cpc’s “top ten” problems/needs (draft – revised jan 2006 – not prioritized)
DESCRIPTION
CPC’s “Top Ten” Problems/Needs (draft – revised Jan 2006 – not prioritized) Climate Model Prediction – acceleration, limitations Multi-Model Ensembles - for CFS, GFDL, NASA, NCAR ? Reanalysis – an Ongoing Analysis of the Climate System - Reforecasting; RNR - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CPC’s “Top Ten” Problems/Needs (draft – revised Jan 2006 – not prioritized)](https://reader037.vdocument.in/reader037/viewer/2022110209/56812a8b550346895d8e31db/html5/thumbnails/1.jpg)
CPC’s “Top Ten” Problems/Needs(draft – revised Jan 2006 – not prioritized)
Climate Model Prediction – acceleration, limitations
Multi-Model Ensembles - for CFS, GFDL, NASA, NCAR ?
Reanalysis – an Ongoing Analysis of the Climate System
- Reforecasting; RNR
AO, NAO, PNA, MJO - sub-seasonal & seasonal predictability
Economic Benefits - studies of climate prediction products
GPRA - better or additional (seasonal?) performance measure
- Simpler (e.g. ENSO forecasts 4x year)
Drought (Water) Outlooks - physically based, verifiable
Decadal Trends - the physical basis for them
-We haven’t solved the problem of what the climatology is today?
Warm-Season Precipitation - outlook tools/skill
-NAME
Atmospheric Responses – neutral/weak ENSO; beyond ENSO
Downscaling - hierarchies of techniques
-5 km
Credible Climatologies – extremes, mesoscale, storms, …
-PDF’s
-How well does CFS (ensembles) reproduce the statistics of weather found in nature?