County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION AND PROJECT DESCRIPTION 1. INTRODUCTION 1.1 OVERVIEW The proposed project is a housing development designed to provide affordable housing in the San Mateo MidCoast region. The intention of the project sponsors and San Mateo County is to improve the jobs/housing balance and jobs/housing fit by providing preference for those who live or work on the San Mateo Coast. The project is located on a parcel in the Coastal Zone of San Mateo County within the unincorporated community of Moss Beach. The project sponsor is seeking several actions from two separate agencies. MidPen Housing Corporation (MidPen) is requesting the following actions from the California Coastal Commission (Coastal Commission): Amend the LCP Implementation Plan and existing Planned Unit Development (PUD) for the site to reduce the number of units from 148 to 71; Amend LCP Land Use Plan and San Mateo County’s General Plan to change the site’s zoning designation from Medium-High Density Residential to Medium Density Residential; and Amend section 3.15(d) of the LCP to allow for 100% of units, apart from a resident manager’s unit, to serve low- or moderate-income households. MidPen will later request the following action from the San Mateo County Planning and Building Department: A Coastal Development Permit (CDP). 1.2 PROJECT PARTICIPANTS AND OTHER APPROVALS 1.2.1 PROJECT SPONSOR MidPen, headquartered in Foster City, is a non-profit organization dedicated to providing affordable housing in the Bay Area. It has developed or rehabilitated over 100 properties, including 29 properties in San Mateo County. MidPen’s mission is to provide safe, affordable housing of high quality to those in need; establish stability and opportunity in the lives of residents; and foster diverse communities that allow people from all ethnic, social and economic backgrounds to live in dignity, harmony and mutual respect. Through its affiliate organizations, MidPen Resident Services Corporation and MidPen Property Management, MidPen owns and manages all new developments and provides on-site resident services and programs to help residents advance. MidPen has been providing housing to residents of the Bay Area for more than 45 years.

Upload: others

Post on 26-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 1 IntroductionandProjectDescriptionMidPenHousing July2018

CYPRESSPOINTPROJECTINTRODUCTIONANDPROJECTDESCRIPTION

1. INTRODUCTION1.1 OVERVIEWTheproposedprojectisahousingdevelopmentdesignedtoprovideaffordablehousingintheSanMateoMidCoastregion.TheintentionoftheprojectsponsorsandSanMateoCountyistoimprovethejobs/housingbalanceandjobs/housingfitbyprovidingpreferenceforthosewholiveorworkontheSanMateoCoast.TheprojectislocatedonaparcelintheCoastalZoneofSanMateoCountywithintheunincorporatedcommunityofMossBeach.Theprojectsponsorisseekingseveralactionsfromtwoseparateagencies.

MidPenHousingCorporation(MidPen)isrequestingthefollowingactionsfromtheCaliforniaCoastalCommission(CoastalCommission):

• AmendtheLCPImplementationPlanandexistingPlannedUnitDevelopment(PUD)forthesitetoreducethenumberofunitsfrom148to71;

• AmendLCPLandUsePlanandSanMateoCounty’sGeneralPlantochangethesite’szoningdesignationfromMedium-HighDensityResidentialtoMediumDensityResidential;and

• Amendsection3.15(d)oftheLCPtoallowfor100%ofunits,apartfromaresidentmanager’sunit,toservelow-ormoderate-incomehouseholds.

MidPenwilllaterrequestthefollowingactionfromtheSanMateoCountyPlanningandBuildingDepartment:• ACoastalDevelopmentPermit(CDP).

1.2 PROJECTPARTICIPANTSANDOTHERAPPROVALS1.2.1 PROJECTSPONSORMidPen,headquarteredinFosterCity,isanon-profitorganizationdedicatedtoprovidingaffordablehousingintheBayArea.Ithasdevelopedorrehabilitatedover100properties,including29propertiesinSanMateoCounty.MidPen’smissionistoprovidesafe,affordablehousingofhighqualitytothoseinneed;establishstabilityandopportunityinthelivesofresidents;andfosterdiversecommunitiesthatallowpeoplefromallethnic,socialandeconomicbackgroundstoliveindignity,harmonyandmutualrespect.Throughitsaffiliateorganizations,MidPenResidentServicesCorporationandMidPenPropertyManagement,MidPenownsandmanagesallnewdevelopmentsandprovideson-siteresidentservicesandprogramstohelpresidentsadvance.MidPenhasbeenprovidinghousingtoresidentsoftheBayAreaformorethan45years.

Page 2: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 2 IntroductionandProjectDescriptionMidPenHousing July2018

ThepointofcontactforMidPenis:

AndrewBielakMidPenHousing303VintageParkDrive,Suite250FosterCity,[email protected](650)235-7675

1.2.2 DECISION-MAKINGAGENCYTheCaliforniaEnvironmentalQualityAct(CEQA)of1970(asamended)iscodifiedinCaliforniaPublicResourcesCodeSections21000etseq.,andtheStateCEQAGuidelinesintheCaliforniaCodeofRegulations,Title14,Division6,Chapter3.CEQArequiresthatapublicagencyserveastheLeadAgencyforthepurposesofcomplyingwithCEQA.However,Section15251providesaspecialenvironmentalcomplianceprocessforregulatoryprogramsofstateagenciesthathavebeencertifiedbytheSecretaryforResources(CCRTitle14,Section15250),includingsubsection(c)whichlists“TheregulatoryprogramoftheCaliforniaCoastalCommissionandtheregionalcoastalcommissionsdealingwiththeconsiderationandgrantingofcoastaldevelopmentpermitsundertheCaliforniaCoastalActof1976,Division20(commencingwithSection30000)ofthePublicResourcesCode.”

ThisenvironmentaldocumenthasbeenpreparedtoprovideenvironmentalinformationneededbytheCoastalCommissiontocompleteitsCEQA-equivalentcertifiedregulatoryprogramfortheproposedSanMateoCountyLCPAmendment.SanMateoCountyhasanalyzedthefullrangeofenvironmentalconditionssothatotheragenciescanrelyuponitforCEQAcomplianceaswell,underCCRTitle14,Section15253.

ThepointofcontactfortheCoastalCommissionis:

RenéeAnandaCaliforniaCoastalCommissionNorthCentralCoastDistrict45FremontStreet,Suite2000SanFrancisco,CA94105(415)[email protected]

Page 3: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 3 IntroductionandProjectDescriptionMidPenHousing July2018

1.2.3 PROJECTAPPLICANTTheSanMateoCountyPlanningandBuildingDepartmentisactingastheapplicantfortheLCPAmendmentbeforetheCoastalCommission.Inthefuture,itisanticipatedthattheCountywillbetheagencydecisionmakerforthegrantingofaCDPfortheCypressPointproject.Aseparatedocumentwillbepreparedforthataction,incompliancewithCEQA.TheSanMateoCountyBoardofSupervisors’maybeaskedtoapprovetheenvironmentaldocumentfortheCDP,toadopttheMitigationMonitoringandReportingProgrampreparedfortheproject,andtoapprovetheCDP.

ThepointofcontactfortheSanMateoCountyPlanningandBuildingDepartmentis:

MikeSchallerCountyofSanMateoPlanningandBuildingDepartment455CountyCenter,RedwoodCity,[email protected]

1.3 BACKGROUNDINFORMATION1.3.1 PROJECTLOCATIONTheproposedprojectislocatedona10.875-acreparceladjacenttothenortheastcornerofCarlosStreetandSierraStreetintheunincorporatedcommunityofMossBeach,SanMateoCounty,California(seeFigures1and2).Thepropertyisboundedbyvacantlandtothesouthwest(towardsStateRoute1),residentialpropertiesalong16thStreettothenorthwest(inthecommunityofMontara),andresidentialpropertiesalongCarlos,Sierra,andLincolnStreetsontheothertwosides.IndividualhousesalongStetsonStreetandBuenaVistaStreetalsobordertheproperty.

1.3.2 BACKGROUNDONPROJECTSITEDuringtheWorldWarIIera,thepropertywasoccupiedbythePointMontaraArtilleryTrainingStation.Numerousconcreteslab-on-gradebuildingfoundationsandfoundationretainingwalls,locatedinthecentralportionoftheparcel,aretheonlyremnantsofthestation.Insomeareas,thesefoundationsarecoveredbythickvegetationconsistingoftreesandshrubsandarecoveredwithgraffiti.Heavyvegetationalsocoversthemajorityofthepropertyoutsidetheareasofthebuildingfoundations.Unpavedinternalroadwaysextendnorthwest-southeastacrossthenorthandcentralportionsoftheproperty.

TheMontaraElementarySchoolDistrictacquiredthesitein1948andusedoneofthebuildingsfortheFarallonViewElementarySchool.ThatschoolwasburnedaspartofafiretrainingexercisewhentheDistrictconstructedanewschoolonadifferentsite(SanMateoCountyPlanningandBuildingDepartment1986).

TwowatertanksownedbytheMontaraWaterandSanitaryDistrictalsooccupythesite,butarenotpartofthedevelopment.

Page 4: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

E:\P

roje

cts\

Stev

ens

Con

sulti

ng\C

ypre

ss P

oint

Pro

ject

\MX

D\c

ypre

ss_p

oint

_pro

ject

_vic

inity

_fig

ure_

1.m

xd

Project LocationSan Mateo County, CA

Figure 1Base Map Source: ESRI, 2017Map Date: 10/05/2017

Project Location

Project Area

/0 1,000500Feet

Page 5: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

¬«1

Moss Beach^

E:\P

roje

cts\

Stev

ens

Con

sulti

ng\C

ypre

ss P

oint

Pro

ject

\MX

D\c

ypre

ss_p

oint

_pro

ject

_loc

atio

n_fig

ure_

2.m

xd

Project VicinitySan Mateo County, CA

Figure 2

Project Site

/0 1,000500Feet

Aerial Source: NAIP (2016)

Page 6: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 6 IntroductionandProjectDescriptionMidPenHousing July2018

1.3.3 EXISTINGLANDUSEDESIGNATIONS

GeneralPlanDesignation: Medium-HighDensityResidentialZoning: PUD-124/CDLCPDesignation: Medium-HighDensityResidentialandAffordableHousing

TheGeneralPlandesignationofMedium-HighDensityResidentialallowsfordevelopmentatdensitiesofbetween8.8to17.4housingunitsperacre.ThezoningdesignationofPUD-124/CDtracesbackto1986,andwasassignedtoaproposedPlannedUnitDevelopment(PUD)onthesitecalledFarrallonHeights.Thiszoningallowsforatotalof148unitsonthesite,withadensityof13.6unitsperacre.ThesiteisdesignatedasMedium-HighDensityResidentialintheSanMateoCountyLCP,whichallowsfordevelopmentatdensitiesfrom8.1to16.0unitsperacre.ThesiteisdefinedasinfillintheLCP,anddesignatedasaprioritydevelopmentsiteforaffordablehousingintheSanMateoCountyLocalCoastalProgramPoliciesdocument(SanMateoCountyPlanningandBuildingDepartment2013).ThesiteisalsodesignatedasanaffordablehousingopportunitysiteundertheSanMateoCountyHousingElement.(SanMateoCountyPlanningandBuildingDepartment2015)

1.4 PUBLICINVOLVEMENT1.4.1 OPPORTUNITIESFORPUBLICCOMMENTDuringtheproject’sconceptualstage,MidPenHousingconductedvoluntaryoutreachtobetterunderstandthecommunity’sconcernspriortosubmittingapre-application.MidPenheldthreecommunityopenhousesin2016,onMarch16,July11,andAugust18.Informationabouttheopenhouseswaswidelydistributedandpublicizedinmultiplelocalnewspapers.Morethan100communitymembersattendedeachopenhouse.MidPenrecordedallcomments,whichincludetranslatingcommentssubmittedinSpanish,andprovidedresponsesonaprojectwebsiteandemaillist(MidPen2018).Inadditiontothecommunityopenhouses,MidPencreatedanemailaddressspecificallyforcommunicationsregardingtheproject,sharedprojectstaff’sdirectcontactinformation,offeredadditionaloutreachthroughsmallgroupmeetingsorone-on-onemeetings,andmaintainedaprojectwebsitewithinformationavailableinbothEnglishandSpanish.

TheCountyofSanMateosponsoredapublicworkshoponSeptember20,2017from6pmto8pmattheElGranadaElementarySchoolinElGranada,CaliforniaPerSection6415.4oftheCountyofSanMateoZoningRegulations,thepurposeofthepublicworkshopwastoallowcommunitymembersandpublicagencyrepresentativestheopportunitytoprovideprojectinputpriortothepreparationoffinaldevelopmentplans.TheCountyofSanMateoandMidPenHousingarrangedforaleadfacilitatorandfourco-facilitators/recordersfromthePeninsulaConflictResolutionCenter,severalwiththeskillstotranslatebetweenEnglishandSpanish.TheteamaskedifSpanishtranslationwasneededasattendeesenteredtheroom,andtheleadfacilitatorreiteratedtheavailabilityofSpanishtranslationduringtheworkshop.Membersofthepublicalsohadanopportunitytoprovidepublicinputontheprojecton

Page 7: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 7 IntroductionandProjectDescriptionMidPenHousing July2018

September27,2017atameetingoftheMidcoastCommunityCouncil(anelectedadvisorybodyrepresentationtheregionwheretheprojectislocated).

Theconcernsexpressedinpersonandinwritingfromthepublicwhicharerelatedtoenvironmentalresources,canbesummarizedasfollows:

• Thescaleoftheprojectistoobigfortheneighborhood.• Whatmitigationmeasureswillbeputinplacetoaddresstrafficduringtheconstructionof

theproject?• ThetrafficanalysisshouldincludethecommutecorridorbeyondchokepointsonSR92and

inPacifica.• TheSR1SafetyandMobilityStudywasbasedondatabeforethetunnelwasopenedand

doesn’tincludetheproposedproject.• Thetrafficstudydoesn’tprovidesufficientanalysisofthecrossingofSR1atCarlosStreet.• Thetrafficstudyneedstoevaluatetheimpactsofotherdevelopmentsandtraffic

improvementsplannedbytheCounty.• WhatistheimpactoftheproposedprojectonneighborhoodstreetsandFaralloneView

Elementaryschool?• Thetrafficstudyneedstoevaluatetheimpactofline-of-siteconcernsattheSR1/Carlos

Streetintersection.• Howwillprojecttrafficaffectnarrowresidentialstreets?• HowwillsignalizationorinstallationofaroundaboutattheSR1/CarlosStreetintersection

affectsafety?• ReducingtravelspeedsonSR1wouldimprovethesafetyoftheSR1/CarlosStreet

intersection.• Soilsamplingshouldbedoneontheprojectsiteduetotheprioruseasamilitary

installation.• WilltheproposedprojectcontributetosewageoverflowproblemsontheMid-Coast?• Whatwillbetheeffectoftheproposedprojectonneighborhoodparking?• Effectsonstormdrainageshouldbeevaluated.• ImprovementstothepedestriancrossingofSR1at16thStreetintersectionareneeded,

particularlytoallowsafeaccesstothebusstop.• Thevolumeofwaterrequiredfortheproposedprojectshouldbeevaluated.• Theeffectsoftheproposedprojectonwaterqualityshouldbeevaluated.• TheeffectsoftheproposedprojectonthepopulationofMossBeachshouldbeevaluated.• Theeffectsoftheproposedprojectonpublictransitneedtobeanalyzed.• TheproposedprojectshouldincludearobustTransportationDemandManagement

Programtoreducevehiclemilestraveled.

Page 8: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 8 IntroductionandProjectDescriptionMidPenHousing July2018

AmoredetaileddescriptionofthecommentsreceivedandresponsesfromMidPenareavailableinaseparatedocument(MidPen2018).Inaddition,thepublicwillhavetwootherformalopportunitiestocommentontheprojectandtheenvironmentaldocumentation,atahearingbeforethePlanningCommissionandahearingbeforetheBoardofSupervisors.ThepublicwillalsobeabletoprovidewrittencommentstothePlanningCommissionandtheBoardofSupervisors.

SanMateoCountyandMidPenarepreparingaseriesoftechnicalstudies,otherenvironmentalanalysisdocumentation(includinganevaluationofarangeofalternativesandcumulativeimpacts),andaCEQAchecklist,tobeprovidedtotheCaliforniaCoastalCommissionaspartoftheapplicationtoamendtheLCPlandusedesignationfortheprojectparcel.Publiccommentsassociatedwithimpactsoftheprojectontheenvironmentwillbeaddressedinthosedocuments.

2. PROJECTDESCRIPTION2.1 PROJECTOBJECTIVESInproposingtheCypressPointproject,MidPenisattemptingtoprovideaffordablehousingontheMidCoastportionofSanMateoCountythat:

1. Provideasignificantnumberoflowincomeaffordablehousingunitsinavibrant,safe,well-designedcommunitythatrespectsthecoastalcharacteroftheMidCoastregion.

2. ProvideaffordablehousingintheMidCoastregionatcosteffectivedensitiesthatarecompetitiveforfinancing.

3. Addresshousingneedsofhouseholds,familiesandworkersintheMidCoastregion;4. Providehousingforadiverserangeoflowincomeworkersandfamilies.5. Improvethejobs/housingbalance1andjobs/housingfit2intheMidCoastregionby

providingaffordabledwellingunitsnearMidCoastjobs.6. ProvideinformalrecreationalopportunitiesforMidCoastresidentsandthegeneralpublic

byprovidingaccesstoatrailonundevelopedportionsofthesite.7. Beconsistentwiththecharacterofthesurroundingneighborhoodbyadheringtothe

existingdevelopmentguidelinestotheextentfeasible.

2.2 PROJECTFEATURESMidPenproposestodevelopa10.875-acrevacantparcel(Assessors’ParcelNumber037-022-070)locatedtothenortheastoftheintersectionofCarlosStreetandSierraStreetinMossBeach,anunincorporatedcommunitywithinSanMateoCounty,California(seeFigures1and2).

1 Thejobs/housingbalancemeasurestheextenttowhichageographicareacontainsarelativebalancebetweenthe

numberofhousesavailableandthenumberofjobs;abalancebetweenjobsandhousingallowsmorepeopletolivewithinthecommunityandreducesthenumberofvehicletripsto/fromoutsidethearea.

2 Thejobs/housingfitmeasurestheextenttowhichthedistributionofhousingpricesmatchtheincomedistributionofworkers,andthuswhetherworkersinanareacanfindhousingtheycanaffordneartotheirjobs.

Page 9: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 9 IntroductionandProjectDescriptionMidPenHousing July2018

Thetotalareatobedevelopedincludesapproximately235,000squarefeet.ThedensityoftheproposedCarlosStreetHousingDevelopmentis6.5unitsperacre,belowthemaximumdensityallowedbythecurrentGeneralPlandesignation,zoning,andLCPdesignation.MidPenisrequestingthattheGeneralPlanandLCPzoningbechangedfromMedium-HighDensityResidentialtoMediumDensityResidential.AGeneralPlandesignationofMediumDensityResidentialallowsfordevelopmentatdensitiesof6.1to8.7housingunitsperacrein.IntheLCP,itallowsfordevelopmentatdensitiesof6.1to8.0housingunitsperacreintheLCP.

MidPenhasalsoclusteredthedevelopmentsoastoretaintheforestedopenspaceonthenorthernportionofthesite.Totheextentfeasible,MidPenwillretainthevegetationadjacenttoCarlosStreetandSierraStreetalongtheperimeterofthesiteoraddvegetationtoshelterthesitevisuallyfromneighbors.Altogether,MidPenproposestoleaveapproximately64%ofthesiteaspublicorprivateopenspace.

Becausethisprojectisintendedtocontributetoimprovingthejobs-housingbalanceandjobs-housingfitincoastalSanMateoCounty,preferenceforhousingwillbegiventopeoplewhocurrentlyliveorworkintheregion.

Residentswillalsohavetheopportunitytotakeadvancetotakeadvantageormultipleservicesincludingafter-schoolprogramsforchildren,adulteducationandtraining,andconnectionstoavarietyofsocialservicesprovidersinthearea.

2.2.1 LIVINGSPACESMidPenproposesthedevelopmentof71affordablehousingunitsonthislot,consistingofapproximately18two-storybuildingsholding2-4unitseachandacommunitybuilding(seeFigure3).Theprojectwouldprovideamixtureof1,2,and3-bedroomunits,includingacombinationoftwo-storytownhousesandADA-accessible1-storyflats.Alloftheunits,exceptforthemanager’sapartment,willbewillbeaffordabletohouseholdsearningupto80%oftheAreaMedianIncome.ItisexpectedthattheCypressPointprojectwillprovidehousingforapproximately213people,includingadultsandchildren.

2.2.2 OTHERSITEAMENITIESInadditiontothehousingunits,thedevelopmentwillincludeanapproximately3,200squarefootcommunitybuilding,thatwillincludethegeneraloffice,themanager’soffice,acommunityroom,kitchen,computerroom,laundry,andmaintenanceandstorageareas(seeFigure3).Theprojectplanalsoincludesseveraloutdooramenities,including:

• Landscaping(seemorebelow);• Acommunitygarden;• Achildren’splayarea;• Anupperandalowergreen;• BBQareas;and• Apublicwalkingtrailthroughaportionofthesite.

Page 10: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

Cypress Point Proposed Site PlanSan Mateo County, CA

Figure 3Source = MidPen Housing Corporation and Pyatok Architects, June 2018

Page 11: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 11 IntroductionandProjectDescriptionMidPenHousing July2018

2.2.3 LANDSCAPINGThelandscapedesignfortheCypressPointaffordablehousingdevelopmentwilldrawfromcoastalinspirationandincorporateseveraloutdoorrecreationandsocialareas,pedestrianandvehicularaccess,site-wideplanting,andirrigation.TheconceptuallandscapeplanfortheproposedprojectisshowninFigure4.

Specificlandscapeelementswillincludescreeningandbioretentionbasins,accessibleandnon-accessiblepathways,emergencyvehicularaccess(EVA),fencing,trailsthroughtheperimeterofthesite,andacommunitygarden.Inaddition,thecentraloutdoorspaceadjacenttothecommunitybuildingwillincludetwoplaystructuresandopengrassyterraceswithfloweringtreesandplanting.Anaccessiblepathwillmeanderthroughandconnecttheterracessteppingupthehillside.Bouldersandlowwallswillretaingradethroughoutthecentralopenspaceasneeded.Theaccessiblepathwillterminateintoatrellis-coveredareawithbarbecueequipment,picnictables,andbenches.Otheroutdoorareaswillincludeahalfbasketballcourt,pavedoverlookwithtrellisandseating,planting,andboulderstoretaingradeneartheEVA.Thedevelopmententrywillbehighlightedwithpermeableconcretepaversandadoublerowoflarge-scaletrees.Plantingwithinthedevelopmentareawillbedetailedandwillconsistoflargeandsmallscaletreesshrubs,grasses,andgroundcover.Outsideofthedevelopmentarea,plantingwillbeminimizedandwillincludetreesandshrubsforscreening,aswellasseedingtorestoreareasimpactedbyconstructionactivities.

Allexistingtreestoberetainedontheprojectsitewillbefencedduringconstructionandprovidedwithtemporaryirrigation.Inordertoensuretheefficientuseofwater,thelandscapingelementstobeaddedtothesitewillbeirrigatedwithapermanentautomatedirrigationsystemandincludeallpartscompatiblewitharemote-orsatellite-controlledsystem.Vegetationwillbeselectedwhichislowmaintenance,waterconserving,nativetotheprojectarea,oradaptivetothriveunderlocalconditions.

2.2.4 PARKINGANDCIRCULATIONAccesstoandfromtheprojectsitewillbeprovidedbyasingledrivewayonCarlosStreet(seeFigure4).Asecondaccessroute,whichwouldberestrictedtoemergencyvehiclesonly,connectswithLincolnStreet.Currentplansprovidefor142parkingspacesonsite,formingaringaroundthecentralcoreofapartmentbuildings.Accessiblewalkwaysprovideinternalpedestrianaccesstothesite,andsofttrailsareprovidedaroundmostoftheperimeterofthesiteforrecreationalusebybothresidentsandthegeneralpublic.

2.2.5 GRADINGANDDRAINAGETheprojectparcelismoderately-slopedtowardsthewest.Gradingwillbeusedtocreateagentlerslopeforthemiddleofthesite,allowingforaccessiblepaths.Thedevelopedareaatthemiddleofthesitewillhaveanaverage8%grade,andthebermatthetopofthehill(alongtheformerdrillfield)willbeextendedtoresolvethenewgradesatthecenterwiththeexistinggradesattheperimeter.Althoughfinalcalculationshavenotbeencompleted,itisanticipatedthatcutandfillwillnotbeabletobebalancedonsite,andthattheimportationofamaximumof7,000cubicyardsofmaterialwillberequired.

Page 12: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

Cypress Point Proposed Landscape PlanSan Mateo County, CA

Figure 4Source = Midpen Housing Corporation and Joni L. Janecki & Associates, June 2018

Page 13: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 13 IntroductionandProjectDescriptionMidPenHousing July2018

Thesiteiswillbegradedtominimizestormwaterrunoff,pertheSanMateoCounty’sMunicipalRegionalStormwaterNPDESPermit(CaliforniaRegionalWaterQualityControlBoard-SanFranciscoBayRegion2015)andtheC.3StormwaterTechnicalGuidancedocument(SanMateoCountywideWaterPollutionPreventionProgram2016).Thiswillbeaccomplishedby,amongotheractions,theinclusionoffourbio-retentionareastotalingapproximately20,000squarefeet.

2.2.6 UTILITIESTheprojectparcelincludeseasementsforfacilitiesoperatedbytheMontaraWaterandSanitaryDistrict,includingtwowaterstoragetanksinthesoutheasternportionofthesite,aboosterpumpsystem,anddistributionfacilitieswithafenced-inparceloflandadjacenttoandwestoftheintersectionofLincolnStreetandBuenaVistaStreetneartheeasternboundaryoftheproperty.Inaddition,thereisaneasementforPG&Efacilitiesunderunpavedroads.Atthispoint,nooffsiteutilityimprovementsareanticipatedtobeneeded.

2.2.7 WASTEMANAGEMENTANDRECYCLINGRecologyoftheCoastwouldbethewasteservicesproviderfortheprojectparcel.Statelawrequiresthatmulti-familydevelopmentsprovidewaste,recycling,andorganicscollection.ThreewasteenclosuresareproposedforCypressPoint,toensurethateachunithasnearbyaccesstodropofftheirwaste.Theseenclosureswillprovidebinsforsolidwaste,recycling,andorganicwastecollection.Theloopeddrivewayallowsgarbagetruckstoenterthesite,circlearoundtoallthreeenclosures,andexitthesiteviathesameprimarydriveway.

2.2.8 LIGHTINGCountyordinancerequiresthat“allexteriorandinteriorlightingshallbedesignedandlocatedsothatdirectlightandglareareconfinedtothepremises.”Thepavedparkinglotsandpathwaysonthesitewillbewell-litasrequiredbycodeforsafety.TheprojectwilluseDarkSkyFriendlylighting,withshieldstoemitnolightabovethegroundplane,andwithwarm-tonedLEDsources.Lightinglevelswillprovidesafetyforresidentswhileminimizingglaretoneighboringparcels.

2.2.9 FENCINGANDGATESTopreventunwantedvehiculartrafficontheemergencyvehicleeasement,gateswillbeerectedjustoffLincolnStreet,blockingaccesstothesiteaswellasthewaterdistrict’saccessdrive.Thesegateswillbeabletobeunlockedbythefiredepartmentorbythewaterdistrict,butnotbylocalresidentsorothers.AlowfencewillrunalongLincolnStreetbetweenthetwositedriveways,disallowinganyuseoftheflatlandatthetopofthehillasaninformalparkinglot.Thefencewillhavenarrowgapstoallowpedestrianaccesstotheopenspaceforrecreationaluse,butwilldiscourageanyprivatevehiclesfromattemptingtoaccessoregressthesiteviaLincolnStreet.

Page 14: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 14 IntroductionandProjectDescriptionMidPenHousing July2018

2.3 PROJECTCONSTRUCTIONTheprojectwillbebuiltinonephaseandisexpectedtotakeapproximately18monthstoconstruct.Thecomponentsofconstructionwouldinclude:

• Sitedemolition• Sitepreparation• Sitegradingandexcavation• Trenching• Interiorarchitecturalfinishing• Paving.

Theequipmentexpectedtobeusedduringprojectconstructionincludes:

• Concrete/industrialsaws• Excavators• Rubber-tireddozers• Tractors• Loaders• Backhoes• Graders• Cranes• Forklifts• Generatorsets• Welders• Aircompressors• Aeriallifts• Cementandmortarmixers• Pavers• Pavingequipment• Rollers.

Page 15: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 15 IntroductionandProjectDescriptionMidPenHousing July2018

2.4 ENVIRONMENTALCOMMITMENTSMidPenhasagreedtothefollowingenvironmentalcommitmentstominimizetheenvironmentaleffectsofthisdevelopment.IndevelopingtheCypressPointproject,MidPenwill:

• LimitconstructiontoperiodsallowedunderSection4.88.360oftheSanMateoCountyCodeofOrdinances:between7:00a.m.and6:00p.m.onweekdaysand9:00a.m.and5:00p.m.onSaturdays.NoconstructionshallbeallowedatanytimeonSundays,oronThanksgivingorChristmas

• Makebesteffortstouseofatleast10percentlocalbuildingmaterials;• Recycleorreuseatleast50percentofconstructionwasteordemolitionmaterials;• Useadministrativecontrols,suchasnotifyingneighborsofscheduledconstructionactivities

andschedulingconstructionactivitieswiththehighestpotentialtoproduceperceptiblevibrationduringhourswiththeleastpotentialtoaffectnearbybusinesses,soperceptiblevibrationcanbekepttoaminimum.

• Preserveaportionofthesiteasundevelopedland.• Removeallinvasivepampasgrass(Cortaderiaselloana)fromtheprojectsite.• Theprojectshallbedevelopedinaccordancewiththeminimumrequirementsofoneofthe

followingprograms:LeadershipinEnergy&EnvironmentalDesign;GreenCommunities;PassiveHousing;LivingBuildingChallenge;NationalGreenBuildingStandard,ortheGreenPointRatedprogram.Thefollowingarefeaturesthatmaybeincluded:v Naturalcross-ventilationofeveryunitwithwindows3sidesofmostunits(2-3BR),and

2sidesof1BRunits;v Coolroofswithlowreflectanceforreducedheat-islandeffect;v High-efficacylightingfixturesthroughout;“Night-sky”compliantsitelighting;v Drought-tolerantlandscapingwithnativespeciesandminimizedandefficientirrigation;v Passiveon-sitestormwatermanagementv PVreadyroofsv Noairconditioningv Sharedlaundryfacilitiesv Securebikeparkingfacilitiestoencouragelessvehicleusev Installtoiletsusinglessthan1.6gallonsperflushv Installshowerheadsprovidingmaximumflowsof2.5gallonsperminuteorlessv Installself-closingfaucetsinnon-residentiallavatoriesv Installhigh-efficiencywashingmachineswithawaterfactorof5orless

• AConstructionManagementPlanshallbedevelopedpriortotheissuanceofagradingpermitandshallbeimplementeduponthecommencementofgradingtominimizethepotentialforconstructionrelatedenvironmentalreleasesandtoaddressthediscoveryofpresentlyunknownsoilcontamination(e.g.,stainedorodoroussoil)orsubsurface

Page 16: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 16 IntroductionandProjectDescriptionMidPenHousing July2018

structures(e.g.,undergroundstoragetanks).TheplanshallbepreparedbyaqualifiedenvironmentalprofessionalregisteredinCalifornia.Theplanshallidentifyspecificmeasurestotaketoprotectworkerandpublichealthandsafety,andshallspecifymeasurestoidentify,manage,and/orremediatewastes,including,butnotlimitedto,thefollowingaccidentpreventionmeasures:v Summaryofknownsitehistoryandsiteconcentrations.Appropriateworkpractices

necessarytoeffectivelycomplywiththeapplicableenvironmentallawsandregulations,including,withoutlimitation,hazardoussubstancemanagement,handling,storage,disposal,andemergencyresponse.Theseworkpracticesincludethefollowing:anon-sitehazardousmaterialspillkitshallbeprovidedforsmallspills;andallconstructionwaste,includingtrashandlitter,garbage,othersolidwaste,petroleumproducts,andotherpotentiallyhazardousmaterials,shallberemovedtoanappropriatewastefacilitypermittedorotherwiseauthorizedtotreat,store,ordisposeofsuchmaterials.

v Contaminationevaluationandmanagementprocedures.Protocolstobeimplementedifpotentialenvironmentalcontaminationorsubsurfacestructuresareidentifiedthroughphysicalobservations(soilstaining,odors,orburiedmaterial)willbedevelopedpriortobeginninggradingactivities.Suchprotocolsmayinclude:temporarycessationofconstructionactivityandevaluationinthevicinityofthediscoveredpotentialenvironmentalcontaminationorsubsurfacestructure;limitingaccesstothepotentialcontaminatedareaorsubsurfacestructuretoproperlytrainedpersonnel;notificationandreporting,includinginternalmanagementandlocalagencies(firedepartment,SanMateoCountyDepartmentofHealthServices,EnvironmentalHealthServices,etc.),asneeded;aworkerhealthandsafetyplanforexcavationofcontaminatedsoil;characterizationandmanagementofexcavatedsoilsinaccordancewithCCRTitle14andTitle22;andcertificationofcompletionofresponseactions,asneeded.

• Inordertominimizethepotentialforfirehazard,MidPenwillincludelanguageinallcontractsforconstructionoftheproposedprojecttorequirebasichousekeepingproceduresincluding:themaintenanceofmechanicalequipmentingoodoperatingcondition;carefulstorageofflammablematerialsinappropriatecontainers;andtheimmediateandcompletecleanupofspillsofflammablematerialswhentheyoccur.

• Priortoissuanceofgradingpermits,theapplicantshallalsosubmitatrafficcontrolplantotheCountyDepartmentofPublicWorksforreviewandapproval.Theplanwilldescribeproceduresforensuringcontinuousaccessforemergencyvehiclesduringanyrequiredroadclosures,andmeasurestoalertneighborstoallroadclosures.Allstagingduringconstructionshalloccuronsite.

Page 17: County Review Draft - planning.smcgov.org · County Review Draft Cypress Point Project 1 Introduction and Project Description MidPen Housing July 2018 CYPRESS POINT PROJECT INTRODUCTION

CountyReviewDraft

CypressPointProject 17 IntroductionandProjectDescriptionMidPenHousing July2018

3. REFERENCESCentralValleyWaterQualityControlBoard.2015.SanFranciscoBayRegion.MunicipalRegional

StormwaterNPDESPermit.OrderNo.R2-2015-0049,NPDESPermitNo.CAS612008.November19,2015.

MidPenHousing,Inc.(MidPen).2018.ResponsetoCountySummaryofPublicCommentsReceivedonCypressPointPre-Application.Availableat:<https://www.midpen-housing.org/moss-beach>.

SanMateo,Countyof.2018.PlanningandBuildingDepartment.SanMateoCountyZoningRegulations.January2018.

_____.2015.PlanningandBuildingDepartment.2015.HousingElement2014-2022.RevisedDecember2015.

_____.2013.PlanningandBuildingDepartment.LocalCoastalProgramPolicies.June2013.

_____.1986.EnvironmentalServicesAgency,PlanningandBuildingDepartment.SanMateoCountyGeneralPlan,OverviewandBackgroundIssues.ApprovedNovember1986.

SanMateoCountywideWaterPollutionPreventionProgram.2016.C.3StormwaterTechnicalGuidance.Version5.0.June2016.