 3
PPC authorizes production activity via formal:
a. BOMb. Work Orderc. Production Schedule
![Page 28: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/28.jpg)
TECHNIQUES & TECHNOLOGY THAT PROMOTES LEAN MANUFACTURING
• PHYSICAL REORGANIZATION OF THE PRODUCTION FACILITIES
Reorganizing and/or restructuring of the Manufacturing process in order to improve its effectiveness and efficiency.
• AUTOMATION OF THE MANUFACTURING PROCESSThe replacement of human labour with autonomous or semi-autonomous machinery.
![Page 29: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/29.jpg)
![Page 30: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/30.jpg)
AUTOMATION OF THE MANUFACTURING PROCESS(The replacement of labour with machinery.)
• Automation in Traditional Manufacturing - Consists of different kinds of machines, each controlled by a single operator. Requires a great deal of setup time whose costs are absorbed by massive production runs.
• Islands of Technology -Stand alone machines that are Computer Numerical Controlled, which can perform multiple operations with minimal human involvement
• Computer Integrated Manufacturing -A completely automated environment that aims to eliminate unnecessary processes in production.
• Automated Storage and Retrieval Systems (AS/RS) -Are computer-controlled conveyor systems that carry raw materials and products across different production departments. Replaced traditional Forklifts and their human operators. This helps improve inventory control, and reduce errors and storage costs.
![Page 31: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/31.jpg)
•Robotics -Manufacturing robots are useful for performing hazardous production tasks,
and are programmed to perform specific actions over and over with a high degree of precision.
•Computer-Aided Design (CAD) -Is used by engineers to design product
faster. It increases their productivity by improving accuracy, automating repetitive tasks, and allowingfirms to adjust their production quickly to be more responsive to market demands.
•Computer-Aided Manufacturing (CAM) -Uses computers to assist in
the manufacturing process. It utilises the CAD data and converts it into a series of processes in themanufacturing process. Utilisation of this technology improves process productivity, cost and timeestimates, process monitoring and quality, decreased setup times and labour costs.
•Value Stream Mapping -Is a very detailed graphical representation of a
company's business processes. It helps to thoroughly identify the aspects of it that are wasteful andunessential, and therefore enabling them to be removed.
![Page 32: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/32.jpg)
![Page 33: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/33.jpg)
Question No. 1
Consists of different kinds of machines, each controlled by a single operator?
a. Automated Storage and Retrieval Systemsb. Roboticsc. Automation in Traditional Manufacturing d. Cells
![Page 34: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/34.jpg)
Question No. 2
Are useful for performing hazardous production tasks, and are programmed to perform specific actions over and over with a high degree of precision.
a. Automaton Assisted Manufacturing b. Automated Storage and Retrieval Systems c. Roboticsd. A and C
![Page 35: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/35.jpg)
Question No. 3
Stand alone machines that are Computer Numerical Controlled, which can perform multiple operations with minimal human involvement
a. Computer-Aided Manufacturing (CAM)b. Automated Manufacturingc. Islands of Technologyd. Stand-alone systems
![Page 36: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/36.jpg)
ACCOUNTING IN A LEAN MANUFACTURING
Require new accounting methods and new information that:
•Shows what matters to its customers• Identifies profitable products• Identifies profitable customers• Identifies opportunities•Encourages the adoption of value-added
activities and processes•Efficiently supports multiple users
![Page 37: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/37.jpg)
WHAT’S WRONG WITH TRADITIONAL ACCOUNTING INFORMATION?
• Inaccurate Cost Allocations• Promotes Nonlean Behavior• Time Lag• Financial Orientation
Activity-Based Costing (ABC)❖ Activities - worked performed in a firm❖ Cost Objects - reason for performing
activities
![Page 38: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/38.jpg)
Advantages of ABC• More accurate costing• Identify most & least profitable• Accurately tracking costs• Equipping managers with cost intelligence• Facilitating better marketing mix• Identifying waste and non-value-added
activities Disadvantages of ABC❖ Time-consuming and complicated
Value Stream Accounting
![Page 39: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/39.jpg)
Question No. 1
What’s wrong with traditional accounting information?
a. Accurate Cost Allocationsb. Promotes Lean Behaviorc. Timelinessd. Financial Orientation
![Page 40: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/40.jpg)
Question No. 2
All are advantages of ABC, except:a. Identifying waste and non-value-added
activitiesb. Time-consuming and complicated c. Facilitating better marketing mixd. Equipping managers with cost intelligence
![Page 41: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/41.jpg)
Question No. 3
Require new accounting methods and new information that:
a. Identifies profitable productsb. Identifies profitable customers c. Encourages the adoption of value-added
activities and processesd. Efficiently supports individual users
![Page 42: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/42.jpg)
INFORMATION SYSTEM THAT SUPPORTS LEAN MANUFACTURING
A.Materials Requirements Planning (MRP)
● automated production planning and control system used to support inventory management.
● Objectives: RM adequacy, inventory and schedules mgt.
● Answers: 1. What is needed? (RM)2. How much is needed? (QTY)3. When is it needed? (SCHEDULE)
![Page 43: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/43.jpg)
INFORMATION SYSTEM THAT SUPPORTS LEAN MANUFACTURING
B.Manufacturing Resource Planning (MRP II)
● integrates product manufacturing & engineering, sales order processing, customer billing, human resources, and related accounting functions.
● Includes labor hours, material costs and other resources related to production.
![Page 44: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/44.jpg)
![Page 45: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/45.jpg)
INFORMATION SYSTEM THAT SUPPORTS LEAN MANUFACTURING
C.Enterprise Resource Planning (ERP) Systems
● Large suites of integrated function-specific modules; capable of EDI with suppliers and customers.
● Improve customer service, reduce production time, increase productivity, and improve decision making.
● Main objective is cost reduction in complex and big companies.
● SAP, ORACLE, People Soft, Baan, JD Edwards.
![Page 46: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/46.jpg)
Question No. 1
MRP stands fora. Materials Requirement Planningb. Manufacturing Resources Planningc. Manufacturing Resources Productiond. None of the Above
![Page 47: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/47.jpg)
Question No. 2
ERP Systems:a. Improve customer service & reduce
production timeb. Increase productivity & improve decision-
makingc. A & Bd. None of the Above
![Page 48: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/48.jpg)
Question No. 3
Which Statement is TRUE?a. ERP evolved directly from MRPb. MRP and MRP II evolved from ERPc. MRP II evolved from MRP and MRP II evolved
into ERP.d. None of the Above
![Page 49: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/49.jpg)
Emergency Question No. 1
Automation of the manufacturing process is ?
a. Computer-Aided Manufacturing (CAM)b. A completely automated environment that
aims to eliminate unnecessary processes in production.
c. Reorganizing and/or restructuring of the Manufacturing process in order to improve its effectiveness and efficiency.
d. The replacement of human labour with autonomous or semi-autonomous machinery.
![Page 50: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/50.jpg)
Emergency Question No. 2
All of the following are characteristics of batch processing except a. each item in the batch is similar b. batches are produced in accordance with detailed customer specifications c. batches are produced to replenish depleted inventory levels d. setting up and retooling is required for different batches
![Page 51: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/51.jpg)
Emergency Question No. 3
Which is not a principle of lean manufacturing: a. Team attitude b. Perfect quality c. Inventory maintenance
![Page 52: Conversion cycle](https://reader036.vdocument.in/reader036/viewer/2022062419/58a62a791a28ab416c8b5e11/html5/thumbnails/52.jpg)
Emergency Question No. 4
If the daily demand is 60 units and the lead time is 12 days, the reorder point is
a. 720 unitsb. 270unitsc. 072 unitsd. none of the above