AIR QUALITY BUREAU ATTN: Application Log in 502 E 9 th St Des Moines IA 50319 EU4 11/2019 cmc For Assistance 1-877-AIR-IOWA (1-877-247-4692) DNR Form 542-0936 FORM EU4: COOLING TOWER INFORMATION Please see instructions on reverse side. Company Name: COOLING TOWER (EMISSION UNIT) DESCRIPTION AND SPECIFICATIONS Tower 1 Tower 2 Tower 3 Tower 4 1. Emission Unit Name 2. Emission Unit (EU) ID 3. Tower Type (N: New, U: Unpermitted, M: Modification) N U M N U M N U M N U M 4. Current Permit Number (if applicable) 5. Tower On-Site Installation Date 6. Tower Modification Date 7. Number of Cells in Tower 8. Tower Maximum Water Flow Rate 9. Measured Total Dissolved Solids (TDS) Content (if known) 10. Do You Use Additives in the Water? Yes No Yes No Yes No Yes No If yes, provide SDS sheets for each additive 11. Are there any mist eliminators? Yes No Yes No Yes No Yes No If yes, provide CE ID: STACK/VENT INFORMATION 12. Emission Point (EP) ID 13. Cell Height from the Ground(ft) 14. Cell Stack Size (in dia. or in x in) 15. Cell Rated Air Flow Rate ( acfm scfm) 16. Total Rated Air Flow Rate ( acfm scfm) 17. Exhaust Exit Temperature (°F) OPERATING LIMITS 18. Are you requesting any operating limits? Yes No Operation Hour Limits: TDS Limits (ppm): Material Usage Limits: Other: Rationale for Requesting the Limit(s):

Upload: others

Post on 24-Oct-2020

18 views

Category:

Documents


0 download

TRANSCRIPT

  • AIR QUALITY BUREAU ATTN: Application Log in 502 E 9th St Des Moines IA 50319

    EU4

    11/2019 cmc For Assistance 1-877-AIR-IOWA (1-877-247-4692) DNR Form 542-0936

    FORM EU4: COOLING TOWER INFORMATION Please see instructions on reverse side.

    Company Name:

    COOLING TOWER (EMISSION UNIT) DESCRIPTION AND SPECIFICATIONS

    Tower 1 Tower 2 Tower 3 Tower 4

    1. Emission Unit Name

    2. Emission Unit (EU) ID

    3. Tower Type (N: New, U: Unpermitted, M: Modification)

    N U M N U M N U M N U M

    4. Current Permit Number (if applicable)

    5. Tower On-Site Installation Date

    6. Tower Modification Date

    7. Number of Cells in Tower

    8. Tower Maximum Water Flow Rate

    9. Measured Total Dissolved Solids (TDS) Content (if known)

    10. Do You Use Additives in the Water?

    Yes No Yes No Yes No Yes No

    If yes, provide SDS sheets for each additive

    11. Are there any mist eliminators? Yes No Yes No Yes No Yes No

    If yes, provide CE ID:

    STACK/VENT INFORMATION

    12. Emission Point (EP) ID

    13. Cell Height from the Ground(ft)

    14. Cell Stack Size (in dia. or in x in)

    15. Cell Rated Air Flow Rate

    ( acfm scfm)

    16. Total Rated Air Flow Rate

    ( acfm scfm)

    17. Exhaust Exit Temperature (°F)

    OPERATING LIMITS

    18. Are you requesting any operating limits? Yes No

    Operation Hour Limits:

    TDS Limits (ppm):

    Material Usage Limits:

    Other:

    Rationale for Requesting the Limit(s):

    cconroySticky NoteThe following fields: Company Name, Emission Unit Name, Emission Unit ID, and Tower Maximum Water Flow Rate (in red) are required to ensure applicants and projects are identified consistently. Additionally, please complete ALL fields on this form. This will ensure faster turnaround time for issuing your permit.

  • EU4

    2/2020 cmc For Assistance 1-877-AIR-IOWA (1-877-247-4692) DNR Form 542-0936

    Instructions for Form EU4: Cooling Tower Information

    This form is intended for cooling towers and should be used in place of forms EU, EP, and CE.

    Up to four cooling towers may be applied for on this form. If more than four towers are being installed, please complete an additional Form EU4.

    Understanding EU4 Form Information: Each number provides an explanation for the corresponding field on the form. Company Name: This is useful if application pages become separated. Cooling Tower Description and Specifications 1. Emission Unit Name: Provide the name of the emission unit, such as “Tower 1,” “Cooling Tower,” etc. 2. Emission Unit (EU) ID: Called the emissions unit (EU) identification (ID). It can be any combination of letters or

    numbers up to 16 characters in length. The ID should match the ID for this equipment used on previous construction permit applications and within this application. If also submitting an operating permit application, the ID used in this application should be consistent with those used in the operating permit application.

    3. Tower Type: Mark the type of cooling tower, such as a new cooling tower to be constructed, an existing cooling tower

    (as-built) needing a permit for the first time, or a cooling tower that already has an existing construction permit that you are requesting be modified.

    4. Current Permit Number: If this is a modification to a cooling tower with an existing construction permit, provide the current construction permit number for the cooling tower.

    5. Tower On-Site Installation Date: Provide the date when on-site installation of the equipment began or will begin, including the month and year.

    6. Tower Modification Date: Provide the month and year of last modification. In the case of proposed modification,

    provide the best estimate of modification date. For the purpose of this form, Modification means any physical change or change in method of operation of any existing equipment or control equipment.

    7. Number of Cells in Tower: Provide the number of cells in this cooling tower.

    8. Tower Maximum Water Flow Rate: Provide the total maximum water flow rate of this cooling tower and the units of measure used to describe that flow rate (e.g. gallons per minute, gallons per hour, etc.).

    9. Measured TDS Content: If data is available, provide the maximum Total Dissolved Solids (TDS) content of the water.

    10. Additives in the Water: If any additives are used in the water (biocide, chromium, anti-corrosion agents, etc.) provide a Safety Data Sheet (SDS) for each additive. Indicate the amount of additive used in gallons per month. SDS can be obtained from the additive supplier.

    11. Mist Eliminators: Indicate if there are mist eliminators associated with the cooling tower. If so, complete a Form CE8

    for each mist eliminator and proved the corresponding CE ID. Stack/Vent Information 12. Emission Point (EP) ID: Provide the emission point (EP) ID for the stack/vent. It can be any combination of letters or

    numbers up to 16 characters in length. The ID should match the ID for this equipment used on previous construction permit applications and within this application. If also submitting an operating permit application, the ID used in this application should be consistent with those used in the operating permit application.

    13. Cell Height from the Ground: Provide the height in feet of the top of the cell(s) from the ground.

    14. Cell Stack Size: Provide size of the cell openings. It could be inches diameter for circular openings, or inches times inches for rectangular, square, or other shapes.

  • EU4

    2/2020 cmc For Assistance 1-877-AIR-IOWA (1-877-247-4692) DNR Form 542-0936

    15. Cell Rated Air Flow Rate: Indicate the rated exhaust flow rate in either actual or standard cubic feet (check the appropriate box) for each cell in the cooling tower.

    16. Total Rated Air Flow Rate: Indicate the rated exhaust flow rate in either actual or standard cubic feet (check the appropriate box) for the entire cooling tower.

    17. Exhaust Exit Temperature: Provide the temperature of the exhaust at the cooling tower in degrees Fahrenheit. Operating Limits 18. Operating Limits: If you wish to have permit limits placed on the cooling tower, mark “Yes.” Then, check each type of

    limit that you would like applied to this emission unit and provide the requested limit. For example, operating hour limits may be in terms of hours per year; material usage limits may be in gallons of additive per year. If you are not sure about a requested operating limit, contact the Air Quality Bureau at 1-877-AIR-IOWA.

    Company Name: 18 Are you requesting any operating limits: OffRationale for Requesting the Limits: 1: Emission Unit Name T1: Emission Unit Name T2: Emission Unit Name T3: Emission Unit Name T4:

    2: Emission Unit EU ID T1: Emission Unit EU ID T2: Emission Unit EU ID T3: Emission Unit EU ID T4:

    3: Tower Type N T1: Off Tower Type U T1: Off Tower Type M T1: Off Tower Type N T2: Off Tower Type U T2: Off Tower Type M T2: Off Tower Type N T3: Off Tower Type U T3: Off Tower Type M T3: Off Tower Type N T4: Off Tower Type U T4: Off Tower Type M T4: Off

    4: Current Permit Number T1: Current Permit Number T2: Current Permit Number T3: Current Permit Number T4:

    5: Tower On-Site Installation Date T1: Tower On-Site Installation Date T2: Tower On-Site Installation Date T3: Tower On-Site Installation Date T4:

    6: Tower Modification Date T1: Tower Modification Date T2: Tower Modification Date T3: Tower Modification Date T4:

    7: Number of Cells in Tower T1: Number of Cells in Tower T2: Number of Cells in Tower T3: Number of Cells in Tower T4:

    8: Tower Max Water Flow Rate T1: Tower Max Water Flow Rate T2: Tower Max Water Flow Rate T3: Tower Max Water Flow Rate T4:

    9: Measured TDS Content T1: Measured TDS Content T2: Measured TDS Content T3: Measured TDS Content T4:

    If yes, provide CE ID T1: If yes, provide CE ID T2: If yes, provide CE ID T3: If yes, provide CE ID T4: Do you Use Additives? T1: OffDo you Use Additives? T2: OffDo you Use Additives? T3: OffDo you Use Additives? T4: OffAre there any mist eliminators? T1: OffAre there any mist eliminators? T2: OffAre there any mist eliminators? T3: OffAre there any mist eliminators? T4: Off12: Emission Point EP ID T1: Emission Point EP ID T2: Emission Point EP ID T3: Emission Point EP ID T4:

    13: Cell Height from Ground T1: Cell Height from Ground T2: Cell Height from Ground T3: Cell Height from Ground T4:

    14: Cell Stack Size T1: Cell Stack Size T2: Cell Stack Size T3: Cell Stack Size T4:

    15: Cell Rated Air Flow T1: Cell Rated Air Flow T2: Cell Rated Air Flow T3: Cell Rated Air Flow T4: Cell Rated Air Flow acfm: Off Cell Rated Air Flow scfm: Off

    16: Total Rated Air Flow Rate T1: Total Rated Air Flow Rate T2: Total Rated Air Flow Rate T3: Total Rated Air Flow Rate T4: Total Rated Air Flow Rate acfm: Off Total Rated Air Flow Rate scfm: Off

    17: Exhaust Exit Temp T1: Exhaust Exit Temp T2: Exhaust Exit Temp T3: Exhaust Exit Temp T4:

    Operation Hour Limits T1: Operation Hour Limits T2: Operation Hour Limits T3: Operation Hour Limits T4: TDS Limits T1: TDS Limits T2: TDS Limits T3: TDS Limits T4: Material Usage Limits T1: Material Usage Limits T2: Material Usage Limits T3: Material Usage Limits T4: Other T1: Other T2: Other T3: Other T4: