creating a new project
TRANSCRIPT
2
I. SITUATION ANALYSIS
As noted in the UNDAF1, “key governance challenges in Uzbekistan lie in centralised decision
making and control, along with needs for a strengthened civil society and more transparency”.
These challenges apply for both central and local level governance. The strengthened and
accountable local governance is a key to support sustainable local development.
Local government in Uzbekistan is organised on two main levels: sub-national (regional) and
district/city. There are 12 regions in addition to the Republic of Karakalpakstan and Tashkent city.
Each is led by ‘Khokim’ (except in the Republic of Karakalpakstan), appointed by the President.
The regions are sub-divided into 199 lower level administrative units (168 districts and 31 cities),
and each of these is overseen by its own Khokim (mayor/district chair) appointed by the regional
Khokim. The local legislative bodies are known as ‘Kengash’, composed of elected representatives
and chaired by the Khokim. As the Khokim has both executive and representative responsibility,
the Kengash has limited scope to exercise an oversight function over the executive branch. The
three main actors that constitute the core of local authority are: executive head (appointed khokim),
a representative body (elected deputies in Kengashes) and managerial/administrative/technical staff
(civil servants) (reporting to khokim and central ministries). Accountability is generally upwards to
the next level of government, rather than to the people of the area. In terms of organisational
culture, local government sees itself as an administrator of the territory rather than as a service
provider to citizens.
Reform Initiatives and Progress
Transition from a highly centralised system of governance within the framework of a centrally
planned economy to a more decentralised one is a highly complex process, requiring careful
sequencing and considerable capacity building. Although the government recognises the limitations
of the current system, and the desirability of decentralisation/deconcentration of more policy,
budget and investment power to local levels, it also recognises that each stage will have to be
1 United Nations Development Assistance Framework for Uzbekistan 2010-2015
Local governance thus refers to the entire gamut of interactions between different players at the sub-national
level, ranging from local governments, to private sector, civil society and community-based organisations. It
comprises the combined set of institutions, systems and processes, at the sub-national level, through which
local authorities interact with and provide services to citizens, groups and local communities and through
which the later articulate their interests and needs, mediate their differences and exercise their rights and
obligations. The building blocks of effective, democratic local governance are many: transparent and robust
central-local relationships, citizen participation, respect for rule of law and human rights, gender equality,
partnerships among key stakeholders at the local level, capacity of local actors, multiple flows of information,
institutions of accountability, a secure environment and an inclusive and pro-poor orientation.
Local development is both a process and an outcome or result. As a process it involves a range of different
stakeholders – civil society organisations, local communities, local governments, private sector companies and
national institutions. It includes financing investments to improve people’s lives, such as water systems,
schools, roads, and irrigation systems, allowing local authorities to provide more effective and responsive local
infrastructure and social services for the poor. It also includes improvements in policy and institutional
frameworks for more effective use of funds allocated, hence the link to the development of appropriate
national decentralisation policies.
(UNDP LDLG Strategy paper, 2013)
3
carefully piloted, and accompanied by improved mechanisms to guarantee accountability and
transparency.
The publication of the Welfare Improvement Strategy2
for 2013-2015 re-confirmed the
government’s commitment to a steady reform process, aspects of which have gathered pace in the
last years, particularly reform of public administration. The UNDAF also notes that “[i]n looking at
the functioning of local administrations, there is a growing awareness of the need for local
decision-making mechanisms to be strengthened to ensure that they can both effectively respond to
and be accountable to their populations” (UNDAF p.22). The UNDAF also argues that “in order to
ensure better policy effectiveness, further improvement in the public administration is called for,
which involves review of the incentive mechanisms, clearer delineation of functions, and measures
to improve efficiency, including the effective use of ICT.”
Ongoing challenges/gaps in reforming the legal and institutional framework
The responsibilities of local government are defined by the Constitution, and include: economic,
social and cultural development, protection of the environment and ‘formation and implementation
of the local budget’ including determination of local taxes and fees.3 However, the Law ‘On local
Government Authorities’ was adopted in 1993 with only minor amendments being introduced in
2008 (the latest amendments). Hence, these responsibilities remain outdated especially in terms of
formulating, planning, monitoring and implementing participatory local development plans. All
responsibilities are virtually the same for both regional and district/city levels of local government;
consequently the division of key responsibilities for ensuring accountability versus elected bodies
(both Parliament and Kengashes), sub-national fiscal transfer schemes, creating enabling
environment for business development, regional socio-economic policies, affordable energy,
sustainable environment and supporting low-income rural and urban households in the same
territories is confused. Further confusion is caused by the continuing lack of accountability of local
representations of line ministries to the regional and district executive bodies (or at least, ambiguity
regarding their dual lines of subordination/accountability).
Reforms are hampered, or are inconsistently implemented, in part because at the national level,
there is no defined Ministry or Agency with responsibility for local government; and there is
therefore no lead or coordination for harmonised efforts to reform local government. The legal
framework for the civil service at both the national and local level comes under various acts,
including the labour law and decisions of the Cabinet of Ministers and other ministries. Unlike
most other transition countries, in Uzbekistan there is no unified Law ‘On Civil Service’ that
regulates accountability, professionalism, recruitment and promotion4. There is also no defined
ministerial responsibility (institutional framework) for the civil service management.
Granting more budget flexibility and accountability for local government is a necessary part of
decentralisation and if successfully implemented can lead to considerable improvements in the
delivery and impact of public services. There is a widely held perception that many local
government mandates have insufficient funding, and there are few opportunities for local
governments to raise their own revenue. However, because local government responsibilities and
functions are not clearly defined, the division of responsibilities for financial management, local
planning and revenue generation is also unclear. Steps towards reforms are being undertaken within
the framework of the new Budget Code, aspects of which will be piloted in 2014-2015.
2http://wis.ifmr.uz/
3 Constitution of Uzbekistan
4OECD Anti-Corruption Network for Eastern Europe and Central Asia, Istanbul Anti-Corruption Action Plan,
Uzbekistan Assessment and Recommendations p.24
4
Capacity Gaps
Repetitive reports by development partners acknowledge the weak capacity of civil servants and
high turnover of staff in the regions. Furthermore, there are no established mechanisms for
engaging civil society and businesses in local governance.
In the absence of professional civil service and coordination body, Academy of Public
Administration remains the sole responsible agency for individual capacity building through
trainings, networking and advocacy. Academy was re-established in 2012 by Presidential Decree.
This institution brings staff with global experience and modern teaching methods to educate mid-
career civil servants from both national and local levels, and is developing new curricula and
teaching methods in order to meet the capacity building needs of local governments.
The institutional capacity of local government needs to be strengthened inter alia in order to
prepare for changes in the Budget Code. This will require understanding of and capacity for mid-
term budget planning and more effective local public expenditure management processes.
While women are represented in local administrations, they are generally confined to specific
professions such as administration and finance, or sectors including education, health and social
services. At the Academy of Public Administration under the President of Uzbekistan, only six out
of 230 students are female, which suggests a worrying trend for the future of public administration.
Women’s participation in the local elected bodies is also low, at around 16.6 per cent in the
regional Kengashes and 16.7 per cent and 20.4 per cent in the district and town Kengashes
respectively5. The situation of women in the civil service is therefore weak, and needs significant
attention and substantial actions to improve the existing situation. It is essential to identify in
conjunction with other UN agencies and non-UN partners a medium to long term action plan that
will support the Government’s efforts in stimulating and creating enabling environment for women,
leading to increase of women at various levels of the Government and their permanent participation
as active civil service participants.
One of the major components of public administration reform is a concerted drive to introduce ICT
systems and Internet technologies into all areas of government. One stated aim is to enable access
to 200 key government services via the Internet. A strong central institution, the Coordinating
Council for Development of Computerisation and ICT, has been created under the Cabinet of
Ministers. This coordinates, inter alia, the well-resourced work of the State Committee for
Communications, Informatisation and Telecommunications Technologies (SCCITT), which as a
state agency is empowered to introduce e-Government systems. The Committee was responsible
for developing ‘e-Hujjat’, an electronic Document Management System (DMS) which has been
adopted by many government bodies according to Government Resolution in 2010. However, a key
barrier to the full introduction of this system is the low level of capacity of local governments,
Internet access among businesses6 and the general population
7.
Transparency and Accountability
Currently, the Government of Uzbekistan is testing a new Law to govern citizens’ free access to
public information and ensure the transparency of state authorities and agencies. Preliminarily pilot
testing of a proposed legislation was experimented in Samarkand and Bukhara regions of
5 As of Dec 2010, source: Women and Men of Uzbekistan 2007-2010 Statistical Bulletin, Tashkent 2012.
6 Less than 50 per cent of businesses have internet access and/or use computers, Chamber of Commerce, interview
28/10/2013 7 In 2012 there were 0.7 fixed internet subscribers per 100 people, and 36 internet users per 100 people, World Bank
Uzbekistan country statistics, extracted 12/11/2013 http://data.worldbank.org/country/uzbekistan
5
Uzbekistan. This legislation would provide a framework for local governments’ decisions about
what information they are obliged to provide to their citizens and how to ensure two-way
communication with public and mass media.
There are also signs of improvement in the situation of civil society organisations. In a recent
report, the President “recognised the importance and usefulness of establishing and developing
civil society institutions and NGOs in Uzbekistan”8. Government is now drafting new Laws ‘On
Social Partnership’ and ‘Social Control’ which foresee the active involvement of NGOs in
oversight and cooperation with state authorities in addressing social, economic and environmental
issues. The importance of civil society organisations has been also mentioned by the President of
Uzbekistan during his annual speech delivered at the official meeting occasioned to the 21st
anniversary of the Constitution of Uzbekistan.
Building on LGSP experience
The first phase of the Local Government Support Project had some significant achievements.
Firstly, it has a developed a strong and cooperative relationship with the National Government
which provides UNDP with a firm mandate to support further change at local level. The Inter-
Agency Coordinating Working Group established by the Prime Minister with support from LGSP
has played a key role in launching reform dialogue and implementation.
Crucial number of recommendations for greater fiscal decentralisation, including the transfer of
powers to collect fines and duties to local budgets, were adopted, while others were reflected in
new Budget Code.
The establishment of One-Stop-Shops (OSS) within the first phase provides a single access point
for many local public services, where citizens can also receive advice and support. The lessons
learned from piloting the OSS were reflected in the core recommendations for the OSS concept
note to the Cabinet of Ministers as well as in the development of draft Decision of President in
cooperation with the Chamber of Commerce and Industry of Uzbekistan (CCI) and
UNDP/Business Forum Uzbekistan (phase-II) project.
Local Government Information Centres (LGICs) under khokimyiats are a newly institutionalised
mechanism to provide information about the work of local government to the press and public, with
the potential to develop a more consultative relationship with the public. Based on the experience
of pilot LGICs,9 policy recommendations were submitted to the Working Group responsible for the
draft Law ‘On Transparency of State Authorities and Agencies’ which has a special provision on
the establishment of Information Centres in all government agencies. Moreover the catalytic pilot
initiative funded by Democratic Governance Thematic Trust Fund (DGTTF) was codified and
disseminated widely through a flagship knowledge product, namely the Handbook for Information
Centres on Effective Public Communications.
The project supported the upgrading and implementation of the e-Hujjat document management
system to make the work of local government significantly more efficient and transparent. This
new version of e-Hujjat is the only electronic document management system (EDMS)
recommended by the Cabinet of Ministers to be installed and used in all government agencies at
both central and local levels.
8
Reported by International Centre for Not-for-profit Law, NGO Law Monitor for Uzbekistan:
www.icnl.org/research/monitor/uzbekistan.pdf 9 6 LGIC were established within LGSP project in two pilot regions under regional, city and district khokimyiats level.
6
LGSP also successfully piloted an initiative to showcase the potential of local government support
in developing rural tourism. Sustainable and integrated rural tourism development has recently
become essential key component of Government Programmes on regional tourism development
adopted for several regions of Uzbekistan (e.g. Resolution of Cabinet of Ministers on Programme
for development of tourism sector in Tashkent region for 2013-2015 approved on 20 September
2013 No.259.)
The gains so far represent positive contributions towards the process of building support for further
decentralisation/deconcentration, greater accountability, transparency, and participation that is
needed to ensure effective local governance. These gains need to be consolidated, and further steps
are needed to push forward in the direction indicated by the Government of Uzbekistan in the new
Welfare Improvement Strategy for 2013-2015.
Lessons learned from the LGSP
1. One of the key achievements of LGSP was the establishment of an Inter-Agency Coordinating
Working Group, which consisted of 13 members from the Cabinet of Ministers and relevant
line ministries/ authorities. It was established on 9 September 2011 by a decision (No.12/15-
930) of the Prime Minister of Uzbekistan. The working group proved to be an effective forum
for discussion of key issues relating to decentralisation, and a mechanism for building a good
working relationship between UNDP and the government, including local government. The
working group also contributed to the identification of excellent opportunities, such as
cooperation with the Academy of Public Administration, and linking the LGSP project to
government initiatives on e-governance and other ICT policies.
2. Partnership with the newly re-formed Academy of Public Administration under the President of
Uzbekistan became an essential part of the success of the project in the first phase, although not
identified or planned at the project’s inception. The Academy has become a valuable partner
and is an instrument for longer-term institutional and structural change. This partnership will be
built on and taken forward.
3. A draft functional analysis ‘Strengthening Capacities for Delivering Four Public Services at the
Local Level in Uzbekistan’ was produced by the LGSP project, based on the work of a team of
local and international consultants. The findings of the review were challenged by Ministry of
Labour and Social Protection and the Mahalla Foundation, which made it difficult to report on
some of the true challenges facing local government. The recommendations of the report
therefore focus on less controversial aspects of performance improvement, without addressing
some underlying issues. The report mainly looks at efficiency improvements in current
processes, but does not tackle issues of duplication of functions, location of policy decisions,
financing of services and quality control and inspection. The edited report nevertheless was
considered by the Inter-Agency Working Group, which promised to take up the
recommendations with respective line ministries/ authorities. The report also formed the basis
of later work to introduce One Stop Shops and the document management system ‘e-Hujjat’.
4. Due to its confidence building efforts and demonstration of measurable results, LGSP was
chosen by the Ministry of Finance, State Tax Committee, SCCITT, Academy of Public
Administration, NIMFOGO, CCI and Tashkent city khokimyiat as a development partner for
joint initiatives on fiscal decentralisation, tax optimisation, e-governance, training of civil
servants, transparency of local governments, OSS for public services delivery and e-billing for
communal utilities.
5. LGSP customised an existing open-source central government electronic DMS (known as ‘e-
Hujjat’) for use at local government levels. Unlike previous attempts (by other agencies) to
7
introduce DMS based on expensive proprietary systems such as Oracle, the LGSP solution
based on open-source software proved to be sustainable. Today, all 27 khokimyiats of regions
and districts/cities in Namangan and Djizak are using e-Hujjat. The system automates the
government procedures of sending out decisions and orders to subsidiary government bodies
and departments and monitoring compliance. In addition to automating current document flows,
historical decisions and regulations of regional khokims were scanned and entered into the
system to create a comprehensive reference source.
Recommendations for the second phase based on experience of LGSP:
The final evaluation of LGSP made the following recommendations:
1. The primary focus of a second phase of the LGSP should be to continue towards building
commitment and readiness for greater decentralisation/ deconcentration within central and local
government.
2. Find ways to engage independent civil society organisations in dialogue with local government
and enable them to strengthen their accountability function.
3. The project should again attempt to conduct a functional review to expose inefficiencies within
the current structure of local government, but should also provide concrete and realistic
recommendations for policy change, and examples of where such change has taken place
successfully in other comparable countries. A prior feasibility study would be needed to
formulate a realistic scope and methodology.
4. In the existing pilot areas of Djizak and Namangan regions, the second phase of the project
should concentrate on supporting the implementation of the regional development strategies.
Identify funds to support specific local projects in support of the Local Development Strategies.
5. The existing LGICs in Djizak and Namangan need to be encouraged to move towards a two-
way communication model with citizens.
6. In both the existing pilot regions and in new regions the project should work with the
Kengashes (local assemblies) to strengthen its functioning in key areas of oversight, rulemaking
functions and promoting public consultations.
7. The project should support further development of the e-learning portal with the Academy for
Public Administration. The topics of new e-learning courses should be more closely linked to
promotion of decentralisation/ deconcentration in line with a Concept of President on Further
Democratisation and Formation of Civil Society and evidence based policy making.
8. The second phase of the LGSP needs to track usage of the OSSs closely to ensure that there is
an increase in demand for services. If demand does not increase, there needs to be a review of
the services to understand why this is the case, and to reformulate the services provided, if
necessary. The project should also promote the sustainability of OSS through policy advice to
Government on the legal and financial framework.
9. The successes achieved so far with recommendations on fiscal decentralisation can be used to
move forward with other aspects of financial management reform at local level. This could
include improved budget management with a focus on planning, performance and financial
reporting.
II. STRATEGY
In line with the above recommendations, the second phase of the Local Governance Support
Programme will embrace reform of policy, legislative and fiscal frameworks for deconcentration
and decentralisation, stronger participatory planning, management and monitoring capacities and
will test new models of citizen engagement and voice.
8
The Programme will contribute to UNDAF Outcome #4: “Effectiveness, inclusiveness,
accountability of governance at the central and local levels enhanced”, and the UNDP Country
Programme Outcome 3.2 “Strengthened public administration at all levels that exercises efficient,
accountable and inclusive governance”.
With this in mind, the main goal/output of LGSP-2 will be formulated as “strengthening local
governance at regional and district levels to ensure accountable, inclusive and equitable local
development.”
The programme strategy has been aligned with the latest UNDP programming guidelines on
adopting an integrated approach to local development and will primarily tackle three areas: the
administrative capacity to deliver local public services, the accountability of local governance,
and the financial transparency framework for local government.
In order to tackle these three aspects, changes are needed at both national level and local level. The
programme will continue to work at the national level to improve legislation and institutional
frameworks which are a necessary precondition for further progress in decentralisation and
deconcentration.
At the local level, the programme will provide practical support to achieve tangible results in these
three areas. Throughout all its results the programme will aim to engage and benefit equally women
and men and young persons by including, where needed, special measures to advance the less
represented group. It will work in three regions of Uzbekistan: Djizak, Namangan and Tashkent.
As far as possible, the programme will integrate its work at local level with other UNDP projects
and UN Agencies/ other donors in the same locations, using the conceptual framework10
, below, as
the basis for coordination and alignment of local actions.
EXPECTED OUTPUT: Strengthened local governance at regional and district levels to
ensure accountable, inclusive and equitable local development
10
From UNDP (Draft) Integrated Local Governance and Local Development Strategy Paper
9
Activity result 1: Reforming the system of public administration and strengthening the
administrative capacity of local authorities and management.
System/ policy level. LGSP-2 will work to assist the Government to identify and reform local
governance aspects of the public administration and local development. This will be done in
partnership with the Cabinet of Ministers, MoE, MoJ and affiliated think tanks and the Academy
for Public Administration, and will use research and opportunities for dialogue to highlight the
needs and current challenges, and offer examples of effective local government policies from other
countries.
LGSP-2 will facilitate policy discussions on a new edition of the Law ‘On Local Government
Authorities’, focusing on clear separation of responsibilities and functions of each level, together
with the arrangements for financing them and proper check and balances among different powers.
To support these policy discussions, LGSP-2 will provide support to the government in conducting
a vertical functional analysis to assess the current situation, and to make recommendations for
rationalisation. This analysis will be accompanied by policy dialogue and technical assistance to the
government in identifying central government responsibility for local government affairs, and
formulating mandate and terms of reference for such an authority, if requested.
LGSP-2 will support the Government`s efforts in civil service reform in terms of creating a unified
legal framework and more capable civil servants including more women. Civil service reform will
enable local government reform because very often human capacities are to blame for poor
implementation of state programs. Evidence–based policy advisory services on capacity
development of local governments/local Kengashes and development of curriculum for civil
servants will carried out in cooperation with the Academy of Public Administration and other
relevant agencies. The legal framework to be developed will identify and take into account specific
requirements to enable more women to be recruited and to progress in civil service careers.
Organisational level. LGSP-2 will work with individual khokimyiats to ensure equitable, effective
and sustainable delivery of goods and services. These activities will include the further
development of multi-channel mechanism to provide easier and inclusive access to public services;
tackling the gender imbalance in local administrations by improving recruitment, retention,
promotion processes, employment conditions and providing additional capacity and training
opportunities for women; and providing technical support for improved IT systems.
Individual level. The programme will support the Academy of Public Administration in
development of its new curriculum to create more capable civil servants, prepared for challenges of
the 21st century. A series of brand new courses will be aimed at improving the strategic planning
and programming capacity and capability of local governments on the use of various analytical
tools on sustainable local development, planning and budgeting. Furthermore, e-learning portal
max.dba.uz will provide distance learning opportunities for local civil servants in priority subjects.
Female civil servants will be specifically encouraged to take on learning opportunities and
additional trainings targeting women might be included based on the baseline study.
Activity result 2: Empowered local governments for equitable development, local
accountability and for better quality and transparency of financial management on planning
and performance of local budgets
System/ policy level. LGSP during it’s the first phase achieved some success in policy support to
fiscal decentralisation related to transfer of revenue collection from central to local budgets. Phase
2 will work to extend and sustain the gains so far on financial management for local planning and
execution of the budget as well as financial transparency at the local level. This will involve
10
participating in the legal experiment on the Budget Code of the local budget and supporting local
governments to take advantage of the revenues that will stay at local level, including technical
support for budgeting. It will also involve working at the policy level to encourage additional
measures for enhancing the own revenues of local government. If implemented in parallel to the
functional review described above, fiscal reform can provide a greater degree of autonomy for local
governments. Fiscal decentralisation should also be accompanied by greater transparency and
scrutiny via the Kengash, to ensure that funds are spent according to local priorities.
Organisational level. LGSP-2 will use Local Development Strategies as a key instrument for
strengthening local accountability. The multilevel (central and local planning) process requires
engaging citizens – various groups – to assist in identifying development priorities, making a public
commitment to achieving goals, and involving citizens in monitoring implementation. This assists
local governments to develop their capacities for dialogue and partnership and means that they are
held to account by citizens. Crucially, the strategies will take into account the views, interests, and
needs of various groups to ensure that they are genuinely reflecting citizens’ priorities. The
participatory planning and implementation of Local Development Strategies will built on the recent
UNDP methodology for sustainable local development that includes cross-practice work on poverty
reduction, environmental and governance dimensions. In addition UNDP Uzbekistan experience in
this area will be consolidated and cooperation with IFMR will continue. Moreover it will be linked
to mid-term budgeting, Human Development Index and will be fed into policy level for potential
approval of the methodology on Local Development Strategy by the government authorities at the
regional level.
While the local governance framework does not refer explicitly to decentralisation and
deconcentration – which is a national process of institutional, legal, fiscal and political changes - it
is obvious that the structure, approach and quality of any particular national decentralisation and
deconcentration policy will influence the milieu and organisation of local development. To achieve
this LGSP-2 will cooperate with SIV and IESP projects as well as UN Women to integrate the
involvement of volunteers into Local Development Strategy planning and implementation
exercises, to replicate and develop a concept of inclusive social enterprises and strengthen the local
opportunities for participation of women in both private business and local governance.
In order to demonstrate the participatory and cross-practice approach in designing and
implementation of Local Development Strategies, the programme will facilitate the tripartite
cooperation among local governments, NGOs, including women’s NGOs and disabled persons
organisations, and private sectors through pilots in 2 cities (Djizak and Namangan).
LGSP-2 will work with individual khokimyiats to provide training and methodological support to
medium term planning and budgeting to improve investment and finance capacities in coordination
with the UNDP Budget System Reform Project in Uzbekistan.
If funding from international donors and/or local governments is available, LGSP-2 will support a
small grants scheme to finance projects (including those addressing the needs of vulnerable groups)
which contribute to achieving the strategy.
Activity result 3: Increased democratic accountability and openness of local executive and
representative authorities as well as active public participation at local decision-making
As part of efforts to promote inclusive decision making, the programme will aim at implementation
of the Law ‘On Transparency of State Authorities and Agencies’ which is a key to bridge the
dialogue with society and local government for sustainable local development. The LGICs already
established under LGSP will be monitored and enhanced to strengthen two-way communications
11
with citizens. This will involve support for consultations on specific local policies and proposals
and more general opportunities for genuine dialogue with citizens. Efforts will be made to ensure
active participation of all members of the society, including less represented groups of women,
youth, unemployed, persons with disabilities. The main purpose is to provide sustainability of
LGICs in Djizak and Namangan regions and to transfer acquired knowledge to the new pilot
Tashkent region. The One-Stop-Shops are a useful source of citizen/entrepreneurs satisfaction with
public services, and the programme activities will link information on quality and effectiveness of
public services obtained from the One-Stop-Shops to the LGICs for public dissemination.
LGSP-2 will strengthen local governance processes for inclusive and rights-compliant societies.
The human initiative in local development will be critical as “human development is not only about
health, education and income—it is also about people’s active engagement in shaping development,
equity and sustainability, intrinsic aspects of the freedom people have to lead lives they have reason
to value.” People’s engagement brings a sense of cooperation at the community level, a feeling that
can foster solidarity, improve development effectiveness and also contribute to their well-being.
The local Kengashes will be enhanced in pilot regions by delivering comprehensive capacity
development programme with a focus on specific functions such as local budget oversight and
monitoring of local socio-economic development programmes, providing resources and assisting
the locally elected bodies (Kengash). Programme will facilitate (together with National Democratic
Institute) secretary function for Kengash members, rigorous communication with the media and
citizens. To implement the new Law ‘On Transparency of State Authorities and Agencies’, LGSP-2
will cooperate with the Senate of Oliy Majlis and Kengashes to design the Rules of Procedures
providing for more active interaction and communication with public, to ensure its accountability to
local voters, development of civic participation and public disclosure documents discussed and/or
adopted by Kengashes.
Evidence–based policy advisory services on capacity development of local governments/local
Kengashes will be carried out in cooperation with the Academy of Public Administration and other
relevant agencies.
Partnership with other UNDP projects and other donors:
LGSP-2 will cooperate with international organisations and donors: World Bank, GIZ and USAID
on area based development, UN Women on women empowerment in rural areas, NIMFOGO and
NDI on local elected bodies and civil society participation, OSCE on responsive governance and
others.
LGSP-2 will seek for possible areas of cooperation and synergy and continue its partnership with
other UNDP projects from GGU, EGU and EEU using cross-practice approach working in the area
of public finance reform, environmental sustainability, support of private sector development, e-
governance, public policy cycle, social innovation and volunteerism, inclusive employment and
social partnership, foreign trade and investment, economic forecasting and planning, energy
efficiency, water and land management, and climate change. What LGSP-2 offers the other UNDP
projects is a platform for sustained cooperation and institutionalisation of project recommendations
and activities through the local government system.
In particular, when designing of Local Development Strategies (LDS) and developing pilot projects
for additional income generation of rural communities in pilot regions, LGSP-2 will cooperate with
UNDP Project on National Biodiversity Planning to Support the Implementation of the CBD 2011-
2020 Strategic Plan in Uzbekistan (EA-CBD) to ensure the incorporation of biodiversity and
environmentally sustainable approaches, methodologies and solutions into LDSs and community-
based initiatives, including eco-tourism.
12
Knowledge management and Advocacy:
UNDP will support the Cabinet of Ministers, respective ministries and authorities in charge of
coordinating local development to establish simple practices and processes for identifying, creating,
documenting, distributing, and indeed adopting insights and experiences from local governance and
local development initiatives. Knowledge development processes need to be established to avoid
loss of institutional memory and promote local learning systems.
Furthermore, to foster policy dialogue and robust discussions, LGSP-2 will facilitate roundtables,
policy discussions, awareness raising on subjects related to the local governance, as well as the
wide dissemination of knowledge products, including through publication of articles in the e-
Journal ‘Society and Governance’ of the Academy of Public Administration on a monthly basis11
.
Local governance aspects of the public administration and local development will also be
strengthened by linking the local processes to international platforms and networks of excellence.
UNDP will act as a knowledge broker establishing and/or coordinating international platforms for
local governments to enhance the exchange of good practices with a specific results oriented
emphasis. Purpose would be to widen the scope for local governance institutions to reach beyond
the national knowledge platforms, creating opportunities for more experienced local governments
to share their knowledge and practical experience with others.
Modus Operandi in Djizak and Namangan regions:
Representation in pilot regions will be sustained by full time 2 SCs (subject to budget availability),
regional project offices may be used by other UN/DP projects for quick roll out on cost recovery
basis.
Policy dialogue: Strategic nexus between citizen-centric local development and policy advice
at the national level
LGSP-2 will continue the facilitation of consultative and participatory dialogue with the
Government of Uzbekistan through the mechanism of high-level Inter-Agency Coordinating
Working Group approved by Prime Minister of Uzbekistan. New membership was re-approved on
February, 14 2014 by the Prime Minister. TOR and full list of members is attached herewith.
Another platform to be used is the Project Board meetings as well as providing regular reports and
policy advisory services to the Main Information and Analytic Department for Macroeconomic
Development, Structural Economic Reforms and Complex Development of Territories of the
Cabinet of Ministers of Uzbekistan in accordance with the decision of the First Deputy Prime
Minister of Uzbekistan. This Department conducts analysis of economic development trends in the
country, provides options for structural transformations, performs systemic monitoring of
macroeconomic and social development parameters, identifies regional and sector disparities in
socio-economic development, expertise of sectorial and regional development programmes,
investment projects, monitors the implementation of economic and investment programmes, drafts
the decisions of Government relating to its mandate, and coordinates the activities of other
government agencies.
The following results of the project will be presented to regular meetings of IACWG for review and
consideration during 2014-2017:
- Proposals regarding the Law “On local public authorities”;
11
http://journal.dba.uz/
13
- Proposals to the Budget Code in order to improve the quality of finance administration and
increase the income on a local level;
- Draft Decree of the President of the Republic of Uzbekistan on One Stop Shops (OSS) and
OSS functioning sustainably in the pilot regions;
- Proposals about the development of entrepreneurship, enhancing the attractiveness of
regions for foreign investors, as well as optimizing tax burden on individuals and legal
entities;
- Draft legal acts, provisions on openness of admission to the vacant civil servant positions, as
well as provisions on introducing the system of performance assessment of civil servants.
- Methodology/ options of proposals for vertical functional analysis of public services
- Reports on local multichannel public services;
- Strategies of local development for Djizakh and Namangan cities;
- Evaluation report on "e-Hujjat“ functioning in 20 khokimiats of Tashkent region;
- Evaluation reports on increased the efficiency of regional Kengashes of people’s deputies,
as well as of Djizakh and Namangan cities;
- Assessment of curriculum anddevelopment/integration of brand new training courses for
mid-level and senior government officials at the Academy of Public Administration.
III. RESULTS AND RESOURCES FRAMEWORK
Intended Outcome as stated in the Country Programme Results and Resource Framework:
3.2 Outcome: Strengthening public administration at all levels that exercise efficient, accountable and inclusive governance.
Outcome indicators as stated in the Country Programme Results and Resources Framework, including baseline and targets:
Outcome 3.2 Indicator: Progress in civil service reform.
Outcome 3.2 Baseline: Comprehensive civil service reform or law on public administration adopted.
Outcome 3.2 Target: Comprehensive strategy in place for civil service reform, and a shift towards Results-Based Management.
Applicable Key Result Area (from 2014-17 Strategic Plan): Institutions enabled to deliver universal access to basic services
Partnership Strategy: The Cabinet of Ministers is the implementing partner. Other responsible parties include UNDP, the regional khokimyiats of the
Djizak, Namangan and Tashkent regions, the Legislative Chamber and Senate of the Oliy Majlis, Ministry of Justice, Ministry of Economy, Ministry of
Finance, Ministry of Labour and Social Protection of population, SCCITT, the State Tax Committee, the Chamber of Commerce and Industry, the
Women’s Committee, Academy of Public Administration, IMCL, IFMR, ISR, NIMFOGO, Uzinfocom, UNICON, Uzbektourism, UN Women, NDI and
others
Project title and ID (ATLAS Award ID): Local Governance Support Programme/Phase -2 Atlas Award ID: 00088584
INTENDED
OUTPUT(S)
OUTPUT TARGETS
FOR YEARS
INDICATIVE ACTIVITIES RESPONSIBLE
PARTIES
INPUTS
Output: Strengthening
local governance at
regional and district
levels to ensure
accountable, inclusive
and equitable local
development.
Baselines:
1.1. Neither central nor
local authorities have
methodologies for
streamlining service
delivery at the local
level; the out-of-date law
‘On Local Government’
precludes local results-
based governance and
sustainable development;
2014 (Target 1)
1.1. Develop roadmap and
methodology/policy
options for the vertical
functional review of public
services provision is
prepared and tested to
integrate into multi-
channel local service
delivery mechanisms.
2015 (Target 2)
1.2. The quality of
curriculum development of
the Academy of Public
Administration is enhanced
through participatory
design processes and the
Activity result No 1: Reforming the
system of public administration and
strengthening the administrative capacity
of local authorities and management.
1.1. Promote the streamlining of the
multi-channel delivery of local public
services, in cooperation with national and
regional partners in three cities:
Identify public service providers in pilot
regions, and conduct vertical functional
reviews and/or time-studies of performance,
in cooperation with national think-tanks,
after conducting a feasibility study guided
by an international consultant;
Development of proposals for
strengthening the powers of local (regional,
city and district) authorities by specifying
the distribution of powers between the
The Cabinet of
Ministers, the Oliy
Majlis, the Ministry of
Justice, the Ministry of
Finance, the Ministry
of Economy, the
Ministry of Labour and
social protection of the
population, pilot
regional khokimyiats,
APA, WCU, IFMR,
ISR, IMCL, UN
Women, SCCITT,
UNICON, Uzinfocom,
CCI, the Legal
Problems Research
Centre
Budget: $ 250,000
Project staff
Local and international
consultants
Publications and
printing services
Research and analysis
IT procurement
Software, Apps,
website and portal
development
Travel to regions
Event management
services
15
1.2. In the absence of
civil service reform, there
are few opportunities for
local civil servants to
improve their
performance;
1.3. Public access to e-
government services is
limited at the local level.
Indicators:
1.1. The government is
provided with
methodology/policy
options for the functional
review of the
streamlining of public
services delivery as an
institutional aspect of
civil service reform, and
the decentralisation
/deconcentration of
powers between central
and local level
authorities; The
government is provided
with a comprehensive
concept of administrative
decentralisation, and
recommendations on
Law ‘On Local
Government’;
1.2. Curriculum
introduction of new
courses (at least 2 new
courses) for the civil
servants of local
governments, and for
Master’s students.
2016 (Target 3)
1.1. The proposed
amendments to the Law
‘On Local Government’
are submitted to the
Cabinet of Ministers.
2017 (Target 4)
1.3. E-government tools
are applied in processing
documents, in the decision-
making systems of local
governments, and in local
services, for the benefit of
citizens.
republican, regional and city / district
governments;
Provide options to the government to
ensure the financial sustainability of all
three OSSs (Namangan, Djizak & Tashkent)
under a new decision on OSS (subject to
approval by the government);
Assistance in finalizing the draft
Resolution of the President of the Republic
of Uzbekistan on One-Stop Shops (OSS);
Support measures to ensure the
continuing development of services, and
quality, inclusive and equal public access
for OSSs, etc.;
Train in-country capacities for rolling
out the optimisation for service provision,
with the aim of streamline services;
If the legal status and financial
sustainability of OSSs are assured by a
decision of the government, provide
methodological support to assist local
governments in establishing additional
OSSs in areas of low internet access.
Identify alternative delivery models for
rural areas, e.g. small OSSs located in local
government buildings, mahallas, mobile
OSS, etc.;
Development of proposals to eliminate
administrative and legislative barriers to
entrepreneurship;
Development of proposals to improve
organizational, legal and regulatory
conditions to improve the regions’
attractiveness for foreign investors;
Support the development of the new
16
development at the
Academy of Public
Administration, extended
to local governments;
1.3. The number of
users/clients (men and
women) and companies
using One-Stop-Shops
and other e-services of
local governments; the
number of public
services transformed into
e-services.
version of the Law ‘On local government’;
Conduct national and regional events on
awareness-raising regarding issues of local
governance reform and civil service reform,
as well as the dissemination of knowledge
products (brochures, bulletins, reports, info-
graphics, etc.) among the public.
1.2. Curriculum development for local
civil servants, including skills building
and knowledge building through modern
learning courses and other methods:
Support the Academy of Public
Administration to develop new, relevant
courses for local civil servants (e.g. local
economic development, planning &
budgeting with a particular focus on what
will be required to implement the new
Budget Code, in cooperation with Budget
Reform Project, HR management,
performance evaluation, participatory
monitoring, etc.);
Develop and promote offline and e-
learning courses in basic human resource
management, sustainable local
development, performance appraisal
systems, results-based management,
leadership, public speaking and
management skills intended for junior level
and mid-level civil servants (men and
women) and a Code of Conduct (ethical
issues of integrity, accountability and
transparency) for civil servants, with the
Academy of Public Administration and
other partners;
Foster local inter-municipal cooperation
17
between local (regional/city/district)
governments (in Djizak, Tashkent&
Namangan), e.g. study trips to those
regions, establish peer networks for people
working in same functions/different areas,
etc.;
Increase national ownership and further
development of the distance learning portal
max.dba.uz;
Assist in developing a brief Paper
together with the Academy of Public
Administration on the recruitment,
promotion and evaluation of civil servants
at the local level;
Identify and agree with the government
and the Academy of Public Administration
on practical measures/recommendations to
increase the participation of women in civil
service over the medium to long term,
including recommendations regarding
recruitment, working conditions,
trainings/learning opportunities, promotion,
dismissal and retirement;
Prepare a concept note for a national
roster of civil servants, including a quota of
up to 30 per cent for qualified professional
women;
Develop an educational movie on local
government, regarding how to perform
efficient and effective khokimyiat
operations and interact with citizens and
businesses, together with the Academy of
Public Administration, as a part of
curriculum for graduate students and short-
term courses for khokims;
18
Prepare and provide materials and
articles to the e-Journal of the Academy of
Public Administration.
1.3. Support local public services
providers to develop e-services, and
transfer knowledge and know-how to
pilot regions, in cooperation with the
UNDP e-Government Project:
Support the development of mobile
applications for public services at the local
level;
Taking into account the international
experience, assistance in the development of
online public services and innovative
methods of urban management in pilot
regions;
Support the implementation of the
concept of e-Kommunal, including the wide
dissemination of results of e-billing;
Organise hackathons for local e-
solutions, for accessing government
services (together with UNDP e-governance
project);
Assess needs, and plan and specify
UNDP support for (except for the
procurement of ICT) the implementation of
the ‘e-Hujjat’ system in the Tashkent region
with organisations training sessions for
khokimyiats and ‘Regional Computerisation
Centre’ staff;
Monitoring e-Hujjat application by 27
khokimyiats of the Djizak and Namangan
regions, with the intention of providing
recommendations for performance
improvement;
19
Support the modernisation of the
website of the Tashkent regional
khokimyiat;
Conduct round tables with local
business entities and mahalla
(neighbourhood government) leaders on the
quality assessment and improvement of
introduced new government services (OSS,
e-Hujjat, etc.).
Baselines:
2.1. Highly centralised
fiscal and public finance
management does not
empower local
governments to seek
additional sources of
local revenue generation
for equitable
development;
2.2. Planning strategy for
the cities are sector-
based, with a
predominantly narrow
focus on economic
development;
Indicators:
2.1. The number of
initiatives taken by local
authorities for additional
revenue generation, in
collaboration with local
stakeholders;
2015 (Target 5)
2.1. Policy options for the
new Budget Code on
empowering local
governments to improve
the quality of financial
management, and to
increase local revenue
generation, are prepared
and submitted to pilot
regional khokimyiats and
Cabinet of Ministers.
2016 (Target 6)
2.2. A cross practice Local
Development Strategy for
cities is developed through
consultative processes, and
tested and used by local
administration for planning
purposes.
Activity result No 2. Empowered local
governments for equitable development/
local accountability, and for better
quality and transparency of financial
management regarding the planning and
performance of local budgets.
2.1. Support the strengthening of the
capacity of local governments regarding
financial management and fiscal
transparency:
Participation in the legal experiment
regarding the Budget Code of local budgets;
Organise trainings for local government
staff regarding financial management, based
on international experience and in line with
the priorities set forth in the new Budget
Code (in cooperation with the UNDP
Budget Reform Project);
Development of proposals for
optimizing the tax burden on individuals
and legal entities;
Develop draft legal acts regarding the
planning of local budgets and fiscal
transparency, together with the Ministry of
The Cabinet of
Ministers, the Ministry
of finance, the Ministry
of Economy, the State
Tax Committee,
Senate, the Budget
Committee of the
Legislative Chamber of
the Oliy Majlis,
MFERIT, regional
khokimyiats, APA,
CCI, SCCITT,
Uzinfocom, GIZ,
Uzbektourism, IFMR,
ISR, NDI, and UN
Women
Budget: $ 250,000
Research and analysis
Travel to regions
Event management
services
Seed funding (subject
to availability of funds)
20
2.2. The availability of
cross practice Local
Development Strategies
for cities (discussed and
adopted in consultations
with CSOs, the private
sector and with citizens);
Finance and the State Tax Committee.
2.2. Support cities (including Djizak,
Namangan and Angren), to develop and to
implement Local Development Strategies:
Consolidate lessons learned from the
development of Local Development
Strategies in the Djizak and Namangan
cities, and support connecting the strategy
with the mid-term planning and financing of
local budgets;
Cooperate with UNDP’s Social
Innovation and Volunteerism in Uzbekistan
and Inclusive Employment and Social
Partnership projects, as well as UN Women,
to integrate the involvement of volunteers,
local CSOs and private sector into Local
Development Strategy planning and
implementation exercises, to replicate and
develop a concept of inclusive social
enterprises, and to strengthen local
opportunities for the participation of women
in both private business and local
governance;
Support the development of monitoring
mechanisms for strategies, including the
involvement of CSOs and citizens to report
on progress;
Facilitate cooperation with other UNDP
projects working on poverty reduction,
social protection, energy efficiency,
integrated land management, water
management, and environmental
sustainability and other projects having
linkage to Local Development Strategies.
21
Cooperate with UNDP Project on
National Biodiversity Planning to Support
the Implementation of the Convention for
Biological Diversity (CBD) 2011-2020
Strategic Plan in Uzbekistan (EA-CBD) on
following:
- A joint feasibility study of areas
subject to protected zones
(Zapovedniki, National Parks, etc.);
- Technical advice and practical
solutions to local governments, local
businesses and communities on how
to take into account local ecosystem
sustainability, biodiversity issues
and nature preservation while
planning and implementing business
plans and commercial projects (local
road and housing construction can
also be an option) in pilot regions,
based on expertise, methodologies
and recommendations of
Biodiversity project experts.
In cooperation with the UNDP-GEF
‘Small Grants Programme’, elaborate and
publish information materials regarding
biodiversity and energy efficiency, etc.;
Facilitate the development and
dissemination of annual monitoring reports
and annual public monitoring meetings, to
present and discuss progress;
Assist in the dissemination of reports &
outcomes of meetings to traditional media,
websites and social media sites;
Facilitate the implementation of the
tourism development programme in the
22
Tashkent region, with the participation of
the civil society and private sectors;
Development of proposals to eliminate
administrative and other barriers to the
development of rural/sustainable tourism;
Development and dissemination of an
informational toolkit on Rural Tourism
Development, in cooperation with GIZ,
national and regional partners;
Dissemination of best practices of
Zaamin district branding and marketing
strategy in the Tashkent region and other
regions of the country.
Baselines:
3.1. The public has a
limited voice in local
government decision-
making;
3.2. Kengashes have
limited capacities to
effectively carry out their
oversight, representative
and rule-making
functions, in partnership
with local stakeholders.
Indicators:
3.1. The frequency of
public
events/consultations to
inform local government
decisions; the quantity of
feedback received from
public;
2016 (Target 7)
3.1. Regular (at least twice
a year) public consultations
with local stakeholders are
conducted in accordance
with the annual plans of
local governments.
2017 (Target 8)
3.2. A plan of actions of
pilot Kengashes level (at
the regional level, and the
Djizak and Namangan
cities), is adopted and
implemented in order to
perform oversight,
representative and
rulemaking functions.
Activity result No. 3. Increased
democratic accountability and openness
of local executive and representative
authorities, as well as active public
participation in local decision-making
3.1. Support open and accountable local
executive and representative authorities:
Provide training and facilitation to ICs
to support their confidence, and skills to run
town hall meetings (with at least 30 per cent
of participants being women) in Tashkent
region;
Develop concept note on introducing
open data together with UNDP e-
governance project;
Assistance in the implementation of the
Law of the Republic of Uzbekistan "On the
openness of public authorities and
management“;
Support the khokimyiat of the Tashkent
region in developing an annual plan for
The Cabinet of
Ministers, the Senate,
regional khokimyiats
and Kengashes,
NIMFOGO, CCITT,
NANNOUZ, ISR, NDI,
APA, the International
Training Centre for
Journalists, and the
Legal Problems
Research Centre.
Budget: $ 200,000
Project staff
Local and international
consultants
Publications, branding
and printing services
Research and analysis
Travel to regions
Event management
services
23
3.2. The number of
documented tools for the
performance of public
oversight, representative
and rulemaking
functions, fulfilled by
Kengashes in cooperation
with local stakeholders.
town hall meetings on key topics (including
budgets, and major investments). Organize
thematic meetings, with open access to
citizens, CSOs and selected
experts/officials. Promote the participation
of the youth, and the equal representation of
women. Include open Q&A sessions;
Build the capacities of the mass media
to highlight the issues of local governance
and local development, including four to
five talk-shows on public administration
and local development on central TV
Channels, thematic discussions, and
publication in media and related outlets;
The monitoring of six Local
Government Information Centres in the
Djizak and Namangan regions with a view
to provide recommendations for regional
khokimyiats regarding the improvement of
two-way communication with citizens,
CSOs and mass media;
The replication of the experience of
Local Government Information Centres in
other regions of Uzbekistan as per the
request and commitment for national
ownership by regional authorities, after the
enactment of the Law ‘On Transparency of
State Authorities and Agencies’;
Development of the draft legal act to
implement an effective system of
monitoring and evaluation of local
government;
Development of the draft legal act and
the Regulations on Transparency rules on
admission to vacant positions of civil
24
servants;
Development of appropriate regulatory
act and regulations to implement the system
of performance evaluation of civil servants;
Development of Concept on personnel
reserve for the central and local
governments (including the 30% quota for
female professionals and managers).
3.2. Support Kengashes to exercise more
effective oversight, representative and
rulemaking functions in a participatory
manner by CSOs:
Conduct needs assessment of selected
Kengashes to develop capacity development
strategy, both organizational and individual
(including ex officio support mechanisms
for Kengashes);
Analyse and address the specific
training needs of Kengash members
connected with the implementation of a new
Budget Code, in cooperation with Budget
Reform Project;
Identify and deliver actions to support
the effectiveness of Kengashes, set of
training, provision of research/support staff,
an office or room for a library, documents,
computer/internet access, training for
researchers and other services, and
agreements with respective khokims;
Advocacy opportunities to assist
government and experts in identifying
solutions for the democratic accountability
of both appointed and elected local
authorities, including publications, expert
25
seminars, workshops, conferences and
roundtables;
Provide the government with policy
options to design a concept in which
ministries/agencies are responsible for local
government development, as based on
international experience;
Development of proposals to improve
the accountability of local authorities to the
local Kengashes and the public;
The development and dissemination of
an educational movie to Local Kengashes,
regarding how to effective perform their
functions, and to interact with the public,
together with the Academy of Public
Administration for Kengash deputies.
TOTAL BUDGET: USD 700,000 FOR 2014-2015.
26
IV. MANAGEMENT ARRANGEMENTS
The Cabinet of Ministers will be the Implementing partner and will be represented in the Project
Board. The Project Board will be responsible for making by consensus management decisions
for a project when guidance is required by the Project Manager, including recommendation for
UNDP/Cabinet of Ministers approval of project plans and revisions. In order to ensure UNDP’s
ultimate accountability, Project Board decisions should be made in accordance to standards that
shall ensure best value to money, fairness, integrity transparency and effective international
coordinating. Detailed roles and responsibilities of the Project Board are provided in Annex 3.
This Board contains three roles, including:
1) An Executive: individual representing the project ownership to chair the group.
2) Senior Supplier: individual or group representing the interests of the parties concerned
which provide funding and/or technical expertise to the project. The Senior Supplier’s primary
function within the Board is to provide guidance regarding the technical feasibility of the project.
3) Senior Beneficiary: individual or group of individuals representing the interests of those
who will ultimately benefit from the project. The Senior Beneficiary’s primary function within
the Board is to ensure the realization of project results from the perspective of project
beneficiaries.
Project Assurance is the responsibility of each Project Board member, however the role can be
delegated. The Project Assurance role supports the Project Board by carrying out objective and
independent project oversight and monitoring functions. This role ensures appropriate project
management milestones are managed and completed.
The Project Support role provides project administration, management and technical support to
the Project Manager as required by the needs of the individual project or Project Manager. The
provision of any Project Support on a formal basis is optional. It is necessary to keep Project
Project Manager
(SC-10)
Project Board
Senior Beneficiary
Cabinet of Ministers,
regional khokimiyats
Executive
National Project
Coordinator from SIAD
Senior Supplier
(UNDP)
Project Assurance
GGU, RMU
Project Support
UNDP Operations
Project Organisation Structure
Task manager on
local governance (SC-8)
Specialist on capacity
building (SC-7)
AFA (SC-6)
Project Assistant in Djizak
(SC-6)
Project Assistant in
Namangan (SC-6)
Economist (SC-8)
PR and Outreach Specialist
(co-financed by E-governance
and Applied Policy Cycle
Projects) (SC-7)
Driver (SC-2)
27
Support and Project Assurance roles separate in order to maintain the independence of Project
Assurance.
In accordance with the provisions of the letter of agreement signed on 30 April, 2010 and
the approved Country Programme Action Plan 2010-2015, the UNDP country office shall
provide support services for the Project as described below.
The Cabinet of Ministers will provide office premises for the project team as well as telephone
communication lines, and the required expertise and services of their corresponding staff.
Use of institutional logos on project deliverables: In order to accord proper acknowledgement to
UNDP for providing funding, UNDP should appear on all relevant project publications,
including among others, project hardware purchased with UNDP funds. Any citation on
publications regarding projects funded by UNDP should also accord proper acknowledgment to
UNDP. The UNDP logo should be more prominent - and separated from any other logo, if
possible, as UN visibility is important for security purposes.
Audit Arrangements: The Audit will be conducted in accordance with the established UNDP
procedures set out in the Programming and Finance manuals by the legally recognized auditor.
Direct UNDP Country office Support Services to the project implementation
The UNDP and the Cabinet of Ministers have agreed that the UNDP Country Office will provide
the following support services for the project activities at the request of the Cabinet of Ministers:
1. Identification and/or recruitment and solution of administrative issues related to the
project personnel;
2. Procurement of commodities, labor and services;
3. Identification and facilitation of training activities, seminars and workshops;
4. Financial monitoring and reporting;
5. Processing of direct payments;
6. Supervision of project implementation, monitoring and assistance in project assessment.
The UNDP country office may provide support services for assistance with reporting
requirements and direct payment. In providing such support services, the UNDP country office
shall ensure that the capacity of the Cabinet of Ministers is strengthened to enable it to carry out
such activities directly.
When providing the above support services, the UNDP Country Office will recover the costs for
providing Implementation Support Services on the basis of actual costs and transaction fee based
on the Universal Price List. According to the corporate guidelines, these costs are an integral
part of project delivery and, hence, will be charged to the same budget line (account in AWP) as
the project input itself.
The procurement of goods and services and the recruitment of project personnel by the UNDP
country office shall be in accordance with the UNDP regulations, rules, policies and procedures.
If the requirements for support services by the country office change during the life of a project,
the list UNDP country office support services is revised with the mutual agreement of the UNDP
Resident Representative and the Cabinet of Ministers.
The relevant provisions of the Standard Basic Assistance Agreement (SBAA) between the
Government of Uzbekistan and the UNDP, signed by Parties on 10th June 1993, including the
provisions on liability and privileges and immunities, shall apply to the provision of such support
services.
The Cabinet of Minister shall retain overall responsibility for this nationally managed project and
will appoint the National Project Coordinator (NPC). Direct responsibility of the NPC will be
provision of strategic advice, as well as coordination of the project activity taking into account
28
interests of the Government. He/she will approve Annual Work Plan of the Project, according to
which the whole project activity will be carried out.
Any claim or dispute arising under or in connection with the provision of support services by the
UNDP country office in accordance with this document shall be handled pursuant to the relevant
provisions of the SBAA.
29
V. MONITORING FRAMEWORK AND EVALUATION
In accordance with the programming policies and procedures outlined in the UNDP User Guide,
the project will be monitored through the following:
Within the annual cycle
On a quarterly basis, a quality assessment shall record progress towards the completion
of key results.
An Issue Log shall be activated in Atlas and updated by the Project Manager to facilitate
tracking and resolution of potential problems or requests for change.
Based on the initial risk analysis submitted (see annex 1), a risk log shall be activated in
Atlas and regularly updated by reviewing the external environment that may affect the
project implementation.
Based on the above information recorded in Atlas, a Quarterly Progress Reports (QPR)
shall be submitted by the Project Manager to the Project Board through Project
Assurance, using the standard report format available in the Executive Snapshot.
a project Lesson-learned log shall be activated and regularly updated to ensure on-going
learning and adaptation within the organization, and to facilitate the preparation of the
Lessons-learned Report at the end of the project
a Monitoring Schedule Plan shall be activated in Atlas and updated to track key
management actions/events
Annually
Annual Review Report. An Annual Review Report shall be prepared by the Project
Manager and shared with the Project Board and the Outcome Board. As minimum
requirement, the Annual Review Report shall consist of the Atlas standard format for the
QPR covering the whole year with updated information for each above element of the
QPR as well as a summary of results achieved against pre-defined annual targets at the
output level.
Annual Project Review. Based on the above report, an annual project review shall be
conducted during the fourth quarter of the year or soon after, to assess the performance of
the project and appraise the Annual Work Plan (AWP) for the following year. In the last
year, this review will be a final assessment. This review is driven by the Project Board
and may involve other stakeholders as required. It shall focus on the extent to which
progress is being made towards outputs, and that these remain aligned to appropriate
outcomes.
VI. LEGAL CONTEXT
This project document shall be the instrument referred to as such in Article 1 of the SBAA
between the Government of Uzbekistan and UNDP, signed on June 10, 1993.
Consistent with the Article III of the Standard Basic Assistance Agreement, the responsibility for
the safety and security of the executing agency and its personnel and property, and of UNDP’s
property in the executing agency’s custody, rests with the executing agency.
30
The executing agency shall:
a) put in place an appropriate security plan and maintain the security plan, taking into
account the security situation in the country where the project is being carried;
b) assume all risks and liabilities related to the executing agency’s security, and the full
implementation of the security plan.
UNDP reserves the right to verify whether such a plan is in place, and to suggest modifications
to the plan when necessary. Failure to maintain and implement an appropriate security plan as
required hereunder shall be deemed a breach of this agreement.
The executing agency agrees to undertake all reasonable efforts to ensure that none of the UNDP
funds received pursuant to the Project Document are used to provide support to individuals or
entities associated with terrorism and that the recipients of any amounts provided by UNDP
hereunder do not appear on the list maintained by the Security Council Committee established
pursuant to resolution 1267 (1999). The list can be accessed via
http://www.un.org/Docs/sc/committees/1267/1267ListEng.htm. This provision must be included
in all sub-contracts or sub-agreements entered into under this Project Document.
VII. ANNEXES
Annex I. Risk Log
Annex II. Project Management Roles
Annex III. Interagency Coordination Working Group
Annex IV. TORs for key project personnel
31
Annex I. RISK LOG
Project Title: Local Government Support Programme
/Phase 2 Award ID: 00088584
Date: 28/02/2014
# Description Date
Identi
fied
Type Impact &
Probability
Countermeasures / Mngt
response
Owner
1
It takes a long
time to
coordinate the
drafting of legal
acts
28/02/
14
Strategic
Probability= 4
Impact=4
Project will seek or
assistance from the Main
Informational and
Analytical Department of
the Cabinet of Ministers,
CIAD
Project
Manager
2
Difficulties in
collecting of
statistics and
other data,
including for
updating and
implementation
of local
development
strategies for the
cities Djizakh
and Namangan
28/02/
14
Program
matic
P =2
I = 4
Project will cooperate with
regional partners and build
their capacities to provide
data
Project
Manager
3 Busy schedule
of khokimiyats
with daily tasks
may lead to
delay in
activities
28/02/
14
Organiza
tional
P =2
I =3
Annual Action Plans
between regional
Khokimiyat and the
UNDP will be signed
Project
Manager
4 Some
sustainable local
development
initiatives will
require
additional
funding
28/02/
14
Financial P =4
I = 2
Project will organize
donor coordination
meeting with support of
SIAD
Project
Manager
5 Inadequate
capacity of civil
servants and
Deputies of
local Kengashes
and high
turnover of the
personnel;
28/02/
14
Organiza
tional
P =3
I = 3
Project, in cooperation
with Academy of Public
Administration, will
organize professional
capacity development
activities and innovative
courses
Project
Manager
32
Annex II. Project Management Roles
I. Project Board12
Overall responsibilities13
: The Project Board is the group responsible for making by consensus
management decisions for a project when guidance is required by the Project Manager (PM),
including recommendation for UNDP/Implementing Partner approval of project plans and
revisions. In order to ensure UNDP’s ultimate accountability, Project Board decisions should be
made in accordance to standards14
that shall ensure best value to money, fairness, integrity
transparency and effective international competition. In case a consensus cannot be reached,
final decision shall rest with the UNDP Programme Manager/Officer. Project reviews by this
group are made at designated decision points during the running of a project, or as necessary
when raised by the PM. This group is consulted by the PM for decisions when PM tolerances
(normally in terms of time and budget) have been exceeded.
Based on the approved annual work plan (AWP), the Project Board may review and approve
project quarterly plans when required and authorizes any major deviation from these agreed
quarterly plans. It is the authority that signs off the completion of each quarterly plan as well as
authorizes the start of the next quarterly plan. It ensures that required resources are committed
and arbitrates on any conflicts within the project or negotiates a solution to any problems
between the project and external bodies. In addition, it approves the appointment and
responsibilities of the PM and any delegation of its Project Assurance responsibilities.
Composition and organization: This group contains three roles, including:
1) An Executive: individual representing the project ownership to chair the group.
2) Senior Supplier: individual or group representing the interests of the parties concerned
which provide funding and/or technical expertise to the project. The Senior Supplier’s
primary function within the Board is to provide guidance regarding the technical
feasibility of the project.
3) Senior Beneficiary: individual or group of individuals representing the interests of those
who will ultimately benefit from the project. The Senior Beneficiary’s primary function
within the Board is to ensure the realization of project results from the perspective of
project beneficiaries.
Potential members of the Project Board are reviewed and recommended for approval during the
LPAC15
meeting. For example, the Executive role can be held by a representative from the
Government Cooperating Agency or UNDP, the Senior Supplier role is held by a representative
of the Implementing Partner and/or UNDP, and the Senior Beneficiary role is held by a
representative of the government or civil society. Representative of other stakeholders can be
included in the Board as appropriate.
Efforts shall be made to the extent possible to ensure gender balance among the members of the
Project Board.
Specific responsibilities:
12 For a simple programme component, separate Project Boards would not be required if their roles can be covered by the Outcome Board. 13 Source: Guidelines on UNDP Implementation of UNDAF Annual Review Process 14 UNDP Financial Rules and Regulations: Chapter E, Regulation 16.05: a) The administration by executing entities or, under the harmonized operational modalities, implementing partners, of resources obtained from or through UNDP shall be carried out under their respective financial regulations, rules, practices and procedures only to the extent that they do not contravene the principles of the Financial Regulations and Rules of UNDP. b) Where the financial governance of an executing entity or, under the harmonized operational modalities, implementing partner, does not provide the required guidance to ensure best value for money, fairness, integrity, transparency, and effective international competition, that of UNDP shall apply. 15 Depending on its composition, the Outcome Board can fulfill the function of the Project Appraisal Committee (LPAC)
33
Defining a project
Review and approve the Initiation Plan (if such plan was required and submitted to the
LPAC).
Initiating a project
Agree on PM’s responsibilities, as well as the responsibilities of the other members of the
Project Management team;
Delegate any Project Assurance function as appropriate;
Review the Progress Report for the Initiation Stage (if an Initiation Plan was required);
Review and appraise detailed Project Plan and AWP, including Atlas reports covering
activity definition, quality criteria, issue log, updated risk log and the monitoring and
communication plan.
Running a project
Provide overall guidance and direction to the project, ensuring it remains within any
specified constraints;
Address project issues as raised by the Project Manager;
Provide guidance and agree on possible countermeasures/management actions to address
specific risks;
Agree on Project Manager’s tolerances in the Annual Work Plan and quarterly plans
when required;
Conduct regular meetings to review the Project Quarterly Progress Report and provide
direction and recommendations to ensure that the agreed deliverables are produced
satisfactorily according to plans.
Review Combined Delivery Reports (CDR) prior to certification by the Implementing
Partner;
Appraise the Project Annual Review Report, make recommendations for the next AWP,
and inform the Outcome Board about the results of the review.
Review and approve end project report, make recommendations for follow-on actions;
Provide ad-hoc direction and advice for exception situations when project manager’s
tolerances are exceeded;
Assess and decide on project changes through revisions;
Closing a project
Assure that all Project deliverables have been produced satisfactorily;
Review and approve the Final Project Review Report, including Lessons-learned;
Make recommendations for follow-on actions to be submitted to the Outcome Board;
Commission project evaluation (only when required by partnership agreement)
Notify operational completion of the project to the Outcome Board.
II. Executive
The Executive is ultimately responsible for the project, supported by the Senior Beneficiary and
Senior Supplier. The Executive’s role is to ensure that the project is focused throughout its life
cycle on achieving its objectives and delivering outputs that will contribute to higher level
outcomes. The Executive has to ensure that the project gives value for money, ensuring a cost-
conscious approach to the project, balancing the demands of beneficiary and supplier.
Specific Responsibilities (as part of the above responsibilities for the Project Board)
Ensure that there is a coherent project organisation structure and logical set of plans
Set tolerances in the AWP and other plans as required for the Project Manager
Monitor and control the progress of the project at a strategic level
Ensure that risks are being tracked and mitigated as effectively as possible
34
Brief Outcome Board and relevant stakeholders about project progress
Organise and chair Project Board meetings
The Executive is responsible for overall assurance of the project as described below. If the
project warrants it, the Executive may delegate some responsibility for the project assurance
functions.
Senior Beneficiary
The Senior Beneficiary is responsible for validating the needs and for monitoring that the
solution will meet those needs within the constraints of the project. The role represents the
interests of all those who will benefit from the project, or those for whom the deliverables
resulting from activities will achieve specific output targets. The Senior Beneficiary role
monitors progress against targets and quality criteria. This role may require more than one
person to cover all the beneficiary interests. For the sake of effectiveness the role should not be
split between too many people.
Specific Responsibilities (as part of the above responsibilities for the Project Board)
Ensure the expected output(s) and related activities of the project are well defined
Make sure that progress towards the outputs required by the beneficiaries remains
consistent from the beneficiary perspective
Promote and maintain focus on the expected project output(s)
Prioritise and contribute beneficiaries’ opinions on Project Board decisions on whether to
implement recommendations on proposed changes
Resolve priority conflicts
The assurance responsibilities of the Senior Beneficiary are to check that:
Specification of the Beneficiary’s needs is accurate, complete and unambiguous
Implementation of activities at all stages is monitored to ensure that they will meet the
beneficiary’s needs and are progressing towards that target
Impact of potential changes is evaluated from the beneficiary point of view
Risks to the beneficiaries are frequently monitored
Where the project’s size, complexity or importance warrants it, the Senior Beneficiary may
delegate the responsibility and authority for some of the assurance responsibilities (see also the
section below)
III. Senior Supplier
The Senior Supplier represents the interests of the parties which provide funding and/or technical
expertise to the project (designing, developing, facilitating, procuring, implementing). The
Senior Supplier’s primary function within the Board is to provide guidance regarding the
technical feasibility of the project. The Senior Supplier role must have the authority to commit or
acquire supplier resources required. If necessary, more than one person may be required for this
role. Typically, the implementing partner, UNDP and/or donor(s) would be represented under
this role.
Specific Responsibilities (as part of the above responsibilities for the Project Board)
Make sure that progress towards the outputs remains consistent from the supplier
perspective
Promote and maintain focus on the expected project output(s) from the point of view of
supplier management
Ensure that the supplier resources required for the project are made available
Contribute supplier opinions on Project Board decisions on whether to implement
recommendations on proposed changes
Arbitrate on, and ensure resolution of, any supplier priority or resource conflicts
35
The supplier assurance role responsibilities are to:
Advise on the selection of strategy, design and methods to carry out project activities
Ensure that any standards defined for the project are met and used to good effect
Monitor potential changes and their impact on the quality of deliverables from a supplier
perspective
Monitor any risks in the implementation aspects of the project
If warranted, some of this assurance responsibility may be delegated (see also the section below)
IV. Project Manager
Overall responsibilities: The PM has the authority to run the project on a day-to-day basis on
behalf of the Project Board within the constraints laid down by the Board. The PM is responsible
for day-to-day management and decision-making for the project. The PM’s prime responsibility
is to ensure that the project produces the results specified in the project document, to the required
standard of quality and within the specified constraints of time and cost.
Prior to the approval of the project, the Project Developer role is the UNDP staff member
responsible for project management functions during formulation until the PM from the
Implementing Partner is in place.
Specific responsibilities would include:
Overall project management:
Manage the realization of project outputs through activities;
Provide direction and guidance to project team(s)/ responsible party (ies);
Liaise with the Project Board or its appointed Project Assurance roles to assure the
overall direction and integrity of the project;
Identify and obtain any support and advice required for the management, planning and
control of the project;
Ensure that project contributes to the promotion of gender equality by reaching, involving
and benefiting both women and men in its activities (gender mainstreaming);
Responsible for project administration;
Liaise with any suppliers;
May also perform Team Manager and Project Support roles;
Running a project
Plan the activities of the project and monitor progress against the initial quality criteria,
ensure that all data gathered during project implementation is disaggregated by sex
whenever possible.
Mobilize goods and services to initiative activities, including drafting TORs and work
specifications;
Monitor events as determined in the Monitoring & Communication Plan, and update the
plan as required;
Manage requests for the provision of financial resources by UNDP, using advance of
funds, direct payments, or reimbursement using the FACE (Fund Authorization and
Certificate of Expenditures);
Monitor financial resources and accounting to ensure accuracy and reliability of financial
reports;
Manage and monitor the project risks as initially identified in the Project Brief appraised
by the LPAC, submit new risks to the Project Board for consideration and decision on
possible actions if required; update the status of these risks by maintaining the Project
Risks Log;
Be responsible for managing issues and requests for change by maintaining an Issues
Log.
36
Prepare the Project Quarterly Progress Report (progress against planned activities, update
on Risks and Issues, expenditures) and submit the report to the Project Board and Project
Assurance;
Prepare the Annual review Report, and submit the report to the Project Board and the
Outcome Board;
Based on the review, prepare the AWP for the following year, as well as Quarterly Plans
if required.
Closing a Project
Prepare Final Project Review Reports to be submitted to the Project Board and the
Outcome Board;
Identify follow-on actions and submit them for consideration to the Project Board;
Manage the transfer of project deliverables, documents, files, equipment and materials to
national beneficiaries;
Prepare final CDR/FACE for signature by UNDP and the Implementing Partner.
V. Project Assurance
Overall responsibility: Project Assurance is the responsibility of each Project Board member,
however the role can be delegated. The Project Assurance role supports the Project Board by
carrying out objective and independent project oversight and monitoring functions. This role
ensures appropriate project management milestones are managed and completed.
Project Assurance has to be independent of the PM; therefore the Project Board cannot delegate
any of its assurance responsibilities to the PM. A UNDP Programme Officer typically holds the
Project Assurance role.
The implementation of the assurance responsibilities needs to answer the question “What is to be
assured?”. The following list includes the key suggested aspects that need to be checked by the
Project Assurance throughout the project as part of ensuring that it remains relevant, follows the
approved plans and continues to meet the planned targets with quality.
Maintenance of thorough liaison throughout the project between the members of the
Project Board.
Beneficiary needs and expectations are being met or managed
Gender mainstreaming policy is embedded into project and implemented
Risks are being controlled
Adherence to the Project Justification (Business Case)
Projects fit with the overall Country Programme
The right people are being involved, efforts to ensure gender balance in personnel and
among beneficiaries are made
An acceptable solution is being developed
The project remains viable
The scope of the project is not “creeping upwards” unnoticed
Internal and external communications are working
Applicable UNDP rules and regulations are being observed
Any legislative constraints are being observed
Adherence to RMG monitoring and reporting requirements and standards
Quality management procedures are properly followed
Project Board’s decisions are followed and revisions are managed in line with the
required procedures
Specific responsibilities would include:
Initiating a project
37
Ensure that project outputs definitions and activity definition including description and
quality criteria have been properly recorded in the Atlas Project Management module to
facilitate monitoring and reporting;
Ensure that people concerned are fully informed about the project
Ensure that all preparatory activities, including training for project staff, logistic supports
are timely carried out
Running a project
Ensure that funds are made available to the project;
Ensure that risks and issues are properly managed, and that the logs in Atlas are regularly
updated;
Ensure that critical project information is monitored and updated in Atlas, using the
Activity Quality log in particular;
Ensure that Project Quarterly Progress Reports are prepared and submitted on time, and
according to standards in terms of format and content quality;
Ensure that CDRs and FACE are prepared and submitted to the Project Board and
Outcome Board;
Perform oversight activities, such as periodic monitoring visits and “spot checks”.
Ensure that the Project Data Quality Dashboard remains “green”
Closing a project
Ensure that the project is operationally closed in Atlas;
Ensure that all financial transactions are in Atlas based on final accounting of
expenditures;
Ensure that project accounts are closed and status set in Atlas accordingly.
VI. Project Support
Overall responsibilities: The Project Support role provides project administration, management
and technical support to the Project Manager as required by the needs of the individual project or
Project Manager. The provision of any Project Support on a formal basis is optional. It is
necessary to keep Project Support and Project Assurance roles separate in order to maintain the
independence of Project Assurance.
Specific responsibilities: Some specific tasks of the Project Support would include:
Provision of administrative services:
Set up and maintain project files
Collect project related information data, ensure that it is disaggregated by gender
whenever possible
Update plans
Administer the quality review process
Administer Project Board meetings
Project documentation management:
Administer project revision control
Establish document control procedures
Compile, copy and distribute all project reports
Financial Management, Monitoring and reporting
Assist in the financial management tasks under the responsibility of the Project Manager
Provide support in the use of Atlas for monitoring and reporting
Provision of technical support services
Provide technical advices
Review technical reports
Monitor technical activities carried out by responsible parties.
38
Annex III. Interagency Coordination Working Group
Members of
Inter-Agency Coordination Working Group on the Project "Local Governance Support
Programme/Phase-2" implemented in cooperation with UNDP during 2014-2017
Bakiev F.H. Head of Consolidated Information and Analytical Department (CIAD)
on macroeconomic development, structural reform, attracton of foreign
investments and komplex development of territories of the Cabinet of
Ministers, National Project Coordinator, Head of Inter-Agency Group
Tursunov A.K. Head of section at Consolidated Information and Analytical
Department (CIAD) of the Cabinet of Ministers, Deputy head of group
Shakirov K.A. Head of section at Consolidated Information and Analytical
Department (CIAD) of the Cabinet of Ministers
Kuchkarov B.T. Head of legal expertise and international treaties Department of the
Cabinet of Ministers
Turdiev D.R. Deputy Minister of Economy
Mirzaev M.M. Deputy Minister of Finance
Ikramov M.M. First Deputy Minister of Justice
Alimukhamedov
B.B.
First Deputy Minister of labor and social protection
Shermatov Sh.H. Deputy Chairperson of the State Committee for communication,
informatization and telecommunication technologies
Marufova G.M. Deputy Chairperson of Women's Committee of the Republic of
Uzbekistan
Shayhov A.E. Chairman of the Chamber of Commerce and Industry of Uzbekistan
Rizaev F.M. Chairman of NC "Uzbektourism"
Abdukadirov A.A. Deputy khokim of Tashkent region
Kenjaev R.A. Deputy khokim of Djizakh region
Jalolov H.S. Deputy khokim of Namangan region
Isroilov D.Sh. Project Manager, executive secretary of Inter-Agency Group
Notes:
1. Inter-Agency Coordination Working Group shall ensure the coordination, monitoring and
control on effective implementation of the project, targeted use of grant funds of the UNDP,
consider the reports of the heads of the responsible agencies and khokimiyats, upon necessity,
submits proposals to the Cabinet of Ministers on improvement in effective implementation of the
project.
2. Working Group meetings shall be held as necessary, however, no less than once per quarter.
3. In transferring of the Working Group members to other positions, the newly-appointed
persons shall be included to the list of Working Group members based on their position.
39
Annex IV. TORs of key project personnel
1. Project Manager (SC-10)
2. Task Manager on Local Governance (SC-8)
3. Economist (SC-8)
4. Specialist on capacity building (SC-7)
5. PR and Outreach Specialist (SC-7 co-financed by E-governance and Policy Cycle
Projects)
6. AFA (SC-6)
7. Project Assistant in Djizak (SC-6)
8. Project Assistant in Namangan (SC-6)
9. Driver (SC-2)