country estates final report paragon. project team mike reeves – project manager cole marr –...
Post on 21-Dec-2015
218 views
TRANSCRIPT
![Page 1: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/1.jpg)
Country EstatesFinal Report
PARAGON
![Page 2: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/2.jpg)
Project Team Mike Reeves – Project Manager
Cole Marr – Project Engineer
Bryce Beckstrom – Project Engineer
Amanda Sheehe – Project Editor
![Page 3: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/3.jpg)
Project DescriptionDesign RequirementsProject ApproachWork Completed Projected Work
![Page 4: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/4.jpg)
Project Description
![Page 5: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/5.jpg)
![Page 6: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/6.jpg)
Project Description 66 Acres 22 Estate Size Homes 1-2 Acre Lots ± 33 Acre Community
Space High Efficiency Low Environmental
Impact
![Page 7: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/7.jpg)
Existing Site
Proposed Development
![Page 8: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/8.jpg)
Design Requirements
Objectives Develop 3 Wastewater Treatment Options Develop Stormwater Management Plan Incorporate Greywater Treatment and Reuse Wetland Habitat Area Community Recycling Program Design Trail Around Site
![Page 9: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/9.jpg)
Preliminary Feasibility Study Location Zoning Utilities Transportation Site Characteristics
![Page 10: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/10.jpg)
Environmental Site Assessment Site Reconnaissance
Current and Past Use Tax Information Other Concerns
Interviews Josh Reed – Property Owner Hancock County Assessor’s Office
![Page 11: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/11.jpg)
Codes & Regulations
Regulation Entities Hancock County Conservation Subdivision IDNR LEED 10 State Standards AASHTO
![Page 12: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/12.jpg)
LID Design Options
![Page 13: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/13.jpg)
Preliminary Site Plan Designed According
to Hancock County
Will Meet R-1 Zoning
1-2 Acre Lots for
Adequate Septic
![Page 14: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/14.jpg)
In Contact with Mike Dale - Planning Dept
Use Natural Lay of
Land to Reduce Cut and Fill in Roadway
Roundabout Designed to Standards (TFHDC)
Preliminary Site Plan
![Page 15: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/15.jpg)
Geotechnical Analysis
Wildcat Dynamic Cone Penatrometer
Tube Samples (6” &3’)
![Page 16: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/16.jpg)
Laboratory Analysis of Samples Unconfined Compression Test (ASTM D2166)
Atterberg Limits (ASTM D4318)
Particle Size Analysis (ASTM D422)
![Page 17: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/17.jpg)
Assessment of Wastewater Options 3 Options Considered
Conventional Septic System
Presby Treatment System
Wetlands Treatment
![Page 18: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/18.jpg)
Assessment of Wastewater Options Decision Matrix Criteria
Decision Matrix Results
Alternative Percentage Weighting
Environmental Impact 30%
Cost 30%
Feasibility 20%
Creativity 20%
AlternativeEnvironmental
ImpactCost Feasibility Creativity Total
Conventional Septic 0.9 0.6 0.3 0.45 2.25
Presby System 0.3 0.3 0.15 0.3 1.05
Wetlands Treatment 0.6 0.6 0.45 0.3 1.95
![Page 19: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/19.jpg)
Hydraulics and Hydrology
Design for 100-yr flood Route stormwater
through wetlands Size pipes to control
flooding Design water quality
trenches Promote natural
overland flow
Existing vs Proposed 100-year Storm Routing
![Page 20: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/20.jpg)
Wetlands Treat 170 acres Design wet pond to
allow for sediment settling/quality volume
Research vegetation for the wetlands
Design outlet structure that controls 100-year flood
![Page 21: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/21.jpg)
Erosion Control Plan
Minimize sediment runoff into Miller Ditch
Minimize cut and fill on-site: 680cy cut
Reduce soil that leave site via truck tires
![Page 22: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/22.jpg)
LID/Conservation Highlights 50% Community
Space 20 Lots front
community space Enviro-Septic
Wastewater Treatment
Density meets maximum requirement
![Page 23: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda](https://reader030.vdocument.in/reader030/viewer/2022032522/56649d625503460f94a44180/html5/thumbnails/23.jpg)
Highlights
22 Lots, 1-2 Acres Each Site Layout/Roadway Design Sustainable LID Designs for:
Wastewater
Greywater
Stormwater
$440,000 Cost Estimates for Design/Construction/Lifecycle