PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
Granby Trading And Construction 27554 L Balai Bantayan 1Brgy. Kabac,
Bantayan, Cebu6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory
"R.R. Seismundo Construction & Supply" 10961 L A MA GE1Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-
New Cortez-San Jose Carcor Panas Rd.Davao Del Norte 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 -
"R.R. Seismundo Construction & Supply" 10961 L A MA GE1Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-
New Cortez-San Jose Carcor Panas Rd.
New Corella, Davao
del Norte3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -
"R.R. Seismundo Construction & Supply" 10961 L A MA GE1Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-
Km.1822+821, Apokon Sect.
Tagum City, Davao
del Norte3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -
"R.R. Seismundo Construction & Supply" /
Davao Concrete Products Joint VentureJV-12-116 L A MA GE2
Const. of Flood Control Structure (Sheet Piles & Grouted
Riprap) Agusan River, Brgy. Inambatan
Monkayo, COMVAL
Province11/27/2012 1st XI LF 27.838 240 08/28/12 04/24/13 0.86 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -
"R.R. Seismundo Construction & Supply" /
Double J Construction And Supply Joint
Venture
JV-16-948 L A MA GERechanneling and Construction of Dike in Kingking River,
Mosahamat Section ( Left Side)
Pantukan 2nd LD,
Compostela Valley
Province
3/20/18 1st/FinalCompostela Valley
DEOLF 44.251 185 3/10/17 9/10/17 0 C 0.475 0.133 0.3 - - - 90.80 *90.8% Very Satisfactory
(Cavdeal) Cavite Ideal International
Construction And Development Corp.5599 L AAA
Procurement of Fully Developed Lots and Complete Housing
Units
Basey Pointe, Brgy.
Tingib, Basey,
Samar
01/26/18 Final NHA LF 290.000 862 3/7/2015 10/11/2017 -1.99 D 0.399 0.200 0.244 - - - 84.2984.13%
Satisfactory
(Cavdeal) Cavite Ideal International
Construction And Development Corp.5599 L AAA Basey Pointe 2
Brgy. Tingib, Basey,
Samar2/3/2018 1st NHA LF 225.387 636 06/25/16 03/26/18 -39.75 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 -
0405 Construction & Supply 34735 L B SB GERepair/Rehab. of Drainage Canal along Sorsogon-Bacon-
Manito Road, Bibincahan, Sorsogon City
Bibincahan,
Sorsogon City5/30/2017 1st & Final Sorsogon 1st DEO LF 2.841 90 12/11/2016 3/10/2017 0.00 C 0.400 0.133 0.300 - - - 83.30
*83.3%
Satisfactory
0405 Construction & Supply 34735 L D SB GE
Construction of Flood Mitigation Structures (Baybay Dagat
Dike) Sitio Bacolod along Bito River, San Fernando, MasbateSan Fernando,
Masbate6/14/2016 1st Masbate 3rd DEO LF 4.653 115 3/3/16 6/25/16 0.00 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% -
0405 Construction & Supply 34735 L B SB GEConstruction / Repair / Rehabilitation of Multi-Purpose
Building (Municipal Hall), Monreal, MasbateMonreal, Masbate 8/19/2017 1st Masbate 3rd DEO LF 3.881 150 11/4/2016 4/2/2017 0.00 O 0.488 0.133 0.300 - - - 92.10 -
11-16 Construction 29646 L AAA MA GE
Construction/ Maintenance of Flood Mitigation Structures
and Drainage Systems-Rehabilitation/ Improvement of
Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta.
0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta.
0+129, Bamban, Tarlac
Bamban, Tarlac 11/21/17 1st & Final DPWH LF 45.616 147 4/17/17 9/10/17 0.00 C 0.496 0.133 0.300 - - - 92.90*92.9%
Very Satisfactory
121 Construction Corporation (Formerly: 121
Construction)21686 L D SB GE
Improvement/Concreting with Drainage System along
Ballesteros Street
Brgy. Zaniga,
Mandaluyong City11/29/2014 1st NCR LF 6.684 120 8/14/14 12/11/14 1.00% O 0.355 0.240 0.150 0.030 0.035 0.033 84.30%
84.30%
Satisfactory
128 Dragon Construction And Supplies 35408 L B SB GEConstruction of Flood Control Structure, Brgy. Kanluran, San
Vicente, Camarines Norte, 2nd Legislative District
Brgy. Kanluran, San
Vicente, Camarines
Norte, 2nd
Legislative District
3/14/2016 1stCamarines Norte
DEOLF 0.949 30 3/23/15 4/22/15 - C 0.396 0.2 0.3 0 0 0 89.60%
89.6%
Very Satisfactory
2M Construction & Enterprises 33331 L C SB GE2Slope Protection (Grouted Riprap) along Isabela-Maluso Rd.,
Matarling Sect. at K15+190-K15+249Basilan Province 3/13/2013 1st IX LF 4.842 75 02/15/13 04/30/13 3.25 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -
2M Construction & Enterprises 33331 L B SB GB Construction of Water System Level II
at Lubigan Vitali
District Zamboanga
City
3/7/2016 1stZamboanga City
DEOLF 1.945 75 9/18/15 12/1/15 (+)1.33% C 0.428 0.147 0.3 0 0 0 87.50%
87.5%
Satisfactory
2M Construction & Enterprises 33331 L B MA GERoad Widening Including Drainage along Ipil-Magdaup Wharf
Road (S01143MN) (K2014+800 - K2015+297)
Ipil, Zamboanga
Sibugay3/13/18 2nd/Final
Zamboanga
Sibugay 2nd DEOLF 16.187 177 6/5/17 11/28/17 -1% C 0.487 0.201 0.278 - - - 96.60 92.92% Very Satisfactory
2-R Construction & Supply 15304 L B MA GEConcreting of Barangay Camanggaan - Calapugan, FMR,
Brgy. Camanggaan-Calapugan
Natividad,
Pangasinan 3/19/18 1st/Final
Pangasinan 3rd
DEOLF 3.977 119 8/29/17 12/25/17 0.2101 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory
2-R Construction & Supply 15304 L C SB GE
Raising of Grade of Dike Agno River Basin Flood Control
Project (Phase III), Brgy. Cabalitian, Asingan, PangasinanAsingan,
Pangasinan11/16/2015 1st
PANGASINAN 3RD
DEOLF 9.167 120 8/26/15 12/23/15 0.05 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10%
91.1%
Very Satisfactory
2-R Construction & Supply 15304 L C SB GEOff Carriageway Improvement at Lingayen Capitol Loop,
K0364+(-219) to K0364+836, Lingayen, Pangasinan
K0364+(-219) to
K0364+836,
Lingayen,
Pangasinan
9/2/2016 FinalPangasinan 2nd
DEOLF 9.34 105 3/6/15 6/19/15 - C 0.473 0.133 0.3 - - - 90.60%
*87.36%
Satisfactory
301 Engineers 38364 L B - GE
Indv. Project - Rehab./Reconst. of National Roads w/ Slips,
Slope Collapse and Landslide along Iriga City-Masoli Road
Iriga City, KO
479+700-KO
479+923
11/16/17 1st & Final DPWH LF 5.071 132 3/8/17 7/17/17 2.94 C 0.493 0.134 0.300 - - - 92.70*92.7%
Very Satisfactory
301 Engineers 38364 L B SB GB
Construction of School Building, Brgy. Caranan, Pasacao,
Camarines Sur
Brgy. Caranan,
Pasacao,
Camarines Sur
8/25/2016 1st & FinalCamarines Sur 1st
DEOLF 1.937 90 3/17/15 6/14/15 0.02 C 0.497 0.133 0.3 0 0 0 0.9300
93%
Very Satisfactory
3C'Sl Construction And Supply 36393 L D SB GBConstruction of One Storey Two Classroom (Toilet Attached)
Tolosa CES, Cabadbaran City, Agusan del Norte
Cabadbaran City,
Agusan del Norte3/14/2016 1st ADN DEO LF 1.927 90 10/15/15 1/12/16 0 C 0.441 0.133 0.3 0 0 0 87.40%
87.4%
Satisfactory
3Diamonds Construction Corporation 35457 L B SB GE
Rehabilitation of San Francisco River Control (San Francisco-
Maguiron Section) Guinobatan, Albay 11/6/17 1st & Final DPWH LF 9.328 105 7/8/17 10/20/17 16.57 C 0.500 0.134 0.300 - - - 93.40*93.4%
Very Satisfactory
3G A Construction & Supply 35033 L D SB GEConstruction of Flood Control along Cabugao River, Brgy.
Turod - Patac
Cabugao, Ilocos
Sur 3/16/18 1st/Final Ilocos Sur 1st DEO LF 9.304 140 3/4/17 9/20/17 38.57% C 0.479 0.133 0.3 - - - 91.20 *91.20% Very Satisfactory
3K Rock Engineering 27908 L A MB GE
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-4 Project Analysis) Asin (KM 8)-Nangalisan
San Pascual, Tuba, Benguet-LU Road, K0273+707 -
K0273+728, K0273+790 - K0274+127, K0275+351 - K0275+613,
K0275+629 - K0275+1014, K0275+1050 - K0275+1240, Tuba,
Benguet
Tuba, Benguet 11/17/2016 2nd & Final Benguet 1st DEO LF 33.303 196 2/16/2016 8/29/2016 0.00 C 0.408 0.175 0.3 0 0 0 0.883086.32%
Satisfactory
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 1 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
3K Rock Engineering 27908 L A MB GE
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
National Roads including drainage based on Pavement
Management System/Highway-4 Kennon KO 238 + 880-KO 239
+ 048, KO237 + 123- KO238 + 000, KO228 + 791-KO229+000,
KO228+080-KO228+440, Tuba, Benguet
Tuba, Benguet 11/16/2016 1st Regional Office LF 46.620 282 2/19/2016 11/26/2016 -0.03 O 0.331 0.289 0.121 0.03 0.055 0.033 0.8590 -
3K Rock Engineering 27908 L A MB GE
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-4 Project Analysis) Asin (Km 8) - Nangalisan
San Pascual, Tuba, Benguet, K0273+707 to K0273+728;
K0273+790 to K0274+127; K0275+531 to K0275+631;
K0275+629 to K0275+1014; K0275+1050 to K0275+1240, Tuba,
Benguet
Tuba, Benguet 3/29/2017 1st & Final Benguet 1st DEO LF 33.303 195 2/17/2016 8/29/2016 0.00 C 0.437 0.132 0.300 - - - 86.90*86.9%
Satisfactory
3K Rock Engineering 27908 L A MB GE
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) (Intermittent Sections) of
Kabugao - Pudtol - Luna - Cagayan Bdry. Road, K0611+917 to
K0612+961, K0612+973 to K0613+699, K0613+723 to
K0614+500, Apayao
Apayao 8/27/2015 1st CAR LF 75.709 221 5/26/15 1/1/16 -16.41% O 0.363 0.241 0 0.03 0.061 0.033 72.80% -
3K Rock Engineering 27908 L A MB GE
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-4 Project Analysis) Asin Km. 8 - Naglisan - San
Pascual, Tuba, Benguet-La Union Road, K0273+707 to
K0273+728, K0273+790 to K0274+
Tuba, Benguet 8/23/2016 1stBENGUET 1ST
DEOLF 33.303 195 2/16/16 8/28/16 0.01 O 0.339 0.24 0.15 0.02 0.051 0.05 0.8500 -
3K Rock Engineering/Rvc Construction (J.V.) 27908 L B MA GE
Road Upgrading (Gravel to Concrete) of Asin -Nanganban -
San Pascual Road K0270+594 - K0272+220 ; K0275+5311 -
K0275+7178
8/16/2014 1st CAR LF 91.358 237 3/28/14 11/19/14 7.20 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 -
3-L Construction 16745 L B MA GEConcreting of Barangay Road, Barangay Salvacion, Del
Gallego, Camarines Sur
Del Gallego,
Camarines Sur8/16/2017 1st
Camarines Sur 5th
DEOLF 1.410 40 5/25/2017 7/3/2017 0.02 O 0.496 0.133 0.300 - - - 92.90 -
3-L Construction 16745 L D SB GE
Construction/Improvement of Roads and Concreting of
Roads, Brgy. Alianza, San Fernando, Camarines Sur
Brgy. Alianza, San
Fernando,
Camarines Sur
6/8/2016 1st & FinalCamarines Sur 1st
DEOLF 1.844 45 3/7/16 4/20/16 0.00 C 0.475 0.149 0.3 0 0 0 92.40%
92.4%
Very Satisfactory
3-L Construction 16745 L B MA GEConcreting of Mataoroc (Zone 3- Zone 5 FMR) Barangay
Mataoroc
Minalabac,
Camarines Sur4/6/2018 1st/Final
Camarines Sur 1st
DEOLF 4.723 90 9/29/2017 1/26/2017 0.00 C 0.490 0.146 0.300 - - - 94.50 *94.50% Very Satisfactory
3N Construction & Supply 37872 L D SB GBCluster 5-Local Infrastructure Program-Repair/Rehab. of Multi-
Purpose Building, Barangay Sweetland, Buenavista, Bohol
Barangay
Sweetland,
Buenavista, Bohol
3/10/2016 1st Bohol 2nd DEO LF 0.7682 75 10/12/15 12/26/15 (+)1.33% C 0.467 0.133 0.3 0 0 0 90.00%90%
Very Satisfactory
3Rb Construction And Supply 19541 L B MA GE
Cluster 6 - Network Development - Improvement/Widening of
National Roads - Secondary Road along DM- Jct.-Legazpi-Sto.
Domingo-Tabaco-Cam. Sur Bdry. Roads, Malinao, Albay and
along Ligao-Tabaco Roads, Buang, Tabaco City, Albay 1st LD
Malinao, Albay and
along Ligao-
Tabaco Roads,
Buang, Tabaco City,
Albay 1st LD
6/8/2017 1st Albay 1st DEO LF 92.711 190 3/6/2017 9/11/2017 0.02 O 0.387 0.232 0.150 0.03 0.061 0.033 89.30 -
3Rb Construction And Supply 19541 L B MA GE
Cluster 6- Network Development - Improvement/ Widening of
National Roads - Secondary Roads along DM- Junction -
Legazpi - Sto. Domingo- Tabaco - Camarines Sur Bdry Roads,
Malinao, Albay and along Ligao- Tabaco Roads, Buang ,
Tabaco City, Malinao and Tabaco City
Malinao and
Tabaco City8/24/2017 1st Albay 1st DEO LF 92.771 190 3/6/2017 9/11/2017 (+) 4.37% O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 -
3Rb Construction And Supply 19541 L B MA GE
Construction/ Maintenance of Flood Mitigation Structures and
Drainage Systems - Construction of Revetment along Pooc
Creek, Barangay Balibago and Barangay Macabling, Sta. Rosa
City, Laguna
Sta. Rosa City,
Laguna3/19/2017 1st & Final Laguna 2nd LF 19.002 140 1/28/2016 6/15/2016 0.00 C 0.344 0.200 0.300 - - - 84.40
*84.4%
Satisfactory
3Rb Construction And Supply 19541 L B MA GE
Extension of River Control, Sta. 0+112.50 - Sta. 0+232.50,
Bongabong, Tabaco City, AlbaySta. 0+112.50 - Sta.
0+232.50,
Bongabong,
Tabaco City, Albay
3/13/2017 1st & Final Albay 1st DEO LF 16.705 128 3/21/2016 7/26/2016 0.00 C 0.485 0.141 0.300 - - - 92.60*92.6%
Very Satisfactory
3Rb Construction And Supply 19541 L B MA GE
Widening of National Roads Outside N1 DM Jct-Legazpi-Sto.
Domingo-Tabaco-Camarines Sur Bdry. K0552+532-
K0553+660, K0554+600-K0555+400, Malilipot, Albay and
Tabaco City
Malilipot, Albay and
Tabaco City3/7/2016 1st Albay 1st DEO LF 43.1972 147 3/25/15 8/18/15 - C 0.448 0.196 0.3 0 0 0 94.40%
94.4%
Very Satisfactory
3Rb Construction And Supply 19541 L B MA GE-5 Prieto Diaz Port Development ProjectPrieto Diaz,
Sorsogon8/19/2015 1st DOTC LF 8.512 124 05/01/15 09/01/15 1.12 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 -
3Rb Construction And Supply 19541 L B MA GECluster 9-Construction/Rehabilitation/Improvement of River
Control Section, Estancia, Estancia, Malinao, Albay
Estancia, Malinao,
Albay3/7/2016 1st Albay 1st DEO LF 3.9755 218 6/22/15 1/25/16 - C 0.48 0.133 0.3 0 0 0 91.30%
91.3%
Very Satisfactory
3Rb Construction And Supply 19541 L B MA GE
Cluster 9-Construction/Rehabilitation/Improvement of River
Control, San Antonio and San Vicente, Tabaco City and Diaro
and Estancia, Malinao,, Albay
San Antonio and
San Vicente,
Tabaco City and
Diaro and Estancia,
Malinao,, Albay
6/11/2016 1st & Final Albay 1st DEO LF 29.927 218 6/22/15 1/25/16 0.00 C 0.485 0.133 0.3 0 0 0 91.80%91.8%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 2 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
3R'S Builders And Resources 35922 L D SB GB Construction of Multi-Purpose BuildingMuseum, Tudela,
Misamis Occidental3/16/2016 1st
MISAMIS
OCCIDENTAL 2ND
DEO
LF 1.937 120 4/13/15 8/11/15 0 C 0.458 0.133 0.3 0 0 0 89.10%89.1%
Very Satisfactory
4 A'S Construction 9446 L B SB GBConstruction of 2STY 4CL School Building at Andabuen
National High School Benito Soliven, Isabela
Benito Soliven,
Isabela3/18/2017 1st Isabela 2nd LF 5.996 150 8/23/2016 1/19/2017 -0.20 O 0.341 0.299 0.000 0.03 0.047 0.033 75.00 -
4 A'S Construction 9446 L B SB GB
Construction of Two (2) Storey Four (4) Classroom School
Building at Andabuen National High School Benito Soliven,
Isabela
Benito Soliven,
Isabela11/19/2016 1st Isabela 2nd LF 5.996 150 8/23/2016 1/19/2017 0.02 O 0.389 0.2 0.15 0.02 0.052 0.05 0.8610 -
4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,
Pampanga2/5/2015 2nd BCDA L 18.951 120 09/03/14 12/31/14 21.45 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 -
4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,
Pampanga11/20/2014 1st BCDA L 18.951 120 09/03/14 12/31/14 0.00 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 -
4B Construction Corporation L2014 heavy maintenance works along SCTEX lot 2 - Bridge
revetment, slope and drainage repair works
Bataan and
Pampanga/Region
3
10/31/2014 1st BCDA L 12.430 90 08/03/14 11/01/14 0.00 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 -
525 Construction 28532 L B MA GE
Repair/ Maintenance of Flood Control Structure along
Balagtas River, San Juan Section, Balagtas, Bulacan Balagtas, Bulacan 5/31/2017 1st & Final Bulacan 1st DEO LF 18.325 150 10/5/2016 3/3/2017 0.00 C 0.469 0.133 0.300 - - - 90.20*90.2%
Very Satisfactory
525 Construction 28532 L B MA GEConstruction of Flood Control Structure along Balagtas at
Dalig, Balagtas, BulacanBalagtas, Bulacan 8/25/2017 1st & Final Bulacan 1st LF 4.628 90 4/25/2017 7/23/2017 0.33 C 0.367 0.200 0.300 - - - 86.70
*86.7%
Satisfactory
525 Construction 28532 L B MA GERehabilitation of Roads Brgy. Igulot - Brgy. Binang - Brgy.
TuroBocaue, Bulacan 9/19/2016 1st Bulacan 1st DEO LF 34.143 210 4/3/16 10/29/16 0.00 O 0.312 0.3 0.15 0.03 0.042 0.05 0.8840 -
525 Construction 28532 L B MA GE
Valenzuela-Obando-Meycauayan Flood Control Project-
Meycauayan, Construction of River wall Protection,
Meycauayan-Valenzuela Boundary Phase I, RS , (Sta. 3+475.40-
Sta. 3+567.00), Right Side, Meycauayan, Bulacan
(Sta. 3+475.40-Sta.
3+567.00), Right
Side, Meycauayan,
Bulacan
3/8/2016 1stBulacan Second
DEOLF 24.1599 201 8/24/15 3/11/16 0.31% C 0.398 0.207 0.15 0.03 0.06 0.05 89.50%
89.5%
Very Satisfactory
525 Construction 28532 L A MB GE
Valenzuela-Obando-Meycauayan Flood Control Project -
Meycauayan - Construction of Riverwall Protection,
Meycauayan-Valenzuela Boundary Phase I, RS (Sta. 3+475.40 -
Sta. 3+567.00), Right Side
Meycauayan,
Bulacan6/7/2016 2nd & Final Bulacan 2nd LF 24.159 201 8/24/15 3/11/16 0.00 C 0.491 0.102 0.3 0 0 0 89.30%
89.42%
Very Satisfactory
525 Construction 28532 L B MA GE
Construction of Flood Control Structure along Angat River,
Pulilan, Bulacan Pulilan, Bulacan 11/17/17 1st & Final DPWH LF 10.880 150 6/8/17 11/4/17 6.21 C 0.472 0.133 0.300 - - - 90.50*90.5%
Very Satisfactory
5'S Construction & Supply 32404 L D SB GB
Local Infrastructure Program - Improvement of Multi-Purpose
Building (Public Market) Iloilo 4th Legislative District , Brgy.
Poblacion, Banate Iloilo
Banate, Iloilo 3/9/2016 1st Iloilo 2nd DEO LF 1.969 259 7/16/15 3/31/16 (+) 6.91% C 0.457 0.133 0.3 0 0 0 89.00%89%
Satisfactory
5'S Construction & Supply 32404 L D SB GBImprovement of Multi-Purpose Building/ Barangay Hall,
Barangay Punong Lapuz, Iloilo CityIloilo City 3/23/18 1st/Final Iloilo City DEO LF 1.914 118 6/13/17 10/8/17 0.20 C 0.492 0.133 0.3 - - - 92.50 *92.50% Very Satisfactory
6 Jewels Construction 34737 L C SB GE
MFO 1 - National Road Network Services, Network
Development Off-Carriageway Improvement including
Drainage, Secondary Roads Batangas Quezon Road, K0134+(-
664) - K0134+(-414), K0134+100 - K0134+407, Batangas City,
Batangas
Batangas City,
Batangas8/25/2017 1st & Final
Batangas 2nd
DEOLF 5.287 45 2/9/2017 3/25/2017 0.17 C 0.483 0.133 0.300 - - - 91.60
*91.6%
Very Satisfactory
6 Jewels Construction 34737 L D SB GE
Local Infrastructure Program - Construction/ Improvement of
Draiange FacilititesBrgy. Calicanto,
Batangas City9/21/2016 1st & Final Batangas 2nd LF 1.880 56 3/27/16 5/21/16 0.00 C 0.479 0.133 0.3 0 0 0 0.9120
91.2%
Very Satisfactory
626 Construction & Trading, Inc. 34990 L D SB GERehabilitation & Improvement of Bustos Dam and Picnic
GroundsBustos, Bulacan 9/27/18 2nd TIEZA LF 7.500 90 10/19/16 9/9/18 -2.07 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going
626 Construction & Trading, Inc. 34990 L D SB GE Improvement of Hot and Cold Spring ResortBalungao,
Pangasinan10/9/2015 2nd TIEZA LF 12.000 240 01/21/15 09/19/15 -4.710 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 -
626 Construction & Trading, Inc. 34990 L D SB GE Improvement of Balungao Hot and Cold Spring ResortBalungao,
Pangasinan5/27/2015 1st TIEZA LF 11.800 180 01/21/15 07/19/15 -17.71 O 0.397 0.299 0 0.030 0.045 0.017 78.74
722 Construction, Inc.(Formerly: 722
Construction)21923 L A MA GE
Repair/Rehabilitation/Improvement along Baliuag-Candaba
Road K0054+000 to K0057+000Baliuag, Bulacan 11/24/2014 1st III LF 12.104 72 9/27/14 12/7/14 0.69% O 0.295 0.240 0.150 0.030 0.037 0.033 78.50%
78.50%
Unsatisfactory
739 Builders 31174 L B MA GB
Provision of Techvoc Workshop Buildings/Laboratories for
Senior High School, Narvacan NCHS Narvacan, Ilocos
Sur6/4/2017 1st & Final
Ilocos Sur 2nd
District Engineering
Office
LF 2.307 85 12/1/2016 2/23/2017 -0.02 C 0.484 0.199 0.240 - - - 92.30*92.3%
Very Satisfactory
739 Builders 31174 L B MA GEConstruction of Drainage Canal, Vigan-Sta. Catalina Road,
K0407+405-K0408+288Vigan, Ilocos Sur 8/17/2017 1st & Final Ilocos Sur 1st DEO LF 11.177 120 3/10/2017 7/7/2017 -0.02 C 0.488 0.172 0.228 - - - 88.80
*88.8%
Satisfactory
739 Builders 31174 L B MA GB
Provision of Techvoc Workshop Building/Laboratories for
Senior High School, Narvacan National High School,
Narvacan, Ilocos Sur
Narvacan, Ilocos
Sur3/18/2017 1st
Ilocos Sur 2nd
DEOLF 2.306 115 12/1/2016 3/25/2017 -0.10 O 0.225 0.300 0.051 0.03 0.052 0.033 69.10 -
739 Builders / Arthit Corporation31174 /
40667L MA SB
Upgrading and Improvement of Sta. Lucia - Nagrebcan -
Ronda Road
Sta. Lucia, Ilocos
Sur / Region 110/9/2018 1st
Provincial
Government of
Ilocos Sur
LF 44.784 211 9/20/2018 4/26/2018 0.63 O 0.40 0.30 0.15 0.03 0.07 0.05 100.00 - On - Going
811 Trading & Construction 21215 L A MA GBConstruction of Two (2) Storey, Four Classroom Building for
Punong NHS, Sta. Cruz, MarinduqueSta. Cruz, Marinduq 8/25/2017 1st & Final Marinduque DEO LF 7.115 262 6/1/2016 2/17/2017 - C 0.473 0.200 0.154 - - - 82.70
*82.7%
Satisfactory
811 Trading & Construction 21215 L A MA GB
Construction of 2 Storey/ 8 Classrooms at Doroteo S.
Mendoza SR Memorial National High School, Naujan, Oriental
Mindoro
Naujan, Oriental
Mindoro8/17/2017 1st & Final
Mindoro Oriental
DEOLF 10.769 210 8/22/2016 3/19/2017 - C 0.488 0.200 0.000 - - - 68.80
*68.8%
Poor
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 3 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
811 Trading & Construction 21215 L A MA GB
Construction of 2 Storey/8 Classrooms at Doroteo S.
Mendoza, Sr., Memorial National High School, Naujan, Oriental
Mindoro
Naujan, Oriental
Mindoro11/17/2016 1st
Mindoro Oriental
DEOLF 10.821 150 8/22/2016 1/18/2017 -0.04 O 0.349 0.3 0.109 0.03 0.058 0.033 0.8790 -
811 Trading & Construction/ Great Lakes
Enterprises, Joint VentureJV-15-1249 L A B GE
Construction of Wawa Seawall, Calapan City, Oriental Mindoro Calapan City,
Oriental Mindoro8/26/2016 2nd
Mindoro Oriental
DEOLF 18.576 181 3/9/16 9/5/16 0.15 O 0.382 0.2 0.3 0 0 0 0.8820 -
876 Construction 24224 L D B GEPaving of Shoulder with Drainage and Slope Protection,
Calapan North Road (CNR)
San Teodoro,
Oriental Mindoro8/26/2016 2nd
Mindoro Oriental
DEOLF 1.293 75 1/27/16 4/10/16 0.00 O 0.455 0.158 0.3 0 0 0 0.9130 -
888 Acy Enterprises 32898 L B MA GE
Cluster-Road Widening along Daang Maharlika (S00223LT),
K1024+443-K1024+699, K1024+721-K1025+607 Southern Leyte 11/6/17 1st DPWH LF 33.567 240 3/19/17 11/13/17 -3.75 O 0.344 0.254 0.112 0.03 0.056 0.033 82.90 -
888 Acy Enterprises 32898 L B MA GE
Off-Carriageway Improvement Along Jct. Taft-Oras-San
Policarpio-Arteche Road (S00167SM) K0939+500-K0940+744;
K0942+280-K0943+344, K0943+432-K0944+1087, Eastern
Samar
K0939+500-
K0940+744;
K0942+280-
K0943+344,
K0943+432-
K0944+1087,
Eastern Samar
8/15/2017 1stEastern Samar
DEOLF 39.857 210 3/8/2017 10/3/2017 (+)0.37% O 0.364 0.300 0.150 0.03 0.012 0.033 88.90 -
888 Acy Enterprises 32898 L B MA GE
Rehab./Major Repair of Permanent Bridges, Canlawis Bridge
along Lilo-an-San Ricardo Road (B00368LT), Pintuyan,
Southern Leyte
- 3/30/2017 1st & FinalSouthern Leyte
DEOLF 19.585 247 1/27/2016 9/29/2016 0.00 C 0.412 0.133 0.300 - - - 84.50
*84.5%
Satisfactory
888 Acy Enterprises 32898 L B MA GE
Rehab./Major Repair of Permanent Lo-oc Bridge along Bdry.
So. Leyte-Maasin-Macrohon-Sogod-Daang Maharlika
(B00330LT), Lo-oc, Tomas Oppus, Southern Leyte
Lo-oc, Tomas
Oppus, Southern
Leyte
11/14/2016 1st & FinalSouthern Leyte
DEOLF 9.699 170 1/27/2016 7/14/2016 0.00 C 0.442 0.133 0.3 0 0 0 0.8750
87.5%
Satisfactory
888 Acy Enterprises 32898 L B MA GE
Rehab./Major Repair of Permanent Dinahugan Bridge along
Bdry. So. Leyte-Maasin-Macrohon-Sogod-Daang Maharlika
(B003011LT)
Padre Burgos,
Southern Leyte6/26/2016 1st
Southern Leyte
DEOLF 19.148 202 1/27/16 8/15/16 0.00 O 0.367 0.24 0.15 0.03 0.056 0.05 89.30% -
888 Acy Enterprises 32898 L A MA GE
Rehab/Major Repair of Permanent Bridges, Pandan Bridge,
Along Brdy, S. leyte-Maasin-Macrohon-Sogod-Daang
Maharlika
Along Brdy, S. leyte-
Maasin-Macrohon-
Sogod-Daang
Maharlika
6/3/2015 1stSouthern Leyte
DEOLF 8.812 150 3/4/15 7/31/15 - O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% -
888 Acy Enterprises 32898 L B MA GE
Off-Carriageway Improvement along Taft - Oras - San
Policarpio - Arteche Road, K0939+500 - K0940+744,
K0942+280 - K0943+344, K0943+432 - K0944+490, K0944+672 -
K0944+1087
Eastern Samar 4/10/18 2nd/FinalEastern Samar
DEOLF 39.857 210 3/8/17 10/3/17 0.00% C 0.481 0.186 0.3 - - - 96.70 91.48% Very Satisfactory
888 Acy Enterprises 32898L B MA GE
Road Widening along Daang Maharlika, K1024+443-
K1024+699.00; K1024+721-K1025+607.000Southern Leyte 04/09/18
1st/Final
Southern Leyte
DEOLF 33.567 240 42,813 43,052 0 C 0.482 0.133 0.300 - - - 91.50 *91.50% Very Satisfactory
8G Construction And General Services 35783 L B SB GB
Construction of 4 STY, 8-CL at Amlan NHSAmlan 2nd District,
Negros Oriental11/18/2016 1st & Final
Negros Oriental
2nd DEOLF 14.868 230 10/26/2015 6/11/2016 0.00 C 0.491 0.133 0.3 0 0 0 0.9240
92.4%
Very Satisfactory
8G Construction And General Services 35783 L B SB GE
Rehabilitation/Improvement of Farm to Market Road at
Jandalamanon, Kilaban, Gomentoc and Candanaay,
Ayungon, Negros Oriental
Ayungon, Negros
Oriental3/11/2016 1st
Negros Oriental
First DEOLF 3.7437 50 6/26/15 8/14/15 0 C 0.435 0.133 0.3 0 0 0 86.80%
86.8%
Satisfactory
8G Construction And General Services 35783 L B SB GB
Rehabilitation of Multi-Purpose Building, Barangay
Manalungon,
Sta. Catalina,
Negros Oriental 3rd
LD
8/24/2016 1st & FinalNegros Oriental
3rd DEOLF 1.940 180 2/2/16 7/30/16 0.00 C 0.436 0.133 0.3 0 0 0 0.8690
86.9%
Satisfactory
8R'S Construction 22997 L B A GE
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
National Rd. including Drainage (Marinduque Circumferencial
Road), K0004+000-K0004+600, K0005+300-K0005+486, and
K0005+670-K0005+832, Boac-Mogpog, Marinduque
Boac-Mogpog,
Marinduque8/27/2016 1st Marinduque DEO LF 26.202 257 2/22/16 11/4/16 0.02 O 0.347 0.259 0.15 0.03 0.025 0.033 0.8440 -
969 Construction & Supplies 35818 L D or C SB GBBarangay San Roque, Delfin Albano, Isabela Delfin Albano,
Isabela6/2/2017 1st & Final Isabela 1st DEO LF 1.410 91 2/14/2017 5/15/2017 0.00 C 0.442 0.138 0.300 - - - 88.00
*88%
Satisfactory
A B Aponesto Construction, Parts & Supply 22998 L A MA GE
Repair/Rehab of Agusan River Flood Control, Osmena
Section, Compostela along Montevista – Compostela – New
Bataan – Maragusan – Mati Bdry. Road.
Compostela Valley 8/9/2014 1st XI LF 30.533 183 12/27/13 7/27/14 -2.74 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 -
A De Guia Construction 18228 L AA MA GEConstruction of River Bank Protection, Siffu Flood Control
Project, Sittio Gabit Section, Roxas, IsabelaRoxas, Isabela 8/28/2015 1st Isabela 2nd DEO LF 18.346 215 2/24/15 9/26/15 0.32% O 0.354 0.3 0.15 0.03 0.04 0.05 92.40% -
A J Taylan Construction & Development/Jlp
Construction & Supply Joint VentureJV-14-518 L A MB GE
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Roads including Drainage Based on Pavement
Management System/Highway Development and Management-
4(HDM-4), Pinili-Nueva Era Road, K0453+(-224)-K0454+1013,
K0455+884-K0456+433, Pinili Road, Ilocos Norte
Pinili-Nueva Era
Road, K0453+(-
224)-K0454+1013,
K0455+884-
K0456+433, Pinili
Road, Ilocos Norte
8/26/2015 1stIlocos Sur 2nd
DEOLF 37.519 219 4/29/15 12/4/15 (+)2.27 O 0.355 0.209 0.15 0.03 0.051 0.05 84.50% -
A. B. Taylan Construction & Development /
North Tech Builders And Construction Supply
Joint Venture
JV-14-115 L AAA - GE
MFO-1 National Road Network Services: Network
Development: Widening of National Roads (Arterial)-along N1,
Bangag-Magapit Road, K0686+(-512) - K0687+980, Bangag-
Magapit, Allacapan, Cagayan
Allacapan,
Cagayan6/1/2017 1st & Final
Regional Office No.
IILF 74.138 294 2/15/2016 12/4/2016 0.00 C 0.452 0.134 0.300 - - - 88.60
*88.6%
Satisfactory
A. C. Rivero Development Corporation 5122 L A MB GEReplacement/ Raising of PHHC Bridge (S00130NR) along
Bacolod Circumferential Road, Bacolod CityBacolod City 11/16/17 1st DPWH LF 19.600 255 4/26/17 1/5/18 0.34 O 0.391 0.240 0.150 0.03 0.04 0.05 90.10 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 4 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A. C. Soliven Construction * General
Merchandise19278 L B MA GE
Rehabilitation/ Improvement of Existing Dike along Lucung
River, Upstream of Sta. Maria Section, Left Side, Sta. (-)2+050
to Sta. (-)2+132 and Sta. (-)2+200 to Sta. (-)2+619.60,
Concepcion, Tarlac
Concepcion, Tarlac 8/20/2017 1st & Final Tarlac 2nd DEO LF 37.231 147 2/16/2017 7/12/2017 0.00 C 0.421 0.133 0.300 - - - 85.40*85.4%
Satisfactory
A. D. Pendon Construction & Supply, Inc.
(Formerly: A. D. P. Construction & Supply) 3466 L A MB GE
Asset Preservation of National Roads Preventive Maintenance
- Asset Preservation of National Roads -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Roads Including Drainage, Odiong - Sibalom - San
Remigio - Leon Road, San Remigio, Antiq
San Remigio,
Antique6/9/2016 1st ANTIQUE DEO LF 29.476 223 8/14/15 3/23/16 0.00 O 0.23 0.291 0.121 0.008 0.022 0 67.20% -
A. D. Pendon Construction & Supply, Inc.
(Formerly: A. D. P. Construction & Supply) 3466 L A MB GE
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
National Roads including Drainage, Iloilo-Capiz Road (Pavia
Diversion), K0010+449 to K0010+824.30, IloiloIloilo 11/16/2016 1st ILOILO 4TH DEO LF 7.258 170 6/30/2016 12/16/2016 0.04 O 0.341 0.24 0.15 0.03 0.05 0.05 0.8610 -
A. D. Pendon Construction & Supply, Inc.
(Formerly: A. D. P. Construction & Supply) 3466 L A MB GE
Upgrading of Delgado St. K0001+(-402)-K0001+(-100), K0001+(-
100)-K0001+080, Iloilo CityIloilo City 9/1/2016 1st ILOILO DEO LF 22.611 22.611 3/26/00 4/16/00 0.00 O 0.275 0.3 0.05 0.03 0.058 0 0.7130 -
A. De Guia Construction 18228 L AA MA GEConstruction/ Rehabilitation of Flood Control Projects,
Nagassican Flood Control Projects, Sta. 0+000 to Sta. 0+224
Nagassican,
Santiago City8/12/2014 1st II LF 19.500 184 4/3/14 10/3/14 13.19 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 -
A. De Guia Construction 18228 L AA MA GE
Construction of Drainage System / Protection Works along
Daang Maharlika, Isabela 4th LD K0311+590 - K0314+350, San
Luis - Caquilingan
Cordon, Isabela 10/27/2014 1st II LF 19.403 231 3/26/14 11/11/14 0.96% O 0.347 0.300 0.150 0.030 0.029 0.033 88.90%88.90%
Satisfactory
A. DE GUIA CONSTRUCTION 18228 L AA MB GE
Concreting of San Pablo-Salvacion Road, Barangay San Pablo
Alicia, IsabelaBarangay San
Pablo Alicia, Isabela11/11/17 1st & Final DPWH LF 6.930 122 2/28/17 6/29/17 0.00 C 0.470 0.133 0.300 - - - 90.30
*90.3%
Very Satisfactory
A. DE GUIA CONSTRUCTION 18228 L AA MB GE
Network Development - Improvement/ Widening of National
Roads Primary Roads - Other Primary Roads along National
Roads along Santiago - Tuguegarao Road, K0369+000 -
K0371+000, K0373+000 - K0374+000, K0374+947 - K0376+000,
Aurora and San Miguel, Isabela
Aurora and San
Miguel, Isabela8/19/2017 1st Isabela 2nd DEO LF 91.157 251 2/27/2017 11/4/2017 0.02 O 0.381 0.240 0.150 0.03 0.07 0.033 90.40 -
A. DE GUIA CONSTRUCTION 18228 L AA MB GE
MFO 1 - National Road Network Services: Network
Development: Improvement/Widening of National Roads,
Primary Roads along N1 Daang Maharlika (LZ) - K0382+977-
K0383+450 L/S, K0383+830-K0386+182 L/S, K0386+291-
K0387+215 L/S, K0382+977-K0383+450 R/S, K0383+83
K0382+977-
K0383+450 L/S,
K0383+830-
K0386+182 L/S,
K0386+291-
K0387+215 L/S,
K0382+977-
K0383+450 R/S,
K0383+830-
K0385+006 R/S,
K0385+220-
K0386+014 R/S,
K0386+102-
K0386+193 R/S,
K0386+375-
K0387+215 R/S
6/15/2016 1st Regional Office LF 79.349 248 2/4/16 10/8/16 0.02 O 0.393 0.24 0.15 0.03 0.047 0.05 91.00% -
A. DE GUIA CONSTRUCTION 18228 L AA MB GE
Network Development-Improvement/Widening of National
Roads-Primary Roads-Other Primary Roads along National
Roads along Santiago-Tuguegarao Road, K0369+000-
K0371+000, K0373+000-K0374+000 & K0374+947-K0376+000
Aurora and San
Manuel, Isabela04/09/18
2nd/Final
Isabela 2nd DEO LF 91.157 281 42,793 43,073 0 C 0.363 0.200 0.300 - - - 86.30 91.40% Very Satisfactory
A. DE GUIA CONSTRUCTION 18228 L AA MA GE
Network Development, Improvement/Widening of National
Roads, Santiago-Tuguegarao Road, K0342+(-039)-
K0343+884, Oscar, Ramon
Isabela-Sinamar
Sur, San Mateo,
Isabela
3/20/18 1st/Final Isabela 3rd DEO LF 45.847 179 4/4/17 9/29/17 0.00% C 0.461 0.176 0.300 - - - 93.70 *93.70% Very Satisfactory
A. Dela Cruz Builders Inc. 38836 L D SB GBConstruction of Multi-Purpose Building at Dona Aurora
Elementary School, Brgy. Doña Aurora, Quezon CityQuezon City 3/17/18 1st/Final
Quezon City 2nd
DEOLF 14.724 250 7/14/17 3/20/18 0.06 C 0.490 0.132 0.300 - - - 92.20 *92.20% Very Satisfactory
A. J. Lava Builders Corp. (Formerly: A. J. Lava
Builders)22265 L B MA GE
Flood Management Services Construction/Maintenance of
Flood Mitigation Structures and Drainage System
Improvement/Riprapping of Sitio Kapatagan River
(Downstream), Brgy. San Jose, Antipolo City, 2nd LD
Brgy. San Jose,
Antipolo City11/11/2015 1st RIZAL 1ST DEO LF 27.612 180 6/10/15 12/6/15 0.0018 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00%
92%
Very Satisfactory
A. J. Taylan Construction Corporation 2336 L B MA GEConstruction of Apatot Bridge and Approaches, Pinili, Ilocos
NortePinili, Ilocos Norte 11/15/2016 1st & Final
Ilocos Norte 2nd
DEOLF 27.042 270 3/23/2013 12/17/2013 0.05 C 0.35 0.3 0.101 0.03 0.055 0.033 0.8690
86.9%
Satisfactory
A. J. Taylan Construction Corporation 2336 L B MA GE
Laoag River Basin Flood and Sabo Project, Concrete
Revetment along Bongo River, Brgy. Sta Monica, Sitio 2, San
Nicolas, Ilocos Norte
Brgy. Sta Monica,
Sitio 2, San Nicolas,
Ilocos Norte
3/9/2016 2ndILOCOS NORTE
2ND DEOLF 9.649 194 8/12/15 2/22/16 0 C 0.42 0.2 0.3 0 0 0 91.10%
91.1%
Very Satisfactory
A. M. Oreta and Co., Incorporated 108 L AAA LB Region 2-PIDP-CBIMO Sta. Ana, Cagayan 9/19/2015 1st NIA LF 80.788 690 04/01/14 10/09/15 -1.58 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 -
A. M. P. Construction 16574 L B MA GEConstruction of Flood Control Wall along Agbalili River,
Altavas, AklanAltavas, Aklan 8/28/2016 1st AKLAN DEO LF 34.428 34.428 12/14/00 1/16/01 0.00 O 0.388 0.3 0.003 0.03 0.058 0 0.7790 -
A. M. P. Construction 16574 L B MA GEConstruction of Flood Control Revetment Wall along Agbalili
River, Altavas, AklanAltavas, Aklan 6/11/2016 2nd AKLAN DEO LF 34.428 274 9/29/15 6/28/16 0.00 O 0.385 0.3 0.104 0.023 0.055 0.033 90.00% -
A. M. P. Construction/ Forthright Construction
Joint VentureJV-16-1612 L A MA GE
Construction/ Maintenance of Flood Mitigation Structures and
Drainage System, Rehabilitation/ Improvement of Pampanga
River Control, Brgy. Sapang Buho, Palayan City, Nueva EcijaPalayan City, Nueva
Ecija8/23/2017 1st
Nueva Ecija 2nd
DEOLF 39.200 161 5/10/2017 10/17/2017 0.02 O 0.309 0.300 0.150 0.02 0.042 0.05 87.10 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 5 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A. P. B. Construction 17055 L B MA GE
Network Development/ Widening of National Roads-
Secondary Road-Abra-Ilocos Norte Road K0409+000-
K0409+100, K0409+115-K409+178, K0409+307-K0409+404,
K0409+531-K0409+648, K0409+748-K0410+139, K0410+159-
K0410+360, K0410+369-K0410+777, K0411+050-K0411+220,
K0412+122-K0412+499, K0413+000-K0414+354, K0414+764-
K0415+747, K0416+175-K0416+445, K041
Abra 11/20/2015 1st Regional Office LF 81.971 286 6/25/15 4/5/16 2.15% O 0.318 0.29 0.15 0.022 0.045 0.033 85.80%85.8%
Satisfactory
A. P. Consebido Construction And Trading 33616 L D SB GB
Construction of Barangay Hall/Evacuation Center, Brgy.
Salvacion, Roxas, PalawanBrgy. Salvacion,
Roxas, Palawan11/23/2016 1st & Final Palawan First DEO LF 1.982 100 3/7/2016 6/14/2016 0.10 C 0.481 0.179 0.3 0 0 0 0.9600
96%
Very Satisfactory
A. P. Consebido Construction And Trading 33616 L D SB GEConstruction of Barangay Road, Barangay Dumarao, Sta.
00+012.70-Sta. 0+149.00, Roxas, Palawan
Sta. 00+012.70-Sta.
0+149.00, Roxas,
Palawan
3/10/2016 1st Palawan First DEO LF 1.9478 100 7/20/15 10/27/15 -1.00% C 0.429 0.2 0.27 0 0 0 89.90%89.9%
Very Satisfactory
A. P. D. Construction 17467 L A MB GE
Retrofitting/Strengthening of Disiluad Br. (B01939LZ) along
Cordon-Aurora Boundary Road (Isabela Boundary - Jct.
Dumabato)
Disiluad, Aglipay,
Quirino3/17/2016 1st Quirino LF 29.4724 180 7/12/15 1/7/16 62.00% C 0.486 0.133 0.3 0 0 0 91.90%
91.9%
Very Satisfactory
A. R. Lustre Jr. Construction 7680 L AAA LA GBConstruction of Multi-Purpose Building, Barangay Sta.
Monica, Inagawan Sub. And San Miguel, Puerto Princesa City
Barangay Sta.
Monica, Inagawan
Sub. And San
Miguel, Puerto
Princesa City
3/11/2016 1st Palawan 3rd DEO LF 1.9142 156 2/7/15 7/12/15 - C 0.483 0.177 0.3 0 0 0 96.00%96%
Very Satisfactory
A. Sandoval Construction & Supply 35991 L B SB GB
Local Infrastructure Program - Construction of 2 Storey, 4
Classroom School Building, Luyos NHS, Brgy. Luyos,
Tanauan City, Batangas 3rd LD
Brgy. Luyos,
Tanauan City,
Batangas 3rd LD
6/30/2016 1st & Final Batangas 3rd LF 8.464 180 6/30/15 12/26/15 0.00 C 0.461 0.133 0.3 0 0 0 89.40%89.4%
Very Satisfactory
A. Y. U. Engineering And Construction 25632 L B MA GERoad Concreting, Bato to Likate Road, Brgy. Bato and Kilate,
Toril, Davao CityToril, Davao City 9/2/2016 2nd & Final
Davao City 2nd
DEOLF 9.800 105 4/14/16 7/27/16 0.00 C 0.483 0.133 0.3 0 0 0 0.9160
88.3%
Satisfactory
A.B Taylan Construction & Development 25273 L A MB GE
Netwrork Development, Improvement of National Roads along
Manila North Road, K0508+050-K0508+125; K0508+140-
K0508+250; K0508+329; K0508+410-K0509+755; K0509+760-
K0510+501; K0519+000-K0520+200; K0521+000-K0522+500;
K0522+500-K0523+060
Pasuguin, Ilocos
Norte11/8/17 1st & Final DPWH LF 144.750 255 2/24/17 11/5/17 0.00 C 0.473 0.133 0.300 - - - 90.60
*90.6%
Very Satisfactory
A.B. Opeña Builders 33996 L D SB GB
Construction of Multi-Purpose Building, Brgy. North Centro,
Sipocot, Camarines Sur
Brgy. North Centro,
Sipocot, Camarines
Sur
6/6/2016 1st & FinalCamarines Sur 1st
DEOLF 1.881 120 3/10/15 7/7/15 0.00 C 0.484 0.147 0.3 0 0 0 93.10%
93.1%
Very Satisfactory
A.B. Opeña Builders 33996 L D SB GB
Construction of Multi-Purpose Building at Colacling National
High SchoolLupi, Camarines
Sur11/15/17 1st & Final DPWH LF 0.955 60 7/27/17 9/24/17 3.33 C 0.488 0.133 0.300 - - - 92.10
*92.1%
Very Satisfactory
A.B. Opeña Builders 33996 L D SB GE
Concreting of Barangay Road at Brgy. Mabini, Del Gallego,
Camarines Sur
Brgy. Mabini, Del
Gallego, Camarines
Sur
6/1/2017 1st & FinalCamarines Sur 5th
DEOLF 1.410 40 2/23/2017 4/3/2017 0.00 C 0.443 0.134 0.300 - - - 87.70
*87.7%
Satisfactory
A.B. Opeña Builders 33996 L D SB GEConcreting of Barangay Road, Barangay Sta. Cruz, Cabusao,
Camarine Sur
Cabusao,
Camarine Sur8/16/2017 1st
Camarines Sur 5th
DEOLF 1.881 45 5/25/2017 7/8/2017 0.02 O 0.489 0.134 0.300 - - - 92.30 -
A.B. Opeña Builders 33996 L D SB GB
Cluster: Completion/Construction of Multi-Purpose Building at
Brgy. Ragay, Camarines SurBrgy. Ragay,
Camarines Sur11/24/2016 1st & Final
Camarines 5th
DEOLF 2.883 90 6/22/2016 9/19/2016 0.03 C 0.466 0.133 0.3 0 0 0 0.8990
89.9%
Very Satisfactory
A.B. Taylan Construction & Development 28233 L A MB GE
Improvement/Widening of National Road along N1, Manila
North Roads, K0494+396-K0495+024; K0496+164-K0496+423;
K0496+775-K0497+444; K0497+834-K0498+000; K0499+200-
K0500+676; K0500+676-K0500+698; K0500+676-K0500+756;
K0503+380-K0506+084; K0503+380-K0506+048, Bacarra,
Ilocos Norte
K0494+396-
K0495+024;
K0496+164-
K0496+423;
K0496+775-
K0497+444;
K0497+834-
K0498+000;
K0499+200-
K0500+676;
K0500+676-
K0500+698;
K0500+676-
K0500+756;
K0503+380-
K0506+084;
K0503+380-
K0506+048,
Bacarra, Ilocos
Norte
11/16/2016 1stRegional Office No.
ILF 146.250 325 1/27/2016 12/16/2016 0.04 O 0.49 0.133 0.3 0 0 0 0.9230 -
A.B. Taylan Construction & Development/
Badoc Builders & Supply Joint VentureJV-16-621 L B MA GE
Construction of Final Mitigation Structure along Badoc River,
U/S and D/S of Badoc Bridge Badoc, Ilocos Norte 8/16/2017 2nd & FinalIlocos Norte 2nd
DEOLF 44.100 225 2/24/2017 10/6/2017 0.12 C 0.457 0.200 0.300 - - - 95.70
*92.4%
Very Satisfactory
A.B. Taylan Construction & Development/
Badoc Builders & Supply Joint VentureJV-15-404 L AAA MB GE
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4) along Batac-Pinili via Maipalig Road
(S04765LZ)
K0481+643-
K0482+046;
K0482+186-
K0485+624
8/17/2017 1st & FinalRegional Office No.
ILF 146.249 300 1/26/2016 11/20/2016 0.00 C 0.491 0.145 0.292 - - - 92.80
*92.8%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 6 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.C Rivero Development Corporation 5122 L A MA GEUpgrading of Drainage System Along El Dorado Street,
Barangay Bosco, District II
Parañaque City,
Manila11/21/17 1st DPWH LF 14.035 261 3/20/17 12/5/17 -7.06 O 0.376 0.300 0.079 0.03 0.056 0.033 87.40 -
A.C Rivero Development Corporation 5122 L A MB GE
Rehabilitation/Reconstruction of Proposed Slope Protection
along Sta. Felomina-Bonbonon-Digkilaan-Rogongon Road
K1526+000-K1526+200 R/S
Iligan City, Lanao
del Norte Lone
District
11/14/17 1st & Final DPWH LF 33.582 193 3/9/17 9/17/17 10.35 C 0.448 0.175 0.300 - - - 92.30*92.3%
Very Satisfactory
A.C Soliven Construction & General
Merchandise19278 L B MA GE
Agno River Basin & Allied Rivers Flood Control Project -
Heightening of Villasis-Alacala Earth Dike Phase I, Agno River
Control
Brgy. Gualsic,
Alcala, Pangasinan11/14/17 1st & Final DPWH LF 44.687 220 3/13/17 10/18/17 0.00 C 0.438 0.133 0.300 - - - 87.10
*87.1%
Satisfactory
A.C. Mojares Construction, Inc. 1771 L AAA MA GEConcreting and Sidewalk Improvement of Phase 2, Scout
Tobias St., Brgy. Laging Handa, Quezon CityQuezon City 6/3/2014 1st
Quezon City 2nd
DEOLF 10.018 207 2/20/15 9/14/15 (+) 41.00 O 0.394 0.24 0.15 0.015 0.028 0.05 87.70% -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MA GE
Rehabilitation/ Reconstruction of National Roads with Slips,
Slope Collapse and Landslide along Tomas Oppus StreetK1135+300 to
K1136+000,
Maasin City,
Southern Leyte
6/3/2017 1st & FinalSouthern Leyte
DEOLF 27.915 260 2/5/2016 10/21/2016 0.00 C 0.499 0.133 0.300 - - - 93.20
*93.2%
Very Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MA GB
CY 2016 Basic Education Facilities Fund (BEFF), Provision of
Tech Voc. Laboratores, Batch 12, Merida Vocation School,
Merida, Leyte
- 4/1/2017 1st & Final Leyte 4th Deo LF 2.556 90 9/14/2016 12/12/2016 (+)7.78% C 0.462 0.133 0.300 - - - 89.50*89.5%
Very Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Indv. Project - Concreting of Monte-Calvario-Igbac-Barangay
Road, Brgy. Monte-Calvario and Igbac Buhi, Camarines 11/16/17 1st & Final DPWH LF 9.860 83 4/26/17 7/17/17 0.00 C 0.484 0.132 0.300 - - - 91.60*91.6%
Very Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Off-Carriageway Improvement including Drainage along
Liloan-San Ricardo Road (S00218LT), K1070+685 to
K1072+000
Southern Leyte 11/6/17 1st DPWH LF 45.307 270 3/19/17 12/13/17 10.00 O 0.368 0.239 0.150 0.03 0.065 0.05 90.20 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Replacement of PHHC Bridge along Bacolod Circumferential
RoadBacolod City 6/6/2017 2nd Bacolod City LF 34.299 330 3/4/2016 1/27/2017 -0.12 O 0.373 0.200 0.029 0.03 0.058 0.033 72.33 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Replacement of PHHC Bridge along Bacolod Circumferential
Road, Bacolod CityBacolod City 8/23/2017 2nd & Final Bacolod City LF 34.299 330 3/4/2016 1/27/2017 - C 0.490 0.134 0.000 - - - 62.40
*68.34%
Poor
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB C
MFO-1: National Road Network Services Off-Carriageway
Improvement including Drainage-Secondary Roads Flaring of
Intersection along Carrmen-Patag-Bulua Road K1440+(-272)
and K1441+370
Cagayan de Oro
City03/16/18 1st/Final
Cagayan de Oro
City 1st DEOLF 9.221 195 02/20/17 09/02/17 -0.06 C 0.477 0.200 0.120 - - - 79.70 *79.70% Unsatisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB C
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) along Sta. Felomina-
Bonbonon-Digkilaan-Rogongon Road K1535+891-K1536+457
Iligan City 3/22/18 1st/FinalLanao del Norte
2nd DEOLF 33.269 202 3/9/17 9/26/17 0.08% C 0.492 0.133 0.300 - - - 92.50 *92.50% Very Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Construction and Maintenance of Bridges along National
Roads (Replacement of Weak Bridge) at Olingan Bridge
Olingan, Dipolog
City3/15/2017 1st & Final
Zamboanga del
Norte 1st DEOLF 21.622 355 5/29/2015 5/17/2016 -0.05 C 0.459 0.199 0.152 - - - 81.00
*81%
Unsatisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MA GE1
Upgrading/Conc. of San Juanico-Basey-Sohoton Rd.,
K0913+721.75-K0917+915.72, w/ exceptionsBasey, Samar 8/7/2012 1st VIII LF 47.065 200 04/27/12 11/12/12 23.72 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MA GE1
Const./Completion of Subang Daku Bridge, Subang Daku
River, San Miguel
Sogod, Southern
Leyte8/17/2012 1st VIII LF 42.820 220 02/20/12 09/26/12 0.24 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MA GE1
Const./Impv't. of San Miguel-Jct. Buac Rd., Daang Maharlika
Rd (Km1207+000 - Km1209+454.40)
Sogod, Southern
Leyte8/19/2012 1st VIII LF 35.731 220 02/20/12 09/26/12 0.24 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MA GE
Const./Completion of Maasin Flood Control along Tomas
Oppus Street (Road ID S00222LT)
Maasin City,
Southern Leyte6/26/2016 1st
Southern Leyte
DEOLF 25.281 180 2/5/16 8/2/16 0.00 O 0.32 0.3 0.15 0.03 0.056 0.05 90.60% -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)1 L A MA GE
Construction of River Control, Brgy. Calico-an, Borongan City,
Eastern Samar
Borongan City,
Eastern Samar8/30/2016 1st & Final
Eastern Samar
DEOLF 9.794 95 2/10/16 5/14/16 0.00 C 0.415 0.133 0.3 0 0 0 0.8480
84.8%
Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Construction and Maintenance of Bridges along National
Roads (Widening of Permanent Bridges to more than 2 lanes)
Miputak Bridge along Dipolog-Oroquieta Road
Zamboanga Del
Norte11/21/2016 1st & Final
Zamboanga del
Norte 1st DEOLF 22.247 295 5/29/2015 3/18/2016 0.00 C 0.436 0.2 0.3 0 0 0 0.9360
93.6%
Very Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Widening of Permanent Bridges from 1 Lane to 2 Lanes
Malatgao Bridge (B00168PW) along Quezon, Punta, Baja Rd.,
Quezon, Palawan
Quezon, Palawan 11/22/2016 1stPalawan Second
DEOLF 18.408 220 6/26/2016 1/31/2017 0.12 O 0.388 0.176 0.15 0.03 0.04 0.05 0.8340 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Completion of Dodiongan Bridge along Sta. Felomina-
Bonbonon-Digkilaan-Rogongon Road, Brgy. Bonbonon,
Iligan City K01526+058-K01526+118, K01526+910-K01526+297
Brgy. Bonbonon,
Iligan City
K01526+058-
K01526+118,
K01526+910-
K01526+297y
9/3/2015 1stLanao del Norte
2nd DEOLF 37.105 236 2/18/15 10/11/15 1.32% O 0.384 0.285 0.15 0.02 0.045 0.05 93.40% -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Off-Carriageway Improvement along Jct. Taft - Oras - San
Policarpio-Arteche Road, K0950+000 - K0955+000
K0950+000 -
K0955+0006/29/2015 1st
Eastern Samar
DEOLF 33.355 150 3/17/15 8/13/15 - O 0.297 0.3 0.15 0.03 0.04 0.033 85.00% -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Replacement of Permanent Weak Bridge, Ramon Magsaysay
Bridge (B00469MN) Along Jct. Switch-Jct. Monte Alegre Road Ramon Magsaysay,
Zamboanga del Sur8/30/2016 2nd & Final
Zamboanga del
Sur 1st DEOLF 29.101 290 5/11/15 2/24/16 0.00 C 0.467 0.133 0.3 0 0 0 0.9000
88.074%
Satisfactory
A.C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Replacement of Permanent Weak Bridge, Ramon Magsaysay
Bridge (B0469MN) along Jct. Switch-Jct.Monte Alegre Road
Ramon Magsaysay,
Zamboanga del Sur8/29/2015 1st
Zamboanga del
Sur 1stLF 29.101 230 5/11/15 12/26/15 (+)19.46 O 0.288 0.2989 0.15 0.03 0.051 0.05 86.79% -
A.C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Construction and Maintenance of Bridges along National
Roads - (Widening of Permanent Bridges to more than 2
lanes), Miputak Bridge (BO1192MN) along Dipolog-Oroquieta
National Road
Zamboanga del
Norte6/11/2016 1st
Zamboanga del
Norte 1st DEOLF 22.574 250 5/29/15 2/2/16 0.00 O 0.388 0.24 0.12 0.03 0.04 0.033 85.10% -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 7 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Construction and Maintenance of Bridges along National
Roads (Replacement of Permanent Weak Bridge), Olingan
Bridge (B01193MN)
Dipolog-Oroquieta
National Road8/25/2016 2nd
Zamboanga del
Norte 1st DEOLF 21.559 340 5/29/15 5/2/16 0.00 O 0.38 0.24 0.105 0.03 0.045 0.017 0.8170 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MB GE
Construction and Maintenance of Bridges along National Rd.
(Replacement of Permanent Weak Bridge) at Olingan Bridge
along Dipolog-Oroquieta National Road, Olingan, Dipolog City,
Zamboanga del Norte
Olingan, Dipolog
City, Zamboanga
del Norte
11/16/2015 1stZamboanga Del
Norte 1st DEOLF 21.218 220 5/29/15 1/3/16 0.16% O 0.371 0.22 0.15 0.022 0.042 0.05 85.50%
85.5%
Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122 L A MA GE
Construction/ Maintenance of Flood Control Mitigation
Structure and Drainage, Construction of Sibugay Flood
Control Brgy. Poblacion, Albuera, Leyte
Brgy. Poblacion,
Albuera, Leyte8/22/2017 1st & Final Leyte 4th DEO LF 9.299 90 2/15/2017 5/15/2017 - C 0.403 0.200 0.300 - - - 90.30
*90.3%
Very Satisfactory
A.C. Rivero Development Corporation / Jqd
Construction And General Services Joint
Venture
JV-15-513 L A MB GE
Const./Impv't./Concreting of Access Road Leading to
Napantao Dive Site (Napantao Road), San Franciso, Southern
Leyte
San Franciso,
Southern Leyte11/15/2016 1st & Final
Southern Leyte
DEOLF 37.270 220 3/20/2016 10/25/2016 0.00 C 0.424 0.154 0.3 0 0 0 0.8780
87.8%
Satisfactory
A.C. Rivero Development Corporation / Jqd
Construction And General Services Joint
Venture
JV-14-1038 L A MB GE
Rehabilitation/Major Repair of Permanent Weak Bridges,
Otikon Bridge Along Daang Maharlika (B00598LT), Libagon,
Southern Leyte
Libagon, Southern
Leyte11/16/2015 1st
Southern Leyte
DEOLF 31.056 195 6/24/15 1/4/16
(+)22.63
%O 0.249 0.3 0.15 0.03 0.06 0.05 83.90%
83.9%
Satisfactory
A.C. Rivero Development Corporation / Jqd
Construction And General Services Joint
Venture
0 L A MB GERehabilitation/Major Repair of Permanent Weak Bridge, Otikon
Bridge along Daang Maharlika, Libagon, Southern Leyte
Libagon, Southern
Leyte3/7/2016 2nd Southern Leyte LF 31.056 195 6/24/15 1/4/16 0 C 0.45 0.194 0.3 0 0 0 88.10%
88.1%
Satisfactory
A.C Soliven Construction & General
Merchandise19278 L B MA GE
Flood Management Services: Construction/ Maintenance of
Flood Mitigation Structures and Drainage System,
Construction of Flood Control Facilities at Paranum Creek,
Sta. 0+000 - Sta. 0+110 and Sta. 0+390 - Sta. 1+170, (L/S), Brgy.
Camias, Magalang, Pampanga
Magalang,
Pampanga6/8/2017 1st
Pampanga 3rd
DEOLF 17.784 150 2/12/2017 7/11/2017 0.10 O 0.370 0.242 0.150 0.03 0.065 0.033 89.00 -
A.C Soliven Construction & General
Merchandise19278 L B MA GE
Flood Management Services: Construction/ Maintenance of
Flood Mitigation Structures and Drainage System;
Construction of Flood Facilities at Paranum Creek, Barangay
Camias, Sta. 0+000 to Sta. 0+110, Magalang, Pampanga
Magalang,
Pampanga8/19/2017 2nd & Final
Pampanga 3rd
DEOLF 17.784 150 2/12/2017 7/11/2017 0.00 C 0.392 0.199 0.300 - - - 89.10
*89.04%
Very Satisfactory
A.C Soliven Construction & General
Merchandise19278 L B MA GE
Construction/Maintenance of Flood Mitigation Structure &
Drainage Systems - Agno River Basin Flood Control Project-
Extension/ Construction of Bank Protection of River Course,
Brgy. Mabanogbog, Namcamaliran Pinmaludpod, Urdaneta
City, Pangasinan
Brgy. Mabanogbog,
Namcamaliran
Pinmaludpod,
Urdaneta City,
Pangasinan
11/25/2016 1stPangasinan 3rd
DEOLF 34.299 250 5/26/2016 1/30/2017 0.00 O 0.4 0.3 0.15 0.03 0.035 0.025 0.9400 -
A.C Soliven Construction & General
Merchandise19278 L B MA GE
Construction/Maintenance of Flood Mitigation Structures &
Drainage Systems - Agno River Basin Flood Control Project -
Extension/Construction of Bank Protection of River Course,
Brgy. Mabanogbog, Nancamairan, Pinmalupod, Urdaneta City,
Pangasinan
Urdaneta City,
Pangasinan3/23/2017 2nd
Pangasinan 3rd
DEOLF 34.299 250 5/26/2016 1/30/2017 -0.09 O 0.400 0.300 0.060 0.03 0.04 - 83.00 -
A.C Soliven Construction & General
Merchandise19278 L B MA GE
Construction of Bank Protection Works, Agnooo River Basin
Flood Control Project (Phase III) Brgy. Bantog, Asingan,
Pangasinan
Asingan,
Pangasinan11/16/2015 1st
PANGASINAN 3RD
DEOLF 18.336 180 8/26/15 2/23/16 0.025 O 0.389 0.24 0.15 0.03 0.055 0.05 91.40%
91.4%
Very Satisfactory
A.C Soliven Construction & General
Merchandise19278 L B MA GE
Construction of Bank Protection, Agno River Basin Flood
Control Project (Phase III), Barangay Bantog, Asingan,
Pangasinan
Barangay Bantog,
Asingan,
Pangasinan
3/18/2016 2ndPANGASINAN 3RD
DEOLF 18.335 180 8/28/15 2/23/16 0.0444 C 0.414 0.197 0.3 0 0 0 91.28%
91.28%
Very Satisfactory
A.C Soliven Construction & General
Merchandise19278 L B SB GE
Construction/Rehabilitation of Drainage along National
Roads, Villasis-Malassiqui-San Carlos Road, K0190+785-
K0192+800 with Exception (B/S), Malasiqui, Pangasinan
Malasiqui,
Pangasinan3/15/2016 1st
PANGASINAN 4TH
DEOLF 34.3 226 3/13/15 10/24/15 0 C 0.362 0.2 0.3 0 0 0 86.20%
86.2%
Satisfactory
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L - MA GE
Construction of Drainage along Mandurriao-Jaro
Road,K0006+100-K0007+082, K0007+082, Mandurriao, Iloilo
City
K0006+100-
K0007+082,
K0007+082,
Mandurriao, Iloilo
City
8/24/2017 1st Iloilo City DEO LF 38.376 191 2/27/2017 9/5/2017 0.00 O 0.392 0.200 0.150 0.022 0.037 0.05 85.10 -
A.D.L. Constrak 26442 L B B GE
Concreting of Ipil-Sagana Bridge Approaches "A" and "B" and
Sta. Cruz Road, Brgy. Ipil and Sagan and Sta. Cruz,
Bongabong, Oriental Mindoro
Bongabong,
Oriental Mindoro8/24/2016 1st
Southern Mindoro
DEOLF 3.290 35 3/27/16 4/30/16 0.00 O 0.424 0.164 0.3 0 0 0 0.8880 -
A.D.L. Constrak 26442 L B SB GERehabilitation/Reconstruction of Paclasan Seawall, Roxas,
Oriental Mindoro
Roxas, Oriental
Mindoro3/18/2017 1st
Southern Mindoro
DEOLF 3.627 67 9/19/2016 11/24/2016 0.02 O 0.438 0.200 0.300 - - - 93.80 -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MA GE2
Const. of Slope Protection along Jct. Bancal-Leon-Antique
Boundary Rd., K0031+722-K0031+891Leon, Iloilo 3/22/2013 1st VI LF 13.802 188 11/05/12 05/11/13 0.59 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MA GB Construction of Multi-Purpose Building
Poblacion, Pavia,
Iloilo10/28/2014 1st VI LF 4.227 120 6/17/14 10/14/14 -2.91% O 0.362 0.214 0.121 0.030 0.049 0.050 82.60%
82.60%
Satisfactory
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MB GE
Construction/Rehab. Of Drainage System along Balasan-
Carles Road, Brgy. BarosbosCarles, Iloilo 10/29/2014 1st VI LF 43.954 274 4/24/14 1/22/15 6.46% O 0.373 0.218 0.150 0.030 0.054 0.050 87.50%
87.50%
Satisfactory
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MB GE
Road Upgrading (Gravel to Paved) along Davao-Sarangani
Coastal Road km. 1671+600 to km. 1673+060, Biton-Lanao
Section
Davao del Sur 8/7/2014 2nd XI LF 40.082 208 3/7/13 9/30/13 0.00 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MB GE1
Rd. Upgrading (Gravel to Paved) along Davao-Sarangani
Coastal Rd., Km.1671+600-Km.1673+060, Biton-Lanao Sect.Davao del Sur 8/6/2013 1st XI LF 40.082 179 03/07/13 09/01/13 -19.55 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MB GE
Malag-it Box Culvert along Iloilo East Coast-Capiz Road
(Construction of Malag-it Bridge along Iloilo East Coast-Capiz
Road)
Pontevedra, Capiz 10/29/2014 1st VI LF 35.132 240 5/23/14 1/17/15 -37.28% O 0.388 0.249 0.000 0.030 0.054 0.033 75.40%75.40%
Unsatisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 8 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MB GE
Widening of Caradio-an Bridge alog Bacolod South Road,
Barangay Caradio-an
Himamaylan City,
Negros Occidental10/23/2014 1st VI LF 24.804 273 2/16/14 11/15/14 -11.60% O 0.378 0.221 0.034 0.030 0.045 0.033 74.10%
74.10%
Poor
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 6/14/2010 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466
Rehab./Reconst./Upgrading of Damaged Paved National
Road, Roxas City Boundary-Panitan Road-Jct. Bailan Road,
Capiz (KM.112+750-Km.122+705) with exception
8/31/2010 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MA GE
Construction of Drainage System along Iloilo East Coast
Capiz Road
K0204+106, Sara,
Iloilo6/9/2015 1st Iloilo Third DEO LF 44.467 252 2/18/15 10/27/15 2.63% O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MB GE Widening of Sara-San Dionisio Road
K0203+(-882) to
K0203+243, Sara,
Iloilo
6/9/2015 1st Iloilo Third DEO LF 26.054 175 2/16/15 8/9/15 29.00% O 0.344 0.252 0.15 0.022 0.035 0.05 85.30% -
A.D. Pendon Construction & Supply, Inc.
(Formerly: Adp Construction & Supply 3466 L A MB GE
Network Development, Widening of National Road, Secondary
Road along Roxas City, Cagay-Sibaguan Balijuangan-Cudian-
Ijisan Road
Chainage 0-200,
Chainage 942-
1182 10-200
(0+304.80)
(K0104+760-
K0105+000),
Pontevedra, Capiz
6/6/2015 1st Capiz First DEO LF 10.341 121 3/12/15 7/10/15 -4.53% O 0.368 0.251 0.105 0.03 0.035 0.033 82.20% -
A.F.G Construction & Construction Supply 17161 L A MA GB
Construction of Standard One (1) Unit - 2 Sty 10-CL School
Building, Eustacio Lopez NHS, Silay City, Negros Occidental - 3/22/2017 2nd & FinalNegros Occidental
1st DEOLF 17.397 235 4/3/2016 11/23/2016 0.00 C 0.476 0.132 0.300 - - - 90.80
*87.23%
Satisfactory
A.F.G Construction & Construction Supply 17161 L A MA GBRepair/Imporvement of Multi Purpose Building, Barangay
Kasambagan Cebu City 4/12/18 1st/Final Cebu City DEO LF 2.908 75 7/20/17 10/2/17 4.00% C 0.499 0.133 0.300 - - - 93.20 *93.20% Very Satisfactory
A.F.G Construction & Construction Supply 17161 L A MB GE
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Road including Drainage Based on Pavement
Management System / Highway Development and
Management - 4 (HDM-4) (Intermittent Section) along
Hinigaran - Isabela Road, K0058+263 - K0059+000
Barangay Paticui,
Hinigaran, Negros
Occidental
8/27/2015 1stNegros Occidental
2ndLF 12.674 127 5/6/15 9/9/15 0.25% O 0.358 0.239 0.15 0.03 0.05 0.033 86.00% -
A.F.G Construction & Construction Supply 17161 L A MB GEConcreting of Barangay Road, Brgy. Sta. Teresa, Dumalag,
CapizDumalag, Capiz 11/10/17 1st & Final DPWH LF 9.407 97 2/6/17 5/13/17 0.00 C 0.420 0.135 0.300 - - - 85.50
*85.5%
Satisfactory
A.F.G Construction & Construction Supply 17161 L A MA GE1 Const. of Tangalan-Ibajay Rd. Aklan 3/19/2013 1st VI LF 45.834 179 01/15/13 07/12/13 7.79 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -
A.F.G Construction & Construction Supply 17161 L A MA GE1Odiong-Sibalom-San Remegio-Leon Rd. Upgrading (Gravel to
Paved), Km. 129+328-Km. 131+275
San Remigio,
Antique8/15/2013 1st VI LF 40.453 179 02/22/13 08/19/13 15.36 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 -
A.F.G Construction & Construction Supply 17161 L A MA GE
Construction of Standard One (1) Unit - 2 Sty 10-CL School
Building at Brgy. Eustaquio Lopez NHS, Silay City, Negros
Occidental
Silay City, Negros
Occidental6/16/2016 1st
Negros Occidental
First DEOLF 17.396 175 4/3/16 9/24/16 0.00 O 0.304 0.3 0.15 0.03 0.023 0.05 85.70% -
A.F.G Construction & Construction Supply 17161 L A MA GB1Const. of Two (2) Storey, Eight (8) Cl Sch. Bldg., Leonora
Salapantan NHSSan Miguel, Iloilo 8/22/2013 1st VI LF 8.949 150 04/03/13 08/30/13 -4.25 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 -
A.F.G Construction & Construction Supply 17161 L A MA GE1 Replacement/Const. of Tubog Bridge, Brgy. Tubog Hamtic, Antique 8/15/2012 1st VI LF 7.587 180 02/29/12 08/26/12 5.13 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -
A.F.G Construction & Construction Supply 17161 L A MA GB
Construction of Multi-Purpose Building at Brgy. Candumarao,
Hinigaran, Negros OccfidentalHinigaran, Negros
Occfidental6/15/2016 1st & Final
Negros Occidental
Second DEOLF 1.965 60 2/2/16 4/1/16 0.00 C 0.497 0.107 0.3 0 0 0 90.40%
90.4%
Very Satisfactory
A.F.G Construction & Construction Supply 17161 L A MA GBConstruction of 2-CL Alimanguan National High School Brgy.
Alimanguan
San Vicente,
Palawan6/5/2015 1st Palawan 1st DEO LF 1.721 120 2/17/15 6/16/15 0.00% O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% -
A.F.G Construction & Construction Supply 17161 L A MB GB
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Road Including Drainage Based on Pavement
Management System/Highway Development and Management-
4 (HDM-4) (Intermittent Section) along Hinigaran-Isabela Road,
K0058+263 to K0059+000Barangay
K0058+263 to
K0059+000Barang
ay Paticui,
Hinigaran, Negros
Occidental
3/14/2016 1stNegros Occidental
Second DEOLF 12.6742 157 5/6/15 10/9/15 0 C 0.451 0.133 0.3 0 0 0 88.40%
88.4%
Satisfactory
A.F.G Construction & Construction Supply 17161 L A GE
Preventive Maintenance Based on Pavement Management
System/Highway Development and Management -4 (HDM-4)
Jct Bagonawa-La Castellana-Isabela Road, K0057+244 to
K0072+800
La Castellana and
Isabela03/14/18 1st/Final
Negros Occidental
2nd DEOLF 46.210 221 04/16/17 11/22/17 -0.05 C 0.485 0.134 0.161 - - - 78.00 *78.00% Unsatisfactory
A.F.G. Construction And Construction
Supply/Yurich Builders And Construction
Supplu Joint Venture
JV-15-1239 L A MA GE
Off-Carriageway Improvement including Drainage of Puerto
Princesa North Road, K0090+000-K0090+600, K0091+100-
K0091+350, K0095+200-K0096+246, K0103+600-K0103+961,
K0107+600-K0107+720, Roxas, Palawan
K0090+000-
K0090+600,
K0091+100-
K0091+350,
K0095+200-
K0096+246,
K0103+600-
K0103+961,
K0107+600-
K0107+720, Roxas,
Palawan
3/13/2017 2nd & Final Palawan 1st DEO LF 45.859 280 8/4/2016 5/10/2017 0.00 C 0.380 0.200 0.300 - - - 88.00*89.38%
Very Satisfactory
A.H. Raga Construction 36952 L - SB GE
MFO1-National Road Network Services-Construction and
Maintenance of Bridge along National Roads-
Rehabilitation/Major Repair of Permanent Bridges-Zapote Br.
(BO2887LZ) Manila-Cavite (NCR Bdry-Jct Cavite City Section),
Bacoor City, Cavite
Bacoor City, Cavite 11/28/17 1st & Final DPWH LF 9.593 180 7/17/17 1/12/18 29.00 C 0.500 0.133 0.300 - - - 93.30*93.3%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 9 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.I.P Construction 32458 L A MA GE
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations; Guisset-Binga-Baloy-
Tinongdan Road leading to Binga Dam and Mt. Ugo, Site for
International Sky Running Event
Itogon, Benguet 11/8/17 1st DPWH LF 96.500 386 4/10/17 4/30/18 11.63 O 0.376 0.240 0.150 0.03 0.056 0.05 90.20 -
A.I.P Construction 32458 L A MA GE
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Roads including Drainage Based on Pavement
Management System/Highway Development and Management-
4 (HDM-4) (Intermittent Section), Lt. Takay Road, K0308+(-599)
to K0308+000 & K0308+616 to K0308+754, Baguio City
Baguio City 9/4/2015 1st Baguio City DEO LF 13.442 104 6/15/15 9/26/15 2.59% O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% -
A.I.P Construction 32458 L A MA GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide, Marcos Highway, K0280+(-725)
to K0280+(-640), Baguio City
Baguio City 9/1/2016 1st & Final BAGUIO CITY DEO LF 5.509 84 2/19/16 5/12/16 0.00 C 0.418 0.133 0.3 0 0 0 0.851085.1%
Satisfactory
A.J Taylan Construction Corporation 2336 L A MB GE1Road Opening/Const. of Missing Links of National Road,
Solsona-Kabugao Road, Ilocos Norte Side9/9/2009 1st I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -
A.J. Lava Builders Corp. (Formerly: A.J. Lava
Builders)22265 L C SB GE2
Repair & Maint. of Flood Control & Drainage Structures along
Rofriguez-San Jose-Quezon City Rd.Rodriguez, Rizal 11/19/2012 1st IVA LF 2.449 90 09/11/12 12/09/12 29.23 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -
A.J. Lava Builders Corp. (Formerly: A.J. Lava
Builders)22265 L B SB GE
Flood Management Services, Construction/ Maintenance of
Flood Mitigation Structures and Drainage System
Improvement/ Riprapping of Siito Kapatagan River
(Upstream), Brgy. San Jose, Antipolo City, 2nd LD
Brgy. San Jose,
Antipolo City, 2nd
LD
6/21/2016 1st & Final Rizal 1st LF 46.503 240 6/22/15 2/16/16 0.00 C 0.43 0.133 0.3 0 0 0 86.30%86.3%
Satisfactory
A.J. Lava Builders Corp. (Formerly: A.J. Lava
Builders)22265 L B MA GE
MFO2-Flood Management Services, Construction/
Maintenance of Flood Mitigation Structure and Drainage
Systems - Construction/ Maintenance of Flood Mitigation
Structures Drainage Systems - Construction of Flood Control
Structures along Montalban, Rizal
Montalban, Rizal 3/12/18 1st/Final Rizal 2nd DEO LF 28.350 212 2/20/17 9/19/17 0.00% C 0.497 0.133 0.300 - - - 93.00 *93.00% Very Satisfactory
A.J. Lava Builders Corp. (Formerly: A.J. Lava
Builders)22265 L B MA GE
MFO-1 National Road Network Services-Asset Preservation of
National Roads Preventive Maintenance Based on Pavement
Management System/Highway Development and Management-
4 (HDM-4) Cabrera - Antipolo Road, K0026+(-554) to
K0026+000, Taytay, Rizal
Taytay, Rizal 11/21/17 1st & Final DPWH LF 14.260 60 2/20/17 4/20/17 36.46 C 0.410 0.196 0.300 - - - 90.60*90.6%
Very Satisfactory
A.J. Taylan Construction Corp/FR Espiritu Jr.
Builders (JV)JV-14-074 L B MA GE Additional Priority Flood Control Project
San Isidro,
Dumalneg, Ilocos
Norte
10/21/2014 1st I LF 41.179 163 9/11/14 2/20/15 0.36% O 0.299 0.276 0.150 0.030 0.056 0.050 86.10%86.10%
Satisfactory
A.J Taylan Construction Corporation 2336 L B MA GE
Laoag River Basin Flood and Sabo Project, Concrete
Revetment along Bongo River Brgy. Sta. Monica, Sitio 2, San
Nicolas, Ilocos Norte
San Nicolas, Ilocos
Norte11/13/2015 1st
ILOCOS NORTE
2ND DEOLF 9.650 194 8/12/15 2/21/16 0.016 O 0.38 0.24 0.15 0.03 0.055 0.05 90.50%
90.5%
Very Satisfactory
A.J. Taylan Construction Corporation/ J.L.P
Construction And Supply Joint VentureJV-16-1092 L B MA GE
Improvement/Concreting of Sand Dunes Access RoadPaoay, Ilocos Norte 8/16/2017 1st
Ilocos Norte 2nd
DEOLF 39.688 210 2/16/2017 9/13/2017 0.10 O 0.381 0.214 0.150 0.03 0.058 0.05 88.30 -
A.J. Taylan Construction Corporation/ J.Q.C.
Summit Construction And Development
Corporation
JV-15-1238 L B MA GE
Construction/Maintenance of Flood Control Mitigation
Structures and Drainage Systems, Damaged Flood Control
Facilities/Structures under the Laoag River Basin and Flood
Control and Sabo Project (LRBDCSP)-Batac City Flood
Control, Quiaoit River, Eroded Bank Embankment
Laoag, Ilocos Norte 8/16/2017 1st & FinalIlocos Norte 2nd
DEOLF 14.700 396 3/21/2016 4/20/2017 0.02 C 0.466 0.133 0.300 - - - 89.90
*89.9%
Very Satisfactory
A.J. Taylan Construction Corporation/Djcm
Construction Corporation Joint VentureJV-15-412 L B MA GE
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) along Batac-Pinili via
Maipalig Road, K0485+624 o K0485+978; K0486+023 to
K0486+304; K0+486+389 to K0488+039
Ilocos Norte 8/26/2016 1st & FinalRegional Office No.
ILF 83.728 211 1/27/16 8/24/16 0.07 C 0.489 0.133 0.3 0 0 0 0.9220
92.2%
Very Satisfactory
A.J. Taylan Construction Corporation/ J.Q.C.
Summit Construction And Development
Corporation
JV-15-1238 L B MA GE
Construction/Maintenance of Flood Mitigation Structures and
Drainage System, Damaged Flood Control
Facilities/Structures under the Laoag River Basin Flood
Control and Sabo Project (LRBDCSP) Batac City Flood
Control, Quiaoit River, Eroded Bank Embankment, Ilocos
Norte
Ilocos Norte 3/15/2017 1stIlocos Norte 2nd
DEOLF 14.699 396 3/22/2016 4/21/2017 0.04 O 0.390 0.239 0.150 0.03 0.04 0.033 88.20 -
A.J. Taylan Construction Corporation/Zedik
Builders (JV)JV-13-345 L B MA GE
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved
Standard (HDM-4 Project Analysis) of Piniti-Banna (Espiritu)
Road
Ilocos Norte 8/8/2014 1st I LF 28.942 236 2/14/14 10/7/14 27.99 O 0.380 0.240 0.150 0.030 0.055 0.033 88.80 -
A.J.Taylan Construction Corp./Jlp Construction
& Supply, Joint Venture JV-16-1092 L B MA GE Improvement/Concreting of Sand Dunes Access Road Paoay, Ilocos Norte 3/15/18 2nd/Final
Ilocos Norte 2nd
DEOLF 39.688 236 2/17/17 2/17/17 2.58% C 0.46 0.12 0.3 - - - 88.00 89.00% Satisfactory
A.L Acharon Construction & Supply 33068 L B SB GE
Off-Carriageway Improvement Paving Shoulders/Construction
along Makar-Kiamba Road K1667+270 to K1667+720 General Santos City 11/15/17 1st & Final DPWH LF 13.150 150 6/4/17 10/31/17 0.00 C 0.473 0.145 0.300 - - - 91.80*91.8%
Very Satisfactory
A.L Acharon Construction & Supply 30872Construction of the Diversion Works and Canal System of
Libertad CIP - Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -
A.L Acharon Construction & Supply 30872 L C SB GE2 Benolho CIS 10/6-10/08 1st NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -
A.L Acharon Construction & Supply 33068 L D SB GB
Construction of Classroom in Areas Experiencing Classroom
Shortage - Construction of Two (2) Storey, Two (2) Classroom
School Building, Bawing Elementary School Brgy. Bawing,
General Santos City
Brgy. Bawing,
General Santos City3/18/2016 -
South Cotabato
2ndLF 4.3497 120 3/26/15 7/24/15 (+)0.95% C 0.473 0.116 0.3 0 0 0 88.90%
88.9%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 10 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.L Acharon Construction & Supply 33068 L B B GEOff-Carriageway Improvement - Paving of Shoulders/
Construction Along Makar-Kiamba Road
K1667+270 -
K1667+720,
General Santos City
3/22/18 1st/FinalSouth Cotabato
2nd DEOLF 11.019 120 6/4/17 10/1/17 0.00% C 0.476 0.133 0.3 - - - 90.90 *90.90% Very Satisfactory
A.L. Dare Construction 11932 L B MA GE
Rehabilitation/ Improvement of Sepung Ilog, Sta. Lucia, Sta.
Ana By Pass Road, Sta. 0+000 to Sta. 1+227, Sta. Ana,
Pampanga
Sta. Ana,
Pampanga11/27/17 1st & Final DPWH LF 25.187 135 2/16/17 6/30/17 0.00 C 0.493 0.133 0.300 - - - 92.60
*92.6%
Very Satisfactory
A.L. Dare Construction 11932 L B MA GE1Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.
Sect.) at Candaba-San Miguel Rd., K0070+290-K0071+184
Candaba,
Pampanga7/29/2013 1st III LF 11.909 139 03/25/13 08/10/13 -1.40 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30
A.L. Salazar Construction, Inc. 3899 L AAA LA GEDrainage Improvement of Commonwealth Avenue Drive to
Zuzuaregui, Brgy. Batasan Hills, Quezon City
Brgy. Batasan Hills,
Quezon City8/25/2015 1st QC 1st DEO LF 17.562 270 4/7/15 1/1/16 22.77% O 0.38 0.24 0.15 0.023 0.045 0.05 88.80% -
A.L. Salazar Construction, Inc. 3899 L AAA LA GE1Const./Widening/Upgrading/Rehab. of Access Rd. to Taytay-
Bantulan Port (Km.210+000-Km.214+211)Taytay, Palawan 3/12/2013 2nd IVB LF 89.312 450 03/28/12 06/20/13 -11.99 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 -
A.L. Salazar Construction, Inc. 3899 L AAA LA GE1Const./Widening/Upgrading/Rehab. of Access Road
(Km.210+000-Km.214+211)Taytay, Palawan 8/3/2012 1st IVB LF 81.362 349 03/28/12 02/19/13 2.82 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -
A.L. Salazar Construction, Inc. 3899 L AAA LA GEDrainage Improvement of Commonwealth Avenue Drive to
Zuzuaregui, Brgy. Batasan Hills, Quezon City
Brgy. Batasan Hills,
Quezon City4/12/2016 2nd
Quezon City 1st
DEOLF 17.5621 270 4/7/15 1/1/16 0 C 0.465 0.133 0.3 0 0 0 89.20%
89.2%
Very Satisfactory
A.L. Salazar Construction, Inc. 3899 L AAA LA GERehabiliation/Improvement of drainage System along C-3
RoadCaloocan City 11/22/2014 1st NCR LF 17.425 209 5/2/14 11/26/14 0.36% O 0.380 0.240 0.150 0.030 0.045 0.033 87.80%
87.80%
Satisfactory
A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 2/24/2010 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -
A.M Oreta & Co ., Inc / Ibc International Builders
Corporation (Joint Venture)JV-07096 L AAA B Kalibo Airport Development Project Kalibo,Aklan 8/22/2017 Final DOTC LF 309.889 450 04/04/10 02/03/17 0.000 C 0.483 0.200 0.300 - - - -
95.00%
Satisfactory
A.M. Ayunan Construction 13983 L AAA SB GBConstruction/Rehabilitation of Brgy Hall Brgy. Langkong,
M'lang, Cotabato11/11/2015 1st Cotabato First DEO LF 0.924 75 8/12/15 11/24/15 (-) 9.80% O 0.363 0.16 0.052 0.03 0 0.016 62.10%
62.1%
Poor
A.M. Ayunan Construction 13983 L AA SB GBConstruction/Rehabilitation of Barangay Hall Barangay
Langkong, M'lang, Cotabato
Barangay
Langkong, M'lang,
Cotabato
3/10/2016 - Cotabato 1st LF 0.924 75 8/12/15 10/26/15 (-)9.80% C 0.496 0.2 0.006 0 0 0 64.53%64.53%
Poor
A.M Oreta & Co ., Inc / Ibc International Builders
Corporation (Joint Venture)JV-07096 L AAA LB Kalibo Airport Development Project Pook, Kalibo, Aklan 6/17/2015 1st DOTC LF 287.056 360 04/04/10 09/24/15 4.92 O 0.381 0.300 0.150 0.020 0.044 0.033 92.80 -
A.M. Oreta / IBC (Joint Venture) JV-11-210 L AAA LB GE2Const. of Drainage System along Iloilo-Capiz Rd. (Old Route)
Nat'l Rd. CPU Sect., Iloilo CityJaro, Iloilo City 8/6/2012 1st VI LF 42.875 240 01/04/12 08/30/12 6.12 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 -
A.M.P. Construction 16574 L B MA GERepair/Maintenance of Flood Control Talavera River Control,
Brgy. Sicsican Matanda, Talavera, Nueva Ecija
Talavera, Nueva
Ecija6/2/2017 1st & Final
Nueva Ecija 1st
DEOLF 1.901 70 12/19/2016 2/26/2017 0.00 C 0.419 0.135 0.300 - - - 85.40
*85.4%
Satisfactory
A.M.P. Construction 16574 L B MA GEConstruction of Flood Control Revetment Wall along Agbalili
RiverAltavas, Aklan 3/15/2016 1st Aklan DEO LF 34.428 244 9/29/15 4/29/16 (-) 4.87% O 0.328 0.3 0.101 0.03 0.045 0.033 83.70%
83.7%
Satisfactory
A.M.P. Construction/ Forthright Construction
Joint VentureJV-16-1612 L A MA GE
Construction/ Maintenance of Flood Mitigation Structures and
Drainage Systems, Rehabilitation/ Improvement of Pampanga
River Control, Brgy. Sapang Buho, Palayan City, Nueva Ecija
Palayan City, Nueva
Ecija3/15/18 2nd/Final
Nueva Ecija 2nd
DEOLF 39.200 161 5/10/17 10/17/17 0.00% C 0.472 0.133 0.3 - - - 90.50 88.46% Satisfactory
A.M.P. Construction/ Forthright Construction
Joint VentureJV-16-933 L A MA GE
Improvement/ Rehabilitation of Revetment along Talavera
River Barangay Basang Hamog, Talavera, Nueva Ecija
Talavera, Nueva
Ecija3/13/18 1st/Final
Nueva Ecija 1st
DEOLF 31.723 240 7/10/17 3/6/18 25.94% C 0.413 0.141 0.3 - - - 85.40 *85.40% Satisfactory
A.P Palacios Construction 29021 L C SB GE1 Rehab./Impvt. of Dikidit-Suguit FTMR 9/8/2009 1st III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -
A.P. Consebido Construction And Trading 33616 L D SB GB
Construction of Two (2) Units Technical-Vocational Livelihood
(TVL) Laboratories/Worshop Roxas National Comprehensive
High School, Roxas, Palawan
Roxas, Palawan 3/13/2017 1st Palawan 1st DEO LF 5.347 140 7/3/2016 11/19/2016 0.01 O 0.451 0.200 0.300 - - - 95.10 -
A.P.B. Construction 17055 L B MA GEConcreting of Ore West Capangdanan Road
Bantay, Ilocos Sur 11/9/17 1st & Final DPWH LF 24.500 175 4/12/17 10/3/17 0.00 C 0.407 0.133 0.300 - - - 84.00*84%
Satisfactory
A.P.B. Construction 17055 L B MA GE
Improvement/Widening of National Roads along Pangasinan-
Nueva Ecija Roa, K0180+417-K0181+745; K0183+129-
K0184+062
Pangasinan-Nueva
Ecija Road8/21/2017 1st & Final
Pangasinan 3rd
DEOLF 46.372 300 4/4/2017 1/28/2018 0.54 C 0.479 0.135 0.300 - - - 91.40
*91.4%
Very Satisfactory
A.P.B. Construction 17055 L B MA GE
Improvement/Upgrading of Naguilian-Bagulin Road Leading
to Tudingan Falls and Kedlap Burial Cave, Sta. 266+980-Sta.
271+279 with Exception, Naguilian-Bagulin, La Union
Naguilian-Bagulin,
La Union3/14/2016 2nd
LA UNION 2ND
DEOLF 41.295 179 5/22/15 11/16/15 0.1117 C 0.261 0.2 0.3 0 0 0 83.36%
83.36%
Satisfactory
A.P.B. Construction 17055 L B MA GE
Construction/Improvement of Access Roads Leading to
Airports, Seaports and Declared Tourism Destinations, Chaya -
Nagchayan leading to Barangays Chaya and Nagchayan,
Mayoyao, Ifugao
Mayoyao, Ifugao 8/27/2016 1st & Final IFUGAO 2ND DEO LF 35.857 386 5/9/15 5/28/16 0.00 C 0.362 0.176 0.3 0 0 0 0.838083.8%
Satisfactory
A.P.B. Construction 17055 L B MA GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide: Magsaysay Ave. (Trinidad Rd.),
K0251+996 to K0251+1024; K0252+255 to K0252+270;
K0252+350 to K0252+444, Baguio City
Baguio City 9/1/2016 1st BAGUIO CITY DEO LF 19.805 177 3/14/16 9/6/16 -0.03 O 0.387 0.3 0.118 0.03 0.04 0.017 0.8920 -
A.P.B. Construction 17055 L B MA GE
Off-Carriageway Improvement along Baguio-Bontoc Road,
K0253+(-586) to K0253+000, K0259+450 to K0259+600,
K0260+500 to K0262+000
La Tridad, Benguet 6/2/2015 1st Benguet 1st DEO LF 18.999 150 2/20/15 7/19/15 (-) 0.02% O 0.333 0.274 0.149 0.03 0.05 0.035 87.10% -
A.P.B. Construction 17055 L B MB GE
Improvement/Upgrading of Naguilian-Bagulin Road Leading
to Tudingan Falls and Kedlap Burial Cave Sta. 266+980 to Sta.
271+279, Naguilian, La Union
Naguilian, La Union 8/30/2015 1st La Union 2nd DEO LF 41.295 179 5/22/15 11/17/15 (+)0.69 O 0.335 0.287 0.15 0.023 0.037 0.05 88.20% -
A.P.B. Construction 17055 L C SB GE1Rehab./Reconst./Upgrading of Damaged Paved National
Road, PMA cut-off Road 2 K0+000-K0+360Baguio City 8/18/2011 1st CAR LF 5.610 102 05/06/11 08/15/11 - O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 11 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.P.O. General Construction 7010 L B MA GE
MFO-1: National Road Network Services - Asset Preservation
of National Roads - Rehabilitation/ Reconstruction/ Upgrading
Tertiary - Reconstruction from Concrete to Concrete - Mt.
Province - Ifugao Road (Kiling-Paracelis Section), K0456+753-
K0457+000, K0459+300-K0460+000
Paracelis, Mountain
Province11/11/17 1st DPWH LF 28.581 250 4/17/17 12/22/17 2.62 O 0.351 0.240 0.150 0.03 0.061 0.05 88.20 -
A.P.O. General Construction 7010 L B MA GB
Construction of 4 Storey 12 Classroom School Building
Senior High School in AringayAringay, La Union 6/6/2017 2nd
La Union 2nd
District Engineering
Office
LF 21.893 255 10/10/2016 6/21/2017 -0.01 O 0.397 0.239 0.138 0.03 0.065 0.033 90.20 -
A.P.O. General Construction 7010 L B MA GE
Road Upgrading (Unpaved to Paved) based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-4 Project Analysis) Junction-Talubin-Barlig-
Natonin-Paracelis-Calaccad Road, K0443+054 - K0446+000
Natonin, Mt.
Province6/3/2017 1st & Final
Cordillera
Administrative
Region, R.O.
LF 97.500 455 3/18/2016 6/15/2017 0.00 C 0.428 0.133 0.300 - - - 86.10*86.1%
Satisfactory
A.P.O. General Construction 7010 L A MA GBConstruction of 4 Storey 12 Classroom School Building
Senior High School, Aringay, La UnionAringay, La Union 3/18/2017 1st La Union 2nd DEO LF 21.481 195 10/10/2016 4/22/2017 -0.04 O 0.285 0.300 0.112 0.03 0.041 0.033 80.10 -
A.P.O. General Construction 7010 L B MA GE
Road Upgrading (Gravel to Paved) along Acop-Kapangan-
Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -
K0287+685, K0289+214 - K0289+473, K0289+549 - K0289+709,
K0290+901 - K0291+000, K0292+016 - K0292+114, K0298+781 -
K0299+514, K0299+531 - K0299+816
Kapangan, Benguet 11/20/2014 1st CAR LF 72.026 267 6/9/14 3/2/15 10.93% O 0.362 0.240 0.150 0.030 0.061 0.050 89.30%89.30%
Very Satisfactory
A.P.O. General Construction 7010 L B MA GE1
Rd. Upgrading (gravel to concrete) along Acop-Kapangan-
Kibungan-Bakun Rd., K0285+444-K0286+840 V.S. (K0285+423-
K0286+836 as per RBIA) & K0345+470-K0348+000 V.S.
(K0345+500-K0348+000 as per RBIA)
Benguet 11/21/2012 1st CAR LF 59.896 237 04/26/12 12/18/12 0.78 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 -
A.P.O. General Construction 7010 L B MA GE
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis)(Intermittent Sections)
along Mountain Province - Ifugao Road (Kiling - Paracelis
Section), K0460+508 to K0460+868, K0467+904 to K0469+000,
K0471+451 to K0472+061, K0473+155 to K0473+582,
K0474+350 to K0474+368, K0477+312 to K0477+341, Paracelis,
Mountain Province
Paracelis, Mountain
Province3/13/2016 2nd Regional Office LF 57.843 248 4/7/15 12/10/15 0.0255 C 0.35 0.186 0.3 0 0 0 87.08%
87.08%
Satisfactory
A.P.O. General Construction 7010 L B MA GE
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) (Intermittent Sections)
along Mt. Province - Ifugao Road (Kiling - Paracelis Section),
K0460+508 to K0460+868, K0467+904 to K0469+000,
K0471+451 to K0472+061, K0473+155 to K0473+582,
K0474+350 to K0474+368, K0477+312 to K0477+341, Paracelis,
Mt. Province
Paracelis, Mt.
Province8/29/2015 1st CAR LF 54.883 237 4/7/15 11/29/15 1.01% O 0.367 0.246 0.15 0.03 0.051 0.05 89.40% -
A.P.O. General Construction 7010 L B MA GE1Rd. Upgrading (Gravel to Paved) Int. Sect., Acop-Kapangan-
Kibungan-Bakun Rd., K0348+000-K0349+000Benguet 8/1/2013 1st CAR LF 23.654 207 02/05/13 08/30/13 0.91 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 -
A.R. & Mark Builders 31673 L C SB GB Const. of Multi-Purpose Building, BUSECO CompoundManolo Fortich,
Bukidnon10/21/2014 1st X LF 7.920 124 7/28/14 11/28/14 -13.35% O 0.304 0.240 0.017 0.010 0.022 0.033 62.60%
62.60%
Poor
A.R. & Mark Builders 31673 L D SB GB1Const. of 1-Storey, 1-CL & 1-Storey, 1-CL Kinder at Maramag
South PS, Pob.
Maramag,
Bukidnon8/8/2013 1st X LF 1.448 187 03/25/13 09/27/13 -2.86 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 -
A.R. Lustre, Jr. Construction 7680 L AAA LA GE
Asphalt Overlay of Puerto Princesa South Road, K000+000 -
K000+420, K001+420 - K002+300 Puerto Princesa City 11/17/17 1st & Final DPWH LF 29.860 105 3/24/17 7/6/17 0.00 C 0.429 0.200 0.300 - - - 92.90*92.9%
Very Satisfactory
A.R. Lustre, Jr. Construction 7680 L AAA LA GE
Asphalt Overlay of Puerto Princesa South Road K0000+000 to
K000+420, K000+420 to K002+300, Puerto Princesa City,
Palawan
K0000+000 to
K000+420,
K000+420 to
K002+300, Puerto
Princesa City,
Palawan
6/5/2017 1st Palwan 3rd LF 29.884 90 3/23/2017 6/20/2017 0.03 O 0.385 0.298 0.150 0.03 0.037 0.033 93.30 -
A.R. Lustre, Jr. Construction 7680 L AAA LA GE
Asphalt Overlay of Puerto Princesa South Road, K0000+000 to
K0000+420, K0000+420 to K0002+300, Puerto Princesa City,
Palawan
Puerto Princesa
City, Palawan8/24/2017 1st Palawan 3rd DEO LF 29.860 105 3/23/2017 7/5/2017 - O 0.489 0.133 0.300 - - - 92.20 -
A.R. Lustre, Jr. Construction 7680 L AAA LA GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide Puerto Princesa South Road,
K0139+214 to K0139+245, K0139+292 to K0139+397,
K0140+033 to K0140+111, K0141+807 to K0141+880,
K0142+000 to K0142+300, Espanola, Palawan
K0139+214 to
K0139+245,
K0139+292 to
K0139+397,
K0140+033 to
K0140+111,
K0141+807 to
K0141+880,
K0142+000 to
K0142+300,
Espanola, Palawan
3/14/2017 1st & Final Palawan 2nd DEO LF 47.859 266 10/7/2016 6/29/2017 0.06 C 0.402 0.200 0.300 - - - 90.20*90.2%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 12 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.R. Lustre, Jr. Construction 7680 L AAA LA GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide, Puerto Princesa South Road,
K0139+214-K0139+245, K0139+292-K0139+397, K0140+033-
K0140+111, K0141+807-K0141+880, K0142+000-K0142+300,
Española, Palawan
K0139+214-
K0139+245,
K0139+292-
K0139+397,
K0140+033-
K0140+111,
K0141+807-
K0141+880,
K0142+000-
K0142+300,
Española, Palawan
11/22/2016 1stPalawan Second
DEOLF 47.859 266 7/10/2016 4/1/2017 0.46 O 0.34 0.3 0.15 0.03 0.05 0.033 0.9030 -
A.R. Lustre, Jr. Construction 7680 L AAA MB GE1Conc. of Puerto Princesa South Rd. (Aborlan Sect.
Km.60+024.80-Km.64+000 w/ exceptions)Aborlan, Palawan 3/15/2013 1st IVB LF 62.614 240 12/14/12 08/10/13 -10.01 O 0.362 0.240 0.150 0.030 0.055 0.033 87.00 -
A.R. Lustre, Jr. Construction 39263 L C 0 GE
Asphalt Overlay along Malvar Road and Puerto Princesa
South Road K0002+1005 - K0002+1784 & K0002+300 -
K0002+567, Puerto Princesa City, Palawan
Puerto Princesa
City, Palawan9/2/2016 1st Palawan 3rd DEO LF 10.092 40 3/17/16 4/25/16 0.00 O 0.437 0.135 0.3 0 0 0 0.8720 -
A.R. Lustre, Jr. Construction 7680 L AAA MB GE1Const. of Taguliat Bridge along PPSR-JCT-Napsan-Apurawan
Rd., K0037+675Puerto Princesa City 8/15/2013 1st IVB LF 18.839 515 05/17/12 10/14/13 -10.34 O 0.373 0.300 0.047 0.030 0.042 0.033 82.50 -
A.R.T. Dwell Lifestyle Store And Eco Builders 38284 L B SB GB
Construction of Multi-Purpose Building, Villa Dolores Subd. Barangay Sto.
Domingo, Angeles
City, Pampanga
9/21/2016 1st & FinalPampanga 3rd
DEOLF 4.652 150 3/18/16 8/14/16 0.00 C 0.395 0.133 0.3 0 0 0 0.8280
82.8%
Satisfactory
A.S. Obquia Construction 19844 L D SB GE
Construction/ Repair/ Rehabilitation/ Improvement of Various
Infrastructure including Local Projects - Concreting of Brgy.
Poblacion Road leading to Sarangani Ricefield and Boongon
Dam, Candijay, Bohol
Candijay, Bohol 11/10/17 1st & Final DPWH LF 9.344 108 3/30/17 7/15/17 2.78 C 0.428 0.161 0.300 - - - 88.90*88.9%
Satisfactory
A.S.S. Construction 31509 L B Design & Build of Site Development Phase 2 - Road Network
Lily Hill Street, Clark
Freeport,
Pampanga
9/27/18 1st & Final DOST LF 6.965 275 7/7/17 4/7/18 0.00 C 0.45 0.19 0.30 - - - 94.04 *94.04% Very Satisfactory
A.S.S. Construction 31509 L B Construction of Academic Building III Phase 2
Lily Hill Street, Clark
Freeport,
Pampanga
09/27/18 1st & Final DOST LF 17.888 230 09/01/17 04/18/18 0.00 C 0.48 0.19 0.30 - - - 96.80 *96.80% Outstanding
A.S.S. Construction 31509 L D MA GB1 Completion of ACA Building II 05/14-15/09 1st DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -
A.S.V. Construction Supply And Services 13490 L C SB GE
Asset Preservation of National Roads Rehab./ Reconst./
Upgrading of Damaged Paved National Roads including
Drainage Based on Pavement Management System/ Highway
Development and Management - 4 (HDM-4) of Jct. Layac Bal.-
Mar. Port Road, K0128+048 - K0128+126, K0128+706 -
K0128+842, Bataan Province
Orion, Bataan 3/16/18 1st/Final Bataan 2nd DEO LF 3.388 48 8/9/17 9/25/17 0% C 0.418 0.2 0.3 - - - 91.80 *91.80% Very Satisfactory
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide along NRJ Cuevas-Bislig Road,
K1378+327 - K1378+443 (RBIA Chainage), K1378+320 -
K1378+450 (Survey), (S00464MN), Trento, Agusan del Sur)
Trento, Agusan del
Sur11/11/2015 1st
Agusan del Sur
2nd DEOLF 25.215 208 6/24/15 1/17/16 (+) 11.11 O 0.383 0.252 0.15 0.03 0.045 0.05 91.00%
91%
Very Satisfactory
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE
Construction/Widening of Adlayan Bridge along Daang
Maharlika (Agusan - Davao Section) K1307+585 - K1307+614.8
San Francisco,
Agusan del Sur8/8/2014 1st XIII LF 36.650 196 2/20/14 9/3/14 -9.08 O 0.400 0.240 0.060 0.030 0.065 0.033 82.80 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1
Replacement of San Pedro Bridge along Daang Maharlika
(Surigao-Agusan Rd.) Brgy. San Pedro
Alegria, Surigao del
Norte11/21/2012 2nd XIII LF 14.945 390 01/13/12 02/06/13 -2.26 O 0.360 0.231 0.127 0.030 0.055 0.033 83.60 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE
Replacement of Lengigon Bridge (Temporary to Permanent)
along Argao - Moalboal Road, Municipality of ArgaoArgao, Cebu 10/24/2014 1st VII LF 12.230 270 2/26/14 11/22/14 -44.15% O 0.400 0.300 0.000 0.030 0.055 0.000 78.50%
78.50%
Unsatisfactory
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1
Reconst. of Timamana Bridge along Daang Maharlika
Highway (Surigao-Agusan Rd.), Brgy. Timamana
Tubod, Surigao del
Norte3/14/2013 1st XIII LF 24.213 496 12/16/11 04/24/13 0.29 O 0.305 0.252 0.150 0.030 0.056 0.050 84.30 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L A MA GE
Construction/ Maintenance of Permanent Bridges along
National Roads Widening of Reyes Bridge (B00851MN) along
Daang Maharlika
Km. 1130+839.50 -
Km. 1130+869.5011/21/2016 1st & Final
Surigao del Norte
1st DEOLF 29.100 325 4/17/2015 3/6/2016 0.00 C 0.478 0.2 0.3 0 0 0 0.9780
97.8%
Outstanding
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1
Rehab./Reconst. of Hubang Bridge along Daang Maharlika
(Agusan-Davao Rd.) Km.1307+369-Km.1307+536
San Francisco,
Agusan del Sur3/9/2013 1st XIII LF 19.141 380 01/27/12 02/10/13 - O 0.338 0.300 0.000 0.030 0.058 0.033 75.90 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1
Replacement of San Pedro Bridge along Daang Maharlika
(Surigao-Agusan Rd.), Brgy. San Pedro
Alegria, Surigao del
Norte3/14/2013 3rd XIII LF 15.781 435 01/13/12 03/23/13 0.42 O 0.355 0.223 0.150 0.030 0.035 0.033 82.60 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028 L A MA GE
Rehabilitation of the Reinforced Concrete Deck Girder (RCDG)
Bridge
Bayabas, Surigao
del Sur3/16/18 1st/Final
Regional Office No.
XIIILF 58.373 427 4/27/16 6/27/17 0.22% C 0.498 0.133 0.3 - - - 93.10 *93.10% Very Satisfactory
A.V.M. Construction and Supplies 114114 NHA Bayside Subdivision Housing Project
Brgy. Poblacion,
Bislig City, Surigao
del Sur
10/24/2014 1st NHA L 19.225 330 10/04/13 03/06/15 5.49 O 0.376 0.300 0.095 0.030 0.023 0.033 85.74 -
A.Y.U Engineering And Construction 25632 L B MA GE
Road Concreting Bato-Kilate Road, Barangay Bato and Kilate,
Toril District, Davao City
Barangay Bato and
Kilate, Toril District,
Davao City
6/15/2016 1stDavao City 2nd
DEOLF 9.799 105 4/14/16 7/27/16 0.27 O 0.362 0.218 0.15 0.03 0.051 0.05 86.10% -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 13 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
A.Y.U Engineering And Construction 0 L 0 0 GB
Construction of Two (2) Storey Six (6) Classroom School
Building at Mintal NCHS-Sto. Niño High School, Sto. Niño
Tugbok District, Davao City
Sto. Niño Tugbok
District, Davao City3/11/2016 1st
Davao City Second
DEOLF 8.0138 150 9/10/15 2/6/16 - C 0.493 0.191 0.3 0 0 0 98.40%
98.4%
OutstandingOutstanding
A.Y.U Engineering And Construction 25632 L B MB GERehabilitation/Reconstruction/Improvement of Quezon
Boulevard, K1509+(-060) to K1509+280, Davao City
K1509+(-060) to
K1509+280, Davao
City
3/17/2016 1st Davao City DEO LF 27.4042 170 5/1/15 10/17/15 - C 0.434 0.2 0.3 0 0 0 93.40%93.4%
Very Satisfactory
A.Y.U Engineering And Construction 25632 L B MA GE
Concreting of Sitio Mohon - Sitio Kauswagan, Brgy. Langub
(Phase 2) FMR, Brgy. Langub, Talomo District, Davao CityTalomo District,
Davao City11/17/2016 1st
Davao City First
DEOLF 9.850 90 9/19/2016 12/17/2016 0.00 O 0.44 0.133 0.3 0 0 0 0.8730 -
A5R Dynamic Const. Corp. ARN Builders Inc.
(JV)L AA Abra De Ilog Port Expansion Project
Brgy. Matabang
Abra De Ilog
Occidental Mindoro
04/18/18 1st PPA LF 76.000 360 10/02/17 09/27/18 1.07 O 0.40 0.30 0.15 0.03 0.07 0.00 95.00 - On - Going
Aarcon Builders 28336 L A MA GE
MFO 2-Flood Management Services, Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems, Construction of Revetment along Maliksi River,
Phase II, Bacoor, Cavite, 2nd Legislative District
Bacoor, Cavite 11/29/17 1st & Final DPWH LF 37.227 177 5/4/17 10/27/17 0.00 C 0.400 0.133 0.300 - - - 83.30*83.3%
Satisfactory
Aarcon Builders 28336 L A MA GE
MFO 2 - Flood Management Services, Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems, Construction of Revetment along Maliksi River,
Phase II, Bacoor, Cavite 2nd LD
Bacoor, Cavite 8/18/2017 1st Cavite 2nd DEO LF 37.228 177 5/4/2017 10/27/2017 0.26 O 0.388 0.240 0.150 0.03 0.07 0.05 92.80 -
Aarcon Builders 28336 L A MA GE
Improvement of Parañaque River Mouth Sheet Piling (Phase
III), Sta. 0+186 to Sta. 0+630 with Exception North Side,
Parañaque City, Manila
Parañaque City,
Manila9/15/2016 1st
METRO MANILA
2ND DE0LF 45.262 210 3/15/16 10/10/16 -0.05 O 0.345 0.3 0.095 0.03 0.04 0.033 0.8430 -
AB Aponesto Construction, Parts & Supply 22998 L A MA GE
Construction of River Bank Protection, Brgy. Naboc,
Monkayo, Compostela Valley
Brgy. Naboc,
Monkayo,
Compostela Valley
3/17/2017 1stCompostela Valley
DEOLF 96.500 324 8/24/2015 7/12/2016 0.00 O 0.488 0.133 0.300 - - - 92.10 -
AB Aponesto Construction, Parts & Supply 22998Conc. of Lublub-Bolilac-Salad Road, Km.277+707.50-
Km.278+7119/5/2010 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -
AB Aponesto Construction, Parts & Supply /
FFJJ Construction Joint VentureJV-15-1869 L A SB GB
Construction of One (1) Unit Two (2) Storey Six (6) Classroom
Building with Toilet at Mangayon National High School,
Compostela
Compostela 3/18/2017 1stCompostela Valley
DEOLF 8.880 200 8/24/2016 3/11/2017 0.00 O 0.482 0.135 0.300 - - - 91.70 -
Abada Construction And Supply 37005 L A MD GB
Provision of TechVoc Workshop Building- Patin-ay National
High SchoolProsperidad,
Agusan del Sur3/13/2017 1st & Final
Agusan del Sur 1st
DEOLF 2.596 90 10/17/2016 1/14/2017 0.00 C 0.462 0.133 0.300 - - - 89.50
*89.5%
Very Satisfactory
Abada Construction And Supply 37005 L D SB GBConstruction of One (1) Storey Six (6) CL with Toilet Attached
@ Lingayao National High School
Las Nieves,
Agusan del Norte11/24/2016 1st Butuan City DEO LF 5.813 170 9/7/2016 2/23/2017 (+)15.75 O 0.383 0.3 0.15 0.03 0.041 0.05 0.9540 -
Abe General Contractor 33982 L D SB GEConcreting of Santor - Andarayan Barangay Road, Delfin,
Albano, IsabelaAlbano, Isabela 8/18/2017 1st & Final Isabela 1st DEO LF 9.404 110 3/20/2017 7/7/2017 0.00 C 0.412 0.134 0.300 - - - 84.60
*84.6%
Satisfactory
Abulug Construction Company, Inc. 5593 L B MA GE1 Const. of Colony Road 11/13/2008 1st II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -
Abulug Developers And Builders Co., Inc.
(Formerly: F. Vargas Construction)2366 L AAA LB GE1
Reblocking along Manila North Road (Fugu Bdry.-Bangag
Section)5/21/2009 1st II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -
Abulug Developers And Builders Co., Inc.
(Formerly: F. Vargas Construction)2366 L AA MB GE
Construction of Flood Control System (Gabion with Steel
Sheet Piles), Dugayung, Amulung Cagayan
Dugayung,
Amulung Cagayan3/8/2016 1st Cagayan 3rd LF 39.1985 300 4/28/15 2/21/16 - C 0.417 0.133 0.3 0 0 0 85.00%
85%
Satisfactory
AC Rivero Development Corporation (Formerly:
AC Rivero Construction)5122 L A MB GE
Const./Imprv't of Access Road to Sabsaban Falls & Eco Park Aribungos,
Brooke's Point,
Palawan
11/10/2015 1st Palawan 2nd Deo LF 31.345 172 6/1/15 11/19/15 0 O 0.308 0.3 0.15 0.006 0.035 0.033 83.20%83.2%
Satisfactory
AC Rivero Development Corporation (Formerly:
AC Rivero Construction)5122 L A MB GE
Const. of Bridge at Dodiongan Box Culvert along Sta.
Felomina-Bonbon-Digkilaan-Rogongon RoadIligan City 10/29/2014 1st X LF 24.567 295 1/30/14 11/20/14 7.27% O 0.339 0.278 0.150 0.010 0.051 0.050 87.80%
87.80%
Satisfactory
Acamada Builder's & Construction Supply 39355 L C SB GB
Construction/ Rehabilitation of Multi-Purpose Buildings of
Cabatuan Iloilo 3rd LD, Brgy. Jelicuon, Montinola, Cabatuan,
Iloilo
Montinola,
Cabatuan, Iloilo6/4/2017 1st & Final
Iloilo 2nd District
Engineering OfficeLF 3.955 125 9/21/2016 1/23/2017 0.00 C 0.478 0.201 0.300 - - - 97.90
*97.9%
Outstanding
Accuracy Builders Enterprise 27507 L B MA GE Rehabilitation of Banaue Hotel Roofing Banaue, Ifugao 1/13/2014 1st TIEZA LF 19.880 180 06/19/13 12/18/13 -9.81 S 0.304 0.300 0.052 0.150 0.008 0.033 71.14 -
ACJ Construction Resources 10635 L B MA GE1Rd. Upgrading (Gravel to Conc.) Nat'l Secondary Rd., K1657+(-
247)-K1659+824 along Paco-Roxas-Arakan Valley Rd.Arakan, Cotabato 8/10/2012 1st XII LF 46.844 384 08/11/11 08/29/12 0.90 O 0.354 0.244 0.150 0.030 0.051 0.050 87.90 -
ACJ Construction Resources 10635 L B MA GE1
Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l
Secondary Rd., Km.1628+584-Km.1630+803 along Kidapawan-
Magpet-Pangao-an Rd.
Magpet, Cotabato 8/17/2011 1st XII LF 24.178 180 04/06/11 10/03/11 -34.26 O 0.342 0.300 0.000 0.030 0.045 0.033 75.00 -
ACJ Construction Resources 10635 L B MA GE1Concreting of Poblacion Magpet-Nowa Road (Nowa Basak
Sect.) 3/10/2009 1st XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -
ACJ Construction Resources 10635 L B MA GEConcreting/Rehabilitation of Takepan -Saranay Farm to
Market Road, Takepan, Pikit, Cotabato
Takepan, Pikit,
Cotabato6/12/2016 1st & Final
COTABATO 2ND
DEOLF 3.980 51 7/31/15 9/19/15 0.00 C 0.45 0.133 0.3 0 0 0 88.30%
88.3%
Satisfactory
ACJ Construction Resources 10635 L B MB GE1Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section
(Km. 1648+300-Km.1649+385.63)9/5/2009 1st XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -
Acme Builders Corporation 6442 L A MA GEImprovement/Widening of Daang Maharlika Road, K0897+000
to K0897+820, K0903+-(077) to K0903+133 Tacloban City 4/11/2018 1st/Final Tacloban City DEO LF 23.316 166 7/10/2017 12/22/2017 0.00 C 0.476 0.148 0.300 - - - 92.40 *92.40% Very Satisfactory
Acme Builders Corporation 6442 L A MA GE
Construction of Slope Protection (Retaining Wall) along
Tigbao Sta. Fe San Miguel Road (S00033LT), K0905+586 to
K0905+655, Tacloban City
- 4/3/2017 1st & Final Tacloban City DEO LF 2.793 90 7/28/2016 10/25/2016 (+)22% C 0.396 0.200 0.300 - - - 89.60*89.6%
Very Satisfactory
Acme Builders Corporation 6442 L A MA GE1Rd. Upgrading of Tigbao-Sta. Fe-San Miguel Rd., K0910+000-
K0911+500 & K0913+000-K0913+900Tacloban City 8/22/2013 1st VIII LF 55.416 270 02/27/13 11/23/13 2.49 O 0.383 0.240 0.150 0.012 0.042 0.050 87.70 -
Acme Builders Corporation 6442 L B MA GE1 Construction of Bagacay Bridge 3/2/2009 1st VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 14 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Acme Builders Corporation 6442 L A MA GE1Rehab./Strengthening of Rosales Bridge along Daang
Maharlika (SM) (San Isidro-San Juanico Bridge)
Calbayog City,
Samar8/14/2013 1st VIII LF 25.251 165 02/06/13 08/16/13 3.00 O 0.393 0.242 0.150 0.030 0.060 0.033 90.80 -
Acme Builders Corporation 6442 L A MB GE
Road Upgrading along Tigbao-Sta. Fe-San Miguel Road K0913+940-
K0914+764
(S00030LT),
K0907+455-
K097+638
(S00033LT),
Tacloban City
4/3/2017 1st & Final Tacloban City DEO LF 41.625 179 7/28/2016 1/22/2017 (+)10% C 0.490 0.133 0.300 - - - 92.30*92.3%
Very Satisfactory
Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of Damaged Pavement,
Tacloban Baybay South Rd.6/17/2010 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -
Acme Builders Corporation / B. Vicencio
ConstructionJV-07-066 L A MB GE1
Const. of Palo East By Pass Road (Const. of Bernard Reed II
Bridge)8/31/2009 3rd VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -
Acme Builders Corporation / MWJ Construction
(JV)JV-08-243 L A MB GE1
Const. of Albuera-Burauen Road including Bridges, Burauen
Sect.9/2/2009 1st VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -
Acme Builders Corporation/ B. Vicencio
Construction Joint VentureJV-15-1423 L AA LA GE
Road Widening Including Drainage along Daang Maharlika
(SM), San Isidro-San Juanico Bridge, K0691+(-570) to
K0691+000, K0694+000 to K0694+192, K0694+300 to
K0695+020, K0704+000 to K0705+000, K0706+000 to
K0707+000 and K0710+(565) to K0711+101
Calbayog, Samar 11/14/17 2nd & Final DPWH LF 138.704 359 6/16/16 6/9/17 2.95 C 0.453 0.132 0.300 - - - 88.50*89.89%
Very Satisfactory
Adad Engineering Services And Supply 25477 L C SB GE
Rehabilitation/ Improvement of Calauag Seawall Calauag,
Quezon Calauag, Quezon 6/3/2017 1st & Final Quezon 4th DEO LF 9.552 60 11/21/2016 1/19/2017 0.00 C 0.400 0.200 0.300 - - - 90.00*90%
Very Satisfactory
ADB Dynamic Builders & Supply 33359 L B MA GE
Local Infrastructure Program, Concrete Paving of Road
Shoulder, Rawis (Junction)-Catubig Road, Dango-Oleras
Section, K0798+000-K0798+200, Northern Samar
Northern Samar 3/16/2016 1stNorthern Samar
2ndLF 3.7339 30 2/25/15 3/26/15 0 C 0.459 0.133 0.3 0 0 0 89.20%
89.2%
Very Satisfactory
ADB Dynamic Builders & Supply 33359 L B SB GERepair/Maintenance of Cawayan Revetment II, Brgy. Cawayan,
Catarman, Northern Samar
Catarman, Northern
Samar3/15/2016 1st
Northern Samar
1stLF 3.8965 108 11/3/15 1/31/16 0 C 0.45 0.133 0.3 0 0 0 88.30%
88.3%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1Rehab./Reconst. of Damaged Paved National Roads Gingoog-
Calveria-Villanueva Road9/10/2009 1st X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1
Rehab./Reconst. of Damaged Paved National Rd. along
Butuan City-CDO-Iligan Rd.,(Agusan-Misamis Oriental
Sect.)Libertad-Bancasi Sect.
9/16/2009 1st XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GB1Const./Completion/Continuation of Unfinished Bridge and
Approaches, Brgy. Libertad9/16/2009 1st XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1 Concreting of NRJ-Bahbah-Talacogon Rd. 9/13/2009 1st XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GEConstruction of Agusan - Bukidnon Road, Sta. 1262+260 - Sta.
1265+120
Buenavista, Agusan
del Norte8/5/2014 1st XIII LF 40.140 209 2/4/14 9/1/14 0.51 O 0.360 0.264 0.150 0.030 0.037 0.050 89.10 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE
Rehab./Reconstruction/Replacement/Retrofitting of
Magsaysay Bridge along Butuan - Cagayan de Oro - Iligan
(Agusan - Misamis Oriental)
Butuan City 8/15/2014 1st XIII LF 36.843 234 2/14/14 10/5/14 12.89 O 0.384 0.234 0.150 0.030 0.047 0.050 89.50 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GEConst./Improvement of Road to Support River Rhine Cruise
leading to Banza Ruins, Barangay Banza
Brangay Banza,
Butuan City8/14/2014 1st XIII LF 26.706 148 4/25/14 9/19/14 0.58 O 0.332 0.254 0.150 0.030 0.070 0.050 88.60 -
Adfil Corporation (Formerly: Adfil Construction) 14437 Rehab. of Magsaysay Bridge along Iligan City 9/9/2010 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -
Adfil Corporation (Formerly: Adfil Construction) 14437Repair/Maintenance with Asphalt Overlay of Tabon-Tabon Slip
along Agusan- Davao Road6/17/2010 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LB GEImprovement of Taguibo Riverbank Protection Sta. 0+000 to
Sta.0+200Butuan City 3/22/18 1st/Final Butuan City DEO LF 24.125 155 7/3/17 12/4/17 0.00% C 0.499 0.143 0.3 - - - 94.20 *94.20% Very Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LB GE
Improvement/Widening of National Roads, Daang Maharlika
(Agusan-Davao Section) K1313+077 to K1314+401, K1314+625
to K1314+830, K1315+052 to K1317+523, K1319+960 to
K1320+444, K1320+665 to K1321+532
San Isidro - Pasta
Rosario, Agusan
del Sur
3/20/18 1st/FinalRegional Office No.
XIIILF 193.207 420 5/4/16 6/27/17 0% C 0.465 0.135 0.3 - - - 90.00 *90.00% Very Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GERoad Upgrading (Gravel to Paved) of Butuan City-Pianing-
Tandag Road, K1237+055 - K1240+040, with exceptionsButuan City 10/30/2014 1st XIII LF 127.287 270 5/15/14 2/8/15 0.02% O 0.346 0.240 0.150 0.024 0.056 0.050 86.60%
86.60%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Widening/Conc. of Add'l. Lane Both Directions along Butuan
City-Cagayan de Oro-Iligan Rd., K1249+461-K1253+310.50
Buenavista, Agusan
del Norte8/6/2013 1st XIII LF 86.661 240 03/25/13 11/19/13 14.58 O 0.390 0.238 0.150 0.030 0.035 0.050 89.30 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GEConstruction of Agusan-Bukidnon Road, Sta. 1262+260 - Sta.
1265+120
Buenavista, Agusan
del Norte10/21/2014 1st XIII LF 40.140 271 2/4/14 11/1/14 0.46% O 0.387 0.182 0.150 0.024 0.065 0.050 85.80%
85.80%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GERehab./Reconst./Replacement/Retrofitting of Salvacion Bridge
along NRJ Cuevas - Bislig Road, K1374+670 - K1374+731
Trento, Agusan del
Sur8/8/2014 1st XIII LF 36.656 196 2/18/14 9/2/14 10.85 O 0.400 0.200 0.150 0.030 0.042 0.050 87.20 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE
Reconstruction/Replacement/Completion of Minusong Bridge
along Butuan-Cagayan de Oro-Iligan Road (Agusan--Misamis
Oriental), Km1269+217
Agusan del Norte 10/21/2014 1st XIII LF 34.627 270 2/4/14 10/30/14 0.05% O 0.343 0.286 0.150 0.030 0.065 0.050 92.40%92.40%
Very Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika Butuan City 8/23/2013 2nd XIII LF 19.207 219 1/30/13 09/05/13 1.87 O 0.397 0.240 0.150 0.018 0.040 0.050 89.50 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Widening of Permanent Bridges to more than 2 Lanes, Wawa
Bridge (B00896MN)along Daang Maharlika (Agusan-Davao
Section)
Brgy. Wawa,
Sibagat, Agusan del
Sur
11/23/2016 1st & FinalRegional Office No.
XIIILF 219.820 400 8/26/2015 9/28/2016 (+)2.56% C 0.489 0.2 0.3 0 0 0 0.9890
98.9%
Outstanding
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 15 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Completion of East-West Lateral Road Connecting Agusan
del Sur/Agusan del Norte to Bukidnon, Simbalan-Dulag
Section
Agusan del Norte
1st LD11/11/17 1st DPWH LF 76.093 270 4/3/17 12/28/17 0.01 O 0.383 0.300 0.150 0.03 0.055 0.033 95.10 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Widening of Minalum Bridge (B00817MN) Along dAang
Maharlika (Surigao-Agusan Section) (Phase II) Butuan City 11/11/17 1st & Final DPWH LF 11.972 96 4/3/17 7/7/17 0.00 C 0.488 0.134 0.300 - - - 92.20*92.2%
Very Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Construction of By-Passes/ Diversion Road, Including ROW,
NRJ Daang Maharlika, Taguibo-Masao Port, (Pagatpatan-
Lumbocan-Masao Section)
Agusan del Norte 6/27/2017 1stRegional Office No.
XIIILF 125.444 409 9/8/2016 10/21/2017 0.09 O 0.394 0.300 0.150 0.03 0.07 0.05 99.40 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Widening of Daang Maharlika (Agusan- Davao Section K1304, K130+(-
4040 to K1307 +
471, K1309+
138.10 to
K1312+810, San
Francisco, Agusan
del Sur
3/15/2017 2nd & FinalRegional Office No.
XIIILF 169.798 390 5/20/2015 6/12/2016 0.00 C 0.478 0.133 0.300 - - - 91.10
*87.56%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Widening of Permanent Bridges to more than 2 lanes, Wawa
Bridge (B00896MN) along Daang Maharlika (Agusan-Davao
Road Section), Brgy. Wawa, Sibagat, Agusan del Sur
Brgy. Wawa,
Sibagat, Agusan del
Sur
11/9/2015 1st Regional Office LF 207.695 340 8/26/15 7/30/16 (+) 19.17 O 0.317 0.24 0.15 0.03 0.055 0.033 82.50%82.5%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Widening of Daang Maharlika (Agusan-Davao Section),
K1304+(-404) - K1307-471, K1309+138.1 - K1312+810, San
Francisco, Agusan del Sur
San Francisco,
Agusan del Sur11/11/2015 1st Regional Office LF 169.799 300 5/20/15 3/14/16 (+) 29.68 O 0.257 0.3 0.15 0.03 0.065 0.033 83.50%
83.5%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE
Construction of Road Slip Along Butuan City-Malaybalay
Road, Brgy. Bit-os, Butuan CityBrgy. Bit-os, Butuan
City9/2/2016 1st & Final Butuan City DEO LF 18.330 160 3/10/16 8/16/16 0.00 C 0.481 0.138 0.3 0 0 0 0.9190
91.9%
Very Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE2 Rehab. of Salvacion (Crossing Luna Flood Control)Esperanza, Agusan
del Sur8/20/2012 1st XIII LF 16.733 285 03/07/12 12/17/12 47.69 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1
Rehab./Reconst./Upgrading of Butuan City-Cagayan de Oro-
Iligan City Rd. a)K1494+049-K1495+240; b)K1499+692-
K1499+712; c)K1500+678-K1500+902; d)K1501+905-
K1507+000; e)K1508+000-K1508+919
Misamis Oriental 3/12/2013 2nd X LF 48.167 285 06/13/12 03/24/13 3.06 O 0.293 0.271 0.150 0.010 0.050 0.050 82.40 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds.,
Butuan City-Cagayan de Oro City-Iligan City Rd.: a.)K1494+049-
K1495+240; b.)K1499+692-K1499+712; c.)k1500+678-
K1500+902; d.)K1501+905-K1507+000; e.)K1508+000-
K1508+919
Misamis Oriental 11/23/2012 1st X LF 44.537 255 06/13/12 02/23/13 7.85 O 0.332 0.300 0.150 0.030 0.040 0.050 90.20 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1Conc. of Agusan-Malaybalay Road, Km. 1283+183.50-
Km.1284+780
Esperanza, Agusan
del Sur3/31/2012 1st XIII LF 39.495 300 08/26/11 06/20/12 0.49 O 0.351 0.300 0.150 0.030 0.040 0.050 92.10 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Const./Impv't of Rd. to Support River Rhine Cruise, Banza
RuinsButuan City 3/21/2013 1st XIII LF 29.509 155 01/30/13 07/03/13 2.48 O 0.313 0.300 0.150 0.024 0.060 0.033 88.00 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1
Widening/Conc. of Add'l Lane along Daang Maharlika
(Agusan-Surigao Rd.) Cabadbaran City Sect., Sta.1213+540-
Sta.1215+520
Cabadbaran,
Agusan del Norte3/11/2013 1st XIII LF 29.059 142 02/08/13 06/29/13 24.99 O 0.365 0.300 0.150 0.030 0.050 0.033 92.80 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1
Rehab./Reconst./Strengthening of Minusong Bridge along
Butuan-Cagayan de Oro-Iligan (Agusan Misamis Oriental)
Km.1269+217, Aclan, Nasipit
Agusan del Norte 8/6/2012 2nd XIII LF 28.848 270 01/12/12 10/22/12 3.53 O 0.383 0.246 0.150 0.030 0.045 0.033 88.70 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Widening of Daang Maharlika (Agusan-Usrigao Rd.) Pob.,
Cabadbaran Sect.Agusan del Norte 8/6/2012 2nd XIII LF 27.390 255 01/12/12 09/22/12 1.10 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Widening of Butuan-Cagayan de Oro-Iligan Rd. (Agusan-
Misamis Oriental Sect.) Pob., Buenavista Sect.Agusan del Norte 8/6/2012 1st XIII LF 24.129 255 01/12/12 09/22/12 0.77 O 0.336 0.296 0.150 0.030 0.055 0.033 90.00 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Rehab./Reconst./Strengthening of Minusuang Bridge along
Daang Maharlika (Surigao-Agusan Rd.) Km.1206+561
Tubay, Agusan del
Norte8/7/2012 2nd XIII LF 23.512 270 01/11/12 10/22/12 0.80 O 0.326 0.240 0.150 0.030 0.055 0.050 85.10 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1
Rehab./Reconst./Strengthening of Maraput Bridge along
Daang Maharlika (Surigao-Agusan Rd.) Km.1207+192, Brgy.
Victory
Tubay, Agusan del
Norte8/7/2012 2nd XIII LF 23.512 285 01/12/12 10/22/12 1.45 O 0.325 0.240 0.150 0.030 0.055 0.050 85.00 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika Butuan City 3/21/2013 1st XIII LF 18.426 171 01/30/13 07/19/13 11.89 O 0.390 0.300 0.150 0.030 0.054 0.033 95.70 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Completion of La Union Bridge along Pandanon-Magallanes
Rd.
Cabadbaran,
Agusan del Norte3/11/2013 1st XIII LF 15.889 150 01/23/13 06/21/13 37.30 O 0.312 0.300 0.150 0.020 0.047 0.033 86.20 -
Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Completion of Maraput Bridge along Daang Maharlika
(Surigao-Agusan Rd.), Sta.1207+192
Tubay, Agusan del
Norte3/11/2013 1st XIII LF 9.115 120 12/26/12 04/24/13 21.54 O 0.348 0.300 0.150 0.030 0.037 0.033 89.80 -
Adfil Corporation/Ramises Construction (Joint
Venture)JV-16-785 L AAA LB GE
Construction of Lower Agusan River Bank Protection Butuan City, Agusan
del Norte 1st LD11/11/17 1st & Final DPWH LF 46.438 159 4/3/17 9/8/17 17.77 C 0.500 0.133 0.300 - - - 93.30
*93.3%
Very Satisfactory
Adfil Corporation/JQG Builders Joint Venture JV-15-1822 L AAA LA GE
Construction of By-Passes/ Diversion Roads, Including ROW
NRJ Daang Maharlika, Taguibo-Masao Port, (Banza-Muag
Section)
Butuan City, Agusan
del Norte6/27/2017 1st
Regional Office No.
XIIILF 144.680 428 9/29/2016 11/30/2017 -0.01 O 0.347 0.300 0.141 0.03 0.07 0.033 92.10 -
Adfil Corporation/Ramises Construction (Joint
Venture)JV-14-491 L AAA MB GE
Upgrading of NRJ Butuan Cuty - Mayor Democrito D. Plaza II
Ave. Road Leading to Mt. Mayapay (Delta Discovery Park),
Sitio Matin-ao, Bonbon, Butuan City
Sitio Matin-ao,
Bonbon, Butuan
City
3/15/2016 1st Butuan City DEO LF 36.833 317 3/3/15 1/13/16 0.0074 C 0.485 0.133 0.3 0 0 0 91.80%91.8%
Very Satisfactory
Adige Sta. Clara (JV) JV-06-032 L AAA LB GE1DPWH Component Project under the Help for Catubig
Agricultural Advancement Proj.5/30/2009 5th VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 16 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Adige Sta. Clara (JV) JV-06-032 FA/LF AAA LB GE1DPWH Component Project under the HELP for Catubig
Agricultural Project (HCAAP)8/25/2008 3rd VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -
Adimre Construction 25534 L B MA Region III-San Fernando, Pampanga LTFRB Regional OfficeSan Fernando,
Pampanga7/5/18 1st and Final DOTr LF 2.381 120 1/25/18 5/24/18 0.00 C 0.50 0.20 0.30 99.50 *99.50% Outstanding
Adimre Construction 25534 L B MA Puerto Princesa Airport Development Project
Puerto Princesa,
Palawan, Region IV-
B
3/9/2017 3rd & Final DOTC L 65.90 460 10/07/2015 11/30/2016 0.00 C 0.497 0.200 0.300 - - - 99.71
Adimre Construction 25534 B MA Puerto Princesa Airport Development Project
Puerto Princesa,
Palawan/ Region
4B
3/29/2016 1st DOTC LF 64.553 420 10/07/15 11/29/16 4.24 O 0.353 0.300 0.150 0.020 0.039 0.050 91.23 -
Adimre Construction 25534 L B MA Puerto Princesa Airport Development Project
Puerto Princesa,
Palawan/ Region
4B
9/20/2016 2nd DOTC LF 64.553 420 10/07/15 11/30/16 -8.79 O 0.396 0.300 0.062 0.020 0.039 0.033 85.05 -
Adimre Construction 25534 L B MA Taytay Airport Development Project Taytay, Palawan 07/22/15 1st DOTC LF 10.794 154 02/27/15 09/01/15 -11.75 O 0.390 0.300 0.033 0.030 0.044 0.050 84.70 -
Adimre Construction 25534 L B MA GB1 Const. of Three Storey Six CL Sch. Bldg. Tibagan NHS Bustos, Bulacan 8/14/2013 1st III LF 7.027 180 04/02/13 09/28/13 3.82 O 0.326 0.240 0.150 0.030 0.047 0.033 82.60 -
Adimre Construction 25534 L B MA GB-1 Marinduque Airport Development Project Gasan, Marinduque 8/7/2015 1st DOTC LF 6.293 120 07/05/15 11/01/15 27.87 O 0.384 0.300 0.150 0.015 0.035 0.050 93.40 -
Adimre Construction 25534 L B SB GE2Const. of Drainage Canal along Pulilan-Calumpit Rd., Pulilan
Section Km. 46+000-Km. 47+200Pulilan, Bulacan 8/2/2012 1st III LF 11.886 170 05/08/12 10/24/12 1.71 O 0.376 0.283 0.150 0.022 0.060 0.050 94.10 -
Adimre Construction 25534 L B SB GE-5 Malolos Port Development Project
Brgy. Panasahan &
Brgy. Namayan,
Malolos, Bulacan
8/19/2014 1st DOTC LF 9.625 254 03/12/14 11/20/14 29.72 O 0.397 0.300 0.150 0.010 0.009 0.050 91.56 -
Adimre Construction 25534 L B SB GE-5 Meycauayan Port Development ProjectMeycauayan,
Bulacan7/9/2014 1st DOTC LF 8.300 150 03/12/14 08/09/14 0.68 O 0.385 0.300 0.150 0.020 0.035 0.033 92.30 -
Adimre Construction 25534 L B SB GE-5 Obando Port Development Project
Brgy. Paliwas &
Bargy. Binuangan,
Obando, Bulacan
8/18/2014 1st DOTC LF 8.109 194 03/13/14 10/22/14 7.73 O 0.378 0.300 0.150 0.010 0.016 0.033 88.65 -
Adimre Construction 25534 L B SB GE-5 Balagtas Port Development Project Balagtas, Bulacan 7/10/2014 1st DOTC LF 7.802 180 03/13/14 09/09/14 0.61 O 0.385 0.300 0.150 0.020 0.040 0.033 92.80 -
Adimre Construction 25534 L B Lawigan Port Development Project
Brgy. Lawigan,
Catarman Camigiun
/Region X
9/14/2017 1st DOTC LF 8.399.916 150 05/04/15 10/24/17 1 C 0.399 0.300 0.150 0.010 0.023 0.050 93.20 -
ADP Construction & Supply 3466 L A Const. of Sta. Barbara Catching DAM and Canal Struc. Legares, Iloilo 4/5/2014 1st NIA LF 16.962 150 04/17/13 04/30/14 0.00 O 0.327 0.245 0.150 0.018 0.032 0.050 82.20 -
ADP Construction & Supply 3466 L GE2 Const. of Various CIP's Package 1 - Badbaran CIP Badbaran CIP,
Dumarao, Capiz 4/13/2013 1st NIA LF 24.770 210 02/13/13 09/22/13 26.15 O 0.348 0.249 0.150 0.000 0.027 0.050 82.40 -
ADP Construction & Supply 3466 L A MB GE
Reconstruction/Improvement of Dumalag Municipal Road,
Brgy. Poblacion, Dumalag, Capiz (Section I)
Brgy. Poblacion,
Dumalag, Capiz
(Section I)
11/13/2015 1st Capiz 2nd LF 35.960 224 7/2/15 2/11/16 14.45% O 0.366 0.232 0.15 0.03 0.07 0.05 89.80%89.8%
Very Satisfactory
Adroit Construction 11169 L A - GBConstruction of a 4STY 8CL Sschool Building, Bonfal National
High School Bayombong, Nueva Vizcaya
Bayombong, Nueva
Vizcaya3/15/2017 1st Nueva Vizcaya 1st LF 15.914 331 6/28/2016 5/24/2017 0.00 O 0.390 0.240 0.150 0.03 0.051 0.033 89.40 -
Adroit Construction 11169 L B MA GB
Construction of 4 Sty. 8 CL. School Building, Bonfal National
High School Bayombong, Nueva VizcayaBayombong, Nueva
Vizcaya11/8/17 2nd & Final DPWH LF 0.043 331 6/28/16 5/24/17 0.00 C 0.466 0.135 0.300 - - - 90.10
*89.61%
Very Satisfactory
Adroit Construction 11169 L B MA GE
Off-Carriageway Improvement Including Drainage,
K0139+382.50 to K0139+993.50, Nueva Ecija-Pangasinan
Road
Nueva Ecija-
Pangasinan Road11/22/17 1st & Final DPWH LF 4.687 60 7/3/17 8/31/17 0.00 C 0.386 0.200 0.300 - - - 88.60
*88.6%
Satisfactory
Adroit Construction 11169 L B MA GB
Construction of a 4STY 8CL School Building, Bonfal National
High School Boyombong, Nueva VizcayaBoyombong, Nueva
Vizcaya8/24/2017 2nd & Final
Nueva Vizcaya 1st
DEOLF 15.914 331 6/28/2016 5/24/2017 0.00 C 0.471 0.134 0.300 - - - 90.50
*89.79335%
Very Satisfactory
Adroit Construction 11169 L B MA GB
Construction of a 2STY 8CL School Building Ganduz National
High School, Pantabangan, Nueva Ecija, 2nd LDPantabangan,
Nueva Ecija8/21/2017 1st & Final
Nueva Ecija 1st
DEOLF 11.565 150 11/22/2016 4/20/2017 0.00 C 0.493 0.132 0.300 - - - 92.50
*92.5%
Very Satisfactory
Adroit Construction 11169 L B Building Improvement / RenovationWangal, La
Trinidad, Benguet11/09/18 1st NIA LF 28.830 210 5/29/18 6/7/18 10.21 O 0.39 0.24 0.15 0.02 0.04 0.05 89.52 - On - Going
Advance Foundation Const. System Corp. /
Abulug Developer Builders Const. Inc. (JV)JV-09-289 L AAA LB GE1
Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao
RoadRizal, Cagayan 3/30/2011 1st II LF 112.029 240 09/13/10 05/10/11 -63.60 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -
Advance Tech Construction and Trading
Corporation35288 L B SB GE-5 Cabucgayan Seaport Construction
Sitio Lakay, Brgy.
Bunga,
Cabuacgayan,
Biliran
8/11/2015 1st DOTC LF 8.606 240 04/29/15 12/24/15 20.87 O 0.400 0.300 0.150 0.015 0.029 0.050 94.42 -
Advance Tech Construction and Trading
Corporation35288 L B SB Antique Airport Port Development
Brgy. Funda-Dalipe,
San Jose, Antique/
Region VI
3/23/2017 1st & Final DOTC L 7.47 180 09/21/2016 03/19/2017 (-) 1.37 C 0.438 0.200 0.300 - - - 93.75*93.75%
V. Satisfactory
Advance Tech Construction and Trading
Corporation35288 L B SB Miag-ao Feeder Port Development
Miag-ao, Iloilo/
Region VI2/16/2017 2nd & Final DOTC L 7.16 120 09/21/2015 01/18/2017 0.00 O 0.500 0.200 0.300 - - - 100.00 -
Advance Tech Construction and Trading
Corporation35288 L B SB Miag-ao Feeder Port Development
Miag-ao, Iloilo/
Region 611/16/2016 1st DOTC LF 7.161 120 09/21/16 01/18/17 1.09 O 0.400 0.300 0.150 0.020 0.041 0.050 96.08 -
Advance Tech Construction and Trading
Corporation35288 B SB Construction of Brgy. Iquiran Wharf
Brgy. Iquiran,
Daram, Western
Samar/ Region VIII
10/14/2015 1st DOTC LF 9.438 180 06/03/15 11/29/15 18.64 O 0.400 0.300 0.150 0.020 0.018 0.050 93.75 -
Advance Tech Construction and Trading
Corporation35288 SB Construction of Iquiran Wharf
Brgy. Iquiran,
Daram, Western
Samar/ Region VIII
1/21/2016 2nd & Final DOTC LF 9.438 180 06/03/15 11/25/15 0.00 C 0.492 0.200 0.300 - - - 99.1595.91%
V. Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 17 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Advance Tech Construction and Trading
Corporation35288 B SB Cabucgayan Port Development Project
Brgy. Bunga,
Canucgayan, Biliran2/16/2016 2nd & Final DOTC LF 8.602 240 04/29/15 07/25/16 57.13 C 0.467 0.200 0.300 - - - 96.70
95.30%
V. Satisfactory
Advance Tech Construction and Trading
Corporation35288 L B MA Badoc Port Development Project Badoc, Ilocos Norte 5/17/2018 1st & Final DOTC LF 9.147 150 11/1/2017 3/30/2018 0.00 C 0.462 0.200 0.300 - - - 96.20
*96.20%
Outstanding
Advance Tech Construction and Trading
Corporation35288 L B MA Mongpong Port Development Project
Sta. Cruz,
Marinduque5/31/2018 1st & Final DOTC LF 8.530 150 11/1/2017 3/30/2018 0.00 C 0.471 0.200 0.300 - - - 97.10
*97.10%
Outstanding
Advance Tech Construction and Trading
Corporation35288 L B SB Volcano Island Port Development Project
Volcano Island,
Talisay, Batangas08/30/18 1st and Final DOTr LF 9.077 155 1/22/18 6/25/18 0.00 C 0.48 0.20 0.30 97.70 *97.70% Outstanding
Advance Tech Construction and Trading
Corporation35288 L B SB Caminawit Port Development Project
Caminawit, San
Jose, Occidental
Mindoro
11/06/18 1st and Final DOTr LF 7.382 180 1/22/18 07/20/18 0.00 C 0.44 0.20 0.30 93.90 *93.90% Very Satisfactory
Advance Tech Construction and Trading
Corporation35288 L B SB Tuguegarao LTFRB Regional Office Building Project Tacloban City, Leyte 4/12/2018 1st & Final DOTC LF 4.904 120 1/11/2018 5/10/2018 23.33 C 0.473 0.200 0.300 - - - 97.30
*97.30%
Outstanding
Advanced Foundation Construction System
Corp./Pulsar Construction (JV)JV-13-601 L AAA LB GE
Construction and Maintenance of Bridges along National
Roads-Construction of Bridges-On-going, Lucban Bridge
along Manila North Road
Abulug, Cagayan
Province6/1/2015 2nd
Regional Office No.
ILF 278.183 674 3/18/14 1/20/16 16.94% O 0.398 0.3 0.15 0.024 0.05 0.033 95.50% -
Advanced Foundation Construction System,
Corp.15449 L AAA LB GE1 Lucban Bridge & Approaches Phase I along Manila North Rd. Abulug, Cagayan 8/1/2013 1st II LF 153.067 450 03/26/13 06/18/14 23.14 O 0.328 0.300 0.150 0.030 0.056 0.033 89.70 -
Advanced Foundation Construction Systems
Corp./ Pulsar Construction (JV)JV-16-1596 L AAA LB GE
Locally Funded Projects: Construction/ Repair/ Rehabilitation/
Improvement of Various Infrastructure including Local
Projects, Roads and Bridges - Local Bridges: Construction of
Pigalo Bridge and Approaches along Alicia-Angadanan-San
Guillermo Provincial Road Angadanan, Isabela
Angadanan,
Isabela11/11/17 1st DPWH LF 437.067 750 4/10/17 4/29/19 20.53 O 0.335 0.240 0.150 0.03 0.06 0.05 86.50 -
Advanced Foundation Construction System
Corp./ R.U. Aquino Construction And
Development Corporation Joint Venture
JV-
15449
L AAA LB GE
Construction and Maintenance of Bridges along National
Roads-Widening of Permanent Bridges to more than 2-lanes,
Sto. Domingo Bridge (B01480LZ) along Jose Abad Santos
Avenue Road (formerly GSO), Mexico, Pampanga
Mexico, Pampanga 11/27/17 1st DPWH LF 83.123 420 11/23/16 1/16/18 1.29 O 0.348 0.240 0.150 0.03 0.061 0.033 86.17 -
Advanced Foundation Construction System
Corp./Pulsar Construction(JV)JV-13-601 F AAA LB GE
Construction and Maintenance of Bridges along National
Roads - Construction of Bridges - On going; Lucban Bridge
along Manila North Road
Abulug, Cagayan 10/22/2014 1st II LF 253.267 650 3/18/14 12/27/15 23.35% O 0.456 0.225 0.150 0.030 0.033 0.033 92.70%92.70%
Very Satisfactory
Advanced Matrix Construction Inc. 32873 L MA Structural Retrofitting of Buildings at PICC Phase 1PICC Complex,
Pasay City1/27/2016 Final BSP LF 36.535 240 12/18/13 07/31/16 0.00 C 0.481 0.200 0.300 - - - 98.10
92.50%
Very Satisfactory
Advanced Matrix Construction Inc. 32873 L MA Full Upgrading of Toilets at PICCPICC Complex,
Pasay City1/26/2016 Final BSP LF 29.298 210 02/20/14 07/18/15 0.00 C 0.481 0.200 0.300 - - - 98.10
93.50%
Very Satisfactory
Advanced Matrix Construction Inc. 32873 L MA New Roofing System for Building E RoofdeckSecurity Plant
Complex3/2/2016 Final BSP LF 23.296 321 02/06/14 12/23/14 3.54 C 0.469 0.200 0.194 - - - 86.30
84.30%
Satisfactory
Advanced Matrix Construction Inc. 32873 L MARehabilitation of Common Maintenance Shop (CMS) at BSP,
SPCBuilding A, SPC 1/27/2016 Final BSP LF 19.053 188 10/29/13 10/01/14 6.02 C 0.466 0.200 0.119 - - - 78.50
86.90%
Satisfactory
Advanced Matrix Construction Inc. 32873 L AA Replacement of Ceiling at the Skywalk
Security Plant
Complex, Quezon
City
9/30/2016 1st & Final BSP LF 3.900 70 12/23/15 03/01/16 0.00 C 0.427 0.200 0.300 - - - 92.7092.70%
Very Satisfactory
Advanced Matrix Construction Inc. 32873 L A Rehabilitation of Building B Lighting System
BSP, Security Plant
Complex, East Ave.,
Quezon City
10/8/2013 1st BPS LF 2.000 60 03/26/13 11/20/13 4.50 O 0.346 0.279 0.150 0.030 0.035 0.050 89.00 -
Advanced Matrix Construction Inc. 32873 L MA New Roofing System for Building E RoofdeckSecurity Plant
Complex11/19/2014 1st BSP L 22.300 120 02/06/14 06/05/14 7.87 O 0.389 0.300 0.071 0.020 0.030 0.025 83.50 -
Advanced Matrix Construction Inc. 32873 L MAImprovement of BSP-SPC Parking Lot at BSP Security Plant
Complex
BSP, Security Plant
Complex, Cor BIR
Road, East Ave.,
Quezon City
3/31/2013 1st BSP LF 13.800 180 03/22/13 09/07/13 0.00 O 0.399 0.190 0.150 0.030 0.051 0.050 87.00 -
AE Belleza Builders 35594 L B SB GB
Construction of One (1) Unit Senior High School Unique
Workshop Building (Under DepEd CY 2016 BEFF Technical
Vocational Laboratory Batch 10), Carayan National High
School, Naga City, Camarines Sur
Naga City,
Camarines Sur3/18/2017 1st & Final
Camarines Sur
2nd DEOLF 2.624 90 9/19/2016 12/17/2016 0.00 C 0.482 0.166 0.300 - - - 94.80
*94.8%
Very Satisfactory
AEJ Hardware Construction & Enterprises 34740 L D SB GEConstruction of Revetment along Ayala River at Calle San
Miguel SiteZamboanga City 11/23/2016 1st
Zamboanga City
DEOLF 3.851 295 2/8/2016 11/28/2016 0.00 O 0.417 0.2 0.3 0 0 0 0.9170 -
AEJ Hardware Construction & Enterprises 34740 L D SB GEConstruction/Rehabilitation of Flood Control Mitigation
Facilities along Tumaga River Basin
Tugbungan,
Zamboanga City3/7/2016 1st
Zamboanag City
DEOLF 9.3975 274 11/12/14 8/12/15 0 C 0.362 0.2 0.3 0 0 0 86.20%
86.2%
Satisfactory
AEJ Hardware Construction & Enterprises 34740 L D SB GE1
Repair/Rehab. of Licomo Failed Rd. Shoulder along Maria
Clara Lobregat Highway (Pagadian-ZC Rd.), K1851+500-
K1851+600
Zamboanga City 3/11/2013 1st IX LF 1.880 64 02/26/13 05/01/13 -2.60 O 0.363 0.240 0.124 0.030 0.035 0.033 82.50 -
AEJ Hardware Construction & Enterprises 34740 L B SB GE
Retrofitting/Strengthening of Permanent Bridge of Tictapul
Bridge (B00557MN) along Pagadian City-Zamboanga City
Road
Zamboanga City 03/19/18 1st/FinalZamboanga City
DEOLF 5.615 89 03/22/17 06/18/17 0.00 C 0.369 0.169 0.300 - - - 83.80 *83.80% Satisfactory
AEJ Hardware Construction & Enterprises/
Mamsar Construction And Industrial
Corporation Joint Venture
JV-16-459 L AAA MA GE
Construction of Flood Control at Labuan River, Labuan
Section, (Including Right of Way Acquisition), Zamboanga
City 1st LD
- 11/7/17 1st DPWH LF 25.217 304 7/19/18 5/18/19 3.56 O 0.369 0.240 0.150 0.03 0.06 0.05 89.90 -
Agafer Construction 7912 L B SB GE2 Const. of Cagayan River Control 11/11/2008 2nd II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 18 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Aguero Construction 23338 L B MA GE
Construction of Two (2) Storey Six (6) Classroom School
Building Tambing National High SchoolBarobo, Surigao del
Sur11/11/17 1st & Final DPWH LF 8.100 200 10/13/16 4/30/17 2.71 C 0.500 0.133 0.300 - - - 93.30
*93.3%
Very Satisfactory
Aguero Construction 23338 L B MA GB
Construction of Two (2) Storey Eight (8) CL at La Trinidad
Integrated Secondary School Butuan City 7/7/2017 1st & Final Butuan City LF 12.373 210 10/19/2016 5/16/2017 0.00 C 0.499 0.144 0.300 - - - 94.30*94.3%
Very Satisfactory
Aguero Construction 23338 L B MA GB
Construction of Two (2) Storey Eight (8) Classrooms School
Building at Manobo National High School, Magpet, Cotabato Magpet, Cotabato 3/16/2017 1stCOTABATO FIRST
DEOLF 10.618 165 8/18/2016 1/29/2017 -0.70 O 0.331 0.300 0.000 0.03 0.058 - 71.90 -
Aguero Construction 23338 L A MA GE
Repair/ Maintenance Road Slip along NRJ Cuevas-Bislig Road K1388+820 to
K1388+870(S0046
4MN) Trento,
Agusan del Sur
3/14/2017 1st & FinalAgusan del Sur
2nd DEOLF 6.616 123 10/3/2016 2/2/2017 0.00 C 0.444 0.133 0.300 - - - 87.70
*87.7%
Satisfactory
Aguero Construction 23338 L B MA GE
Concreting of Lemsinolon Farm to Market, Brgy. Lemsinolon,
T'Boli, South Cotabato 0 11/19/2016 1st & FinalSouth COTABATO
1ST DEOLF 2.951 80 4/7/2016 6/25/2016
(+)10.66
%C 0.382 0.171 0.3 0 0 0 0.8530
85.3%
Satisfactory
Aguero Construction 23338 L B MA GB
Construction of Two (2) Storey, 6 CL Senior High School
Building at Esperanza NHS Koronadal City South Cotabato South Cotabato 8/30/2016 1st & Final South Cotabato LF 8.172 150 11/9/15 4/6/16 0.00 C 0.487 0.133 0.3 0 0 0 0.920092%
Very Satisfactory
Aguero Construction 23338 L B SA GBConstruction of 2-Storey, 6-CL Senior High School Building at
Esperanza NHS Koronadal City, South Cotabato
Koronadal City,
South Cotabato3/7/2016 1st South Cotabato 1st LF 8.172 150 11/9/15 4/7/16 (+)0.26% O 0.349 0.24 0.15 0.03 0.035 0.05 85.40%
85.4%
Satisfactory
Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road
Prosperidad,
Agusan del Sur /
Caraga (13)
12/19/17 1st
Provincial
Government of
Agusan del Sur
LF 62.645 270 08/29/17 05/25/18 -4.46 O 0.39 0.23 0.11 0.03 0.06 0.05 86.80 - On - Going
Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road
Prosperidad,
Agusan del Sur /
Caraga (13)
04/06/18 2nd
Provincial
Government of
Agusan del Sur
LF 62.645 270 08/29/17 05/25/18 -3.70 O 0.40 0.23 0.11 0.03 0.06 0.05 88.50 - On - Going
Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road
Prosperidad,
Agusan del Sur /
Caraga (13)
11/13/18 Final
Provincial
Government of
Agusan del Sur
LF 63.910 429 08/29/17 10/31/18 3.13 C 0.49 0.20 0.30 - - - 98.50 92.00% Very Satisfactory
Aguero Construction 23338 L AConcreting of NRJ Barangay 1-Das agan-Barobo Boundary
Road
San Francisco,
Agusan del Sur /
Caraga (13)
1/7/19 Final
Provincial
Government of
Agusan del Sur
LF 60.938 409 8/29/17 10/11/18 0.22 C 0.47 0.20 0.30 - - - 97.00 93.55% Very Satisfactory
Aguero Construction 23338 L AConcreting of NRJ Barangay 1-Das agan-Barobo Boundary
Road
San Francisco,
Agusan del Sur /
Caraga (13)
2/20/18 2nd
Provincial
Government of
Agusan del Sur
LF 60.533 270 8/29/17 5/25/18 21.00 O 0.39 0.24 0.15 0.03 0.05 0.05 91.20 -
Aguero Construction 23338 L AConcreting of NRJ Barangay 1-Das agan-Barobo Boundary
Road
San Francisco,
Agusan del Sur /
Caraga (13)
12/18/17 1st
Provincial
Government of
Agusan del Sur
LF 60.533 270 8/29/17 5/25/18 4.58 O 0.39 0.24 0.15 0.03 0.05 0.05 91.30 -
Aguero Construction 23338 L A MB GBConstruction of Two (2) Storey Six (6) Classroom School
Building Tambis National High School
Barobo, Surigao del
Sur03/19/18 2nd/Final
Surigao del Sur
2nd DEOLF 8.100 200 10/13/16 04/30/17 0.00 C 0.481 0.160 0.300 - - - 94.10 *94.03% Very Satisfactory
Aguero Construction 24880 L A MA GERepair/ Rehabilitation of Bolok River Bank Protection,
Poblacion Section
Koronadal City,
South Cotabato 11/7/17 1st & Final DPWH LF 13.150 150 3/9/17 8/5/17 8.00 C 0.456 0.133 0.300 - - - 88.90
*88.9%
Satisfactory
Aguero Construction 23338 L B MA GBConstruction of Two Storey Six Classroom School Building
Tambis National High School
Barobo, Surigao del
Sur11/17/2016 1st
Surigao del Sur
2nd DEOLF 8.100 140 10/13/2016 3/1/2017
(+)15.40
%O 0.392 0.3 0.15 0.03 0.035 0.033 0.9400 -
Aguinsod General Construction 34741 L B SB GE
Construction of Slope Protection/Retaining Wall along Pico-
Lamtang Road, K0256+300 - K0256+420, K0258+163 -
K0258+235, K0259+670 - K0259+700, K0260+665 - K0260+725,
K0262+500 - K0262+585
La Tridad, Benguet 6/2/2015 1st Benguet 1st DEO LF 8.292 120 2/20/15 6/19/15 (+) 1.00% O 0.237 0.3 0.15 0.02 0.045 0.05 80.20% -
Ahe Construction 33486 L S SB GB
Construction of Two (2) Storey Six Classroom School
Building at Guiwan ES Guiwan,
Zamboanga City 3/22/2017 1st & Final
Zamboanga City
DEOLF 7.696 275 3/30/2016 12/29/2016 0.00 C 0.484 0.137 0.300 - - - 92.10
*92.1%
Very Satisfactory
Ahnex Builders & Ready Mix Corporation 32296 L AAA MA GE1Widening of Governors Drive (Carmona-Dasmariñas-Trece
Martires City Rd.) inc. Drainage System
G.M.A. and
Carmona, Cavite8/15/2012 1st IVA LF 38.813 190 02/07/12 08/14/12 -6.91 O 0.366 0.300 0.081 0.030 0.055 0.033 86.50 -
Ahnex Builders & Ready Mix Corporation 32296 L AAA MA GE1 Widening of Cavite-Batangas Rd., Km.22+000-Km.23+653 Imus, Cavite 11/23/2012 1st IVA LF 30.797 369 02/07/12 02/08/13 -4.41 O 0.352 0.300 0.106 0.022 0.050 0.033 86.30 -
Aina Construction 30026 LProcurement of Fully Developed Lots and Completed
Housing Units (510 units)
Green Park Ville,
Brgy. Takas,
Valderrama,
Antique
11/23/18 1st NHA LF 147.000 602 7/29/17 3/22/19 4.54 O 0.39 0.30 0.15 0.03 0.06 0.05 98.29 - On - Going
Aina Construction/Eddmari Construction And
Trading - JvL
Procument of 1000 Fully Developed House and Lot Packages
(St, Peter and Paul Housing Project)
Bgry. Bagacay, San
Dionisio, Iloilo2/2/2018 1st NHA LF 289.600 604 09/22/16 03/18/18 1.03 D 0.368 0.300 0.150 0.030 0.056 0.050 95.41 -
AJ Lava Builders Corp. 22265 L B MA GE
MFO-1 National Road Network Services - Asset Preservation
of National Roads Preventive Maintenance Based on
Pavement Management System/ Highway Development and
Management-4 (HDM-4), Marikina-Infanta Road, K0031+426 to
K0035+658, Antipolo City, 2nd LD
Antipolo City, 2nd
LD6/8/2017 1st & Final Rizal 1st DEO LF 29.351 90 2/23/2017 5/23/2017 0.54 C 0.437 0.133 0.300 - - - 87.00
*87%
Satisfactory
AJ Lava Builders Corp. 22265 L B MA GERehabilitation of Drainage System Including Curbs and Gutter
and Sidewalk, Imelda AvenuePasig City 3/16/18 1st/Final
Metro Manila 1st
DEOLF 13.700 332 4/11/17 3/8/18 7.78% C 0.489 0.134 0.3 - - - 92.30 *92.30% Very Satisfactory
AJ Lava Builders Corp. 22265 L B MA GERehabilitation of Drainage System Including Curbs and Gutter
and Sidewalk
Imelda Avenue,
Pasig City11/23/17 1st DPWH LF 13.700 270 4/11/17 1/5/18 1.89 O 0.397 0.240 0.150 0.03 0.06 0.033 91.00 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 19 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
AJ Taylan Construction Corporation / Badoc
Builders & Supply Joint Venture2336 L B MA GE
Construction of Flood Mitigation Structure along Badoc River,
U/S and D/S of Badoc BridgeBadoc, Ilocos Norte 6/2/2017 1st
Ilocos Norte 2nd
District Engineering
Office
LF 41.895 195 2/24/2017 9/6/2017 0.19 O 0.372 0.240 0.150 0.03 0.06 0.05 90.20 -
AJ Taylan Construction Corporation / DJCM
Construction Corporation Joint VentureJV-16-1034 L B MA GE
Construction of Flood Control Structure along Bislak River
Brgy. Dagupan,
Vintar, Ilocos Norte5/31/2017 1st
Ilocos Norte 1st
District Engineering
Office
LF 42.424 220 2/24/2017 10/1/2017 0.48 O 0.367 0.240 0.150 0.03 0.061 0.05 89.80 -
AJ Taylan Construction Corporation/DJCM
Construction Corporation (Formerly: Djcm
Construction) Joint Venture
JV-16-1034 L B MA GE
Construction of Flood Control Structure along Bislak RiverBrgy. Dagupan,
Vintar, Ilocos Norte8/15/2017 2nd & Final
Ilocos Norte 1st
DEOLF 44.093 220 2/24/2017 10/1/2017 0.18 C 0.498 0.133 0.300 - - - 93.10
*91.102%
Very Satisfactory
AJ Tylan Const., Corp./DJCM Const/VVH Const.,
Corp./ZEDIK Builders (DAVZ JV)JV-13-702 L A MA GE
Construction and Maintenance of Bridges along National
Roads-Widening of Permanent Bridges, Subec Bridge along
MNR
Pagudpud, Ilocos
Norte10/21/2014 1st I LF 36.706 304 5/9/14 3/8/15 0.01% O 0.330 0.249 0.150 0.030 0.056 0.050 86.50%
86.50%
Satisfactory
Ajan Jeada, Inc. (Formerly: Jeada
Construction)17869 L A MB GB1 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 1st NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -
Ajan Jeada, Inc. (Formerly: Jeada
Construction)17869 L A MB GE1 Impv't. of Bahi-Cagubulacao Rd. (Cagraray Eco Park) Bacacay, Albay 8/3/2011 1st V LF 18.989 221 01/03/11 08/11/11 0.63 O 0.317 0.300 0.150 0.030 0.045 0.033 87.50 -
Ajan Jeada, Inc. (Formerly: Jeada
Construction)17869 L A MA GE
Cluster 4-Local Infrastructure Program-Construction of Local
Road (Road Opening) and Drainage Canal and Slope
Protection, Camalig, Albay
Camalig, Albay 3/8/2016 1st Albay 2nd DEO LF 4.2732 114 2/9/15 6/2/15 (+)6.514 C 0.484 0.133 0.3 0 0 0 91.70%91.7%
Very Satisfactory
AJYSC Marketing 26924 L A MA GE
Midsayap-Marbel Road K1777+353 to K1779+553.16 with
exception Luayan-Dumadalig Section, Tantangan South
Cotabato, 2nd LD
Tantangan, South
Cotabato11/9/2015 1st
South Cotabato
First DEOLF 47.958 234 3/31/15 11/19/15 (+) 0.09% O 0.36 0.248 0.15 0.03 0.042 0.05 88.00%
88%
Satisfactory
AJYSC Marketing 26924 L A MA GE
Midsayap-Marbel Road, K1777+409 - K1780+120 (with
exceptions), Luayan-Dumadalig Section Tantangan, South
Cotabato Modified To: MFO1 - Widening of National
Secondary Road, - Midsayap - Marbel Road, K1777+353 -
K1779+553.16 (with exceptions), Luayan-Dumadalig Section
Tantangan, South Cotabato
Tantangan, South
Cotabato3/8/2016 - South Cotabato 1st LF 47.9577 234 11/19/15 7/10/16 0.00% C 0.362 0.2 0.3 0 0 0 87.28%
87.28%
Satisfactory
AJYSC Marketing 26924 L A MA GE
Midsayap-Marbel Road, K1777+409-K1780+1020 ( with
exceptions), Luayan-Dumadalig Section, Tantangan, South
Cotabato Modified to: MF01- Widening of Secondary Road-
Midsayap-Marbel Road, K1777+353-K1779+553.16 ( with
exceptions), Luayan-Dumadalig Section
Tantangan, South
Cotabato6/2/2015 1st
South Cotabato
DEOLF 43.944 174 3/31/15 9/20/15 15.05% O 0.358 0.24 0.15 0.03 0.02 0.033 83.10% -
AJYSC Marketing 26924 L A MA GE
Construction and Namleaning of Bridges along National
Roads- Widening of Permanent Bridges to more than 2 lanes,
Bawing Bridge along Makar-Kiamba Road
General Santos City 11/18/2015 1stSouth Cotabato
Second DEOLF 25.481 176 4/1/15 10/12/15
(-)
24.00%O 0.346 0.3 0 0 0.023 0 66.90%
66.9%
Poor
AJYSC Marketing 26924 L A MA GE2Completion of Drainage Canal along Dulawan-Marbel Rd. (New
Carment Sect.)Tacurong City 3/11/2013 3rd XII LF 17.419 214 05/19/12 12/28/12 - O 0.364 0.300 0.000 0.030 0.050 0.033 77.70 -
AJYSC Marketing 26924 L A MA GE2Completion of Drainage Canal along Dulawan-Marbel Rd., New
Carmen Sect. Tacurong City 11/24/2012 2nd XII LF 17.419 214 05/19/12 12/28/12 -4.81 O 0.359 0.300 0.102 0.030 0.055 0.000 84.60 -
AJYSC Marketing 26924 L A MA GE2Completion of Drainage Canal along Dulawqan-Marbel Rd.
(New Carment Sect.)
Tacurong City,
Sultan Kudarat8/8/2012 1st XII LF 17.419 196 05/29/12 12/10/12 -6.47 O 0.386 0.300 0.085 0.030 0.045 0.033 87.90 -
AJYSC Marketing 26924 L A MA GE2Rehab./Improvement of Bulok Bridge along Marbel-Makar
Road6/5/2009 1st R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -
AJYSC Marketing 26924 L A MB GE
Construction/Rehabilitation of Flood Control Mitigation
Facilities Major River Basins-Mindanao River Basin:
Construction of Bank Protection along Cotabato-Marbel Road,
Km. 1723+100 Banga, South Cotabato
Banga, South
Cotabato3/7/2016 1st South Cotabato 1st LF 16.5484 160 9/30/15 3/8/16 (-)8.61% O 0.201 0.248 0.064 0.022 0.04 0.017 59.20%
59.2%
Poor
AJYSC Marketing 26924Const./Replacement of Banga Bridge and Approaches Phase
II3/8/2010 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -
AJYSC Marketing 26924 L AImprovement of NHW Jct. Lomutan - Upper Kalaneg Farm to
Market Road
Maitum, Sarangani
Province 3/20/19 1st
Provincial
Government of
Sarangani
LF 41.336 480 1/8/18 9/13/18 -9.37 O 0.02 0.30 0.14 0.24 0.06 0.02 77.29 - On - Going
AJYSC Marketing 26924 L A MA GEConstruction of River Control along Alah River (Panas-
Bambad-Section) K0+000 - K0+210
Isulan, Sultan
Kudarat 11/8/17 1st DPWH LF 18.503 259 3/6/17 11/19/17 0.00 O 0.355 0.235 0.150 0.03 0.042 0.033 84.50 -
AKH Construction and Trading Corporation 20759 L A MA GE
Rehabilitation/Reconstruction/Upgrading of Damaged South
Super Highway East Service Road, K13+890 to K16+793,
Parañaque City
Parañaque City 9/3/2015 1st NCR LF 27.364 165 5/15/15 10/26/15 8.29% O 0.376 0.24 0.15 0.03 0.053 0.05 89.90% -
AKH Construction and Trading Corporation 20759 L A MA GE
Preventive Maintenance Based on Pavement Management
System/Highway Development and Management-4 (HDM-4)
along V. Mapa Street
Sta. Mesa, Manila 11/24/2014 1st NCR LF 22.598 206 5/28/14 12/19/14 0.17% O 0.381 0.240 0.150 0.030 0.045 0.033 87.90%87.90%
Satisfactory
AKH Construction and Trading Corporation 20759 L A MA GE
Concrete Reblocking along commonwealth Ave., Quezon City,
K0017+061 - K0020+(-262), K0016+938 - K0019+731, Quezon
City
Quezon City 6/6/2015 1st NCR LF 17.988 273 10/29/14 7/28/15 (+) 21.83 O 0.387 0.24 0.15 0.024 0.056 0.05 90.70% -
AKH Construction and Trading Corporation 20759 L A MA GEProposed Repair/Rehab. Of Road along Jalandoni St., CCP
ComplexPasay City 8/17/2014 1st NCR LF 8.100 90 5/21/14 8/18/14 14.30 O 0.446 0.215 0.150 0.030 0.040 0.030 91.10 -
AKH Construction and Trading Corporation 20759 L AAA MB GE1
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.
Sect.) of Mendiola Extension (Chainage 0000-Chainage 0119,
A) Prev. Maint. (Int. Sect.) of Mendiola (Chainage 0119-085)
Manila 3/13/2013 1st NCR LF 2.678 69 02/20/13 04/29/13 10.22 O 0.366 0.200 0.150 0.030 0.048 0.033 82.70 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 20 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
AKN Construction Corporation (Formerly: Akn
Construction)11845 L AAA LB GE
Construction of Drainage System along PNR Railroad Track in
Cupang, Muntinlupa City, Metro Manila
Muntinlupa City,
Metro Manila11/24/2016 1st & Final
Las Piñas-
Muntinlupa DEOLF 24.116 180 9/4/2015 3/1/2016 0.00 C 0.425 0.133 0.3 0 0 0 0.8580
85.8%
Satisfactory
AKN Construction Corporation (Formerly: AKN
Construction)11845 L AAA - GE
Construction of Flood Control StructureUpper Paliko Creek,
Brgy. Cupang,
Muntinlupa City
8/15/2017 1st & FinalLas Piñas-
Muntinlupa DEOLF 17.690 318 8/2/2016 6/15/2017 0.00 C 0.439 0.145 0.300 - - - 88.40
*88.4%
Satisfactory
AKN Construction Corporation (Formerly: AKN
Construction)11845 L AAA LB GE
Dredging of Parañaque River Mouth (Phase II), Parañaque
City, Metro ManilaParañaque City,
Metro Manila6/8/2016 2nd & Final
METRO MANILA
2ND DE0LF 86.132 240 5/12/15 1/6/16 0.01 C 0.433 0 0.5 0 0 0 93.30%
93.48%
Very Satisfactory
AKN Construction Corporation (Formerly: AKN
Construction)11845 L AAA LB GE Slope Protection of Estero Tripa De Gallina, Barangay Bangkal
District I, Makati City,
M.M.11/19/2014 1st NCR LF 17.321 150 6/18/14 11/14/14 -9.07% O 0.357 0.300 0.059 0.030 0.049 0.050 84.50%
84.50%
Satisfactory
AKN Construction Corporation (Formerly: AKN
Construction)11845 L AAA MA GE1
Widening/Conc. of R-10 inc. ROW, (Const. of Footbridge at
corner Pacheco)Tondo, Manila 4/15/2011 1st NCR LF 17.977 248 06/25/10 02/27/11 1.67 O 0.371 0.296 0.150 0.030 0.035 0.050 93.20 -
AKN Construction Corporation (Formerly: AKN
Construction)11845 L AAA MB GE1
Rehab./Reconstruction of Muntinlupa Insular Prison Road
and its Vicinity, Brgy. Poblacion9/9/2009 1st NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -
AKN Construction Corporation (Formerly: AKN
Construction)11845 L AAA MA GE
Dredging of Paranaque River Mouth (Phase I), Paranaque City,
Metro Manila Metro Manila 12/3/2015 1stMetro Manila 2nd
DEOLF 86.133 240 5/12/15 1/1/16 (+)6.05% O 0.4 0.2 0.05 0.036 0.25 - 93.60%
93.6%
Very Satisfactory
AL Chris Construction 12406 L B B GE
Repair/Maintenance of Flood Control- Sta.00+723.80-
Sta.00+840 (Downstream), Sagasa, Balilihan, BoholSagasa, Balilihan,
Bohol3/14/2017 1st & Final Bohol 1st DEO LF 3.932 60 10/27/2016 12/25/2016 0.07 C 0.479 0.133 0.300 - - - 91.20
*91.2%
Very Satisfactory
AL Chris Construction 12406 L B MA GB
Construction of Multi-Purpose Building, Municipality of
Alburquerque, Bohol
Municipality of
Alburquerque,
Bohol
6/1/2017 1st & FinalBohol 1st District
Engineering OfficeLF 9.777 150 6/30/2016 11/26/2016 0.00 C 0.494 0.132 0.300 - - - 92.60
*92.6%
Very Satisfactory
AL Chris Construction 12406 L B MB GE
MFO-1-National Road Network Services-Asset Preservation of
the Road, Rehabilatation/Reconstruction/Upgrading of
Damaged Paved National Roads Including Drainage Based on
Pavement Management System /Highway Development and
Management System-4 (HDM-4), Secondary P00102023VS,
Tagbilaran North Road, K0024+120 - K0025+000 and
K0028+330 - K0028+393
Loon, Bohol 8/20/2017 1st Bohol 1st DEO LF 28.924 181 4/29/2017 10/26/2017 0.11 O 0.391 0.300 0.150 0.018 0.045 0.05 95.40 -
AL Chris Construction 12406BERRRP-Candumayao (Catigbian) - Cabanugan (San Isidro)
rd.
Catigbian-San
Isidro, Bohol1/19/2015 1st
Provincial
Government of
Bohol
L 8.874 209 06/05/14 01/14/15 -0.59 O 0.338 0.300 0.066 0.030 0.051 0.050 83.50 -
AL Chris Construction 12406 L B MA GE
MFO-1- National Road Network Service-Asset Preservation of
National Roads - Rehabilitation/ Reconstruction/ Upgrading of
Damaged Paved National Roads Including Drainage Based on
Pavement Management System/Highway Development
Management-4 (HDM-4) Secondary at Tagbilaran North Road
(Tagbilaran-Jetafe Section)-S00030BH, 1) K0024+120-
K0025+000 and K0028+330-K0028+393
Loon, Bohol 4/3/18 2nd/Final Bohol 1st DEO LF 30.457 186 4/29/17 10/31/17 0.00 C 0.465 0.133 0.3 - - - 89.80 93.16% Very Satisfactory
AL Handasa Construction 0 L 0 0 GBConstruction of 1 Unit 1-Storey, 3 CL School with Toilet
Attached, Jose T. Arranguez Sr. ES, Kiblawan, Davao del Sur
Jose T. Arranguez
Sr. ES, Kiblawan,
Davao del Sur
3/14/2016 1stDavao del Sur
Second DEO1 2.9325 150 11/23/15 4/20/16 (+)11.67 O 0.4 0.3 0.15 0.03 0.041 0.05 97.10%
97.1%
OutstandingOutstanding
AL Handasa Construction 36974 L D SB GB
Construction of One (1) Unit, One (1) Storey, Three (3)
Classroom School with Toilet Attached at Jose T. Arrangues
SR., Elementary School, Kiblawan, Davao del SurKiblawan, Davao
del Sur6/13/2016 2nd & Final
Davao del Surd
2nd DEOLF 2.932 120 11/23/15 3/21/16 0.00 C 0.461 0.18 0.3 0 0 0 94.10%
96.2%
Outstanding
AL Handasa Construction 36974 L D SB GB
Construction of TechVoc Workshop Building, Sulop NHS,
Sulop, Davao del SurSulop, Davao del
Sur11/21/2016 1st & Final
Davao del Sur
Second DEOLF 2.580 90 3/15/2016 6/12/2016 0.01 C 0.483 0.133 0.3 0 0 0 0.9160
91.6%
Very Satisfactory
AL Handasa Construction 36974 L D SB GB
Locally funded projects-Local Infrastructure Program-
Buildings and other Structures-Multipurpose/Facilities-
Construction of Multi-Purpose Building of Demoloc ES
Brggy. Demoloc,
Malita, Davao
Ocidental
3/14/18 1st/FinalDavao Occidental
DEOLF 1.479 105 4/19/17 8/1/17 0% C 0.476 0.133 0.3 - - - 90.90 *90.90% Very Satisfactory
AL Hussein Construction 18438 L A MA GE
Rehabilitation/Reconstruction of National Road with Slip,
Slope Collapse and Landslides, Lanao del Norte
Circumferential Road (LDNICR)
Tagoloan, Lanao
del Norte,
K1536+610 -
K1536+750;
K1544+120 -
K1544+725
3/14/2016 1stLANAO DEL
NORTE 1ST DEOLF 44.7894 235 2/25/15 10/18/15 0 C 0.473 0.199 0.3 0 0 0 97.20%
97.2%
Outstanding
AL Hussein Construction 18438 L A MA GE
Rehabilitation/Reconstruction of National Road with Slips,
Collapse and Landslides, Lanao del Norte Interior
Circumferential Road (LDN1CR), K1536+610-K1536+750;
K1544+120-K1544+725, Tagoloan, Lanao del Norte
K1536+610-
K1536+750;
K1544+120-
K1544+725,
Tagoloan, Lanao
del Norte
9/3/2015 1stLanao del Norte
1st DEOLF 44.744 205 2/25/15 9/17/15 0.34% O 0.384 0.24 0.15 0.03 0.06 0.05 91.40% -
AL Hussein Construction / NDP Construction
Development Joint VentureJV-16-514 L A MB GE
Network Development Off-Carriageway Improvement
Including Drainage Tertiary Road: Lanao del Norte Interior
Circumferential Road (LDNICR) S00941MN, K1535+(-560)-
K1539+000
Tagoloan, Lanao
del Norte3/22/18 1st/Final
Lanao del Norte
1st DEOLF 39.240 250 2/13/17 10/20/17 0 C 0.418 0.133 0.3 - - - 85.10 *85.10% Satisfactory
Al Niño Construction & Supply 18378 L B 0 GERehab./Retrofitting of Pili Bridge along Cumadcad-San Isidro-
Poblacion Road, Castilla, SorsogonCastilla, Sorsogon 5/30/2017 1st & Final Sorsogon 1st DEO LF 4.680 120 11/17/2016 3/16/2017 0.00 C 0.445 0.134 0.300 - - - 87.90
*87.9%
Satisfactory Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 21 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Al Niño Construction & Supply 18378 L B MA GE
Concreting of Capuy Road, Sorsogon City
Sorsogon City 11/18/2016 1st & Final Sorsogon 1st DEO LF 2.875 120 3/7/2016 7/4/2016 0.00 C 0.482 0.133 0.3 0 0 0 0.915091.5%
Very Satisfactory
Al Niño Construction & Supply / Steven
Construction & Supply Joint VentureJV-16-249 L B MA GB
Cluster II - Const. of Various School Bldg. Projects under FY
2016 Basic Educational Facilities Fund (BEFF) Batch 11, Pilar
& Castilla, Sorsogon City
Pilar & Castilla,
Sorsogon City5/30/2017 1st Sorsogon 1st DEO LF 40.187 210 11/23/2016 6/20/2017 0.15 O 0.376 0.205 0.150 0.03 0.054 0.05 86.50 -
Alagon Construction 32626 L D SB GB
Construction of Multi-Purpose Covered Court, Brgy. Dambo,
Pangil, Laguna Pangil, Laguna 11/23/17 1st & Final DPWH LF 4.498 120 2/9/17 6/8/17 0.00 C 0.498 0.133 0.300 - - - 93.10*93.1%
Very Satisfactory
Al-B Development Corporation (Formerly: Al-B
Construction)11740
Rehab./Reconst./Upgrading along Angeles-Porac-
Floridablanca-Dinalupihan Rd.6/1/2010 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -
Al-B Development Corporation (Formerly: Al-B
Construction)11740 L A MA GE
Network Development, Widening of National Roads, (Arterial
Roads-Outside N1), Angeles-Porac-Floridablanca-Dinalupihan
Road at KO084+(-615) to KO085+(-024), Angeles City,
Pamapanga 1st LD
Angeles City,
Pamapanga 1st LD8/29/2015 1st
Pampanga Third
DEOLF 34.069 210 4/29/15 11/24/15 1.90% O 0.379 0.24 0.15 0.03 0.07 0.05 91.90% -
Al-B Development Corporation (Formerly: Al-B
Construction)11740 L A MA GE
Network Development, Widening of National Roads, (Arterial
Roads-Outside N1, Angeles-Porac-Floridablanca-Dinalupihan
Road), K0084+(-615) to K0085+(-024), Angeles City, Pampanga
1st LD
K0084+(-615) to
K0085+(-024),
Angeles City,
Pampanga 1st LD
3/17/2016 2ndPampanga Third
DEOLF 34.0666 232 4/29/16 12/16/16 0.43% C 0.485 0.133 0.3 0 0 0 91.86%
91.86%
Very Satisfactory
Al-B Development Corporation (Formerly: Al-B
Construction)11740 L A MA GE
Flood Management Services; Construction/ Maintenance of
Flood Mitigation Structures & Drainage System;
Repair/Rehabilitation of Slope Protection along Taug River
Angeles City, Pampanga
Angeles City,
Pampanga11/20/2016 1st & Final Pampanga 3rd LF 37.124 150 3/18/2016 8/14/2016 0.00 C 0.338 0.2 0.3 0 0 0 0.8380
83.8%
Satisfactory
Al-B Development Corporation (Formerly: Al-B
Construction)11740 L A MA GE
Locally Funded Projects: Construction/ Repair/ Rehabilitation/
Improvement of Various Infrastructure including Local
Projects: Roads and Bridges, Local Roads, Improvement/
Rehabilitation of Ayala - Sto. Niño - Turu, Magalang,
Pampanga
Magalang,
Pampanga3/21/18 1st/Final
Pampanga 3rd
DEOLF 27.574 180 6/25/17 12/21/17 0% C 0.452 0.133 0.3 - - - 88.50 *88.50% Satisfactory
AL-B Dev't Corp./ Ping-Ann's Construction and
Trading (JV)JV-14-075 L A MA GE Reconstruction of Loboc River Terminal Loboc, Bohol 6/24/2015 1st TIEZA LF 19.550 240 11/04/14 07/01/15 -5.350 O 0.375 0.300 0.097 0.030 0.070 0.050 92.10 -
Al-Badr Construction 11387 L B MA GE
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) (Intermittent Section)
Tertiary Road:Lanao del Norte Interior Circumferential Road
(LDNICR), K1553+729 -K15
Pantao Ragat,
Lanao del Norte6/13/2016 1st & Final
LANAO DEL
NORTE 1ST DEOLF 24.483 131 2/19/16 6/28/16 0.31 C 0.411 0.124 0.3 0 0 0 83.50%
83.5%
Satisfactory
Alberto Uy Construction & Development 20924 L B MA GERehabilitation/Upgrading of Mapang (Taas) Formon Road,
Bongabong, Oriental Mindoro
Bongabong,
Oriental Mindoro8/28/2015 1st
Southern Mindoro
DEOLF 14.477 149 4/7/15 9/2/15 1.64% O 0.368 0.24 0.15 0.03 0.057 0.05 89.50% -
Alberto Uy Construction & Development 20924 L B MA GE Concreting of Sitio Sulbod Road
Barangay Anilao,
Bongabong,
Oriental Mindoro
03/21/18 1st/FinalSouthern Mindoro
DEOLF 10.617 175 04/25/17 10/16/17 0.01 C 0.473 0.200 0.300 - - - 97.30 *97.30% Outstanding
Alcel Construction 15129 L A MA GE
MFO-1: National Road Network Services: Various Projects
under Asset Preservation of National Roads within DPWH-
Benguet Second District Engineering Office (Cluster I-2016),
Acop-Kapangan-Kibungan-Bakun Road,
Buguias, Benguet 6/7/2017 1st & Final
Benguet 2nd
District Engineering
Office
LF 26.161 325 2/7/2006 12/28/2006 0.00 C 0.445 0.134 0.300 - - - 87.90*87.9%
Satisfactory
Alcel Construction 15129 L A MA GE
Road Upgrading (Gravel-Paved) Along Gurel-Bokod-Kabayan-
Buguias-Abatan Road, K0338+481-K0339+838, Kabayan,
Benguet
Kabayan, Benguet 8/14/2014 1st CAR LF 46.461 240 1/31/14 9/27/14 0.13 O 0.361 0.240 0.150 0.023 0.050 0.050 87.40 -
Alcel Construction 15129 L A MA GE1 Const. of Access Rd. for Alaminos Airport (Phase I)Alaminos City,
Pangasinan8/16/2012 1st I LF 17.991 253 12/13/11 08/21/12 6.64 O 0.384 0.240 0.150 0.030 0.045 0.033 88.20 -
Alcel Construction 15129 L A MA GE1 Const. of Access Rd. to Airport, Alaminos City AirportAlaminos,
Pangasinan3/15/2013 1st I LF 1.821 45 02/22/13 04/07/13 18.23 O 0.390 0.300 0.150 0.010 0.023 0.033 90.60 -
Alcel Construction 15129 L AAA MB GE
Construction and Maintenance of Bridges along National
Roads (Magalong Br.) Pangasinan-Zambales Road Mabini, Pangasinan 8/24/2017 1st & FinalPangasinan 1st
DEOLF 8.149 120 2/20/2017 6/19/2017 0.03 C 0.500 0.133 0.300 - - - 93.30
*93.3%
Very Satisfactory
Alcel Construction 15129 L A MB GE
MFO-1 Various Projects:
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Roads including Drainage Based on Pavement
Management System/Highway Development and Management-
4 (HDM-4) (Intermittent Sections), Acop - Kapangan -Kibungan
- Bakun Road
Benguet 3/30/2017 1st & Final Benguet 2nd DEO LF 10.316 280 3/9/2016 12/13/2016 0.00 C 0.455 0.200 0.300 - - - 95.50*95.5%
Very Satisfactory
Alcel Construction 15129 L A MB GE
Construction/Improvement of Access Roads Leading to
Airports, Seaports and Declared Tourism Destinations - Turod
- San Gregorio - Shalom - Lusok Road Leading to Lusok Cave,
Luna, Apayao
Luna, Apayao 8/30/2016 1st & Final CAR LF 96.499 389 4/13/15 5/5/16 0.00 C 0.369 0.2 0.3 0 0 0 0.869086.9%
Satisfactory
Alcel Construction 15129 L A MB GE
Construction/Improvement of Access Roads leading to
Airports, Seaports and Declared Tourism Destination
Poblacion - Lappa - Marag leading to Marag Valley, Luna,
Apayao
Luna, Apayao 8/30/2016 1st & Final CAR LF 96.491 389 4/13/15 5/5/16 0.00 C 0.333 0.2 0.3 0 0 0 0.833083.3%
Satisfactory
Alcel Construction 15129 L A MB GE
Rehabilitation/Reconstruction/Upgrading of Alaminos-Bolinao
Road, K0325+000 to K0326+000, K0321+(-204) to K0323+133,
Alaminos City, Pangasinan
Alaminos City,
Pangasinan6/14/2016 1st & Final
PANGASINAN 1ST
DEOLF 46.011 270 5/22/15 2/15/16 0.14 C 0.385 0.2 0.3 0 0 0 88.50%
88.5%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 22 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Alcel Construction 15129 L A MB GE
Rehabilitation/Reconstruction/Upgrading of Alaminos-Bolinao
Road, K0325+000 to K0326+000, K0321+(-204) to K0323+133,
Alaminos City, Pangasinan
K0325+000 to
K0326+000,
K0321+(-204) to
K0323+133,
Alaminos City,
Pangasinan
9/1/2015 1stPangasinan 1st
DEOLF 43.823 240 5/22/15 1/17/16 (+)29.75 O 0.331 0.3 0.15 0.023 0.042 0.05 89.60% -
Alcel Construction 15129 L A MB GE
National Road Network Services: Various Projects under
Asset Preservation of National Roads within DPWH - Benguet
2nd, Buguias and Kapangan, Benguet
Buguias and
Kapangan, Benguet8/24/2016 1st
BENGUET 2ND
DEOLF 26.335 222 3/9/16 10/16/16 -0.04 O 0.334 0.3 0.105 0.03 0.051 0.033 0.8530 -
Alcel Construction 15129 L A MB GE
Construction of Road Baywalk, Brgy. Baybay Lopez,
Binmaley, PangasinanBinmaley,
Pangasinan9/2/2016 1st & Final
PANGASINAN 2ND
DEOLF 18.617 180 7/14/15 1/9/16 0.00 C 0.458 0.133 0.3 0 0 0 0.8910
89.1%
Very Satisfactory
Alcel Construction 15129 L A MB GE
Installation/Application/Construction of Road Safety Devices
along Odiong-Sibalom-San Remigio-Leon Road, KO104+(-448)-
KO134+000, Sibalom-Alangan Road, KO107+(-555)-
KO110+175, San Remigio-Bugo Road, KO118+(-448)-
KO126+223, Bantayan-San Pedro-Cubay Road, KO
Hamtic, San Jose,
Sibalom & San
Remigio, Antique
6/9/2016 1st & Final ANTIQUE DEO LF 10.431 70 12/16/15 2/23/16 0.00 C 0.478 0.2 0.3 0 0 0 97.80%97.8%
Outstanding
Alcel Construction 15129 L MB Rehabilitation of Banaoang - Mapandan RoadSta. Barbara,
Pangasinan1/22/18 1st
Provincial
Government of
Pangasinan
LF 45.449 195 7/12/17 5/28/18 2.74 O 0.36 0.30 0.15 0.03 0.05 0.05 93.20 - On - Going
Alcel Construction L Rehabilitation of Banaoang-Mapandan Road
Sta. Barbara,
Pangasinan /
Region 1
1/22/18 1st
Provincial
Government of
Pangasinan
LF 45.449 195 7/12/17 8/14/17 2.74 O 0.39 0.30 0.15 0.03 0.047 0.05 96.70 - On - Going
Alcel Construction/ DJCM Construction
Corporation (Formerly: Djcm Construction)
Joint Venture
JV-16-1033 L A MA GE
Network Development Construction of Missing Gaps
connecting National Roads, including RROW along Ilocos
Norte-Apayao Road
K0537+554 -
K0540+050, Nueva
Era, Ilocos Norte
11/8/17 2nd & Final DPWH LF 144.715 299 2/14/17 12/9/17 28.61 C 0.474 0.134 0.300 - - - 90.80*91.94%
Very Satisfactory
Alcel Construction/Oriental Sales Center and
Contractor (J.V.)JV-12-432 L A MA GE1
Prev. Maint. of Manila North Rd. K0169+700-K0172+105 w/
exception w/n the District
Carmen, Rosales,
Pangasinan8/9/2013 1st I LF 34.285 150 03/27/13 08/23/13 0.44 O 0.345 0.300 0.150 0.030 0.047 0.033 90.50 -
Alcel Construction/Rodekom General
Construction And Enterprise Joint VentureJV-15-680 L A MB GE
Off-Carriageway Improvement Including Drainage along
Benguet - Nueva Vizcaya Road, K0290+000 to K0293+662,
K0293+703 to K0297+792, K0297+852 to K0302+000, Bokod,
Benguet
Bokod, Benguet 8/23/2016 1st & FinalBENGUET 1ST
DEOLF 44.022 165 2/7/16 7/20/16 0.00 C 0.407 0.191 0.3 0 0 0 0.8980
89.8%
Very Satisfactory
Alcel Construction/Rodekom General
Construction And Enterprise Joint VentureJV-15-797 L A MB GE
Replacement of Permanent Weak Bridges along Gurel-Bokod-
Kabayan-Buguias-Abatan Road Alanod Bridge (B02667LZ) K0337+760,
Kabayan, Benguet5/30/2017 1st & Final
Benguet 1st District
Engineering OfficeLF 26.162 250 2/7/2016 10/13/2016 0.00 C 0.442 0.134 0.300 - - - 87.60
*87.6%
Satisfactory
Alebon Genuine Merchandising Incorporated 26300 L B MA GEWidening of Butuan City - Cagayan de Oro City - Ilagan City
Road Km1425+500 - Km.1426+500
Cagayan de Oro
City8/4/2014 1st X LF 18.578 191 1/31/14 8/10/14 0.00 O 0.383 0.300 0.150 0.030 0.040 0.050 95.30 -
Alebon Genuine Merchandising Incorporated 26300 L B MA GE
Rehab/Reconst/Upgrading of Damaged Paved National Roads
Including Drainage Based on Pavement Management
System/Highway Development and Management-4 (HDM-4)
(Intermittent Section) CDO-Cadre Circumferential Ext., Rd.,
Chainage 0-556.00, Cagayan de Oro City
CDO-Cadre
Circumferential Ext.,
Rd., Chainage 0-
556.00, Cagayan
de Oro City
6/11/2015 1stCagayan de Oro
City First DEOLF 8.865 170 2/9/15 7/28/15 - O 0.353 0.3 0.15 0.02 0.025 0.05 89.80% -
Alebon Genuine Merchandising Incorporated 26300 L B MA GE1 Widening of Carmen-Patag-Bulua Rd., Bulua-Patag Sect.Cagayan de Oro
City3/11/2013 1st X LF 4.198 37 01/15/13 02/20/13 6.52 O 0.371 0.244 0.150 0.010 0.037 0.050 86.20 -
Alebon Genuine Merchandising Incorporated 26300 L B SB GEConstruction of Concrete Revetment along Kinoguitan By-
Pass Road
Brgy. Poblacion,
Kinoguitan, Misamis
Oriental
8/11/2014 1st X LF 13.482 210 1/20/14 8/17/14 0.18 O 0.383 0.300 0.150 0.030 0.047 0.033 94.30 -
Alebon Genuine Merchandising Incorporated 26300 L B A GB
Concreting of Barangay Macasandig FMR, Macasandig,
Cagayan de Oro City
Macasandig,
Cagayan de Oro
City
3/24/2017 1stCagayan de Oro
City 2nd DEOLF 4.350 150 11/8/2016 4/6/2017 0.00 O 0.393 0.300 0.115 0.03 0.054 0.017 90.90 -
Alebon Genuine Merchandising Incorporated 26300 L B MA GE
Concreting of Barangay Macasandig FMRCagayan De Oro
City11/6/17 1st & Final DPWH LF 3.728 150 11/8/16 4/6/17 0.00 C 0.431 0.200 0.300 - - - 93.10
*93.1%
Very Satisfactory
Alfahad Builders And Enterprises 40063 L D SB GEOff-Carriageway Improvement Including Drainage along
Overton-Abaga Boundary Road KO 1531+176-KO 1532+675
Brgy. Ma. Cristina,
Iligan City03/22/18 1st/Final
Lanao del Norte
2nd DEOLF 6.224 37 03/09/17 04/14/17 0.00 C 0.492 0.133 0.300 - - - 92.50 *92.50% Very Satisfactory
Al-Fahdel Const. and Eng'g. 17953 L B MA GB
Construction of 3-storey, 9-classroom School Building at
Iligan City East High School-Hinaplanon Annex, Iligan City Iligan City 8/27/2016 1stLanao del Norte
2nd DEOLF 15.003 210 7/29/16 2/23/17 0.00 O 0.317 0.246 0.15 0.03 0.054 0.05 0.8470 -
Al-Fahdel Const. and Eng'g. 17953 L B MA GE
Road Project (Concreting), Brgy. Poblacion, Kapatagan-
Sapad, Tertiary: Kapatagan-Sapad Road, Sta. 0+000-Sta.
2+037.36 with Box Culvert, Kapatagan-Sapad, Lanao del Norte Lanao del Norte 11/23/2016 1st & Final
LANAO DEL
NORTE 1ST DEOLF 49.442 224 1/25/2016 9/4/2016 0.00 C 0.468 0.139 0.3 0 0 0 0.9070
90.7%
Very Satisfactory
Al-Fahdel Const. and Eng'g. 17953 L B MA GE1Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta.
1602+000-Sta. 1603+000 with exception6/5/2009 1st X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -
Al-Fahdel Const. and Eng'g. 17953 L B A GB
Construction of 3-Storey, 9-Classroom School Building at
Iligan City East High School, Hinaplanon Annex, Iligan City Iligan City 3/20/2017 2nd & FinalLanao del Norte
2nd DEOLF 15.003 240 5/23/2016 1/17/2017 0.00 C 0.500 0.142 0.300 - - - 94.20
*87.55%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 23 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Al-Fahdel Const. and Eng'g. 17953 L B MA GE1Repair/Rehab. of Rd. Slip (down) along Dobleston-Butadon
Nat'l Rd. (Secondary Rd.), K2007+860-K2007+900
Butadon,
Kapatagan, Lanao
del Norte
11/28/2012 1st X LF 3.790 59 10/04/12 12/01/12 0.23 O 0.363 0.226 0.150 0.030 0.023 0.033 82.50 -
Al-Fahdel Const. and Eng'g. 17953 L B MA GE
Network Development: Improvement/Widening of National
Roads: Primary Roads: Malabang-Dobleston-Tukuran Road
SND, Lanao del
Norte K2001+244-
K2002+244
11/15/17 1st & Final DPWH LF 32.233 162 2/13/17 7/24/17 0.00 C 0.409 0.190 0.300 - - - 89.90*89.9%
Very Satisfactory
Alfalfa Construction 29712 L A MA GB
Construction of 2-Storey, 6-Classroom School Building, Lawig
National High School (Main) Lamut, Ifugao 6/1/2017 1st & FinalIfugao 1st District
Engineering OfficeLF 8.947 140 6/27/2017 11/13/2017 0.00 C 0.492 0.133 0.300 - - - 92.50
*92.5%
Very Satisfactory
Alfalfa Construction 29712 L B MA GE1Road Upgrading of Banaue-Hungduan Benguet Bdry. Road
Hapao-Abatan SectionHungduan, Ifugao 4/8/2011 1st CAR LF 16.560 177 01/20/11 07/02/11 -6.00 O 0.385 0.300 0.090 0.010 0.054 0.017 85.60 -
Alfalfa Construction 29712 L A MA GB
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure Including Local Projects - Construction of
Office of the Vice President (OVP)-Office of Senior Citizens
Affairs (OSCA), (Multi-Purpose Building Center), Hungduan,
Ifugao
Hungduan, Ifugao 3/11/2016 1st Ifugao 1st DEO LF 1.855 150 8/12/15 1/8/16 0 C 0.434 0.133 0.3 0 0 0 86.70%86.7%
Satisfactory
Alfalfa Construction 29712 L A MA GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide along Banaue-Hungduan-
Benguet Boundary Road, Hungduan, Ifugao
Hungduan, Ifugao 8/25/2016 1st & Final IFUGAO 1ST DEO LF 1.849 89 3/28/16 6/24/16 0.00 C 0.417 0.133 0.3 0 0 0 0.850085%
Satisfactory
Alfalfa Construction 29712 L A MB GE
Construction/ Improvement/ Rehabilitation of Barangay
Tanap, Lawig FMR, Lamut, Ifugao Lamut, Ifugao 11/20/2016 1st & Final Ifugao 1st DEO LF 1.889 36 6/30/2016 8/4/2016 0.00 C 0.48 0.133 0.3 0 0 0 0.913091.3%
Very Satisfactory
Alfalfa Construction 29712 L A MB GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide, Banaue-Mayoyao-A. Lista-
Isabela Bdry Rd., K0354+544 to K0354+567, K0361+813 to
K0361+863, K0363+680 to K0363+702, K0363+702 to
K0363+730, K0364+350 to K0364+630, K03
Banaue, Mayoyao
& Aguinaldo, Ifugao8/27/2016 1st IFUGAO 2ND DEO LF 28.461 180 3/18/16 9/13/16 0.04 O 0.324 0.293 0.15 0.022 0.037 0.05 0.8760 -
Alfalfa Construction/Carlyz Construction Joint
VentureJV-15-870 L B MB GE
Repair/Rehabilitation/Improvement (Reblocking, Additional
Pavement Width with Drainage Improvement), K0315+(-147) to
K0318+000 with Exception, Kiangan-Tinoc-Buguias, Kiangan,
Ifugao
Kiangan, Ifugao 8/26/2016 1st & Final IFUGAO 1ST DEO LF 9.497 156 1/29/16 7/2/16 -0.01 C 0.448 0.133 0.278 0 0 0 0.859085.9%
Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE1 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road 3/5/2009 2nd VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE1
Completion of Binalbagan Bridge 2 - Km. 66+910 along
Hinigaran-Isabela Road3/5/2009 4th VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE1
Const. of Access Rd. for Himoga-an Bridge, Bacolod North
Rd., Sta. 71+035.20-Sta. 74+557.20
Sagay City, Negros
Occidental8/12/2013 1st VI LF 109.290 310 01/15/13 11/20/13 10.51 O 0.342 0.240 0.150 0.030 0.042 0.050 85.40 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE1
Road Upgrading of Villahermoso-Canla-on City-La Castellana
Road, K0074+205-K0074+995
La Castellana,
Negros Occidental8/10/2013 1st VI LF 23.131 182 01/28/13 07/28/13 -3.18 O 0.356 0.206 0.047 0.030 0.035 0.033 70.70 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MA GE
Widening of Catabla Bridge 3 along Bacolod Silay Airport
Access Road
Talisay City, Negros
Occidental3/20/18 1st/Final
Negros Occidental
1st DEOLF 30.061 180 5/9/17 12/4/17 0.00 C 0.498 0.133 0.3 - - - 93.10 *93.10% Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-4 Project Analysis - Intermittent Sections)
National Secondary Road, Kabankalan Jct. Salong Tapi
Dacongcogon Bantayan Road - Package B
Kabankalan City,
Negros Occidental10/24/2014 1st VI LF 48.461 209 5/29/14 12/23/14 O 0.361 0.232 0.150 0.030 0.048 0.033 85.40%
0%
Poor
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE1
Conc. of Nat'l Rd. along Bacolod South Rd., K0086+061-
K0088+003
Kabankalan City,
Negros Occidental8/11/2012 1st VI LF 32.631 222 01/27/12 09/04/12 0.31 O 0.242 0.300 0.150 0.030 0.050 0.050 82.20 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE1
Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-
Bantayan Raod (Km. 99+675.50-Km.131+142.75 w/ exception,
Brgy. Salong & Batayan
9/17/2009 2nd VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Construction/ Improvement of Junction National Road -
Talisay - Concepcion-Mucia Road with exception Leading to
Campuestohan Resort, Talisay City, Negros OccidentalTalisay City, Negros
Occidental8/25/2017 1st & Final
Regional Office No.
VILF 197.818 450 3/15/2016 6/7/2017 - C 0.479 0.133 0.300 - - - 91.20
*91.2%
Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Improvement/Widening of Bacolod Silay Airport Access Road, K0012+403 -
K0012+623,
Talisay, Negros
Occidental
9/3/2016 1st & FinalNegros Occidental
1st DEOLF 9.848 96 3/28/16 7/1/16 0.00 C 0.478 0.133 0.3 0 0 0 0.9110
91.1%
Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Repair/Rehabilitation/Improvement of Bacolod South Road,
K0046+(-910) - K0047+700 with exception Hinigaran, Negros
Occidental, NIR
K0046+(-910) -
K0047+700 with
exception
Hinigaran, Negros
Occidental, NIR
6/14/2016 1st & FinalNegros Occidental
Second DEOLF 6.934 151 6/14/16 11/11/16 0.00 C 0.42 0.138 0.3 0 0 0 85.80%
85.8%
Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Widening of Guihalaran (B00494NR) Bridge 2 along Bacolod
Silay Airport Access Road
Silay City, Negros
Occidental3/20/18 1st/Final
Negros Occidental
1st DEOLF 23.734 200 5/9/17 11/24/17 0.00% C 0.487 0.133 0.3 - - - 92.00 *92.00% Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 24 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Widening of National Roads along Bacolod South Road,
K0048+542-K0051+468; K0052+444-K0053+600; K0064+250-
K0065+360, Hinigaran, Negros Occidental
Hinigaran, Negros
Occidental11/16/2015 1st
Regional Office,
NIRLF 119.102 310 5/20/15 3/24/16 (+)7.18% O 0.373 0.238 0.15 0.03 0.055 0.05 89.60%
89.6%
Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Widening of Bacolod Circumferential Road (South) with
Drainage (including RROW), K0006+451 - K0011+476, Bacolod
City, Negros Occidental
Bacolod City,
Negros Occidental11/9/2015 1st
Regional Office,
NIRLF 81.443 255 3/16/15 11/25/15 (-)7.23% O 0.337 0.3 0.078 0.03 0.06 0.033 83.80%
83.8%
Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Road along Bacolod North Road, K0039+771-
K0040+288; K0061+420-K0062+000; K0075+903-K0075+953;
K0076+620-K0077+000; K0080+060-K0081+000; K0081+558-
K0082+000; K0082+000-K0083+000; K0036+902-K0036+952;
K0038+200-K0038+406; K0041+843-K0042+300; K0042+500-
K0043+000, Manapla, Negros Occidental
Manapla, Negros
Occidental11/19/2015 1st
Regional Office,
NIRLF 75.626 265 4/8/15 12/28/15 (+)0.75% O 0.34 0.214 0.15 0.03 0.055 0.05 83.90%
83.9%
Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Rehabilitation/Reconstruction/Upgrading of Bacolod North
Road, K0086+000 - K0087+000, K0087+540 - K0088+327,
K0088+362 - K0090+933, Sagay City, Negros OccidentalSagay City, Negros
Occidental11/19/2015 1st
Regional Office,
NIRLF 68.500 280 3/11/15 12/15/15 (+)0.04% O 0.371 0.237 0.15 0.03 0.055 0.05 89.30%
89.3%
Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Rehabilitation/Reconstruction/Upgrading of Bacolod North
Road,
K0086+000 -
K0087+000,
K0087+540 -
K0088+327,
K0088+362 -
K0090+933
8/25/2015 1stRegional Office
No.VILF 65.069 250 3/11/15 11/15/15 17.60% O 0.357 0.24 0.15 0.03 0.06 0.05 88.70% -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Construction/Replacement of Permanent Weak Bridges along
National Road, Tapi Bridge (B00211NR), along Kabankalan
Jct. Salong Tapi Dacongcogon Bantayan Road, Brgy. Tapi,
Kabankalan City, Negros Occidental
Brgy. Tapi,
Kabankalan City,
Negros Occidental
11/14/2015 1stNegros Occidental
3rd DEOLF 10.094 286 2/26/15 12/8/15 (+)11.0% O 0.363 0.241 0.15 0.03 0.045 0.05 87.90%
87.9%
Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Construction/Replacement of Permanent Weak Bridges along
National Road Tapi Bridge (B00211NR), K0115+044 along
Kabankalan Junction Salong Tapi, Dacongcogon Bantayan
Road, Barangay Tapi, Kabankalan City, Negros Occidental
Barangay Tapi,
Kabankalan City,
Negros Occidental
3/8/2016 2ndNegros Occidental
Third DEOLF 10.094 306 2/26/15 12/28/15 0 C 0.48 0.133 0.3 0 0 0 89.26%
89.26%
Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Improvement/Widening of National Roads along Bacolod
South RoadK0057+740-
K0059+781,
Binalbagan, Negros
Occidental
11/22/2016 2nd & Final NIR LF 45.720 179 3/30/2016 9/24/2016 0.00 C 0.485 0.133 0.3 0 0 0 0.918089.94%
Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Rehabilitation/Major Repair of Tan-ao Bridge (B00175MN)
along Bacolod North RoadSaga City, Negros
Occidental11/25/2016 1st & Final
Negros Occidental
1st DEOLF 13.861 88 3/30/2016 6/25/2016 0.00 C 0.5 0.133 0.3 0 0 0 0.9330
93.3%
Very Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE1
Const. of the Remaining Structures: Himogaan Bridge, Sta.
71+035.20-Sta. 74+557.20
Sagay City, Negros
Occidental8/12/2013 1st VI LF 116.246 505 05/14/12 09/30/13 0.66 O 0.376 0.240 0.150 0.030 0.042 0.050 88.80 -
Alfies Construction & Construction Supply,
Inc./Aqua Dragon Construction & Supply17162 L A MB GE
Preventive Maintenance Based on Pavement Management
System/Highway Development and Management -4 (HDM-4) of
Bacolod South Road, K0046+(-910) to K0081+486
Hinigaran,
Binalbagan and
Himamaylan
3/15/18 1st/FinalNegros Occidental
2nd DEOLF 29.692 207 4/16/17 11/8/17 -3.00% C 0.456 0.133 0.21 - - - 79.90 *79.90% Unsatisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 L A MB GE
Improvement/Widening of National Roads along Bacolod
South Road, K0057+740 - K0059+781,Binalbagan, Negros
Occidental8/30/2016 1st
Regional Office,
NIRLF 45.720 209 3/30/16 10/24/16 0.00 O 0.357 0.239 0.15 0.03 0.061 0.05 0.8870 -
Alfie'S Construction And Construction Supply/
Aqua Dragon Construction & Supply Joint
Venture
JV-16-1465 L A MB GE
Preventive Maintenance based on Pavement Management
System/Highway Development and Management-4 (HDM-4) of
Bacolod South Road, K0046+(-910)-K0046+ (-045),
K0049+830-K0050+090, K0058+275-K0058+500, K0060+600-
K0060+389, K0063+303-K0063+747, K0071+042-K0071+632,
K0072+000-K0072+075, K0072+901.50-K0073+430, K0081+121-
K0081+486, Hinigaran, Binalbagan and Himamaylan City,
Negros Occidental
Hinigaran,
Binalbagan and
Himamaylan City,
Negros Occidental
8/20/2017 1stNegros Occidental
2nd DEOLF 28.152 166 4/16/2017 9/28/2017 0.01 O 0.375 0.240 0.150 0.03 0.061 0.05 90.60 -
Alfrego Builders & Supply 19284 L D SB GE2Improvement/Riprapping of Sasa Creek Second
Congressional District6/11/2009 1st XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 -
Algamon Construction 30704 L B MA GERehabilitation/Reconstruction of National Roads with Slip,
Slope Collapse and Land Slide Along Dinagat-Loreto Road
Dinagat-Loreto
Road, San Jose,
Province of Dinagat
Islands
8/31/2015 2nd Dinagat Island LF 6.385 180 3/20/15 9/15/15 (+) 0.17% O 0.366 0.234 0.15 0.03 0.046 0.05 87.60% -
Algamon Construction 30704 L C SB GE2Protection Works along Daang Maharlika, (Surigao-Ipil-Lipata
Rd.) Kinabutan Bridge II, Brgy. RizalSurigao City 11/21/2012 1st XIII LF 4.735 120 08/16/12 12/13/12 -7.90 O 0.395 0.268 0.071 0.020 0.045 0.017 81.60 -
Algamon Construction 30704 L B MA GERehabilitation/ Reconstruction of National Roads with Slip,
Slope Collapse and Land Slide along Dinagat - Loreto Road
San Jose, Province
of Dinagat Islands6/11/2015 1st
DINAGAT
ISLANDS DEOLF 6.385 180 3/20/15 9/15/15 (+) 0.92% O 0.366 0.234 0.15 0.03 0.045 0.033 85.80% -
Algimar Construction 15232 L A MA GE1Conc. of Tablas Circumferential Road (Doña Juana-Binunga-
an Section)8/27/2009 1st IVB 19.652 180 O 0.319 0.291 0.150 0.030 0.047 0.033 87.00 -
Algimar Construction 15232 L A MA GE1Concreting of Tablas Circumferential Road (Hinugasan-
Camantaya Section)5/21/2009 1st IV-B 19.298 180 O 0.312 0.236 0.150 0.030 0.040 0.033 80.10 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 25 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Algimar Construction 15232 L A MA GE1Repair of Damaged Rd. Sect. along Looc-Odiongan-San
Andres Rd., Km.104+400-Km.122+400 (IS)
Tablas Island,
Romblon11/29/2012 1st IVB LF 15.860 210 09/20/12 04/17/13 26.67 O 0.306 0.291 0.150 0.030 0.040 0.033 85.00 -
Algimar Construction 15232 L A MA GE1 Const. of Bridge Approaches @ Maingaran Bridge 2/27/2009 1st V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 -
Algimar Construction 15232 L AA MB GE
Rehabilitation/Reconstruction of Puerto Princesa South Road,
K0154+460-K0156+369.50, K0168+685-K0169+338.70,
K0173+714-K0173+919.50, K0184+479.00-K0184+532.98,
Espanola, Palawan
K0154+460-
K0156+369.50,
K0168+685-
K0169+338.70,
K0173+714-
K0173+919.50,
K0184+479.00-
K0184+532.98,
Espanola, Palawan
3/8/2016 1st Regional Office LF 75.5646 258 7/24/15 4/6/16 0.20% O 0.272 0.3 0.15 0.03 0.05 0.05 85.20%85.2%
Satisfactory
Algimar Construction 15232 L AA MB GERoad Upgrading Based on Gravel Road Strategies Traffic
Benchmark for Upgrading to Paved Road Standard
San Fernando,
Masbate6/11/2015 1st Masbate 3rd LF 37.877 178 3/9/15 9/6/15 3.50% O 0.352 0.253 0.15 0.018 0.051 0.05 87.40% -
Algimar Construction 15232 L AA MB GE
Road Upgrading(Gravel to Paved) Based on Gravel Road
Strategies Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-4 Project Analysis) San Fernando-Talisay
Road, San Fernando, Masbate
San Fernando,
Masbate9/3/2015 2nd
Masbate Third
DEOLF 37.877 200 3/11/15 9/26/15 0.21% O 0.321 0.281 0.15 0.03 0.06 0.05 89.20% -
Algimar Construction 15232 L AA MB GE
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved the
Road Standard (HDM-4 Project Analysis) San Fernando-
Talisay Road, San Fernando, Masbate
San Fernando,
Masbate6/11/2016 3rd & Final Masbate 3rd DEO LF 37.876 179 3/11/15 9/5/15 0.00 C 0.383 0.2 0.3 0 0 0 88.30%
88.3%
Satisfactory
Algimar Construction 15232 L AA MB GERoad Upgrading ( Gravel to Paved) Quezon-Aramaywan Road,
K0154+950-K0156+851.20 with ExceptionQuezon, Palawan 11/22/2014 1st IV LF 34.958 209 5/28/14 12/22/14 -2.00% O 0.360 0.240 0.130 0.030 0.054 0.050 86.40%
86.40%
Satisfactory
Algimar Construction 15232 L AA MB GE
Road Upgrading (Unpaved to Paved) of Tablas
Circumferential Road, K0029+765-K0029+990, K0112+196.60-
K00112+281, K0115+190-K0115+219, K0115+392-K0115+838,
K0116+300-K0116+674, Re-aligned to Road Upgrading
(Unpaved to Paved) of Tablas Circumferential Road,
K0029+765-K0029+990, K0115+090-K0115+219, K0115+392-
K0115+838, K0116+300-K0116+674.
Tablas Island,
Romblon6/12/2015 1st Romblon DEO LF 29.682 145 4/15/15 9/6/15 0.00% O 0.381 0.24 0.15 0.03 0.051 0.05 90.20% -
Algimar Construction 15232 L A SB GB1Const. of 1 Unit 7x7 S/B at Teofilo Tamabago E/S, Palanas
South realigned to Dimasalang C/S5/26/2009 1st V 0.843 90 O 0.292 0.300 0.150 0.030 0.032 0.033 83.70 -
Algimar Construction 15232 L A MA GE1Upgrading of Balud-Tawad-Milagros-Aroroy Road (Bangad
Sect.) Masbate 8/9/2011 1st V LF 96.100 360 11/23/10 11/17/11 17.47 O 0.382 0.237 0.150 0.030 0.061 0.033 89.30 -
Algon Engineering Construction Corporation 270 L AAA LB GB1 Construction of Overhead Water Tank with Cistern 4/29/2009 Final DOST 3.153 124 O 0.373 0.291 0.12 0.03 0.07 0.05 93.40 -
Algon Engineering Construction Corporation 270 L A A GB
Construction of Tugas Bridge, Camp 1, Maramag, BukidnonCamp 1, Maramag,
Bukidnon3/14/2017 2nd
Bukidnon 2nd
DEOLF 20.424 266 3/6/2016 11/26/2016 -0.03 O 0.393 0.300 0.050 0.03 0.07 0.033 87.60 -
Algon Engineering Construction Corporation 270 L AAA LB GE
Widening (2 into 4 lanes) of Davao-Cotabato Road (Jct. Digos-
Cotabato Section) including RROW (Brgy. Sinawilan-Brgy.
Tubod Section), K1575+610-K1576+000, K1576+419-
K1578+776, K1579+294-K1581+398, K1581+434-K1581+814,
K1582+553-K1583+884
Davao del Sur Lone
District11/13/17 1st DPWH LF 174.689 300 4/11/17 2/4/18 0.11 O 0.385 0.239 0.150 0.022 0.047 0.05 89.30 -
Algon Engineering Construction Corporation 270 L AAA LB GE
Widening (with Reblocking) of Davao-Cotabato Road (Jct.
Digos-Cotabato Section), K01564+(-278) to K01564+800,
K01567+(-364) to K01567+448, K01567+448 to K01568+200
(LS), K01570+000 to K01571+500, K01572+198 to K01573+893,
including Road-Right of-Way, Davao del Sur
Davao del Sur 3/15/2017 1stDavao del Sur 1st
DEOLF 140.776 383 4/12/2016 4/29/2017 0.01 O 0.367 0.240 0.150 0.03 0.061 0.05 89.80 -
Algon Engineering Construction Corporation 270 L AAA LB GE
Widening (with Reblocking) of Davao-Cotabato Road (Jct.
Digos Cotabato Section), K1564+(-278)-K1564+800, K1567+(-
364)-K1567+448, K1567+448-K1568+200(LS), K1570+000-
K1571+500, K1572+198-K1573+893, Davao del Sur, Including
Road Right-of-Way (RROW) (as per RBIA Station Limits),
Davao del Sur
K1564+(-278)-
K1564+800,
K1567+(-364)-
K1567+448,
K1567+448-
K1568+200(LS),
K1570+000-
K1571+500,
K1572+198-
K1573+893, Davao
del Sur, Including
Road Right-of-Way
(RROW) (as per
RBIA Station Limits),
Davao del Sur
11/19/2016 1stDavao Del Sur First
DEOLF 140.776 331 4/12/2016 3/8/2017 0.00 O 0.351 0.24 0.15 0.03 0.037 0.05 0.8580 -
Algon Engineering Construction Corporation 270 L AAA LB GE1Conc. of NRJ Bayugan-Calaitan-Tandag Rd. (Km.1273+491.80-
Km.1281+040 w/ exception)
Bayugan, Agusan
del Sur3/20/2013 2nd XIII LF 159.496 495 12/26/11 05/03/13 4.25 O 0.312 0.300 0.150 0.030 0.051 0.050 89.30 -
Algon Engineering Construction Corporation 270 L AAA LB GE1Widening of Davao-Bukidnon Rd., Davao City, Tugbok-Mintal
Sect., Km.1693+400-Km.1697+335.40Davao City 8/7/2013 1st XI LF 46.965 209 02/26/13 09/22/13 -0.69 O 0.352 0.298 0.143 0.030 0.025 0.033 88.10 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 26 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Algon Engineering Construction Corporation 270 L AAA LB GE1
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. along
Davao-Cotabato Rd. (Davao City-Jct. Digos) Sta.1556+000-
Sta.1561+249
Davao del Sur 3/24/2012 1st XI LF 46.285 249 07/21/11 03/25/12 -4.97 O 0.360 0.300 0.100 0.030 0.041 0.033 86.40 -
Algon Engineering Construction Corporation 270 L AAA LB GE1 Widening of Davao-Bukidnon Rd. Davao City 8/17/2012 1st XI LF 36.342 210 01/31/12 08/27/12 -0.29 O 0.379 0.213 0.147 0.030 0.055 0.033 85.70 -
Algon Engineering Construction Corporation 270 L AAA LB GE1
Prev. Maint. (Int. Sects.) along Pres. Diosdado Macapagal
Highway, a)Km.1712+000-Km.1712+802.90; b)Km.1713+303-
Km.1713+815.64
Davao Oriental 3/20/2013 1st XI LF 24.973 52 01/25/13 03/17/13 7.83 O 0.319 0.299 0.150 0.030 0.040 0.050 88.80 -
Algon Engineering Construction Corporation 270 L AAA LB GE1Conc. of NRJ Bayugan-Lalaitan-Tandag Rd. Km. 1273+491.80-
Km. 1281+040 (w/ exceptions)
Bayugan, Agusan
del Sur11/29/2012 1st XIII LF 159.496 435 12/26/11 03/04/13 12.50 O 0.332 0.289 0.150 0.030 0.060 0.050 91.10 -
Al-Hussein Construction 18438 L A MA GE
Rehabilitation/Recons-truction of National Roads with Slips,
Slope Collapse and Landslide, Iligan City - Marawi City via Bito-
Abaga Road, Tertiary: Bito-Abaga Road, Balo-I, Lanao del
Norte, Km. 1539+ (-1805)-K1539+(1745); K1539+ (-1350)-
K1539+(-1283);
Balo-I, Lanao del
Norte, Km. 1539+ (-
1805)-
K1539+(1745);
K1539+ (-1350)-
K1539+(-1283);
K1539+(-720)-
K1539+ (-590);
K1539+(-571)-
K1539+(-498);
K1539+ (-244)-
K1539+000
8/28/2016 1st & FinalLanao del Norte
1st DEOLF 8.667 122 1/25/16 5/25/16 0.00 C 0.465 0.133 0.3 0 0 0 0.8980
89.8%
Very Satisfactory
Alj Construction And Supply 30571 L D SB GE
Rehabilitation/ Major Repair of Joovellar Bridge (B00039PN)
along Guimbal -Igbaras - Tubungan - Leon Road, K0036+728,
Igbaras, Iloilo
Igbaras, Iloilo 11/24/2016 1st & Final ILOILO 1ST DEO LF 0.949 30 2/5/2016 3/5/2016 0.07 C 0.5 0.172 0.3 0 0 0 0.972097.2%
Outstanding
Alj Construction And Supply 30571 L D SB GBConstruction of Multi-Purpose Building, Brgy. Poblacion
(Purok IV), Pavia, IloiloPavia, Iloilo 8/24/2016 1st & Final ILOILO 4TH DEO LF 1.921 1.9205 3/30/00 3/30/00 0.00 C 0.5 0.2 0 0 0 0 0.7000
70%
Poor
Aljon Construction & Supply / Rolco
Construction & Development CorporaJV-16-1613 L B MA GE
Construction/Maintenance of Flood Mitigation Structure &
Drainage Systems, Const. of Flood Control/Drainage Jct
National Road to Cavinitan Barangay Road-Sto. Domingo
River Sta. 0+854-Sta. 2+700
Virac, Catanduanes 11/17/17 1st DPWH LF 32.584 131 7/30/17 12/7/17 -4.00 O 0.337 0.240 0.110 0.03 0.05 0.033 80.00 -
Allado Construction Company, Inc / Quadcore
Construction - J.VL Bacay Peoples Village
Brgy. Bacay,
Dumangas, Iloilo9/1/2017 Final NHA LF 289.90 613 02/03/2016 10/01/2017 2.76 O 0.427 0.194 0.300 - - - -
92.13% Very
Satisfactory
Allado Construction Company, Inc. 073-667 L AAA GE1Rehabilitation of Jct Sayre Highway (Kibawe) - Natulongan -
Bukangliwayway Footbridge P1CKibawe Bukidnon/X 11/23/2011 1st
Provincial
Government of
Bukidnon
LF 19.145 226 04/05/11 01/16/12 -5.65 O 0.310 0.290 0.090 0.030 0.060 0.050 83.00 -
Allen Construction 12584 L B MA GB
Construction of Multi-Purpose Building (Cooperative
Building), Brgy. Calabalabaan, Muñoz, Nueva Ecija Muñoz, Nueva Ecija 11/22/17 1st & Final DPWH LF 1.430 60 7/9/17 9/6/17 0.00 C 0.475 0.134 0.300 - - - 90.90*90.9%
Very Satisfactory
Allen Construction 12584 L MB Casecnan Multipurpose Irrigation & Power Project - IC PH IITalavera, Nueva
Ecija 5/22/2018 1st NIA LF 7.968 610 9/22/2016 5/24/2018 0.00 O 0.32 0.3 0.15 0.03 0.06 0.05 90.70 - On - Going
Allen Construction 12584 L SB GE2Restoration of Embankment @ D-Main & Const. of Thresher
Crossing with Turn-out @ Div II Service Area
Talavera, Nueva
Ecija7/21/2012 1st NIA LF 8.653 90 07/11/12 8.80 O 0.358 0.293 0.150 0.030 0.057 0.050 93.77 -
Allencon Development Corporation 12302 L D SB GE
Preventive Maintenance of Iloilo East Coast Capiz Road,
K0195+395 - K0196+000 and K0250+545 - K0250+669, San
Dionisio and Barotac Viejo, Iloilo
San Dionisio and
Barotac Viejo, Iloilo3/27/2017 1st & Final Iloilo 3rd DEO LF 8.700 75 8/1/2016 10/14/2016 0.00 C 0.450 0.134 0.300 - - - 88.40
*88.4%
Satisfactory
Allencon Development Corporation 12302 L D SB GE2Const. of Coastal Protection Works along Iloilo-Antique Rd.
K0026+700-K0027+151Guimbal, Iloilo 8/14/2013 1st VI LF 7.301 244 12/28/12 08/28/13 0.48 O 0.269 0.300 0.150 0.030 0.037 0.050 83.60 -
Allencon Development Corporation 12302 L D SB GE1 Reconst. of Cabasi Bridge along Iloilo-Antique Rd., Km.30+534 Guimbal, Iloilo 8/14/2012 1st VI LF 4.978 240 01/20/12 09/15/12 1.68 O 0.279 0.300 0.150 0.030 0.040 0.050 84.90 -
Alleyway Construction 15310 L A MA GE
MFO 1-National Road Network Services-Asset Preservation of
National Roads-Rehabilitation/ Reconstrtuction/Upgrading of
Damaged Paved National Roads including Drainage based on
PMS/HDM-4 Tertiary-Reconstruction from Concrete to
Concrete-Delpan Ext. Road-Chainage 010.80-Chainage 347.78
(S02380LZ); Chainage (-)24.60-Chainage 309.15 (S02381LZ)
Manila City 8/19/2017 1st North Manila DEO LF 14.699 120 5/24/2017 9/20/2017 0.19 O 0.397 0.242 0.150 0.02 0.027 0.033 86.90 -
Alleyway Construction 15310 L A MA GE
Construction/Maintenance of Flood Mitigation Structures and
Drainage System (RCBC) along Raxabago Chainage 285.00 to
Chainage 504.00, Tondo, Manila City 2nd LD
Tondo, Manila 6/11/2015 1st North Manila DEO LF 33.638 200 3/20/15 10/5/15 (-) 4.40 O 0.37 0.24 0.106 0.012 0.06 0.033 82.10% -
Alleyway Construction 15310 L A MA GE
Construction/Maintenance of Flood Mitigation Structures and
Drainage Systems-Construction of Flood Control/Drainage at
Pureza St. crossing Lardizabal and Arevalo, Sampaloc, ManilaSampaloc, Manila 6/10/2016 1st
NORTH MANILA
DEOLF 13.954 180 2/1/16 7/29/16 0.02 O 0.381 0.24 0.15 0.022 0.035 0.05 87.80% -
Alleyway Construction 15310 L A MA GE
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects-
Construction/Rehabilitation of various Projects in Manila City
2nd LD - Rehabilitation with Drainage Improvement of Torres
Bugallon St. And Vicinity
Manila City 2nd
Legislative District11/24/2014 1st NCR LF 9.099 120 9/9/14 1/6/15 13.40% O 0.365 0.229 0.150 0.030 0.045 0.033 85.20%
85.20%
Satisfactory
Alleyway Construction 15310 L A MA GE
Construction/Maintenance of Flood Mitigation Structures and
Drainage Systems-Construction of Flood Control/Drainage at
Pureza Street crossing Lardizabal and Arevalo, Sampaloc,
Manila
Sampaloc, Manila 11/28/2016 1st & Final North Manila DEO LF 13.954 180 2/1/2016 7/29/2016 0.00 C 0.463 0.133 0.3 0 0 0 0.896089.6%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 27 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Allied Trade Resources Multi-Purpose
Cooperative 31667 L B MA GB1 DOTC CARAGA Regional Office Development Project
Capitol Drive,
Butuan City 8/27/2013 1st DOTC L 10.258 180 04/22/13 10/18/13 38.26 O 0.389 0.300 0.150 0.015 0.004 0.050 90.71 -
Allied Trade Resources Multi-Purpose
Cooperative 31667 L B MA GB1 PATIN-AY LTO District Office Development Project
Patin-ay,
Prosperidad,
Agusan del Sur
8/28/2013 1st DOTC L 5.147 180 04/08/13 10/04/13 2.99 O 0.391 0.240 0.150 0.015 0.030 0.050 87.64 -
Almakar Builders and Metal Works 21929 L B MA GB
Construction of Four (4) Storey, Eight (8) Classroom School
Building, Aniban Central School, Bacoor City, Cavite Bacoor City, Cavite 11/28/17 1st & Final DPWH LF 15.956 251 5/31/16 2/5/17 0.00 C 0.480 0.134 0.300 - - - 91.40*91.4%
Very Satisfactory
Almakar Builders and Metal Works 21929 L B MA GEConstruction of Revetment along Bacoor River, Banalo
Section, Phase III, Bacoor, CaviteBacoor, Cavite 3/22/2018 1st/Final Cavite Sub DEO LF 37.274 192 9/4/2017 3/14/2018 0.00 C 0.480 0.133 0.300 - - - 91.30 *91.30% Very Satisfactory
Almakar Builders and Metal Works 21929 L B MA GE
MFO 2-Flood Management Services, Construction,
Maintenance of Flood Mitigation Structures and Drainage
System, West River Bank Stabilization Project along Imus
River (Phase I and II) Cavite 4th LD, Dasmariñas City, Cavite
Dasmariñas City,
Cavite4/5/2016 1st Cavite 1st DEO LF 27.0325 281 6/6/15 3/12/16 0 C 0.455 0.2 0.3 0 0 0 95.50%
95.5%
Very Satisfactory
Almakar Builders and Metal Works 21929 L C SB GB1 Const. of MPB in Poblacion I-A Imus, Cavite 11/23/2012 1st IVA LF 0.681 135 07/18/12 11/29/12 1.20 O 0.342 0.300 0.150 0.020 0.041 0.033 88.60 -
Almana Construction And Dev't Corporation 38859 L AAA MB GB
Construction of Unit Four (4) Storey Eight (8) Classroom
School Building at Manjuyod NHSManjuyod, Negros
Oriental5/30/2017 1st & Final
Negros Oriental 1st
DEOLF 14.577 180 8/15/2016 2/10/2017 0.00 C 0.485 0.133 0.300 - - - 91.80
*91.8%
Very Satisfactory
Alnino Construction & Supply 18378 L D MA GEConstruction of Pili River Control, Poblacion, Castilla,
Sorsogon, First District of Sorsogon
First District of
Sorsogon3/11/2016 1st Sorsogon 1st DEO LF 9.5035 150 2/3/15 7/2/15 - C 0.467 0.133 0.3 0 0 0 90.00%
90%
Very Satisfactory
Alnino Construction & Supply/Steven
Construction & Supply Joint Venture3 L 0 0 GB
Cluster V-Const. of Various Sch. Building Project under FY
2015 Basic Educational Facilities Fund (BFFF) Batch 6, Const.
of Two Storey Four (4) Classroom 7mx9m Sch. Bldg, Cabidan
ES, East Dist., Sorsogon City
East Dist., Sorsogon
City8/31/2016 1st & Final Sorsogon 1st DEO LF 6.126 150 11/23/15 4/20/16 0.00 C 0.487 0.133 0.3 0 0 0 0.9200
92%
Very Satisfactory
Alonzo Construction 32145 L MBUpgrading/Improvement of Nabunturan-Nuevo Iloco
Provincial Road Phase II
Nabunturan,
Compostel Valley3/27/18 Final
Provincial
Government of
Compostela Valley
LF 75.900 140 10/21/17 3/6/18 0.00 C 0.50 0.20 0.30 - - - 100.00 *100.00% Outstanding
Alonzo Construction 32145 LUpgrading/Improvement of Nabunturan-Nuevo Iloco
Provincial Road Phase II
Nabunturan &
Mawab, Laak,
Compostela Valley
7/25/18 1st
Provincial
Government of
Compostela Valley
LF 75.713 140 10/18/17 8/19/18 0.93 O 0.38 0.29 0.15 0.03 0.06 0.05 96.08 - On - Going
Alonzo Construction / Gemma Construction
and SupplyL
Rehabilitation of Cabinuangan - Magangit FMR with 3 units
Bridge Retrofitting Works
New Bataan,
Compostela Valley
Province, Region XI
6/3/19 1st
Provincial
Government of
Compostela Valley
LF 190.825 450 12/21/18 2/28/20 11.49 O 0.36 0.26 0.15 0.03 0.06 0.05 90.90 - On - Going
Alpha & Omega Gen. Contractor &
Development Corp.38958 L A - GE
Improvement/Repair/Rehabilitation of Existing Flood Control
Structures Angat River Tanauan Section, Bustos, Bulacan Bustos, Bulacan 11/28/17 1st & Final DPWH LF 9.311 60 10/18/17 12/16/17 26.47 C 0.456 0.133 0.300 - - - 88.90*88.9%
Satisfactory
Alpha Ryder Construction And Supplies 12197 L A MA GE
Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National
Roads Including Drainage Based on Pavement Management
System - Highway Development Management (HDM-4) Tertiary
Reconstruction from Concrete to Concrete Junction Donsol-
Banuang Gurang Road, K0578+800 - K0579+732, K0580+604 -
K0580+906, K0583+540 - K0583+832 Donsol, Sorsogon
K0578+800 -
K0579+732,
K0580+604 -
K0580+906,
K0583+540 -
K0583+832 Donsol,
Sorsogon
8/15/2017 1st Sorsogon 1st DEO LF 47.040 240 5/11/2017 1/5/2018 0.10 O 0.386 0.237 0.150 0.022 0.03 0.033 85.80 -
Alpha Ryder Construction And Supplies 12197 L A MA GE
Rehab./Reconst. National Roads with Slips, Slope Collapse &
Landslide Jct. Donso-Banuang Gurang Road, K0582+000-
K0584+000, K0856+050-K0587+000, w/ excpetions, Donsol,
Sorsogon
Donsol, Sorsogon 11/18/2016 1st Sorsogon 1st DEO LF 55.519 260 3/13/2016 11/27/2016 0.01 O 0.351 0.227 0.15 0.03 0.056 0.05 0.8640 -
Alpha Ryder Construction And Supplies 12197 L A MB GE
Construction of Flood Control Structure along San Isidro
River including the removal of old bridge (obstruction to river
flow), Brgy. San Isidro, Bulan, Sorsogon
Brgy. San Isidro,
Bulan, Sorsogon6/3/2017 1st & Final
Sorsogon 2nd
DEOLF 58.500 260 3/23/2016 12/7/2016 0.00 C 0.426 0.200 0.300 - - - 92.60
*92.6%
Very Satisfactory
Alpha Ryder Construction And Supplies 12197 L A MB GE
Rehab./Reconstruction of Anahaw River Control, Macabog,
Sorsogon CityMacabog,
Sorsogon City5/30/2017 1st & Final Sorsogon 1st DEO LF 4.680 76 3/23/2017 6/6/2017 0.00 C 0.462 0.133 0.300 - - - 89.50
*89.5%
Very Satisfactory
Alphatec Chemical Corporation 39938 L B MA GE
Construction and Maintenance of Bridges along National
Roads - Rehabilitation/ Major Repair of Permanent Bridges,
Panas Bridge (B00190BH) along Tagbilaran North Road (
Tagbilaran - Getafe Section), Talibon, Bohol
Talibon, Bohol 11/9/17 1st & Final DPWH LF 8.781 172 5/16/17 11/3/17 0.00 C 0.496 0.155 0.300 - - - 95.10*95.1%
Very Satisfactory
Alphatec Chemical Corporation 39938 L B SB GE
Contract ID No. 16FBD122: Construction and Maintenance of
Bridges along National Roads: Rehabilitation/ Major Repair of
Permanent Bridge Primary along Daang Maharlika at Upi
Bridge (B01174LZ) Upi, Gamu, IsabelaUpi, Gamu, Isabela 11/13/17 1st & Final DPWH LF 13.230 81 2/7/17 4/28/17 0.34 C 0.500 0.133 0.300 - - - 93.30
*93.3%
Very Satisfactory
Alphatec Chemical Corporation 39938 L B SB GE
Retrofitting/Major Repair of Permanent Bridges Overpass
Bridge 1 (B03221lLZ) along Manila North RoadLaoag City 6/1/2017 1st & Final
Ilocos Norte 1st
District Engineering
Office
LF 1.997 45 3/13/2017 4/26/2017 0.06 C 0.499 0.133 0.300 - - - 93.20*93.2%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 28 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Alphatec Chemical Corporation 39938 L B SB GE
Retrofitting/ Major Repair of Permanent Bridges Overpass
Bridge 2 (B03224LZ) along Manila North RoadLaoag City 6/1/2017 1st & Final
Ilocos Norte 1st
District Engineering
Office
LF 1.996 45 3/13/2017 4/26/2017 0.06 C 0.498 0.133 0.300 - - - 93.10*93.1%
Very Satisfactory
Alphatec Chemical Corporation 39928 L B MA GE
Construction and Maintenance of Bridges along National
Roads-Rehabilitation/ Major Repair of Permanent Bridges,
Panas Bridge (B00190BH) along Tagbilaran North Road
(Tagbilaran-Getefe Section)
Talibon, Bohol 4/5/18 2nd/Final Bohol 2nd DEO LF 8.781 172 5/16/17 11/3/17 0% C 0.437 0.133 0.3 - - - 87.00 91.86% Very Satisfactory
Alphin Trading & Construction 26260 L B MA GB
Construction of 3-Storey Daniel Maramba National High
School Alumni Association MPB-Education CenterSta. Barbara,
Pangasinan 11/15/17 1st & Final DPWH LF 9.690 240 3/21/17 11/15/17 0.00 C 0.484 0.131 0.300 - - - 91.50
*91.5%
Very Satisfactory
Alphin Trading & Construction 26260 L B MA GE
Construction/ Rehabilitation of River Dike along Sinucalan
RiverBrgy. Banzal, Sta.
Barbara,
Pangasinan
6/8/2017 1st & Final
Pangasinan 4th
District Engineering
Office
LF 13.997 146 10/4/2016 2/26/2017 0.04 C 0.420 0.133 0.300 - - - 85.30*85.3%
Satisfactory
Alphin Trading & Construction 26260 L A MA GE
Construction/Rehabilitation of River Dikes along Sinucalan
River Brgy. Banzal, Sta. 0+000 to Sta. 0+601, Sta. Barbara,
Pangasinan
Sta. Barbara,
Pangasinan3/24/2017 1st & Final
Pangasinan 4th
DEOLF 13.997 146 9/28/2016 2/20/2017 0.04 C 0.400 0.133 0.300 - - - 83.30
*83.3%
Satisfactory
Alphin Trading & Construction/Aquino De La
Cruz Eng'G & Construction Joint Venture- L D SB GE
Improvement/ Widening of Sta. Barbara Old Road, K0.199+(-
096) - K0.199+904, Sta. Barbara, PangasinanK0.199+(-096) -
K0.199+904, Sta.
Barbara,
Pangasinan
11/24/2016 1st & FinalPangasinan 4th
DEOLF 29.400 196 1/21/2016 8/3/2016 0.00 C 0.439 0.133 0.3 0 0 0 0.8720
87.2%
Satisfactory
Alphin Trading & Construction 26260 L B SB GE Improvement of Mangaldan Municipal PlazaMangaldan,
Pangasinan3/14/19 Final TIEZA LF 15.000 202 5/8/18 12/4/18 0.00% C 0.475 0.193 0.3 96.80 96.80% Outstanding
Alpiz Construction And Development Corp. 11039 L B MA GERehabilitation of Flood Control Structures and Tributaries at
Brgy. PayatasQuezon City 8/24/2017 1st & Final
Quezon City 1st
DEOLF 24.399 300 3/23/2016 1/16/2017 0.00 C 0.333 0.200 0.300 - - - 83.30
*83.3%
Satisfactory
Alpiz Construction And Development Corp. 11039 L B MA GERehabiltitation/Improvement of Flood Control Structures and
Tributarities, Brgy. Payatas, Quezon CityQuezon City 9/16/2016 1st
QUEZON CITY
1ST DEOLF 22.195 270 3/23/16 12/17/16 0.20 O 0.359 0.3 0.15 0.022 0.035 0.033 0.8990 -
Alpiz Construction And Development Corp. 11039 L B MA GERehabilitation of Flood Control Structures and Tributaries,
Brgy. Payatas, Quezon CityQuezon City 6/8/2017 1st
Quezon City 1st
DEILF 27.482 210 3/2/2017 9/27/2017 0.00 O 0.400 0.240 0.150 0.022 0.037 0.05 89.90 -
Alqaod Construction And Supply 39078 L D B GB
Construction of One (1) Storey, 2-Classroom School Building
at Servillano G. Reuyan Memorial Elementary School, Iligan
City
Iligan City 3/20/2017 1st & FinalLanao del Norte
2nd DEOLF 2.042 90 8/8/2016 11/5/2016 0.02 C 0.492 0.128 0.300 - - - 92.00
*92%
Very Satisfactory
Alraf Construction & Enterprises 17297 L AAA LA GE1Rehab./Const./Impvt. of Zambaonga City-Pagadian Road (with
Intermittent Section)9/2/2009 3rd IX 46.408 295 O 0.338 0.300 0.150 0.030 0.055 0.050 92.30 -
Alraf Construction & Enterprises 17297 L AAA LA GE1 Rehab./Const./Impvt. of Zamboanga City-Pagadian Road 5/26/2009 2nd IX 44.695 253 O 0.396 0.300 0.150 0.030 0.042 0.050 96.80 -
Alraf Construction & Enterprises 17297 L AAA MA GE
Construction/Upgrading/Rehabilitation of Drainage along
National Roads pagadian-Zamboanga City Road, K1929+700-
K1932+540 (Boalan-Dvisoria-Putik Section), Zamboanga City
Zamboanga City 9/3/2015 1st Zamboanga City LF 16.984 218 6/22/15 1/25/16 (+)0.31% O 0.351 0.24 0.15 0.03 0.054 0.05 87.50% -
Alraf Construction & Enterprises 17287 L AAA MA GE
Construction/Upgrading/ Rehabilitation of Drainage along
National Roads Pagadian-Zamboanga City RoadK1929+700 to
K1932+540
(Boalan-Divisoria
Putik Section),
Zamboanga City
9/2/2016 2nd & FinalZamboanga City
DEOLF 16.983 248 6/22/15 2/24/16 0.00 C 0.458 0.133 0.3 0 0 0 0.8910
88.14%
Satisfactory
Alraf Construction & Enterprises 17297 L AAA MB GE
Widening of National Roads along Pagadian-City-Zamboanga
City Road, Manicahan-Cabaluay-Culianan Section, K1916+560-
K1923+396.70, Zamboanga City
K1916+560-
K1923+396.70,
Zamboanga City
8/24/2015 1stRegional Office No.
IXLF 148.858 280 4/20/15 1/25/16 (+)7.42 O 0.354 0.24 0.15 0.022 0.056 0.05 87.20% -
Alraf Construction & Enterprises 17297 L AAA MB GE1Upgrading/Concrete Paving of Nat'l Rd. along Liloy-Siocon
Rd., Kipit-La Libertad-Loay-Imelda San Roque Sect.
Zamboanga del
Norte11/27/2012 1st IX LF 64.478 244 04/10/12 12/09/12 -0.50 O 0.264 0.300 0.145 0.030 0.059 0.033 83.10 -
Alraf Construction & Enterprises 17297 L AAA MB GE1
Settled/Collapsed PCCP along Maria Clara L. Lobregat H-way
(Pagadian ZC Road) w/n Km.1867+000 to K1868+000,
Mangusu Sect.
Zamboanga City 3/12/2013 1st IX LF 2.514 78 02/22/13 05/11/13 -0.60 O 0.400 0.240 0.144 0.030 0.038 0.033 88.50 -
Alraf Construction & Enterprises/Wee Builders
(Joint Venture)JV-15-1371 L AAA MA GE
Construction of the RCDG Bridge and Approaches along
Lamisahan Road, Sta.0 + 000- Sta.2 + 800 Modified to
Construction of Steel Brideg and Approaches along
Lamisahan Road
sta.2 + 602 - sta.2
+ 741 Brgy.
Lamisahan,
Zamboanga City
3/23/2017 1stZamboanga City
DEOLF 39.052 420 3/30/2016 5/23/2017 (+)0.32% O 0.366 0.212 0.150 0.03 0.05 0.05 85.80 -
Alraf Construction & Enterprises/Wee Builders
(Joint Venture)JV-15-1371 L AAA LA GE
Construction of RCDG Bridge and Approaches along/Modified
to Construction of Steel Bridge and Approaches along
Lamisahan Road, Lamisahan Road
Sta. 0+000-Sta.
2+800, Lamisahan,
Zamboanga City
2nd LD/Sta. 2+602-
Sta. 2+741, Brgy
Lamisahan,
Zamboanga City
2nd LD
11/24/2016 1stZamboanga City
DEOLF 39.052 420 3/30/2016 5/23/2017 0.00 O 0.367 0.276 0.15 0.024 0.05 0.05 0.9170 -
Alro Construction & Development Corporation 18361 L A MA GE
Construction/Maintenance of Flood Control Mitigation
Structures and Drainage System - Rehabilitation of Flood
Control System along Busay River (Left Side), Daraga, AlbayDaraga, Albay 3/20/2017 1st & Final Albay 2nd DEO LF 27.859 189 3/7/2016 9/11/2016 0.00 C 0.450 0.133 0.300 - - - 88.30
*88.3%
Satisfactory
Alro Construction & Development Corporation 18361 L A MA GE1Guicadale Rd. Network to Int'l Airport, Albay (Comun-Cotmon-
Del Rosario Rd. Sect.)Camalig, Albay 8/11/2013 1st V LF 46.044 215 02/06/13 09/08/13 4.90 O 0.362 0.245 0.150 0.030 0.052 0.033 87.20 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 29 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Alro Construction & Development Corporation 18361 L A MA GE
Construction/Rehabilitation of Flood Control Mitigation
Facilities along Major River basins and Prinicipal Rivers-
Kabilugan/Velasco/Batu River Basin (Lake Bicol ,
Const./Improvement of Salugan Flood Control, Camalig, AlbayCamalig, Albay 9/2/2016 1st & Final Albay 2nd DEO LF 34.530 158 6/15/16 11/19/16 0.51 C 0.5 0.188 0.3 0 0 0 0.9880
98.8%
Outstanding
Alro Construction & Development Corporation 18361 L A MB GE
Rehabilitation/ Reconstruction of National Roads with Slips,
Slope Collapse and Landslide along Pili - Tigaon - Albay
Boundary Road (Construction of Slope Protection),
K0500+300 to K0500+400, K0504+500 to K0504+673,
K0504+800 to K0504+900, Patitinan Section, Sagñay,
Camarines Sur
Patitinan Section,
Sagñay, Camarines
Sur
6/7/2017 1st & FinalCamarines Sur 3rd
DEOLF 28.310 256 3/13/2016 11/23/2016 0.00 C 0.426 0.200 0.300 - - - 92.60
*92.6%
Very Satisfactory
Alro Construction & Development Corporation 18361 L A MB GE
Camarines Sur-Albay Diversion Road, Asn Fernando-Oas-
Daraga Section of the PAN Philippine Highway including
Bridges-Camarines Sur Section, Upgrading of Bula-Nabua
(ACC-PCCP) including Slope Protection, Bula, Camarines Sur
Bula, Camarines
Sur6/6/2016 1st & Final Regional Office LF 97.498 258 6/24/16 3/8/17 0.00 C 0.491 0.183 0.3 0 0 0 97.40%
97.4%
Outstanding
Alro Construction & Development Corporation 18361 L A MB GE
Camarines Sur-Albay Diversion Road, San Fernando-Oas-
Daraga Section of the PAN Philippine Highway Including
Bridges-Camarines Sur Section, Upgrading of Bula-Nabua
(ACC-PCCP) Including Slope Protection, Bula, Camarines Sur
Bula, Camarines
Sur9/5/2015 1st
Regional Office No.
VLF 92.618 196 6/24/15 1/5/16 1.06% O 0.391 0.24 0.15 0.03 0.06 0.05 92.10% -
Alro Construction & Development Corporation 18361 L A MB GE
Rehabilitation/Reconstruction of National Roads with Slip,
Slope Collapse and Landslide along Pili-Tigaon-Albay
Boundary Road, K0497+000-K0497+370
Sagnay, Camarines
Sur 4/5/18 1st/Final
Camarines Sur 3rd
DEOLF 23.095 246 3/5/17 11/5/17 41.99% C 0.483 0.2 0.3 - - - 98.30 *98.30% Outstanding
Alro Construction & Development Corporation 18361 L A MA GE
Construction/Maintenace of Flood Mitigation Structures and
Drainage System Rehabilitation of Flood Control System
along Busay River (Left Side), Daraga, Albay
Daraga, Albay 11/16/2016 1st & Final Albay 2nd DEO LF 27.859 189 3/7/2016 9/11/2016 0.00 C 0.471 0.142 0.3 0 0 0 0.913091.3%
Very Satisfactory
Al's Enterprise and Construction 9721 L A MA GB1 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) 3/17/2009 2nd VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 -
Alta Negros Industrial Supply Corporation 33806 L C SB GE1 Repair/Rehab. of Lacson Street Bacolod City 8/13/2012 1st VI LF 6.465 145 04/10/12 09/01/12 3.89 O 0.332 0.297 0.150 0.015 0.029 0.033 85.60 -
Althea Construction 18717 L B SB GB
Improvement/Rehabilitation of Multi-Purpose Building, Brgy.
16 San Jacinto, Laoag City, Ilocos Norte
Brgy. 16 San
Jacinto, Laoag City,
Ilocos Norte
11/16/2016 1st Ilocos Norte DEO LF 5.346 170 6/23/2016 12/9/2016 -0.05 O 0.384 0.263 0.104 0.03 0.047 0.033 0.8610 -
Alxm Construction 33436 L B MA GE
Concreting of Farm to Market (FMR) in First District of Albay:
Ocncreting of San Carlos- San Vicente (San Carlos Section)
FMR, Brgy. San Carlos, Tabaco City, Albay
Brgy. San Carlos,
Tabaco City, Albay 11/15/2016 1st & Final Albay 1st DEO LF 9.234 103 6/27/2016 10/7/2016 0.00 C 0.448 0.133 0.3 0 0 0 0.8810
88.1%
Satisfactory
Alxm Construction 33436 L B MA GE Construction of Flood Control Structure along Danlog River
Brgy. San Isidro,
Barcelona,
Sorsogon
6/10/2015 1st Sorsogon 2nd LF 21.347 171 2/16/15 8/5/15 -3.84% O 0.379 0.3 0.112 0.03 0.06 0.05 93.10% -
Alxm Construction/Meta Construction Joint
VentureJV-14-911 L B MA GE
Widening of National Roads along Santiago-Tuguegarao
RoadK0329+165-
K0329+389 (RS),
K0329+155-
K0329+428 (LS),
K0330+000 -
L0330+205,
K0330+215-
K0331+661.8,
Rizal, Santiago City-
Raniag, Ramon,
Isabela
6/15/2016 1st & Final Isabela Fourth LF 45.255 239 4/29/15 12/23/15 0.02 C 0.469 0.2 0.3 0 0 0 96.90%96.9%
Outstanding
Alzam Enterprises 19113 L A MA GE
Road Upgrading (Gravel to Concrete) of Inawayan-Baracatan
Road, Davao City Davao City 11/24/2016 1st & FinalRegional Office No.
XILF 128.713 260 4/29/2015 1/13/2016 0.00 C 0.488 0.133 0.3 0 0 0 0.9210
92.1%
Very Satisfactory
Alzam Enterprises 19113 L A MA GE1
Rd. Upgrading (Gravel/Asphalt to Concrete) of Mintal (Davao-
Bukidnon Rd.) Bago Oshiro-Bago Gallera (Old Davao-
Cotabato Rd.)
Davao City 8/21/2013 1st XI LF 72.933 269 03/06/13 11/29/13 -2.68 O 0.374 0.300 0.123 0.030 0.025 0.030 88.20 -
Alzam Enterprises 19113 L A MA GE1
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. (IS)/
Imprv't./Widening of Davao-Bukidnon Rd. leading to Phil.
Eagle Foundation, Km.1698+780-Km.1701+828
Davao City 8/21/2012 1st XI LF 45.680 250 01/25/12 09/30/12 1.46 O 0.387 0.221 0.150 0.030 0.055 0.033 87.60 -
Alzam Enterprises 19113 L A MA GE1 Widening of Davao-Cotabato Rd. Davao City 8/21/2012 1st XI LF 43.791 250 01/24/12 09/29/12 6.06 O 0.292 0.287 0.150 0.030 0.045 0.050 85.40 -
Alzam Enterprises 19113 L A MA GE1Widening of Davao-Cotabato Rd., Davao City, Lizada Sect.,
Km.1525+920-Km.1527+800
Toril District, Davao
City8/5/2013 1st XI LF 37.443 179 02/26/13 08/23/13 -0.29 O 0.343 0.292 0.147 0.030 0.025 0.033 87.00 -
Alzam Enterprises 19113 L A MA GE2 Const. of Davao River Control Proj. Davao City 3/21/2013 1st XI LF 22.942 221 12/02/12 07/10/13 39.30 O 0.377 0.240 0.150 0.020 0.045 0.050 88.20 -
Alzam Enterprises 19113 L A MA GE1Rd. Upgrading (Gravel to Paved) of Inawayan-Baracatan Rd.,
Km.1538+770-Km.1539+110Toril, Davao City 3/12/2013 1st XI LF 6.854 55 01/22/13 03/17/13 0.00 O 0.269 0.235 0.150 0.030 0.045 0.050 77.90 -
Alzam Enterprises 19113 L A MB GE
Off-carriageway Improvement of Davao City Diversion Road
Including Improvement of Drainage K01498+(-349) to
K01499+871, Davao City
K01498+(-349) to
K01499+871,
Davao City
3/24/2017 2nd & FinalDavao City 1st
DEOLF 19.601 185 2/15/2016 8/17/2016 0.00 C 0.456 0.134 0.300 - - - 89.00
*90.2%
Very Satisfactory
Alzam Enterprises 19113 L A MB GE
Off-Carriageway Improvement of Davao City Diversion Road
Including Improvement of Drainage, K1498+(-349)-K1499+871,
Davao City
K1498+(-349)-
K1499+871, Davao
City
6/16/2016 1st Davao City DEO LF 19.008 170 2/15/16 8/2/16 0.00 O 0.374 0.262 0.15 0.03 0.047 0.05 91.30% -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 30 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Alzam Enterprises 19113 L Rehabilitation of Esperanza - Sto. Tomas Farm to Market Road
Brgy. Esperanza to
Municipality of Sto.
Tomas, Davao del
Norte
4/13/18 1st
Provincial
Government of
Davao del Norte
LF 117.410 853 4/22/17 7/22/19 -9.36 O 0.03 0.06 0.05 0.33 0.30 0.06 82.40 - On - Going
Alzam Enterprises 19113 L Rehabilitation of Esperanza - Sto Tomas Farm to Market Road
Brgy. Esperanza to
Municipality of Sto.
Tomas, Davao del
Norte
4/13/18 1stProvincial of Davao
del NorteLF 117.410 853 4/22/17 7/22/19 -9.36 O 0.03 0.06 0.05 0.33 0.3 0.056 82.40 - On - Going
Alzen Engineering & Construction Supplies/
Borderline Construction & Supply Joint
Venture
13911 L A MA GE
Road Upgrading (Unpaved to Paved) of Matalam-Lampayan-
Antipas Road, K1663+687.36-K1668+658; K1668+658-
K1670+260, Matalam, North Cotabato
Matalam, North
Cotabato3/17/2017 1st & Final
REGIONAL
OFFICE NO. XIILF 146.055 235 2/26/2016 10/17/2016 0.00 C 0.446 0.152 0.300 - - - 89.80
*89.8%
Very Satisfactory
Amarro Construction & Realty Developer 34562 L D SB GERoad Upgrading Gravel to Paved at Baranga, Sta. 0+000 to
Sta. 0+200Zamboanga City 3/20/18 1st/Final
Zamboanga City
DEOLF 2.916 149 3/22/17 8/17/17 0.05 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory
Amazing Builders And Construction 32932 L D SB GB
Local Infrastructure Program-Construction of Multi-Purpose
Building (Covered Court), Lumangog Ubay, Bohol 8/21/2017 2nd & Final Bohol 2nd DEO LF 2.965 90 4/3/2017 7/1/2017 - C 0.499 0.180 0.300 - - - 97.90*94.274%
Very Satisfactory
Amazing Builders And Construction 32932 L C SB GB
Local Infrastructure Program - Construction of Multi-Purpose
Building (Covered Court), Lomangog, Ubay, BoholLomangog, Ubay,
Bohol6/3/2017 1st
Bohol 2nd District
Engineering OfficeLF 2.822 90 4/3/2017 7/1/2017 0.25 O 0.398 0.240 0.150 0.03 0.059 0.05 92.70 -
Ammar Construction And Enterprises 35325 L B SB GB
Construction of 2-Storey 6-Classroom School Building at
Binuni-Demologan NHS, Bacolod, Lanao del NorteBacolod, Lanao del
Norte11/17/2015 1st
Lanao del Norte
2ndLF 8.186 150 8/25/15 1/22/16 (+) 8.00% O 0.386 0.24 0.15 0.03 0.047 0.05 90.30%
90.3%
Very Satisfactory
Amp Construction 16574 L B MA GE
Repair/ Maintenance of Flood Control, Talavera River Control,
Brgy. Sicsican Matanda Talavera, Nueva EcijaTalavera, Nueva
Ecija3/23/2017 1st & Final Nueva Ecija 1st LF 1.901 70 12/19/2016 2/26/2017 0.00 C 0.400 0.200 0.300 - - - 90.00
*90%
Very Satisfactory
Amphil Construction & Consulting Services 33716 L B SB GE
Repair/Rehabilitation (Upgrading) Bacolod City Boundary
Road,Brgy. Alangilan,
Bacolod City,
K0017+190 to
K0019+586 w/
exceptions
9/2/2016 1st & Final Bacolod City DEO LF 8.692 120 1/5/16 5/3/16 0.00 C 0.478 0.133 0.3 0 0 0 0.911091.1%
Very Satisfactory
Andoni T. Dumlao Civil Engineer - Contractor 34028 L B MA GE1Replacement of San Pedro Bridge along Daang Maharlika
(Surigao-Agusan Rd.), Brgy. San Pedro
Alegria, Surigao del
Norte8/8/2012 1st XIII LF 14.945 375 01/13/12 01/22/13 1.71 O 0.328 0.290 0.150 0.030 0.060 0.050 90.80 -
Andoni T. Dumlao Civil Engineer - Contractor 34028 L B MA GE1
Repair/Reconst. Of Boan Bridge along Daang Maharlika
(Agusan-Davao Rd.) Km.1331+632-Km.1380+775 w/
exceptions
Rosario, Agusan
del Sur8/18/2012 1st XIII LF 12.163 240 01/27/12 09/24/12 1.25 O 0.312 0.262 0.150 0.030 0.050 0.033 83.70 -
Angel & Sam Construction & General
Merchandise19968 L B MA GE
Concreting of Sinomoc Camanse Tipan Road, Sinacaban,
Misamis OccidentalSinacaban,
Misamis Occidental8/31/2016 1st & Final
Misamis
Occidental 2nd
DEO
LF 23.188 190 6/15/15 12/21/15 0.00 C 0.397 0.128 0.3 0 0 0 0.825082.5%
Satisfactory
Angel & Sam Construction & General
Merchandise19968 L B MA GE1 Rehab. of ICBR Puerto-Cugman Section 3/2/2009 1st X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 -
Angel & Sam Construction & General
Merchandise19968 L B MA GB
Const. of 2 units, 1 Storey, 1 Classroom School Building,
Aglayan ES
Aglayan,
Malaybalay City10/24/2014 1st X LF 2.022 105 7/28/14 11/9/14 0.35% O 0.250 0.278 0.150 0.010 0.016 0.033 73.70%
73.70%
Poor
Angel & Sam Construction & General
Merchandise19968 L B Concreting of Miglamin-Cabulohan-Iba Road
Cabanglasan,
Bukidnon1/16/19 1st
Provincial
Government of
Bukidnon
LF 53.682 271 7/26/18 4/22/19 4.46 O 0.28 0.29 0.15 0.02 0.06 0.05 84.87 - On - Going
Animas Bros Construction 35002 L B SB GE
Concreting of Delapa-Sipaloc Road Section (FMR) Brgy. Delapa
Sibutad,
Zamboanga del
Norte
2/6/2017 1st & FinalZamboanga Del
Norte 3rd DEOLF 9.601 60 10/5/2016 12/3/2016 0.00 C 0.463 0.133 0.300 - - - 89.60
*89.6%
Very Satisfactory
Animas Bros Construction 35002 L B SB GB
Construction of One (1) Unit Technical & Vocational
Workshop/ Building Laboratory
Dapitan City,
Zamboanga del
Norte
3/16/2017 1st & FinalZamboanga Del
Norte 3rd DEOLF 2.562 60 10/20/2016 12/18/2016 (+)2.31% C 0.433 0.133 0.300 - - - 86.60
*86.6%
Satisfactory
Anncon Builders 36097 L D SB GEConcreting of Barangay Palola Farm to Market Road
Barangay Palola, Lucban, Quezon
Barangay Palola,
Lucban, Quezon11/17/2016 1st & Final Quezon 1st LF 1.910 21 4/4/2016 4/24/2016 0.00 C 0.444 0.133 0.3 0 0 0 0.8770
87.7%
Satisfactory
Antonio V. Nidea Construction 6382Const. of Iriga Flood Control Project (Consolidation Dam,
Ground Sill, Slope Protection & Damage Canal)2/28/2010 V 28.505 240 O 0.352 0.240 0.150 0.030 0.035 0.033 84.00 -
Antonio V. Nidea Construction, Inc. (Formerly:
Antonio V. Nidea Construction)6382 L A MB GE
Cluster 9 - Construction / Maintenance of Flood Mitigation
Structures and Drainage System: Rehabilitation/
Construction/ Estension of Seawall at Fatima, San Roque And
Sto. Cristo, Tabaco City
Tabaco City 8/24/2017 1st Albay 1st DEO LF 93.004 243 3/13/2017 11/10/2017 0.00 O 0.391 0.292 0.150 0.022 0.033 0.033 92.10 -
Antonio V. Nidea Construction, Inc. (Formerly:
Antonio V. Nidea Construction)6382 L A MB GE Construction of Access Road, Brgy. Gapo Daraga, Albay 04/02/18 1st/Final Albay 2nd DEO LF 19.418 151 42,879 43,029 0 C 0.480 0.135 0.300 - - - 91.50 *91.50% Very Satisfactory
Antonio V. Nidea Construction, Inc. (Formerly:
Antonio V. Nidea Construction)6382 L A MB GE
Construction/Maintenance of Flood Mitigation Structures and
Drainage Systems Rehabilitation/Construction/ Extension of
Seawall at Fatima, San Roque and Sto. Cristo
Tabaco City, Albay 04/12/18 2nd/FinalAlbay 1st District
DEOLF 96.500 288 03/13/17 12/25/17 0.00 C 0.478 0.133 0.300 - - - 91.10 87.90% Satisfactory
Antonio V. Nidea Construction, Inc. (Formerly:
Antonio V. Nidea Construction)6382 L A MA GB1 Const./Repair/Rehab. of MPB, Albay III DEO Paulog, Ligao City 8/9/2013 1st V LF 3.679 90 06/25/13 09/22/13 6.65 O 0.334 0.286 0.150 0.030 0.040 0.033 87.30 -
Antonio V. Nidea Construction, Inc. (Formerly:
Antonio V. Nidea Construction)6382 L A MB GE1
Guicadale Platform Rd., Cotmon-Maninila-Taplacon-Taloto
Rd., (Cotmon-Maninila Sect.)Camalig, Albay 8/10/2013 1st V LF 22.843 206 02/01/13 08/25/13 -3.26 O 0.366 0.241 0.117 0.030 0.041 0.033 82.80 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 31 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
APD Construction 180 L AA LA GE
Road Upgrading (Unpaved to Paved) based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) along Jct. Victoria -
Maddela - Alicia - Kasibu Boundary Road (Jct. Victoria -
Kasibu Boundary Road), K0385+661 to K0386+000 and
K0397+720 to K0397+1599, Maddela, Quirino
Maddela, Quirino 8/23/2017 1st & Final Quirino DEO LF 46.707 180 2/8/2017 8/6/2017 0.00 C 0.485 0.134 0.300 - - - 91.90*91.9%
Very Satisfactory
APD Construction 17467 L AA MB GE
MFO 1 - National Road Upgrading (Unpaved to Paved) Based
on Gravel Road Strategies, Traffic Benchmark for Upgrading
to Paved Road Standards (HDM-4 Project Analysis)
(Intermittent Sections), Jct. Abbag Guingin Boundary Road
K0393+558-
K0395+000,
K0395+915-
K0396+084,
K0398+101-
K0398+478,
K0399+316-
K0400+000,
K0400+564-
K0403+243.5
6/14/2016 1st & Final Regional Office LF 159.196 300 3/30/15 1/23/16 0.37 C 0.454 0.2 0.3 0 0 0 95.40%95.4%
Very Satisfactory
APD Construction 17467 L A MB GE
Preventive Maintenance based on Pavement Management
System / Highway Development and Management-4 (HDM-4)
Asphalt Overlay along Cordon-Aurora Boundary Road
(Isabela Boundary-Jct. Dumabato), K0330+000-K0331+640,
K0337+653-K0337+694, K0337+739-K0338+319, K0
Diffun &
Cabarroguis,
Quirino
6/14/2016 1st & Final Quirino LF 41.217 137 2/25/16 7/10/16 0.36 C 0.479 0.133 0.3 0 0 0 91.20%91.2%
Very Satisfactory
APD Construction 17467 L AA LA GE
Asset Preservation of National Roads -
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslike - Tertiary Roads along Jct.
Abbag-Guingin Bdry. Road - (Construction of Road Slope
Protection Struture)
K0405+160-
K0405+185,
Nagtipunan, Quirino
3/21/18 1st/Final Quirino DEO LF 24.284 200 7/4/17 1/29/18 0.01 C 0.492 0.133 0.3 - - - 92.50 *92.50% Very Satisfactory
Aqua Dragon Construction & Supply 36405 L C SB GE
Retrofitting/ Strenghtening of Ingay Bridge (B00168 PN) along
Gumbal - Tubungan Road, Iloilo City Iloilo City 11/13/17 1st & Final DPWH LF 7.715 140 3/14/17 7/31/17 29.11 C 0.500 0.134 0.300 - - - 93.40*93.4%
Very Satisfactory
Aqua Dragon Construction & Supply 36405 L C SB GE
Retrofitting/ Strengthening of Permanent Bridges, Moog
Bridge (B00219NR) Along Bacolod South Road (Kabankalan-
Hinoba-an Section)
K0096+759, Brgy.
Vista Alegre, Ilog,
Negros Occidental
6/2/2017 1st & FinalNegros Occidental
3rd DEOLF 4.651 67 2/21/2017 4/28/2017 0.00 C 0.332 0.133 0.300 - - - 76.50
*76.5%
Unsatisfactory
Aqua Dragon Construction & Supply 36405 L C SB GE
Retrofitting/ Strengthening of Lanutan Bridge (B00136PN)
along Iloilo - Antique Road, Miag-ao, Iloilo, Miag-ao, Iloilo Miag-ao, Iloilo 6/6/2017 1st & FinalIloilo 1st District
Engineering OfficeLF 5.776 106 3/14/2017 6/27/2017 0.48 C 0.497 0.200 0.300 - - - 99.70
*99.7%
Outstanding
Aqua Dragon Construction & Supply 36405 L C SB GE
Retrofitting/ Strengthening of Ingay Bridge along Guimbal-
Tubungan Road, Tubungan, Iloilo Tubungan, Iloilo 8/23/2017 1st & Final Iloilo 1st DEO LF 7.715 140 3/14/2017 7/31/2017 0.29 C 0.500 0.134 0.300 - - - 93.40*93.4%
Very Satisfactory
Aqua Dragon Construction & Supply 36405 L C SB GBConstruction of Level II Water System at Brgy. Manlucahoc,
Sipalay City, Negros Occidental
Sipalay City, Negros
Occidental3/8/2016 1st
Negros Occidental
Third DEOLF 2.475 60 9/8/16 11/6/16 0 C 0.471 0.133 0.3 0 0 0 90.40%
90.4%
Very Satisfactory
Aqualand Engineering and Construction 38209 L D Malitubog Maridagao Irrigation Project Stage IIPikit, Cotabato /
Region XII5/12/18 1st NIA LF 2.172 474 11/11/2016 2/28/2018 -58.70 O 0.40 0.30 0.00 0.02 0.06 0.05 82.10 - On - Going
Aqualine Construction 11555 L AA MA GE
Construction of Bantayan River Control, Bantayan River
Basin, San Roque, Northern SamarSan Roque,
Northern Samar11/14/17 1st & Final DPWH LF 24.399 180 2/17/17 8/15/17 2.16 C 0.486 0.133 0.300 - - - 91.90
*91.9%
Very Satisfactory
Aqualine Construction 11555 L A MA GE
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse, and Landslide along Palo - Carigara - Ormoc
Road
KO970+670 -
KO970+685,
KO972+300-
KO972+352,
KO972+380 -
KO972+415,
KO+972+500 -
KO972+338,
KO972+538 -
KO972+ 577,
KO972+900 -
KO972+918,
KO977+480 -
KO977+495,
KO977+505 -
KO977+520,
Section ID:
S00074LT and
S000075LT,
Capoocan, Leyte
2nd District
4/7/2017 1st & FinalRegional Office No.
VIIILF 43.625 265 7/6/2016 3/27/2017 0.00 C 0.488 0.134 0.300 - - - 92.20
*92.2%
Very Satisfactory
Aqualine Construction 11555 L AAA MB GEConstruction of Pambujan River Control Brgy. Dale, San
Roque, Northern Samar
San Roque,
Northern Samar8/17/2017 1st
Northern Samar
2nd DEOLF 41.612 195 4/3/2017 10/14/2017 -0.01 O 0.375 0.235 0.141 0.03 0.035 0.033 84.90 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 32 of 33
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019
PCAB ARC TYPE AMOUNTDUR
(C.D.)STARTED COMP
NAME OF CONSTRUCTOR LICENSE NO. L/F
CATEGORY
PROJECTPROJECT
LOCATION
DATE OF
EVALUATIONNO. of VISIT *IMPL. AGENCY
FUNDING
SOURCE
CONTRACT DATESLIPPAG
E (%)STATUS WMS
FINAL RATING/
QUALITATIVE
DESCRIPTION
QUALITATIVE
DESCRIPTIONMTL TIME FAC ESH RDR
CPES VISIT
RATING
Aqualine Construction 11555 L AA MB GE
Construction/Mainte-nance of Flood Mitigation Structrures
and Drainage Systems, Construction of Bantayan River
Control Structures (Bantayan River Basin), San Roque,
Northern Samar
San Roque,
Northern Samar11/23/2016 1st & Final
Northern Samar
Second DEOLF 48.075 201 2/12/2016 8/30/2016 0.01 C 0.371 0.2 0.3 0 0 0 0.8710
87.1%
Satisfactory
Aqualine Construction 11555 L AA MB GE
Repair/Improvement of Bantayan River Control along
Catarman (Boundary)-Rawis Road Bantayan-San Roque
Section, K0768+100-K0768+200, Bantayan, San Roque
Bantayan, San
Roque3/16/2016 1st
Northern Samar
2ndLF 16.3142 180 6/24/15 12/20/15 (+) 4.08 C 0.47 0.133 0.3 0 0 0 90.30%
90.3%
Very Satisfactory
Aqualine Construction 11555 L AANational Irrigation System Rehabilitation & Improvement
Project
Narra,
Palawan/Region IV-
B
8/6/2016 1st NIA LF 189.364 730 08/26/15 08/24/17 -12.77 O 0.316 0.300 0.022 0.030 0.051 0.033 75.27 -
Aqualine Construction 11555 L AAA LA GEImprovement/Widening of National Roads along Daang
Maharlika K0931+509-K0932+945, K0932+952-K0933+659
Opong, San
Rioque, Tolosa,
Leyte
4/2/18 1st/Final Leyte 1st DEO LF 57.286 150 7/17/17 12/13/17 0.00% C 0.478 0.133 0.3 - - - 91.10 *91.10% Very Satisfactory
Aqualine Construction - ITP Construction, Inc.
(Joint Venture)
11555 /
9392 L
AA /
AAA
National Irrigation Sector Rehabilitation and Improvement
Project
Manaoag, San
Jacinto, San
Fabian,
Pangasinan
11/10/2017 1st NIA FA 92.79 608 10/5/2016 6/4/2018 1.17 O 0.367 0.237 0.150 0.030 0.070 0.050 90.39 -
Aqualine Construction /C.R Domingo
Construction, Inc. (Jv)2992 L A Nueva Viscaya bagabag Irrigation System
San Geronimo
,Bagabag ,Nueava
Viscaya
9/20/2017 Final NIA LF 79.364 1,225 05/17/13 10/27/16 0 C 0.410 0.200 0.300 - - - -86.81%
Satisfactory
Aqualine Construction/C.R. Domingo
Construction, Inc. (JV)2992 L A Nueva Viscaya Bagabag Irrigation System
San Geronimo,
Bagabag, Nueva
Viscaya
9/29/2015 1st NIA LF 74.478 866 05/17/13 09/30/15 -10.30 O 0.373 0.296 0.047 0.030 0.045 0.050 84.05 -
Aquaterra Konstrukt Inc. 15929 L A MB GE
Construction of Flood Control Structures, Tumaga River
Basin at Pasonanca-Luyuhan (Including Right of Way
Acquisition )
Zamboanga City 1st
LD3/23/2017 1st
Zamboanga City
DEOLF 43.496 465 3/30/2016 7/7/2017 -0.06 O 0.274 0.300 0.089 0.03 0.04 0.033 76.60 -
Aquaterra Konstrukt Inc. 15929 L AA MA GE
Construction/ Repair/ Rehabilitation/ Improvement of Various
Infrastructure including Local Projects, Construction of Water
Supply Project
Panay, Capiz 3/16/18 First Capiz 1st DEO LF 55.003 277 7/9/17 4/11/18 0.72% OG 0.389 0.220 0.150 0.030 0.070 0.050 90.90 - On - Going
Aquaterra Konstrukt Inc. / Mcgabriel
Construction Joint VentureJV-16-449 L A MB GE
Construction of Flood Control Structure at Maasin Creek
(Including ROW Acquisition)
Maasin,
Zamboanga City3/20/18 Second
Zamboanga City
DEOLF 22.504 487 3/22/17 7/21/18 1% OG 0.3 0.3 0.15 0.03 0.05 0.05 88.00 - On - Going
Aquaterra Konstrukt Inc. 15929 L A MA GE
Construction of Flood Control Structure, Tumaga River Basin
at Pasonanca-Luyahan Section (Including Right of Way
Acquisition), Zamboanga City
- 11/6/17 3rd & Final DPWH LF 43.716 525 3/30/16 9/5/17 0.00 C 0.420 0.133 0.300 - - - 85.30*82.6%
Satisfactory
Aquaterra Konstrukt Inc. 15929 L A MB GE
Construction/Repair/ Improvement of Flood Control at
Tumaga River, Pasomanca Section, Tumaga, Zamboanga CityTumaga,
Zamboanga6/15/2016 3rd & Final
Zamboanga City
DEOLF 10.547 311 3/30/15 2/3/16 0.00 C 0.461 0.133 0.3 0 0 0 89.40%
86.64%
Satisfactory
Aquaterra Konstrukt Inc. 15929 L A MB GEConstruction/Repair/Improvement of Flood Control at Tumaga
River, Pasonanca Section, Zamboanga CityZamboanga City 9/3/2015 1st Zamboanga City LF 9.766 191 3/30/15 10/7/15 (+)0.18% O 0.34 0.24 0.15 0.03 0.051 0.05 86.10% -
Aquaterra Konstrukt Inc. 15929 L A MB GEConstruction/Repair/Improvement of Flood Control at Tumaga
River, Pasonanca Section, Zamboanga CityZamboanga City 11/9/2015 2nd
Zamboanga City
DEOLF 9.766 161 3/30/15 9/6/15 5.43% O 0.268 0.3 0.15 0.02 0.047 0.05 83.50%
83.5%
Satisfactory
Aquaterra Konstrukt Inc. 15929 L A MC GE
Construction of Flood Control Structure Tumaga River Basin
at Pasonanaca-Luyahan (Including Right-of-Way Acquisition) Zamboanga City 11/24/2016 1stZamboanga City
DEOLF 43.496 465 3/30/2016 7/7/2017 -0.02 O 0.339 0.3 0.128 0.015 0.035 0.033 0.8500 -
Aquaterra Konstrukt, Inc./ Mcgabriel
Construction Joint VentureJV-16-449 L AAA MB GE
Construction of Flood Control at Maasin Creek (Including
Right of Way Acquisition), Zamboanga City- 11/7/17 1st DPWH LF 22.504 487 3/22/17 7/21/18 -0.01 O 0.392 0.240 0.150 0.03 0.059 0.05 92.10 -
Aquino-Dela Cruz Engineering & Construction 16751 L B MA GEWidening of Urdaneta Jct. - Dagupan Road, K0192+650 to
K0194+680, Sta. Barbara, Pangasinan
Sta. Barbara,
Pangasinan8/30/2016 1st & Final
PANGASINAN 4TH
DEOLF 49.000 236 3/9/15 10/30/15 0.03 C 0.44 0.133 0.3 0 0 0 0.8730
87.3%
Satisfactory
Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE
Widening of Carmen Jct.-Bayambang-Manat Road,
K0.190+169 - K0.193+864.60 (Bayambang Section),
Bayambang, Pangasinan
Bayambang,
Pangasinan11/26/2015 1st
PANGASINAN 4TH
DEOLF 49.000 264 3/11/15 11/29/15 0.0114 O 0.372 0.24 0.15 0.03 0.055 0.05 89.70%
89.7%
Very Satisfactory
Aquino-Dela Cruz Engineering & Construction 16751 L B MA GERehabilitation/Reconstruction/Upgrading of Damaged Paved
National Road including Drainage along Manila North Road
KO202+695 -
KO203+060
(Bobonan Section)
6/8/2015 1stPangasinan 3rd
DEOLF 12.518 131 2/20/15 6/30/15 -7.60% O 0.351 0.3 0.074 0.03 0.045 0.033 83.30% -
Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE
Construction/ Improvement of Access Roads Leading to
Airports, Seaports & Declared Tourism Destinations,
Concreting/Rehabilitation/Improvement of Peralta Road to
Mabini - San Andres Barangay Road Leading to Mt. Balungao
Hilltop Adventure
Balungao,
Pangasinan6/7/2017 1st & Final
Pangasinan 3rd
District Engineering
Office
LF 34.447 279 5/17/2016 2/19/2017 0.00 C 0.489 0.134 0.300 - - - 92.30*92.3%
Very Satisfactory
Aquino-Dela Cruz Engineering & Construction 16751 L B MA GEWidening of Permanent Bridges to more than two lanes
including ROW at Mitura Bridge (B00726LZ)
Urdaneta City,
Pangasinan8/21/2017 1st
Pangasinan 3rd
DEOLF 25.962 289 3/13/2017 12/26/2017 0.11 O 0.367 0.181 0.150 0.022 0.045 0.05 81.50 -