· corrective reprint house amended prior printer's nos. 655, 678, 923, 998, 1256, 1319...

530
CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL No. 680 Session of 2013 INTRODUCED BY CORMAN, HUGHES, PILEGGI AND SCARNATI, MARCH 13, 2013 AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 29, 2013 AN ACT Providing for the capital budget for the fiscal year 2012-2013 2013-2014; itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, redevelopment assistance capital projects, flood control projects, Keystone Recreation, Park and Conservation Fund projects, State forestry bridge projects, State ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat Commission projects, Manufacturing Fund projects, Oil and Gas Lease Fund projects and , Environmental Stewardship Fund projects AND HIGHWAY BRIDGE PROJECTS to be constructed or acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission; stating the estimated useful life of the projects; and making appropriations. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: <-- <-- <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Upload: others

Post on 16-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

CORRECTIVE REPRINTHOUSE AMENDED

PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319

PRINTER'S NO. 1329

THE GENERAL ASSEMBLY OF PENNSYLVANIA

SENATE BILL No. 680 Session of

2013

INTRODUCED BY CORMAN, HUGHES, PILEGGI AND SCARNATI, MARCH 13, 2013

AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 29, 2013

AN ACTProviding for the capital budget for the fiscal year 2012-2013

2013-2014; itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, redevelopment assistance capital projects, flood control projects, Keystone Recreation, Park and Conservation Fund projects, State forestry bridge projects, State ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat Commission projects, Manufacturing Fund projects, Oil and Gas Lease Fund projects and, Environmental Stewardship Fund projects AND HIGHWAY BRIDGE PROJECTS to be constructed or acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission; stating the estimated useful life of the projects; and making appropriations.The General Assembly of the Commonwealth of Pennsylvania

hereby enacts as follows:

<--<--

<--<--

123456789101112131415161718192021222324252627

Page 2:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Section 1. Short title.This act shall be known and may be cited as the Capital

Budget Project Itemization Act of 2012-2013 2013-2014.Section 2. Total authorizations.

(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, shall be $3,572,285,000 $3,897,449,000 $3,977,449,000.

(b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, shall be $137,620,000 $138,120,000 $150,120,000.

(c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, shall be $1,718,429,000 $1,823,639,000 $1,846,939,000.

(d) Redevelopment assistance.--The total authorization for the capital projects in the category of redevelopment assistance capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns, and to be financed by the incurring of debt, shall

20130SB0680PN1329 - 2 -

<--

<--

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 3:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

be $3,965,614,000 $6,077,447,000 $6,438,618,000.(e) Flood control.--The total authorization for the capital

projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns, and to be financed by the incurring of debt, shall be $78,702,000 $127,852,000 $137,852,000.

(f) Keystone Recreation, Park and Conservation Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 and to be constructed by the Department of Conservation and Natural Resources, its successors or assigns, and to be financed from current revenues in the Keystone Recreation, Park and Conservation Fund, shall be $59,202,000.

(g) State forestry bridge projects.--The total authorization for the capital projects itemized in section 9 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns, and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax), shall be $25,155,000.

(h) State ATV/snowmobile projects.--The total authorization for the capital projects itemized in section 10 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns, and to be financed from current revenues in the State ATV/Snowmobile Fund, shall be $250,000.

(i) Fish Fund and Boat Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 11 to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be

20130SB0680PN1329 - 3 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 4:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

financed by the incurring of debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive authorization shall be $128,741,000.

(j) Manufacturing Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 12 and to be constructed by the Department of General Services, its successors or assigns, and to be financed from current revenues in the Manufacturing Fund, shall be $7,500,000.

(k) Oil and Gas Lease Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 13 to be acquired or developed by the Department of Conservation and Natural Resources and to be financed by current revenues of the Oil and Gas Lease Fund pursuant to executive authorization shall be $698,000.

(l) Environmental Stewardship Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 14 to be acquired or developed by the Department of Conservation and Natural Resources and to be financed by current revenues of the Environmental Stewardship Fund pursuant to executive authorization shall be $900,000.

(M) HIGHWAY BRIDGE PROJECTS.--THE TOTAL AUTHORIZATION FOR CAPITAL PROJECTS IN THE CATEGORY OF HIGHWAY BRIDGE PROJECTS ITEMIZED IN SECTION 15 TO BE CONSTRUCTED BY THE DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF DEBT OR FROM CURRENT REVENUE SHALL BE $190,000. AS USED IN THIS SUBSECTION, THE TERM "CAPITAL PROJECT" SHALL MEAN A CAPITAL PROJECT AS DEFINED IN SECTION 302 OF THE ACT OF

20130SB0680PN1329 - 4 -

<--

123456789

101112131415161718192021222324252627282930

Page 5:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FEBRUARY 9, 1999 (P.L.1, NO.1), KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING ACT, AND SHALL INCLUDE A COUNTY OR MUNICIPAL BRIDGE REHABILITATION, REPLACEMENT OR IMPROVEMENT PROJECT AS SET FORTH IN SECTION 15.Section 3. Itemization of public improvement capital projects.

(a) General rule.--Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal ProjectAllocation

(1) Department of Agriculture(i) Farm Show Complex

(A) Upgrade Farm Show Complex, including new entrance to Expo Hall with meeting rooms and covered walkwayProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Repave parking lot adjacent to Elmerton Avenue lot

(B) UPGRADE AND IMPROVEMENTS TO PARKING AREASProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Construct new parking garage to accommodate increased patronage during large show eventsProject Allocation 10,000,000

20130SB0680PN1329 - 5 -

<--

123456789

101112131415161718192021222324252627282930

Page 6:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $10,000,000)

(ii) Health Diagnostic Laboratory(A) Construct new plant industry

laboratory in Harrisburg to satisfy modern testing proceduresProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Construct new Pennsylvania Equine

Toxicology and Research Laboratory on New Bolton Campus of The University of PennsylvaniaProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(2) Department of Conservation and Natural Resources(i) Bald Eagle State Forest

(A) Repair roadways, including drainage along Poe Valley RoadProject Allocation 960,000(Base Project Allocation - $800,000)(Design & Contingencies - $160,000)

(i.1) Bald Eagle State Park(A) Construct an addition to the park

office and maintenance buildingProject Allocation 4,080,000(Base Project Allocation - $3,400,000)(Design & Contingencies - $680,000)

(i.2) Black Moshannon State Park

20130SB0680PN1329 - 6 -

123456789

101112131415161718192021222324252627282930

Page 7:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Develop ten additional family cabins with vehicle access and connection of utilitiesProject Allocation 3,000,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $600,000)

(ii) Blue Knob State Park(A) Replace two office buildings and

combine into one modern office buildingProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

(ii.1) Buchanan State Forest(A) Construction of a new maintenance

headquartersProject Allocation 3,000,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $500,000)

(iii) Caledonia State Park(A) Rehabilitate campground restrooms and

shower houses with modern facilitiesProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Replace water lines throughout parkProject Allocation 900,000(Base Project Allocation - $900,000)

(iv) Cherry Springs State Park(A) Construct visitors and administrative

center to accommodate increased park usage

20130SB0680PN1329 - 7 -

123456789

101112131415161718192021222324252627282930

Page 8:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(v) Codorus State Park(A) Rehabilitate and pave roads and

parking lots for visitor safetyProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

(B) Rehabilitate and pave roads and parking lots for visitor safetyProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

(vi) Colonel Denning State Park(A) Replace pit restroom, add sewer lines

and replace campground restrooms and shower houses with modern facilitiesProject Allocation 1,800,000(Base Project Allocation - $1,800,000)

(vii) Cowans Gap State Park(A) Construct park office addition and

maintenance building additionProject Allocation 1,200,000(Base Project Allocation - $1,200,000)

(viii) Delaware Canal State Park(A) Provide for repair and ongoing

maintenance of Delaware CanalProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Replacement of 12 adjacent box beam

bridges along Delaware Canal

20130SB0680PN1329 - 8 -

123456789

101112131415161718192021222324252627282930

Page 9:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 16,200,000(Base Project Allocation -

$13,500,000)(Design & Contingencies - $2,700,000)

(C) Construct a new resource center with storage building to meet current needsProject Allocation 3,300,000(Base Project Allocation - $2,750,000)(Design & Contingencies - $550,000)

(D) Rehabilitate Pecks Pond DamProject Allocation 7,200,000(Base Project Allocation - $6,000,000)(Design & Contingencies - $1,200,000)

(E) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REHABILITATION OF THE DELAWARE CANAL STATE PARK IN RIEGELSVILLE TO BRISTOLPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(viii.1) Delaware State Forest(A) Construct a new resource center with

storage buildingProject Allocation 8,400,000(Base Project Allocation - $7,000,000)(Design & Contingencies - $1,400,000)

(ix) Denton Hill State Park(A) Rehabilitate park, including ski

lodge, ski lifts, snowmaking equipment, roads, parking lots, modern

20130SB0680PN1329 - 9 -

<--

123456789

101112131415161718192021222324252627282930

Page 10:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

cabins and maintenance facilities for a four-season operationProject Allocation 12,000,000(Base Project Allocation -

$12,000,000)(ix.1) Forbes State Forest

(A) Remediate three acid mines originating on State forest landsProject Allocation 1,800,000(Base Project Allocation - $1,500,000)(Design & Contingencies - $300,000)

(x) Forest District 10(A) Replace failed acid mine drainage

treatment system to reduce pollutants in Kettle Creek watershedProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xi) Forest District 11(A) Construct bridge over Lehigh River to

provide public and administrative access to Blue Ridge Tract of Lackawanna State Forest with public parkingProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xii) Forest District 12(A) Construct bridge over Slate Run

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Demolish old building and build

20130SB0680PN1329 - 10 -

123456789

101112131415161718192021222324252627282930

Page 11:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

public restrooms and contact station on Pine Creek Rail TrailProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(xiii) Forest District 13(A) Remediate and reclaim acid mine

drainage pollution source on Commonwealth's land into Little Dents Run watershedProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(xiv) Forest District 14(A) Locate, plug and retire abandoned oil

and gas wells on State forest landProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xv) Gifford Pinchot State Park(A) Replace water lines which are in

continual need of repairProject Allocation 1,560,000(Base Project Allocation - $1,560,000)

(B) Repave main road, including drainageProject Allocation 780,000

(xvi) Greenwood Furnace State Park(A) Construct new maintenance building to

meet modern codesProject Allocation 1,800,000(Base Project Allocation - $1,800,000)

(xvii) Hickory Run State Park(A) Construct new visitors center with

20130SB0680PN1329 - 11 -

123456789

101112131415161718192021222324252627282930

Page 12:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

administration facilities and comfort station and demolish old centerProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(B) Develop and construct family cabin colony within parkProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Rehabilitate and upgrade office to accommodate personnelProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(xviii) Kettle Creek State Park(A) Dredge lake and provide for improved

quality recreational opportunities in and around Kettle Creek ReservoirProject Allocation 2,000,000(Base Project Allocation - $1,600,000)(Design & Contingencies - $400,000)

(xviii.1) Kinzua Bridge State Park(A) Additional funds for DGS project 130-

1, Phase 2, construction of new office/visitor center, maintenance center, roads, trails, parking lots, water and sewage systems, clearing and grubbing of debris field, fencing of debris field, rehabilitation of remaining bridge towers and related site workProject Allocation 3,000,000

20130SB0680PN1329 - 12 -

123456789

101112131415161718192021222324252627282930

Page 13:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,400,000)(Design & Contingencies - $600,000)

(B) Construction of site improvements, including infrastructure and land acquisitionProject Allocation 2,000,000(Base Project Allocation - $1,600,000)(Design & Contingencies - $400,000)

(xviii.2) Kittanning State Forest(A) Restore iron furnace

Project Allocation 1,600,000(Base Project Allocation - $1,500,000)(Design & Contingencies - $100,000)

(xviii.3) Lackawanna State Forest(A) Breach and remove Olyphant #1 Dam

Project Allocation 900,000(Base Project Allocation - $750,000)(Design & Contingencies - $150,000)

(xix) Lackawanna State Park(A) Replace pool

Project Allocation 6,000,000(Base Project Allocation - $4,800,000)(Design & Contingencies - $1,200,000)

(xx) Laurel Mountain State Park(A) Develop Phase II of ski area, adding

ski and visitor service, including support facilities, lifts and tubing parkProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

20130SB0680PN1329 - 13 -

123456789

101112131415161718192021222324252627282930

Page 14:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(xx.1) Lehigh Gorge State Park(A) Rehabilitate White Haven public

access area to include trail improvement, parking facilities, modern comfort station and boat launchProject Allocation 4,122,000(Base Project Allocation - $3,435,000)(Design & Contingencies - $687,000)

(xx.2) Little Buffalo State Park(A) Replacement of old cottages

Project Allocation 500,000(Base Project Allocation - $400,000)(Design & Contingencies - $100,000)

(xxi) Maurice K. Goddard State Park(A) Replace existing marina facility with

new structure for boat concession operations, public restrooms and meeting room spaceProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

(xxi.1) Michaux State Forest(A) Rehabilitate Old Forge Picnic area,

pump house and dredge pond to meet modern codesProject Allocation 450,000(Base Project Allocation - $350,000)(Design & Contingencies - $100,000)

(xxii) Moraine State Park(A) Upgrade sewage treatment facilities

Project Allocation 5,000,000

20130SB0680PN1329 - 14 -

123456789

101112131415161718192021222324252627282930

Page 15:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $5,000,000)(xxiii) Ohiopyle State Park

(A) Develop family cabin colony with vehicle access and connection of utilitiesProject Allocation 3,000,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $600,000)

(B) Improvements to Ferncliff parking lot and provide additional parking facilities adjacent to the falls areaProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(xxiii.1) Park Region #2(A) Removal of ten underground fuel tanks

and remediate the land in seven State parks and replace aboveground tanksProject Allocation 3,300,000(Base Project Allocation - $2,750,000)(Design & Contingencies - $550,000)

(xxiv) Penn Nursery and Woodshop(A) Replace outdated maintenance shop to

meet current code requirementsProject Allocation 5,500,000(Base Project Allocation - $5,500,000)

(xxiv.1) Pine Grove Furnace State Park(A) Replacement of waterlines throughout

parkProject Allocation 2,040,000

20130SB0680PN1329 - 15 -

123456789

101112131415161718192021222324252627282930

Page 16:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,700,000)(Design & Contingencies - $340,000)

(xxv) Point State Park(A) Connect Great Allegheny Passage Trail

to Point State Park and rehabilitate flag bastion, pedestrian access and parking lotsProject Allocation 9,000,000(Base Project Allocation - $9,000,000)

(xxvi) Presque Isle State Park(A) Replenish sand to maintain beach

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Replace three beach/shower houses,

including design, site location and constructionProject Allocation 3,600,000(Base Project Allocation - $3,600,000)

(xxvii) Prince Gallitzin State Park(A) Replace two pit restrooms with modern

facilities at Wyerough and sailboat mooring areasProject Allocation 960,000(Base Project Allocation - $960,000)

(B) Replace water lines throughout parkProject Allocation 3,240,000(Base Project Allocation - $3,240,000)

(C) Repave main road, including drainage to beach

20130SB0680PN1329 - 16 -

123456789

101112131415161718192021222324252627282930

Page 17:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(D) Replacement of six miles of water lines within the parkProject Allocation 5,000,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $1,000,000)

(xxviii) Pymatuning State Park(A) Rehabilitate campground facilities

for full-service hook-ups, including new water well, water storage tanks and sewage collection systemProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

(B) Replacement of existing livery docks throughout the parkProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(xxix) Ryerson Station State Park(A) Rehabilitate dam

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Dredging of sediment in Duke LakeProject Allocation 7,800,000(Base Project Allocation - $6,500,000)(Design & Contingencies - $1,300,000)

(xxx) Samuel S. Lewis State Park(A) Replace pit restroom with modern

facilities, including onsite septic

20130SB0680PN1329 - 17 -

123456789

101112131415161718192021222324252627282930

Page 18:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

systemProject Allocation 1,200,000(Base Project Allocation - $1,200,000)

(xxxi) Shawnee State Park(A) Replace regional office to meet

modern code requirements and increase efficiencyProject Allocation 3,600,000(Base Project Allocation - $3,600,000)

(xxxii) Shikellamy State Park(A) Replace dam bags that have reached

their life expectancyProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(xxxii.1) Susquehannock State Park(A) Rehabilitate entryway from township

road to park overlookProject Allocation 360,000(Base Project Allocation - $300,000)(Design & Contingencies - $60,000)

(xxxii.2) Tioga State Forest(A) Construction of new maintenance

headquartersProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(xxxii.3) Various lakes(A) Dredging of various lakes throughout

this Commonwealth and removing sediment

20130SB0680PN1329 - 18 -

123456789

101112131415161718192021222324252627282930

Page 19:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 3,295,000(Base Project Allocation - $2,746,000)(Design & Contingencies - $549,000)

(xxxiii) Tobyhanna State Park(A) Rehabilitate Tobyhanna No. 2 dam

Project Allocation 8,500,000(Base Project Allocation - $7,000,000)(Design & Contingencies - $1,500,000)

(xxxiv) Whipple Dam State Park(A) Replace bathhouse with modern

facility and add onsite septic systemProject Allocation 1,800,000(Base Project Allocation - $1,800,000)

(xxxv) Various Parks and Forest Districts(A) Rehabilitate or replace lookout fire

towers throughout park systemProject Allocation 6,000,000(Base Project Allocation - $4,800,000)(Design & Contingencies - $1,200,000)

(3) Department of Corrections(i) Elizabethtown Training Academy

(A) Replace domestic and fire water lines and add fire hydrantsProject Allocation 500,000(Base Project Allocation - $400,000)(Design & Contingencies - $100,000)

(B) Renovate boiler plant, including boilers and associated equipmentProject Allocation 3,125,000(Base Project Allocation - $2,500,000)

20130SB0680PN1329 - 19 -

123456789

101112131415161718192021222324252627282930

Page 20:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $625,000)(C) Replace current fire alarm system

Project Allocation 450,000(Base Project Allocation - $360,000)(Design & Contingencies - $90,000)

(i.1) State Correctional Institution at Albion(A) Replace various roofs throughout

institutionProject Allocation 1,200,000(Base Project Allocation - $960,000)(Design & Contingencies - $240,000)

(B) Replace fire alarm system throughout institutionProject Allocation 900,000(Base Project Allocation - $720,000)(Design & Contingencies - $180,000)

(ii) State Correctional Institution at Cambridge Springs(A) Replace 5,260 feet of current

perimeter security system, which is obsolete and no longer supported by the manufacturerProject Allocation 1,200,000(Base Project Allocation - $960,000)(Design & Contingencies - $240,000)

(B) Install perimeter lights around circumference of institutionProject Allocation 1,565,000(Base Project Allocation - $1,252,000)

20130SB0680PN1329 - 20 -

123456789

101112131415161718192021222324252627282930

Page 21:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $313,000)(iii) State Correctional Institution at Camp

Hill(A) Renovate boiler plant to repair or

replace worn out equipment, modify pollution controls system and utilize most effective fuel source

(A) RENOVATE BOILER PLANT TO REPAIR OR REPLACE WORN OUT EQUIPMENT AND MODIFY POLLUTION CONTROLS SYSTEMProject Allocation 4,000,000(Base Project Allocation - $3,200,000)(Design & Contingencies - $800,000)

(B) Renovate kitchen No. 2Project Allocation 12,500,000(Base Project Allocation -

$10,000,000)(Design & Contingencies - $2,500,000)

(C) Demolish housing units A, B, C and D and construct four new housing unitsProject Allocation 81,000,000(Base Project Allocation -

$64,800,000)(Design & Contingencies - $16,200,000)

(iv) State Correctional Institution at Chester(A) Replace various roofs throughout

institutionProject Allocation 7,000,000(Base Project Allocation - $5,600,000)

20130SB0680PN1329 - 21 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 22:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $1,400,000)(v) State Correctional Institution at Coal

(A) Replace rubber roofing on all inmate housing unitsProject Allocation 3,500,000(Base Project Allocation - $2,800,000)(Design & Contingencies - $700,000)

(vi) State Correctional Institution at Dallas(A) Expand existing visiting room with

approximately 2,000-square-foot addition to handle increased visitation demandsProject Allocation 400,000(Base Project Allocation - $320,000)(Design & Contingencies - $80,000)

(B) Additional funding to upgrade storm and sewage plant project 578-24Project Allocation 4,000,000(Base Project Allocation - $3,200,000)(Design & Contingencies - $800,000)

(vii) State Correctional Institution at Fayette(A) Upgrade security system, including

door control, intercom, public address and perimeter security head unit for the institutionProject Allocation 1,300,000(Base Project Allocation - $1,040,000)(Design & Contingencies - $260,000)

(viii) State Correctional Institution at

20130SB0680PN1329 - 22 -

123456789

101112131415161718192021222324252627282930

Page 23:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Forest(A) Replace 5,300 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturerProject Allocation 1,430,000(Base Project Allocation - $1,144,000)(Design & Contingencies - $286,000)

(B) Repair or replace the HTHW (High Temperature Hot Water) piping distribution system.Project Allocation 4,000,000(Base Project Allocation - $3,200,000)(Design & Contingencies - $800,000)

(C) Upgrade or replace institution's intercom systemProject Allocation 700,000(Base Project Allocation - $560,000)(Design & Contingencies - $140,000)

(ix) State Correctional Institution at Graterford(A) Replace 5,300 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturerProject Allocation 1,200,000(Base Project Allocation - $960,000)(Design & Contingencies - $240,000)

(B) Remove and replace EPDM roofing and drain system on Correctional

20130SB0680PN1329 - 23 -

123456789

101112131415161718192021222324252627282930

Page 24:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Industries and maintenance buildingsProject Allocation 1,375,000(Base Project Allocation - $1,100,000)(Design & Contingencies - $275,000)

(x) State Correctional Institution at Greensburg(A) Replace 4,224 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturerProject Allocation 750,000(Base Project Allocation - $600,000)(Design & Contingencies - $150,000)

(xi) State Correctional Institution at Houtzdale(A) Replace current microwave security

system with a buried coaxial systemProject Allocation 1,020,000(Base Project Allocation - $816,000)(Design & Contingencies - $204,000)

(B) Renovate boiler plant equipment, modify pollution controls systems and utilize most cost-effective fuel source availableProject Allocation 2,250,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $450,000)

(xii) State Correctional Institution at Huntingdon(A) Replace electrical services to blocks

20130SB0680PN1329 - 24 -

123456789

101112131415161718192021222324252627282930

Page 25:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

and cells to meet current power demand requirementsProject Allocation 8,500,000(Base Project Allocation - $6,800,000)(Design & Contingencies - $1,700,000)

(xiii) State Correctional Institution at Laurel Highlands(A) Replace perimeter security detection

system, including taut wire system on perimeter fence, and add new razor wireProject Allocation 2,500,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $500,000)

(xiv) State Correctional Institution at Mahanoy(A) Repair deteriorated face block on

inmate housing units and repair infrastructureProject Allocation 15,000,000(Base Project Allocation -

$12,000,000)(Design & Contingencies - $3,000,000)

(B) Replace rubber roofing and metal roofing on all inmate housing unitsProject Allocation 3,800,000(Base Project Allocation - $3,040,000)(Design & Contingencies - $760,000)

(C) Replace personal alarm system throughout institution

20130SB0680PN1329 - 25 -

123456789

101112131415161718192021222324252627282930

Page 26:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 425,000(Base Project Allocation - $340,000)(Design & Contingencies - $85,000)

(D) Replace block walls surrounding Level 5 housing unit exercise yard pens which have deteriorated from normal settling of structuresProject Allocation 500,000(Base Project Allocation - $400,000)(Design & Contingencies - $100,000)

(E) Expand parking and repave access roads and parking lotsProject Allocation 800,000(Base Project Allocation - $640,000)(Design & Contingencies - $160,000)

(xv) State Correctional Institution at Mercer(A) Replace rubber roofing on all inmate

housing unitsProject Allocation 750,000(Base Project Allocation - $600,000)(Design & Contingencies - $150,000)

(B) Repave existing perimeter road and install new perimeter road along new perimeter fence pathProject Allocation 458,000(Base Project Allocation - $366,000)(Design & Contingencies - $92,000)

(C) Replace cell doors on A, F and M blocksProject Allocation 1,600,000

20130SB0680PN1329 - 26 -

123456789

101112131415161718192021222324252627282930

Page 27:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,280,000)(Design & Contingencies - $320,000)

(D) Upgrade electrical panels, switches and breakers throughout facilityProject Allocation 600,000(Base Project Allocation - $480,000)(Design & Contingencies - $120,000)

(xvi) State Correctional Institution at Muncy(A) Install new 1,000,000-gallon water

tower and install new water line for municipal water service tie-inProject Allocation 3,000,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $600,000)

(B) Expand existing visiting room with approximately 15,000-square-foot addition to handle increased visitation demandsProject Allocation 5,300,000(Base Project Allocation - $4,240,000)(Design & Contingencies - $1,060,000)

(C) Replace 6,340 feet of current perimeter security system which is obsolete and no longer supported by the manufacturerProject Allocation 1,430,000(Base Project Allocation - $1,144,000)(Design & Contingencies - $286,000)

(D) Replace existing sewer lines which are obsolete and causing ground water

20130SB0680PN1329 - 27 -

123456789

101112131415161718192021222324252627282930

Page 28:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infiltrationProject Allocation 1,875,000(Base Project Allocation - $1,500,000)(Design & Contingencies - $375,000)

(E) Construct new admissions building and demolish current buildingProject Allocation 625,000(Base Project Allocation - $500,000)(Design & Contingencies - $125,000)

(F) Expand parking lot and repave access roads and parking lotsProject Allocation 1,800,000(Base Project Allocation - $1,440,000)(Design & Contingencies - $360,000)

(G) Replace existing modular housing unit to make ADA compliantProject Allocation 1,250,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $250,000)

(H) Construct new treatment centerProject Allocation 3,125,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $625,000)

(I) Renovate housing units, including ADA improvements, electrical upgrades and HVAC systems and replace windows and doorsProject Allocation 12,500,000(Base Project Allocation -

$10,000,000)

20130SB0680PN1329 - 28 -

123456789

101112131415161718192021222324252627282930

Page 29:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $2,500,000)(xvii) State Correctional Institution at Pine

Grove(A) Replace 5,310 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturerProject Allocation 2,000,000(Base Project Allocation - $1,600,000)(Design & Contingencies - $400,000)

(B) Expand and renovate main control roomProject Allocation 680,000(Base Project Allocation - $544,000)(Design & Contingencies - $136,000)

(xviii) State Correctional Institution at Pittsburgh(A) Replace 5,520 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturerProject Allocation 1,200,000(Base Project Allocation - $960,000)(Design & Contingencies - $240,000)

(B) Replace leaking steam and condensate piping from power plant to A & B housing unitsProject Allocation 565,000(Base Project Allocation - $452,000)(Design & Contingencies - $113,000)

(xix) State Correctional Institution at

20130SB0680PN1329 - 29 -

123456789

101112131415161718192021222324252627282930

Page 30:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Rockview(A) Replace and add fencing to front of

institutionProject Allocation 2,400,000(Base Project Allocation - $1,920,000)(Design & Contingencies - $480,000)

(B) Replace existing water tank at institutionProject Allocation 1,440,000(Base Project Allocation - $1,152,000)(Design & Contingencies - $288,000)

(C) Replace windows in treatment buildingProject Allocation 2,400,000(Base Project Allocation - $1,920,000)(Design & Contingencies - $480,000)

(D) Additional funds for DGS Project 571-30, upgrade reservoir to meet dam safety regulationsProject Allocation 3,518,000(Base Project Allocation - $2,814,000)(Design & Contingencies - $704,000)

(E) Renovate boiler plant ash handling system to meet current regulationsProject Allocation 625,000(Base Project Allocation - $500,000)(Design & Contingencies - $125,000)

(F) Renovate exterior of main dining hall and auditorium building, including refacing and repairing of concrete and sealing building

20130SB0680PN1329 - 30 -

123456789

101112131415161718192021222324252627282930

Page 31:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,000,000(Base Project Allocation - $1,600,000)(Design & Contingencies - $400,000)

(G) Renovate exterior of deputy warden's building, including refacing and repairing of concrete and sealing buildingProject Allocation 1,000,000(Base Project Allocation - $800,000)(Design & Contingencies - $200,000)

(H) Expand parking and repave access roads and parking lotsProject Allocation 800,000(Base Project Allocation - $640,000)(Design & Contingencies - $160,000)

(xx) State Correctional Institution at Smithfield(A) Renovate boilers and equipment,

modify pollution controls and provide effective fuel sourceProject Allocation 3,500,000(Base Project Allocation - $2,800,000)(Design & Contingencies - $700,000)

(xxi) State Correctional Institution at Somerset(A) Renovate 480-volt distribution

switchgear and replace obsolete circuit breakersProject Allocation 432,000(Base Project Allocation - $346,000)

20130SB0680PN1329 - 31 -

123456789

101112131415161718192021222324252627282930

Page 32:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $86,000)(B) Replace existing digital management

system panels throughout institutionProject Allocation 420,000(Base Project Allocation - $336,000)(Design & Contingencies - $84,000)

(C) Replace roof on Correctional Industries Laundry BuildingProject Allocation 910,000(Base Project Allocation - $728,000)(Design & Contingencies - $182,000)

(D) Replace proximity card access system throughout institution for door controlProject Allocation 625,000(Base Project Allocation - $500,000)(Design & Contingencies - $125,000)

(E) Replace rooftop heating and cooling units on inmate housingProject Allocation 775,000(Base Project Allocation - $620,000)(Design & Contingencies - $155,000)

(F) Install new water pump within facilityProject Allocation 500,000(Base Project Allocation - $500,000)

(xxii) State Correctional Institution at Waymart(A) Repoint exterior building masonry and

repair parapets and brick work

20130SB0680PN1329 - 32 -

123456789

101112131415161718192021222324252627282930

Page 33:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

throughout institutionProject Allocation 3,420,000(Base Project Allocation - $2,736,000)(Design & Contingencies - $684,000)

(B) Demolish J-Ward and repair corridor and roof structure at current building tie-in pointProject Allocation 840,000(Base Project Allocation - $672,000)(Design & Contingencies - $168,000)

(C) Renovate and expand existing dining room to satisfy current needsProject Allocation 3,300,000(Base Project Allocation - $2,640,000)(Design & Contingencies - $660,000)

(D) Construct a new education buildingProject Allocation 4,600,000(Base Project Allocation - $3,680,000)(Design & Contingencies - $920,000)

(E) Expand parking and repave access roads and parking lotsProject Allocation 1,750,000(Base Project Allocation - $1,400,000)(Design & Contingencies - $350,000)

(F) Additional funding to renovate boiler plant project No. 1578-7Project Allocation 4,260,000(Base Project Allocation - $3,408,000)(Design & Contingencies - $852,000)

(G) Renovate and expand A block housing

20130SB0680PN1329 - 33 -

123456789

101112131415161718192021222324252627282930

Page 34:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

unitProject Allocation 2,500,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $500,000)

(xxiii) State Correctional Institutions Statewide(A) Replace door control systems and

central control, housing units and other buildingsProject Allocation 9,000,000(Base Project Allocation - $7,200,000)(Design & Contingencies - $1,800,000)

(4) Department of Education(i) Department of Education Headquarters

(A) Renovate two floors of Department of Education headquarters building at 333 Market Street, HarrisburgProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Delaware County Community College(A) Construction, infrastructure and

other related costs for renovation of the existing Technical High School Pickering CampusProject Allocation 2,400,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $400,000)

(iii) Lehigh Carbon Community College(A) Site development, infrastructure,

redevelopment, construction and other

20130SB0680PN1329 - 34 -

123456789

101112131415161718192021222324252627282930

Page 35:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

costs related to construction of an educational facility in Carbon CountyProject Allocation 4,800,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $800,000)

(iv) Lincoln University(A) Additional funds for DGS Project No.

1101-46, construction of additional tennis courts, softball field, soccer field and bleachers to support track and soccer fieldsProject Allocation 20,000,000(Base Project Allocation -

$16,000,000)(Design & Contingencies - $4,000,000)

(B) Provide for new construction and renovation of three existing facilities to create the Center for the Study of Black Culture at the universityProject Allocation 25,000,000(Base Project Allocation -

$20,000,000)(Design & Contingencies - $5,000,000)

(C) Renovate and expand Alumni HouseProject Allocation 20,000,000(Base Project Allocation -

$16,000,000)(Design & Contingencies - $4,000,000)

(v) Pennsylvania Highlands Community College

20130SB0680PN1329 - 35 -

123456789

101112131415161718192021222324252627282930

Page 36:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Acquisition, construction, rehabilitation and other costs related to the design and construction of facilities to be utilized as a branch campus to be located in Mifflin CountyProject Allocation 600,000(Base Project Allocation - $500,000)(Design & Contingencies - $100,000)

(vi) Community College of Philadelphia(A) Renovation of biology labs and

associated prep rooms at main campus and West Regional CenterProject Allocation 4,800,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $800,000)

(vi.1) Reading Area Community College(A) Construction, infrastructure

improvements and related costs for the Reading Area Community College Berks Hall renovation and conservation projectProject Allocation 1,167,000(Base Project Allocation - $1,167,000)

(B) Construction, infrastructure improvements and related costs for the Reading Area Community College pedestrian safety, gateway and traffic improvement projectProject Allocation 2,356,000(Base Project Allocation - $2,356,000)

20130SB0680PN1329 - 36 -

123456789

101112131415161718192021222324252627282930

Page 37:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(vii) Temple University(A) Renovate and modernize existing

entrance to Tomlinson HallProject Allocation 4,500,000(Base Project Allocation - $3,600,000)(Design & Contingencies - $900,000)

(B) Renovate and construct an addition to Gladfelter Hall to house a Center for ScholarsProject Allocation 2,700,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $300,000)

(C) Renovate Paley LibraryProject Allocation 90,000,000(Base Project Allocation -

$90,000,000)(D) Renovate Old Dental School

Project Allocation 75,000,000(Base Project Allocation -

$75,000,000)(E) Renovate and expand law school

Project Allocation 60,000,000(Base Project Allocation -

$60,000,000)(F) Renovate and construct addition to

College of EngineeringProject Allocation 100,000,000(Base Project Allocation -

$100,000,000)(G) Demolition of Barton Hall and

20130SB0680PN1329 - 37 -

123456789

101112131415161718192021222324252627282930

Page 38:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construct campus quad, Main CampusProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(H) Reface and renovate Health Sciences

CampusProject Allocation 35,000,000(Base Project Allocation -

$35,000,000)(I) Acquisition, infrastructure,

renovations, construction and other related costs to support a dental, medical, health sciences and patient care facilities project in Lackawanna CountyProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(J) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR DEVELOPMENT OF A MULTIUSE FACILITY FOR ATHLETICS, ACADEMICS AND RESEARCH AND LOCAL COMMUNITY ATHLETIC EVENTSPROJECT ALLOCATION 130,000,000(BASE PROJECT ALLOCATION -

$130,000,000)(viii) Thaddeus Stevens College of Technology

(A) Upgrade and rehabilitate college's main electrical system, including infrastructure

20130SB0680PN1329 - 38 -

<--

123456789

101112131415161718192021222324252627282930

Page 39:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 3,000,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $600,000)

(B) Expand dining hall by adding second story which will connect into Hartzell Instructional CenterProject Allocation 5,750,000(Base Project Allocation - $5,060,000)(Design & Contingencies - $690,000)

(C) Infrastructure, development, design and other costs related to demolition of Leonard Building and construction of technology centerProject Allocation 16,800,000(Base Project Allocation -

$14,000,000)(Design & Contingencies - $2,800,000)

(D) Renovate Mellor Classroom and Administrative BuildingProject Allocation 1,017,000(Base Project Allocation - $895,000)(Design & Contingencies - $122,000)

(E) Upgrade electrical system campus-wideProject Allocation 2,875,000(Base Project Allocation - $2,530,000)(Design & Contingencies - $345,000)

(F) Renovate Learning Resource Center to meet modern codes, including ADA and HVACProject Allocation 2,300,000

20130SB0680PN1329 - 39 -

123456789

101112131415161718192021222324252627282930

Page 40:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,018,000)(Design & Contingencies - $282,000)

(G) Upgrade HVAC, including controls in three main buildings and two auxiliary buildingsProject Allocation 400,000(Base Project Allocation - $352,000)(Design & Contingencies - $48,000)

(H) Renovate metal fabrication and welding shop, including new exhaust system and welding stationsProject Allocation 250,000(Base Project Allocation - $220,000)(Design & Contingencies - $30,000)

(I) Abatement of lead paint and painting of two campus buildingsProject Allocation 230,000(Base Project Allocation - $202,000)(Design & Contingencies - $28,000)

(J) Renovate Hartzell Hall to include a second floor with additional classroom and office spaceProject Allocation 5,000,000(Base Project Allocation - $4,400,000)(Design & Contingencies - $600,000)

(K) Upgrade IT distribution, including electrical wiring throughout campusProject Allocation 5,000,000(Base Project Allocation - $4,400,000)(Design & Contingencies - $600,000)

20130SB0680PN1329 - 40 -

123456789

101112131415161718192021222324252627282930

Page 41:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(ix) The Pennsylvania State University(A) Convert existing coal-fired boilers

to natural gas to comply with new EPA/DEP clean air regulationsProject Allocation 25,000,000(Base Project Allocation -

$20,000,000)(Design & Contingencies - $5,000,000)

(B) Provide for continuation of capital to renovate campuses located in university's eastern regionProject Allocation 28,000,000(Base Project Allocation -

$28,000,000)(C) Design, infrastructure, construction,

renovations, abatement of hazardous materials, utility upgrades and extensions and other related costs for state-of-the-art research and teaching space for College of Liberal ArtsProject Allocation 54,000,000(Base Project Allocation -

$43,200,000)(Design & Contingencies - $10,800,000)

(D) Design, infrastructure, renovations, abatement of hazardous materials and other related costs for building access modifications, including installation of key access boxes and video surveillance cameras and

20130SB0680PN1329 - 41 -

123456789

101112131415161718192021222324252627282930

Page 42:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure and any building modifications neededProject Allocation 10,000,000(Base Project Allocation - $8,000,000)(Design & Contingencies - $2,000,000)

(E) Design, infrastructure, construction, renovations, abatement of hazardous materials, underground piping upgrades and additions and other related costs for a chilled water capacity and distribution expansion project at University Park campusProject Allocation 25,000,000(Base Project Allocation -

$20,000,000)(Design & Contingencies - $5,000,000)

(F) Design, infrastructure, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for new classroom/class lab building at University Park campusProject Allocation 51,300,000(Base Project Allocation -

$41,040,000)(Design & Contingencies - $10,260,000)

(G) Additional funding for renovations, rehabilitation, construction and other costs related to an addition to existing computer building or

20130SB0680PN1329 - 42 -

123456789

101112131415161718192021222324252627282930

Page 43:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construction of new facilityProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(H) Design, acquisition, infrastructure,

demolition, construction, abatement of hazardous materials, utility upgrades and extensions, and other related costs for a general computing Tier III data centerProject Allocation 50,000,000(Base Project Allocation -

$40,000,000)(Design & Contingencies - $10,000,000)

(I) Additional funding for renovations to Henning Building, including upgrades to systems to bring them to current facility standardsProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(J) Infrastructure, renovations,

construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for the rehabilitation of Kostos BuildingProject Allocation 12,000,000(Base Project Allocation - $9,600,000)(Design & Contingencies - $2,400,000)

(K) Design, infrastructure, construction,

20130SB0680PN1329 - 43 -

<--

123456789

101112131415161718192021222324252627282930

Page 44:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

abatement of hazardous materials, utility upgrades and extensions and other related costs for a capital renewal project to Baker Engineering and Science BuildingProject Allocation 8,000,000(Base Project Allocation - $6,400,000)(Design & Contingencies - $1,600,000)

(L) Design, infrastructure, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for new Recital Hall addition and Music I renovationsProject Allocation 25,000,000(Base Project Allocation -

$20,000,000)(Design & Contingencies - $5,000,000)

(M) Design, infrastructure, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for a capital renewal project to Ruhl Student/Community Center and the attached multipurpose buildingProject Allocation 10,500,000(Base Project Allocation - $8,400,000)(Design & Contingencies - $2,100,000)

(N) Design, infrastructure, construction, abatement of hazardous materials, utility extensions and other related

20130SB0680PN1329 - 44 -

123456789

101112131415161718192021222324252627282930

Page 45:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

costs for Student Union building at BrandywineProject Allocation 16,000,000(Base Project Allocation -

$12,800,000)(Design & Contingencies - $3,200,000)

(O) Design, infrastructure, construction, abatement of hazardous materials, and other related costs for capital renewal project to waste water treatment plant at University Park campusProject Allocation 45,000,000(Base Project Allocation -

$36,000,000)(Design & Contingencies - $9,000,000)

(P) Additional funding for infrastructure, construction and other related costs for construction of water treatment facility and distribution system at University ParkProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(Q) Design, infrastructure, construction,

abatement of hazardous materials, and other related costs for athletic field conversion and expansion project at Pennsylvania College of TechnologyProject Allocation 1,200,000

20130SB0680PN1329 - 45 -

123456789

101112131415161718192021222324252627282930

Page 46:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,000,000)(Design & Contingencies - $200,000)

(R) Design, infrastructure, construction and other related costs for career and alumni center at Pennsylvania College of TechnologyProject Allocation 13,200,000(Base Project Allocation -

$11,000,000)(Design & Contingencies - $2,200,000)

(S) Design, infrastructure, construction and other related costs for athletic, fitness and wellness center at Pennsylvania College of TechnologyProject Allocation 30,000,000(Base Project Allocation -

$25,000,000)(Design & Contingencies - $5,000,000)

(T) Design, infrastructure, construction, abatement of hazardous materials and other related costs, including utility upgrades and extensions, site improvements and code-related upgrades for multiphased development of Pattee Library Knowledge Commons at University ParkProject Allocation 11,000,000(Base Project Allocation - $8,800,000)(Design & Contingencies - $2,200,000)

(U) Construct new data center at Milton

20130SB0680PN1329 - 46 -

123456789

101112131415161718192021222324252627282930

Page 47:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

S. Hershey Medical CenterProject Allocation 24,000,000(Base Project Allocation -

$24,000,000)(V) DESIGN, INFRASTRUCTURE, CONSTRUCTION,

DEMOLITION, RENOVATIONS, ABATEMENT OF HAZARDOUS MATERIALS, UTILITY UPGRADES AND EXTENSIONS AND OTHER RELATED COSTS FOR STATE-OF-THE-ART RESEARCH AND TEACHING SPACE FOR COLLEGE OF ENGINEERINGPROJECT ALLOCATION 100,000,000(BASE PROJECT ALLOCATION -

$80,000,000)(DESIGN & CONTINGENCIES - $20,000,000)

(W) ORIGINAL FURNITURE AND EQUIPMENT FOR STATE-OF-THE-ART RESEARCH AND TEACHING SPACE FOR COLLEGE OF ENGINEERINGPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(X) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR MEDICAL AND EDUCATIONAL FACILITIES FOR PENN STATE HERSHEY MEDICAL CENTERPROJECT ALLOCATION 50,000,000(BASE PROJECT ALLOCATION -

$50,000,000)(Y) DESIGN, INFRASTRUCTURE, CONSTRUCTION,

DEMOLITION, RENOVATIONS, ABATEMENT OF

20130SB0680PN1329 - 47 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 48:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

HAZARDOUS MATERIALS, UTILITY UPGRADES AND EXTENSIONS AND OTHER RELATED COSTS FOR COLLEGE OF AGRICULTURAL SCIENCES.PROJECT ALLOCATION 80,000,000(BASE PROJECT ALLOCATION -

$64,000,000)(DESIGN & CONTINGENCIES - $16,000,000)

(x) University of Pittsburgh(A) Renovate exterior of Hillman Library,

including plaza, planters, windows, masonry and waterproofing membraneProject Allocation 10,000,000(Base Project Allocation - $8,000,000)(Design & Contingencies - $2,000,000)

(B) Renovate Fitzgerald Fieldhouse to meet modern codes, including ADA, and expand building to meet demandsProject Allocation 10,000,000(Base Project Allocation - $8,000,000)(Design & Contingencies - $2,000,000)

(C) Renovate and construct addition to Trees HallProject Allocation 40,000,000(Base Project Allocation -

$40,000,000)(D) Renovate and construct addition to

Fitzgerald FieldhouseProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)

20130SB0680PN1329 - 48 -

123456789

101112131415161718192021222324252627282930

Page 49:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(E) Renovate Bellefield HallProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(F) Renovate, construct addition and fit-

out to Posvar HallProject Allocation 30,000,000(Base Project Allocation -

$30,000,000)(G) Renovation and addition to David

Lawrence HallProject Allocation 30,000,000(Base Project Allocation -

$30,000,000)(H) Upgrade to Trees Field

Project Allocation 20,000,000(Base Project Allocation -

$20,000,000)(I) Upgrade and deferred maintenance --

Phase VIIProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(J) Programmatic renovations - Phase III

Project Allocation 20,000,000(Base Project Allocation -

$20,000,000)(5) Department of Environmental Protection

(i) Allegheny County(A) Acquisition, construction,

20130SB0680PN1329 - 49 -

123456789

101112131415161718192021222324252627282930

Page 50:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure and other related costs for aviation, industrial and commercial site development and improvements, including flood mitigation and structural improvements, at or surrounding Allegheny County AirportProject Allocation 40,000,000(Base Project Allocation -

$40,000,000)(B) Construction, infrastructure

improvements and other costs related to the development of de-icing fluid treatment facility at Pittsburgh International Airport, including flood mitigation structural improvementsProject Allocation 25,000,000(Base Project Allocation -

$25,000,000)(C) Acquisition, construction,

infrastructure and other related costs for the development of industrial and commercial sites at or surrounding Pittsburgh International AirportProject Allocation 50,000,000(Base Project Allocation -

$50,000,000)(D) Acquisition, construction,

infrastructure and other related costs for Pitcairn Borough Dirty Camp Run

20130SB0680PN1329 - 50 -

123456789

101112131415161718192021222324252627282930

Page 51:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

flood protection projectProject Allocation 1,360,000(Base Project Allocation - $1,360,000)

(ii) Cambria County(A) Additional funding for DGS Project

183-19, flood protection project in Adams and Croyle Townships for south fork of Little Conemaugh River, including earthen levee repair and concrete channel rehabilitationProject Allocation 1,800,000(Base Project Allocation - $1,620,000)(Design & Contingencies - $180,000)

(B) Rehabilitate existing flood protection in Northern Cambria Borough, including replacement of drainage structures, pedestrian ramp and mitigationProject Allocation 1,350,000(Base Project Allocation - $1,215,000)(Design & Contingencies - $135,000)

(iii) Carbon County(A) Provide for complete rehabilitation

of flood protection to bring existing flood protection to current standards in Weissport BoroughProject Allocation 3,750,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $750,000)

(iv) Clearfield County

20130SB0680PN1329 - 51 -

123456789

101112131415161718192021222324252627282930

Page 52:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Rehabilitate existing flood protection in Irvona Borough, including replacement of drainage structures, elimination of two closure structures and mitigationProject Allocation 1,800,000(Base Project Allocation - $1,620,000)(Design & Contingencies - $180,000)

(v) Columbia County(A) Provide additional funds for flood

protection project in Town of Bloomsburg currently being designed by Baltimore District to satisfy post- Hurricane Katrina Federal guidelinesProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Provide for flood protection for the

town of Bloomsburg, including watershed and channel improvementsProject Allocation 70,000,000(Base Project Allocation -

$59,500,000)(Design & Contingencies - $10,500,000)

(vi) Dauphin County(A) Acquire and rehabilitate or construct

south central regional officeProject Allocation 22,750,000(Base Project Allocation -

$20,475,000)

20130SB0680PN1329 - 52 -

123456789

101112131415161718192021222324252627282930

Page 53:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $2,275,000)(vii) Lancaster County

(A) Additional funding for DGS Project 182-21, Marietta Borough flood protection project, including embankment, earthen levee, concrete wall closure and gatesProject Allocation 20,700,000(Base Project Allocation -

$18,630,000)(Design & Contingencies - $2,070,000)

(viii) Lehigh County(A) Construction of a storm water

retention system for flooding mitigation in Borough of Fountain Hill Mill 2 complexProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ix) Luzerne County(A) Repair or replace debris dam

embankment and its inlet works on Brown Creek and replace damaged storm drains within Plymouth BoroughProject Allocation 1,800,000(Base Project Allocation - $1,620,000)(Design & Contingencies - $180,000)

(B) Additional funding for DGS Project 183-3, stream bank stabilization in Pittston Township, including mitigation and maintenance on access

20130SB0680PN1329 - 53 -

123456789

101112131415161718192021222324252627282930

Page 54:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

rampsProject Allocation 1,350,000(Base Project Allocation - $1,215,000)(Design & Contingencies - $135,000)

(x) Monroe County(A) Construction, infrastructure

improvements and other costs related to Skytop Dam restorationProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xi) Montgomery County(A) Additional funding for DGS Project

181-08, raising level of levees along Tacony Creek, construction of concrete channel, extension of culvert box and construction of new SEPTA railroad bridge for stream flow improvement in Cheltenham and Abington TownshipsProject Allocation 4,000,000(Base Project Allocation - $3,200,000)(Design & Contingencies - $800,000)

(B) Additional funding for DGS Project 181-17, Sandy Run flood protection project, in Abington and Upper Dublin Townships, including channel realignment and improvements, including mitigationProject Allocation 360,000(Base Project Allocation - $324,000)(Design & Contingencies - $36,000)

20130SB0680PN1329 - 54 -

123456789

101112131415161718192021222324252627282930

Page 55:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(C) Additional funding for DGS Project 181-8, raising level of levees along Tacony Creek, construction of concrete channel, extension of culvert box and construction of new SEPTA railroad bridge for stream flow improvement in Glenside area of Cheltenham Township, including raising of concrete channel wall and earthen levee and constructing concrete channel with culvertProject Allocation 1,800,000(Base Project Allocation - $1,620,000)(Design & Contingencies - $180,000)

(D) Construction, infrastructure improvements and other costs related to Abington stream bank stabilization flood control projectProject Allocation 200,000(Base Project Allocation - $200,000)

(xii) Philadelphia County(A) Construction, infrastructure, storm

water management and restoration of tidal wetland for Penn Treaty Park Phase I projectProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(B) Lake renovations and other costs

related to Franklin Delano Roosevelt

20130SB0680PN1329 - 55 -

123456789

101112131415161718192021222324252627282930

Page 56:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

ParkProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(6) Department of General Services

(i) Berks County(A) Upgrade and renovate two elevators in

Reading State Office Building, including replacement of controller, car fixtures, corridor fixtures door operator, tracks/hangars and power unitProject Allocation 250,000(Base Project Allocation - $150,000)(Design & Contingencies - $100,000)

(B) Completely renovate two elevators, including motors and remodeling, in Reading State Office BuildingProject Allocation 250,000(Base Project Allocation - $150,000)(Design & Contingencies - $100,000)

(C) Replace coal boilers with more efficient system in Reading State Office BuildingProject Allocation 1,000,000(Base Project Allocation - $800,000)(Design & Contingencies - $200,000)

(D) Upgrade security at Reading State Office BuildingProject Allocation 100,000

20130SB0680PN1329 - 56 -

123456789

101112131415161718192021222324252627282930

Page 57:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $100,000)(i.1) Cambria County

(A) Demolition, construction, infrastructure, abatement of hazardous materials and other costs related to the State Corrections Facility at SCI Cresson property reuse projectProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(ii) Dauphin County

(A) Replace wiring in all lighting fixtures in Main Capitol BuildingProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Upgrade and renovate all existing elevators, including upgrading motors and remodeling cabs, in Finance BuildingProject Allocation 1,820,000(Base Project Allocation - $1,638,000)(Design & Contingencies - $182,000)

(C) Upgrade and renovate all existing elevators, including upgrading motors and remodeling cabs, in Forum BuildingProject Allocation 1,820,000(Base Project Allocation - $1,638,000)(Design & Contingencies - $182,000)

(D) Replace roof, including paver supports, roof membrane and roof and

20130SB0680PN1329 - 57 -

123456789

101112131415161718192021222324252627282930

Page 58:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

parapet material of Keystone BuildingProject Allocation 2,500,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $500,000)

(E) Replace parapet roof, including full removal of old roof and repair spalling, in Finance BuildingProject Allocation 700,000(Base Project Allocation - $600,000)(Design & Contingencies - $100,000)

(F) Repair roof-interstice space between roof and ceiling and tie into control system in Main Capitol BuildingProject Allocation 1,000,000(Base Project Allocation - $900,000)(Design & Contingencies - $100,000)

(G) Replace roof and windows in Matthew J. Ryan Office BuildingProject Allocation 550,000(Base Project Allocation - $500,000)(Design & Contingencies - $50,000)

(H) Remove and replace architectural grade shingles, remove and replace BUR roofs with R-30 insulation and EPDM roofing and replace EPDM roof on windows, including insulation, in DGS Annex Complex, Administration BuildingProject Allocation 113,000(Base Project Allocation - $110,000)(Design & Contingencies - $3,000)

20130SB0680PN1329 - 58 -

123456789

101112131415161718192021222324252627282930

Page 59:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(I) Install central air conditioning in Chapel Building of DGS Annex ComplexProject Allocation 116,000(Base Project Allocation - $113,000)(Design & Contingencies - $3,000)

(J) Repair or replace damaged sandstone headers along entryway of Archives BuildingProject Allocation 310,000(Base Project Allocation - $300,000)(Design & Contingencies - $10,000)

(K) Reline cooling towers, including membrane for chillers, at Central PlantProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(L) Construct ADA entrance in North Office BuildingProject Allocation 750,000(Base Project Allocation - $700,000)(Design & Contingencies - $50,000)

(M) Repave or rebuild various annex cartways at DGS Annex ComplexProject Allocation 681,000(Base Project Allocation - $681,000)

(N) Replace moduline diffuser in East Wing BuildingProject Allocation 381,000(Base Project Allocation - $381,000)

(O) Completely renovate elevators,

20130SB0680PN1329 - 59 -

123456789

101112131415161718192021222324252627282930

Page 60:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

including motors and remodeling, in Finance BuildingProject Allocation 910,000(Base Project Allocation - $700,000)(Design & Contingencies - $210,000)

(P) Completely renovate elevators, including motors and remodeling, in Forum BuildingProject Allocation 910,000(Base Project Allocation - $700,000)(Design & Contingencies - $210,000)

(Q) Repair or replace pavers within Keystone Building PlazaProject Allocation 2,000,000(Base Project Allocation - $1,500,000) (Design & Contingencies - $500,000)

(R) Completely replace roof of Arsenal Building, including flashing and roof drainsProject Allocation 700,000(Base Project Allocation - $600,000)(Design & Contingencies - $100,000)

(S) Replace chiller that controls cooling system in 22nd and Forster BuildingProject Allocation 600,000(Base Project Allocation - $480,000)(Design & Contingencies - $120,000)

(T) Replace moduline diffusers in Rachel Carson BuildingProject Allocation 1,000,000

20130SB0680PN1329 - 60 -

123456789

101112131415161718192021222324252627282930

Page 61:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $800,000)(Design & Contingencies - $200,000)

(U) Completely renovate all building restrooms in Health and Welfare BuildingProject Allocation 4,000,000(Base Project Allocation - $3,200,000)(Design & Contingencies - $800,000)

(V) Completely renovate all building restrooms in Labor and Industry BuildingProject Allocation 8,000,000(Base Project Allocation - $6,400,000)(Design & Contingencies - $1,600,000)

(W) Replace secondary switchgear in State Museum Building, including under floor feedersProject Allocation 2,500,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $500,000)

(X) Replace generator in Petry BuildingProject Allocation 500,000(Base Project Allocation - $400,000)(Design & Contingencies - $100,000)

(Y) Replace security and fire detection systems at Northwest Office Building located on Forster StreetProject Allocation 11,500,000(Base Project Allocation -

$10,500,000)

20130SB0680PN1329 - 61 -

123456789

101112131415161718192021222324252627282930

Page 62:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $1,000,000)(Z) Install replacement windows

throughout Northwest Office Building located on Forster StreetProject Allocation 1,000,000(Base Project Allocation - $900,000)(Design & Contingencies - $100,000)

(AA) Repoint bad joints and install vertical expansion joints in exterior wall corners of Northwest Office Building located on Forster StreetProject Allocation 1,000,000(Base Project Allocation - $900,000)(Design & Contingencies - $100,000)

(BB) Upgrade security in Capitol Complex(BB) UPGRADE SECURITY IN STATE BUILDINGS

AND FACILITIES WITHIN THE CITY OF HARRISBURG AND SUSQUEHANNA TOWNSHIPProject Allocation 5,800,000(Base Project Allocation - $5,800,000)

(iii) Lackawanna County(A) Upgrade security at the Scranton

State Office BuildingProject Allocation 100,000(Base Project Allocation - $100,000)

(iv) Philadelphia County(A) Renovations and rehabilitation of

Pennsylvania Convention Center FacilitiesProject Allocation 38,000,000

20130SB0680PN1329 - 62 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 63:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $38,000,000)

(6.1) Pennsylvania Emergency Management Agency(i) Eastern Area Office Building

(A) Demolish and remediate old Eastern Area Office on grounds of Hamburg CenterProject Allocation 1,000,000(Base Project Allocation - $900,000)(Design & Contingencies - $100,000)

(7) Pennsylvania Historical and Museum Commission(I) BOWMAN'S HILL WILDFLOWER PRESERVE

(A) CONSTRUCTION AND OTHER RELATED COSTS FOR BOWMAN'S HILL WILDFLOWER PRESERVE VISITOR CENTERPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(i) (II) Brandywine Battlefield Park(A) Acquisition, infrastructure,

renovation, construction and other related costs for redevelopment and preservation of Welcome Center and other historic buildings and access improvementsProject Allocation 7,200,000(Base Project Allocation - $6,000,000)(Design & Contingencies - $1,200,000)

(ii) (III) Daniel Boone Homestead(A) Restore Daniel Boone Homestead and

20130SB0680PN1329 - 63 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 64:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

other structures at siteProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(iii) (IV) Eckley Miners' Village(A) Install fire protection system,

including construction of water main to provide sufficient fire suppression to buildingsProject Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(B) Provide for Phase IV of preservation and restoration of miners' houses, including structural and interior restoration, infrastructure and restoration of outbuildingsProject Allocation 4,800,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $800,000)

(iv) (V) Erie Maritime Museum(A) Provide for replacement of portions

of existing exhibits, selective exhibit component improvements, new energy-efficient exhibit lighting and installation of new exhibitsProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(v) (VI) Landis Valley Village and Farm

20130SB0680PN1329 - 64 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 65:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Museum(A) Replace underground sewage, water,

electrical, phone, data and fire and security lines throughout site and upgrade HVAC system with new geothermal systems and other energy-saving equipment and featuresProject Allocation 9,000,000(Base Project Allocation - $7,500,000)(Design & Contingencies - $1,500,000)

(B) Install fire protection system, including construction of water main to provide sufficient fire suppression to buildingsProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(C) Provide site improvements, including preservation and restoration of interior and exterior of buildingsProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(D) Design, fabricate and install new permanent exhibits for new visitor centerProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(vi) (VII) Old Economy Village(A) Rehabilitate exterior and structure

20130SB0680PN1329 - 65 -

<--

123456789

101112131415161718192021222324252627282930

Page 66:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

of up to 18 buildings, including painting, roofing, moisture barriers, repair of structural members, masonry, gutters and drainage chimneys, electrical, wastewater systems, HVAC and water supply lines with archaeological investigations at siteProject Allocation 3,000,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $500,000)

(vii) (VIII) Pennsbury Manor(A) Install fire protection system,

including construction of water main to provide sufficient fire suppression to buildingsProject Allocation 2,400,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $400,000)

(viii) (IX) Pennsylvania Anthracite Heritage Museum(A) Install fire protection system,

including bringing sufficient water to building and installation of new sprinklers and gas/chemical suppression system in collection areaProject Allocation 960,000(Base Project Allocation - $800,000)(Design & Contingencies - $160,000)

(ix) (X) Pennsylvania Lumber Museum(A) Provide for second phase of exhibits

20130SB0680PN1329 - 66 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 67:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

in main gallery, as well as outdoor site interpretive signage and exhibitsProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(x) (XI) Railroad Museum of Pennsylvania(A) Install fire protection system,

including construction of water main to provide sufficient fire suppression to buildingsProject Allocation 1,200,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $200,000)

(x.1) (XII) Scranton Iron Furnaces(A) Restore and stabilize furnaces,

including masonry, drainage, lighting, security, fencing and infrastructureProject Allocation 6,000,000(Base Project Allocation - $5,000,000)(Design & Contingencies - $1,000,000)

(xi) (XIII) Washington Crossing Historic Park(A) Provide restoration and improvements

to Bowman's Hill Tower and ancillary facilitiesProject Allocation 6,000,000(Base Project Allocation - $5,000,000)(Design & Contingencies - $1,000,000)

(B) Install fire protection system, including construction of water main to provide sufficient fire suppression

20130SB0680PN1329 - 67 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 68:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

to buildingsProject Allocation 2,400,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $400,000)

(8) Department of Labor and Industry(i) Labor and Industry Building, Harrisburg,

Dauphin County(A) Replace two high voltage

transformers, including infrastructureProject Allocation 5,000,000(Base Project Allocation - $4,500,000)(Design & Contingencies - $500,000)

(9) Department of Military and Veterans Affairs(i) (Reserved)(ii) Coraopolis Readiness Center, Allegheny

County(A) Rehabilitate Coraopolis Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); and repair façade and parking facilityProject Allocation 1,500,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $250,000)

(iii) Pittsburgh Hunt Readiness Center, Allegheny County(A) Rehabilitate Pittsburgh Hunt

Readiness Center, including assembly

20130SB0680PN1329 - 68 -

123456789

101112131415161718192021222324252627282930

Page 69:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 4,500,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $500,000)

(iv) Pittsburgh Support Maintenance Shop, Allegheny County(A) Combine three field maintenance shops

with 11,300 square feet of usable space and 2,250 square feet of unheated storageProject Allocation 1,440,000(Base Project Allocation - $1,200,000)(Design & Contingencies - $240,000)

(v) Southwestern Veterans Center, Allegheny County(A) Renovate and repair Southwestern

Veterans Center, including replacement of facility roofProject Allocation 3,125,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $625,000)

(B) Provide for renovation and general repairs of Southwestern Veterans Center, including life safety and

20130SB0680PN1329 - 69 -

123456789

101112131415161718192021222324252627282930

Page 70:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

regulatory deficienciesProject Allocation 8,125,000(Base Project Allocation - $7,313,000)(Design & Contingencies - $812,000)

(vi) Ford City Readiness Center, Armstrong County(A) Rehabilitate Ford City Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,000,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $500,000)

(vii) Hollidaysburg Readiness Center, Blair County(A) Rehabilitate Hollidaysburg Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); and repair façade and parking facilityProject Allocation 2,800,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $400,000)

(viii) Hollidaysburg Veterans Home, Blair

20130SB0680PN1329 - 70 -

123456789

101112131415161718192021222324252627282930

Page 71:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

County(A) Provide for renovation and general

repairs of Hollidaysburg Veterans Home, including upgrading community living center at Eisenhower Hall and constructing meal delivery systems at Arnold and Eisenhower HallsProject Allocation 1,325,000(Base Project Allocation - $1,060,000)(Design & Contingencies - $265,000)

(B) Provide for renovation and general repairs of Hollidaysburg Veterans HomeProject Allocation 6,325,000(Base Project Allocation - $5,693,000)(Design & Contingencies - $632,000)

(ix) Butler Readiness Center, Butler County(A) Rehabilitate Butler Readiness Center,

including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,800,000(Base Project Allocation - $3,300,000)(Design & Contingencies - $500,000)

(x) Southeastern Veterans Center, Chester County(A) Provide for renovation and general

20130SB0680PN1329 - 71 -

123456789

101112131415161718192021222324252627282930

Page 72:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

repairs of Southeastern Veterans Center, including upgrades and renovations at Coates Hall and construction of new maintenance buildingProject Allocation 1,925,000(Base Project Allocation - $1,540,000)(Design & Contingencies - $385,000)

(B) Provide for renovation and general repairs of Southeastern Veterans Center, including replacement of facility roofProject Allocation 9,925,000(Base Project Allocation - $8,933,000)(Design & Contingencies - $992,000)

(xi) Spring City Armory, Chester County(A) Rehabilitate Spring City Armory to

current standards, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,600,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $600,000)

(xii) Spring City Readiness Center, Chester County

20130SB0680PN1329 - 72 -

123456789

101112131415161718192021222324252627282930

Page 73:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Rehabilitate Spring City Readiness Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(xiii) Lock Haven Readiness Center, Clinton County(A) Rehabilitate Lock Haven Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,000,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $500,000)

(xiv) Harrisburg Readiness Center, Dauphin County(A) Rehabilitate Harrisburg Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms

20130SB0680PN1329 - 73 -

123456789

101112131415161718192021222324252627282930

Page 74:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 4,600,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $600,000)

(xiv.1) Harrisburg Maintenance Shop(A) Rehabilitate Harrisburg Field

Maintenance Shop, including maintenance bays, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms and upgrade building systems, including HVAC, roofs, windows and doors, repairs to the facade, expansion of parking and construction of unheated storage facilityProject Allocation 3,500,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $500,000)

(xv) Pennsylvania Soldiers and Sailors Home, Erie County(A) Provide for renovation and general

repairs of Pennsylvania Soldiers and Sailors Home, including life safety and regulatory deficienciesProject Allocation 13,400,000(Base Project Allocation -

20130SB0680PN1329 - 74 -

123456789

101112131415161718192021222324252627282930

Page 75:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$12,060,000)(Design & Contingencies - $1,340,000)

(xvi) Indiana Readiness Center, Indiana County(A) Rehabilitate Indiana Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,200,000(Base Project Allocation - $2,700,000)(Design & Contingencies - $500,000)

(xvii) Gino J. Merli Veterans Center, Lackawanna County(A) Provide for renovation and general

repairs of Gino J. Merli Veterans Center, including life safety and regulatory deficienciesProject Allocation 9,895,000(Base Project Allocation - $8,906,000)(Design & Contingencies - $989,000)

(xvii.1) Scranton Maintenance Shop, Lackawanna County(A) Rehabilitate maintenance shop,

administrative offices, classrooms, storage rooms, mechanical rooms and parking

20130SB0680PN1329 - 75 -

123456789

101112131415161718192021222324252627282930

Page 76:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 4,500,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $500,000)

(xvii.2) New Castle Maintenance Shop, Lawrence County(A) Rehabilitate maintenance shop,

administrative offices, classrooms, storage rooms, mechanical rooms and parkingProject Allocation 2,500,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $500,000)

(xvii.3) Combat Aviation Brigade Readiness Center, Lebanon County(A) Rehabilitate 28th Aviation Brigade at

Fort Indiantown Gap, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, lockers, mechanical rooms, HVAC, infrastructure and parkingProject Allocation 4,500,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $500,000)

(xvii.4) Recruiting and Retention Battalion, Lebanon County(A) Rehabilitate recruiting and retention

battalion at Fort Indiantown Gap to include assembly hall, classrooms, administrative offices, storage

20130SB0680PN1329 - 76 -

123456789

101112131415161718192021222324252627282930

Page 77:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

spaces, restrooms, locker rooms and mechanical rooms and upgrade the building systems, including HVAC, roofs, windows and doors and repairs to facadeProject Allocation 2,500,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $500,000)

(xviii) Wilkes-Barre Readiness Center, Luzerne County(A) Rehabilitate Wilkes-Barre Readiness

Center, including assembly hall, dining facility, classrooms, administrative offices, storage space, restrooms, locker rooms, parking for privately owned and military vehicles and renovation of existing facilityProject Allocation 3,000,000(Base Project Allocation- $2,500,000)(Design & Contingencies - $500,000)

(xviii.1) Williamsport Maintenance Shop, Lycoming County(A) Rehabilitate maintenance shop,

administrative offices, classrooms, storage rooms, mechanical rooms and parkingProject Allocation 2,500,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $500,000)

(xix) Bradford Readiness Center, McKean

20130SB0680PN1329 - 77 -

123456789

101112131415161718192021222324252627282930

Page 78:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

County(A) Expand Bradford Readiness Center,

including additional classroom, administrative offices, storage space, restrooms, locker rooms, mechanical rooms and parking facilitiesProject Allocation 1,200,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $200,000)

(B) Expand Bradford Readiness Center, including infrastructure at airportProject Allocation 1,200,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $200,000)

(xx) Kane Readiness Center, McKean County(A) Rehabilitate Kane Readiness Center,

including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,300,000(Base Project Allocation - $2,800,000)(Design & Contingencies - $500,000)

(xxi) Hermitage Readiness Center, Mercer County(A) Rehabilitate Hermitage Readiness

Center, including assembly hall,

20130SB0680PN1329 - 78 -

123456789

101112131415161718192021222324252627282930

Page 79:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 4,700,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $700,000)

(xxii) East Stroudsburg Readiness Center, Monroe County(A) Rehabilitate East Stroudsburg

Readiness Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,000,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $600,000)

(xxiii) Tobyhanna Armed Forces Reserve Center, Monroe County(A) Rehabilitation and building expansion

of Tobyhanna Armed Forces Center, including assembly hall, kitchen, supply, locker room, administration and classroom with parking, including

20130SB0680PN1329 - 79 -

123456789

101112131415161718192021222324252627282930

Page 80:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

maintenance facilityProject Allocation 600,000(Base Project Allocation - $500,000)(Design & Contingencies - $100,000)

(xxiv) Plymouth Meeting Readiness Center, Montgomery County(A) Rehabilitate Plymouth Meeting

Readiness Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 4,500,000(Base Project Allocation - $3,900,000)(Design & Contingencies - $600,000)

(xxv) Delaware Valley Veterans Home, Philadelphia County(A) Provide for renovation and general

repairs of Delaware Valley Veterans Home, including life safety and regulatory deficienciesProject Allocation 10,250,000(Base Project Allocation - $9,225,000)(Design & Contingencies - $1,025,000)

(B) Provide for renovation and general repairs of Delaware Valley Veterans Home, including life safety and

20130SB0680PN1329 - 80 -

123456789

101112131415161718192021222324252627282930

Page 81:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

regulatory deficienciesProject Allocation 5,625,000(Base Project Allocation - $4,500,000)(Design & Contingencies - $1,125,000)

(xxv.1) Southampton Road Readiness Center, Philadelphia County(A) Rehabilitate assembly hall,

classrooms, administrative offices, storage space, restrooms, lockers, mechanical rooms, HVAC, infrastructure and parkingProject Allocation 4,500,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $500,000)

(xxv.2) 23rd Street Readiness Center, Philadelphia County(A) Rehabilitate assembly hall,

classrooms, administrative offices, storage spaces, restrooms, lockers, mechanical rooms, HVAC, infrastructure and parkingProject Allocation 3,500,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $500,000)

(xxvi) Schuylkill County Readiness Center, Schuylkill County(A) Purchase 10 to 20 acres of land for

future construction of new Schuylkill County Readiness Center to replace current facilities to meet new

20130SB0680PN1329 - 81 -

123456789

101112131415161718192021222324252627282930

Page 82:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

requirementsProject Allocation 1,600,000(Land Allocation - $1,600,000)

(xxvi.1) Oil City Readiness Center, Venango County(A) Rehabilitate assembly hall,

classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms and upgrade building systems, including HVAC, roofs, windows, doors and repairs to facadeProject Allocation 3,500,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $500,000)

(xxvii) Mount Pleasant Readiness Center, Westmoreland County(A) Rehabilitate Mount Pleasant Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage facilityProject Allocation 3,000,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $500,000)

(xxviii) York Readiness Center, York County(A) Rehabilitate York Readiness Center,

20130SB0680PN1329 - 82 -

123456789

101112131415161718192021222324252627282930

Page 83:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair façade; expand parking; and construct unheated storage spaceProject Allocation 2,400,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $400,000)

(10) Department of Public Welfare(i) Clarks Summit State Hospital

(A) Replace all G & W oil switches and high voltage lines throughout facility and install new generators at Buildings 2 and 7, including new 200-amp serviceProject Allocation 5,000,000(Base Project Allocation - $4,300,000)(Design & Contingencies - $700,000)

(B) Upgrade fire alarm and fire suppression system throughout facilityProject Allocation 2,800,000(Base Project Allocation - $2,520,000)(Design & Contingencies - $280,000)

(C) Replace boilersProject Allocation 4,200,000(Base Project Allocation - $3,780,000)(Design & Contingencies - $420,000)

(ii) Cresson Secure Treatment Unit

20130SB0680PN1329 - 83 -

123456789

101112131415161718192021222324252627282930

Page 84:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Construct multipurpose modular building for classroom and gym useProject Allocation 3,000,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $500,000)

(iii) Danville State Hospital(A) Replace tower roof and flat roof of

Building IProject Allocation 750,000(Base Project Allocation - $650,000)(Design & Contingencies - $100,000)

(B) Replace roofs on various buildingsProject Allocation 1,800,000(Base Project Allocation - $1,620,000)(Design & Contingencies - $180,000)

(iv) Ebensburg Center(A) Replace, install and upgrade air

conditioning to various hallways, corridors, day activity rooms, and dining areas in five residential unitsProject Allocation 500,000(Base Project Allocation - $388,000)(Design & Contingencies - $112,000)

(B) Upgrade fire alarm and fire suppression system throughout facilityProject Allocation 2,200,000(Base Project Allocation - $1,980,000)(Design & Contingencies - $220,000)

(C) Replace current HVACProject Allocation 3,500,000

20130SB0680PN1329 - 84 -

123456789

101112131415161718192021222324252627282930

Page 85:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $3,150,000)(Design & Contingencies - $350,000)

(iv.1) Hamburg Center(A) Demolish and remediate obsolete

boiler plant buildingProject Allocation 1,000,000(Base Project Allocation - $900,000)(Design & Contingencies - $100,000)

(v) Loysville Youth Development Center(A) Replace fire lines and pumps and

install new fire sprinklers in Building 10Project Allocation 1,800,000(Base Project Allocation - $1,500,000) (Design & Contingencies - $300,000)

(B) Upgrade and replace HVAC equipment throughout facility to meet current ventilation codesProject Allocation 3,000,000(Base Project Allocation - $2,700,000)(Design & Contingencies - $300,000)

(vi) (Reserved)(vii) Norristown State Hospital

(A) Demolish vacant and deteriorated buildings considered a nuisance and hazardProject Allocation 1,000,000(Base Project Allocation - $900,000)(Design & Contingencies - $100,000)

(B) Upgrade and replace HVAC equipment

20130SB0680PN1329 - 85 -

123456789

101112131415161718192021222324252627282930

Page 86:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

throughout facility to meet current ventilation codesProject Allocation 5,000,000(Base Project Allocation - $4,500,000) (Design & Contingencies - $500,000)

(viii) North Central Secure Treatment Unit(A) Construct multipurpose modular

building for classroom and gym useProject Allocation 5,400,000(Base Project Allocation - $4,500,000)(Design & Contingencies - $900,000)

(B) Replace existing standard glass windows with new security-type shatterproof glass windows for health and safety issuesProject Allocation 600,000(Base Project Allocation - $540,000)(Design & Contingencies - $60,000)

(C) Replace current HVAC to meet code requirementsProject Allocation 9,000,000(Base Project Allocation - $8,100,000)(Design & Contingencies - $900,000)

(viii.1) Philipsburg State Hospital(A) Demolish and remediate all campus

buildingsProject Allocation 6,000,000(Base Project Allocation - $5,400,000)(Design & Contingencies - $600,000)

(ix) Polk Center

20130SB0680PN1329 - 86 -

123456789

101112131415161718192021222324252627282930

Page 87:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Remove and replace water plantProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Repair all mortar joints between brick and seal all brick and mortar jointsProject Allocation 2,500,000(Base Project Allocation - $2,250,000)(Design & Contingencies - $250,000)

(C) Upgrade fire alarm and fire suppression system throughout facilityProject Allocation 1,800,000(Base Project Allocation - $1,620,000)(Design & Contingencies - $180,000)

(x) Selinsgrove Center(A) Reseal joints and renovate lighting

and drainage systems in steam tunnels between power plant and central building complexProject Allocation 550,000(Base Project Allocation - $475,000)(Design & Contingencies - $75,000)

(B) Upgrade fire alarm and fire suppression system throughout facilityProject Allocation 2,700,000(Base Project Allocation - $2,430,000)(Design & Contingencies - $270,000)

(C) Funding for DGS Project 553-34 relating to portable waterProject Allocation 3,500,000

20130SB0680PN1329 - 87 -

123456789

101112131415161718192021222324252627282930

Page 88:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $3,150,000)(Design & Contingencies - $350,000)

(xi) South Mountain Restoration Center(A) Provide for breech of Carbarough Dam

and land restoration to protect property and life as mandated by Department of Environmental ProtectionProject Allocation 3,500,000(Base Project Allocation - $3,150,000)(Design & Contingencies - $350,000)

(xii) Torrance State Hospital(A) Replace existing wastewater treatment

plant to comply with current regulations and codesProject Allocation 4,500,000(Base Project Allocation - $4,200,000)(Design & Contingencies - $300,000)

(B) Additional funds for construction and replacement of existing wastewater treatment plantProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xiii) Warren State Hospital(A) Upgrade medium-voltage and low-

voltage electrical gear throughout facilityProject Allocation 4,000,000(Base Project Allocation - $3,600,000)(Design & Contingencies - $400,000)

(xiii.1) Wernersville State Hospital

20130SB0680PN1329 - 88 -

123456789

101112131415161718192021222324252627282930

Page 89:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Replace boilerProject Allocation 1,500,000(Base Project Allocation - $1,350,000)(Design & Contingencies - $150,000)

(xiv) White Haven Center(A) Upgrade fire alarm and fire

suppression system throughout facilityProject Allocation 2,100,000(Base Project Allocation - $1,890,000)(Design & Contingencies - $210,000)

(B) Upgrade existing facility to comply with current emission requirementsProject Allocation 5,500,000(Base Project Allocation - $4,950,000)(Design & Contingencies - $550,000)

(C) Upgrade existing medium-voltage distribution systemProject Allocation 5,000,000(Base Project Allocation - $4,500,000)(Design & Contingencies - $500,000)

(xv) Youth Forestry Camp No. 2(A) Demolish existing building and

construct new medical buildingProject Allocation 750,000(Base Project Allocation - $675,000)(Design & Contingencies - $75,000)

(xvi) Youth Forestry Camp No. 3(A) Install HVAC

Project Allocation 700,000(Base Project Allocation - $630,000)

20130SB0680PN1329 - 89 -

123456789

101112131415161718192021222324252627282930

Page 90:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $70,000)(11) Pennsylvania State Police

(i) DNA Laboratory, Westmoreland County(A) Construct new DNA laboratory in

Greensburg to meet requirements and codesProject Allocation 29,000,000(Base Project Allocation - 22,500,000)(Land Allocation - $1,500,000)(Design & Contingencies - $5,000,000)

(ii) Greensburg Headquarters, Westmoreland County(A) Design and construction of new

headquarters facilityProject Allocation 9,264,000(Base Project Allocation - $7,720,000)(Design & Contingencies - $1,544,000)

(III) ACADEMY COMPLEX, DERRY TOWNSHIP, DAUPHIN COUNTY(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR RENOVATIONS TO PENNSYLVANIA STATE POLICE ACADEMY COMPLEXPROJECT ALLOCATION 8,164,000(BASE PROJECT ALLOCATION - $7,220,000)(DESIGN & CONTINGENCIES - $944,000)

(12) State System of Higher Education(i) Bloomsburg University

(A) Construct facilities complex to centralize facilities management functions into single complex of

20130SB0680PN1329 - 90 -

<--

123456789

101112131415161718192021222324252627282930

Page 91:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

buildingsProject Allocation 19,000,000(Base Project Allocation -

$15,200,000)(Design & Contingencies - $3,800,000)

(ii) Cheyney University(A) Completely renovate Coppin Hall

BuildingProject Allocation 9,000,000(Base Project Allocation - $7,200,000)(Design & Contingencies - $1,800,000)

(B) Construction, infrastructure and other related costs for the design and construction of dormitoryProject Allocation 12,000,000(Base Project Allocation -

$10,000,000)(Design & Contingencies - $2,000,000)

(C) Renovate Cope Athletic Complex and supporting academic spacesProject Allocation 10,000,000(Base Project Allocation - $8,000,000)(Design & Contingencies - $2,000,000)

(D) ADDITIONAL FUNDING TO CONSTRUCT NEW STUDENT HOUSINGPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(iii) East Stroudsburg University(A) Completely renovate Kemp Library

Building

20130SB0680PN1329 - 91 -

<--

123456789

101112131415161718192021222324252627282930

Page 92:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 45,000,000(Base Project Allocation -

$36,000,000)(Design & Contingencies - $9,000,000)

(iii.1) Edinboro University(A) Rehabilitate existing facility to

house precision tool and mold design classrooms in Porreco CenterProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(A) REHABILITATE AND RENOVATE PORRECO CENTERPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(iv) Indiana University of Pennsylvania(A) Additional funding for renovation of

Stapleton/Stabley Library, including space reconfigurationProject Allocation 14,500,000(Base Project Allocation -

$11,600,000)(Design & Contingencies - $2,900,000)

(v) Kutztown University(A) Additional funding for renovation of

Beecky Education Building, including infrastructureProject Allocation 9,000,000(Base Project Allocation - $7,200,000)(Design & Contingencies - $1,800,000)

(B) Renovate DeFrancesco Building

20130SB0680PN1329 - 92 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 93:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

interiorProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vi) Lock Haven University(A) Renovate and upgrade campus

electrical infrastructure to meet modern demands and efficienciesProject Allocation 16,000,000(Base Project Allocation -

$12,800,000)(Design & Contingencies - $3,200,000)

(B) Additional funding for renovation of South Ulmer Hall, including infrastructure converting from science to general classroomProject Allocation 23,000,000(Base Project Allocation -

$18,400,000)(Design & Contingencies - $4,600,000)

(C) Renovate Russell Hall, including infrastructureProject Allocation 15,000,000(Base Project Allocation -

$12,000,000)(Design & Contingencies - $3,000,000)

(D) CONSTRUCTION AND OTHER RELATED COSTS FOR RENOVATION OF OFFICE BUILDINGPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)

20130SB0680PN1329 - 93 -

<--

123456789

101112131415161718192021222324252627282930

Page 94:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(vii) Mansfield University(A) Renovate Belknap and Retan Halls to

provide better functionality and space usageProject Allocation 10,000,000(Base Project Allocation - $8,000,000)(Design & Contingencies - $2,000,000)

(B) Expand Butler Music Center, including infrastructureProject Allocation 8,000,000(Base Project Allocation - $6,400,000)(Design & Contingencies - $1,600,000)

(C) Reroute Morris DriveProject Allocation 6,000,000(Base Project Allocation - $4,800,000)(Design & Contingencies - $1,200,000)

(D) Demolish Maple Hall and construct new parking lotProject Allocation 6,000,000(Base Project Allocation - $4,800,000)(Design & Contingencies - $1,200,000)

(E) Upgrade utilities and infrastructure campuswide and replace outdated systemsProject Allocation 10,000,000(Base Project Allocation - $8,000,000)(Design & Contingencies - $2,000,000)

(viii) Millersville University(A) Completely renovate Pucillo Hall,

including infrastructure

20130SB0680PN1329 - 94 -

123456789

101112131415161718192021222324252627282930

Page 95:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 7,000,000(Base Project Allocation - $5,600,000)(Design & Contingencies - $1,400,000)

(B) Completely renovate Brooks Hall into health and wellness centerProject Allocation 15,000,000(Base Project Allocation -

$12,000,000)(Design & Contingencies - $3,000,000)

(ix) Shippensburg University(A) Additional funding for renovation of

Franklin Science CenterProject Allocation 25,000,000(Base Project Allocation -

$20,000,000)(Design & Contingencies - $5,000,000)

(B) Additional funding for replacement of Henderson HallProject Allocation 11,000,000(Base Project Allocation - $8,800,000)(Design & Contingencies - $2,200,000)

(ix.1) Slippery Rock University(A) Renovate, demolish and construct an

addition, including infrastructure to McKay BuildingProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(A) ADDITIONAL FUNDING FOR RENOVATION AND ADDITION TO MCKAY BUILDINGPROJECT ALLOCATION 1,000,000

20130SB0680PN1329 - 95 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 96:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $1,000,000)(x) West Chester University

(A) Additional funding for renovation of Sturzebecker Health Science Center, including new additionProject Allocation 13,000,000(Base Project Allocation -

$10,400,000)(Design & Contingencies - $2,600,000)

(B) Construct new athletics facility, approximately 85,000 square feetProject Allocation 15,000,000(Base Project Allocation -

$12,000,000)(Design & Contingencies - $3,000,000)

(C) Renovate the Sturzebecker Health Science CenterProject Allocation 20,000,000(Base Project Allocation -

$16,000,000)(Design & Contingencies - $4,000,000)

(13) Department of Transportation(i) Adams County

(A) Construct new vehicle wash building at Adams County Maintenance GarageProject Allocation 690,000(Base Project Allocation - $600,000)(Design & Contingencies - $90,000)

(B) Develop new stockpile facility in Adams County, including site purchase,

20130SB0680PN1329 - 96 -

123456789

101112131415161718192021222324252627282930

Page 97:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(C) Renovate and expand current Adams County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(D) Develop new stockpile, including site purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(E) Construct four new storage buildings and site work at various stockpilesProject Allocation 1,400,000(Base Project Allocation - $1,190,000)(Design & Contingencies - $210,000)

(F) Demolish and construct two new salt storage buildings and site work at Adams County Maintenance StockpileProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(ii) Allegheny County

20130SB0680PN1329 - 97 -

123456789

101112131415161718192021222324252627282930

Page 98:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Renovate Allegheny County District 11-0 Office, including roof, infrastructure, energy efficiencies and program requirementsProject Allocation 2,200,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $200,000)

(B) Renovate Allegheny County Maintenance Garage, including roof, infrastructure, energy efficiencies and program requirementsProject Allocation 825,000(Base Project Allocation - $750,000)(Design & Contingencies - $75,000)

(C) Construct new PM/service/line paint building at the Neville Island Stockpile FacilityProject Allocation 775,000(Base Project Allocation - $700,000)(Design & Contingencies - $75,000)

(D) Construct new service/PM building at Fort Pitt Tunnel Facility to meet program requirementsProject Allocation 3,850,000(Base Project Allocation - $3,500,000)(Design & Contingencies - $350,000)

(E) Replace electric generators and remove existing roof systems at Fort Pitt, Liberty and Squirrel Hill Tunnel Facilities

20130SB0680PN1329 - 98 -

123456789

101112131415161718192021222324252627282930

Page 99:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 3,350,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $350,000)

(F) Demolish and construct new salt storage buildings and site work at Allegheny County Maintenance StockpileProject Allocation 2,400,000(Base Project Allocation - $2,100,000)(Design & Contingencies - $300,000)

(G) Renovate and expand Rest Site 11, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(H) Renovate and expand Rest Site 12, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(I) Renovate and expand Allegheny County Driver Licensing Center, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and

20130SB0680PN1329 - 99 -

123456789

101112131415161718192021222324252627282930

Page 100:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(J) Renovate and expand Allegheny County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 3,500,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $500,000)

(K) Construct new maintenance garage at Liberty Tunnels FacilityProject Allocation 3,750,000(Base Project Allocation - $3,250,000)(Design & Contingencies - $500,000)

(ii.1) Armstrong County(A) Demolish and construct new salt

storage buildings and site work at Armstrong County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(iii) Beaver County(A) Construct new PM/service/line paint

building at Beaver County Maintenance FacilityProject Allocation 775,000(Base Project Allocation - $700,000)(Design & Contingencies - $75,000)

20130SB0680PN1329 - 100 -

123456789

101112131415161718192021222324252627282930

Page 101:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(B) Remove and replace roof system at Beaver County Maintenance FacilityProject Allocation 525,000(Base Project Allocation - $450,000)(Design & Contingencies - $75,000)

(C) Construct new PM building at Beaver County Maintenance FacilityProject Allocation 1,100,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $100,000)

(D) Remove and replace HVAC system and wall installation at Beaver County Maintenance OfficeProject Allocation 1,150,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $150,000)

(E) Demolish and construct two new salt storage buildings and site work at Beaver County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(F) Renovate and expand Beaver County Driver Licensing Center, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)

20130SB0680PN1329 - 101 -

123456789

101112131415161718192021222324252627282930

Page 102:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $150,000)(G) Renovate and expand Beaver County

Maintenance Garage, including roof replacement, upgrade building systems and improve energy efficiencyProject Allocation 3,600,000(Base Project Allocation - $3,250,000)(Design & Contingencies - $350,000)

(iii.1) Bedford County(A) Develop new stockpile, including site

purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(B) Demolish and construct new salt storage buildings and site work at Bedford County Maintenance StockpileProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(C) Construct new maintenance garage, including salt storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

20130SB0680PN1329 - 102 -

123456789

101112131415161718192021222324252627282930

Page 103:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(D) Renovate and expand current county maintenance garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(iv) Berks County(A) Construct new vehicle wash building

at Berks County Maintenance GarageProject Allocation 690,000(Base Project Allocation - $600,000)(Design & Contingencies - $90,000)

(B) Reskin metal building at Berks County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(C) Renovate and expand Berks County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(iv.1) Blair County(A) Renovate and expand District Office

9-0, including roof replacement and building systems upgradeProject Allocation 2,000,000

20130SB0680PN1329 - 103 -

123456789

101112131415161718192021222324252627282930

Page 104:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(B) Renovate and expand Blair County Maintenance Facility, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(C) Design and construction of new district bridge slab building and site work at Blair County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(D) Demolish and construct new salt storage building, including site work at Blair County Maintenance FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(iv.2) Bradford County(A) Develop new stockpile facility,

including site purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

20130SB0680PN1329 - 104 -

123456789

101112131415161718192021222324252627282930

Page 105:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(B) Demolish and construct new storage buildings and site work at various stockpiles at Bradford County Stockpile FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(C) Demolish and construct new salt storage building and site workProject Allocation 5,000,000(Base Project Allocation - $4,500,000)(Design & Contingencies - $500,000)

(D) Renovate and expand Bradford County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(iv.3) Bucks County(A) Construct new salt storage buildings

and site work at Bucks County Maintenance FacilityProject Allocation 1,600,000(Base Project Allocation - $1,400,000)(Design & Contingencies - $200,000)

(B) Renovate and expand Welcome Center Site P, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot

20130SB0680PN1329 - 105 -

123456789

101112131415161718192021222324252627282930

Page 106:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

upgrades and sewage plant upgradesProject Allocation 1,050,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $50,000)

(iv.4) Cambria County(A) Develop new stockpile, including site

purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(B) Develop new stockpile, including site purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(C) Demolish and construct new salt storage buildings and site work at Fulton County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $720,000)(Design & Contingencies - $80,000)

(D) Renovate and expand Cambria County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000

20130SB0680PN1329 - 106 -

123456789

101112131415161718192021222324252627282930

Page 107:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(E) Renovate and expand Cambria County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(iv.5) Cameron County(A) Construct new county maintenance

garage, including salt storage buildings, auxiliary buildings, site work and acquisition of land at Cameron County Maintenance GarageProject Allocation 15,000,000(Base Project Allocation -

$11,775,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,225,000)

(B) Renovate and expand current Cameron County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(iv.6) Carbon County(A) Construct new salt storage building

and site work at Carbon County

20130SB0680PN1329 - 107 -

123456789

101112131415161718192021222324252627282930

Page 108:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Maintenance FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(B) Demolish and construct satellite office and garage at Hudsondale StockpileProject Allocation 2,300,000(Base Project Allocation - $1,970,000)(Design & Contingencies - $30,000)

(C) Renovate and expand Carbon County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(iv.7) Centre County(A) Renovate and expand current Centre

County Maintenance Garage, including roof replacement and buildings systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(B) Renovate and expand County Rest Site 29, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades

20130SB0680PN1329 - 108 -

123456789

101112131415161718192021222324252627282930

Page 109:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(C) Renovate and expand County Rest Site 30, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(D) Renovate and expand Centre County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(iv.8) Chester County(A) Construct new salt storage building

and site work at Chester County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(B) Construct new salt storage buildings and site work at Chester County Maintenance Facility

20130SB0680PN1329 - 109 -

123456789

101112131415161718192021222324252627282930

Page 110:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,600,000(Base Project Allocation - $1,400,000)(Design & Contingencies - $200,000)

(iv.9) Clarion County(A) Renovate and expand Clarion County

Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 1,900,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $200,000)

(iv.10) Clearfield County(A) Renovate and expand current

Clearfield County Maintenance Garage, including roof replacement and building systems upgradesProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(B) Construct new salt storage buildings at Clearfield County Stockpile FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(iv.11) Clinton County(A) Construct new salt storage buildings

at Clinton County Stockpile FacilityProject Allocation 800,000(Base Project Allocation - $700,000)

20130SB0680PN1329 - 110 -

123456789

101112131415161718192021222324252627282930

Page 111:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $100,000)(B) Renovate and expand Rest Site 33,

including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(C) Renovate and expand Rest Site 34, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(iv.12) Columbia County(A) Renovate and expand Rest Site 37,

including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(B) Renovate and expand Rest Site 38, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades

20130SB0680PN1329 - 111 -

123456789

101112131415161718192021222324252627282930

Page 112:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(C) Renovate and expand current Columbia County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(D) Construction of new Columbia County Maintenance Garage, including salt storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(E) Construct new salt storage buildings at Columbia County Stockpile FacilityProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(iv.13) Crawford County(A) Demolish and construct new storage

buildings and site work at various stockpiles at Crawford County

20130SB0680PN1329 - 112 -

123456789

101112131415161718192021222324252627282930

Page 113:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $298,000)(Design & Contingencies - $52,000)

(B) Renovate and expand County Rest Site 19, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(C) Renovate and expand County Rest Site 20, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(D) Renovate and expand Crawford County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(E) Renovate and expand Crawford County

20130SB0680PN1329 - 113 -

123456789

101112131415161718192021222324252627282930

Page 114:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(iv.14) Cumberland County(A) Demolish and construct two new salt

storage buildings and site work at Cumberland County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(B) Renovate and expand Rest Site 45, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(C) Renovate and expand Rest Site 46, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

20130SB0680PN1329 - 114 -

123456789

101112131415161718192021222324252627282930

Page 115:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(v) Dauphin County(A) Construct new vehicle wash building

at Dauphin County Maintenance GarageProject Allocation 690,000(Base Project Allocation - $600,000)(Design & Contingencies - $90,000)

(B) Develop new stockpile facility in Dauphin County, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(C) Construct new vehicle wash building at Dauphin County Maintenance Garage Stockpile 02 in ElizabethvilleProject Allocation 690,000(Base Project Allocation - $600,000)(Design & Contingencies - $90,000)

(D) Renovate and expand District Office 8-0, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(E) Renovate and expand current Dauphin County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,500,000

20130SB0680PN1329 - 115 -

123456789

101112131415161718192021222324252627282930

Page 116:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(F) Demolish and construct two new salt storage buildings and site work at Dauphin County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(G) Renovation and expansion of Dauphin County Sign Shop, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(H) Renovate and expand Dauphin County Fleet Management Facility, including roof replacement and building systems upgradeProject Allocation 3,500,000(Base Project Allocation - $3,100,000)(Design & Contingencies - $400,000)

(vi) Delaware County(A) Develop new stockpile facility in

Delaware County, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

20130SB0680PN1329 - 116 -

123456789

101112131415161718192021222324252627282930

Page 117:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(B) Construct new salt storage buildings and site work at Delaware County Maintenance FacilityProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(C) Renovate and expand Welcome Center Site P, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,050,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $50,000)

(D) Renovate and expand Delaware County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 1,500,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $500,000)

(vi.1) Elk County(A) Construct new salt storage building

at Elk County Stockpile FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(vi.2) Erie County(A) Develop new stockpile facilities,

including site purchase, design and

20130SB0680PN1329 - 117 -

123456789

101112131415161718192021222324252627282930

Page 118:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construction at Erie County Stockpile FacilityProject Allocation 9,000,000(Base Project Allocation - $5,250,000)(Land Allocation - $2,250,000)(Design & Contingencies - $1,500,000)

(B) Renovate and expand Welcome Center Site L, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(C) Renovate and expand Welcome Center Site M, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(D) Renovate and expand Erie County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(vi.3) Fayette County

20130SB0680PN1329 - 118 -

123456789

101112131415161718192021222324252627282930

Page 119:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Construct new maintenance garage, including slat storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(B) Demolish and construct three new salt storage buildings and site work at Fayette County Maintenance FacilityProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(C) Renovate and expand District Office 12-0, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,150,000)(Design & Contingencies - $350,000)

(D) Renovate and expand current driver licensing center, including roof replacement, building systems upgrade, sidewalks, curbing and parking lot upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(vi.4) Forest County

20130SB0680PN1329 - 119 -

123456789

101112131415161718192021222324252627282930

Page 120:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Construct new Forest County Maintenance Garage, including salt storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(B) Construct new salt storage facility at Forest County Stockpile FacilityProject Allocation 350,000(Base Project Allocation - $298,000)(Design & Contingencies - $52,000)

(vii) Franklin County(A) Develop new stockpile facility in

Franklin County, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(B) Develop new stockpile facility to replace SP 17 in Franklin County, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)

20130SB0680PN1329 - 120 -

123456789

101112131415161718192021222324252627282930

Page 121:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $200,000)(C) Construct new storage buildings and

site work at various stockpilesProject Allocation 1,800,000(Base Project Allocation - $1,530,000)(Design & Contingencies - $270,000)

(D) Renovate and expand current Franklin County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(E) Construct new salt storage buildings and site work at Franklin County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(F) Renovate and expand Welcome Center Site G, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(G) Renovate and expand current driver licensing center, including roof replacement, building systems upgrade,

20130SB0680PN1329 - 121 -

123456789

101112131415161718192021222324252627282930

Page 122:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

sidewalks, curbing and parking lot upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(vii.1) Fulton County(A) Renovate and expand current

maintenance facility, including roof replacement, building systems upgrade and construction of two bays with overhead cranesProject Allocation 2,700,000(Base Project Allocation - $2,350,000)(Design & Contingencies - $350,000)

(B) Demolish and construct new salt storage buildings and site work at Fulton County Maintenance StockpileProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(C) Renovate and expand Welcome Center Site B, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(D) Renovate and expand Rest Site 3, including roof replacement, building

20130SB0680PN1329 - 122 -

123456789

101112131415161718192021222324252627282930

Page 123:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(vii.2) Greene County(A) Rehabilitate and expand Greene County

Welcome CenterProject Allocation 1,800,000(Base Project Allocation - $1,530,000)(Design & Contingencies - $270,000)

(B) Demolish and construct new salt storage buildings and site work at Greene County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $720,000)(Design & Contingencies - $80,000)

(C) Renovate and expand Greene County Maintenance Facility, including roof replacement and building systems upgradeProject Allocation 3,000,000(Base Project Allocation - $2,650,000)(Design & Contingencies - $350,000)

(D) Renovate and expand Welcome Center Site D, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades

20130SB0680PN1329 - 123 -

123456789

101112131415161718192021222324252627282930

Page 124:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(E) Renovate and expand Greene County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(vii.3) Huntingdon County(A) Renovate and expand Huntingdon County

Maintenance Facility, including roof replacement and building systems upgradeProject Allocation 2,700,000(Base Project Allocation - $2,350,000)(Design & Contingencies - $350,000)

(B) Demolish and construct new salt storage buildings and site work at Huntingdon County Maintenance StockpileProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(vii.4) Indiana County(A) Develop new stockpile, including site

purchase, design and construction

20130SB0680PN1329 - 124 -

123456789

101112131415161718192021222324252627282930

Page 125:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 3,050,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $550,000)

(B) Renovate and expand Indiana County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,520,000(Base Project Allocation - $2,220,000)(Design & Contingencies - $300,000)

(vii.5) Jefferson County(A) Renovate and expand Rest Site 25,

including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(B) Renovate and expand Rest Site 26, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(C) Renovate and expand Jefferson County Maintenance Garage, including roof

20130SB0680PN1329 - 125 -

123456789

101112131415161718192021222324252627282930

Page 126:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

replacement, building systems upgrade and energy efficiency improvementProject Allocation 1,500,000(Base Project Allocation - $1,350,000)(Design & Contingencies - $150,000)

(vii.6) Juniata County(A) Renovate and expand Juniata County

Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(viii) Lackawanna County(A) Renovate and expand District 4-0

District Office to bring building into code compliance, upgrade buildings systems and improve program requirements and energy efficiencyProject Allocation 2,750,000(Base Project Allocation - $2,500,000)(Design & Contingencies - $250,000)

(B) Construct new county metal storage building at Lackawanna County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(C) Construct new Lackawanna County Maintenance Garage

20130SB0680PN1329 - 126 -

123456789

101112131415161718192021222324252627282930

Page 127:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(D) Renovate and expand current Lackawanna County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,520,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(E) Demolish and construct four new storage buildings and site work at various stockpiles at Lackawanna County Stockpile FacilityProject Allocation 1,600,000(Base Project Allocation - $1,400,000)(Design & Contingencies - $200,000)

(F) Construct addition to District Office 4-0 for expansion of work units, conference rooms and cafeteriaProject Allocation 4,000,000(Base Project Allocation - $3,400,000)(Design & Contingencies - $600,000)

(G) Renovate and expand Lackawanna County Roadside Rest Site 36, including roof replacement, building systems upgrade, energy efficiency improvement, sidewalks, curbing and step

20130SB0680PN1329 - 127 -

123456789

101112131415161718192021222324252627282930

Page 128:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

replacement, parking lot upgrades and water and sewer treatment plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(ix) Lancaster County(A) Develop new stockpile facility in

Lancaster County, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(B) Renovate and expand current Lancaster County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(C) Demolish and construct new salt storage buildings and site work at various stockpilesProject Allocation 2,000,000(Base Project Allocation - $1,750,000)(Design & Contingencies - $250,000)

(x) Lawrence County(A) Construct new PM building at Lawrence

County Maintenance Facility

20130SB0680PN1329 - 128 -

123456789

101112131415161718192021222324252627282930

Page 129:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 825,000(Base Project Allocation - $750,000)(Design & Contingencies - $75,000)

(B) Develop new stock pile facility, including site purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(C) Construct new salt storage building at Lawrence County Maintenance FacilityProject Allocation 800,000(Base Project Allocation - $720,000)(Design & Contingencies - $80,000)

(D) Construct new maintenance garage, including salt storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(E) Demolish and construct two new salt storage buildings and site work at Lawrence County Maintenance StockpileProject Allocation 800,000(Base Project Allocation - $700,000)

20130SB0680PN1329 - 129 -

123456789

101112131415161718192021222324252627282930

Page 130:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $100,000)(F) Renovate and expand Lawrence County

Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(G) Renovate and expand Lawrence County Roadside Rest Site 15, including roof replacement, building systems upgrade, energy efficiency improvement, sidewalks, curbing, step replacement and parking lot upgradesProject Allocation 1,250,000(Base Project Allocation - $1,200,000)(Design & Contingencies - $50,000)

(H) Renovate and expand Lawrence County Roadside Rest Site 16, including roof replacement, building systems upgrade, energy efficiency improvement, sidewalks, curbing, step replacement and parking lot upgradesProject Allocation 1,250,000(Base Project Allocation - $1,200,000)(Design & Contingencies - $50,000)

(x.1) Lebanon County(A) Construct new maintenance garage,

20130SB0680PN1329 - 130 -

123456789

101112131415161718192021222324252627282930

Page 131:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

including salt storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(B) Demolish and construct new salt storage buildings and site work at various stockpilesProject Allocation 1,600,000(Base Project Allocation - $1,400,000)(Design & Contingencies - $200,000)

(C) Renovate and expand Lebanon County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(D) Renovate and expand Lebanon County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

20130SB0680PN1329 - 131 -

123456789

101112131415161718192021222324252627282930

Page 132:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(xi) Lehigh County(A) Construct new vehicle wash building

at Lehigh County Maintenance GarageProject Allocation 690,000(Base Project Allocation - $600,000)(Design & Contingencies - $90,000)

(B) Renovate and expand Lehigh County Maintenance Garage to upgrade building systems and improve program requirements and energy efficiencyProject Allocation 1,150,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $150,000)

(C) Construction of new salt storage building at Lehigh County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(D) Renovate and expand District Office 5-0, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(E) Renovate and expand Lehigh County Maintenance Facility, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 1,500,000

20130SB0680PN1329 - 132 -

123456789

101112131415161718192021222324252627282930

Page 133:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,275,000)(Design & Contingencies - $225,000)

(xii) Luzerne County(A) Develop new stockpile facility,

including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(B) Construct new salt storage buildings at Luzerne County Maintenance FacilityProject Allocation 850,000(Base Project Allocation - $730,000)(Design & Contingencies - $120,000)

(C) Construct new bay storage buildings with overhead doors at Luzerne County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(D) Construct new county metal storage building at Luzerne County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(E) Construct seven new salt storage buildings and site work at various stockpiles at Luzerne County Stockpile

20130SB0680PN1329 - 133 -

123456789

101112131415161718192021222324252627282930

Page 134:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FacilityProject Allocation 2,800,000(Base Project Allocation - $2,450,000)(Design & Contingencies - $350,000)

(F) Renovate and expand Rest Site 39, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(G) Renovate and expand Rest Site 53, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,050,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $50,000)

(H) Renovate and expand Rest Site 54, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,050,000(Base Project Allocation - $1,000,000)(Design & Contingencies - $50,000)

(xii.1) Lycoming County(A) Demolish and construct new storage

20130SB0680PN1329 - 134 -

123456789

101112131415161718192021222324252627282930

Page 135:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

buildings and site work at various stockpiles at Lycoming County Stockpile FacilityProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(B) Renovate and expand current District Office 3-0, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(C) Renovate and expand Lycoming County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(xii.2) McKean County(A) Construct new salt storage buildings

at McKean County Stockpile FacilityProject Allocation 700,000(Base Project Allocation - $650,000)(Design & Contingencies - $50,000)

(B) Renovate and expand McKean County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000

20130SB0680PN1329 - 135 -

123456789

101112131415161718192021222324252627282930

Page 136:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(xii.3) Mercer County(A) Develop new maintenance garage,

including site purchase, design and construction at Mercer County Maintenance GarageProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(B) Renovate and expand Rest Site 17, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(C) Renovate and expand Rest Site 18, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(D) Construct new county maintenance garage, including salt storage buildings, auxiliary buildings, site work and acquisition of site at Mercer

20130SB0680PN1329 - 136 -

123456789

101112131415161718192021222324252627282930

Page 137:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

County Maintenance GarageProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(E) Demolish and construct new storage buildings and site work at various stock piles at Mercer County Stockpile FacilityProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(F) Renovate and expand Mercer County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(xii.4) Mifflin County(A) Renovate and expand Mifflin County

Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000

20130SB0680PN1329 - 137 -

123456789

101112131415161718192021222324252627282930

Page 138:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(xii.5) Monroe County(A) Construct new salt storage building,

auxiliary buildings, site work and land acquisition at Monroe County Maintenance FacilityProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(B) Renovate and expand current Monroe County Welcome Center, including roof replacement and building systems upgradeProject Allocation 3,000,000(Base Project Allocation - $2,550,000)(Design & Contingencies - $450,000)

(C) Renovate and expand Rest Site 41, including roof replacement, building systems upgrade, program requirements improvement, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(D) Renovate and expand Monroe County Maintenance Facility, including roof

20130SB0680PN1329 - 138 -

123456789

101112131415161718192021222324252627282930

Page 139:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

replacement, building systems upgrades and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(xiii) Montgomery County(A) Renovate Montgomery County District

Office by designing and constructing dry chemical fire protection system for TCC and all server roomsProject Allocation 440,000(Base Project Allocation - $400,000)(Design & Contingencies - $40,000)

(B) Construct new garage parking deck at Montgomery County District OfficeProject Allocation 3,300,000(Base Project Allocation - $3,000,000)(Design & Contingencies - $300,000)

(C) Renovate and expand Montgomery County Maintenance Garage to upgrade building systems and improve program requirements and energy efficiencyProject Allocation 825,000(Base Program Allocation - $750,000)(Design & Contingencies - $75,000)

(D) Renovate and expand District 6-0 District Office to bring building into code compliance, upgrade buildings systems and improve program requirements and energy efficiency

20130SB0680PN1329 - 139 -

123456789

101112131415161718192021222324252627282930

Page 140:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,200,000(Base Project Allocation - $2,000,000)(Design & Contingencies - $200,000)

(E) Construction of new salt storage buildings and site work at Montgomery County Maintenance FacilityProject Allocation 2,000,000(Base Project Allocation - $1,750,000)(Design & Contingencies - $250,000)

(F) Renovate and expand Montgomery County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(G) Renovate and expand Montgomery County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 1,500,000(Base Project Allocation - $1,275,000)(Design & Contingencies - $225,000)

(xiii.1) Montour County(A) Demolish and construct new storage

buildings and site work at various stockpiles at Montour County Stockpile Facility

20130SB0680PN1329 - 140 -

123456789

101112131415161718192021222324252627282930

Page 141:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(B) Renovate and expand Rest Site 35, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(C) Renovate and expand Rest Site 36, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(xiii.2) Northampton County(A) Construct new salt storage buildings,

auxiliary buildings, site work and land acquisition at Northampton County Maintenance FacilityProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(B) Renovate and expand current

20130SB0680PN1329 - 141 -

123456789

101112131415161718192021222324252627282930

Page 142:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Northampton County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(C) Construct new salt storage building and site work at Northampton County Maintenance GarageProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(xiii.3) Northumberland County(A) Demolish and construct new storage

buildings and site work at various stockpiles at Northumberland County Stockpile FacilityProject Allocation 1,600,000(Base Project Allocation - $1,400,000)(Design & Contingencies - $200,000)

(B) Construct new maintenance garage, including salt storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(C) Renovate and expand Northumberland

20130SB0680PN1329 - 142 -

123456789

101112131415161718192021222324252627282930

Page 143:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(xiv) Perry County(A) Develop new stockpile facility in

Perry County, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(B) Demolish and construct new salt storage buildings and site work at various stockpilesProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(C) Develop new stockpile, including site purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(xiv.1) Philadelphia County(A) Construction of new salt storage

building at Philadelphia County

20130SB0680PN1329 - 143 -

123456789

101112131415161718192021222324252627282930

Page 144:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Maintenance FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(B) Renovate and expand Philadelphia County Maintenance Facility, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(C) Demolish and construct new salt storage building and site work at Philadelphia County Maintenance FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(D) Renovate and expand Philadelphia County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(xiv.2) Pike County(A) Construct new salt storage building

and site work at Pike County

20130SB0680PN1329 - 144 -

123456789

101112131415161718192021222324252627282930

Page 145:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Maintenance FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(B) Renovate and expand Welcome Center Site K, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(C) Renovate and expand Rest Site 61, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(D) Renovate and expand Rest Site 62, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(E) Removal and roof replacement system at maintenance facility at Pike County

20130SB0680PN1329 - 145 -

123456789

101112131415161718192021222324252627282930

Page 146:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Welcome CenterProject Allocation 650,000(Base Project Allocation - $600,000)(Design & Contingencies - $50,000)

(xiv.3) Potter County(A) Renovate and expand current Potter

County Maintenance GarageProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(B) Demolish and construct two new storage buildings and site work at Potter County Stockpile FacilityProject Allocation 1,050,000(Base Project Allocation - $900,000)(Design & Contingencies - $150,000)

(xv) Schuylkill County(A) Renovate and expand Schuylkill County

Maintenance Garage to upgrade building systems and improve program requirements and energy efficiencyProject Allocation 1,150,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $150,000)

(B) Renovate and expand current Schuylkill County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 1,500,000(Base Project Allocation - $1,275,000)

20130SB0680PN1329 - 146 -

123456789

101112131415161718192021222324252627282930

Page 147:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $225,000)(C) Construct new salt storage building

and site work at Schuylkill County Maintenance FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(D) Renovate and expand Schuylkill County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(xv.1) Snyder County(A) Demolish and construct new storage

buildings and site work at various stockpiles at Snyder County Stockpile FacilityProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(B) Renovate and expand Snyder County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades

20130SB0680PN1329 - 147 -

123456789

101112131415161718192021222324252627282930

Page 148:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(xv.2) Somerset County(A) Demolish and construct new salt

storage buildings and site work at Somerset County Maintenance StockpileProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(B) Develop new stockpile, including site purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(C) Renovate and expand Somerset County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(D) Renovate and expand current drivers license center, including roof replacement, building systems upgrade, program requirements improvement, sidewalks, curbing, step replacement and parking lot upgrades.Project Allocation 1,400,000

20130SB0680PN1329 - 148 -

123456789

101112131415161718192021222324252627282930

Page 149:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(xv.3) Sullivan County(A) Renovate and expand current Sullivan

County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 1,500,000(Base Project Allocation - $1,275,000)(Design & Contingencies - $225,000)

(B) Demolish and construct two new storage buildings and site work at various stockpiles at Sullivan County Stockpile FacilityProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(xv.4) Susquehanna County(A) Renovate and expand current

Susquehanna County Maintenance Facility, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,100,000)(Design & Contingencies - $400,000)

(B) Reskin metal building at Susquehanna County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

20130SB0680PN1329 - 149 -

123456789

101112131415161718192021222324252627282930

Page 150:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(C) Construct new salt storage buildings and site work at various stockpiles at Susquehanna County Maintenance FacilityProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(D) Renovate and expand Rest Site 56, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(E) Renovate and expand Welcome Center Site H, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(xv.5) Tioga County(A) Renovate and expand current Tioga

County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,125,000)

20130SB0680PN1329 - 150 -

123456789

101112131415161718192021222324252627282930

Page 151:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $375,000)(B) Construct new Tioga County

Maintenance Garage, including salt storage buildings, auxiliary buildings, site work and land acquisitionProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(C) Demolish and construct new storage buildings and site work at various stockpiles at Tioga County Stockpile FacilityProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(D) Renovate and expand Welcome Center Site T, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(xv.6) Union County(A) Renovate and expand current Union

County Maintenance Garage, including roof replacement and building systems

20130SB0680PN1329 - 151 -

123456789

101112131415161718192021222324252627282930

Page 152:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

upgradeProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(B) Demolish and construct new storage buildings and site work at various stockpiles at Union County Stockpile FacilityProject Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(xv.7) Venango County(A) Construct new county maintenance

garage, including salt storage buildings, auxiliary buildings, site work and acquisition of land at Venango County Maintenance GarageProject Allocation 15,000,000(Base Project Allocation -

$11,750,000)(Land Allocation - $1,000,000)(Design & Contingencies - $2,250,000)

(B) Construct parking lot at District Office 1-0Project Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(C) Demolish and construct new storage building and site work at Venango County Stockpile Facility

20130SB0680PN1329 - 152 -

123456789

101112131415161718192021222324252627282930

Page 153:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 400,000(Base Project Allocation - $350,000)(Design & Contingencies - $50,000)

(D) Renovate and expand Rest Site 21, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plan upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(E) Renovate and expand Rest Site 22, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plan upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(F) Renovate and expand current Venango County District Office, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(G) Renovate and expand Venango County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step

20130SB0680PN1329 - 153 -

123456789

101112131415161718192021222324252627282930

Page 154:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

replacement, parking lot upgrades and sewage plan upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(xv.8) Warren County(A) Demolish and construct new storage

buildings and site work at various stock piles at Warren County Stockpile FacilityProject Allocation 1,800,000(Base Project Allocation - $1,550,000)(Design & Contingencies - $250,000)

(B) Renovate and expand Warren County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plan upgradesProject Allocation 1,400,000(Base Project Allocation - $1,250,000)(Design & Contingencies - $150,000)

(C) Renovate and expand Warren County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvementProject Allocation 2,500,000(Base Project Allocation - $2,125,000)(Design & Contingencies - $375,000)

(xvi) Washington County

20130SB0680PN1329 - 154 -

123456789

101112131415161718192021222324252627282930

Page 155:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Develop new stockpile facility, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(B) Develop new stockpile facility at Atlasburg, including site purchase, design and constructionProject Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(C) Demolish and construct new salt storage buildings and site work at Washington County Maintenance StockpileProject Allocation 1,200,000(Base Project Allocation - $1,050,000)(Design & Contingencies - $150,000)

(D) Renovate and expand Welcome Center Site A, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plan upgradesProject Allocation 2,500,000(Base Project Allocation - $2,200,000)(Design & Contingencies - $300,000)

(xvi.1) Wayne County

20130SB0680PN1329 - 155 -

123456789

101112131415161718192021222324252627282930

Page 156:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Renovate and expand current Wayne County Maintenance Facility, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,100,000)(Design & Contingencies - $400,000)

(B) Reskin metal building at Wayne County Maintenance FacilityProject Allocation 350,000(Base Project Allocation - $300,000)(Design & Contingencies - $50,000)

(C) Construct new salt storage buildings and site work at various stockpiles at Wayne County Maintenance FacilityProject Allocation 800,000(Base Project Allocation - $700,000)(Design & Contingencies - $100,000)

(xvi.2) Westmoreland County(A) Construct new salt storage building

at Westmoreland County Maintenance FacilityProject Allocation 400,000(Base Project Allocation - $380,000)(Design & Contingencies - $20,000)

(B) Construct retaining wall at Latrobe StockpileProject Allocation 325,000(Base Project Allocation - $300,000)(Design & Contingencies - $25,000)

20130SB0680PN1329 - 156 -

123456789

101112131415161718192021222324252627282930

Page 157:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(C) Purchase additional property for expansion of Westmoreland County Maintenance GarageProject Allocation 1,000,000(Land Allocation - $1,000,000)

(D) Rehabilitate and expand 12-5 Maintenance Facility, including infrastructureProject Allocation 3,000,000(Base Project Allocation - $2,650,000)(Design & Contingencies - $350,000)

(E) Demolish and construct new salt storage buildings and site work at Westmoreland County Maintenance StockpileProject Allocation 2,400,000(Base Project Allocation - $2,100,000)(Design & Contingencies - $300,000)

(xvi.3) Wyoming County(A) Renovate and expand current Wyoming

County Maintenance Facility, including roof replacement and building systems upgradeProject Allocation 2,500,000(Base Project Allocation - $2,100,000)(Design & Contingencies - $400,000)

(xvii) York County(A) Develop a new stockpile facility,

including site purchase, design and construction

20130SB0680PN1329 - 157 -

123456789

101112131415161718192021222324252627282930

Page 158:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,220,000(Base Project Allocation - $2,000,000)(Land Allocation - $20,000)(Design & Contingencies - $200,000)

(B) Construct new vehicle wash building at York County Maintenance GarageProject Allocation 690,000(Base Project Allocation - $600,000)(Design & Contingencies - $90,000)

(C) Develop new maintenance garage, including site purchase, design and constructionProject Allocation 5,000,000(Base Project Allocation - $3,000,000)(Land Allocation - $1,500,000)(Design & Contingencies - $500,000)

(D) Renovate and expand current York County Maintenance Garage, including roof replacement and building systems upgradeProject Allocation 2,000,000(Base Project Allocation - $1,700,000)(Design & Contingencies - $300,000)

(E) Demolish and construct new salt storage buildings and site work at York County Maintenance StockpileProject Allocation 3,200,000(Base Project Allocation - $2,800,000)(Design & Contingencies - $400,000)

(F) Develop new stockpile, including site

20130SB0680PN1329 - 158 -

123456789

101112131415161718192021222324252627282930

Page 159:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

purchase, design and constructionProject Allocation 3,000,000(Base Project Allocation - $1,750,000)(Land Allocation - $750,000)(Design & Contingencies - $500,000)

(G) Construct new welcome center, including auxiliary buildings, site work and site acquisitionProject Allocation 10,000,000(Base Project Allocation - $7,500,000)(Land Allocation - $1,000,000)(Design & Contingencies - $1,500,000)

(H) Renovate and expand Welcome Center Site J, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plan upgradesProject Allocation 2,000,000(Base Project Allocation - $1,800,000)(Design & Contingencies - $200,000)

(xviii) Montgomery and Philadelphia Counties(A) City Avenue Special Services

District. Construction, infrastructure improvements and other related costs on City Avenue for pedestrian and vehicular hazard mitigation and storm water management in Lower Merion and the City of PhiladelphiaProject Allocation 10,000,000(Base Project Allocation -

20130SB0680PN1329 - 159 -

123456789

101112131415161718192021222324252627282930

Page 160:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$10,000,000)(b) Port projects.--Additional capital projects in the

category of improvement projects for ports to be constructed or acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal ProjectAllocation

(1) Erie County(i) Erie Inland Port

(A) Construct rail improvements and ship loading infrastructure at the Port of ErieProject Allocation 9,000,000(Base Project Allocation - $9,000,000)

(B) Construct rail improvements and replace rail bridge at Erie Inland Port-Albion siteProject Allocation 12,000,000(Base Project Allocation -

$12,000,000)Section 4. Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successor or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

20130SB0680PN1329 - 160 -

123456789

101112131415161718192021222324252627282930

Page 161:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

ProjectTotal ProjectAllocation

(1) Department of Conservation and Natural Resources(i) Kinzua Bridge State Park

(A) Original furniture and equipment for new office/visitor center for public and staff useProject Allocation 3,000,000(Base Project Allocation - $2,400,000)(Design & Contingencies - $600,000)

(ii) Ohiopyle State Park(A) Original furniture and equipment for

Project DGS 166-9, Ohiopyle State Park Visitors' CenterProject Allocation 220,000(Base Project Allocation - $220,000)

(iii) S. B. Elliott State Park(A) Additional funding for purchase of

exhibits, furnishings and equipment for visitor center and overnight facilitiesProject Allocation 3,500,000(Base Project Allocation - $2,800,000)(Design & Contingencies - $700,000)

(iv) Sinnemahoning State Park(A) Purchase of exhibits, furnishings and

equipment for visitor center and officeProject Allocation 2,000,000

20130SB0680PN1329 - 161 -

123456789

101112131415161718192021222324252627282930

Page 162:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,600,000)(Design & Contingencies - $400,000)

(2) Department of Education(i) Lincoln University

(A) Original furniture and equipment associated with renovation of Center for the Study of Black CultureProject Allocation 4,000,000(Base Project Allocation - $3,200,000)(Design & Contingencies - $800,000)

(B) Provide necessary furniture and equipment associated with renovation of Alumni HouseProject Allocation 5,000,000(Base Project Allocation - $4,000,000)(Design & Contingencies - $1,000,000)

(ii) Temple University(A) Original furniture and equipment

associated with renovation of Tomlinson HallProject Allocation 450,000(Base Project Allocation - $360,000)(Design & Contingencies - $90,000)

(B) Original furniture and equipment associated with design and construction of Center for ScholarsProject Allocation 300,000(Base Project Allocation - $300,000)

(iii) Thaddeus Stevens College of Technology(A) Original furniture and equipment

20130SB0680PN1329 - 162 -

123456789

101112131415161718192021222324252627282930

Page 163:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

associated with design and construction of technology centerProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iv) The Pennsylvania State University(A) Original furniture and equipment for

state-of-the-art research and teaching space for College of Liberal ArtsProject Allocation 8,100,000(Base Project Allocation - $8,100,000)

(B) Original furniture and equipment for building entrance and security systems project, including key access boxes and video surveillance camerasProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(C) Original furniture and equipment for chilled water expansion project for University Park campusProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(D) Original furniture and equipment for new classroom/class lab building at University Park campusProject Allocation 7,700,000(Base Project Allocation - $7,700,000)

(E) Additional funding for furniture and equipment for computer building at University Park campusProject Allocation 1,500,000

20130SB0680PN1329 - 163 -

123456789

101112131415161718192021222324252627282930

Page 164:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,500,000)(F) Original furniture and equipment for

general computing Tier III data centerProject Allocation 13,000,000(Base Project Allocation -

$13,000,000)(G) Additional funding for furniture and

equipment for Henning BuildingProject Allocation 2,250,000(Base Project Allocation - $2,250,000)

(H) Capital renewal for Kostos BuildingProject Allocation 1,800,000(Base Project Allocation - $1,800,000)

(I) Capital renewal for Baker Engineering & Science BuildingProject Allocation 1,400,000(Base Project Allocation - $1,400,000)

(J) Original furniture and equipment for new Recital Hall addition and Music IProject Allocation 3,300,000(Base Project Allocation - $3,300,000)

(K) Original furniture and equipment for Ruhl Student/Community Center and multipurpose building upgradesProject Allocation 1,600,000(Base Project Allocation - $1,600,000)

(L) Original furniture and equipment for Student Union Building at BrandywineProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

20130SB0680PN1329 - 164 -

<--

123456789

101112131415161718192021222324252627282930

Page 165:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(M) Capital renewal for waste water treatment plant located at University Park campusProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(N) Additional funding for furniture and equipment for water treatment plant located at University Park campusProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(O) Original furniture and equipment for Pattee Library Knowledge Commons at University ParkProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(P) Provide for necessary furniture and equipment associated with design and construction of Milton S. Hershey Data CenterProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

(Q) ORIGINAL FURNITURE AND EQUIPMENT FOR STATE-OF-THE-ART RESEARCH AND TEACHING SPACE FOR COLLEGE OF AGRICULTURAL SCIENCES.PROJECT ALLOCATION 12,000,000(BASE PROJECT ALLOCATION -

$12,000,000)(2.1) Department of General Services

(i) Family Court Complex, Philadelphia

20130SB0680PN1329 - 165 -

<--

123456789

101112131415161718192021222324252627282930

Page 166:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Provide the necessary furniture and equipment associated with construction of Family Court Complex in PhiladelphiaProject Allocation 22,000,000(Base Project Allocation -

$22,000,000)(3) Pennsylvania Historical and Museum

Commission(i) Landis Valley Village and Museum

(A) Original furniture and equipment for new visitor centerProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(ii) Railroad Museum of Pennsylvania(A) Original equipment for new rolling

stock storage facilityProject Allocation 1,200,000(Base Project Allocation - $1,200,000)

(iii) Southeastern Veterans Center, Chester County(A) Provide original furniture and

equipment to fully equip new maintenance buildingProject Allocation 200,000(Base Project Allocation - $200,000)

(4) State System of Higher Education(i) Bloomsburg University

(A) Original furniture and equipment associated with renovation of

20130SB0680PN1329 - 166 -

123456789

101112131415161718192021222324252627282930

Page 167:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

McCormick CenterProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) California University of Pennsylvania(A) Original furniture and equipment

associated with renovation of Coover HallProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Original furniture and equipment associated with renovation of South Hall and Old MainProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(iii) Cheyney University(A) Original furniture and equipment

associated with renovation of Cope HallProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iv) Clarion University(A) Original furniture and equipment

associated with renovation of Marwick-Boyd Fine Arts CenterProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(v) East Stroudsburg University(A) Original furniture and equipment

associated with construction of Information Commons

20130SB0680PN1329 - 167 -

123456789

101112131415161718192021222324252627282930

Page 168:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(VI) EDINBORO UNIVERSITY(A) ORIGINAL FURNITURE AND EQUIPMENT

ASSOCIATED WITH RENOVATION AND ADDITION OF PORRECO CENTERPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(vi) (VII) Indiana University of Pennsylvania(A) Original furniture and equipment

associated with renovation of Stapleton/Stabley LibraryProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Provide for necessary furniture and equipment associated with renovation of Weyant/Walsh HallsProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vii) (VIII) Kutztown University(A) Original furniture and equipment

associated with renovation of Lytle HallProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Original furniture and equipment associated with renovation of Poplar HouseProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

20130SB0680PN1329 - 168 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 169:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(viii) (IX) Mansfield University(A) Original furniture and equipment

associated with construction of new student housingProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ix) (X) Slippery Rock University(A) Original furniture and equipment

associated with renovation of Student Success CenterProject Allocation 2,800,000(Base Project Allocation - $2,800,000)

Section 5. Itemization of transportation assistance projects.(a) Mass transit.--Additional capital projects in the

category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

ProjectTotal ProjectAllocation

(1) ADAMS COUNTY TRANSIT AUTHORITY(I) DESIGN, CONSTRUCTION AND OTHER RELATED

COSTS FOR MULTIMODAL TRANSPORTATION FACILITY FOR FREEDOM TRANSIT, ACTA PARA-TRANSIT, INTERCITY BUSES, AUTOMOBILES AND BICYCLES TO PROVIDE OFF-STREET PARKING FOR BOTH PUBLIC AND PRIVATE USERS, AS WELL AS TO ACCOMMODATE OVERFLOW PARKING FROM THE GETTYSBURG NATIONAL MILITARY PARK, BOROUGH

20130SB0680PN1329 - 169 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 170:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

OF GETTYSBURGPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(1) (1.1) Allegheny County(i) High-density redevelopment at new and

existing transit stops along proposed Bus Rapid Transit Route and Lightrail and Busway stops in City of Pittsburgh

Project Allocation 20,000,000(Base Project Allocation -

$20,000,000)(II) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MULTIMODAL PUBLIC TRANSPORTATION FACILITY

PROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(2) Area Transportation Authority(i) Provide for facility and facility

upgrades, including mobility management center, terminals, fuel storage, parking lots, fueling depots, roof replacement and miscellaneous equipment

Project Allocation 2,253,000(Base Project Allocation - $2,028,000)(Design & Contingencies - $225,000)

(ii) Upgrade and renovate Dubois facility to bring to state of good repair

Project Allocation 959,000(Base Project Allocation - $863,000)

20130SB0680PN1329 - 170 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 171:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $96,000)(iii) Construct terminals

Project Allocation 1,162,000(Base Project Allocation - $1,162,000)

(iv) Mobility Management Center, to match discretionary Federal capital funding to rehabilitate infrastructure throughout system

Project Allocation 1,066,000(Base Project Allocation - $959,000)(Design & Contingencies - $107,000)

(v) Bus Purchase Program, provide for replacement of buses that have exceeded their useful life

Project Allocation 2,464,000(Base Project Allocation - $2,218,000)(Design & Contingencies - $246,000)

(2.1) BEAVER COUNTY TRANSIT AUTHORITY(I) CONSTRUCTION, INFRASTRUCTURE AND OTHER

RELATED COSTS FOR NATURAL GAS FUELING STATION IN CENTER TOWNSHIP

PROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(3) Butler Transit Authority(i) Expand Cranberry Area Park and Ride

Facility on Route 528 near I-79, Butler County, including property acquisition and construction

Project Allocation 450,000(Base Project Allocation - $405,000)

20130SB0680PN1329 - 171 -

<--

123456789

101112131415161718192021222324252627282930

Page 172:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $45,000)(ii) Provide for infrastructure improvements,

facility upgrades for bus storage and maintenance areas, construction of public waiting area, training room, park and ride facility and compressed natural gas (CNG) refueling station and purchase of four 45-foot Coach CNG buses.

Project Allocation 1,700,000(Base Project Allocation - $1,700,000)

(4) Cambria County Transit Authority(i) Replace transit facility in Johnstown to

meet current standards and requirementsProject Allocation 2,419,000(Base Project Allocation - $2,177,000)(Design & Contingencies - $242,000)

(ii) Construct transit facilityProject Allocation 3,871,000(Base Project Allocation - $3,871,000)

(iii) Construction and infrastructure improvements for new facility and bus replacement projects for Camtran

Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(iv) Replace track ties and other improvements

Project Allocation 271,000(Base Project Allocation - $244,000)(Design & Contingencies - $27,000)

(v) Replace fare collection system

20130SB0680PN1329 - 172 -

123456789

101112131415161718192021222324252627282930

Page 173:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 78,000(Base Project Allocation - $70,000)(Design & Contingencies - $8,000)

(5) Capital Area Transit Authority(i) Replace CAT's transit facility to meet

modern requirementsProject Allocation 7,742,000(Base Project Allocation - $6,968,000)(Design & Contingencies - $774,000)PROJECT ALLOCATION 47,742,000(BASE PROJECT ALLOCATION -

$42,968,000)(DESIGN & CONTINGENCIES - $4,774,000)

(ii) Upgrade transportation technology for vehicle monitoring and real-time information for CAT's transit operations

Project Allocation 1,935,000(Base Project Allocation - $1,742,000)(Design & Contingencies - $193,000)

(6) Centre Area Transportation Authority(i) Expand CATA's maintenance and bus storage

areasProject Allocation 968,000(Base Project Allocation - $871,000)(Design & Contingencies - $97,000)

(ii) Acquisition of replacement busesProject Allocation 1,600,000(Base Project Allocation - $1,600,000)

(iii) Rehabilitate or replace various facilities and infrastructure

20130SB0680PN1329 - 173 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 174:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 30,000,000(Base Project Allocation -

$24,000,000)(Design & Contingencies - $6,000,000)

(iv) Acquisition of compressed natural gas (CNG) buses

Project Allocation 5,700,000(Base Project Allocation - $5,700,000)

(7) County of Lackawanna Transit System(i) Acquisition, construction, infrastructure

and other costs related to compressed natural gas fueling station and maintenance facility

Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(ii) Acquisition, construction, infrastructure and other costs related to intermodal transportation center

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(8) Crawford Area Transportation Authority(i) Construct steel structure sheltered bus

storage facility and wash bay for bus fleet

Project Allocation 387,000(Base Project Allocation - $348,000)(Design & Contingencies - $39,000)

(9) Erie Metropolitan Transit Authority(i) Construct new operations facility,

including infrastructure

20130SB0680PN1329 - 174 -

123456789

101112131415161718192021222324252627282930

Page 175:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,796,000(Base Project Allocation - $1,616,000)(Design & Contingencies - $180,000)

(9.1) Lebanon Transit(i) Rehabilitate building and grounds,

including maintenance garage roofProject Allocation 406,000(Base Project Allocation - $365,000)(Design & Contingencies - $41,000)

(10) Lehigh and Northampton Transportation Authority(i) Construct new operations facility,

including infrastructure at Allentown operating facility

Project Allocation 2,517,000(Base Project Allocation - $2,265,000)(Design & Contingencies - $252,000)

(ii) Transit vehicle purchase, provide funding for purchase of transit buses

Project Allocation 1,646,000(Base Project Allocation - $1,481,000)(Design & Contingencies - $165,000)

(10.1) LYCOMING COUNTY(I) CONSTRUCTION, INFRASTRUCTURE AND OTHER

RELATED COSTS FOR REPLACING EXISTING CAST IN PLACE CULVERT WHICH CARRIES LAWSHEE RUN UNDER SEVERAL BOROUGH STREETS AND SIDEWALKS, INCLUDING REPAIRS TO STREETS AND REPLACEMENT OF SIDEWALKS IN JERSEY SHORE BOROUGH

20130SB0680PN1329 - 175 -

<--

123456789

101112131415161718192021222324252627282930

Page 176:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 2,800,000(BASE PROJECT ALLOCATION - $2,800,000)

(11) Mid-County Transit Authority(i) Construct bus storage facility

Project Allocation 215,000(Base Project Allocation - $215,000)

(12) Mid Mon Valley Transit Authority(i) Rehabilitate bus storage, phase II,

including construction to rehabilitate existing bus storage, administration and passenger areas at Donora transit facility

Project Allocation 1,160,000(Base Project Allocation - $1,044,000)(Design & Contingencies - $116,000)

(ii) Construct Donora Phase II projectProject Allocation 965,000(Base Project Allocation - $965,000)

(iii) Replace revenue rolling stock that has outlived its useful life as part of Phase II of rehabilitation of Donora Transit Facility

Project Allocation 364,000(Base Project Allocation - $328,000)(Design & Contingencies - $36,000)

(13) Monroe County Transit Agency(i) Construct new bus storage facility and

staging areaProject Allocation 968,000(Base Project Allocation - $871,000)(Design & Contingencies - $97,000)

20130SB0680PN1329 - 176 -

123456789

101112131415161718192021222324252627282930

Page 177:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(14) Montgomery County(i) Construction, infrastructure improvements

and other costs related to expansion of Ardmore Train Station transit and parking improvements project

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)(14.1) NORTHAMPTON COUNTY

(I) INSTALLATION OF TRAFFIC LIGHT AT INTERSECTION OF POLK VALLEY ROAD AND ROUTE 412 IN LOWER SAUCON TOWNSHIP

PROJECT ALLOCATION 450,000(BASE PROJECT ALLOCATION - $450,000)

(15) Philadelphia County(i) Infrastructure improvements, including

equipment upgrades for Phlash Trolley fleet

Project Allocation 235,000(Base Project Allocation - $235,000)

(16) Port Authority of Allegheny County(i) FY 2011-2012 Section 5307 Program,

replacement and rehabilitation of major components of bus and fixed guideway system

Project Allocation 7,341,000(Base Project Allocation - $6,607,000)(Design & Contingencies - $734,000)

(ii) FY 2011-2012 Section 5309 Program, replacement and rehabilitation of major

20130SB0680PN1329 - 177 -

<--

123456789

101112131415161718192021222324252627282930

Page 178:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

components within Port Authority's rail and busway system, including North Shore Connector project

Project Allocation 6,000,000(Base Project Allocation - $5,400,000)(Design & Contingencies - $600,000)

(iii) FY 2011-2012 Section 5307 Flex Program, to provide funding of replacement buses and standardize bus procurement program

Project Allocation 1,493,000(Base Project Allocation - 1,344,000)(Design & Contingencies - 149,000)

(iv) FY 2011-2012 Section 5309 Bus and Bus Facilities Program, utilization of bus and bus facilities earmarks to perform various bus upgrades and facility improvements

Project Allocation 1,161,000(Base Project Allocation - $1,045,000)(Design & Contingencies - $116,000)

(v) Infrastructure Safety Renewal Program, to restore PAAC's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 16,000,000(Base Project Allocation -

$14,400,000)(Design & Contingencies - $1,600,000)

(vi) Vehicle Overhaul ProgramProject Allocation 7,419,000(Base Project Allocation - $6,678,000)

20130SB0680PN1329 - 178 -

123456789

101112131415161718192021222324252627282930

Page 179:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $741,000)(vii) FY 2011-2012 Section 5307 Program, for

replacement and rehabilitation of major components of bus and fixed guideway system

Project Allocation 13,706,000(Base Project Allocation -

$12,335,000)(Design & Contingencies - $1,371,000)

(viii) FY 2011-2012 Section 5309 Program, for replacement and rehabilitation of major components within Port Authority's rail and busway system to ensure safety and reliability, including North Shore Connector project

Project Allocation 11,756,000(Base Project Allocation -

$10,580,000)(Design & Contingencies - $1,176,000)

(ix) FY 2011-2012 Section 5307 Flex Program, to provide funding for match of Federal and local funding

Project Allocation 1,493,000(Base Project Allocation - $1,344,000)(Design & Contingencies - $149,000)

(x) FY 2011-2012 Section 5309 Bus and Bus Facilities Program, to provide for utilization of bus and bus facilities earmarks to perform various bus upgrades and facility improvements

20130SB0680PN1329 - 179 -

123456789

101112131415161718192021222324252627282930

Page 180:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,403,000(Base Project Allocation - $1,263,000)(Design & Contingencies - $140,000)

(xi) Infrastructure Safety Renewal Program, to provide funding to restore PAAC's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 45,484,000(Base Project Allocation -

$41,000,000)(Design & Contingencies - $4,484,000)

(xii) Vehicle Overhaul Program, to provide for PAAC's major overhaul of rolling stock

Project Allocation 5,000,000(Base Project Allocation - $4,500,000)(Design & Contingencies - $500,000)

(xiii) Section 5307 Program, to match discretionary Federal capital and local funding for replacement of major components of bus and fixed guideway systems

Project Allocation 4,723,000(Base Project Allocation - $4,251,000)(Design & Contingencies - $472,000)

(xiv) Section 5309 Program, to match Federal capital funds to replace buses and rehabilitate various facilities and infrastructure

Project Allocation 678,000(Base Project Allocation - $610,000)

20130SB0680PN1329 - 180 -

123456789

101112131415161718192021222324252627282930

Page 181:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $68,000)(xv) Section 5307 Program, to match

discretionary Federal capital funding to purchase 70 replacement buses annually

Project Allocation 1,493,000(Base Project Allocation - $1,344,000)(Design & Contingencies - $149,000)

(xvi) Federal Grant Program, to match discretionary Federal capital and local funding to rehabilitate or replace existing facilities and infrastructure

Project Allocation 5,601,000(Base Project Allocation - $5,041,000)(Design & Contingencies - $560,000)

(16.1) Red Rose Transit Authority(i) Purchase buses, to provide for

replacement of busesProject Allocation 1,887,000(Base Project Allocation - $1,698,000)(Design & Contingencies - $189,000)

(17) River Valley Transit(i) Expand Trade and Transit Center and

Church Street Transportation Intermodal Center

Project Allocation 1,161,000(Base Project Allocation - $1,045,000)(Design & Contingencies - $116,000)

(ii) Expand Trade and Transit CenterProject Allocation 1,459,000(Base Project Allocation - $1,313,000)

20130SB0680PN1329 - 181 -

123456789

101112131415161718192021222324252627282930

Page 182:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $146,000)(iii) Construct compressed natural gas

fueling station and purchase four CNG transit vehicles

Project Allocation 1,042,000(Base Project Allocation - $937,800)(Design & Contingencies - $104,200)

(18) Southeastern Pennsylvania Transportation Authority(i) FFY 2012 Section 5307 Formula Program of

Prospects, including state of good repair, vehicle overhaul, regional rail signal mechanization, system improvements, bus purchase and paratransit vehicle purchase programs

Project Allocation 23,831,000(Base Project Allocation -

$21,448,000)(Design & Contingencies - $2,383,000)

(ii) FFY 2012 Section 5309 Rail Modernization Program, including state of good repair, vehicle overhaul, regional rail signal mechanization, system improvements, transit and regional rail station and station accessibility programs

Project Allocation 24,170,000(Base Project Allocation -

$21,753,000)(Design & Contingencies - $2,417,000)

(iii) FFY 2012 Bus Purchase Program,

20130SB0680PN1329 - 182 -

123456789

101112131415161718192021222324252627282930

Page 183:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

including acquisition and replacement of buses

Project Allocation 4,133,000(Base Project Allocation - $3,720,000)(Design & Contingencies - $413,000)

(iv) FFY 2012 Federal Highway Flex Program, including funds for SEPTA's railroad/highway grade crossings and for CMAQ projects that help meet requirements of the Clean Air Act

Project Allocation 774,000(Base Project Allocation - $697,000)(Design & Contingencies - $77,000)

(v) Federal Competitive Grant Program, to provide for State funds to match Federal capital funding awarded through competitive grant programs

Project Allocation 15,839,000(Base Project Allocation -

$14,255,000)(Design & Contingencies - $1,584,000)

(vi) FY 2012-2013 State of Good Repair Program, to bring transit and railroad facilities to a state of good repair, including communications, track right-of-way, station facilities, environmental concerns and bridges

Project Allocation 24,174,000(Base Project Allocation -

$21,755,000)

20130SB0680PN1329 - 183 -

123456789

101112131415161718192021222324252627282930

Page 184:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $2,419,000)(vii) Infrastructure Safety Renewal Program,

to restore SEPTA's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 31,936,000(Base Project Allocation -

$28,742,000)(Design & Contingencies - $3,194,000)

(viii) FY 2011-2012 Vehicle Overhaul ProgramProject Allocation 53,226,000(Base Project Allocation -

$47,903,000)(Design & Contingencies - $5,323,000)

(ix) FFY 2013 Formula Program of Projects, to provide for SEPTA's State funds to match Federal capital funding to replace buses and rehabilitate various facilities and infrastructure to bring to state of good repair

Project Allocation 23,226,000(Base Project Allocation -

$20,903,000)(Design & Contingencies - $2,323,000)

(x) FFY 2013 Rail Modernization Program, to provide for SEPTA's state of good repair program, vehicle overhaul program, regional rail signal mechanization, system improvements program, transit and regional rail station program and station

20130SB0680PN1329 - 184 -

123456789

101112131415161718192021222324252627282930

Page 185:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

accessibility programProject Allocation 23,226,000(Base Project Allocation -

$20,903,000)(Design & Contingencies - $2,323,000)

(xi) FFY 2013 Bus Purchase Program, to provide for acquisition and replacement of buses for SEPTA services

Project Allocation 4,133,000(Base Project Allocation - $3,720,000)(Design & Contingencies - $413,000)

(xii) Federal Competitive Grant Program, to provide for State funds to match Federal capital funding awarded through competitive grant programs by improving air quality and removing congestion

Project Allocation 17,420,000(Base Project Allocation -

$15,678,000)(Design & Contingencies - $1,742,000)

(xiii) Federal Competitive Clean Fuel Program, to provide for State funds to match discretionary Federal capital funding to replace existing vehicles with clean fuel vehicles to bring to state of good repair

Project Allocation 1,452,000(Base Project Allocation - $1,307,000)(Design & Contingencies - $145,000)

(xiv) FY 2013-2014 Safety Renewal Program, to

20130SB0680PN1329 - 185 -

123456789

101112131415161718192021222324252627282930

Page 186:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair

Project Allocation 33,872,000(Base Project Allocation -

$30,485,000)(Design & Contingencies - $3,387,000)

(xv) FY 2013-2014 State of Good Repair Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair

Project Allocation 19,356,000(Base Project Allocation -

$17,420,000)(Design & Contingencies - $1,936,000)

(xvi) Vehicle Overhaul Program, to provide for SEPTA's 2013-2014 Vehicle Overhaul Program which provides for major overhaul of rolling stock

Project Allocation 53,227,000(Base Project Allocation -

$47,904,000)(Design & Contingencies - $5,323,000)

(xvii) FY 2012-2013 State of Good Repair Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair

Project Allocation 24,194,000

20130SB0680PN1329 - 186 -

123456789

101112131415161718192021222324252627282930

Page 187:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $21,775,000)

(Design & Contingencies - $2,419,000)(xviii) Infrastructure Safety Renewal

Program, to provide for restoration of SEPTA's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 31,936,000(Base Project Allocation -

$28,742,000)(Design & Contingencies - $3,194,000)

(xix) Vehicle Overhaul Program, to provide for SEPTA's 2012-2013 Vehicle Overhaul Program which provides for major overhaul of rolling stock

Project Allocation 53,227,000(Base Project Allocation -

$47,904,000)(Design & Contingencies - $5,323,000)

(xx) FY 2012-2013 Infrastructure Safety Renewal Program, to provide for restoration of SEPTA's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 31,936,000(Base Project Allocation -

$28,742,000)(Design & Contingencies - $3,194,000)

(xxi) Commuter rail expansion project, Phase

20130SB0680PN1329 - 187 -

123456789

101112131415161718192021222324252627282930

Page 188:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

1 -- Elwyn to WawaProject Allocation 16,500,000(Base Project Allocation -

$15,000,000)(Design & Contingencies - $1,500,000)

(xxii) Commuter rail expansion project, Phase 2 -- Wawa to West Chester

Project Allocation 16,500,000(Base Project Allocation -

$15,000,000)(Design & Contingencies - $1,500,000)

(xxiii) Urbanized Area of Formula Program, to match Federal capital funding and to replace buses and rehabilitate various facilities and infrastructure

Project Allocation 47,614,000(Base Project Allocation -

$42,853,000)(Design & Contingencies - $4,761,000)

(xxiv) State of Good Repair Program, to provide for the State of Good Repair Program and Facilities Overhaul Program and to to rehabilitate or replace various facilities and infrastructure

Project Allocation 51,098,000(Base Project Allocation -

$45,988,000)(Design & Contingencies - $5,110,000)

(xxv) Bus and Bus Facilities Program, to match Federal capital funding and replace

20130SB0680PN1329 - 188 -

123456789

101112131415161718192021222324252627282930

Page 189:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

buses and rehabilitate various facilities and infrastructure

Project Allocation 3,484,000(Base Project Allocation - $3,136,000)(Design & Contingencies - $348,000)

(xxvi) Bus Purchase Flex Program, to match Federal funds to replace buses and rehabilitate various facilities and infrastructure

Project Allocation 8,267,000(Base Project Allocation - $7,440,000)(Design & Contingencies - $827,000)

(xxvii) Federal Grant Program, to match discretionary Federal capital funding to rehabilitate or replace existing facilities and infrastructure

Project Allocation 1,452,000(Base Project Allocation - $1,307,000)(Design & Contingencies - $145,000)

(xxviii) Infrastructure Safety Renewal Program, to provide for transit and railroad infrastructure, including maintenance support facilities

Project Allocation 67,744,000(Base Project Allocation -

$60,970,000)(Design & Contingencies - $6,774,000)

(xxix) Fiscal year 2014-2015 State of Good Repair Program, to provide for the State of Good Repair Program and Facilities

20130SB0680PN1329 - 189 -

123456789

101112131415161718192021222324252627282930

Page 190:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Overhaul Program and to rehabilitate or replace various facilities and infrastructure

Project Allocation 19,356,000(Base Project Allocation -

$17,420,000)(Design & Contingencies - $1,936,000)

(xxx) Vehicle Overhaul Program, to provide for fiscal year 2013-2014 Vehicle Overhaul Program

Project Allocation 53,266,000(Base Project Allocation -

$47,903,000)(Design & Contingencies - $5,323,000)

(xxxi) Federal Grant Program, provide State funds to match discretionary Federal capital funding to rehabilitate or replace existing assets

Project Allocation 4,839,000(Base Project Allocation - $4,355,000)(Design & Contingencies - $484,000)

(19) Department of Transportation(i) Vehicle and Capital Equipment Program, to

provide funding match for non-Federal projects for purchase of transit vehicles and other capital equipment and infrastructure

Project Allocation 50,000,000(Base Project Allocation -

$45,000,000)

20130SB0680PN1329 - 190 -

123456789

101112131415161718192021222324252627282930

Page 191:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $5,000,000)(ii) Provide funding for capital improvements

and capital maintenance to Keystone Corridor, including interlockings and stations

Project Allocation 15,000,000(Base Project Allocation -

$13,500,000)(Design & Contingencies - $1,500,000)

(iii) Vehicle and Capital Equipment Program, to provide funding match for Federal projects for purchase of transit vehicles and other capital equipment and infrastructure

Project Allocation 50,000,000(Base Project Allocation -

$45,000,000)(Design & Contingencies - $5,000,000)

(iv) Alternative Fuel Vehicles Program, provide for CNG, equipment and infrastructure to support alternate fuel vehicles for various transit authorities across this Commonwealth

Project Allocation 50,000,000(Base Project Allocation -

$50,000,000)(19.1) Washington City Transit

(i) Improve transit facilities, to provide for purchase of passenger amenities

Project Allocation 58,000

20130SB0680PN1329 - 191 -

123456789

101112131415161718192021222324252627282930

Page 192:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $52,000)(Design & Contingencies - $6,000)

(ii) Purchase equipment, to provide for purchase of new equipment for additional transit staff

Project Allocation 24,000(Base Project Allocation - $22,000)(Design & Contingencies - $2,000)

(20) York County Transportation Authority(i) Renovate transit operations

center/maintenance facilityProject Allocation 8,710,000(Base Project Allocation - $7,839,000)(Design & Contingencies - $871,000)

(ii) Purchase buses, to provide for replacement of fixed-route vehicles

Project Allocation 1,348,000(Base Project Allocation - $1,213,000)(Design & Contingencies - $135,000)

(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal ProjectAllocation

(1) Allegheny County(i) City of Pittsburgh

20130SB0680PN1329 - 192 -

123456789

101112131415161718192021222324252627282930

Page 193:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) High-density redevelopment at new and existing transit stops along proposed Bus Rapid Transit Route and Lightrail and Busway stops in City of PittsburghProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(ii) Three Rivers Marine & Rail Terminals

(A) Rail rehabilitation, including track infrastructure improvements, upgrade

ballast, ties and surface and align tracks for Glassport Terminal rail expansion projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(2) Allegheny, Fayette, Washington and Westmoreland Counties(i) Wheeling & Lake Erie Railroad

(A) Upgrade existing infrastructure and construct new capacity for projected increases in car loadings and new customer development, including engineering, site preparation, grading, rail, ties, ballast, switches, signals, crossings, bridges, tunnels, slope stabilization and other related materialsProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)

20130SB0680PN1329 - 193 -

123456789

101112131415161718192021222324252627282930

Page 194:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(3) Allegheny, Butler and Washington Counties(i) Allegheny Valley Railroad

(A) Rehabilitate and build railroad infrastructure to enhance operational capacity, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, tunnels, crossings, freight yard modification and expansionProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(3.1) Allegheny and Washington Counties(i) Pittsburgh and Ohio Central Railroad

(A) Rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related workProject Allocation 4,900,000(Base Project Allocation - $4,900,000)

(B) Rail construction or rehabilitation, including switches, ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related workProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

20130SB0680PN1329 - 194 -

123456789

101112131415161718192021222324252627282930

Page 195:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(4) Beaver County(i) Aliquippa and Ohio River Railroad

(A) Rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related workProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(B) Rail construction or rail rehabilitation for support of new or existing customers in Beaver CountyProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(5) Berks County(i) City of Reading

(A) Rehabilitation, construction and renovation of rail infrastructure to service Evergreen Community Power site, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail service and any other related costsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

20130SB0680PN1329 - 195 -

123456789

101112131415161718192021222324252627282930

Page 196:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(ii) Colebrookdale Railroad(A) Rehabilitation of historic Civil War

Era railroad, including track improvements, siding extensions, passenger station development, equipment maintenance facility construction and related workProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(A) REHABILITATION OF RAILROAD, INCLUDING

TRACK IMPROVEMENTS, SIDING EXTENSIONS, VISITORS CENTER, EQUIPMENT AND EQUIPMENT MAINTENANCE FACILITY, CONSTRUCTION AND RELATED WORK TO ENHANCE ECONOMIC DEVELOPMENT OPPORTUNITIES AND ENHANCE CORRIDOR FOR FREIGHT TRAFFIC IN BERKS AND MONTGOMERY COUNTIESPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(iii) Richmond Township

(A) Construction of an approximately 3,000 feet, three-track rail spur from Norfolk Southern eastbound mainline between Reading and Allentown to East Penn Manufacturing facility, including track, ties, rail, switches, surface, bridges, road crossing, drainage,

20130SB0680PN1329 - 196 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 197:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

grading and other associated improvements and costsProject Allocation 921,000(Base Project Allocation - $921,000)

(6) Bucks County(i) Fairless Hills

(A) Acquisition, infrastructure, redevelopment, construction and other related costs for Fairless Hills rail expansion project at the Keystone Industrial Port complexProject Allocation 5,750,000(Base Project Allocation - $5,750,000)

(ii) Bucks County Industrial Development Authority(A) Acquisition, infrastructure,

redevelopment, construction and other related costs to extend rail service to Riverside Industrial ParkProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) SMS Rail Lines(A) Expand service to current and future

customers and upgrade rail infrastructure, including land acquisition, engineering, site preparation, rail, ties, undercutting, ballast, sidings, crossings, equipment and other related materialsProject Allocation 4,000,000

20130SB0680PN1329 - 197 -

123456789

101112131415161718192021222324252627282930

Page 198:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $4,000,000)(7) Cambria County

(i) City of Johnstown(A) Rehabilitation, construction and

renovation of rail infrastructure to service an economic development project related to or impacted by Marcellus Shale natural gas production located in the greater Johnstown area, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costsProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ii) County projects

(A) Rehabilitation, construction and renovation of rail infrastructure to service an economic development project related to or impacted by Marcellus Shale natural gas production, located in the greater Johnstown area, including track construction and rebuild, property and

20130SB0680PN1329 - 198 -

123456789

101112131415161718192021222324252627282930

Page 199:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costsProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) REHABILITATION, CONSTRUCTION AND

RENOVATION OF RAIL INFRASTRUCTURE TO SERVE ECONOMIC DEVELOPMENT PROJECTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(7.1) Carbon County

(I) GRAYMONT, INC., PLEASANT GAP(A) RAIL CONSTRUCTION AND REHABILITATION,

INCLUDING GRADING AND FILLING, BALLASTS, SWITCHES, DERAILERS AND RELATED WORK FOR A GRAYMONT, INC., PLEASANT GAP PLANT RAIL EXPANSION PROJECTPROJECT ALLOCATION 2,100,000(BASE PROJECT ALLOCATION - $2,100,000)

(i) (II) Reading Blue Mountain and Northern Railroad(A) Nesquehoning bridge project, Phase 2,

construction of second span over

20130SB0680PN1329 - 199 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 200:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Lehigh River adjacent to existing bridgeProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(7.2) CENTRE COUNTY

(I) TITAN ENERGY PARK(A) RAIL CONSTRUCTION, RAIL SIDINGS,

SWITCHES, BRIDGE REPLACEMENT, SITE UPGRADES, CONNECTOR ROAD, LOADING EQUIPMENT, BUILDING UPGRADES, ACCESS SYSTEMS AND OTHER RELATED COSTS FOR DEVELOPMENT OF CENTRALIZED TRANSLOADING SITEPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(7.2) (7.3) Clinton County(I) Clinton County Solid Waste Authority

(A) Construction and related infrastructure for railroad siding and transloading facility in Wayne TownshipProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(II) Clinton County Economic Partnership(A) Construct siding and loading

facilities for the Wayne Township landfill Henry Street Rail projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

20130SB0680PN1329 - 200 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 201:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(7.3) (7.4) Crawford County(i) Economic Progress Alliance of Crawford

County(A) Infrastructure, construction and

other related costs for development of Keystone Regional Industrial Park rail line, including improvements to existing rail line and construction of new track and turnoutsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(7.4) (7.5) Dauphin County(i) Steelton and Highspire Railroad

(A) Rehabilitation of rail infrastructure to facilitate the efficient and safe movement of raw materials and finished steel products in Dauphin County, including engineering, site preparation, drainage, grading, rails, ties, ballast, switches, crossings, sidings, bridge and pavingProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(7.6) DELAWARE COUNTY(I) DELAWARE COUNTY REDEVELOPMENT AUTHORITY

(A) CONSTRUCTION, ACQUISITION, RAILROAD INFRASTRUCTURE, INCLUDING SUPPORT FACILITIES, AND RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECT IN DELAWARE COUNTY

20130SB0680PN1329 - 201 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 202:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(II) SEPTA MEDIA/ELWYN REGIONAL RAIL

(A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MODERNIZATION OF SECANE REGIONAL RAIL STATIONPROJECT ALLOCATION 13,000,000(BASE PROJECT ALLOCATION -

$13,000,000)(8) Erie County

(i) City of Erie(A) Construct rail improvements and ship

loading infrastructure at the Port of Erie.Project Allocation 9,000,000(Base Project Allocation - $9,000,000)

(B) Construct rail improvements and replace rail bridge at Erie Inland Port-Albion site.Project Allocation 12,000,000(Base Project Allocation -

$12,000,000)(9) Fayette and Westmoreland Counties

(i) Southwest Pennsylvania Railroad Company(A) Rehabilitate and build railroad

infrastructure to enhance operational capacity, including acquisition of land, planning and engineering, rail,

20130SB0680PN1329 - 202 -

123456789

101112131415161718192021222324252627282930

Page 203:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, crossings, freight yard modification and expansionProject Allocation 11,500,000(Base Project Allocation -

$11,500,000)(10) Lackawanna County

(i) Pocono Northeast Regional Railroad Authority(A) Purchase and install ties, ballast,

raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Laurel Line Mainline projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(ii) Pennsylvania Northeast Regional Railroad Authority(A) Purchase and install ties, ballast,

raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Carbondale MainlineProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Purchase and install ties, ballast, raise, line and surface, bridge repairs, tunnel repairs, crossing

20130SB0680PN1329 - 203 -

123456789

101112131415161718192021222324252627282930

Page 204:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

rehabilitation and other related costs for Pocono MainlineProject Allocation 1,250,000(Base Project Allocation - $1,250,000)

(iii) County of Lackawanna Transit System(A) Acquisition, construction,

infrastructure and other costs related to an intermodal transportation centerProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(11) Lancaster County(I) COLUMBIA ECONOMIC DEVELOPMENT CORPORATION

(A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RAILROAD TRACKS, TURNOUTS TO SERVE AS A RAIL YARD, A RUNAROUND TRACK, TRACK REPAIR AND REHABILITATION IN COLUMBIA BOROUGHPROJECT ALLOCATION 733,000(BASE PROJECT ALLOCATION - $733,000)

(II) LANCASTER COUNTY REDEVELOPMENT AUTHORITY(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR RAIL RELOCATION, INCLUDING REMOVAL OF OLD TRACKS, CONSTRUCTION OF NEW SWITCHING TRACK AND REDEVELOPMENT OF OLD TRACK SITE IN LITITZ BOROUGHPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(i) (III) Strasburg Railroad

20130SB0680PN1329 - 204 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 205:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Land acquisition, engineering, rail, ties, ballast, crossings, transload equipment and other related costs for expansion of existing transload terminal and rail infrastructureProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(IV) URBAN OUTFITTERS, INC.(A) REHABILITATION, CONSTRUCTION AND

RENOVATION OF RAIL INFRASTRUCTURE TO SERVICE A DIRECT-TO-CONSUMER DISTRIBUTION CENTER LOCATED IN THE GAP AREA OF LANCASTER COUNTY, INCLUDING TRACK CONSTRUCTION AND REBUILD, PROPERTY AND RIGHT-OF-WAY ACQUISITION, DESIGN, ENGINEERING, PERMITTING, RAILS, TIES, BALLASTS, CROSSINGS, SWITCHES, TURNOUTS, REPAIR OF GRADE CROSSINGS, TRACK AND OTHER REPAIRS AND REBUILDS, CONSTRUCTION OF RAIL STATION AND ANY OTHER RELATED COSTS IN SALISBURY TOWNSHIPPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(12) Lycoming County

(i) Jersey Shore Railroad(A) Rehabilitation of existing yard rail

infrastructure and construction of additional track to increase capacity

20130SB0680PN1329 - 205 -

<--

123456789

101112131415161718192021222324252627282930

Page 206:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

within the yard, including engineering, site preparation, rail, ties, ballast and grade crossingsProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(ii) Williamsport City(A) Track rehabilitation, new

construction and other related costs to provide rail service to NuWeld Corporation facilityProject Allocation 350,000(Base Project Allocation - $350,000)

(13) McKean County(i) American Refining Group

(A) Reconstruct loading areas and rehabilitate existing infrastructure in McKean County to facilitate safe and efficient transfer of products critical to oil refining and petroleum distribution supply chain, including engineering, site preparation, rail, ties, ballast, switches, sidings, crossings, drainage, pipe and related loading equipmentProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii) McKean County Economic Development(A) Acquisition, construction,

rehabilitation, restoration, remediation, maintenance and

20130SB0680PN1329 - 206 -

123456789

101112131415161718192021222324252627282930

Page 207:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure development and improvements for railroad development projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(14) Mifflin County

(i) Mifflin County Industrial Development Authority(A) Infrastructure, rehabilitation,

abatement of hazardous materials and other related costs for remediation of abandoned brownfield site and construction of new railroad infrastructureProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(15) Monroe County(i) Pennsylvania Northeast Regional Railroad

Authority(A) Purchase and install ties, ballast,

raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Pocono MainlineProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(16) Montgomery County(i) Montgomery County

(A) Construction, infrastructure

20130SB0680PN1329 - 207 -

123456789

101112131415161718192021222324252627282930

Page 208:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(II) COLEBROOKDALE RAILROAD

(A) REHABILITATION OF RAILROAD, INCLUDING TRACK IMPROVEMENTS, SIDING EXTENSIONS, VISITORS CENTERS, EQUIPMENT AND EQUIPMENT MAINTENANCE FACILITY, CONSTRUCTION AND RELATED WORK TO ENHANCE ECONOMIC DEVELOPMENT OPPORTUNITIES AND ENHANCE CORRIDOR FOR FREIGHT TRAFFIC IN BERKS AND MONTGOMERY COUNTIESPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(17) Schuylkill County

(i) Greater Tamaqua Industrial Development Enterprise(A) Infrastructure, rehabilitation and

other related costs for Gordon Building rail spur project, including new rail and switchesProject Allocation 140,000(Base Project Allocation - $140,000)

(17.1) SOMERSET COUNTY

20130SB0680PN1329 - 208 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 209:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(I) SOMERSET COUNTY(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR RAIL PROJECTS RELATING TO ECONOMIC DEVELOPMENT PROJECTS IN QUEMAHONING TOWNSHIPPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR RAIL SIDING AND TRANSLOADING FACILITY IN SHADE TOWNSHIPPROJECT ALLOCATION 2,100,000(BASE PROJECT ALLOCATION - $2,100,000)

(18) Washington County(i) Washington County

(A) Acquisition, construction, infrastructure, redevelopment and other costs related to site improvement project at Mon River Industrial Park in Allenport BoroughProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Acquisition, construction,

infrastructure, redevelopment and other costs related to Zediker Station Business Park improvement project in South Strabane TownshipProject Allocation 10,000,000(Base Project Allocation -

20130SB0680PN1329 - 209 -

123456789

101112131415161718192021222324252627282930

Page 210:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$10,000,000)(C) Acquisition, construction,

infrastructure, redevelopment and other costs related to mixed-use business parkProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Acquisition, construction, infrastructure, redevelopment and other costs related to development of pad-ready sites along the I-79 and Route 19 corridorProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) Acquisition, construction, infrastructure, redevelopment and other costs related to locating sites for support companies for natural gas industryProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(F) Acquisition, construction, infrastructure, redevelopment and other costs related to redevelopment of former industrial sites for new and expanding businessesProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, construction, infrastructure, redevelopment and

20130SB0680PN1329 - 210 -

123456789

101112131415161718192021222324252627282930

Page 211:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

other costs related to Mon Valley receiving and loading facility development projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Acquisition, construction, infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business parkProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(I) Acquisition, construction,

infrastructure, redevelopment and other costs related to Skypointe business parkProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(J) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR LOADOUT FACILITY IN CARROLL TOWNSHIPPROJECT ALLOCATION 4,750,000(BASE PROJECT ALLOCATION - $4,750,000)

(19) Westmoreland County(i) Three Rivers Marine and Rail Terminal LP

(A) Infrastructure, rehabilitation, construction and other related costs

20130SB0680PN1329 - 211 -

<--

123456789

101112131415161718192021222324252627282930

Page 212:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

for rail track expansion, including addition of rail switchesProject Allocation 750,000(Base Project Allocation - $750,000)

(ii) Westmoreland County Industrial Development Corporation(A) Infrastructure, construction and

other related costs for Southwest Pennsylvania Railroad rail rehabilitation projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Infrastructure, construction and other related costs for Derry Porcelain Park Redevelopment project, including extension of rail spur service for industrial useProject Allocation 350,000(Base Project Allocation - $350,000)

(III) WESTMORELAND COUNTY(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR RAIL EXPANSION PROJECT IN CITY OF MONESSENPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(20) Wyoming County(i) Procter and Gamble Paper Products Co.,

Mehoopany Plant(A) Rehabilitate rail and existing

infrastructure, including switches,

20130SB0680PN1329 - 212 -

<--

123456789

101112131415161718192021222324252627282930

Page 213:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

signals, ties, ballast, rail, timbers, surfacing and other related materialsProject Allocation 250,000(Base Project Allocation - $250,000)

(21) Multiple Counties(i) D & I Silica, LLC

(A) Improve and expand existing transload sites in Armstrong, Cameron, Elk, Fayette, Luzerne, McKean, Tioga and Warren Counties, including land acquisition, drainage, ditching, rail, ties, ballast, switches, grading, surfacing, gaging, unloading pits, transload equipment, truck staging and road accessProject Allocation 5,500,000(Base Project Allocation - $5,500,000)

(B) Establish new intermodal facilities to transload materials required by natural gas industry in Blair, Bradford, Butler, Centre, Clearfield, Clinton, Crawford, Erie, Indiana, Lawrence, Mercer, Venango, Westmoreland and Wyoming Counties, including land acquisition, site preparation, brush cutting, drainage, ditching, rail, ties, ballast, switches, grading, surfacing, unloading pits, transload equipment, truck staging and road access

20130SB0680PN1329 - 213 -

123456789

101112131415161718192021222324252627282930

Page 214:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ii) SEDA-COG Joint Rail Authority

(A) Railroad bridge upgrades, including load capacity increases in Columbia, Montour, Northumberland, Union, Lycoming, Clinton, Centre, Blair and Mifflin CountiesProject Allocation 2,100,000(Base Project Allocation - $2,100,000)

(B) Nittany & Bald Eagle Railroad yard upgrades and expansion, including construction of railroad tracks in Blair, Centre and Clinton CountiesProject Allocation 2,800,000(Base Project Allocation - $2,800,000)

(C) Shamokin City and yard rehabilitation, including roadbed, crossing surfaces, turnouts and related track workProject Allocation 3,150,000(Base Project Allocation - $3,150,000)

(D) Lycoming Valley Railroad track upgrades and expansion, including construction of new storage tracks between Williamsport, Lycoming County, and South Avis, Clinton CountyProject Allocation 1,260,000(Base Project Allocation - $1,260,000)

20130SB0680PN1329 - 214 -

123456789

101112131415161718192021222324252627282930

Page 215:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(E) Capital upgrades and other safety upgrades to eight railroad bridges in Blair, Centre, Columbia, Lycoming, Mifflin and Northumberland Counties for critical rail service on the Nittany & Bald Eagle, Juniata Valley, Lycoming Valley, North Shore and Shamokin Valley RailroadsProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(iii) North Shore Railroad(A) Retrofitting of diesel locomotives

and other equipment to operate on alternative fuel sources or natural gas, or both, in Lycoming and Northumberland CountiesProject Allocation 750,000(Base Project Allocation - $750,000)

(B) Rehabilitation, infrastructure, construction and other related costs for equipment upgrades, installation of new technology and other upgrades to ensure Federal regulation compliance in Blair, Centre, Clinton, Columbia, Lycoming, Mifflin, Montour and Northumberland CountiesProject Allocation 1,250,000(Base Project Allocation - $1,250,000)

(iv) R. J. Corman Railroad Company(A) Rehabilitation of the rail line known

20130SB0680PN1329 - 215 -

123456789

101112131415161718192021222324252627282930

Page 216:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

as the Clearfield Cluster, located in Cambria, Centre, Clearfield, Clinton, Indiana and Jefferson Counties, including rail bed, ties, rail and other materials to support continued growth of business in these areas and reduction of truck trafficProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(v) Southwest Pennsylvania Railroad

(A) Rehabilitate and build railroad infrastructure to enhance operational capacity in Fayette and Westmoreland Counties, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, crossings, freight yard modification and expansionProject Allocation 11,500,000(Base Project Allocation -

$11,500,000)(vi) Colebrookdale Railroad

(A) Rehabilitation of historic Civil War Era Railroad, including track improvements, siding extensions, passenger station development, equipment maintenance facility

20130SB0680PN1329 - 216 -

<--

123456789

101112131415161718192021222324252627282930

Page 217:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construction and related work, to develop heritage tourism economic opportunities and preserve corridor for future freight traffic in Berks and Montgomery CountiesProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(vii) (VI) Lycoming and Union Counties(A) Construction, rehabilitation,

development of rail infrastructure and other costs relating to extending service through Gregg Township, Union County, to Timber Run Industrial Park in Brady Township, Lycoming CountyProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal ProjectAllocation

(1) Allegheny County(i) Allegheny County Airport Authority

(A) Acquisition, construction, infrastructure and other related costs for aviation, industrial and

20130SB0680PN1329 - 217 -

<--

123456789

101112131415161718192021222324252627282930

Page 218:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

commercial site development and improvements at or surrounding Allegheny County AirportProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(B) Construction, infrastructure

improvements and other costs related to development of de-icing fluid treatment facility at Pittsburgh International AirportProject Allocation 12,500,000(Base Project Allocation -

$12,500,000)(C) Construction, infrastructure

improvements and other costs related to development of Phase III of Clinton Commerce CenterProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(D) Construction, infrastructure

improvements and other costs related to development of business park on site 7 at Pittsburgh International AirportProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(E) Construction, infrastructure improvements and other costs related

20130SB0680PN1329 - 218 -

123456789

101112131415161718192021222324252627282930

Page 219:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

to development of Cherrington Commerce Center Phase IIProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(F) Acquisition, construction,

infrastructure and other related costs for development of industrial and commercial sites at or surrounding Pittsburgh International AirportProject Allocation 50,000,000(Base Project Allocation -

$50,000,000)(2) Armstrong County

(i) McVille Airport(A) Acquisition, infrastructure,

construction and other related costs for expansion of existing facilities and construction of access road, new hangars and helipadProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(2.1) BEAVER COUNTY(I) BEAVER COUNTY AIRPORT AUTHORITY

(A) CONSTRUCTION AND OTHER RELATED COSTS FOR HANGARS AND AN EXTENSION OF RUNWAY IN CHIPPEWA TOWNSHIPPROJECT ALLOCATION 300,000(BASE PROJECT ALLOCATION - $300,000)

(2.2) BEDFORD COUNTY

20130SB0680PN1329 - 219 -

<--

123456789

101112131415161718192021222324252627282930

Page 220:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(I) BEDFORD COUNTY AIRPORT AUTHORITY(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR A HANGAR AND REQUIRED TAXI LANEPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(2.3) BRADFORD COUNTY(I) BRADFORD COUNTY AIRPORT AUTHORITY

(A) CONSTRUCTION AND OTHER RELATED COSTS TO EXTEND RUNWAY AND PARALLEL TAXIWAY IN TOWANDAPROJECT ALLOCATION 4,227,000(BASE PROJECT ALLOCATION - $4,227,000)

(3) Bucks County(i) Bucks County Airport Authority

(A) Infrastructure, construction and other related costs for airport improvements and upgrades at Quakertown Airport, including renovations to existing facilities and paving of parking lot and access roadsProject Allocation 150,000(Base Project Allocation - $150,000)

(B) Infrastructure, construction and other related costs for airport improvements and upgrades at Doylestown Airport, including demolition, infrastructure development and construction of administration building, aircraft storage hangar and aircraft maintenance hangar

20130SB0680PN1329 - 220 -

123456789

101112131415161718192021222324252627282930

Page 221:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(4) Carbon County(i) Carbon County Airport Authority

(A) Construction of airport buildings, including general aviation terminal and snow removal equipment storage and aircraft storage hangarsProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(5) Chester County(i) Chester County Area Airport Authority

(A) Infrastructure, construction and other related costs for Phase I of a hangar development expansion projectProject Allocation 337,000(Base Project Allocation - $337,000)

(6) Crawford County(i) Crawford County Regional Airport

Authority(A) Design, engineer and other related

costs for the construction of field hangarProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Design, engineer, and other related costs for construction of aircraft T hangarsProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

20130SB0680PN1329 - 221 -

123456789

101112131415161718192021222324252627282930

Page 222:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(ii) Titusville Airport Authority(A) Runway expansion

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(7) Lancaster County(i) Lancaster Airport Authority

(A) Site development to include sewer pumping station and extended sewer linesProject Allocation 750,000(Base Project Allocation - $750,000)

(8) LUZERNE COUNTY(I) HAZLETON AIRPORT

(A) ACQUISITION, CONSTRUCTION, REHABILITATION AND OTHER RELATED COSTS FOR HANGARS AND EXPANSION OF RUNWAY AT HAZLETON AIRPORTPROJECT ALLOCATION 300,000(BASE PROJECT ALLOCATION - $300,000)

(8) (9) Lycoming County(i) Williamsport Regional Airport

(A) Design and construction of facility improvements, including directional signage, terminal building, renovations and parkingProject Allocation 3,676,000(Base Project Allocation - $3,676,000)

(B) Demolition of existing terminal building and other associated buildings, construction of new

20130SB0680PN1329 - 222 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 223:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

terminal building and other airport improvementsProject Allocation 11,500,000(Base Project Allocation -

$11,500,000)(9) (10) Somerset County

(i) Somerset County Airport(A) Replacement of existing underground

aviation fuel storage tanks and dispensing unitsProject Allocation 400,000(Base Project Allocation - $400,000)

(B) Construction of permanent location for medical helicopter baseProject Allocation 400,000(Base Project Allocation - $400,000)

(C) Construction of new hangars, improvements to existing hangars and acquisition of existing hangarsProject Allocation 500,000(Base Project Allocation - $500,000)

(10) (11) Snyder County(i) Penn Valley Airport Authority

(A) Acquisition, infrastructure and other related costs for development of aviation industrial parkProject Allocation 750,000(Base Project Allocation - $750,000)

(B) Infrastructure, construction and other related costs for construction

20130SB0680PN1329 - 223 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 224:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

of energy-efficient maintenance facilityProject Allocation 850,000(Base Project Allocation - $850,000)

(11) (12) Washington County(i) Washington County Airport

(A) Acquisition, construction, infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business parkProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ii) Skypointe Business Park

(A) Acquisition, construction, infrastructure, redevelopment and other costs related to Skypointe business parkProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

Section 6. Itemization of redevelopment assistance projects.(a) Additional capital projects in the category of

redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects and to be financed by the incurring of debt,

20130SB0680PN1329 - 224 -

<--

123456789

101112131415161718192021222324252627282930

Page 225:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

are hereby itemized, together with their estimated financial costs, as follows:

ProjectTotal ProjectAllocation

(1) Adams County(i) County projects

(A) Design, infrastructure, construction and other related costs for the development of county-wide broadband infrastructureProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Adams County Industrial Development Authority(A) Costs related to site preparations

for lots within business park, including the blasting of diabaseProject Allocation 500,000(Base Project Allocation - $500,000)

(iii) Adams County Economic Development Corporation(A) Acquisition, construction and other

related costs for new Head Start facility to provide educational and dental services to the communityProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Rehabilitation, construction and other related costs for facilities expansion within professional center

20130SB0680PN1329 - 225 -

123456789

101112131415161718192021222324252627282930

Page 226:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

located in Cumberland TownshipProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure, acquisition and related development costs for commercial economic development projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(2) Allegheny County(i) County projects

(A) Design, acquisition, infrastructure, construction and other related costs for redevelopment of Kelman Bottles plant, including equipment and system upgradesProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, construction, infrastructure and other related costs for development of industrial and commercial sites at or surrounding Pittsburgh International AirportProject Allocation 50,000,000(Base Project Allocation -

$50,000,000)(C) Infrastructure, site development and

construction of The Odeon Building mixed use facilityProject Allocation 2,000,000

20130SB0680PN1329 - 226 -

123456789

101112131415161718192021222324252627282930

Page 227:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,000,000)(D) Acquisition, construction,

infrastructure improvements and related costs for the development of an educational complex for Junior Achievement of Western PennsylvaniaProject Allocation 5,500,000(Base Project Allocation - $5,500,000)

(E) Site development, infrastructure, remediation and construction for Keystone Commons expansion projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ii) City of Clairton

(A) Acquisition, construction, infrastructure and other related costs for Clairton revitalization projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR A CITYWIDE REDEVELOPMENT PROJECT IN CITY OF CLAIRTONPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)PROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

20130SB0680PN1329 - 227 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 228:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(II.1) CITY OF MCKEESPORT(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR CITYWIDE REDEVELOPMENT PROJECT IN CITY OF MCKEESPORTPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(iii) City of Pittsburgh(A) Construction, infrastructure

improvements and other costs related to expansion of Women's Center and Shelter of Greater PittsburghProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction, infrastructure improvements and other costs related to mixed-use development of Eastside Campus of Chatham UniversityProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(C) Construction, infrastructure

improvements and other costs related to office expansion building for The Andy Warhol Museum and Carnegie Museums of PittsburghProject Allocation 3,450,000(Base Project Allocation - $3,450,000)

20130SB0680PN1329 - 228 -

123456789

101112131415161718192021222324252627282930

Page 229:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(D) Construction, infrastructure improvements and other costs related to Carnegie Science Center expansion projectProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(E) Acquisition, construction,

infrastructure and other related costs for public park expansion projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Acquisition, construction, infrastructure and other related costs for Pittsburgh Riverfront redevelopment projectsProject Allocation 14,000,000(Base Project Allocation -

$14,000,000)(G) Acquisition, construction,

infrastructure and other related costs for Pittsburgh Advanced Technology Incubator development projectsProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(H) Acquisition, construction,

infrastructure and other related costs for North Point Breeze redevelopmentProject Allocation 1,000,000

20130SB0680PN1329 - 229 -

123456789

101112131415161718192021222324252627282930

Page 230:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,000,000)(I) Acquisition, construction,

infrastructure and other related costs for Larimer redevelopment neighborhood improvement projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(J) Acquisition, construction, infrastructure and other related costs for Homewood redevelopment mixed-use rehabilitation projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(K) Construction, infrastructure improvements and other related costs for Garfield redevelopment projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(L) Acquisition, construction, infrastructure and other related costs for Entrepreneur Resource Center projectProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(M) Acquisition, construction, infrastructure and other related costs for East Liberty redevelopment projectProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)

20130SB0680PN1329 - 230 -

123456789

101112131415161718192021222324252627282930

Page 231:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(N) Acquisition, construction, infrastructure and other related costs for Construction Junction projectProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(O) Acquisition, construction, infrastructure and other related costs for redevelopment of closed schools and historic churches into housing, office or commercial usesProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(P) Demolition, acquisition, construction, infrastructure and other related costs for redevelopment of areas in Central LawrencevilleProject Allocation 5,500,000(Base Project Allocation - $5,500,000)

(Q) Acquisition, construction, infrastructure and other related costs for Allegheny Riverfront redevelopment projectProject Allocation 14,000,000(Base Project Allocation -

$14,000,000)(R) Acquisition, construction,

infrastructure and other related costs for Hill District Uptown redevelopment projectProject Allocation 2,000,000

20130SB0680PN1329 - 231 -

123456789

101112131415161718192021222324252627282930

Page 232:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,000,000)(S) Acquisition, construction,

infrastructure and other related costs for Pittsburgh Neighborhood Connectivity projectProject Allocation 200,000,000(Base Project Allocation -

$200,000,000)(T) Acquisition, construction,

infrastructure and other related costs for transit-oriented development projectsProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(U) Acquisition, construction,

infrastructure and other related costs for Flashlight Factory Loft projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(V) Acquisition, construction, infrastructure and other related costs for Duquesne University renovation projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)PROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)

20130SB0680PN1329 - 232 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 233:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(W) Acquisition, construction, infrastructure and other related costs for University of Pittsburgh Medical Center Mercy projectsProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(X) Acquisition, construction, infrastructure and other related costs for University of Pittsburgh Medical Center Magee-Women's Hospital service line expansion projectProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(Y) Construction, infrastructure and other related costs for Pittsburgh Symphony Orchestra Heinz Hall renovation projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(Z) Construction, infrastructure and

other related costs for Gardens at Market Square mixed-use development projectProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(AA) Acquisition, construction, infrastructure and other related costs for redevelopment of West Neighborhoods and Sheraden Market

20130SB0680PN1329 - 233 -

123456789

101112131415161718192021222324252627282930

Page 234:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(BB) Acquisition, construction, infrastructure and other related costs for Pittsburgh Civic Building Office relocation reinvestment projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(CC) Construction, infrastructure and

other related costs for Pittsburgh Central Business District parking projectProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(DD) Acquisition, construction,

infrastructure and other related costs for Parkway Center Mall redevelopment projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(EE) Demolition, acquisition,

construction, infrastructure and related costs for the redevelopment of mixed-use development site in the neighborhood of Mount WashingtonProject Allocation 10,000,000(Base Project Allocation -

20130SB0680PN1329 - 234 -

123456789

101112131415161718192021222324252627282930

Page 235:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$10,000,000)(FF) Construction, infrastructure and

other related costs for Federal and North phase 2 projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(GG) Construction, infrastructure and other related costs for Downtown Pittsburgh revitalization projectProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(HH) Construction, infrastructure and

other related costs for Downtown Preservation project phase 2Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(II) Acquisition, construction, infrastructure and other related costs for redevelopment of former J. Allen Steel site in the Chateau neighborhood and in the adjacent Manchester neighborhoodProject Allocation 18,000,000(Base Project Allocation -

$18,000,000)(JJ) Construction, infrastructure and

other related costs for Broadhead Industrial Park redevelopment projectProject Allocation 10,000,000

20130SB0680PN1329 - 235 -

123456789

101112131415161718192021222324252627282930

Page 236:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $10,000,000)

(KK) Demolition, construction, restoration and related costs for commercial corridor in Beechview neighborhoodProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(LL) Construction, infrastructure and other related costs for Robert Morris University Student Recreation Center redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(MM) Renovations, infrastructure, rehabilitation and other related costs for Robert Morris University Yorktown HallProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(NN) Acquisition, remediation, infrastructure development and related site preparation costs for redevelopment of former brownfield site in Squirrel Hill and Swisshelm Park neighborhoodsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(OO) Acquisition, site preparation of parking garages and related

20130SB0680PN1329 - 236 -

123456789

101112131415161718192021222324252627282930

Page 237:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure within the redevelopment sites of South Side Works and Pittsburgh Technology CenterProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(PP) Acquisition, remediation,

construction, infrastructure and related site preparation costs in Hazelwood neighborhoodProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(QQ) Acquisition, construction,

renovation, infrastructure and related activities in redevelopment of neighborhood of CarrickProject Allocation 5,500,000(Base Project Allocation - $5,500,000)

(RR) Acquisition, remediation, construction, infrastructure and related activities for redevelopment of strategic brownfield sitesProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(SS) Construction, infrastructure and

other related costs for Gateway Center Islands refurbishment redevelopment project

20130SB0680PN1329 - 237 -

123456789

101112131415161718192021222324252627282930

Page 238:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(TT) Acquisition, infrastructure improvements, construction and other related costs for the University of Pittsburgh Medical Center's development of a Center for Innovation Science's Center for Personalized MedicineProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(UU) Construction, renovations,

infrastructure improvements and other related costs for the Northside Leadership Conference, Inc., Penn Brewery Expansion projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(VV) Construction, renovations, infrastructure improvements and other related costs for the Northside Leadership Conference, Inc., East Deutschtown Historic Gateway mixed use projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(WW) Acquisition, construction, renovation, site work and infrastructure improvements for an

20130SB0680PN1329 - 238 -

123456789

101112131415161718192021222324252627282930

Page 239:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

office building and new hotel within the Oliver BuildingProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(XX) Acquisition, construction and

rehabilitation costs associated with converting the Wholey Building into residential unitsProject Allocation 17,000,000(Base Project Allocation -

$17,000,000)(YY) Construction, infrastructure site

development, remediation and other costs related to the Lawrenceville Technology Center projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ZZ) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIES AT UNIVERSITY OF PITTSBURGHPROJECT ALLOCATION 50,000,000(BASE PROJECT ALLOCATION -

$50,000,000)(ZZ) CONSTRUCTION AND OTHER RELATED COSTS

FOR INNOVATION AND ENTREPRENEURSHIP CENTERPROJECT ALLOCATION 50,000,000

20130SB0680PN1329 - 239 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 240:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $50,000,000)

(AAA) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR ODEON BUILDINGPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(BBB) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR ANIMAL RESOURCE CENTERPROJECT ALLOCATION 6,500,000(BASE PROJECT ALLOCATION - $6,500,000)

(CCC) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR 31ST STREET STUDIOS PROJECTPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(DDD) CONSTRUCTION, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR ADVANCED DIGITAL MEDIA DESIGN, FABRICATION AND SIMULATION CENTER AT CARNEGIE MELLON UNIVERSITYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(EEE) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ANIMAL

20130SB0680PN1329 - 240 -

123456789

101112131415161718192021222324252627282930

Page 241:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

RESOURCE CENTER PROJECTPROJECT ALLOCATION 6,500,000(BASE PROJECT ALLOCATION - $6,500,000)

(FFF) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT SITE OF FORMER CARNEGIE LIBRARY ALLEGHENYPROJECT ALLOCATION 1,625,000(BASE PROJECT ALLOCATION - $1,625,000)

(GGG) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT FRICK ART AND HISTORICAL CENTERPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(HHH) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, REHABILITATION AND OTHER RELATED COSTS FOR FRICK ART AND HISTORICAL CENTER PROJECTSPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(III) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR WORKFORCE DEVELOPMENT CENTERS IN CITY OF PITTSBURGHPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(JJJ) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR NATIONAL MUSEUM OF BROADCASTING

20130SB0680PN1329 - 241 -

123456789

101112131415161718192021222324252627282930

Page 242:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(KKK) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PARKWAY CENTER MALLPROJECT ALLOCATION 50,000,000(BASE PROJECT ALLOCATION -

$50,000,000)(LLL) CONSTRUCTION, REDEVELOPMENT AND

OTHER RELATED COSTS FOR PITTSBURGH BALLET THEATRE EXPANSION PROJECTPROJECT ALLOCATION 1,750,000(BASE PROJECT ALLOCATION - $1,750,000)

(MMM) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECT AT SENATOR JOHN HEINZ HISTORY CENTERPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(NNN) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MIXED-USE DEVELOPMENT PROJECTPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(OOO) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR DEVELOPMENT PROJECT NEAR INTERSECTION

20130SB0680PN1329 - 242 -

123456789

101112131415161718192021222324252627282930

Page 243:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

OF MURRAY AVENUE AND FORWARD AVENUEPROJECT ALLOCATION 4,500,000(BASE PROJECT ALLOCATION - $4,500,000)

(PPP) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MULTIMODAL PUBLIC TRANSPORTATION FACILITYPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(QQQ) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF SCHENLEY TECHNOLOGY PARKPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(RRR) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR EXPANSION AND REDEVELOPMENT OF COMMERCIAL AND OFFICE SPACE, INCLUDING, BUT NOT LIMITED TO, PPG PLACEPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(SSS) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR PROJECTS RELATING TO TOWN PLACE, INCLUDING

20130SB0680PN1329 - 243 -

<--

123456789

101112131415161718192021222324252627282930

Page 244:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

EXPANSION OF PARKING STRUCTUREPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(TTT) ACQUISITION, CLEARING, DEMOLITION,

RENOVATION, EXPANSION, ENVIRONMENTAL REMEDIATION, CONSTRUCTION, INFRASTRUCTURE, STREETS, UTILITIES AND OTHER COSTS ASSOCIATED WITH THE ADDISON DEVELOPMENT PROJECT LOCATED NEAR CENTRE AVENUE, KIRKPATRICK STREET, BENTLEY DRIVE AND DEVILLIERS STREETPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(UUU) ACQUISITION, CLEARING, DEMOLITION, RENOVATION, EXPANSION, ENVIRONMENTAL REMEDIATION, CONSTRUCTION, INFRASTRUCTURE, STREETS, UTILITIES, STORM WATER MITIGATION AND OTHER COSTS ASSOCIATED WITH LARIMER DEVELOPMENT PROJECT LOCATED NEAR NEGLEY RUN, WASHINGTON AND EAST LIBERTY BOULEVARDS, LARIMER AND LINCOLN AVENUES AND BROAD STREETPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(VVV) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS WASTE AND OTHER

20130SB0680PN1329 - 244 -

123456789

101112131415161718192021222324252627282930

Page 245:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

RELATED COSTS FOR FORBES HOTEL PROJECTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(III.1) REDEVELOPMENT AUTHORITY OF ALLEGHENY

COUNTY(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR CHEVRON APPALACHIAN MICHIGAN BUSINESS UNIT TO LOCATE ITS REGIONAL HEADQUARTERS IN MOON TOWNSHIPPROJECT ALLOCATION 8,533,000(BASE PROJECT ALLOCATION - $8,533,000)

(B) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR INNOVATION RIDGE TECHNOLOGY AND OFFICE PARK IN MARSHALL TOWNSHIPPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(III.2) ALLEGHENY COUNTY HOUSING AUTHORITY

(A) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR DEVELOPMENT OF ORCHARD PARK - PHASE IPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(iv) Urban Redevelopment Authority of Pittsburgh

20130SB0680PN1329 - 245 -

123456789

101112131415161718192021222324252627282930

Page 246:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Acquisition, redevelopment and construction of property to support mixed-use development, parking garage and other infrastructure in Strip DistrictProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(IV.1) ASPINWALL BOROUGH

(A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ASPINWALL RIVERFRONT PARK PROJECTPROJECT ALLOCATION 1,543,000(BASE PROJECT ALLOCATION - $1,543,000)

(IV.2) BETHEL PARK MUNICIPALITY(A) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR UPGRADES TO VILLAGE GREEN PARKPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(B) CONSTRUCTION, ACQUISITION, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR UPGRADES TO BETHEL PARK VFD STATIONSPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(IV.3) BRENTWOOD BOROUGH(A) CONSTRUCTION, REDEVELOPMENT AND OTHER

RELATED COSTS FOR BRENTWOOD MUNICIPAL

20130SB0680PN1329 - 246 -

<--

123456789

101112131415161718192021222324252627282930

Page 247:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PUBLIC SAFETY CENTERPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(B) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR BRENTWOOD MUNICIPAL STADIUMPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(v) Bridgeville Borough(A) Construction, infrastructure and

other related costs for ACHIEVA's manufacturing facility expansion projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(V.1) CASTLE SHANNON BOROUGH(A) CONSTRUCTION, ACQUISITION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR WAVERLY TERRACE HOUSING PROJECTPROJECT ALLOCATION 12,000,000(BASE PROJECT ALLOCATION -

$12,000,000)(V.2) CRAFTON BOROUGH

(A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR CRAFTON PARK REHABILITATION PROJECTPROJECT ALLOCATION 1,205,000(BASE PROJECT ALLOCATION - $1,205,000)

20130SB0680PN1329 - 247 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 248:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(v.1) (V.3) Edgewood Borough(A) Construction, infrastructure

improvements and related costs for a new residence hall at the Western Pennsylvania School for the DeafProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(V.4) ETNA BOROUGH(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR MUNICIPAL COMPLEX IMPROVEMENTSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(vi) Findlay Township(A) Construction, infrastructure

improvements and other costs related to development of de-icing fluid treatment facility at Pittsburgh International AirportProject Allocation 12,500,000(Base Project Allocation -

$12,500,000)(B) Construction, infrastructure

improvements and other costs related to development of Phase III of Clinton Commerce CenterProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(C) CONSTRUCTION, ACQUISITION,

INFRASTRUCTURE AND OTHER RELATED COSTS

20130SB0680PN1329 - 248 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 249:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FOR DEVELOPMENT PROJECTPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(VI.1) GLENSHAW

(A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE AND RELATED COSTS FOR THE TAKTL FACILITYPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(VI.2) GREENTREE BOROUGH

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PARKWAY CENTER MALLPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(VI.3) HARMAR TOWNSHIP

(A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR IMPROVEMENTS TO AND EXPANSION OF PPG FACILITYPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(vii) McKees Rocks Borough

(A) Construction, infrastructure and other related costs for Ohio Valley

20130SB0680PN1329 - 249 -

123456789

101112131415161718192021222324252627282930

Page 250:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

General Hospital Data and Information Technology CenterProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Construction, acquisition, infrastructure and related costs for the Island Studios Expansion Project to include, but not be limited to, a film studio, hotel, museum, office and other developmentProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(VII.1) MILLVALE BOROUGH

(A) ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, FOR IMPROVEMENTS IN CENTRAL BUSINESS DISTRICTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(viii) Moon Township(A) Construction, infrastructure

improvements and other costs related to development of business park on site 7 at Pittsburgh International AirportProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(B) Construction, infrastructure

20130SB0680PN1329 - 250 -

<--

123456789

101112131415161718192021222324252627282930

Page 251:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

improvements and other costs related to development of Cherrington Commerce Center Phase IIProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(C) Acquisition, construction, site work

and infrastructure improvements for a development project in Moon TownshipProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(D) Acquisition, construction,

infrastructure improvements and related costs for the development of an athletic and multipurpose arena at Robert Morris UniversityProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(E) CONSTRUCTION, ACQUISITION,

INFRASTRUCTURE AND RELATED COSTS FOR DEVELOPMENT OF OMEGA CORPORATE CENTER PROJECTPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(F) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE AND RELATED COSTS FOR DEVELOPMENT OF ALPHA CORPORATE CENTER PROJECT

20130SB0680PN1329 - 251 -

<--

123456789

101112131415161718192021222324252627282930

Page 252:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 25,000,000(BASE PROJECT ALLOCATION -

$25,000,000)(ix) Mt. Oliver Borough

(A) Acquisition, construction, infrastructure and other related costs for Brownsville Road Corridor redevelopment projectsProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(IX.1) NORTH VERSAILLES TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PITTSBURGH PLAZA EAST SHOPPING CENTERPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(IX.1) (IX.2) OAKMONT BOROUGH

(A) CONSTRUCTION, REHABILITATION AND OTHER RELATED COSTS FOR SENIOR LIVING PROJECTPROJECT ALLOCATION 2,950,000(BASE PROJECT ALLOCATION - $2,950,000)

(B) CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR PROJECTS FOR PRESBYTERIAN SENIORCARE CENTERPROJECT ALLOCATION 1,000,000

20130SB0680PN1329 - 252 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 253:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $1,000,000)(IX.2) (IX.3) PENN HILLS TOWNSHIP

(A) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR EMERGENCY MEDICAL SERVICES BUILDING IN PENN HILLSPROJECT ALLOCATION 600,000(BASE PROJECT ALLOCATION - $600,000)

(x) Plum Borough(A) Construction, infrastructure

improvements and other costs related to Plum Municipal CenterProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xi) Robinson Township(A) Construction, infrastructure and

other related costs for Bradley Center expansion projectProject Allocation 500,000(Base Project Allocation - $500,000)

(B) Acquisition, construction, infrastructure and other related costs for expansion of Industrial Scientific Global HeadquartersProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(C) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF BUSINESS PARK

20130SB0680PN1329 - 253 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 254:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(D) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE AND RELATED COSTS FOR REDEVELOPMENT OF MARQUIS OFFICE PLAZA, INCLUDING, BUT NOT LIMITED TO, A NEW PARKING GARAGEPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(xii) Ross Township(A) Acquisition, demolition,

infrastructure and construction of public facilities in McKnight Road business corridorProject Allocation 2,250,000(Base Project Allocation - $2,250,000)

(B) Acquisition, demolition, infrastructure and construction of public facilities for purposes of redevelopment of Northway Mall on McKnight RoadProject Allocation 2,250,000(Base Project Allocation - $2,250,000)

(C) Acquisition, demolition, infrastructure and construction of public facilities for parks, recreation and open spaceProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(D) ACQUISITION, CONSTRUCTION,

20130SB0680PN1329 - 254 -

<--

123456789

101112131415161718192021222324252627282930

Page 255:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR THE PERRY SHOPS LOCATED ON PERRY HIGHWAYPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(xiii) Sewickley Borough

(A) Construction, infrastructure and other related costs for renovation of 5 South Patient Unit at Heritage Valley Sewickley Hospital facilityProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure and other related costs for renovation and reconstruction of School of Nursing building at Heritage Valley Sewickley campusProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure and other related costs for the design, expansion and renovation of surgical services department at Heritage Valley Sewickley Hospital facilityProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(XIII.1) SHARPSBURG BOROUGH(A) INFRASTRUCTURE AND OTHER RELATED

20130SB0680PN1329 - 255 -

<--

123456789

101112131415161718192021222324252627282930

Page 256:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

COSTS FOR WATER AND SEWER SYSTEM IMPROVEMENTSPROJECT ALLOCATION 1,850,000(BASE PROJECT ALLOCATION - $1,850,000)

(xiv) West Deer Township(A) Infrastructure, rehabilitation,

construction and other related costs, including the abatement of hazardous materials, for development of senior citizen centerProject Allocation 800,000(Base Project Allocation - $800,000)

(xv) West Mifflin Borough(A) Acquisition, construction,

infrastructure and other related costs for aviation, industrial and commercial site development and improvements at or surrounding Allegheny County AirportProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(B) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF A MIXED-USE FACILITYPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(XVI) WHITE OAK BOROUGH

20130SB0680PN1329 - 256 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 257:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PROJECTS IN WHITE OAK BUSINESS DISTRICTPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(3) Armstrong County(i) County projects

(A) Infrastructure, construction and other related costs for renovations to Belmont Complex indoor multiuse facilityProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Acquisition, infrastructure, construction and other related costs, including abatement of hazardous materials, for public school buildings adaptive reuse projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, infrastructure, construction and other related costs for downtown revitalization projects, including façade improvements, landscaping, lighting, parking lots and streetscape improvementsProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ii) Armstrong County Industrial Development Authority

20130SB0680PN1329 - 257 -

123456789

101112131415161718192021222324252627282930

Page 258:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Acquisition, infrastructure and construction for development of new industrial parkProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(4) Beaver County(I) COUNTY PROJECTS

(A) REDEVELOPMENT, RESTORATION AND OTHER RELATED COSTS FOR THE FORMER PITTSBURGH AND LAKE ERIE RAILROAD PASSENGER STATION TO BE USED AS A MULTIPURPOSE MEETING/EVENT SPACEPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PUBLIC WORKS BUILDING AND FIRE STATION IN BIG BEAVER BOROUGHPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(II) CITY OF ALIQUIPPA(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR BUSINESS OR MANUFACTURING FACILITY ASSOCIATED WITH THE PETROCHEMICAL INDUSTRYPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(i) (III) Beaver County Corporation for

20130SB0680PN1329 - 258 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 259:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Economic Development(A) Infrastructure, site improvements and

other related costs for construction of compressed natural gas fueling facilityProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment of industrial properties located within Ellwood CityProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(C) Acquisition, infrastructure,

abatement of hazardous materials, construction and other related costs for redevelopment and improvement of industrial sites located within Potter TownshipProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(ii) (IV) Redevelopment Authority of Beaver

County(A) Renovation and rehabilitation of

patient rooms and corridors at Heritage Valley Beaver Hospital facility

20130SB0680PN1329 - 259 -

<--

123456789

101112131415161718192021222324252627282930

Page 260:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Rehabilitation, construction and other related costs for renovations to radiology department at Heritage Valley Beaver Hospital facilityProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Infrastructure, construction and other related costs for rehabilitation and restoration of historic former Pittsburgh & Lake Erie Railroad passenger stationProject Allocation 975,000(Base Project Allocation - $975,000)

(V) BADEN BOROUGH(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR BADEN ACADEMY CHARTER SCHOOL EXPANSION PROJECTPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(VI) ELLWOOD CITY BOROUGH(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECTSPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

20130SB0680PN1329 - 260 -

<--

123456789

101112131415161718192021222324252627282930

Page 261:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$15,000,000)(VII) HARMONY TOWNSHIP

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR CNG CONVERSION PROJECTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR AN INDUSTRIAL PARKPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(5) Bedford County

(i) (Reserved)(I) COUNTY PROJECTS

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR REHABILITATION OF 8.5 MILES OF ABANDONED PENNSYLVANIA TURNPIKE AS MULTIUSE TRAIL.PROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(II) BEDFORD COUNTY DEVELOPMENT ASSOCIATION(A) PREPARATION OF 90 ACRES OF BEDFORD

COUNTY BUSINESS PARK II AS SHOVEL-READY SITES TO ATTRACT NEW BUSINESSES TO THE AREAPROJECT ALLOCATION 2,375,000

20130SB0680PN1329 - 261 -

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 262:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $2,375,000)(6) Berks County

(i) County projects(A) Acquisition, infrastructure,

construction and other related costs for development of 104 acres for expansion of Reading Health SystemProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS FOR BERKS COMMUNITY HEALTH CENTERPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(C) REHABILITATION OF RAILROAD, INCLUDING

TRACK IMPROVEMENTS, SIDING EXTENSIONS, VISITORS CENTER, EQUIPMENT AND EQUIPMENT MAINTENANCE FACILITY, CONSTRUCTION AND RELATED WORK TO ENHANCE ECONOMIC DEVELOPMENT OPPORTUNITIES AND PRESERVE CORRIDOR FOR FUTURE FREIGHT TRAFFIC IN BERKS AND MONTGOMERY COUNTIESPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(ii) Amity Township

(A) Acquisition, infrastructure,

20130SB0680PN1329 - 262 -

<--

123456789

101112131415161718192021222324252627282930

Page 263:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construction and other related costs for development of retail and business parkProject Allocation 1,300,000(Base Project Allocation - $1,300,000)

(iii) Boyertown Borough(A) Construction, infrastructure and

other related costs for rehabilitation of historic Civil War era railroad projectProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(iv) City of Reading(A) Construction, infrastructure and

other related costs for early learning center at Albright CollegeProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction, infrastructure and other related costs for Albright College Co-Generation Plant expansion projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(C) Construction, infrastructure and other related costs for Albright College Track and Field Facility projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

20130SB0680PN1329 - 263 -

123456789

101112131415161718192021222324252627282930

Page 264:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(D) Construction, infrastructure and other related costs for Albright College Library Holocaust Resource Center projectProject Allocation 500,000(Base Project Allocation - $500,000)

(E) Renovation, restoration, reconstruction, infrastructure improvements and related costs for Reading Public MuseumProject Allocation 1,112,000(Base Project Allocation - $1,112,000)

(F) Construction, infrastructure improvements and other related costs for installation of natural gas refueling station at Evergreen Community Power siteProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Construction, reconstruction, rehabilitation, remediation, infrastructure improvements and other related costs for redevelopment of existing building at Evergreen Community Power siteProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Rehabilitation, construction and renovation of rail infrastructure to service Evergreen Community Power

20130SB0680PN1329 - 264 -

123456789

101112131415161718192021222324252627282930

Page 265:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

site, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail service and any other related costsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(I) Construction, infrastructure improvements and related costs for the Reading Area Community College Berks Hall renovation and conservation projectProject Allocation 600,000(Base Project Allocation - $600,000)

(J) Construction, infrastructure improvements and related costs for the Reading Area Community College pedestrian safety, gateway and traffic improvement projectProject Allocation 1,178,000(Base Project Allocation - $1,178,000)

(IV.1) CUMRU TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, DEVELOPMENT AND OTHER COSTS RELATED TO DEVELOPMENT OF INDUSTRIAL SITE FOR NEW AND EXPANDING

20130SB0680PN1329 - 265 -

<--

123456789

101112131415161718192021222324252627282930

Page 266:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

BUSINESSESPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(v) Exeter Township

(A) Construction, infrastructure and other related costs for Lincoln Business Park redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Construction, site preparation, infrastructure improvements and related costs for new Emergency Services BuildingProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(vi) Fleetwood Borough(A) Acquisition, infrastructure,

renovations and other related costs for Fleetwood Tannery/Fleetwood Auto Body Complex projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovations and other related costs for revitalization of Fleetwood Borough Central Business DistrictProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(vi.1) Kutztown Borough

20130SB0680PN1329 - 266 -

123456789

101112131415161718192021222324252627282930

Page 267:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Revitalization of industrial/commercial sites, including acquisition, rehabilitation, construction, infrastructure development and related costsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) ACQUISITION, DEMOLITION, CONSTRUCTION, REHABILITATION AND REDEVELOPMENT OF MULTIPLE PROPERTIES TO CREATE A MUNICIPAL GOVERNMENT CENTERPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(VI.2) LEESPORT BOROUGH(A) CONSTRUCTION, RENOVATION AND OTHER

RELATED COSTS FOR FIRE STATIONPROJECT ALLOCATION 1,250,000(BASE PROJECT ALLOCATION - $1,250,000)

(VI.2) (VI.3) LYONS BOROUGH(A) CONSTRUCTION, INFRASTRUCTURE,

ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR THE REDEVELOPMENT AND REHABILITATION OF MANUFACTURING FACILITYPROJECT ALLOCATION 17,000,000(BASE PROJECT ALLOCATION -

$17,000,000)(vii) Muhlenberg Township

(A) Acquisition, infrastructure,

20130SB0680PN1329 - 267 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 268:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

renovations and other related costs for NKG Metals facility redevelopment and reuse projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovations and other related costs for Fifth Street Highway Corridor revitalization projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(VIII) SNYDER TOWNSHIP

(A) RENOVATION AND OTHER RELATED COSTS TO REPLACE AND UPGRADE FACILITY INFRASTRUCTURE OF TYRONE HOSPITALPROJECT ALLOCATION 1,650,000(BASE PROJECT ALLOCATION - $1,650,000)

(IX) BOROUGH OF TOPTON(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR RENOVATIONS TO HISTORIC OLD MAIN BUILDING OF DIAKON LUTHERAN HOME AT TOPTONPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(viii) (X) West Reading Borough(A) Acquisition, infrastructure,

renovations and other related costs for Reading Health System surgical tower and related facilities

20130SB0680PN1329 - 268 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 269:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(7) Blair County(I) CITY OF ALTOONA

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE EXPANSION OF ALTOONA REGIONAL HEALTH SYSTEM, INCLUDING NEW OPERATING ROOMS, ADDITIONAL LAB SPACE AND VISION CENTERPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(i) (II) Altoona-Blair County Development Corporation(A) Acquisition, abatement of hazardous

materials, renovations and rehabilitation of regional arts centerProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(8) Bradford County(I) (RESERVED)(II) BOROUGH OF TOWANDA

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR EXPANSION OF MEMORIAL HOSPITALPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(i) (III) Wyalusing Township(A) Acquisition, site preparation,

remediation, infrastructure improvements and construction of

20130SB0680PN1329 - 269 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 270:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Wyalusing Professional ParkProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(9) Bucks County(i) County projects

(A) Acquisition, construction, infrastructure, redevelopment and other related costs for ARIA Health System urgent care facilitiesProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for ARIA Health System facilities to provide medical services, conduct research and other related activitiesProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(C) Acquisition, infrastructure,

redevelopment, construction and other related costs for Fairless Hills rail expansion project at Keystone Industrial Port ComplexProject Allocation 5,750,000(Base Project Allocation - $5,750,000)

(D) Acquisition, rehabilitation, construction and other related costs for renovation of former warehouse

20130SB0680PN1329 - 270 -

123456789

101112131415161718192021222324252627282930

Page 271:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

space and development of entrepreneurial scientists research clustersProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(ii) Bucks County Industrial Development Authority(A) Acquisition, infrastructure,

redevelopment and other related costs for construction of rail service to Riverside Industrial ParkProject Allocation 2,100,000(Base Project Allocation - $2,100,000)

(iii) Redevelopment Authority of Bucks County(A) Acquisition, infrastructure,

construction and other related costs for rehabilitation of Grundy PowerhouseProject Allocation 525,000(Base Project Allocation - $525,000)

(B) Acquisition, infrastructure, construction and other related costs for rehabilitation and development of PECO building in Penndel BoroughProject Allocation 600,000(Base Project Allocation - $600,000)

(C) Acquisition, infrastructure, construction and other related costs for redevelopment of Stocks Waterfront into mixed-use facility

20130SB0680PN1329 - 271 -

123456789

101112131415161718192021222324252627282930

Page 272:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 780,000(Base Project Allocation - $780,000)

(D) Acquisition, infrastructure, redevelopment, construction and other related costs for infrastructure improvements to Route 13 Industrial CorridorProject Allocation 1,100,000(Base Project Allocation - $1,100,000)

(E) Acquisition, infrastructure, construction and other related costs for redevelopment of USI Lighting manufacturing siteProject Allocation 1,200,000(Base Project Allocation - $1,200,000)

(F) Infrastructure, construction and other related costs for improvements to Edgely Industrial Park, including roadways, storm water management, lighting and other infrastructureProject Allocation 1,200,000(Base Project Allocation - $1,200,000)

(G) Acquisition, infrastructure, construction and other related costs for demolition of Mill Run Retirement Community and redevelopment of propertyProject Allocation 1,200,000(Base Project Allocation - $1,200,000)

(H) Acquisition, demolition,

20130SB0680PN1329 - 272 -

123456789

101112131415161718192021222324252627282930

Page 273:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure improvements, construction, renovation and other related costs for development of public/private academic universityProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(I) Infrastructure, construction, redevelopment and other related costs for senior housing project in TelfordProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(iv) Bensalem Township

(A) Acquisition, infrastructure and other costs related to construction of new Newport fire houseProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR HISTORIC GROWDEN MANSIONPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(C) CONSTRUCTION AND OTHER RELATED COSTS FOR AFFORDABLE HOUSING FOR DISABLED VETERANSPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(D) CONSTRUCTION AND OTHER RELATED COSTS FOR TRANSITIONAL HOUSING FOR WOMEN WHO

20130SB0680PN1329 - 273 -

<--

123456789

101112131415161718192021222324252627282930

Page 274:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

HAVE COMPLETED THEIR TREATMENT PROGRAM BUT STILL STRUGGLE WITH HOMELESSNESSPROJECT ALLOCATION 600,000(BASE PROJECT ALLOCATION - $600,000)

(E) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR FAMILY AND COMMUNITY OUTREACH CENTER THAT OFFERS RECOVERY SERVICES TO INDIVIDUALS WITH ADDICTIONSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(F) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR A CULTURAL AND COMMUNITY CENTER WITH BUSINESS DISTRICT IMPROVEMENTSPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(G) CONSTRUCTION AND OTHER RELATED COSTS FOR NEW ACCESS ROAD TO ASSIST IN REDEVELOPMENT OF INDUSTRIAL ZONEPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(H) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RESIDENTIAL DRUG AND ALCOHOL ADDICTION TREATMENT FACILITY FOR FIRST RESPONDERS, CORRECTIONS OFFICERS AND COMBAT VETERANS WHO ARE SEEKING INPATIENT TREATMENT

20130SB0680PN1329 - 274 -

123456789

101112131415161718192021222324252627282930

Page 275:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(IV.1) BRISTOL TOWNSHIP(A) CONSTRUCTION, ACQUISITION AND OTHER

RELATED COSTS TO REDEVELOP AND REVITALIZE VACANT PORTION OF LOWER BUCKS HOSPITAL FOR TREATMENT AND REHABILITATION FACILITYPROJECT ALLOCATION 1,100,000(BASE PROJECT ALLOCATION - $1,100,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PUBLIC HEALTH AND SAFETY PROJECTS IN BRISTOL BOROUGH AND BRISTOL TOWNSHIPPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(IV.2) BRISTOL BOROUGH(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR PROJECTS ALONG OTTER CREEK AND ADAMS HOLLOW CREEKPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(v) Chalfont Borough(A) Acquisition, construction,

infrastructure, pedestrian enhancements and other costs related to transit-oriented development and downtown revitalizationProject Allocation 10,000,000

20130SB0680PN1329 - 275 -

123456789

101112131415161718192021222324252627282930

Page 276:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $10,000,000)

(V.1) DOYLESTOWN BOROUGH(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, RENOVATION AND OTHER RELATED COSTS FOR REDEVELOPMENT OF PENNDOT MAINTENANCE SITE FACILITY FOR URBAN PARK AND OFFICE SPACEPROJECT ALLOCATION 1,415,000(BASE PROJECT ALLOCATION - $1,415,000)

(B) CONSTRUCTION, RECONSTRUCTION AND OTHER RELATED COSTS FOR DOYLESTOWN HOSPITAL MATERNITY CENTERPROJECT ALLOCATION 1,100,000(BASE PROJECT ALLOCATION - $1,100,000)

(vi) Lower Southampton Township(A) Infrastructure, construction,

renovations and other related costs for new public works buildingProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, construction and other related costs for new police department headquartersProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) CONSTRUCTION, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR LOWER SOUTHAMPTON FIREHOUSEPROJECT ALLOCATION 500,000

20130SB0680PN1329 - 276 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 277:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $500,000)(D) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT, ACQUISITION AND OTHER RELATED COSTS FOR NEW POLICE STATIONPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(E) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR NEW PUBLIC WORKS BUILDINGPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(vii) Middletown Township(A) Infrastructure, construction,

rehabilitation and other related costs for roadway improvements to Big Oak Road, located within industrial parkProject Allocation 600,000(Base Project Allocation - $600,000)PROJECT ALLOCATION 800,000(BASE PROJECT ALLOCATION - $800,000)

(B) Infrastructure, construction and other related costs for rehabilitation of municipal buildingProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction and other related costs for redevelopment of school buildings for future public useProject Allocation 2,000,000

20130SB0680PN1329 - 277 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 278:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,000,000)(D) CONSTRUCTION, RENOVATION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR EXPANSION OF ST. MARY MEDICAL CENTERPROJECT ALLOCATION 25,000,000(BASE PROJECT ALLOCATION -

$25,000,000)(E) CONSTRUCTION, ACQUISITION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR REDEVELOPMENT OF FORMER SCHOOL BUILDING FOR PUBLIC USEPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(F) CONSTRUCTION, RENOVATION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR MUNICIPAL BUILDING IN DISREPAIRPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(VII.1) MILFORD TOWNSHIP(A) LAND ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR DEVELOPMENT AND EXPANSION OF HOSPITALPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(viii) Northampton Township

(A) Acquisition, infrastructure, construction and other related costs

20130SB0680PN1329 - 278 -

<--

123456789

101112131415161718192021222324252627282930

Page 279:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

for a new police department headquarters and renovations to existing facilitiesProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ix) Quakertown Borough(A) Acquisition, infrastructure,

construction and other related costs for new downtown infill project consisting of office and retail complexProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(IX.1) UPPER SOUTHAMPTON TOWNSHIP(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR NEW PUBLIC WORKS BUILDING AND RENOVATION OF EXISTING PUBLIC WORKS BUILDING FOR GENERAL GOVERNMENT USEPROJECT ALLOCATION 1,250,000(BASE PROJECT ALLOCATION - $1,250,000)

(B) LAND ACQUISITION FOR RECREATION AND OPEN SPACEPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(x) Warwick Township(A) Acquisition, infrastructure,

construction and other related costs for township building renovations and upgradesProject Allocation 1,000,000

20130SB0680PN1329 - 279 -

<--

123456789

101112131415161718192021222324252627282930

Page 280:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,000,000)(B) Infrastructure, construction,

rehabilitation and other related costs for roadway improvements to Stout Drive, which provides ingress and egress to industrial parkProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(10) Butler County(i) Butler County Redevelopment Authority

(A) Site preparation activity, including onsite utility construction, on property along SR 0019 in Jackson Township to support mixed-use developmentProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Construction of infrastructure,

capital facilities and site development activities for construction of a mixed-use development in Route 228 corridorProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ii) Cranberry Township

(A) Acquisition, infrastructure, rehabilitation and other related costs for construction of public plaza and

20130SB0680PN1329 - 280 -

123456789

101112131415161718192021222324252627282930

Page 281:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

other amenities in Route 228 corridorProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, construction and other related costs for expansion of North Boundary ParkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction, and other related costs, including abatement of hazardous materials, for Fernway redevelopment projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Acquisition, construction, site development and infrastructure costs related to economic development project in Commonwealth and Executive Drive corridorProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(E) Acquisition, infrastructure, rehabilitation and other related costs for construction of new public libraryProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(F) Acquisition, rehabilitation, site development and infrastructure costs related to economic development

20130SB0680PN1329 - 281 -

123456789

101112131415161718192021222324252627282930

Page 282:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

project in Route 228 corridorProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(G) Acquisition, rehabilitation, site development and infrastructure costs related to economic development project in Route 19 corridorProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Acquisition, infrastructure, construction and other costs for redevelopment and implementation of Route 19 Main Street programProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) Zelienople Borough(A) Acquisition, infrastructure,

construction and renovations of Main Street corridor as part of Central Business District revitalization project.Project Allocation 3,900,000(Base Project Allocation - $3,900,000)

(11) Cambria County(i) County projects

(A) Acquisition, construction, site development, infrastructure and transportation improvements and other related costs for Conemaugh Health System for an ambulatory care center

20130SB0680PN1329 - 282 -

123456789

101112131415161718192021222324252627282930

Page 283:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR ACID MINE DRAINAGE CLEANUP INFRASTRUCTUREPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(C) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR AMBULATORY CARE CENTERPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR NATURAL GAS REFUELING STATIONPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(F) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR NATURAL GAS REFUELING STATION IN CAMBRIA COUNTY INDUSTRIAL PARK

20130SB0680PN1329 - 283 -

<--

123456789

101112131415161718192021222324252627282930

Page 284:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(G) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR OUTDOOR RECREATIONAL TOURISM FACILITY AND RELATED PROJECTSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(H) REHABILITATION, CONSTRUCTION AND RENOVATION OF RAIL INFRASTRUCTURE TO SERVE AN ECONOMIC DEVELOPMENT PROJECTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(ii) Cambria Township

(A) Construction, infrastructure and other related costs for Cambria County Prison improvement projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, construction, infrastructure improvements and other related costs for the installation of a natural gas refueling station in Cambria County Industrial ParkProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR NATURAL GAS-POWERED DATA CENTER EXPANSION

20130SB0680PN1329 - 284 -

<--

123456789

101112131415161718192021222324252627282930

Page 285:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(iii) City of Johnstown(A) Construction, infrastructure and

other related costs for Cambria County War Memorial improvement projectProject Allocation 1,250,000(Base Project Allocation - $1,250,000)

(B) Construction, reconstruction, rehabilitation, remediation infrastructure improvements and other related costs for the redevelopment and reuse of historic Conrad BuildingProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Acquisition, construction, reconstruction, rehabilitation, upgrades, related infrastructure improvements, including street-scape and pedestrian improvements and other related costs for Conemaugh Medical ParkProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Demolition and construction of various properties to revitalize the commercial, retail and housing districts within the city and related infrastructureProject Allocation 10,000,000

20130SB0680PN1329 - 285 -

123456789

101112131415161718192021222324252627282930

Page 286:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $10,000,000)

(E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR ACID MINE DRAINAGE AND ALTERNATIVE ENERGY PROJECTSPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(F) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR A NEW EDUCATION FACILITYPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(G) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR EMERGENCY DEPARTMENT PROJECTPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(H) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PROJECTS RELATED TO CONEMAUGH MEDICAL PARKPROJECT ALLOCATION 5,000,000

20130SB0680PN1329 - 286 -

<--

123456789

101112131415161718192021222324252627282930

Page 287:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $5,000,000)(I) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECT AT SITE OF FORMER CONRAD BUILDINGPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(J) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PROJECTS RELATING TO JOHNSTOWN PUBLIC SAFETY BUILDINGPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(K) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR POINT STADIUM PROJECTSPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(iv) Cresson Township(A) Construction, demolition,

renovations, infrastructure and other costs related to expansion of the campus of Mt. Aloysius CollegeProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(v) Ebensburg Borough

(A) Construction, infrastructure and other related costs for Cambria County

20130SB0680PN1329 - 287 -

123456789

101112131415161718192021222324252627282930

Page 288:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Courthouse renovation projectProject Allocation 500,000(Base Project Allocation - $500,000)

(vi) Hastings Borough(A) Acquisition, construction,

reconstruction, rehabilitation, upgrade, infrastructure improvements and other related costs for the Conemaugh Miners Medical Center in Hastings and surrounding municipalitiesProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR MEDICAL CENTER PROJECTS IN THE BOROUGH AND SURROUNDING MUNICIPALITIESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(vii) Loretto Borough(A) Construction, infrastructure and

other related costs for renovation and expansion of Saint Francis University School of Health Sciences complexProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(VIII) RICHLAND TOWNSHIP

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT,

20130SB0680PN1329 - 288 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 289:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR AMBULATORY CARE CENTERPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(12) Cameron County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project in the countyProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(13) Carbon County

(i) County projects(A) Site development, infrastructure,

redevelopment, construction and other costs related to construction of educational facility in Carbon CountyProject Allocation 4,800,000(Base Project Allocation - $4,800,000)

(B) Construction, site development, infrastructure and other costs related to construction of educational facility for Lehigh Carbon Community CollegeProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(C) Construction, infrastructure and other related costs for Blue Mountain

20130SB0680PN1329 - 289 -

123456789

101112131415161718192021222324252627282930

Page 290:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Health Systems renovation projects at Palmerton Hospital and Gnaden Huetten Memorial Hospital campusesProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(D) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the countyProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(II) NESQUEHONING BOROUGH(A) CONSTRUCTION, RENOVATION AND OTHER

RELATED COSTS FOR EXPANSION OF CARBON COUNTY CORRECTIONAL FACILITYPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(14) Centre County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for wildlife education centerProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Acquisition, infrastructure, construction and other related costs for development of expanded natural gas servicesProject Allocation 5,000,000

20130SB0680PN1329 - 290 -

<--

123456789

101112131415161718192021222324252627282930

Page 291:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $5,000,000)(C) Acquisition, infrastructure,

construction and other related costs for rehabilitation and expansion of Memorial Field and Central Parklet, located in State College BoroughProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(D) Acquisition, infrastructure, construction and other related costs for centralized, all-inclusive YMCA multisports facilityProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(E) CONSTRUCTION, INFRASTRUCTURE,

ACQUISITION AND OTHER RELATED COSTS FOR DEVELOPMENT OF NATURAL GAS SERVICESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(F) CONSTRUCTION, REHABILITATION, SITE UPGRADES, CONNECTOR ROAD TO PENN EAGLE INDUSTRIAL PARK, LOADING EQUIPMENT, BUILDING UPGRADES, ACCESS SYSTEM AND OTHER RELATED COSTS FOR DEVELOPMENT OF A CENTRALIZED TRANSLOADING SITE AT TITAN ENERGY PARKPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

20130SB0680PN1329 - 291 -

<--

123456789

101112131415161718192021222324252627282930

Page 292:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(G) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR DEVELOPMENT OF NATURAL GAS SERVICESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(ii) Moshannon Valley Economic Development Partnership(A) Acquisition, infrastructure,

construction and other related costs for medical building in medically underserved areaProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(III) GEISINGER AUTHORITY(A) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR EXPANDED ACCESS TO PRIMARY AND SPECIALTY CARE PROJECTPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(IV) CENTRE HALL BOROUGH/POTTER TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR NEW FIRE HALLPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(V) COLLEGE TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR DEVELOPMENT OF COMPRESSED NATURAL GAS FUELING STATION

20130SB0680PN1329 - 292 -

<--

123456789

101112131415161718192021222324252627282930

Page 293:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FOR CENTRE COUNTY RECYCLING AND REFUSE AUTHORITY OPERATIONSPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(VI) STATE COLLEGE BOROUGH(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR MIXED-USE DEVELOPMENT, INCLUDING RETAIL, HOTEL, RESIDENTIAL AND PARKINGPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(15) Chester County(i) County projects

(A) Acquisition, infrastructure, renovations and other related costs for improvement to park facilitiesProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovations, rehabilitation and other related costs for community revitalization projectsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, infrastructure, renovations, rehabilitation and other related costs for economic development projectsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

20130SB0680PN1329 - 293 -

123456789

101112131415161718192021222324252627282930

Page 294:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(D) Construction, infrastructure and other related costs for Valley Forge Christian College Athletic Facilities expansion projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) Construction, infrastructure and other related costs for renovation of existing Technical High School Pickering CampusProject Allocation 2,400,000(Base Project Allocation - $2,400,000)

(ii) Chester County Economic Development Council(A) Acquisition, infrastructure,

construction, streetscape improvements, industrial and commercial site development and other capital revitalization in Borough of Kennett SquareProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Acquisition, infrastructure,

construction, commercial development and other related costs for Route 1 corridor in southern Chester CountyProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)

20130SB0680PN1329 - 294 -

123456789

101112131415161718192021222324252627282930

Page 295:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(iii) Chester County Industrial Development Authority(A) Acquisition, infrastructure,

construction and other related costs for development of commercial center in East Brandywine TownshipProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) (A) Acquisition, demolition, infrastructure, construction and other related costs, including abatement of hazardous materials, for multisite, transit-oriented redevelopment project in City of Coatesville. Redevelopment to include reconstruction of infrastructure, renovation of historic facilities and new constructionProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(C) (B) Acquisition, construction,

infrastructure and other related costs for renovation of historical cultural centerProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(iii.1) Downingtown Borough(A) Construction, infrastructure,

acquisition and related costs for development and expansion of

20130SB0680PN1329 - 295 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 296:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Downingtown Transportation CenterProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(III.2) EASTTOWN TOWNSHIP(A) CONSTRUCTION, RENOVATION, DEMOLITION,

ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR FIRE COMPANY APPARATUS BUILDINGPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(iv) East Whiteland Township(A) Construction, infrastructure

improvements and other costs related to People's Theatre Phase III expansion projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure improvements and other costs related to Immaculata University building projectsProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(v) Malvern Borough(A) Construction, infrastructure,

acquisition and related costs associated with reuse and development projectsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

20130SB0680PN1329 - 296 -

<--

123456789

101112131415161718192021222324252627282930

Page 297:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(vi) Phoenixville Borough(A) Construction, infrastructure

improvements and other costs related to Colonial Theatre expansion projectProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(B) Mixed-use development, including construction, infrastructure, acquisition and related costs at former Phoenix Steel siteProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PARKING GARAGE AND RECONSTRUCTION OF TRANSIT SERVICE TRESTLE BRIDGEPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(D) CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS FOR UPGRADES TO REEVES PARK, INCLUDING RENOVATIONS TO HISTORIC MEMORIALS AND CIVIL WAR-ERA DISPLAYPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(VI.1) SCHUYLKILL TOWNSHIP(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR RENOVATIONS TO MUNICIPAL COMPLEX, INCLUDING POLICE INDOOR SHOOTING

20130SB0680PN1329 - 297 -

<--

123456789

101112131415161718192021222324252627282930

Page 298:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

RANGE, INSTALLATION OF GEOTHERMAL AND SOLAR AND NEW OUTBUILDINGPROJECT ALLOCATION 1,250,000(BASE PROJECT ALLOCATION - $1,250,000)

(B) CONSTRUCTION, RENOVATION, DEMOLITION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR FIRE COMPANY APPARATUSPROJECT ALLOCATION 4,500,000(BASE PROJECT ALLOCATION - $4,500,000)

(vii) Upper Uwchlan Township(A) Construction, infrastructure and

other related costs for roadway reconstruction, landscaping and streetscape improvements to Pennsylvania Drive and Stockton Drive, located within Hankin's EagleviewProject Allocation 700,000(Base Project Allocation - $700,000)

(B) Construction and other related costs for renovations and rehabilitation of barn located in Upland Farms Park, to be utilized as local community centerProject Allocation 910,000(Base Project Allocation - $910,000)

(viii) Uwchlan Township(A) Construction, infrastructure and

other related costs for improvement and expansion of Eagleview complexProject Allocation 10,000,000

20130SB0680PN1329 - 298 -

123456789

101112131415161718192021222324252627282930

Page 299:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $10,000,000)

(B) Construction, infrastructure and other related costs for improvement and expansion of Innovation Center at EagleviewProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ix) West Chester Borough(A) Acquisition, construction,

infrastructure and other related costs for Borough of West Chester multiuse theater projectProject Allocation 500,000(Base Project Allocation - $500,000)

(B) Acquisition, construction, infrastructure and other related costs for West Chester Borough redevelopment projectsProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(C) Acquisition, construction, infrastructure and other related costs for former biopharma site redevelopment projectsProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(16) Clarion County(i) (Reserved)(II) MONROE TOWNSHIP

20130SB0680PN1329 - 299 -

<--

123456789

101112131415161718192021222324252627282930

Page 300:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR ASSISTED LIVING SENIOR COMMUNITYPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR YMCA HEALTH AND WELLNESS CENTERPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(17) Clearfield County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ii) Moshannon Valley Economic Development

Partnership(A) Acquisition, infrastructure,

construction and other related costs for medical building in medically underserved areaProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iii) City of DuBois(A) Infrastructure, construction and

other related costs for expansion of existing medical arts building at

20130SB0680PN1329 - 300 -

123456789

101112131415161718192021222324252627282930

Page 301:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

DuBois Regional Medical CenterProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(18) Clinton County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) ACQUISITION, CONSTRUCTION, FACILITY

IMPROVEMENTS, MACHINERY AND EQUIPMENT COSTS RELATED TO RENOVATION AND EXPANSION WITH JERSEY SHORE STEELPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(II) LOCK HAVEN(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR BROADBAND FIBER AND WIRELESS COMMUNICATIONS PROJECTPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(B) CONSTRUCTION AND OTHER RELATED COSTS FOR RENOVATION OF OFFICE BUILDING AT LOCK HAVEN UNIVERSITYPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(ii) (III) Wayne Township

20130SB0680PN1329 - 301 -

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 302:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Acquisition, construction and related infrastructure for a mulch recycling facilityProject Allocation 750,000(Base Project Allocation - $750,000)

(B) Demolition, construction and related infrastructure to relocate weight scale and to construct scale house and roadway related to overall projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction and infrastructure for a new administration building that will include educational facilitiesProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(D) Construction and related infrastructure for compressed natural gas filling station for solid waste authority vehicles and public fillingProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(E) Acquisition, construction and related infrastructure for a vehicle maintenance shop for service of compressed natural gas vehiclesProject Allocation 750,000(Base Project Allocation - $750,000)

(F) Construction and related infrastructure for facilities to

20130SB0680PN1329 - 302 -

123456789

101112131415161718192021222324252627282930

Page 303:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

collect and process landfill gas into compressed natural gasProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(19) Columbia County(i) (Reserved)(I) COUNTY PROJECTS

(A) RENOVATIONS AND UPGRADES TO BER VAUGHN PARK SWIMMING POOL COMPLEXPROJECT ALLOCATION 2,750,000(BASE PROJECT ALLOCATION - $2,750,000)

(20) Crawford County(i) County projects

(A) Acquisition, infrastructure, and construction of trail segments advancing Erie-to-Pittsburgh trail corridor and closing existing gapsProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, construction and renovations of existing or needed infrastructure promoting economic developmentProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ii) Conneaut Valley Economic and Industrial Development Authority(A) Acquisition, rehabilitation,

construction and other related costs, including abatement of hazardous

20130SB0680PN1329 - 303 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 304:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

materials, for regional economic development project in downtown Conneautville BoroughProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(iii) Economic Progress Alliance of Crawford County(A) Acquisition, infrastructure

improvements, site planning, renovation, remediation, construction and other related costs for continued development of Linesville Business ParkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure improvements, site planning, renovation, remediation, construction and other related costs for continued development of Bessemer Street in City of MeadvilleProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure improvements, site planning, renovation, remediation, construction and other related costs for continued development of Crawford Woodlands in Vernon TownshipProject Allocation 2,000,000

20130SB0680PN1329 - 304 -

123456789

101112131415161718192021222324252627282930

Page 305:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,000,000)(D) Acquisition, infrastructure,

construction and other related costs for redevelopment and expansion of Meadville Medical CenterProject Allocation 25,000,000(Base Project Allocation -

$25,000,000)(iv) Redevelopment Authority of the City of

Meadville(A) Acquisition, infrastructure,

construction and other related costs for renovations and redevelopment of various land parcels and commercial properties located within City of MeadvilleProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Construction, infrastructure and other related costs for renovation of Bentley Hall at Allegheny CollegeProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(v) Titusville Redevelopment Authority

(A) Infrastructure, construction and redevelopment of properties along Titusville portion of Erie-to-Pittsburgh trailProject Allocation 500,000

20130SB0680PN1329 - 305 -

123456789

101112131415161718192021222324252627282930

Page 306:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $500,000)(B) Acquisition, rehabilitation,

construction and other related costs, including abatement of hazardous materials, for redevelopment of blighted properties located within City of TitusvilleProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Infrastructure, renovation and redevelopment of several steel mill buildings for conversion into multitenant industrial buildingProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Infrastructure and other related costs for construction of five light manufacturing incubators, including new buildings, loading docks, rail spur and rail sidingsProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(VI) CONNEAUT LAKE BOROUGH(A) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT AND OTHER RELATED COSTS FOR REVITALIZATION OF DOWNTOWN BUSINESS DISTRICTPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(21) Cumberland County

20130SB0680PN1329 - 306 -

<--

123456789

101112131415161718192021222324252627282930

Page 307:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(I) (RESERVED)(I.1) (II) CAMP HILL BOROUGH

(A) LAND ACQUISITION, CONSTRUCTION, INFRASTRUCTURE IMPROVEMENT, RENOVATION AND OTHER RELATED COSTS FOR EXPANSION OF HOLY SPIRIT HEALTH SYSTEM FACILITIESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(I.2) (III) EAST PENNSBORO TOWNSHIP(A) LAND ACQUISITION, INFRASTRUCTURE

IMPROVEMENTS, DEMOLITION, SITE IMPROVEMENT, RENOVATION, ADDITION, UTILITY EXPANSION, CONSTRUCTION, PURCHASE OF MEDICALLY NECESSARY FIXTURES AND OTHER RELATED COSTS FOR HOSPITAL AND OTHER RELATED FACILITIES OF HOLY SPIRIT HEALTH SYSTEMPROJECT ALLOCATION 3,500,000(BASE PROJECT ALLOCATION - $3,500,000)

(I.3) (IV) HAMPDEN TOWNSHIP(A) CONSTRUCTION, ACQUISITION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PINNACLEHEALTH WEST SHORE CAMPUSPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(B) ACQUISITION, INFRASTRUCTURE,

CONSTRUCTION, REDEVELOPMENT AND OTHER

20130SB0680PN1329 - 307 -

<--

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 308:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

RELATED COSTS FOR PINNACLEHEALTH COMMUNITY CAMPUSPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(I.4) (V) HAMPDEN TOWNSHIP

(A) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(VI) BOROUGH OF LEMOYNE(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR NEW FIRE STATIONPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(i) (I.5) (VII) Borough of Shippensburg(A) Acquisition, infrastructure,

construction and other costs related to Dykeman Road extension project located within industrial parkProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Renovations, redevelopment and other related costs for design, construction and development of community centerProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

20130SB0680PN1329 - 308 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 309:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(ii) (VIII) Silver Spring Township(A) Land acquisition, infrastructure

improvements, environmental remediation, construction and other related costs for community recreational facilitiesProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(III) (IX) SOUTH MIDDLETON TOWNSHIP(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR NEW DINING FACILITY AND IMPROVEMENTS TO EXISTING BUILDINGS THAT ARE PART OF DIAKON WILDERNESS CENTERPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(X) WORMLEYSBURG BOROUGH(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER COSTS RELATED TO THE EXPANSION OF EARLY CHILDHOOD CENTER AT HARRISBURG ACADEMYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(22) Dauphin County

20130SB0680PN1329 - 309 -

<--

<--

<--

<--123456789

101112131415161718192021222324252627282930

Page 310:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(i) County projects(A) Construction and other related costs

for improvement of infrastructure in City of Harrisburg and other surrounding communitiesProject Allocation 24,000,000(Base Project Allocation -

$24,000,000)(B) Acquisition, construction,

infrastructure and other related costs for Union House Apartment adaptive reuse projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction and infrastructure improvements for Jewish Federation of Greater Harrisburg facilityProject Allocation 1,100,000(Base Project Allocation - $1,100,000)

(D) ACQUISITION, CONSTRUCTION AND RELATED INFRASTRUCTURE FOR FACILITY TO PROVIDE TRAINING FOR MULTIDISCIPLINARY INVESTIGATIVE TEAMS AND OTHER INDIVIDUALS IN AREA OF CHILD PROTECTIVE SERVICESPROJECT ALLOCATION 3,500,000(BASE PROJECT ALLOCATION - $3,500,000)

(E) CONSTRUCTION OF FIREARM MANUFACTURING FACILITY TO BE LOCATED WITHIN TEN MILES OF HARRISBURG INTERNATIONAL

20130SB0680PN1329 - 310 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 311:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

AIRPORT (HIA)PROJECT ALLOCATION 38,000,000(BASE PROJECT ALLOCATION -

$38,000,000)(ii) City of Harrisburg

(A) Acquisition, construction, infrastructure and other related costs for Greenwood Business Center incubator projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) CONSTRUCTION, RENOVATION, REHABILITATION, REDEVELOPMENT, INFRASTRUCTURE IMPROVEMENT AND OTHER RELATED COSTS AT HARRISBURG RESOURCE RECOVERY FACILITYPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR CONSTRUCTION OF ART AND ATHLETIC FACILITYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECTSPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

20130SB0680PN1329 - 311 -

<--

123456789

101112131415161718192021222324252627282930

Page 312:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$20,000,000)(E) ACQUISITION, CONSTRUCTION AND OTHER

RELATED COSTS FOR PINNACLEHEALTH CAMPUS IMPROVEMENTS AND EXPANSIONPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(F) ACQUISITION, RENOVATION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR SITE DEVELOPMENT AND IMPROVEMENTS, INCLUDING STRUCTURAL IMPROVEMENTS, FOR AT-RISK YOUTH THROUGH RENOVATION OF JOSHUA LEARNING CENTERPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(G) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR A SALVATION ARMY CORPS COMMUNITY CENTER ON PAXTON STREETPROJECT ALLOCATION 6,000,000(BASE PROJECT ALLOCATION - $6,000,000)

(iii) Derry Township(A) Acquisition, construction,

infrastructure and other related costs for Vista Foundation Autism Spectrum Disorder projectProject Allocation 350,000(Base Project Allocation - $350,000)

(III.1) EAST HANOVER TOWNSHIP

20130SB0680PN1329 - 312 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 313:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(iv) Londonderry Township(A) Construction, infrastructure and

other related costs for water service infrastructure for commercial and industrial projectsProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(IV.1) LOWER PAXTON TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR RECREATION FACILITY ON BISHOP MCDEVITT HIGH SCHOOL CAMPUS ON SPRING CREEK ROADPROJECT ALLOCATION 725,000(BASE PROJECT ALLOCATION - $725,000)

(B) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(C) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PINNACLEHEALTH COMMUNITY CAMPUS

20130SB0680PN1329 - 313 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 314:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(IV.2) MIDDLE PAXTON TOWNSHIP

(A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RENOVATION AND EXPANSION OF YWCA'S CAMP REILYPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(IV.3) SOUTH HANOVER TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR MUNICIPAL COMPLEX AND EMERGENCY SERVICES FACILITYPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(v) Swatara Township(A) Acquisition, construction,

infrastructure and other related costs for Swatara Gardens senior housing projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(V.1) SUSQUEHANNA TOWNSHIP(A) PURCHASE, RENOVATION AND OTHER

RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000

20130SB0680PN1329 - 314 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 315:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $3,740,000)(23) Delaware County

(i) County projects(A) Acquisition, infrastructure,

construction and other related costs for commercial development of housing, retail and other mixed uses at Widener UniversityProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Delaware County Housing Authority, acquisition, infrastructure, redevelopment, construction, abatement of hazardous materials and other related costs for development of properties in Ridley Township and Nether Providence TownshipProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(C) CONSTRUCTION, RENOVATIONS AND OTHER COSTS RELATED TO CONVERSION AND UPGRADE OF ALL PATIENT ROOMS TO PRIVATE ROOMS AT DELAWARE COUNTY MEMORIAL HOSPITALPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(i.1) Chester Economic Development Authority(A) Construction, expansion,

infrastructure improvements, environmental remediation,

20130SB0680PN1329 - 315 -

<--

123456789

101112131415161718192021222324252627282930

Page 316:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

rehabilitation, renovation and other related costs for the completion of Phase II for sports and entertainment complex on Chester waterfrontProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(i.2) Delaware County Commerce Center

(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for entertainment, hotel and special events facilityProject Allocation 12,500,000(Base Project Allocation -

$12,500,000)(B) CONSTRUCTION, INFRASTRUCTURE,

RENOVATION AND OTHER RELATED COSTS FOR ALTERNATIVE ENERGY FACILITY UTILIZING PLASMA TECHNOLOGIESPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(ii) Delaware County Industrial Development Authority(A) Infrastructure, construction and

other related costs for revitalization of former Sears siteProject Allocation 4,200,000(Base Project Allocation - $4,200,000)

(B) Infrastructure, construction, public utility upgrades and other related

20130SB0680PN1329 - 316 -

<--

123456789

101112131415161718192021222324252627282930

Page 317:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

costs for Chadds Ford redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, site preparation, infrastructure and construction costs related to mixed-use redevelopment project to be located adjacent to Cardinal O'Hara High SchoolProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(D) ACQUISITION, SITE PREPARATION,

CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS TO SUPPORT POND'S EDGE REDEVELOPMENT PROJECT IN MIDDLETOWN TOWNSHIPPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(E) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE REDEVELOPMENT OF FORMER LYONDELL BUILDING IN NEWTOWN TOWNSHIPPROJECT ALLOCATION 5,798,000(BASE PROJECT ALLOCATION - $5,798,000)

(iii) Delaware County Redevelopment Authority(A) Site preparation, installation of

public utilities and related facilities, construction and

20130SB0680PN1329 - 317 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 318:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

installation of sidewalks and fencing and other related costs for multipurpose athletic facility at Cardinal O'Hara High SchoolProject Allocation 300,000(Base Project Allocation - $300,000)

(B) Infrastructure, renovations, construction and other related costs for rehabilitation of former school building to accommodate day program servicesProject Allocation 500,000(Base Project Allocation - $500,000)

(C) Acquisition, infrastructure, construction and other related costs for development of integrated ambulatory center for Mercy Health System to provide expanded access to primary care, specialty care and diagnostic servicesProject Allocation 1,750,000(Base Project Allocation - $1,750,000)

(D) Infrastructure, construction, renovation and other related costs for expansion of Neumann University's Bruder Student Life CenterProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(E) Acquisition, design, infrastructure, construction, renovation and other

20130SB0680PN1329 - 318 -

123456789

101112131415161718192021222324252627282930

Page 319:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

related costs for construction of safety cross-over bridge project, connecting Neumann University's main campus to student center and residence housingProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(F) Acquisition, infrastructure, construction and other related costs for rehabilitation and renovation of the historic Deshong Museum and mansionProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, design, infrastructure, construction and other related costs for access ramp, within Crozer-Chester Medical Center, to allow for ingress and regressProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(H) Acquisition, infrastructure,

redevelopment, construction, abatement of hazardous materials and other related costs for redevelopment of properties in Penn Hills area of Ridley TownshipProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

20130SB0680PN1329 - 319 -

123456789

101112131415161718192021222324252627282930

Page 320:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(I) Land acquisition, infrastructure improvements, demolition, site improvement, renovation, addition, utility expansion and other related costs for hospital and related facilities of main line health systemProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(J) REDEVELOPMENT, CONSTRUCTION,

DEMOLITION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR COMMERCIAL AND RETAIL DEVELOPMENT OF UPPER DARBY 69TH STREET CORRIDORPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(K) REDEVELOPMENT, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR COMMERCIAL DEVELOPMENT OF PRIMOS FILM AND VIDEO STUDIOSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(L) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR NEW ON-CAMPUS STUDENT HOUSING, LIMITED UNIVERSITY-OPERATED AND STUDENT-CENTRIC RETAIL, PERFORMING ARTS CENTER, PEDESTRIAN BRIDGE OVER ROUTE 30 AND PARKING IMPROVEMENTS, INCLUDING A 1,230-CARE PARKING STRUCTURE FOR VILLANOVA

20130SB0680PN1329 - 320 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 321:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

UNIVERSITY IN RADNOR TOWNSHIPPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(M) CONSTRUCTION, ACQUISITION, RAILROAD

INFRASTRUCTURE, INCLUDING SUPPORT FACILITIES, AND RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(iv) City of Chester

(A) Acquisition, infrastructure, construction and other related costs for renovation and rehabilitation of historic 1724 Old Chester Courthouse and courtyardProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MIXED-USE REDEVELOPMENT IN DOWNTOWN CENTRAL BUSINESS DISTRICT AND SURROUNDING NEIGHBORHOODSPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(C) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND

20130SB0680PN1329 - 321 -

<--

123456789

101112131415161718192021222324252627282930

Page 322:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

OTHER RELATED COSTS FOR PARKING PROJECTS IN DOWNTOWN CENTRAL BUSINESS AREA AND SURROUNDING AREASPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(D) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR WATERFRONT REDEVELOPMENTPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(E) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REDEVELOPMENT OF DOWNTOWN CENTRAL BUSINESS DISTRICT AND SURROUNDING NEIGHBORHOODSPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(F) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECTSPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(IV.1) CHESTER TOWNSHIP

(A) CONSTRUCTION AND OTHER RELATED COSTS

20130SB0680PN1329 - 322 -

<--

123456789

101112131415161718192021222324252627282930

Page 323:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FOR FIRE STATIONPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(v) Borough of Eddystone(A) Acquisition, infrastructure,

construction and other related costs for renovation and rehabilitation of Eddystone Fire House and Evacuation CenterProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(VI) GLENOLDEN BOROUGH(A) ACQUISITION, CONSTRUCTION AND OTHER

RELATED COSTS FOR RECREATIONAL FIELDS, MAINTENANCE FACILITY AND WALKING TRAILSPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(VII) MARPLE TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR NEW MUNICIPAL POLICE STATION AND MAGISTERIAL DISTRICT COURTPROJECT ALLOCATION 4,100,000(BASE PROJECT ALLOCATION - $4,100,000)

(B) CONSTRUCTION, INFRASTRUCTURE, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR MARPLE TOWNSHIP MUNICIPAL AND LIBRARY BUILDINGPROJECT ALLOCATION 654,000

20130SB0680PN1329 - 323 -

<--

123456789

101112131415161718192021222324252627282930

Page 324:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $654,000)(C) SITE PREPARATION, INFRASTRUCTURE,

CONSTRUCTION AND OTHER RELATED COSTS TO SUPPORT THE DEVELOPMENT OF NEW FACILITY FOR BROOMALL FIRE COMPANYPROJECT ALLOCATION 3,250,000(BASE PROJECT ALLOCATION - $3,250,000)

(VIII) BOROUGH OF MEDIA(A) CONSTRUCTION, INFRASTRUCTURE,

RENOVATION, REDEVELOPMENT AND OTHER RELATED COSTS FOR MEDIA-UPPER PROVIDENCE FREE LIBRARYPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(VIII.1) MILLBOURNE BOROUGH(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR REDEVELOPMENT OF FORMER SEARS SITEPROJECT ALLOCATION 4,200,000(BASE PROJECT ALLOCATION - $4,200,000)

(IX) MORTON BOROUGH(A) CONSTRUCTION, RENOVATION AND OTHER

RELATED COSTS FOR IMPROVEMENTS TO MUNICIPAL BUILDING, INCLUDING POLICE STATION, BOROUGH OFFICES AND COMMUNITY FACILITIESPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(X) NEWTOWN TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

20130SB0680PN1329 - 324 -

123456789

101112131415161718192021222324252627282930

Page 325:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MUNICIPAL AND PUBLIC SAFETY FACILITYPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(XI) NORWOOD BOROUGH(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR NEW FIREHOUSEPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(XII) PROSPECT PARK BOROUGH(A) CONSTRUCTION, REDEVELOPMENT,

REHABILITATION AND OTHER RELATED COSTS TO REVITALIZE A BLIGHTED BUSINESS/CIVIC DISTRICTPROJECT ALLOCATION 800,000(BASE PROJECT ALLOCATION - $800,000)

(vi) (XIII) Radnor Township(A) Construction, renovation and

rehabilitation of capital facilities, including infrastructure on campus of Cabrini CollegeProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) CONSTRUCTION, REDEVELOPMENT AND OTHER

RELATED COSTS FOR PROJECTS RELATING TO CREUTZBERG CENTERPROJECT ALLOCATION 1,050,000(BASE PROJECT ALLOCATION - $1,050,000)

20130SB0680PN1329 - 325 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 326:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(C) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PROJECTS IN FENIMORE WOODS PARKPROJECT ALLOCATION 700,000(BASE PROJECT ALLOCATION - $700,000)

(D) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS RELATING TO RADNOR TOWNSHIP BUILDINGPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(E) UPGRADES AND DEFERRED MAINTENANCE, PHASE VII, FOR NORTH WAYNE FLOOD MITIGATIONPROJECT ALLOCATION 550,000(BASE PROJECT ALLOCATION - $550,000)

(XIII.1) RIDLEY PARK BOROUGH(A) INFRASTRUCTURE IMPROVEMENTS,

CONSTRUCTION, RELOCATION, RENOVATION AND OTHER RELATED COSTS FOR TAYLOR HOSPITALPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(XIV) SHARON HILL BOROUGH(A) RENOVATIONS, CONSTRUCTION, ENERGY

EFFICIENCY UPGRADES AND OTHER RELATED COSTS FOR SHARON HILL BOROUGH FIRE DEPARTMENTPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

20130SB0680PN1329 - 326 -

<--

123456789

101112131415161718192021222324252627282930

Page 327:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(XV) SPRINGFIELD TOWNSHIP(A) REHABILITATION, RENOVATION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR IMPROVEMENTS TO TWO BUSINESS DISTRICTSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) RENOVATIONS AND OTHER RELATED COSTS FOR ADA ACCESSIBILITY REQUIREMENTS AND UPGRADE FACILITIES USED FOR TOWNSHIP PUBLIC SAFETY AND EMERGENCY OPERATION ACTIVITIESPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(C) RENOVATION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR TOWNSHIP PARKS AND RECREATION PROJECTSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(D) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR DEVELOPMENT OF FULL-SERVICE HOTEL FACILITYPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(E) RENOVATION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR TOWNSHIP BUILDING/POLICE STATIONPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(XVI) TINICUM TOWNSHIP

20130SB0680PN1329 - 327 -

123456789

101112131415161718192021222324252627282930

Page 328:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) CONSTRUCTION, REDEVELOPMENT, REHABILITATION AND OTHER RELATED COSTS FOR RENOVATION OF LAZARETTO QUARANTINE STATION FOR REUSE AS TINICUM TOWNSHIP MUNICIPAL BUILDINGPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(XVII) UPLAND BOROUGH(A) UPGRADE CENTRAL HEAT AND COOLING

SYSTEMS FOR CROZER-KEYSTONE HEALTH SYSTEM, INCLUDING CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTSPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(XVII) (XVIII) UPPER PROVIDENCE TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR NEW GYMNASIUM/MULTIPURPOSE BUILDING AT WALDEN SCHOOL AND RELATED SITE IMPROVEMENTSPROJECT ALLOCATION 1,200,000(BASE PROJECT ALLOCATION - $1,200,000)

(24) Elk County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)

20130SB0680PN1329 - 328 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 329:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(ii) Elk County Redevelopment Authority(A) Acquisition, renovation,

environmental remediation, construction and other related costs for rehabilitation of commercial buildings in Historic District of Ridgway BoroughProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(25) Erie County(i) County Projects

(A) Acquisition, construction, infrastructure improvements and other costs related to the L2S-NMI-ERIE Medical Device Assembly Plant projectProject Allocation 250,000(Base Project Allocation - $250,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ERIE METROPOLITAN TRANSIT AUTHORITY PROJECTSPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR CNG FUELING STATION PROJECTS OF ERIE METROPOLITAN TRANSIT AUTHORITYPROJECT ALLOCATION 2,500,000

20130SB0680PN1329 - 329 -

<--

123456789

101112131415161718192021222324252627282930

Page 330:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $2,500,000)(ii) Boroughs of Albion and Crainesville;

Conneaut and Elk Creek(A) Construct rail improvements and

replace rail bridge at Erie Inland Port-Albion siteProject Allocation 12,000,000(Base Project Allocation -

$12,000,000)(iii) Corry Area Industrial Development

Corporation(A) Acquisition, redevelopment and

rehabilitation of vacant industrial facility to be converted to multitenant manufacturing facilitiesProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(iv) Economic Development Corporation of Erie County(A) Infrastructure, construction,

redevelopment and other related costs for improvement of former potato chip factoryProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v) Erie City(A) Construction, infrastructure and

other related costs for Stairways Behavioral Health neighborhood revitalization project

20130SB0680PN1329 - 330 -

123456789

101112131415161718192021222324252627282930

Page 331:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 5,100,000(Base Project Allocation - $5,100,000)

(B) Construct rail improvements and ship loading infrastructure at Port of ErieProject Allocation 9,000,000(Base Project Allocation - $9,000,000)

(C) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR BUILDING JOINT OPERATIONS FACILITYPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(V.1) CONNEAUT TOWNSHIP(A) ACQUISITION, CONSTRUCTION AND OTHER

RELATED COSTS FOR DEVELOPMENT OF MULTITENANT INDUSTRIAL SITE AS PART OF REGIONAL INITIATIVE CALLED ERIE INLAND PORTPROJECT ALLOCATION 8,075,000(BASE PROJECT ALLOCATION - $8,075,000)

(26) Fayette County(i) Bullskin Township

(A) Construction, infrastructure and other costs related to Fay/West Soccer Complex indoor facility projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) City of Uniontown(A) Acquisition, infrastructure,

construction and other related costs for development of White Swan

20130SB0680PN1329 - 331 -

<--

123456789

101112131415161718192021222324252627282930

Page 332:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

ApartmentsProject Allocation 750,000(Base Project Allocation - $750,000)

(iii) Connellsville City(A) Construction, redevelopment,

infrastructure and other related costs for the renovation of Behavioral Health Unit of Highlands HospitalProject Allocation 1,150,000(Base Project Allocation - $1,150,000)

(27) Forest County(i) (Reserved)

(28) Franklin County(i) Franklin County Redevelopment Authority

(A) Acquisition, construction, infrastructure and other related costs for economic development project in the countyProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Infrastructure, construction and other related costs for renovation and rehabilitation of John Steward Memorial Library on Wilson College campusProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, infrastructure, construction and other related costs for redevelopment of former Scotland

20130SB0680PN1329 - 332 -

123456789

101112131415161718192021222324252627282930

Page 333:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

School for Veterans' Children campus, including construction of educational and other use facilitiesProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(D) Acquisition, infrastructure, construction and other costs related to renovations and improvements at hospital facilities and entities in the countyProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(E) Infrastructure, construction,

abatement of hazardous materials and other related costs for renovation of Prentis Hall on Wilson College CampusProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ii) Chambersburg Borough

(A) Acquisition, infrastructure, design, engineering, renovations, rehabilitation, construction, utility relocation, traffic improvements, traffic signal upgrades and other related costs for upgrading municipal electric systems throughout this CommonwealthProject Allocation 7,000,000

20130SB0680PN1329 - 333 -

123456789

101112131415161718192021222324252627282930

Page 334:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $7,000,000)(B) Acquisition, infrastructure, design,

engineering, renovations, rehabilitation, construction, utility relocation, traffic improvements, traffic signal upgrades and other related costs for creating distributed natural gas generation facilities at municipal electric systems throughout this CommonwealthProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(C) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(iii) Borough of Shippensburg(A) Construction, rehabilitation and

other related costs for improvements to Memorial Park StadiumProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(iv) Borough of Waynesboro(A) Acquisition, construction,

infrastructure and other related costs for economic development project in Borough of WaynesboroProject Allocation 2,000,000

20130SB0680PN1329 - 334 -

<--

123456789

101112131415161718192021222324252627282930

Page 335:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,000,000)(29) Fulton County

(i) (Reserved)(I) COUNTY PROJECTS

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR REHABILITATION OF 8.5 MILES OF ABANDONED PENNSYLVANIA TURNPIKE AS A MULTIUSE TRAILPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(30) Greene County(i) Franklin Township

(A) Acquisition, construction, infrastructure and other related costs for Greene County Airport commercial development projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, construction, infrastructure and other related costs for Waynesburg Crossings economic development projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Acquisition, construction, infrastructure and other related costs for Franklin Township Business Park projectProject Allocation 5,000,000

20130SB0680PN1329 - 335 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 336:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $5,000,000)(D) ACQUISITION, CONSTRUCTION, FACILITY

IMPROVEMENTS, MACHINERY AND EQUIPMENT COSTS RELATED TO RENOVATION OF KYOWA FACILITYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(II) WAYNESBURG BOROUGH(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ACADEMIC BUILDING AT WAYNESBURG UNIVERSITYPROJECT ALLOCATION 7,000,000(BASE PROJECT ALLOCATION - $7,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR DORMITORY AT WAYNESBURG UNIVERSITYPROJECT ALLOCATION 3,500,000(BASE PROJECT ALLOCATION - $3,500,000)

(31) Huntingdon County(i) County projects

(A) Acquisition, construction, infrastructure and other related costs for a Federally Qualified Health Center-anchored multiservice facilityProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(ii) Huntingdon County Business and Industry Incorporated

20130SB0680PN1329 - 336 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 337:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Acquisition, renovation, expansion and other improvements to Huntingdon County Career and Technology CenterProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(32) Indiana County(i) County projects

(A) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of vacant lots at Corporate Campus business parkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of multitenant building at Windy Ridge Business and Technology ParkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of industrial multitenant building known as Dixonville CommonsProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

20130SB0680PN1329 - 337 -

123456789

101112131415161718192021222324252627282930

Page 338:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(D) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for rehabilitation of Indiana Community Center BuildingProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) Acquisition, engineering, infrastructure, construction and other related costs for development of countywide fiber optic networkProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(F) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of multitenant building at 119 Business Park and Joseph Land development projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(G) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of multipurpose building in White TownshipProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(H) Acquisition, engineering, site preparation, infrastructure,

20130SB0680PN1329 - 338 -

123456789

101112131415161718192021222324252627282930

Page 339:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construction and other related costs, including abatement of hazardous materials, for redevelopment of industrial building and conversion to multitenant buildingProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(I) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of vacant lots and acquisition of adjacent property at Windy Ridge Business and Technology ParkProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(J) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of high bay, multitenant, industrial building at Windy Ridge Business and Technology ParkProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(K) Renovation, construction and other related costs for redevelopment of historic Rochester and Pittsburgh Coal Company building and conversion into a boutique hotel

20130SB0680PN1329 - 339 -

123456789

101112131415161718192021222324252627282930

Page 340:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(II) CLYMER BOROUGH(A) ACQUISITION, INFRASTRUCTURE,

REDEVELOPMENT AND OTHER RELATED COSTS TO DEVELOP BOROUGH-OWNED PROPERTY FOR SENIOR RESIDENTIAL DEVELOPMENT, BALLFIELDS, TRAILS, VETERANS MONUMENT, GREEN SPACE AND ADDITIONAL PARKINGPROJECT ALLOCATION 1,650,000(BASE PROJECT ALLOCATION - $1,650,000)

(III) GREEN TOWNSHIP(A) CONSTRUCTION, EXCAVATION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR NEW RAIL SIDING AND TRANSLOADING FACILITYPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(33) Jefferson County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) DEVELOPMENT, CONSTRUCTION,

MAINTENANCE AND OTHER RELATED COSTS FOR A HOTEL IN JEFFERSON COUNTYPROJECT ALLOCATION 2,500,000

20130SB0680PN1329 - 340 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 341:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $2,500,000)(ii) Brockway Borough

(A) Acquisition, infrastructure, construction and other related costs for economic project to be located at intersection of Routes 219 and 28Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Acquisition, infrastructure,

redevelopment, renovations and other related costs for educational and training facilityProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(iii) Eldred Township

(A) Acquisition, infrastructure, construction and other related costs for economic development project in the countyProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(34) Juniata County(i) (Reserved)

(35) Lackawanna County(i) County projects

(A) Acquisition, construction, infrastructure and other related costs for Valley View Business Park

20130SB0680PN1329 - 341 -

123456789

101112131415161718192021222324252627282930

Page 342:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Industrial FacilityProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, renovations, infrastructure and other related costs for dental, medical, health sciences and patient care facilities projectProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(C) Acquisition, construction,

renovations, infrastructure and other related costs for dental, medical, health sciences and patient care clinicProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ii) Archbald Borough(A) Construction, infrastructure and

other costs related to Valley View Business Park redevelopment projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure and other costs related for Archbald Business Park III redevelopment projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

20130SB0680PN1329 - 342 -

123456789

101112131415161718192021222324252627282930

Page 343:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(C) Construction, infrastructure and other costs related to Valley View Business Park new building projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Construction, infrastructure and other costs related to Archbald Route 6 Industrial Facility redevelopment projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECT ALONG PEGGY DRIVE IN ARCHBALD TOWNSHIPPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(F) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR TINKLEPAUGH CREEK FLOOD MITIGATION PROJECTS IN ARCHBALD AND BLAKELY BOROUGHSPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(II.1) ARCHBALD, JESSUP AND BLAKELY BOROUGHS(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR VALLEY

20130SB0680PN1329 - 343 -

<--

123456789

101112131415161718192021222324252627282930

Page 344:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

COMMUNITY CIVIC CENTER PROJECTPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(iii) Blakely Borough(A) Construction, infrastructure and

other costs related to Blakely Borough Main Street Business District revitalization projectProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(iv) Carbondale Township(A) Construction, infrastructure and

other costs related to Carbondale Technology Transfer Complex multitenant flex building projectProject Allocation 361,000(Base Project Allocation - $361,000)

(v) City of Carbondale(A) Acquisition, construction,

infrastructure and other related costs for Carbondale Anchor Building redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vi) City of Scranton(A) Acquisition, construction,

infrastructure and other related costs for Radisson Lackawanna Station restoration projectProject Allocation 4,000,000

20130SB0680PN1329 - 344 -

123456789

101112131415161718192021222324252627282930

Page 345:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $4,000,000)(B) Acquisition, construction,

infrastructure and other related costs for Scranton Department of Public Works complex projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Acquisition, construction, infrastructure and other related costs for Central Business District improvement projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Acquisition, construction, infrastructure and other related costs for South Scranton Area Elm Street revitalization projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(E) Acquisition, construction, infrastructure and other related costs for Central Business District revitalization projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Acquisition, construction, infrastructure and other related costs for Neighborhood Commercial District revitalization projectProject Allocation 4,000,000

20130SB0680PN1329 - 345 -

123456789

101112131415161718192021222324252627282930

Page 346:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $4,000,000)(G) Acquisition, construction,

infrastructure and other related costs for new downtown office buildingProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Acquisition, construction, infrastructure and other related costs for Iron Arts District redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(I) Acquisition, construction, infrastructure and other related costs for Iron Furnaces historic site projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(J) Acquisition, construction,

infrastructure and other related costs for renovation of buildings in Downtown Business District for Lackawanna County Efficiency in Government projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(K) Construction, infrastructure and other costs related to Lackawanna County Park redevelopment and

20130SB0680PN1329 - 346 -

123456789

101112131415161718192021222324252627282930

Page 347:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

improvement projectsProject Allocation 500,000(Base Project Allocation - $500,000)

(L) Construction, infrastructure and other costs related to Lackawanna County Economic Development InitiativeProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(M) Acquisition, construction, infrastructure and other related costs for Lackawanna College Continuing Education expansion projectProject Allocation 1,750,000(Base Project Allocation - $1,750,000)

(N) Acquisition, construction, infrastructure and other related costs for Lackawanna College Learning Commons projectProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(O) Construction, infrastructure and other costs related to Lackawanna College street redevelopment projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(P) Construction, infrastructure and other costs related to Commonwealth Medical College redevelopment projectProject Allocation 500,000(Base Project Allocation - $500,000)

20130SB0680PN1329 - 347 -

123456789

101112131415161718192021222324252627282930

Page 348:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Q) Construction, infrastructure, demolition and other costs related to Scranton Enterprise Center renovation projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(R) Construction, infrastructure and other costs related to former Murray Corporation Building redevelopment projectProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(S) Acquisition, construction, renovation, infrastructure and other related costs for Mt. Pleasant Corporate Center Office Building redevelopment projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(T) Construction and other related costs to rebuild facilities at Scranton's Farmer's Market and Albright AvenueProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(U) Construction, infrastructure and other costs related to University of Scranton South Side Sports Complex projectProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

20130SB0680PN1329 - 348 -

123456789

101112131415161718192021222324252627282930

Page 349:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(V) Construction, infrastructure and other costs related to University of Scranton rehabilitation projectProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(W) Construction, infrastructure and

other costs related to expansion of Sette La Verghetta Center for the Performing Arts at Marywood UniversityProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(X) Construction, infrastructure and other costs related to clinical and community services at Marywood University's South Campus renovation projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(Y) Construction, infrastructure and other costs related to The Knowledge (Learning) Commons at Marywood University redevelopment projectProject Allocation 12,500,000(Base Project Allocation -

$12,500,000)(Z) Acquisition, construction,

infrastructure and other costs related to Wright Primary Care Center development project

20130SB0680PN1329 - 349 -

123456789

101112131415161718192021222324252627282930

Page 350:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(AA) Acquisition, construction, infrastructure and other costs related to redevelopment of Lackawanna AvenueProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(BB) Acquisition, construction,

infrastructure and other costs related to compressed natural gas fueling station and maintenance facilityProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(CC) Acquisition, construction, infrastructure and other costs related to intermodal transportation centerProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(DD) Acquisition, construction, infrastructure and other costs related to Timmy's Town Center Children's Museum projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(EE) Acquisition, renovations, construction, infrastructure and other related costs for dental, medical, health sciences and patient care clinic

20130SB0680PN1329 - 350 -

123456789

101112131415161718192021222324252627282930

Page 351:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vi.1) Covington Township(A) Construction, infrastructure

improvements and other costs for the Moffat Estate redevelopment projectProject Allocation 500,000(Base Project Allocation - $500,000)

(vii) Dickson City(A) Acquisition, construction,

infrastructure and other costs related to Dickson City Senior/Civic Center expansion projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(viii) Jefferson Township(A) Construction, infrastructure and

other costs related to development of commercial site and to provide sanitary sewer infrastructure for projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ix) Jessup Borough(A) Construction, infrastructure and

other costs related to new building at Jessup Small Business CenterProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Acquisition, construction,

20130SB0680PN1329 - 351 -

123456789

101112131415161718192021222324252627282930

Page 352:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure and other costs related to Valley View Business Park Interchange projectProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(x) Laplume Township(A) Construction, infrastructure and

other costs related to recreational facilities and housing projects for Keystone CollegeProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xi) Mayfield Borough(A) Acquisition, construction,

infrastructure and other costs related to Lackawanna Business Center redevelopment projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xii) Moosic Borough(A) Construction, infrastructure

improvements, and other costs related to former JC Penney building expansion projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction, infrastructure and other costs related to new building at Glenmaura Corporate Center

20130SB0680PN1329 - 352 -

123456789

101112131415161718192021222324252627282930

Page 353:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Construction, infrastructure and other costs related to sanitary sewer infrastructure for industrial parkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(xiii) Scott Township(A) Construction, infrastructure

improvements and other costs related to Scott Township Technology and Industrial Facility redevelopment projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xiii.1) South Abington Township(A) Acquisition, development,

construction, infrastructure, design and other costs associated with the Abington Township Maintenance FacilityProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Construction, design, infrastructure improvements and other costs for the Phelps Student Center renovation project at Baptist Bible CollegeProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, development, construction, infrastructure, design

20130SB0680PN1329 - 353 -

123456789

101112131415161718192021222324252627282930

Page 354:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

and other costs associated with a development project at Bible Baptist CollegeProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(D) Construction, design, infrastructure

improvements and other costs for the Jackson Hall renovations at Bible Baptist CollegeProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xiv) Taylor Borough(A) Acquisition, construction,

infrastructure and other costs related to Taylor redevelopment --Colliery/Feltsville projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure and other costs related to Taylor Borough industrial redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(xv) West Mifflin Borough(A) Acquisition, construction,

infrastructure and other costs related to development of aviation, industrial and commercial sites at or surrounding

20130SB0680PN1329 - 354 -

123456789

101112131415161718192021222324252627282930

Page 355:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Allegheny County AirportProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(36) Lancaster County

(i) County projects(A) Infrastructure upgrades, construction

and other related costs for operating room expansion at Heart of Lancaster Regional Medical CenterProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MEDICAL EDUCATION BUILDINGPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(ii) Redevelopment Authority of the County of

Lancaster(A) Acquisition, infrastructure,

construction and other related costs for development and construction of Rock Lititz, a campus-style commercial parkProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(iii) City of Lancaster(A) Acquisition, design, infrastructure,

20130SB0680PN1329 - 355 -

<--

123456789

101112131415161718192021222324252627282930

Page 356:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construction and other related costs for renovations to North Museum of Natural History and Science, including new roof, dome and SciDome touch projection, sound and software systemProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, design, infrastructure, construction and other related costs for mixed-use facility in center of city to be utilized by Millersville University, community services and shopping venuesProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, design, infrastructure, construction and other related costs for state-of-the-art medical education building for Lancaster General College of Nursing and Allied SciencesProject Allocation 22,000,000(Base Project Allocation -

$22,000,000)(D) Infrastructure, construction and

other related costs for design and construction of state-of-the-art facility to be utilized as wellness and medical center and aquatic competition and leisure facilityProject Allocation 22,500,000

20130SB0680PN1329 - 356 -

123456789

101112131415161718192021222324252627282930

Page 357:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $22,500,000)

(E) Design, infrastructure, construction and other related costs for renovations to emergency department and entrances to Lancaster Regional Medical CenterProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(F) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR GREEN INFRASTRUCTURE INITIATIVEPROJECT ALLOCATION 12,000,000(BASE PROJECT ALLOCATION -

$12,000,000)(G) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR NORTH PRINCE STREET REDEVELOPMENT PROJECTPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(H) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REVITALIZATION INITIATIVES IN NORTHEASTERN AREAPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(I) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REDEVELOPMENT

20130SB0680PN1329 - 357 -

<--

123456789

101112131415161718192021222324252627282930

Page 358:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECTS ALONG SOUTH MARKET STREET AND SOUTH PRINCE STREETPROJECT ALLOCATION 12,000,000(BASE PROJECT ALLOCATION -

$12,000,000)(J) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REVITALIZATION INITIATIVES IN SOUTHWESTERN AREAPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(K) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR REDEVELOPMENT OF FORMER STAHR ARMORYPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(L) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR WEST KING STREET REDEVELOPMENT PROJECTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(iv) Elizabethtown Borough

(A) Design, infrastructure, renovations, abatement of hazardous materials and other related costs for building access modifications, including installation of card access boxes,

20130SB0680PN1329 - 358 -

123456789

101112131415161718192021222324252627282930

Page 359:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

video surveillance cameras, door and window improvements and fire control at Elizabethtown CollegeProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Site development, infrastructure improvements, construction and renovation of instructional classroom building at Elizabethtown CollegeProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Site development, infrastructure improvements, construction and other related costs for athletic facilities at Elizabethtown CollegeProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Site development, infrastructure improvements, renovation, construction and other related costs for buildings and residence halls at Elizabethtown CollegeProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS FOR SITE DEVELOPMENT AND INFRASTRUCTURE IMPROVEMENTS OF BUILDINGS AND RESIDENCE HALLS AT ELIZABETHTOWN COLLEGEPROJECT ALLOCATION 5,000,000

20130SB0680PN1329 - 359 -

<--

123456789

101112131415161718192021222324252627282930

Page 360:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $5,000,000)(F) SITE DEVELOPMENT, INFRASTRUCTURE

IMPROVEMENTS, CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS FOR INSTRUCTIONAL CLASSROOM BUILDING AT ELIZABETHTOWN COLLEGEPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(G) CONSTRUCTION AND OTHER RELATED COSTS FOR ATHLETIC FIELDS, FIELD HOUSE, FITNESS CENTER AND WELLNESS CENTER FOR ELIZABETHTOWN COLLEGEPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(H) RENOVATIONS, IMPROVEMENTS AND OTHER RELATED COSTS FOR SAFETY AND SECURITY AT ELIZABETHTOWN COLLEGEPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(V) HEMPFIELD TOWNSHIP(A) PURCHASE, RENOVATION AND OTHER

RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(VI) MANHEIM TOWNSHIP(A) PURCHASE, RENOVATION AND OTHER

RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT

20130SB0680PN1329 - 360 -

123456789

101112131415161718192021222324252627282930

Page 361:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(VII) MARIETTA BOROUGH(A) ACQUISITION, SITE PREPARATION,

INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS, INCLUDING DEVELOPMENT OF MUSEUM ON MIXED-USE SITEPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(VIII) MT. JOY TOWNSHIP

(A) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES BY KEYSTONE HUMAN SERVICES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(v) (IX) New Holland Borough(A) Acquisition, infrastructure,

construction and other related costs to expand and modernize food products manufacturing facilityProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(X) SALISBURY TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE IMPROVEMENT, INCLUDING, BUT NOT LIMITED TO, IMPROVEMENTS

20130SB0680PN1329 - 361 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 362:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

RELATED TO ROAD, HIGHWAY AND PARKING AND OTHER RELATED COSTS FOR DIRECT FULFILLMENT CENTER IN THE AREA OF THE TOWN OF GAPPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(vi) (XI) Warwick Township

(A) Acquisition, infrastructure, construction and other related costs for development and construction of Rock Lititz, a campus-style commercial parkProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(37) Lawrence County(i) City of New Castle

(A) Infrastructure, construction and other related costs for Jameson Health System expansion of ambulatory services, renovation and technology enhancementsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR REDEVELOPMENT IN INDUSTRIAL CORRIDORPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

20130SB0680PN1329 - 362 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 363:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(II) SHENANGO TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR INDUSTRIAL PARKPROJECT ALLOCATION 7,000,000(BASE PROJECT ALLOCATION - $7,000,000)

(III) UNION TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MIXED-USE COMMERCE PARKPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(B) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF MIXED-USE COMMERCIAL PARKPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(IV) WAMPUM AND NEW BEAVER BOROUGHS

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR INDUSTRIAL PARKS AND RELATED PROJECTSPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(38) Lebanon County

20130SB0680PN1329 - 363 -

123456789

101112131415161718192021222324252627282930

Page 364:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(i) County projects(A) Design, engineering, infrastructure

improvements, construction and other related costs for redevelopment of Good Samaritan Hospital Cancer Care CenterProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure improvements, construction and related costs for development of North Cornwall Commons projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(II) CITY OF LEBANON(A) ACQUISITION, CONSTRUCTION AND OTHER

COSTS RELATED TO ADDITIONAL STUDENT PARKING FOR HARRISBURG AREA COMMUNITY COLLEGE, LEBANON CAMPUSPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(II) (III) LEBANON COUNTY HEALTH FACILITIES AUTHORITY(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR CANCER TREATMENT CENTER IN SOUTH LEBANON TOWNSHIPPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(III) (IV) EAST HANOVER TOWSHIP

20130SB0680PN1329 - 364 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 365:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) PURCHASE, RENOVATION AND OTHER RELATED COSTS FOR COMMUNITY HOMES TO SUPPORT PERSONS WITH INTELLECTUAL DISABILITIES AND DEVELOPMENT OF CENTER FOR SUSQUEHANNA SERVICE DOGS PROGRAM, INCLUDING CONSTRUCTION OF KENNELS AND RENOVATIONS TO CREATE TRAINING CENTER AND OFFICES BY KEYSTONE HUMAN SERVICESPROJECT ALLOCATION 3,740,000(BASE PROJECT ALLOCATION - $3,740,000)

(39) Lehigh County(i) Catasauqua Borough

(A) Construction, infrastructure improvements and other costs related to the mixed-use Catasauqua redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECTPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(ii) City of Allentown(A) Acquisition, abatement of hazardous

materials, redevelopment and other related costs for construction of mixed-use facility adjacent to Sacred Heart Hospital

20130SB0680PN1329 - 365 -

<--

123456789

101112131415161718192021222324252627282930

Page 366:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Infrastructure, rehabilitation, construction and renovation of health center facilitiesProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Construction, renovation and other related costs for rehabilitation of Sacred Heart HospitalProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Acquisition, renovations, abatement of hazardous materials, construction and other related costs for rehabilitation of Civic Theatre of AllentownProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(E) Land acquisition, infrastructure improvements, construction and other costs related to Little Lehigh Creek Industrial Corridor redevelopment projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(F) Infrastructure, renovations, construction and other related cost for Miller Symphony Hall's Lyric and Balcony rehabilitation projects

20130SB0680PN1329 - 366 -

123456789

101112131415161718192021222324252627282930

Page 367:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 250,000(Base Project Allocation - $250,000)

(G) Acquisition, renovations, construction and other related cost for DaVinci Discovery Center of Science and TechnologyProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(H) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for development of properties in City of AllentownProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(I) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment of Oakwood Medical Associates buildingProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(J) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for development of medical office building in the vicinity of Sacred Heart HospitalProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

20130SB0680PN1329 - 367 -

123456789

101112131415161718192021222324252627282930

Page 368:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(K) RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR EPISCOPAL HOUSE FACILITYPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(L) CONSTRUCTION, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR SPORTS MEDICINE, REHABILITATION AND HEALTH CENTER FACILITIESPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(M) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR MULTISTORY ADAPTIVE REUSE PROJECTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(N) CONSTRUCTION, INFRASTRUCTURE,

ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT OF FORMER AGERE TECHNOLOGIES PLANT CAMPUSPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(O) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ATHLETIC FIELD IMPROVEMENTS AT CEDAR CREST COLLEGE

20130SB0680PN1329 - 368 -

<--123456789

101112131415161718192021222324252627282930

Page 369:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(P) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR ST. LUKE'S UNIVERSITY HEALTH NETWORKPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(iii) City of Bethlehem(A) Construction, infrastructure

improvements and other costs related to Lehigh Valley Hospital renovation and expansion projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR ST. LUKE'S UNIVERSITY HEALTH NETWORKPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(iv) Fountain Hill Borough(A) Construction, infrastructure

improvements and other costs related to St. Luke's Hospital Bethlehem Campus expansion projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Construction, infrastructure

20130SB0680PN1329 - 369 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 370:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

improvements and other costs related to storm water retention system for flooding mitigation in Mill 2 complexProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR MILL 2 PROJECTSPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(V) HEIDELBERG TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR MUNICIPAL GOVERNMENT CENTERPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(VI) NORTH WHITEHALL TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR ADULT INPATIENT HOSPITAL ON KIDSPEACE ORCHARD HILLS CAMPUSPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(VII) SALISBURY TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR RENOVATION AND EXPANSION OF LEHIGH VALLEY HOSPITAL CEDAR CRESTPROJECT ALLOCATION 10,000,000

20130SB0680PN1329 - 370 -

<--

123456789

101112131415161718192021222324252627282930

Page 371:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $10,000,000)

(VIII) SOUTH WHITEHALL TOWNSHIP(A) CONSTRUCTION, RENOVATION AND OTHER

RELATED COSTS FOR EXPANSION AND DEVELOPMENT OF ST. LUKE'S HOSPITAL ANDERSON CAMPUSPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(B) CONSTRUCTION, RENOVATION AND OTHER

RELATED COSTS NECESSARY TO FURTHER DEVELOP ST. LUKE'S WEST END MEDICAL CENTERPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(IX) UPPER MACUNGIE TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR NEW BUSINESS DEVELOPMENTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR NEW POLICE STATIONPROJECT ALLOCATION 1,900,000(BASE PROJECT ALLOCATION - $1,900,000)

(40) Luzerne County(i) County projects

20130SB0680PN1329 - 371 -

123456789

101112131415161718192021222324252627282930

Page 372:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Acquisition, construction, infrastructure and other costs related to development of Lackawanna River Heritage Trail, lower section, along Lackawanna RiverProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) For acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the countyProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(C) Land acquisition, infrastructure improvements, demolition, site improvement, renovation, addition, utility expansion, construction, purchase of medically necessary fixtures and other related costs for hospital and other related facilities of the Greater Hazelton Health AllianceProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(D) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR 20-MEGAWATT FREQUENCY REGULATION PLANT

20130SB0680PN1329 - 372 -

<--

123456789

101112131415161718192021222324252627282930

Page 373:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(i.1) City of Hazelton

(A) For the acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the cityProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) City of Nanticoke(A) (B) Land acquisition, infrastructure

improvements, site improvement, renovation, construction and other costs related to Greater Hazleton Health Alliance Health and Wellness CenterProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(II) CITY OF NANTICOKE(B) (A) For the acquisition,

construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the cityProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) City of Pittston(A) Acquisition, construction,

20130SB0680PN1329 - 373 -

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 374:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure and other costs related to Main & Market Professional Center projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) For the acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the cityProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR LIBRARY EXPANSION PROJECTPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(iv) City of Wilkes-Barre(A) Acquisition, construction,

infrastructure and other costs related to redevelopment of Citizens Bank CenterProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Construction, infrastructure improvements and other costs related to Wilkes University engineering school development projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

20130SB0680PN1329 - 374 -

<--

123456789

101112131415161718192021222324252627282930

Page 375:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(C) For the acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the cityProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR EXPANSION AND ENERGY SUSTAINABILITY PROJECT AT KING'S COLLEGEPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(v) Dupont Borough(A) Acquisition, construction,

infrastructure and other costs related to Wilkes-Barre/Scranton International Airport economic development projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vi) Plains Township(A) Construction, infrastructure

improvements and other costs related to Ultimate Sports facility projectProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(41) Lycoming County(i) County projects

(A) Construction, rehabilitation and

20130SB0680PN1329 - 375 -

<--

123456789

101112131415161718192021222324252627282930

Page 376:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

other related costs to serve NuWeld Corporation manufacturing facilityProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, demolition and other costs related to Williamsport Regional Airport terminal building projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Design and construction of facility improvements, including directional signage, terminal building, renovations and parking at Williamsport Regional AirportProject Allocation 3,676,000(Base Project Allocation - $3,676,000)

(D) Acquisition, rehabilitation, construction and other related costs for health care and housing facilities for Susquehanna Health SystemProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(E) Acquisition, infrastructure,

construction, redevelopment and other related costs for Susquehanna Community Health and Dental CenterProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)

20130SB0680PN1329 - 376 -

123456789

101112131415161718192021222324252627282930

Page 377:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(F) Acquisition, infrastructure, construction and other related costs for county forensic science centerProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(G) Acquisition, construction, infrastructure and other related costs for mixed-use development of land located at intersection of Brushy Ridge Road and Fairfield Road in Fairfield TownshipProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(H) ACQUISITION, CONSTRUCTION,

REDEVELOPMENT AND OTHER RELATED COSTS FOR SUSQUEHANNA HEALTH SYSTEM FACILITIESPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(I) ACQUISITION, CONSTRUCTION, FACILITY

IMPROVEMENTS, MACHINERY AND EQUIPMENT COSTS RELATED TO RENOVATION AND EXPANSION WITH JERSEY SHORE STEELPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(I.1) CITY OF WILLIAMSPORT(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR YMCA COMMUNITY

20130SB0680PN1329 - 377 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 378:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

CENTERPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(B) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR LYCOMING ENGINES FACILITY IMPROVEMENT PROJECTPROJECT ALLOCATION 2,255,000(BASE PROJECT ALLOCATION - $2,255,000)

(C) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR WILLIAMSPORT YMCAPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(ii) Muncy Township(A) Acquisition, site preparation,

infrastructure and construction for commercial and hotel development project to be constructed at Lycoming Mall Road and Lycoming Mall DriveProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(42) McKean County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)

20130SB0680PN1329 - 378 -

123456789

101112131415161718192021222324252627282930

Page 379:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(ii) City of Bradford(A) Land acquisition, demolition, site

clearance, building rehabilitation, building construction, site work, infrastructure, gateway and streetscape improvements, waterfront development, recreational projects, storm water management for flood control and other community improvements for economic development and community impact projectsProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) RENOVATION, CONSTRUCTION AND OTHER

RELATED COSTS TO MODERNIZE, EXPAND AND IMPROVE EXISTING FACILITIES OF REHABILITATION CENTER FOR INDIVIDUALS WITH DISABILITIESPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(III) FOSTER TOWNSHIP(A) CONSTRUCTION, SITE WORK,

INFRASTRUCTURE IMPROVEMENTS, LAND ACQUISITION AND OTHER RELATED COSTS FOR AN AT-RISK YOUTH EDUCATION AND TREATMENT FACILITY ON MAIN CAMPUS OF BEACON LIGHT IN FOSTER TOWNSHIPPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

20130SB0680PN1329 - 379 -

<--

123456789

101112131415161718192021222324252627282930

Page 380:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$10,000,000)(43) Mercer County

(i) County projects(A) Infrastructure, construction and

other related costs for WaterFire Sharon riverbank developmentProject Allocation 400,000(Base Project Allocation - $400,000)

(B) Infrastructure and other related costs for construction of multitenant facility in Reynolds Industrial ParkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction and other related costs, including abatement of hazardous materials, for rehabilitation of Damascuc-Bishop Tube facilityProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Acquisition, rehabilitation, construction and other related costs for development of Penn-Ohio Center for Arts & TechnologyProject Allocation 2,225,000(Base Project Allocation - $2,225,000)

(E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR FACILITIES DEVELOPMENTPROJECT ALLOCATION 7,500,000

20130SB0680PN1329 - 380 -

<--

123456789

101112131415161718192021222324252627282930

Page 381:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $7,500,000)(F) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR WORKFORCE DEVELOPMENT CENTERPROJECT ALLOCATION 2,225,000(BASE PROJECT ALLOCATION - $2,225,000)

(G) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR HEALTH CARE CENTER MULTITENANT FACILITYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(H) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT OF INDUSTRIAL FACILITYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(I) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR INDUSTRIAL OR COMMERCIAL FACILITYPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(ii) Greenville Area Economic Development Corporation(A) Acquisition, rehabilitation,

construction and other related costs for redevelopment of Greenville Trinity Industries property

20130SB0680PN1329 - 381 -

123456789

101112131415161718192021222324252627282930

Page 382:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Renovation and rehabilitation of historical building to transform it into training facility for Greenville Neuromodulation ClinicProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(III) CITY OF FARRELL(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR INDUSTRIAL PLAZAPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(iii) (IV) City of Hermitage(A) Acquisition, construction, renovation

and infrastructure improvements to industrial facilityProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction and infrastructure improvements for business park projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR FACILITY DEVELOPMENTPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

20130SB0680PN1329 - 382 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 383:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR BUSINESS PARK PROJECTPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR INDUSTRIAL FACILITYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(V) CITY OF SHARON(A) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF DOWNTOWN SHARONPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT PROJECTS ALONG SHENANGO RIVERPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(44) Mifflin County(i) County projects

(A) Acquisition, construction, infrastructure and other related costs for a Federally Qualified Health Center-anchored multiservice facilityProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

20130SB0680PN1329 - 383 -

123456789

101112131415161718192021222324252627282930

Page 384:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(ii) Mifflin County Industrial Development Authority(A) Acquisition, construction,

rehabilitation and other costs related to design and construction of facilities to be utilized as branch campus of Pennsylvania Highlands Community CollegeProject Allocation 600,000(Base Project Allocation - $600,000)

(B) Acquisition, construction and other related costs for extension of public infrastructure within Mifflin County Industrial ParkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Demolition, remediation, renovations and infrastructure improvements to Mifflin County Industrial Development Corporation Plaza, a brownfield site located in Granville TownshipProject Allocation 1,250,000(Base Project Allocation - $1,250,000)

(D) Construction, renovation, rehabilitation and other related costs for redevelopment and improvements for Mifflin County senior citizen housing unitsProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

20130SB0680PN1329 - 384 -

123456789

101112131415161718192021222324252627282930

Page 385:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(45) Monroe County(i) Barrett Township

(A) Construction, infrastructure improvements and other costs related to Skytop restoration projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Bartonsville(A) Land acquisition, construction,

infrastructure and other related costs for St. Luke's University Health Network development projectProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(III) COOLBAUGH AND TOBYHANNA TOWNSHIPS

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR EXPANSION OF NATURAL GAS MAIN FROM CURRENT CONNECTION IN ARCADIA NORTH BUSINESS PARK IN COOLBAUGH TOWNSHIP TO TOBYHANNA TOWNSHIPPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(IV) POCONO TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR EXPANSION OF NATURAL GAS SERVICE TO CENTER OF MONROE COUNTYPROJECT ALLOCATION 5,000,000

20130SB0680PN1329 - 385 -

<--

123456789

101112131415161718192021222324252627282930

Page 386:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $5,000,000)(46) Montgomery County

(i) County projects(A) Acquisition, infrastructure,

construction and other related costs for renovation and expansion of Rosemont College's Cardinal HallProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) REHABILITATION OF RAILROAD, INCLUDING TRACK IMPROVEMENTS, SIDING EXTENSIONS, VISITORS CENTERS, EQUIPMENT AND EQUIPMENT MAINTENANCE FACILITY, CONSTRUCTION AND RELATED WORK TO ENHANCE ECONOMIC DEVELOPMENT OPPORTUNITIES AND PRESERVE CORRIDOR FOR FUTURE FREIGHT TRAFFIC IN BERKS AND MONTGOMERY COUNTIESPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(ii) Redevelopment Authority of the County of

Montgomery(A) Acquisition, infrastructure,

construction, renovation and redevelopment of mill building located at Beech and Evans Streets in Borough of PottstownProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

20130SB0680PN1329 - 386 -

<--

123456789

101112131415161718192021222324252627282930

Page 387:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(B) Acquisition, infrastructure, construction, renovation and redevelopment of Empire Firehouse located at Franklin and Chestnut Streets in Borough of PottstownProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction and development of health complex on campus of Pottstown Memorial Medical Center in Borough of PottstownProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Site preparation, infrastructure, construction and other related costs for construction and development of mixed-use commercial center at the intersection of Route 100 and Market Street in Douglas TownshipProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(II.1) ABINGTON TOWNSHIP(A) CONSTRUCTION AND OTHER RELATED COSTS

FOR ATHLETIC LEAGUE BUILDINGPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) CONSTRUCTION AND OTHER RELATED COSTS FOR AMBULATORY SERVICES UNIT RENOVATION

20130SB0680PN1329 - 387 -

<--

123456789

101112131415161718192021222324252627282930

Page 388:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(C) CONSTRUCTION AND OTHER RELATED COSTS FOR INPATIENT ORTHOPEDIC UNIT PROJECTPROJECT ALLOCATION 2,188,000(BASE PROJECT ALLOCATION - $2,188,000)

(II.2) BOROUGH OF AMBLER(A) INFRASTRUCTURE, REDEVELOPMENT,

CONSTRUCTION AND OTHER RELATED COSTS FOR PARKING GARAGE ON LINDENWOLD AVENUEPROJECT ALLOCATION 1,700,000(BASE PROJECT ALLOCATION - $1,700,000)

(iii) Borough of Hatboro(A) Infrastructure, construction and

other related costs for rehabilitation, expansion and modernization of borough facilities, including Borough Hall, police station and public works buildingProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) ACQUISITION, INFRASTRUCTURE, PRESERVATION AND OTHER RELATED COSTS FOR REUSE OF EXISTING HISTORIC FACTORYPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(iv) Cheltenham Township(A) Construction, infrastructure

improvements, including rehabilitation

20130SB0680PN1329 - 388 -

<--

123456789

101112131415161718192021222324252627282930

Page 389:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

of sanitary sewer system, and other related costs for business developmentProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(B) Construction, infrastructure improvements and other costs related to pedestrian signals and crossingsProject Allocation 1,750,000(Base Project Allocation - $1,750,000)

(C) Construction, infrastructure improvements and other costs related to Elkins Park West streetscape and transportation enhancement projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Acquisition, infrastructure, construction and other related costs for relocation of Public Works facilityProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(E) CONSTRUCTION AND OTHER RELATED COSTS FOR A FIRE STATION EXPANSION PROJECTPROJECT ALLOCATION 225,000(BASE PROJECT ALLOCATION - $225,000)

(F) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PUBLIC WORKS FACILITY RELOCATIONPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

20130SB0680PN1329 - 389 -

<--

123456789

101112131415161718192021222324252627282930

Page 390:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(G) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR STREETSCAPE AND OTHER ENHANCEMENTS IN ELKINS PARK WEST COMMERCIAL DISTRICTPROJECT ALLOCATION 1,650,000(BASE PROJECT ALLOCATION - $1,650,000)

(H) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR INTERSECTION IMPROVEMENTSPROJECT ALLOCATION 875,000(BASE PROJECT ALLOCATION - $875,000)

(I) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PROJECTS RELATED TO SEWER SYSTEMPROJECT ALLOCATION 6,000,000(BASE PROJECT ALLOCATION - $6,000,000)

(J) CONSTRUCTION AND OTHER RELATED COSTS FOR THEATRE AND AUDITORIUM REVITALIZATION PROJECTPROJECT ALLOCATION 742,000(BASE PROJECT ALLOCATION - $742,000)

(K) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR REDEVELOPMENT OF FORMER TYLER ESTATE AND SURROUNDING PROPERTIES IN ELKINS PARKPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(L) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER COSTS RELATED TO GLENSIDE AREA FLOOD PROTECTION

20130SB0680PN1329 - 390 -

123456789

101112131415161718192021222324252627282930

Page 391:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECTPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(M) CONSTRUCTION, INFRASTRUCTURE AND OTHER COSTS RELATED TO GLENSIDE AREA FLOOD PROTECTION PROJECT, PHASE II, IN CHELTENHAM TOWNSHIP ALONG TOOKANY CREEKPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(N) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR TOOKANY CREEK HEADWATERS FLOOD CONTROL PROJECTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(v) Conshohocken Borough(A) Construction, infrastructure

improvements and other costs related to Verizon Building remediation and adaptive reuse projectProject Allocation 4,391,000(Base Project Allocation - $4,391,000)

(B) Construction, infrastructure improvements and other costs related to Seven Tower Bridge development projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS

20130SB0680PN1329 - 391 -

<--

123456789

101112131415161718192021222324252627282930

Page 392:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECT AT SITE OF FORMER VERIZON BUILDINGPROJECT ALLOCATION 3,821,000(BASE PROJECT ALLOCATION - $3,821,000)

(vi) East Norriton Township(A) Construction, infrastructure

improvements and other costs related to renovation of patient roomsProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vii) Lower Gwynedd Township(A) Acquisition, infrastructure,

construction and other related costs for Phase III of Bethlehem Pike revitalization project, including streetscape and safety improvementsProject Allocation 500,000(Base Project Allocation - $500,000)

(viii) Lower Merion Township(A) Construction, infrastructure

improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Construction, infrastructure

improvements and other costs related

20130SB0680PN1329 - 392 -

123456789

101112131415161718192021222324252627282930

Page 393:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

to Rosemont College building renovationsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ix) Lower Providence Township(A) Infrastructure, construction and

other related costs, including abatement of hazardous materials, for redevelopment of Rittenhouse Road CSG Superfund site located in Park Pointe at Lower Providence Business ParkProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(x) Montgomery Township(A) Infrastructure, redevelopment and

construction of multipurpose recreational community centerProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(xi) Norristown Borough(A) Construction, infrastructure

improvements and other costs related to new mixed-income development in downtown NorristownProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction, infrastructure improvements and renovations for the Elmwood Park Zoo Protect the Park project

20130SB0680PN1329 - 393 -

123456789

101112131415161718192021222324252627282930

Page 394:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 750,000(Base Project Allocation - $750,000)

(C) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR MEDICAL OFFICE BUILDINGPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR SUPERMARKET PROJECT ON MARKLEY STREETPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(xi.1) Plymouth Township(A) Construction, infrastructure

improvements and renovations for the East Plymouth Valley Park Little League facilityProject Allocation 300,000(Base Project Allocation - $300,000)

(xii) Springfield Township(A) Construction, infrastructure

improvements and other costs related to Wordsworth Academy Fort Washington projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(xiii) Upper Dublin Township(A) Acquisition, renovation,

20130SB0680PN1329 - 394 -

<--

123456789

101112131415161718192021222324252627282930

Page 395:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure development, site preparation and construction to support redevelopment and revitalization of Fort Washington Office ParkProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(xiv) Upper Merion Township

(A) Construction, infrastructure improvements and other costs related to DeKalb/Gulph redevelopment projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) CONSTRUCTION AND OTHER RELATED COSTS FOR AMBULANCE STATION PROJECTPROJECT ALLOCATION 900,000(BASE PROJECT ALLOCATION - $900,000)

(C) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR SENIOR CENTER PROJECTPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(D) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS RELATED TO TRIAD COMMERCIAL OFFICE FACILITY IN KING OF PRUSSIAPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

20130SB0680PN1329 - 395 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 396:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(xv) Upper Moreland Township(A) Construction, infrastructure

improvements and other related costs for Willow Grove Industrial Commons, including construction of regional storm water management basin to improve economic development of the areaProject Allocation 500,000(Base Project Allocation - $500,000)

(XVI) UPPER PROVIDENCE TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR MONTGOMERY COUNTY POPE JOHN PAUL II HIGH SCHOOL STADIUM PROJECTPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(xvi) (XVII) Whitemarsh Township(A) Construction, infrastructure

improvements and other costs related to AIM Institute for Learning and Research redevelopment and expansion projectProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(XVIII) WHITPAIN TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR RENOVATION OF MONTGOMERY COUNTY COMMUNITY COLLEGE SCIENCE CENTER'S WEST WING

20130SB0680PN1329 - 396 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 397:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(47) Montour County(i) (Reserved)

(48) Northampton County(i) County projects

(A) Acquisition, construction, infrastructure and other costs related to community-based outpatient health services facilityProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(B) Acquisition, construction, infrastructure and other costs related to renovation of mixed-use buildings in urban areasProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Acquisition, construction, infrastructure and other costs related to warehouse facility projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Bethlehem Township(A) Construction, renovation and other

related costs to expand and further develop St. Luke's Hospital Anderson CampusProject Allocation 20,000,000(Base Project Allocation -

20130SB0680PN1329 - 397 -

123456789

101112131415161718192021222324252627282930

Page 398:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$20,000,000)(B) Site development and infrastructure

improvements for Highland Avenue and Mowrer Drive industrial sitesProject Allocation 500,000(Base Project Allocation - $500,000)

(iii) City of Bethlehem(A) Construction, renovation,

infrastructure and other related costs to ArtsQuest renovation projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, construction, infrastructure improvements and other costs for the development of a regional convention center and related improvements in the cityProject Allocation 25,000,000(Base Project Allocation -

$25,000,000)(C) CONSTRUCTION AND OTHER RELATED COSTS

FOR HOTEL AND LEISURE TRAINING CENTERPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(D) CONSTRUCTION AND OTHER RELATED COSTS

FOR TECHNOLOGY CENTERPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)

20130SB0680PN1329 - 398 -

<--

123456789

101112131415161718192021222324252627282930

Page 399:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(iv) City of Easton(A) Acquisition, construction,

infrastructure and other costs related to High School Sports Hall of Fame museumProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure and other costs related to redevelopment of mixed-use building, including structured parking on Ferry StreetProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Acquisition, construction, infrastructure and other costs related to redevelopment of mixed-use buildings, including parking and park infrastructure improvements to Centre SquareProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(D) Construction, infrastructure and

other costs related to redevelopment of mixed-use commercial/office building with integrated parking and residential upper floorProject Allocation 1,156,000(Base Project Allocation - $1,156,000)

20130SB0680PN1329 - 399 -

123456789

101112131415161718192021222324252627282930

Page 400:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(E) Acquisition, construction, infrastructure and other costs related to Marquis Commons projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(F) Acquisition and redevelopment of the Governor Wolf Building for mixed useProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR A SPORTS HALL OF FAME MUSEUMPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(H) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR GOVERNOR WOLF BUILDINGPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(I) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR REDEVELOPMENT OF FERRY STREETPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(J) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR REDEVELOPMENT OF CENTRE SQUAREPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)

20130SB0680PN1329 - 400 -

<--

123456789

101112131415161718192021222324252627282930

Page 401:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(v) East Allen Township(A) Infrastructure and related site costs

for Shoppes at Route 512 and East Allen Marketplace renovation projectProject Allocation 600,000(Base Project Allocation - $600,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR MUNICIPAL FACILITYPROJECT ALLOCATION 785,000(BASE PROJECT ALLOCATION - $785,000)

(C) RENOVATION AND REHABILITATION OF WEAVERSVILLE INTENSIVE TREATMENT UNIT FACILITY FOR MUNICIPAL SERVICES BUILDINGPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(D) LAND ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR MUNICIPAL FACILITYPROJECT ALLOCATION 785,000(BASE PROJECT ALLOCATION - $785,000)

(vi) East Bangor Borough(A) Construction, infrastructure and

other costs related to development of government center, heritage center and community disaster centerProject Allocation 150,000(Base Project Allocation - $150,000)

(VI.1) FREEMANSBURG BOROUGH

20130SB0680PN1329 - 401 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 402:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR FIRE, ADMINISTRATION AND PUBLIC WORKS DEPARTMENT FACILITIESPROJECT ALLOCATION 1,800,000(BASE PROJECT ALLOCATION - $1,800,000)

(vii) Hellertown Borough(A) Acquisition, construction,

infrastructure and other costs related to rehabilitation of former Champion Spark Plug facilityProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(viii) Lower Nazareth(A) Acquisition, construction,

infrastructure and other costs related to industrial park in Nazareth areaProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(ix) Portland Borough

(A) Acquisition of land and construction of office building in Portland Industrial ParkProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(x) Upper Mt. Bethel Township(A) Acquisition, construction,

infrastructure and other costs related to industrial park project

20130SB0680PN1329 - 402 -

123456789

101112131415161718192021222324252627282930

Page 403:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Acquisition of land and construction

of office building in Portland Industrial ParkProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(49) Northumberland County(i) County projects

(A) Redevelopment and other costs related to construction of state-of-the-art carbon processing facility located at Shamokin CarbonsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Northumberland County Industrial Development Authority(A) Infrastructure, renovation,

construction and other related costs for expansion of Strong Industries manufacturing facilityProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(III) CITY OF SUNBURY(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, DEVELOPMENT AND OTHER COSTS RELATED TO REDEVELOPMENT OF FORMER INDUSTRIAL SITE FOR NEW AND EXPANDING BUSINESSES

20130SB0680PN1329 - 403 -

<--

123456789

101112131415161718192021222324252627282930

Page 404:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(50) Perry County(i) (Reserved)

(51) Philadelphia County(i) County projects

(A) Renovation of biology labs and associated prep rooms at Community College of Philadelphia's main campus and West Regional CenterProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Land acquisition, construction, infrastructure and other related costs for design and construction of National Native American MuseumProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(C) Construction, infrastructure

improvements and related costs for the development of a museumProject Allocation 50,000,000(Base Project Allocation -

$50,000,000)(D) INFRASTRUCTURE IN SUPPORT OF DOWNTOWN

HIGHRISE OFFICE AND HOTEL DEVELOPMENT, RECONSTRUCTION OF PUBLIC STREETS AND SIDEWALKS AND EXPANDED CONNECTIONS TO EXISTING MASS TRANSIT SYSTEM

20130SB0680PN1329 - 404 -

<--

123456789

101112131415161718192021222324252627282930

Page 405:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 30,000,000(BASE PROJECT ALLOCATION -

$30,000,000)(E) ACQUISITION, CONSTRUCTION,

RECONSTRUCTION, REHABILITATION, REMEDIATION, INFRASTRUCTURE IMPROVEMENTS, INCLUDING IMPROVEMENTS RELATED TO PARKING AND COMMON AREAS, AND OTHER RELATED COSTS FOR REDEVELOPMENT AND REUSE OF BUILDING 22 LOCATED AT FORMER PHILADELPHIA NAVAL YARDPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(F) ACQUISITION, CONSTRUCTION,

RECONSTRUCTION, REHABILITATION, REMEDIATION, INFRASTRUCTURE IMPROVEMENTS, INCLUDING IMPROVEMENTS RELATED TO PARKING AND COMMON AREAS, AND OTHER RELATED COSTS FOR REDEVELOPMENT AND REUSE OF BUILDING 18 LOCATED AT FORMER PHILADELPHIA NAVAL YARDPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(G) ACQUISITION, CONSTRUCTION,

RECONSTRUCTION, REHABILITATION, REMEDIATION, INFRASTRUCTURE

20130SB0680PN1329 - 405 -

123456789

101112131415161718192021222324252627282930

Page 406:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

IMPROVEMENTS, INCLUDING IMPROVEMENTS RELATED TO PARKING AND COMMON AREAS, AND OTHER RELATED COSTS FOR REDEVELOPMENT AND REUSE OF BUILDING 16 LOCATED AT FORMER PHILADELPHIA NAVAL YARDPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(H) ACQUISITION, CONSTRUCTION,

RECONSTRUCTION, REHABILITATION, REMEDIATION, INFRASTRUCTURE IMPROVEMENTS, INCLUDING IMPROVEMENTS RELATED TO PARKING AND COMMON AREAS, AND OTHER RELATED COSTS FOR REDEVELOPMENT AND REUSE OF BUILDING 19 LOCATED AT FORMER PHILADELPHIA NAVAL YARDPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(I) ACQUISITION, CONSTRUCTION,

RECONSTRUCTION, REHABILITATION, REMEDIATION, INFRASTRUCTURE IMPROVEMENTS, INCLUDING IMPROVEMENTS RELATED TO PARKING AND COMMON AREAS, AND OTHER RELATED COSTS FOR REDEVELOPMENT AND REUSE OF BUILDING 17 LOCATED AT FORMER PHILADELPHIA NAVAL YARD

20130SB0680PN1329 - 406 -

123456789

101112131415161718192021222324252627282930

Page 407:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(ii) City of Philadelphia

(A) Construction, infrastructure, rehabilitation improvements and other costs related to Moore College of Art & Design projectProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(B) Construction and other related costs for Cascia Center of the National Shrine of Saint Rita projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure and other costs related to Hotel Indigo projectProject Allocation 35,000,000(Base Project Allocation -

$35,000,000)(D) Construction, infrastructure and

other costs related to Reading Viaduct projectProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(E) Construction, infrastructure and other costs related to Penn Treaty Village projectProject Allocation 55,000,000

20130SB0680PN1329 - 407 -

123456789

101112131415161718192021222324252627282930

Page 408:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $55,000,000)

(F) For building, gallery, exhibit and site restoration, renovation, construction, infrastructure and technology upgrades at Franklin InstituteProject Allocation 25,000,000(Base Project Allocation -

$25,000,000)(G) Construction, infrastructure and

other related costs for Russell Byers Charter School expansion projectProject Allocation 3,125,000(Base Project Allocation - $3,125,000)

(H) Construction, infrastructure and other costs related to Live Arts Festival and Philly Fringe Arts Center projectProject Allocation 500,000(Base Project Allocation - $500,000)

(I) Construction, infrastructure and other costs related to Convention Center Hotel mixed-use projectProject Allocation 30,000,000(Base Project Allocation -

$30,000,000)(J) Construction, infrastructure and

other costs related to Proto Brewery Hotel project

20130SB0680PN1329 - 408 -

123456789

101112131415161718192021222324252627282930

Page 409:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(K) Construction, infrastructure and other costs related to Stables redevelopment projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(L) Construction, infrastructure and other costs related to Tulip Street redevelopment projectProject Allocation 500,000(Base Project Allocation - $500,000)

(M) Construction, infrastructure and other costs related to Columbia Street redevelopment projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(N) Acquisition, construction, infrastructure and other costs related to 1010 Avenue of the Arts New Headquarters Campus Civic Culture Hub projectProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(O) Construction, infrastructure and other costs related to Pro-Square Kingsessing Nursing Home projectProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(P) Redevelopment, construction,

20130SB0680PN1329 - 409 -

123456789

101112131415161718192021222324252627282930

Page 410:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure and other costs related to Jasper Street Manufacturing Facility projectProject Allocation 1,250,000(Base Project Allocation - $1,250,000)

(Q) Redevelopment, construction, infrastructure and other costs related to AC Linen Laundry commercial projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(R) Redevelopment, construction, infrastructure and other costs related to Convention Center Hotel project at 15th and Race StreetsProject Allocation 30,000,000(Base Project Allocation -

$30,000,000)(S) Facilities construction,

infrastructure, storm water management and restoration of tidal wetland for Penn Treaty Park Phase I projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(T) Facilities construction,

infrastructure, renovations and other costs related to Franklin Delano Roosevelt ParkProject Allocation 10,000,000(Base Project Allocation -

20130SB0680PN1329 - 410 -

123456789

101112131415161718192021222324252627282930

Page 411:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$10,000,000)(U) Construction, infrastructure and

other costs related to Salvation Army Eliza Shirley Campus projectProject Allocation 1,750,000(Base Project Allocation - $1,750,000)

(V) Acquisition, construction, infrastructure and other costs related to KIPP Philadelphia School projectProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(W) Construction, infrastructure and other costs related to East Falls streetscape projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(X) Construction, infrastructure and other costs related to Eastern Pennsylvania Psychiatric Institute redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(Y) Construction, demolition, acquisition, infrastructure, redevelopment and other related costs for campus improvements and facilities expansion at Philadelphia UniversityProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)

20130SB0680PN1329 - 411 -

123456789

101112131415161718192021222324252627282930

Page 412:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Z) Acquisition, construction, infrastructure and other costs related to Women's Domestic Violence Shelter residential and commercial facility projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(AA) Acquisition, construction, infrastructure and other costs related to Free Library of Philadelphia George Institute renovation and building projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(BB) Construction, infrastructure and other costs related to University City Science Center build-out projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(CC) Construction, infrastructure, renovations and other costs for Please Touch Museum restoration projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(DD) Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities and other costs associated with development of Innovation Neighborhood by Drexel

20130SB0680PN1329 - 412 -

123456789

101112131415161718192021222324252627282930

Page 413:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

UniversityProject Allocation 30,000,000(Base Project Allocation -

$30,000,000)(EE) Construction, infrastructure,

renovations and other costs for Gaudenzia Foundation Family CenterProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(FF) Construction, infrastructure, renovations and other costs for North Philadelphia Health System St. Joseph's Hospital & Girard Medical CenterProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(GG) Infrastructure improvements, including electrical and technology upgrades for Holy Family UniversityProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(HH) Construction, infrastructure, renovations and other costs for Holy Family University Marian Hall projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(II) Construction, infrastructure, renovations and other costs for revitalization of former Frankford Arsenal as Shopping Center at the

20130SB0680PN1329 - 413 -

123456789

101112131415161718192021222324252627282930

Page 414:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

ARSENALProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(JJ) Construction, infrastructure and other costs related to plant upgrades at S. D. Richman Sons, Inc., facility for automobile shredder project in Port RichmondProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(KK) Construction, infrastructure, renovations and other costs for Fox Chase Cancer Center Comparative Medical Research FacilityProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(LL) Construction, infrastructure and other costs related to Fox Chase Cancer Center physicians office building projectProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(MM) Construction, infrastructure and other costs related to Fox Chase Cancer Center Outpatient Chemotherapy Infusion CenterProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(NN) Construction, infrastructure, renovations and other costs for Fox

20130SB0680PN1329 - 414 -

123456789

101112131415161718192021222324252627282930

Page 415:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Chase Cancer Center Laboratory Research and shared resource facilitiesProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(OO) Construction, infrastructure, renovations and other costs for Fox Chase Cancer Center Conference CenterProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(PP) Construction, infrastructure, renovations and other costs for Fox Chase Cancer Center central utility plant upgradesProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(QQ) Demolition, acquisition, construction, infrastructure and other costs for Liddonfield revitalization, renovation and rehabilitation projectProject Allocation 35,000,000(Base Project Allocation -

$35,000,000)(RR) Construction, infrastructure,

renovations and other costs for Independence Visitor Center service desk improvement projectProject Allocation 500,000(Base Project Allocation - $500,000)

(SS) Acquisition, construction,

20130SB0680PN1329 - 415 -

123456789

101112131415161718192021222324252627282930

Page 416:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure improvements and other costs related to Parkwood Therapeutic Riding Center expansion and revitalization projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(TT) Acquisition, construction, infrastructure improvements and other costs related to Bustleton Bengals GymnasiumProject Allocation 750,000(Base Project Allocation - $750,000)

(UU) Acquisition, construction, infrastructure improvements and other costs related to manufacturing facility near intersection of Comly Road and Roosevelt Boulevard in Northeast PhiladelphiaProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(VV) Construction, infrastructure and other costs related to Methodist Home for Children incubator/shared kitchen programProject Allocation 500,000(Base Project Allocation - $500,000)

(WW) Construction, infrastructure and other costs related to West 59th and Market Streets mixed-use, transit-oriented development project

20130SB0680PN1329 - 416 -

123456789

101112131415161718192021222324252627282930

Page 417:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(XX) Acquisition, construction, infrastructure, redevelopment and other costs related to Green Tree School development projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(YY) Construction, infrastructure and other costs related to Schuylkill Crossing at Grays Ferry redevelopment projectProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(ZZ) Construction, infrastructure and other costs related to Wistar Institute administrative operations space retrofit projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(AAA) Construction, infrastructure and other costs related to Wistar Institute class A laboratory conversion projectProject Allocation 1,600,000(Base Project Allocation - $1,600,000)

(BBB) Construction, infrastructure and other costs related to Boys' Latin of Philadelphia Charter School Middle School building project

20130SB0680PN1329 - 417 -

123456789

101112131415161718192021222324252627282930

Page 418:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 700,000(Base Project Allocation - $700,000)

(CCC) Acquisition, infrastructure, construction, redevelopment and other related costs for Greater Philadelphia Health ActionProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(DDD) Acquisition, infrastructure,

construction, redevelopment and other related costs for Wynnefield Multipurpose CenterProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(EEE) Construction, infrastructure and other costs related to medical education center at University of Pennsylvania Perelman School of MedicineProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(FFF) Construction, infrastructure and

other costs related to University of Pennsylvania's Walnut Street Gateway streetscape projectProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(GGG) Construction, infrastructure and

20130SB0680PN1329 - 418 -

123456789

101112131415161718192021222324252627282930

Page 419:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

other costs related to Wynne Ballroom redevelopment mixed-use facility projectProject Allocation 200,000(Base Project Allocation - $200,000)

(HHH) Construction, infrastructure and other costs related to Magee Rehabilitation Hospital improvement projectProject Allocation 500,000(Base Project Allocation - $500,000)

(III) Construction, infrastructure and other costs related to El Centro de Oro Market projectProject Allocation 750,000(Base Project Allocation - $750,000)

(JJJ) Acquisition, infrastructure, construction, redevelopment and other related costs for Nueva Esperanza North 5th Street redevelopmentProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(KKK) Acquisition, infrastructure, demolition, construction, redevelopment and other related costs for Nueva Esperanza commercial/retail business redevelopment projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(LLL) Construction, infrastructure and

20130SB0680PN1329 - 419 -

123456789

101112131415161718192021222324252627282930

Page 420:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

other costs related to revitalization of 1711 West Allegheny AvenueProject Allocation 500,000(Base Project Allocation - $500,000)

(MMM) Acquisition, infrastructure, demolition, construction, redevelopment and other related costs for Plaza Allegheny mixed-use commercial retail shopping center in FairhillProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(NNN) Construction, infrastructure and other development costs for emergency, inpatient, outpatient and clinical facilities for Temple University HospitalProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(OOO) Construction, infrastructure and

other costs related to University of Pennsylvania South Bank commercial office and research park redevelopment projectProject Allocation 2,300,000(Base Project Allocation - $2,300,000)

(PPP) Construction, infrastructure and other costs related to renovation and improvement of North City Congress

20130SB0680PN1329 - 420 -

123456789

101112131415161718192021222324252627282930

Page 421:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Senior Community CenterProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(QQQ) Acquisition, construction, infrastructure and other costs related to North City Congress Community Center facility projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(RRR) Construction, infrastructure and other costs related to Smith Memorial Playhouse Restoration IV and Gateway ProjectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(SSS) Acquisition, construction, infrastructure and other costs related to Chariot Landing-International Row mixed-use revitalization projectProject Allocation 40,000,000(Base Project Allocation -

$40,000,000)(TTT) Acquisition, construction,

infrastructure and development of mixed-use Civil Justice Center campus, including commercial office space for leading legal service organizationsProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(UUU) Acquisition, construction,

20130SB0680PN1329 - 421 -

123456789

101112131415161718192021222324252627282930

Page 422:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research or provide other related activities for Magee Rehabilitation HospitalProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(VVV) Construction, infrastructure and

other costs related to FDR Park Boathouse Cescaphe Ballroom adaptive reuse projectProject Allocation 750,000(Base Project Allocation - $750,000)

(WWW) Construction, infrastructure and other costs related to Old City District streetscape improvement projectProject Allocation 500,000(Base Project Allocation - $500,000)

(XXX) Acquisition, construction, infrastructure, redevelopment and other related costs for 1010 Avenue of the Arts New Headquarters Campus/Civic Culture HubProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(YYY) Construction, infrastructure and other costs related to WHYY facilities

20130SB0680PN1329 - 422 -

123456789

101112131415161718192021222324252627282930

Page 423:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

upgrade projectProject Allocation 500,000(Base Project Allocation - $500,000)

(ZZZ) Acquisition, construction, infrastructure, redevelopment and other related costs for Friends Select School renovation projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(AAAA) Construction, site preparation, expansion and infrastructure-related costs and construction of Chestnut Hill College campus academic center facilityProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(BBBB) Construction, infrastructure,

renovations and other costs for National Constitution CenterProject Allocation 30,000,000(Base Project Allocation -

$30,000,000)(CCCC) Construction, infrastructure,

renovations and other costs for museum administration building at Eastern State Penitentiary Historic SiteProject Allocation 6,500,000(Base Project Allocation - $6,500,000)

(DDDD) Construction, infrastructure,

20130SB0680PN1329 - 423 -

123456789

101112131415161718192021222324252627282930

Page 424:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

renovations and other costs for interior and exterior improvements at Eastern State Penitentiary Historic SiteProject Allocation 3,100,000(Base Project Allocation - $3,100,000)

(EEEE) Acquisition, construction, infrastructure, redevelopment and other related costs for 900 North Broad Street projectProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(FFFF) Acquisition, construction, infrastructure and other related costs for Divine Lorraine property redevelopment projectProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(GGGG) Acquisition, construction, infrastructure and other related costs for redevelopment of Stutz property at 666-667 North Broad Street, 1360-64 Ridge Avenue and 1319 Wallace StreetProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(HHHH) Acquisition, construction, infrastructure and other related costs for redevelopment of Stevens property at 523 North Broad StreetProject Allocation 6,000,000

20130SB0680PN1329 - 424 -

123456789

101112131415161718192021222324252627282930

Page 425:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $6,000,000)(IIII) Acquisition, construction,

infrastructure and other related costs for redevelopment of Metropolitan Opera HouseProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(JJJJ) Acquisition, construction, infrastructure and other related costs for redevelopment of Benjamin Franklin High School propertyProject Allocation 12,000,000(Base Project Allocation -

$12,000,000)(KKKK) Acquisition, construction,

infrastructure and other related costs for redevelopment of Parkway Center City High School propertyProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(LLLL) Acquisition, construction, infrastructure and other related costs for redevelopment of Julia R. Masterman High School propertyProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(MMMM) Acquisition, construction, infrastructure and other related costs for redevelopment of Franklin Learning Center property at 616 North 15th

20130SB0680PN1329 - 425 -

123456789

101112131415161718192021222324252627282930

Page 426:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

StreetProject Allocation 7,500,000(Base Project Allocation - $7,500,000)

(NNNN) Acquisition, construction, infrastructure and other related costs for redevelopment of William Penn High School property at 1333 North Broad StreetProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(OOOO) Acquisition, construction,

infrastructure and other related costs for redevelopment of North Broad Street Salvation Army property at 701 North Broad StreetProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(PPPP) Acquisition, construction,

infrastructure, redevelopment and other costs related to Greene Street Friends School expansion projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(QQQQ) Construction, infrastructure and other costs related to the renovation of SHARE Food Program facilityProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

20130SB0680PN1329 - 426 -

123456789

101112131415161718192021222324252627282930

Page 427:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(RRRR) Construction, infrastructure and other costs related to the SoKo site in Old Kensington/Northern Liberties neighborhoodProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(SSSS) Acquisition, infrastructure, construction and other related costs for 30 University Place projectProject Allocation 6,500,000(Base Project Allocation - $6,500,000)

(TTTT) Acquisition, infrastructure, construction, redevelopment and other related costs for Public Health Management CorporationProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(UUUU) Acquisition, infrastructure,

construction, redevelopment and other related costs for St. Francis Villa housing projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(VVVV) Construction, infrastructure and other related costs for the renovation and modernization of the Center in the Park senior community center Internet cafe projectProject Allocation 250,000

20130SB0680PN1329 - 427 -

123456789

101112131415161718192021222324252627282930

Page 428:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $250,000)(WWWW) Construction, renovation,

infrastructure and other related costs for the Kimmel Center for the Performing ArtsProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(XXXX) Acquisition, construction,

infrastructure improvements and other related costs for the renovation of the Mazzoni Center Facility and Medical PracticeProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(YYYY) Acquisition, construction, infrastructure improvements and other related costs for the redevelopment of an existing warehouse facility at the intersection of Tulip and Harbison Streets in WissinomingProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ZZZZ) Construction of the Chinatown Community Center and acquisition, infrastructure improvements and renovation of the Chinatown retail areaProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

20130SB0680PN1329 - 428 -

123456789

101112131415161718192021222324252627282930

Page 429:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A5) Construction, renovation, infrastructure and other related costs for the West Philadelphia Branch YMCA Wellness/Fitness Center and family changing area expansionProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B5) Construction, renovation, infrastructure and other related costs for the Park Towne Place redevelopment projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C5) Construction, rehabilitation, infrastructure and other related costs for the Historical Society of Pennsylvania's Center for History and Learning Phase II retrofitting and renovation projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(D5) Construction, rehabilitation, infrastructure and other related costs for the Historical Society of Pennsylvania's Center for History and Learning Phase II renovation and space addition projectProject Allocation 13,500,000(Base Project Allocation -

$13,500,000)

20130SB0680PN1329 - 429 -

123456789

101112131415161718192021222324252627282930

Page 430:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(E5) Construction, infrastructure and other related costs for the 4.0 University Place projectProject Allocation 20,000,000(Base Project Allocation -

$20,000,000)(F5) Construction and infrastructure

improvements for Goodwill Industries store and training center at 5050 Parkside AvenueProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(G5) Construction, renovation and infrastructure improvements for Nueva Esperanza FacilitiesProject Allocation 4,800,000(Base Project Allocation - $4,800,000)

(H5) Acquisition, construction, infrastructure improvements and other costs related to the 52nd Street Gateway Phase I mixed-use building projectProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(I5) Acquisition, construction, infrastructure improvements and other costs related to the 52nd Street Gateway Phase II Lifelong Learning Center projectProject Allocation 1,300,000

20130SB0680PN1329 - 430 -

123456789

101112131415161718192021222324252627282930

Page 431:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $1,300,000)(J5) Acquisition, construction,

infrastructure improvements and other costs related to the 52nd Street Gateway Phase III transit center projectProject Allocation 3,700,000(Base Project Allocation - $3,700,000)

(K5) Acquisition, construction, infrastructure improvements and other related costs for 52nd Street mixed-use development projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(L5) Acquisition, construction,

infrastructure improvements and other related costs for Inglis housing and long-term care facility development projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(M5) Acquisition, construction,

infrastructure improvements and other related costs for Strawberry Mansion housing development projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)

20130SB0680PN1329 - 431 -

123456789

101112131415161718192021222324252627282930

Page 432:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(N5) Construction, infrastructure improvements and related costs for the Ligouri Academy renovation projectProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(O5) Construction, infrastructure improvements and related costs for the Brown's Superstores redevelopment project at North Broad and Spring Garden StreetsProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(P5) Construction, infrastructure improvements and related costs for the Brown's redevelopment project at 70th and ElmwoodProject Allocation 12,000,000(Base Project Allocation -

$12,000,000)(Q5) Construction, infrastructure

improvements and related costs for the Brown's Superstores redevelopment project at the 24th and Oregon Shopping CenterProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(R5) Construction, infrastructure improvements and related costs for the Brown's Superstores redevelopment project at the PriceRite of Erie

20130SB0680PN1329 - 432 -

123456789

101112131415161718192021222324252627282930

Page 433:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Avenue shopping centerProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(S5) Construction, infrastructure improvements and related costs for the Brown's Superstores redevelopment project at the PriceRite of Mantua shopping centerProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(T5) Acquisition, demolition, construction, renovation, infrastructure and other related costs for Thomas Jefferson University projectsProject Allocation 25,000,000(Base Project Allocation -

$25,000,000)(U5) Acquisition, infrastructure and

other capital improvements for the Wordsworth Ford Road projectProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(V5) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR EXPANSION PROJECT AT PHILADELPHIA FREEDOM VALLEY YMCA WEST PHILADELPHIA BRANCHPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(W5) CONSTRUCTION, INFRASTRUCTURE AND

20130SB0680PN1329 - 433 -

<--

123456789

101112131415161718192021222324252627282930

Page 434:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

OTHER RELATED COSTS FOR DEVELOPMENT OF MULTIUSE FACILITY FOR TEMPLE UNIVERSITY ATHLETICS, ACADEMICS AND RESEARCH AND LOCAL COMMUNITY ATHLETIC EVENTSPROJECT ALLOCATION 30,000,000(BASE PROJECT ALLOCATION -

$30,000,000)(X5) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECT AT ISLAND AVENUE AND BARTRAM AVENUEPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(Y5) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR GATEWAY MARRIOTT HOTEL AND RELATED AMENITIES IN THE VICINITY OF ISLAND AVENUE AND BARTRAM AVENUE INTERSECTIONPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(Z5) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR 52ND STREET GATEWAY PHASE I PROJECTPROJECT ALLOCATION 1,000,000

20130SB0680PN1329 - 434 -

123456789

101112131415161718192021222324252627282930

Page 435:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $1,000,000)(A6) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR 52ND STREET GATEWAY PHASE II PROJECTPROJECT ALLOCATION 1,300,000(BASE PROJECT ALLOCATION - $1,300,000)

(B6) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR 52ND STREET GATEWAY PHASE III PROJECTPROJECT ALLOCATION 3,700,000(BASE PROJECT ALLOCATION - $3,700,000)

(C6) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AS 900 NORTH BROAD STREETPROJECT ALLOCATION 4,500,000(BASE PROJECT ALLOCATION - $4,500,000)

(D6) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ASPIRA SCHOOL EXPANSION PROJECTSPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(E6) CONSTRUCTION AND OTHER RELATED COSTS FOR COMMUNITY CENTER ON OLD YORK ROADPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(F6) ACQUISITION, CONSTRUCTION,

20130SB0680PN1329 - 435 -

123456789

101112131415161718192021222324252627282930

Page 436:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT SITE OF BENJAMIN FRANKLIN HIGH SCHOOLPROJECT ALLOCATION 12,000,000(BASE PROJECT ALLOCATION -

$12,000,000)(G6) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR SITE OF BEURY BUILDING ON NORTH BROAD STREETPROJECT ALLOCATION 6,000,000(BASE PROJECT ALLOCATION - $6,000,000)

(H6) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR BUILDING 16 PROJECT AT FORMER PHILADELPHIA NAVAL YARDPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(I6) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR BUILDING 18 PROJECT AT FORMER PHILADELPHIA NAVAL YARDPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

20130SB0680PN1329 - 436 -

123456789

101112131415161718192021222324252627282930

Page 437:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$20,000,000)(J6) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT AND OTHER RELATED COSTS FOR BUSTLETON BENGALS GYMNASIUM PROJECTPROJECT ALLOCATION 300,000(BASE PROJECT ALLOCATION - $300,000)

(K6) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR COMMUNITY CENTER IN BUSTLETON SECTION OF THE CITYPROJECT ALLOCATION 1,300,000(BASE PROJECT ALLOCATION - $1,300,000)

(L6) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR MEDICAL REHABILITATION FACILITY, INCLUDING GROUND LEVEL RENTAL SPACES, IN GRAYS FERRY SECTION OF THE CITYPROJECT ALLOCATION 8,500,000(BASE PROJECT ALLOCATION - $8,500,000)

(M6) CONSTRUCTION AND OTHER RELATED COSTS FOR 52ND STREET COMMERCIAL CORRIDOR REDEVELOPMENTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(N6) ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR CHARLES M. WINGFIELD COMMUNITY CENTERPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

20130SB0680PN1329 - 437 -

123456789

101112131415161718192021222324252627282930

Page 438:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(O6) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR CHILDREN'S LEARNING CENTERPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(P6) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS RELATED TO CRISTO REY PHILADELPHIA HIGH SCHOOLPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(Q6) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR DIVINE LORRAINE PROPERTYPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(R6) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR STREETSCAPE IMPROVEMENTS IN EAST FALLS RIVERFRONT BUSINESS DISTRICTPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(S6) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR OUTPATIENT CENTERPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(T6) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND

20130SB0680PN1329 - 438 -

123456789

101112131415161718192021222324252627282930

Page 439:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

OTHER RELATED COSTS FOR SUPERMARKET PROJECT ON WEST ERIE AVENUEPROJECT ALLOCATION 4,375,000(BASE PROJECT ALLOCATION - $4,375,000)

(U6) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR SUPERMARKET PROJECT ON WEST ERIE AVENUEPROJECT ALLOCATION 4,375,000(BASE PROJECT ALLOCATION - $4,375,000)

(V6) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR COMMUNITY CENTERPROJECT ALLOCATION 1,500,000(BASE PROJECT ALLOCATION - $1,500,000)

(W6) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS RELATING TO FRANKLIN LEARNING CENTERPROJECT ALLOCATION 7,500,000(BASE PROJECT ALLOCATION - $7,500,000)

(X6) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS RELATING TO GEORGE INSTITUTEPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(Y6) ACQUISITION, CONSTRUCTION,

20130SB0680PN1329 - 439 -

123456789

101112131415161718192021222324252627282930

Page 440:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

INFRASTRUCTURE AND OTHER RELATED COSTS FOR FRIENDS HOUSING COOPERATIVE, INC., PROJECTSPROJECT ALLOCATION 7,467,000(BASE PROJECT ALLOCATION - $7,467,000)

(Z6) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR REHABILITATION OF BUILDING FOR USE AS FAMILY AND HEALTH CARE FACILITYPROJECT ALLOCATION 1,925,000(BASE PROJECT ALLOCATION - $1,925,000)

(A7) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR GREEN TREE SCHOOL PROJECTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR AFFORDABLE HOUSING AND RETAIL DEVELOPMENT FACILITYPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(C7) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR HUNTING PARK REVITALIZATION PROJECTPROJECT ALLOCATION 1,300,000(BASE PROJECT ALLOCATION - $1,300,000)

(D7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF HOUSING AND

20130SB0680PN1329 - 440 -

123456789

101112131415161718192021222324252627282930

Page 441:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

SUPPORTIVE SERVICES INFRASTRUCTURE FOR SPECIAL NEEDS POPULATIONSPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(E7) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR INPATIENT, OUTPATIENT, EMERGENCY AND CLINICAL FACILITIESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(F7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT SITE OF JULIA R. MASTERMAN HIGH SCHOOLPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(G7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR LEHIGH SOMERSET NEIGHBORHOOD REVITALIZATIONPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(H7) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS RELATING TO MAZZONI CENTERPROJECT ALLOCATION 6,000,000(BASE PROJECT ALLOCATION - $6,000,000)

(I7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS

20130SB0680PN1329 - 441 -

123456789

101112131415161718192021222324252627282930

Page 442:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FOR METROPOLITAN OPERA HOUSEPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(J7) CONSTRUCTION AND OTHER RELATED COSTS FOR MULTIPURPOSE COMMUNITY FACILITYPROJECT ALLOCATION 550,000(BASE PROJECT ALLOCATION - $550,000)

(K7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECT AT SITE OF NORTH BROAD SALVATION ARMYPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(L7) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT AND OTHER RELATED COSTS FOR TRANSIT CENTER PROJECT IN NORTH PHILADELPHIAPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(M7) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REVITALIZATION PROJECTS IN NORTHWEST PHILADELPHIAPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(N7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECT AT SITE OF PARKWAY CENTER

20130SB0680PN1329 - 442 -

123456789

101112131415161718192021222324252627282930

Page 443:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

CITY HIGH SCHOOLPROJECT ALLOCATION 6,000,000(BASE PROJECT ALLOCATION - $6,000,000)

(O7) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT PHILADELPHIA ZOOPROJECT ALLOCATION 30,000,000(BASE PROJECT ALLOCATION -

$30,000,000)(P7) ACQUISITION, CONSTRUCTION AND OTHER

RELATED COSTS FOR PHILLY FUNDAMENTALS PROJECTPROJECT ALLOCATION 700,000(BASE PROJECT ALLOCATION - $700,000)

(Q7) INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RENOVATIONS TO PYRAMID TEMPLE NO. 1, INCLUDING ELEVATOR REPLACEMENTPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(R7) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RICHARD ALLEN PREPARATORY SCHOOL EXPANSION PROJECTPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(S7) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS IN ROXBOROUGH

20130SB0680PN1329 - 443 -

123456789

101112131415161718192021222324252627282930

Page 444:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

DISTRICTPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(T7) CONSTRUCTION, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR THE SELF HELP MOVEMENT RESTORATION AND BEAUTIFICATION PROJECTPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(U7) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR HEALTH CENTER FACILITYPROJECT ALLOCATION 300,000(BASE PROJECT ALLOCATION - $300,000)

(V7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR STEVENS PROPERTY ON NORTH BROAD STREETPROJECT ALLOCATION 6,000,000(BASE PROJECT ALLOCATION - $6,000,000)

(W7) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT STUTZ PROPERTYPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(X7) ACQUISITION, INFRASTRUCTURE IMPROVEMENTS AND CONSTRUCTION FOR TALLER PUERTORRIQUENO, INC., EXPANSION PROJECT

20130SB0680PN1329 - 444 -

123456789

101112131415161718192021222324252627282930

Page 445:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(Y7) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RESEARCH AND CLINICAL CARE FACILITIESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(Z7) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR UNIVERSITY OF THE SCIENCESPROJECT ALLOCATION 25,000,000(BASE PROJECT ALLOCATION -

$25,000,000)(A8) CONSTRUCTION AND OTHER RELATED COSTS

FOR UPSALA RENEWAL PROJECTPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(B8) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR REDEVELOPMENT OF VACANT BUILDING ON DUVAL STEETPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(C8) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR COMMUNITY CENTERPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(D8) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PROJECTS FOR PHILADELPHIA FREEDOM VALLEY YMCA WEST

20130SB0680PN1329 - 445 -

123456789

101112131415161718192021222324252627282930

Page 446:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PHILADELPHIA BRANCHPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(E8) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT SITE OF WILLIAM PENN HIGH SCHOOLPROJECT ALLOCATION 20,000,000(BASE PROJECT ALLOCATION -

$20,000,000)(F8) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF PROPERTIES IN WEST PHILADELPHIAPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(G8) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR COMMERCIAL AND MIXED-USE PROPERTY DEVELOPMENT OF VACANT PROPERTIES IN WYNNEFIELDPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(H8) ACQUISITION, CONSTRUCTION,

REDEVELOPMENT AND OTHER RELATED COSTS FOR YESHA FAMILY CARE CENTERPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

20130SB0680PN1329 - 446 -

123456789

101112131415161718192021222324252627282930

Page 447:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(I8) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE AND RELATED COSTS FOR THE EXPANSION AND REDEVELOPMENT OF THE CENTER FOR AUTISMPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(J8) CONSTRUCTION, ABATEMENT OF HAZARDOUS

MATERIALS AND OTHER RELATED COSTS TO RENOVATE THE HISTORIC CARPENTER SHOP ON THE CAMPUS OF THE FRIENDS HOSPITAL TO BECOME A COMMUNITY CENTERPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(K8) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR MULTISTORY FACILITY SPANNING CECIL B. MOORE AVENUE AND OXFORD STREET ALONG BROAD STREETPROJECT ALLOCATION 25,000,000(BASE PROJECT ALLOCATION -

$25,000,000)(L8) ACQUISITION, CONSTRUCTION AND OTHER

RELATED COSTS FOR CORD ADVANCED MANUFACTURING TRAINING CENTER PROJECTSPROJECT ALLOCATION 2,373,000(BASE PROJECT ALLOCATION - $2,373,000)

(M8) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS TO REHABILITATE A HISTORICALLY

20130SB0680PN1329 - 447 -

<--

123456789

101112131415161718192021222324252627282930

Page 448:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

CERTIFIED FORMER GRAIN SILO BUILDING KNOWN AS THE GRANARYPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(N8) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR INDEPENDENCE SEAPORT MUSEUM AT PENN'S LANDINGPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(O8) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR PRESCHOOL PROJECT AT SITE OF MILL CREEK COMMUNITY AND CULTURAL CENTERPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(P8) CONSTRUCTION AND OTHER RELATED COSTS FOR CHRISTY RECREATION CENTER IMPROVEMENT PROJECTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(52) Pike County(i) (Reserved)

(53) Potter County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project

20130SB0680PN1329 - 448 -

123456789

101112131415161718192021222324252627282930

Page 449:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)(54) Schuylkill County

(i) Schuylkill Economic Development Corporation(A) Acquisition, infrastructure,

construction, utilities extensions and roadway improvements for development of Schuylkill Airport Business Park in Foster TownshipProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, infrastructure, construction and utilities extensions for expansion of Deer Lake Industrial ParkProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction of industrial shell building at Tidewood Industrial ParkProject Allocation 1,375,000(Base Project Allocation - $1,375,000)

(D) Acquisition, infrastructure, construction and other related costs for rehabilitation of St. Catherine's Medical Complex located in Butler Township and retrofitting it into a multipurpose facilityProject Allocation 2,000,000

20130SB0680PN1329 - 449 -

123456789

101112131415161718192021222324252627282930

Page 450:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $2,000,000)(E) Construction of commercial and

industrial buildings at Highridge Business ParkProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(F) Construction of industrial shell building at Highridge Business ParkProject Allocation 2,925,000(Base Project Allocation - $2,925,000)

(G) Acquisition, infrastructure, construction and utilities extensions for development and construction of 400-acre business parkProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(ii) Coaldale Borough(A) Acquisition, infrastructure,

renovation, construction and other related costs for development of outpatient medical facility and dialysis treatment centerProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Infrastructure, rehabilitation, construction and other related costs for expansion of St. Luke's Miners HospitalProject Allocation 10,000,000(Base Project Allocation -

20130SB0680PN1329 - 450 -

123456789

101112131415161718192021222324252627282930

Page 451:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$10,000,000)(iii) Mahanoy City Borough

(A) Acquisition, infrastructure, renovation, construction and other related costs for development of new outpatient medical office buildingProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(III.1) CITY OF POTTSVILLE(A) INFRASTRUCTURE, CONSTRUCTION AND

OTHER RELATED COSTS FOR INFRASTRUCTURE IMPROVEMENTS TO SCHUYLKILL HEALTH SYSTEM FACILITIESPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(iv) Tamaqua Borough(A) Acquisition, infrastructure,

renovation, construction and other related costs for development of facility to house state-of-the-art police station, antiblight education center, emergency center and magisterial district courtProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, infrastructure, renovation, construction and other related costs for new state-of-the-art public library, to be constructed in downtown historic district

20130SB0680PN1329 - 451 -

<--

123456789

101112131415161718192021222324252627282930

Page 452:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(C) Acquisition, infrastructure, renovation, construction and other related costs for redevelopment of downtown business districtProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(D) Acquisition, infrastructure, renovation, construction, utilities extensions and other related costs for construction of high-tech industrial community park on east end of borough along Route 209Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(55) Snyder County(i) (Reserved)(II) SHAMOKIN DAM BOROUGH AND MONROE TOWNSHIP

(A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR CONVERSION OF COAL-FIRED POWER PLANT TO NATURAL GAS-FIRED COMBINED-CYCLE POWER PLANTPROJECT ALLOCATION 80,000,000(BASE PROJECT ALLOCATION -

$80,000,000)(56) Somerset County

(i) County Projects(A) Land acquisition, construction,

20130SB0680PN1329 - 452 -

<--

123456789

101112131415161718192021222324252627282930

Page 453:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

infrastructure and related costs for the expansion of Riggs Industries and its subsidiariesProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR AMBULATORY CARE CENTERPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR OUTDOOR RECREATIONAL TOURISM FACILITY AND RELATED PROJECTSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR NATURAL GAS REFUELING STATIONPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR EXPANSION OF OIL AND GAS WASTEWATER TREATMENT FACILITYPROJECT ALLOCATION 50,000,000(BASE PROJECT ALLOCATION -

$50,000,000)(I.1) QUEMAHONING TOWNSHIP

20130SB0680PN1329 - 453 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 454:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR RAIL PROJECTS RELATING TO ECONOMIC DEVELOPMENT PROJECTSPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(I.2) SHADE TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR RAIL SIDING AND TRANSLOADING FACILITYPROJECT ALLOCATION 2,100,000(BASE PROJECT ALLOCATION - $2,100,000)

(ii) Somerset Borough(A) Construction, infrastructure and

other costs related to Somerset Hospital campus improvement projectProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(iii) Somerset Township(A) Construction, infrastructure and

other costs related to Twin Lakes Rehabilitation Center projectProject Allocation 500,000(Base Project Allocation - $500,000)

(IV) WINDBER BOROUGH(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR EDUCATIONAL

20130SB0680PN1329 - 454 -

<--

123456789

101112131415161718192021222324252627282930

Page 455:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FACILITY PROJECTS RELATING TO WINDBER COAL HERITAGE MUSEUMPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(57) Sullivan County(i) (Reserved)(II) LAPORTE BOROUGH

(A) INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR UPGRADES TO MEDICAL EQUIPMENT AND SERVICES FOR RURAL HEALTH CLINICPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(58) Susquehanna County(i) The Progress Authority

(A) Infrastructure improvements, renovations, construction and other related costs for improvements to Camp ArchbaldProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(II) CENTRAL BRADFORD INDUSTRIAL DEVELOPMENT AUTHORITY(A) CONSTRUCTION, ACQUISITION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR A BUSINESS PARK ALONG THE I-81 CORRIDORPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(III) BRIDGEWATER TOWNSHIP

20130SB0680PN1329 - 455 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 456:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR AN EXTENSION OF A PUBLIC WATERLINEPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(59) Tioga County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Infrastructure, renovation,

construction and other related costs for state-of-the-art cancer center at Soldiers and Sailors Memorial HospitalProject Allocation 2,100,000(Base Project Allocation - $2,100,000)

(C) Infrastructure, renovation, construction and other related costs for a same day surgery unit and state-of-the-art emergency department at Soldiers and Sailors Memorial HospitalProject Allocation 18,500,000(Base Project Allocation -

$18,500,000)(ii) Tioga County Development Corporation

(A) Design, engineering, site development, infrastructure,

20130SB0680PN1329 - 456 -

123456789

101112131415161718192021222324252627282930

Page 457:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

demolition, construction and other costs related to redevelopment of the former E. H. Hall, Inc./WESTAN Tannery brownfield site into Westfield Business ParkProject Allocation 4,600,000(Base Project Allocation - $4,600,000)

(III) WELLSBORO BOROUGH(A) REDEVELOPMENT, CONSTRUCTION AND OTHER

RELATED COSTS FOR COMMUNITY ATHLETIC COMPLEXPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(IV) WELLSBORO BOROUGH AND RICHMOND TOWNSHIP(A) CONSTRUCTION, ACQUISITION, EXPANSION,

RENOVATION AND OTHER RELATED COSTS FOR SUSQUEHANNA HEALTH/LAUREL HEALTH ENTITIES/NORTH PENN COMPREHENSIVE HEALTH SERVICESPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(60) Union County

(i) (Reserved)(II) KELLY TOWNSHIP

(A) TRANSPORTATION INFRASTRUCTURE IMPROVEMENTS ASSOCIATED WITH EXPANSION OF EVANGELICAL COMMUNITY HOSPITAL FACILITIES ON GROUNDS OF EXISTING HOSPITAL AND ON ADJACENT LAND

20130SB0680PN1329 - 457 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 458:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 4,100,000(BASE PROJECT ALLOCATION - $4,100,000)

(61) Venango County(i) Oil Region Alliance

(A) Acquisition, infrastructure, construction and other related costs for development of senior living multiphase care facility, to include independent cottage campus, assisted living and nursing home careProject Allocation 7,000,000(Base Project Allocation - $7,000,000)

(62) Warren County(i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic projectProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(63) Washington County

(i) County projects(A) Acquisition, construction,

infrastructure, redevelopment and other costs related to mixed-use business parkProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction, infrastructure, redevelopment and

20130SB0680PN1329 - 458 -

123456789

101112131415161718192021222324252627282930

Page 459:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

other costs related to development of pad-ready sites along I-79 and Route 19 corridorProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, construction, infrastructure, redevelopment and other costs related to economic development projectsProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(D) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECTS RELATING TO NATURAL GAS INDUSTRYPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR REDEVELOPMENT PROJECTS RELATING TO NATURAL GAS INDUSTRYPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(F) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR SKYPOINTE BUSINESS PARK PROJECTPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(G) ACQUISITION, CONSTRUCTION,

20130SB0680PN1329 - 459 -

<--

123456789

101112131415161718192021222324252627282930

Page 460:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

INFRASTRUCTURE AND OTHER RELATED COSTS FOR DEVELOPMENT OF SITES ADJACENT TO WASHINGTON COUNTY AIRPORTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(H) CONSTRUCTION, REHABILITATION AND

OTHER RELATED COSTS FOR SENIOR LIVING PROJECTPROJECT ALLOCATION 2,050,000(BASE PROJECT ALLOCATION - $2,050,000)

(I) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT AND RENOVATION OF HISTORICAL YWCA BUILDING ON WEST MAIDEN STREETPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(J) ACQUISITION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR DEVELOPMENT OF SITE ALONG ROUTE 19 AND I-70 CORRIDORPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(K) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF PAD-READY SITESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(L) CONSTRUCTION, ABATEMENT OF HAZARDOUS

20130SB0680PN1329 - 460 -

123456789

101112131415161718192021222324252627282930

Page 461:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT OF FORMER INDUSTRIAL SITES AND BROWNFIELDSPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(ii) Allenport Borough(A) Acquisition, construction,

infrastructure, redevelopment and other costs related to site improvement project at Mon River Industrial ParkProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(II.1) BUFFALO TOWNSHIP

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR MIXED-USE TRAILPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(B) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR WATER LINE INSTALLATION IN BLAIN AND BUFFALO TOWNSHIPSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(II.2) BURGETTSTOWN BOROUGH(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR STARPOINTE BUSINESS PARK PROJECT

20130SB0680PN1329 - 461 -

<--

123456789

101112131415161718192021222324252627282930

Page 462:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(II.3) CALIFORNIA BOROUGH

(A) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR CENTER IN THE WOODS IMPROVEMENT PROJECTPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(ii.1) (II.4) Canonsburg Borough(A) Acquisition, construction,

infrastructure improvements and other costs related to a Pop Music Hall of Fame projectProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(II.5) CARROLL TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE

REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT MON VALLEY YMCAPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR LOADOUT FACILITYPROJECT ALLOCATION 4,750,000(BASE PROJECT ALLOCATION - $4,750,000)

(C) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR MONONGAHELA VALLEY HOSPITAL

20130SB0680PN1329 - 462 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 463:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(II.6) CECIL TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR PARK IMPROVEMENTSPROJECT ALLOCATION 1,250,000(BASE PROJECT ALLOCATION - $1,250,000)

(iii) Hanover Township(A) Acquisition, construction,

infrastructure, redevelopment and other costs related to Starpointe Business Park expansion projectProject Allocation 15,000,000(Base Project Allocation -

$15,000,000)(III.1) JEFFERSON TOWNSHIP

(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS AT MEADOWCROFT ROCKSHELTER AND HISTORIC VILLAGEPROJECT ALLOCATION 2,000,000(BASE PROJECT ALLOCATION - $2,000,000)

(III.2) CITY OF MONONGAHELA(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR PROJECTS RELATING TO NOBLE J. DICK AQUATORIUM

20130SB0680PN1329 - 463 -

<--

123456789

101112131415161718192021222324252627282930

Page 464:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

PROJECT ALLOCATION 600,000(BASE PROJECT ALLOCATION - $600,000)

(III.3) PETERS TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR IMPROVEMENTS TO PETERSWOOD PARKPROJECT ALLOCATION 650,000(BASE PROJECT ALLOCATION - $650,000)

(B) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR PETERS TOWNSHIP AMPHITHEATERPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(III.4) SOUTH FAYETTE TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE AND OTHER RELATED COSTS FOR PARK IMPROVEMENTSPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR CIVIC CENTERPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(iv) South Strabane Township(A) Acquisition, construction,

infrastructure, redevelopment and other costs related to Zediker Station Business Park improvement project

20130SB0680PN1329 - 464 -

123456789

101112131415161718192021222324252627282930

Page 465:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)(B) Acquisition, construction,

infrastructure, redevelopment and other costs related to development of business park in the townshipProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(C) Acquisition, construction,

infrastructure, redevelopment and other costs related to locating sites for support companies for natural gas industryProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Acquisition, construction, infrastructure, redevelopment and other costs related to redevelopment of former industrial sites for new and expanding businessesProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) Acquisition, construction, infrastructure, redevelopment and other costs related to Mon Valley receiving and loading facility development projectProject Allocation 5,000,000

20130SB0680PN1329 - 465 -

123456789

101112131415161718192021222324252627282930

Page 466:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $5,000,000)(F) Acquisition, construction,

infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business parkProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(G) Acquisition, construction,

infrastructure, redevelopment and other costs related to Skypointe business parkProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Acquisition, infrastructure, construction and other related costs for former foundry site mixed-use redevelopment projectProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(I) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR REDEVELOPMENT OF FORMER INDUSTRIAL SITESPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(J) ACQUISITION, CONSTRUCTION,

20130SB0680PN1329 - 466 -

<--

123456789

101112131415161718192021222324252627282930

Page 467:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR BUSINESS PARK PROJECTPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(K) ACQUISITION, CONSTRUCTION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ZEDIKER STATION BUSINESS PARKPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(64) Wayne County

(i) (Reserved)(65) Westmoreland County

(i) County projects(A) Construction, renovation,

modernization, reconstruction and expansion of Excela Health System Westmoreland Hospital Intensive Care and short-stay unitsProject Allocation 4,500,000(Base Project Allocation - $4,500,000)

(B) Construction of Excela Health System Latrobe Ambulatory Care CenterProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(C) Construction of Excela Health System

20130SB0680PN1329 - 467 -

123456789

101112131415161718192021222324252627282930

Page 468:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Orthopedic Center of ExcellenceProject Allocation 11,500,000(Base Project Allocation -

$11,500,000)(D) Infrastructure, renovation, abatement

of hazardous materials, construction and other related costs for state-of-the-art Southern Alleghenies Museum of Art Education, Conference and Collection Management CenterProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii) Latrobe Redevelopment Authority(A) Construction of LEED-certified

multipurpose athletic, educational and cultural centerProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(iii) Westmoreland County Industrial Development Corporation(A) Acquisition, demolition, site

preparation, environmental remediation, construction and other costs related to redevelopment of brownfield and blighted property in City of Jeannette for future commercial useProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure

20130SB0680PN1329 - 468 -

123456789

101112131415161718192021222324252627282930

Page 469:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

extensions and improvements, construction and other related costs for 150-acre industrial parkProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iv) City of Lower Burrell(A) Acquisition, construction,

demolition, infrastructure, redevelopment and other costs related to Lower Burrell redevelopment project for commercial reuse and developmentProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(V) CITY OF NEW KENSINGTON(A) CONSTRUCTION, ACQUISITION,

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RENOVATION AND REHABILITATION OF DOWNTOWN BUSINESS DISTRICTPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(VI) EAST HUNTINGDON TOWNSHIP(A) CONSTRUCTION, INFRASTRUCTURE,

REDEVELOPMENT AND OTHER RELATED COSTS FOR PITTSBURGH SUPERCOMPUTING CENTER PROJECTSPROJECT ALLOCATION 4,000,000(BASE PROJECT ALLOCATION - $4,000,000)

(VII) HEMPFIELD TOWNSHIP(A) ACQUISITION, CONSTRUCTION,

20130SB0680PN1329 - 469 -

<--

123456789

101112131415161718192021222324252627282930

Page 470:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT PROJECTSPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(VIII) CITY OF MONESSEN

(A) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR REHABILITATION OF DOWNTOWN BUSINESS DISTRICTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(B) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR RAIL EXPANSION PROJECTPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(v) (IX) North Huntington Township(A) Construction and other related costs

for development of regional facility to be utilized as a professional development center for effective teaching and learning of science, technology, engineering and mathematicsProject Allocation 2,500,000(Base Project Allocation - $2,500,000)

(X) UPPER BURRELL TOWNSHIP(A) ACQUISITION, INFRASTRUCTURE

IMPROVEMENTS, CONSTRUCTION AND OTHER

20130SB0680PN1329 - 470 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 471:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

RELATED COSTS FOR INDUSTRIAL PARKPROJECT ALLOCATION 5,000,000(BASE PROJECT ALLOCATION - $5,000,000)

(66) Wyoming County(i) (Reserved)

(67) York County(i) Redevelopment Authority of the City of

York(A) Acquisition, infrastructure,

renovation, construction and rehabilitation for revitalization of West Market Street between George and Beaver StreetsProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovation, construction and other related costs, including abatement of hazardous materials, for redevelopment of Northwest Triangle site and construction of commercial, residential and retail mixed-use facilitiesProject Allocation 6,000,000(Base Project Allocation - $6,000,000)

(ii) Redevelopment Authority of the County of York(A) Infrastructure, renovation,

construction and other related costs for redevelopment of downtown Hanover,

20130SB0680PN1329 - 471 -

123456789

101112131415161718192021222324252627282930

Page 472:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

including historic buildings, blighted buildings and Hanover State TheatreProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(B) Infrastructure, construction and other related costs for renovations and rehabilitation of York College of Pennsylvania campuses, including classrooms, laboratories, offices and student support facilitiesProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(C) Infrastructure, construction and

other related costs for renovations and rehabilitation of York College of Pennsylvania's North Campus, including classrooms, laboratories, offices, student support and other academic facilitiesProject Allocation 12,000,000(Base Project Allocation -

$12,000,000)(iii) City of York

(A) Construction, renovation, infrastructure and other related costs for redevelopment and revitalization of Shipley Energy propertyProject Allocation 10,000,000(Base Project Allocation -

20130SB0680PN1329 - 472 -

123456789

101112131415161718192021222324252627282930

Page 473:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

$10,000,000)(B) CONSTRUCTION, INFRASTRUCTURE,

ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR RENOVATION OF EXISTING COMMERCIAL SPACEPROJECT ALLOCATION 15,000,000(BASE PROJECT ALLOCATION -

$15,000,000)(IV) RED LION BOROUGH

(A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR EXPANSION OF KALTREIDER-BENFER LIBRARYPROJECT ALLOCATION 1,040,000(BASE PROJECT ALLOCATION - $1,040,000)

(68) Multiple Counties(i) Crawford, Erie, Mercer, Venango and

Warren Counties(A) Acquisition, infrastructure,

renovation and other related costs for demolition of existing structures and construction of several incubator facilitiesProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Centre, Columbia, Lackawanna, Luzerne, Mifflin, Montour and Northumberland Counties(A) Acquisition, construction,

infrastructure, redevelopment and other related costs for facilities to

20130SB0680PN1329 - 473 -

<--

123456789

101112131415161718192021222324252627282930

Page 474:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

deliver medical services, conduct research and provide other related activities for Geisinger Health SystemProject Allocation 30,000,000(Base Project Allocation -

$30,000,000)(iii) Pike and Wayne Counties

(A) Wayne Economic Development Corporation, land acquisition, construction, infrastructure development and other related costs for career and technology centerProject Allocation 11,000,000(Base Project Allocation -

$11,000,000)(iv) Berks, Lehigh and York Counties

(A) Redevelopment Authority of the City of York, acquisition, site preparation, infrastructure, construction and other related costs for Think Loud Development project in Cities of Reading, Allentown and York, including renovations and strategic reuse of historic properties and installation of fiber optic infrastructureProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(v) Allegheny, Beaver, Cambria, Erie,

20130SB0680PN1329 - 474 -

123456789

101112131415161718192021222324252627282930

Page 475:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Washington and Westmoreland Counties(A) Acquisition, construction,

infrastructure, redevelopment and other costs related to Children's Hospital of Pittsburgh of UPMCProject Allocation 10,000,000(Base Project Allocation -

$10,000,000)(vi) Lackawanna and Luzerne Counties

(A) Acquisition, construction, infrastructure and other costs related to Mine Drainage Treatment Works projectProject Allocation 18,000,000(Base Project Allocation -

$18,000,000)(vii) Montgomery and Philadelphia Counties

(A) Construction, infrastructure and other costs related to Saint Joseph's University improvement projectProject Allocation 21,300,000(Base Project Allocation -

$21,300,000)(B) City Avenue Special Services

District. Construction, infrastructure improvements and other related costs on City Avenue for pedestrian and vehicular hazard mitigation and storm water management in Lower Merion and the City of Philadelphia

20130SB0680PN1329 - 475 -

123456789

101112131415161718192021222324252627282930

Page 476:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(viii) Berks and Montgomery Counties(A) Construction, infrastructure and

other related costs for rehabilitation of historic Civil War era railroad projectProject Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ix) Fayette and Somerset Counties(A) Infrastructure improvements, new

construction and renovations at Seven Springs Mountain Resort, Seven Springs BoroughProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

Section 7. Itemization of flood control projects.Additional capital projects in the category of flood control

projects to be constructed by the Department of Environmental Protection, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal ProjectAllocation

(1) Department of Environmental Protection(i) Allegheny County

(A) Funding for flood protection and rehabilitation of Pine Creek in Shaler TownshipProject Allocation 900,000

20130SB0680PN1329 - 476 -

123456789

101112131415161718192021222324252627282930

Page 477:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $810,000)(Design & Contingencies - $90,000)

(B) Infrastructure, construction and other costs related to Pine Creek Watershed flood control project, including reconstruction of culvert and retrofit of three existing detention basinsProject Allocation 96,000(Base Project Allocation - $80,000)(Design & Contingencies - $16,000)

(II) BUCKS COUNTY(A) CONSTRUCTION AND OTHER RELATED COSTS

TO CONSTRUCT STREAM BED LINE WITH RIPRAP AND BANK STABILIZATION TO CONTROL EROSION AND FLOODING IN LANGHORNE BOROUGHPROJECT ALLOCATION 100,000(BASE PROJECT ALLOCATION - $100,000)

(B) REHABILITATION AND OTHER RELATED COSTS FOR RETENTION BASIN FOR POQUESSING CREEK IN BENSALEM TOWNSHIPPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(ii) (III) Cambria County(A) Additional funding for DGS Project

184-34, City of Johnstown, channel improvements to St. Clair Run, including rehabilitation and mitigation

20130SB0680PN1329 - 477 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 478:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 1,350,000(Base Project Allocation - $1,215,000)(Design & Contingencies - $135,000)

(B) Funding for flood protection of Solomon's Run, including rehabilitation and mitigation, in City of JohnstownProject Allocation 540,000(Base Project Allocation - $486,000)(Design & Contingencies - $54,000)

(C) Rehabilitate five levee drainage structures along Chest Creek and Flannigan Run, including mitigation, in Patton Borough and Chest and Elder TownshipsProject Allocation 1,350,000(Base Project Allocation - $1,215,000)(Design & Contingencies - $135,000)

(D) Funding for flood protection of Solomon's Run, including rehabilitation and mitigation, in Stonycreek Township and Dale BoroughProject Allocation 900,000(Base Project Allocation - $810,000)(Design & Contingencies - $90,000)

(IV) CHESTER COUNTY(A) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS FOR STORM WATER CONTROL IN SCHUYLKILL TOWNSHIPPROJECT ALLOCATION 7,000,000

20130SB0680PN1329 - 478 -

<--

123456789

101112131415161718192021222324252627282930

Page 479:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(BASE PROJECT ALLOCATION - $7,000,000)(B) CONSTRUCTION, INFRASTRUCTURE AND

OTHER RELATED COSTS TO ADDRESS EXISTING WATERSHED PROBLEMS, ACCELERATED STREAM BANK EROSION AND WATER QUALITY IN TREDYFFRIN TOWNSHIPPROJECT ALLOCATION 9,000,000(BASE PROJECT ALLOCATION - $9,000,000)

(C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR FLOOD MITIGATION PROJECTS ALONG CHESTER CREEK, INCLUDING UPGRADES TO LEVEEPROJECT ALLOCATION 10,000,000(BASE PROJECT ALLOCATION -

$10,000,000)(V) COLUMBIA COUNTY

(A) REHABILITATION AND OTHER RELATED COSTS FOR BANK STABILIZATION, GRAVEL BAR REMOVAL AND DEBRIS REMOVAL AT COLUMBIA COUNTY SOIL CONSERVATIONPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(iii) (VI) Delaware County(A) Construction, infrastructure and

other costs related to installation of stream gauge on Darby CreekProject Allocation 538,000(Base Project Allocation - $538,000)

(B) Acquisition, demolition,

20130SB0680PN1329 - 479 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 480:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

construction, infrastructure and other costs related to Darby Borough flood remediation programProject Allocation 6,200,000(Base Project Allocation - $6,200,000)

(C) UPGRADES AND DEFERRED MAINTENANCE, PHASE VIIPROJECT ALLOCATION 550,000(BASE PROJECT ALLOCATION - $550,000)

(iv) (VII) Lackawanna County(A) Rehabilitate seven levee drainage

structures along Lackawanna River, including mitigation, in Mayfield BoroughProject Allocation 2,700,000(Base Project Allocation - $2,430,000)(Design & Contingencies - $270,000)

(B) Funding for Moosic flood protection project, including rehabilitation and mitigation, along Spring CreekProject Allocation 2,700,000(Base Project Allocation - $2,430,000)(Design & Contingencies - $270,000)

(C) Funding for Blakely flood protection project, including rehabilitation and mitigation, along Hull Creek in Blakely and Dickson City BoroughsProject Allocation 900,000(Base Project Allocation - $810,000)(Design & Contingencies - $90,000)

20130SB0680PN1329 - 480 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 481:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(D) Funding for Scranton flood control project, including rehabilitation and mitigation, along Roaring BrookProject Allocation 4,500,000(Base Project Allocation - $4,050,000)(Design & Contingencies - $450,000)

(E) Construction, infrastructure and other related costs for Racket Brook Creek retaining wall replacement project in City of CarbondaleProject Allocation 1,540,000(Base Project Allocation - $1,540,000)

(F) Construction, infrastructure and other related costs for Mayfield Borough levee extension projectProject Allocation 772,000(Base Project Allocation - $772,000)

(G) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR TINKLEPAUGH CREEK FLOOD MITIGATION PROJECTS IN ARCHBALD AND BLAKELY BOROUGHSPROJECT ALLOCATION 2,500,000(BASE PROJECT ALLOCATION - $2,500,000)

(v) (VIII) Luzerne County(A) Additional funding for DGS Project

182-3, flood protection project for Wadham Creek, including rehabilitation and mitigation, in Plymouth BoroughProject Allocation 540,000(Base Project Allocation - $486,000)

20130SB0680PN1329 - 481 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 482:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Design & Contingencies - $54,000)(B) Funding for Mocanaqua flood

protection project, including rehabilitation and mitigation along Turtle Creek, in Conyngham TownshipProject Allocation 540,000(Base Project Allocation - $486,000)(Design & Contingencies - $54,000)

(vi) (IX) Montgomery County(A) Funding for Ambler flood protection

project, including acquisition, infrastructure, rehabilitation and construction of storm water bypass facility, culverts and upstream neighborhood regional detention basinsProject Allocation 2,475,000(Base Project Allocation - $2,250,000)(Design & Contingencies - $225,000)

(B) Funding for Turnpike Drive storm water improvement project, including infrastructure, rehabilitation and construction of regional storm water management basin in Upper Moreland TownshipProject Allocation 550,000(Base Project Allocation - $500,000)(Design & Contingencies - $50,000)

(C) Acquisition, construction, infrastructure and other costs related to Glenside Flood Control buyout

20130SB0680PN1329 - 482 -

<--

123456789

101112131415161718192021222324252627282930

Page 483:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

project in Cheltenham TownshipProject Allocation 8,000,000(Base Project Allocation - $8,000,000)

(D) Construction, infrastructure and other costs related to flood control improvement projects in headwaters of Tookany Creek in Cheltenham TownshipProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(E) Construction, infrastructure and other costs related to Glenside flood control project Phase II in Cheltenham TownshipProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER COSTS RELATED TO GLENSIDE AREA FLOOD PROTECTION PROJECTPROJECT ALLOCATION 8,000,000(BASE PROJECT ALLOCATION - $8,000,000)

(G) CONSTRUCTION, INFRASTRUCTURE AND OTHER COSTS RELATED TO GLENSIDE AREA FLOOD PROTECTION PROJECT, PHASE II, IN CHELTENHAM TOWNSHIP ALONG TOOKANY CREEKPROJECT ALLOCATION 3,000,000(BASE PROJECT ALLOCATION - $3,000,000)

(H) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS TO TOOKANY CREEK

20130SB0680PN1329 - 483 -

<--

123456789

101112131415161718192021222324252627282930

Page 484:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

HEADWATERS FLOOD CONTROL PROJECTPROJECT ALLOCATION 1,000,000(BASE PROJECT ALLOCATION - $1,000,000)

(vii) (X) Northampton County(A) Permanent reconstruction of storm

sewer system causing the flooding of private, residential properties in Bangor BoroughProject Allocation 506,000(Base Project Allocation - $506,000)

(XI) NORTHUMBERLAND COUNTY(A) CONSTRUCTION, INFRASTRUCTURE,

ACQUISITION AND OTHER RELATED COSTS FOR REHABILITATION OF SHAMOKIN CREEK AND QUAKER RUN CREEK CHANNELS TO ALLEVIATE FLOODING IN COAL TOWNSHIPPROJECT ALLOCATION 14,000,000(BASE PROJECT ALLOCATION -

$14,000,000)(B) REPAIRS TO MITIGATE FLOOD WATER IN

SEVERAL AREAS THROUGHOUT LOWER SAUCON TOWNSHIPPROJECT ALLOCATION 1,250,000(BASE PROJECT ALLOCATION - $1,250,000)

(viii) (XII) Potter County(A) Rehabilitate three levee drainage

structures along Allegheny River and Mill Creek, including mitigation, in Coudersport BoroughProject Allocation 900,000

20130SB0680PN1329 - 484 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 485:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $810,000)(Design & Contingencies - $90,000)

(ix) (XIII) Schuylkill County(A) Funding for McAdoo flood protection

project, including rehabilitation and mitigation, along Celebration Creek in McAdoo, Kline and Banks TownshipsProject Allocation 540,000(Base Project Allocation - $486,000)(Design & Contingencies - $54,000)

(x) (XIV) Somerset County(A) Rehabilitate 25 levee drainage

structures along Paint Creek, including mitigation, in Windber and Paint BoroughsProject Allocation 4,950,000(Base Project Allocation - $4,455,000)(Design & Contingencies - $495,000)

(B) Rehabilitate 18 levee drainage structures along Coxes Creek, including mitigation, in Rockwood BoroughProject Allocation 3,600,000(Base Project Allocation - $3,240,000)(Design & Contingencies - $360,000)

(C) Construction, infrastructure and other costs related to North Fork dam and bridge modifications and repair projectProject Allocation 10,000,000

20130SB0680PN1329 - 485 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 486:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $10,000,000)

(D) CONSTRUCTION, REDEVELOPMENT, REHABILITATION AND OTHER RELATED COSTS FOR HYNDMAN BOROUGH LEVEEPROJECT ALLOCATION 500,000(BASE PROJECT ALLOCATION - $500,000)

(xi) (XV) Warren County(A) Rehabilitate nine levee drainage

structures along Glade Run, including mitigation, in City of WarrenProject Allocation 1,800,000(Base Project Allocation - $1,620,000)(Design & Contingencies - $180,000)

(xii) (XVI) Wayne County(A) Funding for White Mills channel

improvement project, including rehabilitation and mitigation along Lollipop Creek, at White Mills Village, Texas TownshipProject Allocation 540,000(Base Project Allocation - $486,000)(Design & Contingencies - $54,000)

(xiii) (XVII) Westmoreland County(A) Rehabilitate existing flood

protection along Jacks Run, including levee rehabilitation, slope stabilization, flood wall repairs, concrete channel construction and replacement of three drainage

20130SB0680PN1329 - 486 -

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 487:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

structures in South Greensburg BoroughProject Allocation 3,600,000(Base Project Allocation - $3,240,000)(Design & Contingencies - $360,000)

(xiii.1) Westmoreland County(A) (B) Additional funding for DGS

Project 182-7, flood protection in Jeannette City and Penn BoroughProject Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR FLOOD PLAIN IMPROVEMENTS, RETENTION PONDS, RETAINING WALLS AND ACID MINE MITIGATION SITES IN MURRYSVILLE BOROUGHPROJECT ALLOCATION 750,000(BASE PROJECT ALLOCATION - $750,000)

(xiv) (XVIII) Somerset and Fayette Counties(A) Rehabilitate 18 levee drainage

structures along the Youghiogheny and Casselman Rivers, including mitigation, in Confluence BoroughProject Allocation 4,050,000(Base Project Allocation - $3,645,000)(Design & Contingencies - $405,000)

(xv) (XIX) Chester, Delaware and Montgomery Counties(A) Regional watershed improvement

project, including funding for ACE

20130SB0680PN1329 - 487 -

<--

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 488:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

feasibility studyProject Allocation 125,000(Base Project Allocation - $125,000)

Section 8. Itemization of Keystone Recreation, Park and Conservation Fund projects.

Projects in the category of public improvement projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by current revenues of the Keystone Recreation, Park and Conservation Fund are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation

(1) Department of Conservation and Natural Resources(i) Bald Eagle State Forest

(A) Rehabilitate or replace Sand Mountain TrailProject Allocation 316,000(Base Project Allocation - $316,000)

(B) Upgrade sewage treatment plantProject Allocation 500,000(Base Project Allocation - $500,000)

(ii) Bald Eagle State Park(A) Renovate park office to meet

accessibility requirements and improve visitor servicesProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(iii) Blue Knob State Park

20130SB0680PN1329 - 488 -

123456789

101112131415161718192021222324252627282930

Page 489:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Pave and replace culverts at Willow Springs RoadProject Allocation 250,000(Base Project Allocation - $250,000)

(iv) Buchanan State Forest(A) Construct Buchanan Resource

Management CenterProject Allocation 1,750,000(Base Project Allocation - $1,750,000)

(v) Caledonia State Park(A) Replace shower houses and comfort

stations in Chinquapin Hill Campground and renovate campsitesProject Allocation 1,300,000(Base Project Allocation - $1,300,000)

(vi) Codorus State Park(A) Replace sailboat areas and restrooms

and rehabilitate sewage systemProject Allocation 450,000(Base Project Allocation - $450,000)

(vii) Cook Forest State Park(A) Rehabilitate water storage tanks,

including cleaning, painting, replacing level controls and maintenance accessProject Allocation 600,000(Base Project Allocation - $600,000)

(B) Repair sewage line inflow and infiltrationProject Allocation 250,000

20130SB0680PN1329 - 489 -

123456789

101112131415161718192021222324252627282930

Page 490:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $250,000)(viii) Cook State Forest

(A) Replace sewage linesProject Allocation 175,000(Base Project Allocation - $175,000)

(ix) Delaware Canal State Park(A) Replace Ferry Street Bridge

Project Allocation 900,000(Base Project Allocation - $900,000)

(B) Replace Smithtown Bridge No. 5Project Allocation 800,000(Base Project Allocation - $800,000)

(C) Replace or rehabilitate Phillips Mills, Smithtown No. 3 and Lower Limeport BridgesProject Allocation 1,200,000(Base Project Allocation - $1,200,000)

(D) Replace culverts on Rabbit RunProject Allocation 750,000(Base Project Allocation - $750,000)

(E) Reconstruct canal overflows along canalProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(x) Denton Hill State Park(A) Upgrade, rehabilitation or

replacement of ski lift, lighting, equipment, parking and structures to improve operations and safety to public

20130SB0680PN1329 - 490 -

123456789

101112131415161718192021222324252627282930

Page 491:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 750,000(Base Project Allocation - $750,000)

(xi) Evansburg State Park(A) Replace sewer lines throughout park

Project Allocation 480,000(Base Project Allocation - $480,000)

(xii) Frances Slocum State Park(A) Demolish sewage treatment plant and

construct municipal sewer connectionProject Allocation 900,000(Base Project Allocation - $900,000)

(xii.1) French Creek State Park(A) Construct Schuylkill River Trail

connectionProject Allocation 600,000(Base Project Allocation - $600,000)

(xiii) Gifford Pinchot State Park(A) Rehabilitate five shower houses

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(xiv) Hickory Run State Park(A) Replace pit latrines with modern

comfort stations in two organized group campsProject Allocation 2,200,000(Base Project Allocation - $2,200,000)

(xv) Hills Creek State Park(A) Rehabilitate sewage treatment plant,

sewer lines and lift stationsProject Allocation 250,000

20130SB0680PN1329 - 491 -

123456789

101112131415161718192021222324252627282930

Page 492:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $250,000)(B) Replace campground washhouses

Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(xvi) Lackawanna State Park(A) Rehabilitate pool complex and day use

area, including renovation of bath houses and addition of space for lifeguard and first aid stationProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xvi.1) Lackawanna State Forest(A) Construct pole building for equipment

storage at ThornhurstProject Allocation 244,000(Base Project Allocation - $244,000)

(xvii) Laurel Ridge State Park(A) Replace Laurel Highlands Hiking Trail

Bridge within the park and construct horse trail and parking/camping facilities at Bakers RunProject Allocation 1,600,000(Base Project Allocation - $1,600,000)

(xvii.1) Lehigh Gorge State Park(A) Replace Drake's Creek Bridge No. 0508

Project Allocation 300,000(Base Project Allocation - $300,000)

(B) Repair Glen Onoko Bridge, Phase 1Project Allocation 300,000(Base Project Allocation - $300,000)

20130SB0680PN1329 - 492 -

123456789

101112131415161718192021222324252627282930

Page 493:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(C) Replace Bald Mountain BridgeProject Allocation 250,000(Base Project Allocation - $250,000)

(xviii) Little Pine State Park(A) Rehabilitate shooting range to meet

current safety and accessibility standardsProject Allocation 400,000(Base Project Allocation - $400,000)

(xviii.1) Locust Lake State Park(A) Rehabilitate sewage treatment plant

Project Allocation 300,000(Base Project Allocation - $300,000)

(xix) Loyalsock State Forest(A) Rehabilitate Hillsgrove Ranger

Station equipment storage shedProject Allocation 525,000(Base Project Allocation - $525,000)

(B) Repair Pleasant Stream RoadProject Allocation 200,000(Base Project Allocation - $200,000)

(C) Repair Sones Pond Dam, including replacing outlet structure and repairing embankmentProject Allocation 300,000(Base Project Allocation - $300,000)

(xix.1) Marsh Creek State Park(A) Emergency spillway concrete repairs

at damProject Allocation 450,000

20130SB0680PN1329 - 493 -

123456789

101112131415161718192021222324252627282930

Page 494:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $450,000)(xix.2) Michaux State Forest

(A) Construct equipment storage buildingProject Allocation 250,000(Base Project Allocation - $250,000)

(xix.3) Park Region 3(A) Replace HVAC system and upgrade ADA

accessibility at regional officeProject Allocation 200,000(Base Project Allocation - $200,000)

(xx) Moraine State Park(A) Upgrade sewage treatment plant

Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(B) Rehabilitate and upgrade water treatment plantProject Allocation 1,500,000(Base Project Allocation - $1,500,000)

(xxi) Nescopeck State Park(A) Construct culvert at Riley's Pond

Project Allocation 600,000(Base Project Allocation - $600,000)

(xxii) Nockamixon State Park(A) Replace pit latrines with modern

comfort stationsProject Allocation 650,000(Base Project Allocation - $650,000)

(B) Replace boat rental docksProject Allocation 400,000(Base Project Allocation - $400,000)

20130SB0680PN1329 - 494 -

123456789

101112131415161718192021222324252627282930

Page 495:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(xxiii) Ohiopyle State Park(A) Repair sewage collection system and

sewage treatment plant to meet current effluent standardsProject Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xxiv) Park Region 1(A) Renovate or replace HVAC system at

regional officeProject Allocation 250,000(Base Project Allocation - $250,000)

(xxv) Presque Isle State Park(A) Provide for road flooding mitigation,

Predisaster Mitigation Grant ProjectProject Allocation 400,000(Base Project Allocation - $400,000)

(B) Replace sand mound Phase 4 B11 and B10Project Allocation 250,000(Base Project Allocation - $250,000)

(xxvi) Prince Gallitzin State Park(A) Rehabilitate Beaver Valley Marina

Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xxvii) Pymatuning State Park(A) Connect Jamestown sewage to sewer

authorityProject Allocation 500,000(Base Project Allocation - $500,000)

(B) Demolish sewage treatment plant at

20130SB0680PN1329 - 495 -

123456789

101112131415161718192021222324252627282930

Page 496:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

LinesvilleProject Allocation 250,000(Base Project Allocation - $250,000)

(C) Rehabilitate Linesville LiveryProject Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xxviii) Ricketts Glen State Park(A) Replace pit latrine along Route 118

with modern flush facilityProject Allocation 400,000(Base Project Allocation - $400,000)

(B) Replace dam controls and outlet worksProject Allocation 800,000(Base Project Allocation - $800,000)

(C) Reconstruct main park road and parking lots with repavingProject Allocation 750,000(Base Project Allocation - $750,000)

(xxix) Ridley Creek State Park(A) Renovate mansion kitchen

Project Allocation 250,000(Base Project Allocation - $250,000)

(xxx) Salt Springs State Park(A) Replace existing sanitary station

with new comfort station, including infrastructureProject Allocation 437,000(Base Project Allocation - $437,000)

(xxxi) Shawnee State Park(A) Pave areas near and around

20130SB0680PN1329 - 496 -

123456789

101112131415161718192021222324252627282930

Page 497:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

campgroundsProject Allocation 250,000(Base Project Allocation - $250,000)

(xxxii) Shikellamy State Park(A) Construct permanent causeway

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Replace Bag Nos. 6 and 7 and construct permanent causewayProject Allocation 1,000,000(Base Project Allocation - $1,000,000)

(xxxiii) Sinnemahoning State Park(A) Rehabilitate dam gates operators,

including electrical repairsProject Allocation 250,000(Base Project Allocation - $250,000)

(B) Rehabilitate access roadway to visitors' centerProject Allocation 250,000(Base Project Allocation - $250,000)

(xxxiv) Sproul State Forest(A) Rehabilitate Baker's Run horse

trailer parking/campingProject Allocation 250,000(Base Project Allocation - $250,000)

(B) Rehabilitate Baker's Run boat launch and canoe accessProject Allocation 200,000(Base Project Allocation - $200,000)

(C) Construct Hyner hang gliding landing

20130SB0680PN1329 - 497 -

123456789

101112131415161718192021222324252627282930

Page 498:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

strip within parkProject Allocation 225,000(Base Project Allocation - $225,000)

(xxxv) Susquehannock State Park(A) Rehabilitate roads and drainage and

pave main park roadsProject Allocation 250,000(Base Project Allocation - $250,000)

(xxxvi) Tiadaghton State Forest(A) Relocate Trout Run Road

Project Allocation 225,000(Base Project Allocation - $225,000)

(B) Construct trail bridge along Black Forest Trail over Slate RunProject Allocation 200,000(Base Project Allocation - $200,000)

(xxxvi.1) Tioga State Forest(A) Upgrade to Pine Creek Trail and 287

at-grade trail crossingProject Allocation 175,000(Base Project Allocation - $175,000)

(xxxvii) Tobyhanna State Park(A) Pave roads throughout park

Project Allocation 350,000(Base Project Allocation - $350,000)

(xxxviii) Weiser State Forest(A) Construct Weiser Resource Management

CenterProject Allocation 3,300,000(Base Project Allocation - $3,300,000)

20130SB0680PN1329 - 498 -

123456789

101112131415161718192021222324252627282930

Page 499:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(xxxix) Worlds End State Park(A) Reconstruct cabin area access

Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xl) Yellow Creek State Park(A) Rehabilitate beach area buildings

Project Allocation 600,000(Base Project Allocation - $600,000)

Section 9. Itemization of State forestry bridge projects.Projects in the category of State forestry bridge projects to

be constructed by the Department of Conservation and Natural Resources, its successors or assigns, and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (related to imposition of tax) are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation

(1) Cameron County(i) Elk State Forest

(A) Rehabilitate Whitehead Road/Whitehead Run - 9000Project Allocation 250,000(Base Project Allocation - $250,000)

(B) Replace bridge on Whitehead Road over Whitehead RunProject Allocation 250,000(Base Project Allocation - $250,000)

(C) Replace bridge on Naval Hollow Road over Naval Hollow Creek

20130SB0680PN1329 - 499 -

123456789

101112131415161718192021222324252627282930

Page 500:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 150,000(Base Project Allocation - $150,000)

(D) Replace bridge on Ford - administration road over East Branch of Hicks RunProject Allocation 250,000(Base Project Allocation - $250,000)

(E) Replace bridge on Bell Draft Road over McDonald RunProject Allocation 300,000(Base Project Allocation - $300,000)

(F) Replace bridge on Bell Draft Road over Bell Draft RunProject Allocation 200,000(Base Project Allocation - $200,000)

(G) Replace bridge on Bell Draft Road over Shaffer DraftProject Allocation 150,000(Base Project Allocation - $150,000)

(2) Centre County(i) Moshannon State Forest

(A) Replace Shirks Road over Black Moshannon Creek Bridge No. 9-0028Project Allocation 300,000(Base Project Allocation - $300,000)

(B) Replace Clay Mine Road over Six Mile Run - No. 0029 bridge and Huckleberry Road over Black Moshannon Creek - No. 0016Project Allocation 700,000

20130SB0680PN1329 - 500 -

123456789

101112131415161718192021222324252627282930

Page 501:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $700,000)(3) Clarion County

(i) Kittanning State Forest(A) Replace bridge on Corbett Road over

Little Clear Creek and bridge on Corbett Road over Clear CreekProject Allocation 400,000(Base Project Allocation - $400,000)

(4) Clearfield County(i) Moshannon State Forest

(A) Replace bridge on Laurel Ridge Road over Laurel Run and bridge on Jack Dent Road over Medix RunProject Allocation 650,000(Base Project Allocation - $650,000)

(B) Replace bridge on Ames Road over Deer CreekProject Allocation 200,000(Base Project Allocation - $200,000)

(5) Clinton County(i) Sproul State Forest

(A) Replace Beaver Dam Road over left fork of Beaver Dam RunProject Allocation 400,000(Base Project Allocation - $400,000)

(B) Replace culvert at Little Greenlick Road over Little Greenlick RunProject Allocation 250,000(Base Project Allocation - $250,000)

(C) Replace Birch Island Road over Amos

20130SB0680PN1329 - 501 -

123456789

101112131415161718192021222324252627282930

Page 502:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Branch Bridge No. 10-0040Project Allocation 300,000(Base Project Allocation - $300,000)

(D) Replace State Line Road over Beauty Run Bridge No. 10-0029Project Allocation 325,000(Base Project Allocation - $325,000)

(E) Replace bridge on Graham Road over Ferney RoadProject Allocation 200,000(Base Project Allocation - $200,000)

(F) Replace bridge on Penrose Road over box culvert, near intersection with Coon Run RoadProject Allocation 150,000(Base Project Allocation - $150,000)

(G) Replace bridge on Birch Island Road over Amos BranchProject Allocation 175,000(Base Project Allocation - $175,000)

(H) Replace bridge on Slate Line Road over Beauty RunProject Allocation 200,000(Base Project Allocation - $200,000)

(I) Replace bridge on Birch Island Road over Amos BranchProject Allocation 175,000(Base Project Allocation - $175,000)

(6) Elk County(i) Elk State Forest

20130SB0680PN1329 - 502 -

123456789

101112131415161718192021222324252627282930

Page 503:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Replace Dents Run Road over Bear Hollow No. 13-9005 and Weatherboard Run No. 13-9006Project Allocation 500,000(Base Project Allocation - $500,000)

(B) Replace Bridge No. 13-9025, Little Dents Road over Little Dents RunProject Allocation 200,000(Base Project Allocation - $200,000)

(7) Huntingdon County(i) Rothrock State Forest

(A) Replace old culvert at Laurel Run Road with box culvert over tributary to Galbraith Gap RunProject Allocation 100,000(Base Project Allocation - $100,000)

(B) Rehabilitate bridge at Crowfield Road over Standing Stone CreekProject Allocation 150,000(Base Project Allocation - $150,000)

(C) Replace pipe culvert at Thickhead Mountain Road over Sinking CreekProject Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace three small box culverts at Martin and Frew RoadsProject Allocation 500,000(Base Project Allocation - $500,000)

(E) Replace bridge at Beidler Road over Laurel Run

20130SB0680PN1329 - 503 -

123456789

101112131415161718192021222324252627282930

Page 504:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Project Allocation 350,000(Base Project Allocation - $350,000)

(F) Replace bridge on Lingle Valley Road over Laurel CreekProject Allocation 350,000(Base Project Allocation - $350,000)

(G) Replace bridges on Martin Gap Road 1 and 2 and on Frew RoadProject Allocation 600,000(Base Project Allocation - $600,000)

(H) Replace bridge on Diamond Valley Road over Globe Run, No. 5-0023, No. 24Project Allocation 400,000(Base Project Allocation - $400,000)

(I) Replace bridge on Crowfield Road over Standing Stone CreekProject Allocation 150,000(Base Project Allocation - $150,000)

(J) Replace bridge on Thickhead Mountain Road over Sinking CreekProject Allocation 200,000(Base Project Allocation - $200,000)

(K) Replace bridge on Laurel Run Road over tributary to Galbraith Gap RunProject Allocation 175,000(Base Project Allocation - $175,000)

(L) Install guiderail at seven bridgesProject Allocation 350,000(Base Project Allocation - $350,000)

(8) Lycoming County

20130SB0680PN1329 - 504 -

123456789

101112131415161718192021222324252627282930

Page 505:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(i) Tiadaghton State Forest(A) Replace Four Frances Road/Slate Run

Road structuresProject Allocation 800,000(Base Project Allocation - $800,000)

(B) Replace Limbaugh Road over English Run culvertProject Allocation 225,000(Base Project Allocation - $225,000)

(C) Replace Bridge No. 16-0001 on Spoor Hollow Road over Norris BrookProject Allocation 325,000(Base Project Allocation - $325,000)

(ii) Tioga State Forest(A) Replace Owasse Road/Chimney Hollow

Project Allocation 175,000(Base Project Allocation - $175,000)

(B) Replace Cedar Mountain Road over Cedar Run Bridge No. 16-0014Project Allocation 300,000(Base Project Allocation - $300,000)

(C) Replace Landrus Road at South Creek - No. 0023Project Allocation 325,000(Base Project Allocation - $325,000)

(D) Replace Spoor Hollow Road over Norris Brook Bridge No. 16-0001Project Allocation 325,000(Base Project Allocation - $325,000)

(E) Replace bridge on Zinck Fork Road

20130SB0680PN1329 - 505 -

123456789

101112131415161718192021222324252627282930

Page 506:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

over Upper Pine Bottom, No. 12-0047Project Allocation 250,000(Base Project Allocation - $250,000)

(F) Replace bridges on Slate Run Road over Manor Fork No. 12-0041, Daugherty Run No. 12-9006 and culvert at Fill Trestle No. 12-9028Project Allocation 600,000(Base Project Allocation - $600,000)

(G) Replace bridge on Cove Road over Fourth GapProject Allocation 250,000(Base Project Allocation - $250,000)

(H) Replace bridge on English Run Road over English RunProject Allocation 325,000(Base Project Allocation - $325,000)

(I) Replace bridge on Lower Pine Road over Lower Pine Bottom RunProject Allocation 350,000(Base Project Allocation - $350,000)

(9) Monroe County(i) Delaware State Forest

(A) Replace bridge on Five Mile Meadow Road over unnamed creek and bridge on Five Mile Meadow Road over Little Bushkill CreekProject Allocation 300,000(Base Project Allocation - $300,000)

(B) Replace bridge on Bald Hill Road over

20130SB0680PN1329 - 506 -

123456789

101112131415161718192021222324252627282930

Page 507:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

unnamed creekProject Allocation 280,000(Base Project Allocation - $280,000)

(C) Replace bridge on Gunter Valley Road over Trout RunProject Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace Gunter Valley box culvertProject Allocation 200,000(Base Project Allocation - $200,000)

(10) Perry County(i) Tuscarora State Forest

(A) Replace bridge over Couch RoadProject Allocation 150,000(Base Project Allocation - $150,000)

(B) Replace bridge at Colonel Denning Road over Doubling Gap CreekProject Allocation 175,000(Base Project Allocation - $175,000)

(C) Replace bridge on Gunter Valley Road over Trout RunProject Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace Meadow Run Road Bridge over Laurel RunProject Allocation 300,000(Base Project Allocation - $300,000)

(E) Replace bridge on Couch RoadProject Allocation 150,000(Base Project Allocation - $150,000)

20130SB0680PN1329 - 507 -

123456789

101112131415161718192021222324252627282930

Page 508:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(F) Replace bridge on Gunter ValleyProject Allocation 200,000(Base Project Allocation - $200,000)

(G) Replace bridge on access road for Colonel Denning over Doubling Gap CreekProject Allocation 175,000(Base Project Allocation - $175,000)

(11) Potter County(i) Elk State Forest

(A) Replace structures for Bridge No. 13-0045, East Cowley Run Road over East Cowley RunProject Allocation 300,000(Base Project Allocation - $300,000)

(ii) Susquehannock State Forest(A) Replace Bridge No. 15-9013, Nelson

Run Road over Gas Well HollowProject Allocation 200,000(Base Project Allocation - $200,000)

(12) Schuylkill County(i) Weiser State Forest

(A) Construct a roadway and culvert over stream at Jefferson Tract and Road in South Manheim TownshipProject Allocation 200,000(Base Project Allocation - $200,000)

(B) Replace White Oak Road over Wolf Run and Mud Run and Lykens Road - No. 9000Project Allocation 400,000

20130SB0680PN1329 - 508 -

123456789

101112131415161718192021222324252627282930

Page 509:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $400,000)(C) Construct culvert at Weaver Road,

Second Mountain over unnamed tributaryProject Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace bridge on Jefferson Tract and RoadProject Allocation 200,000(Base Project Allocation - $200,000)

(E) Replace bridge on Weaver Road, Second Mountain over ford crossingProject Allocation 200,000(Base Project Allocation - $200,000)

(F) Replace bridges on White Oak over Wolf Run and White Oak over Mud RunProject Allocation 400,000(Base Project Allocation - $400,000)

(G) Replace bridges on Roaring Creek TractProject Allocation 700,000(Base Project Allocation - $700,000)

(H) Construct Weaver Road ford crossing box culvertProject Allocation 200,000(Base Project Allocation - $200,000)

(13) Somerset County(i) Forbes State Forest

(A) Replace three bridges at South Wolf Rock RoadProject Allocation 600,000

20130SB0680PN1329 - 509 -

123456789

101112131415161718192021222324252627282930

Page 510:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $600,000)(B) Rehabilitate Jones Mill Run Road and

Blue Hole Road bridges, widen roads and replace deck bridge with precast box culvertProject Allocation 600,000(Base Project Allocation - $600,000)

(C) Replace box culvert, bridge and roadway on South Wolfe Rock RoadProject Allocation 800,000(Base Project Allocation - $800,000)

(ii) Gallitzin State Forest(A) Replace culvert at Shade Road over

unnamed tributary to Shade CreekProject Allocation 250,000(Base Project Allocation - $250,000)

(14) Sullivan County(i) Loyalsock State Forest

(A) Rehabilitate Yellow Dog Road over Rock Run - No. 0017Project Allocation 350,000(Base Project Allocation - $350,000)

(B) Rehabilitate Hillsgrove Road over tributary to Pleasant Stream, No. 12-9018Project Allocation 250,000(Base Project Allocation - $250,000)

(C) Replace Bridge No. 20-9011, High Knob Road over Ketchum RunProject Allocation 250,000

20130SB0680PN1329 - 510 -

123456789

101112131415161718192021222324252627282930

Page 511:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(Base Project Allocation - $250,000)(D) Replace bridge on Rock Run Road over

Loyalsock CreekProject Allocation 300,000(Base Project Allocation - $300,000)

(15) Tioga County(i) Tioga State Forest

(A) Replace bridge on Cedar Mountain Road over Cedar Mountain RunProject Allocation 300,000(Base Project Allocation - $300,000)

(B) Replace bridge on Owasee Road over Chimney HollowProject Allocation 175,000(Base Project Allocation - $175,000)

(C) Replace bridge on Spoor Hollow Road over Norris BrookProject Allocation 325,000(Base Project Allocation - $325,000)

(D) Replace bridge on Landrus Road over South CreekProject Allocation 325,000(Base Project Allocation - $325,000)

(16) Union County(i) Bald Eagle State Forest

(A) Replace bridge on Bear Run Road over Bear Run CreekProject Allocation 250,000(Base Project Allocation - $250,000)

(17) Westmoreland County

20130SB0680PN1329 - 511 -

123456789

101112131415161718192021222324252627282930

Page 512:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(i) Forbes State Forest(A) Replace bridge on South Wolfe Rock

Road over tributary to Tub Mill Run and bridge on South Wolfe Rock Road over Tub Mill RunProject Allocation 600,000(Base Project Allocation - $600,000)

Section 10. Itemization of State ATV/Snowmobile Fund current revenue projects.

Projects in the category of State ATV/Snowmobile Fund projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns, and to be financed from State ATV/Snowmobile Fund current revenue are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation

(1) Monroe County(i) Delaware State Forest

(A) Construct or rehabilitate ATV trail in Dixon Miller Recreation AreaProject Allocation 250,000(Base Project Allocation - $250,000)

Section 11. Itemization of Pennsylvania Fish and Boat Commission capital projects.

The individual capital projects in the category of public improvements projects to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by the current revenues of the Fish Fund and the Boat Fund pursuant to executive authorizations are

20130SB0680PN1329 - 512 -

123456789

101112131415161718192021222324252627282930

Page 513:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation

(1) Pennsylvania Fish and Boat Commission(i) Berks County

(A) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Kaercher Creek (PA 478)Project Allocation 5,063,000

(ii) Bucks County(A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Levittown LakeProject Allocation 1,875,000

(iii) Cambria County(A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Duman LakeProject Allocation 1,875,000

(iv) Carbon County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Mauch Chunk Lake (PA 462)Project Allocation 5,625,000

(v) Centre County(A) Design, permit and breach Gap Dam

Project Allocation 250,000

20130SB0680PN1329 - 513 -

123456789

101112131415161718192021222324252627282930

Page 514:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(B) Additional funds to construct a dam in the vicinity of Colyer Lake to meet current dam safety requirementsProject Allocation 3,140,000

(C) Additional funds to replace or remodel Pleasant Gap Regional Office BuildingsProject Allocation 2,375,000

(D) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related infrastructure at Pleasant GapProject Allocation 3,013,000

(E) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related infrastructure at Benner SpringProject Allocation 5,044,000

(F) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related infrastructure at BellefonteProject Allocation 5,375,000

(vi) Columbia County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Briar Creek Lake (PA 497)Project Allocation 6,875,000

(vii) Crawford County

20130SB0680PN1329 - 514 -

123456789

101112131415161718192021222324252627282930

Page 515:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Additional funds to design, permit and construct a rehabilitated dam to meet current dam safety requirements, Tamarack LakeProject Allocation 11,097,000

(viii) Cumberland County(A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Shaffer Mill DamProject Allocation 625,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Springfield ReservoirProject Allocation 625,000

(ix) Erie County(A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Hatchery DamProject Allocation 625,000

(B) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related infrastructure at FairviewProject Allocation 734,000

(C) Design, permit and construct marina, outbuilding and effluent treatment facility improvements at NortheastProject Allocation 10,625,000

(x) Fulton County

20130SB0680PN1329 - 515 -

123456789

101112131415161718192021222324252627282930

Page 516:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Additional funds to design, permit and construct a rehabilitated dam to meet current dam safety requirements, Meadow Grounds DamProject Allocation 2,188,000

(xi) Indiana County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Hemlock Lake (Straight Run Dam)Project Allocation 3,438,000

(xii) Juniata County(A) Additional funds to design,

rehabilitate and construct fish-rearing facilities and related infrastructure, Van DykeProject Allocation 2,875,000

(xiii) Luzerne County(A) Design, permit and breach the Mt.

Springs 2 DamProject Allocation 250,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Lily LakeProject Allocation 313,000

(C) Additional funds to design, permit and construct a rehabilitated dam to meet current dam safety requirements, Harris Pond DamProject Allocation 2,625,000

20130SB0680PN1329 - 516 -

123456789

101112131415161718192021222324252627282930

Page 517:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(xiv) Lycoming County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Rose Valley LakeProject Allocation 3,438,000

(xv) Northampton County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, East Bangor LakeProject Allocation 557,000

(xvi) Snyder County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Walker Lake (PA 637)Project Allocation 7,688,000

(xvii) Somerset County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Somerset LakeProject Allocation 1,700,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, High Point LakeProject Allocation 8,250,000

(xviii) Sullivan County(A) Design, permit and construct a

20130SB0680PN1329 - 517 -

123456789

101112131415161718192021222324252627282930

Page 518:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

rehabilitated dam to meet current dam safety requirements, Hunters Lake Recreation DamProject Allocation 1,250,000

(xix) Susquehanna County(A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Stump Pond Dam (Purdy)Project Allocation 625,000

(xx) Tioga County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Beechwood Lake (PA 454)Project Allocation 6,188,000

(xxi) Venango County(A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Kahle LakeProject Allocation 4,825,000

(xxii) Warren County(A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Browns PondProject Allocation 625,000

(xxiii) Wayne County(A) Design, permit and construct a

rehabilitated dam to meet current dam

20130SB0680PN1329 - 518 -

123456789

101112131415161718192021222324252627282930

Page 519:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

safety requirements, Douglas PondProject Allocation 625,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Long PondProject Allocation 625,000

(C) Additional funds to permit and construct a rehabilitated dam to meet current dam safety requirements, Belmont LakeProject Allocation 1,188,000

(D) Additional funds to design, permit and construct a rehabilitated dam to meet current dam safety requirements, Lower Woods PondProject Allocation 1,188,000

(E) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Miller PondProject Allocation 6,563,000

(F) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, White Oak PondProject Allocation 6,563,000

(xxiv) Wyoming County(A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Winola LakeProject Allocation 313,000

Section 12. Itemization of Manufacturing Fund current revenue

20130SB0680PN1329 - 519 -

123456789

101112131415161718192021222324252627282930

Page 520:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

projects.The individual capital projects in the category of public

improvement projects to be developed by the Department of General Services, its successors or assigns, for the Department of Corrections, and to be financed from current revenues of the Manufacturing Fund are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal ProjectAllocation

(1) Department of Corrections(i) State Correctional Institution at Forest

(A) Interior construction of Correctional Institute building to provide for

correctional incentives programProject Allocation 7,500,000(Base Project Allocation - $6,000,000)(Design & Contingencies - $1,500,000)

Section 13. Itemization of Oil and Gas Lease Fund capital projects.

The individual capital projects in the category of public improvement projects to be developed by the Department of Conservation and Natural Resources, its successors or assigns, and to be financed from current revenues of the Oil and Gas Lease Fund are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation

(1) Department of Conservation and Natural Resources(i) Codorus State Park

20130SB0680PN1329 - 520 -

123456789

101112131415161718192021222324252627282930

Page 521:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(A) Construction of camping cottages within parkProject Allocation 150,000(Base Project Allocation - $150,000)

(ii) Ricketts Glen State Park(A) Construction of camping cottages

within parkProject Allocation 548,000(Base Project Allocation - $548,000)

Section 14. Itemization of Environmental Stewardship Fund capital projects.

The individual projects to be developed by the Department of Conservation and Natural Resources, its successors or assigns, and to be financed from current revenues of the Environmental Stewardship Fund are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation

(1) Department of Conservation and Natural Resources(i) Ridley Creek State Park

(A) Construct equestrian riding facilityProject Allocation 900,000(Base Project Allocation - $900,000)

SECTION 15. ITEMIZATION OF HIGHWAY BRIDGE PROJECTS.THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF HIGHWAY

BRIDGE PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES OR BY THE INCURRING OF DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS, AS

20130SB0680PN1329 - 521 -

<--

123456789

101112131415161718192021222324252627282930

Page 522:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

FOLLOWS:

PROJECTTOTAL PROJECT ALLOCATION

(1) NORTHUMBERLAND COUNTY(I) LOCAL BRIDGES (RESERVED).(II) STATE BRIDGES

(A) TENTH STREET BRIDGE IN TREVORTON OVER ZERBE RUN, ZERBE TOWNSHIP, BRIDGE REPLACEMENTPROJECT ALLOCATION 190,000(BASE PROJECT ALLOCATION - $190,000)

SECTION 16. PROVISIONS RELATING TO HIGHWAY BRIDGE PROJECTS.(A) LIMITATION ON EXPENDITURE OF FUNDS.--THE FOLLOWING SHALL

APPLY TO ITEMIZATIONS UNDER SECTION 15:(1) ANY MONEYS DERIVED FROM THE INCURRING OF DEBT SHALL

BE USED SOLELY FOR EFFECTING THE REHABILITATION, REPLACEMENT OR REMOVAL OF BRIDGES LOCATED ON STATE HIGHWAYS. ALL OTHER BRIDGE REHABILITATION, REPLACEMENT OR REMOVAL SHALL BE FINANCED FROM CURRENT REVENUE.

(2) NOTWITHSTANDING ANY LAW TO THE CONTRARY, THE PROJECTS ITEMIZED IN THE ACT OF DECEMBER 8, 1982 (P.L.848, NO.235), KNOWN AS THE HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET ACT FOR 1982-1983, MAY BE FINANCED FROM CURRENT REVENUE.(B) ALLOCATION OF FUNDS.--AS FOLLOWS:

(1) WHENEVER THE DEPARTMENT OF TRANSPORTATION DETERMINES THAT THE FULL ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED IN SECTION 15 ARE NOT NECESSARY FOR THE PROPER DESIGN, ACQUISITION OR CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS NO LONGER REQUIRED MAY BE ALLOCATED BY THE

20130SB0680PN1329 - 522 -

123456789

101112131415161718192021222324252627282930

Page 523:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

DEPARTMENT OF TRANSPORTATION TO INCREASE THE ESTIMATED COSTS OF ANY ONE OR MORE OF THE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.

(2) MONEYS RAISED OR EXPENDED BY MUNICIPALITIES AFTER THE EFFECTIVE DATE OF THIS ACT, IN ANTICIPATION OF RECEIPT OF FUNDS AUTHORIZED FOR PROJECTS ITEMIZED BY THIS ACT, MAY BE REIMBURSABLE TO THOSE MUNICIPALITIES.(C) POLICY ON JOBS AND MATERIALS.--AS FOLLOWS:

(1) IT IS THE DECLARED POLICY OF THE COMMONWEALTH THAT THE CONSTRUCTION PROJECTS AUTHORIZED IN SECTION 15 BE USED, TO THE GREATEST EXTENT POSSIBLE, TO PROVIDE FOR THE CREATION OF JOBS AND THE REHIRING OF THE UNEMPLOYED IN THIS COMMONWEALTH. IN ORDER TO REACH THIS GOAL, FIRMS WITH COMMONWEALTH-BASED FACILITIES SHALL BE ACTIVELY SOLICITED TO MAKE BIDS ON CONTRACTS TO FURNISH PRODUCTS AND MATERIALS, INCLUDING, BUT NOT LIMITED TO, STEEL AND STEEL PRODUCTS, TO BE USED IN THESE PROJECTS.

(2) EVERY CONTRACT DOCUMENT ENTERED INTO TO UNDERTAKE A PROJECT CONTAINED IN SECTION 15 SHALL PROVIDE THAT ANY STEEL OR OTHER PRODUCTS TO BE USED OR SUPPLIED IN THE PERFORMANCE OF THIS CONTRACT SHALL BE REQUIRED TO BE MANUFACTURED BY PLANTS IN THE UNITED STATES UNLESS THE SECRETARY DETERMINES, ON A CONTRACT-BY-CONTRACT BASIS, THAT CERTAIN REQUIRED PRODUCTS ARE NOT PRODUCED IN THE UNITED STATES IN SUFFICIENT QUANTITIES TO MEET THE REQUIREMENTS OF THE CONTRACT. SUCH A DETERMINATION AND THE REASONS FOR THE DETERMINATION SHALL BE PUBLISHED IN THE PENNSYLVANIA BULLETIN. DECISIONS MADE UNDER THIS SUBSECTION SHALL NOT BE INCONSISTENT WITH THE GENERAL PROVISIONS OF THE ACT OF MARCH 3, 1978 (P.L.6, NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT ACT.

20130SB0680PN1329 - 523 -

123456789

101112131415161718192021222324252627282930

Page 524:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

(3) MINORITIES AND WOMEN.--IT IS ALSO THE DECLARED POLICY OF THE COMMONWEALTH TO REQUIRE AND ENCOURAGE SUBSTANTIAL PARTICIPATION BY MINORITIES AND WOMEN IN THE CONSTRUCTION PROJECTS AUTHORIZED IN SECTION 15.(D) PAYMENT OF CAPITAL DEBT SERVICE.--THE REPAYMENT OF ANY

DEBT INCURRED PURSUANT TO SECTION 15 SHALL BE MADE FROM THE HIGHWAY BRIDGE IMPROVEMENT RESTRICTED ACCOUNT AND SUCH REPAYMENT SHALL HAVE FIRST CLAIM ON THE REVENUES OF THE ACCOUNT.

(E) AUTHORIZATION AND DEBT CUMULATION.--THE ADDITIONAL AUTHORIZATION AND DEBT ALLOWANCE PROVIDED FOR IN SECTION 15 SHALL BE ADDED TO THE TOTAL AUTHORIZATIONS AND DEBT INCURRED PURSUANT TO THE ACT OF DECEMBER 8, 1982 (P.L.848, NO.235), KNOWN AS THE HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET ACT FOR 1982-1983, AS AMENDED AND SUPPLEMENTED. SECTION 15 SHALL BE CONSTRUED AS A SUPPLEMENT TO THE HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET ACT FOR 1982-1983.Section 15 17. Debt authorization.

(a) Public improvements.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $3,572,285,000 $3,897,449,000 $3,977,449,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.

(b) Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to

20130SB0680PN1329 - 524 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 525:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $137,620,000 $138,120,000 $150,120,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.

(c) Transportation assistance.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $1,718,429,000 $1,823,639,000 $1,846,939,000 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d) Redevelopment assistance.--Subject to the limitation in section 317(b) of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $3,965,614,000 $6,077,447,000 $6,438,618,000 as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in a capital budget.

(e) Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time

20130SB0680PN1329 - 525 -

<--

123456789

101112131415161718192021222324252627282930

Page 526:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $78,702,000 $127,852,000 $137,852,000 as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

(f) Pennsylvania Fish and Boat Commission projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $128,741,000 as may be found necessary to carry out the acquisition and construction of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget.

(G) HIGHWAY BRIDGE PROJECTS.--THE GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW FROM TIME TO TIME, IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE SUM OF $190,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF THE STATE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.SECTION 16 18. ISSUE OF BONDS.

The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the

20130SB0680PN1329 - 526 -

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 527:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed estimated useful life of the projects being financed as stated in section 14 19.Section 17 19. Estimated useful life and term of debt.

(a) Estimated useful life.--The General Assembly states that the estimated useful life of the public improvement projects itemized in this act is as follows:

(1) Public improvement projects, 30 years.(2) Furniture and equipment projects, 10 years.(3) Transportation assistance projects:

(i) Rolling stock, 15 years.(ii) Passenger buses, 12 years.(iii) Furniture and equipment, 10 years.(iv) All others, 30 years.

(b) Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.Section 18 20. Appropriations.

(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $3,572,285,000 $3,897,449,000 $3,977,449,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department

20130SB0680PN1329 - 527 -

<--

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 528:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

of General Services in the maximum amount of $137,620,000 $138,120,000 $150,120,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $1,718,429,000 $1,823,639,000 $1,846,939,000 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.

(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount of $3,965,614,000 $6,077,447,000 $6,438,618,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance capital projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the moneys as required and

20130SB0680PN1329 - 528 -

<--

<--

<--

<--

<--

123456789

101112131415161718192021222324252627282930

Page 529:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

certified by it to be legally due and payable.(e) Flood control.--The net proceeds of the sale of the

obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Protection in the maximum amount of $78,702,000 $127,852,000 $137,852,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Protection the moneys as required and certified by it to be legally due and payable.

(f) Pennsylvania Fish and Boat Commission projects.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Pennsylvania Fish and Boat Commission in the maximum amount of $128,741,000 to be used by it exclusively to defray the financial cost of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Pennsylvania Fish and Boat Commission the moneys as required and certified by it to be legally due and payable.

(G) HIGHWAY BRIDGE PROJECTS.--THE NET PROCEEDS OF THE SALE OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT OF TRANSPORTATION IN THE MAXIMUM AMOUNT OF $190,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COSTS OF THE HIGHWAY BRIDGE PROJECTS SPECIFICALLY ITEMIZED IN THIS CAPITAL BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE

20130SB0680PN1329 - 529 -

<--

<--

123456789

101112131415161718192021222324252627282930

Page 530:  · CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 PRINTER'S NO. 1329 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL …

OBLIGATION, THE STATE TREASURER SHALL PAY OUT TO THE DEPARTMENT THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.Section 19 21. Federal funds.

(a) Projects itemized in this act.--In addition to those funds appropriated in section 18 20, all moneys received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

(b) Projects not requiring itemization.--Department of Military and Veterans Affairs construction projects which are totally federally funded but which are to be administered by the Department of General Services are hereby authorized.Section 20 22. Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects.Section 21 23. Effective date.

This act shall take effect immediately.

20130SB0680PN1329 - 530 -

<--

<--

<--

<--

123456789

1011121314151617181920212223