OWNER: THE CITY OF WINNIPEG 185 KING ST WINNIPEG, MB R3B 1J1 (204) 794-4418 (204) 986-4354 PRIME CONSULTANT: PETER SAMPSON ARCHITECTURE STUDIO INC. 707 SARA AVENUE WINNIPEG, MB R3G 0Y8 (204) 475-9323 STRUCTURAL CONSULTANT: WOLFROM ENGINEERING LTD. 345 WARDLAW AVENUE WINNIPEG, MB R3L 0L5 (204) 452-0041 MECHANICAL & ELECTRICAL CONSULTANTS: MCW/AGE Consulting Professional Engineers 1821 WELLINGTON AVE #210 WINNIPEG, MB R3H 0G4 (204) 779-7900 LANDSCAPE CONSULTANTS: PLAIN PROJECTS 562-A ACADEMY ROAD WINNIPEG, MB R3N 0E3 (204) 930-0727 PROJECT DESCRIPTION The Crescent Drive Park Pavilion is a fully accessible public facility offering four season washroom and assembly space nestled along a forest edge. The washrooms (men's, women's, and a universal toilet room) and attached mechanical room are separated from a multi-purpose room by a outdoor covered patio. The building is wood framed with a large wood truss structure at the perimeter of the covered patio. The rainscreen siding is of vertical stained douglas fir, with interior siding panels composed of sandblasted aluminum panels. Exterior doors are curtain wall, as is the horizontal mullion SSG glazed window system. Floors in heated spaces are polished structural slab, while the covered patio and landscape patio are of slab on grade concrete with gravel areas adjacent to the building. Total building area (under roof) is approximately 2000 sq. ft, with 1000 sq. ft being conditioned space. The CDP Pavilion is built on the site of the previous pavilion, since demolished. The landscape patios, cast in place concrete block benches and tables and fire pit are designed for four season outdoor use, concentrating park activity and focus at the pavilion. Great care must be taken to protect the trees, and a 3 metre radius is required around the trunks from any soil compaction, hoarding, or construction activity. DRAWING LIST ARCHITECTURAL A-00 TITLE SHEET A-01 SITE & ROOF PLAN A-03 FLOOR PLAN A-04 REFLECTED CEILING PLAN A-05 ELEVATIONS A-06 BUILDING SECTIONS A-07 WALL SECTIONS & DETAILS A-08 DETAILS A-09 DETAILS A-10 INTERIOR ELEVATIONS A-11 INTERIOR ELEVATIONS SP-1 ARCHITECTURAL SPECIFICATION SP-2 ARCHITECTURAL SPECIFICATION LANDSCAPE L001 OUTLINE SPECIFICATIONS L101 MATERIALS PLAN L102 LAYOUT PLAN L501 DETAILS L502 DETAILS STRUCTURAL S-0 GENERAL NOTES S-1 FOUNDATION & MAIN FLOOR FRAMING S-1.1 FOUNDATION LAYOUT PLAN S-2 ROOF FRAMING PLAN & GIRDER TRUSS DETAILS S-3 SECTIONS & DETAILS S-4 BUILDING SECTIONS & ELEVATIONS MECHANICAL M-0.0 MECHANICAL LEGEND AND DRAWING LIST M-1.1 MAIN FLOOR - PLUMBING RENOVATION PLAN M-2.1 MAIN FLOOR - HVAC RENOVATION PLAN M-3.1 MECHANICAL SPECIFICATION M3.2 MECHANICAL SPECIFICATION ME-1.0 MECHANICAL AND ELECTRICAL DATA SHEETS ELECTRICAL E1.0 ELECTRICAL SYMBOL LEGEND, DRAWING LIST AND SCHEDULES E3.0 ELECTRICAL SPECIFICATION EP2.0 MAIN FLOOR - POWER AND SYSTEMS LAYOUT GENERAL NOTES 1. All existing dimensions are plus/minus and are to be confirmed by the General Contractor on site. 2. The General Contractor shall verify the location of all site services with their respective utility companies prior to commencement of work. Coordinate with Contract Administrator and subtrades for service tie-ins. 3. Patch and make good all surfaces affected by installation and construction of adjacent disciplines should any surfaces be damaged through the course of construction and transportation. 4. Clean up all construction debris from the site and repair any damage to the site resulting from construction upon completion of the work. 5. Provide protective site hoarding until occupancy is issued. 6. All topographic data provided is approximate and is to be verified prior to construction. 7. Contract Administrator to verify site layout and location prior to commencement of construction 8. General Contractor to obtain all permits 9. All dimensions are to gridline or face of finished assembly unless otherwise noted. Crescent Drive Park Pavilion Crescent Drive Park, Winnipeg, MB Drawing No. Scale Drawn By Reviewed By Date Drawing Project Owner No. Date Revision Notes City of Winnipeg This drawing must not be scaled. The contractors shall verify all dimensions and other data on site prior to commencement of work. Discrepancies, errors, and omissions are to be reported to the Architect prior to proceeding with the Work. Drawings and specifications as instruments of service are the property of the Architect; the copyright in the same being reserved to him. No reproduction or revision to these drawings may be made without the permission of the Architect, and when made, must bear his name. All prints to be returned to the Architect upon request. Crescent Drive Park Pavilion Title Sheet A-00 MH, DB, MJK PS As Noted January 2016 Crescent Drive Park 781 Crescent Drive Project No. 1448 psa studio in c. Peter Sampson Architecture Studio Incorporated 707 Sara Avenue R3G 0Y8 Winnipeg, Manitoba [email protected] 1 204 475 9323 Revision No. 0 MIR Mirror MTL Metal MTL DK Exposed metal deck N.I.C. Not in contract O/C On centre O/F Outside face O/H Overhead O/O Outside to outside OTA Open to above OWSJ Open web steel joist P/A Public address PL Plastic laminate PNT Paint PRTN Partition PT Pressure treated PTL Push to lock button PW Plywood RB Rubber base RD Roof drain RH Robe hook R/O Rough opening RSB Recessed switch box RTU Roof top unit RV Relief vent RWL Rain water leader SB Switch box SCR Screen SD Soap dispenser SF Storefront SG Steel sign SIM Similar SN Sanitary napkin disposal SP Splash pad SS Stainless steel ST Stain STN Station TG Tempered glass T/O Top of TP Toilet paper dispenser TPTN Toilet Partition TYP Typical U/S Underside VOS Verify on site WC Washroom WD Wood WG Wall grille WP Water proof WR Waste receptacle WW Window Wall X Existing ABBREVIATIONS: ACT Acoustic ceiling tile AFC At finished ceiling AFF At finished floor AH Access hatch ALUM Aluminum AP Access panel AR Abuse resistant BB Base board BBH Base board heater BCS Baby change station BF Barrier free B/O Bottom of BR Back rest CA Contract administrator CB Cove base CIP Cast in place CJ Control joint CLG Ceiling CMU Concrete masonry unit COL Column CONC Concrete CT Ceramic tile CW Curtain wall C/W Complete with DF Drinking fountain DO Door operator DN Down EHD Electric hand dryer E/S Each side EP Electrical panel EPT Epoxy paint FAP Fire annunciator panel FE Fire extinguisher FD Floor drain FH Floor hatch FR Frosted finish FRP Fibre reinforced panel GB Grab bar GWB Gypsum wall board H Recessed Heater HP Hose bib HM Hollow metal HDM Hydro meter HP Hydro pole HSS Hollow steel section I/F Inside face I/I Inside to inside LF Light fixture MG Mechanical grille 229 230 230 229 229 229 230 230 229 229 229 ASPHALT PATH 0 30 50 M CRESCENT DRIVE Parking Lot Shed Construction Access Route CRESCENT DRIVE RED RIVER Hydrant Dashed line of appoximate location of demolished pavilion site Black outline approximate location of new pavilion Existing path Existing DIP pole 72359 78529 Approximate loaction of WORK POINT "A1". See A-01. 150188 109 169 The Russell Wood Slat Exterior Wall 2x3 (38x64mm) vertical fir rough sawn lumber @ 57mm O/C 2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C 3" (78mm) vertical z-girt @ 915mm O/C 2x3 (38x64mm) PT horizontal wood @ 600mm O/C 4" (100mm) rigid insulation Adhered air and vapour barrier 1/2" (13mm) plywood sheathing 2x6 (38x140mm) wood stud at 610mm O/C 4" (100mm) mineral wool batt insulation 5/8" (16mm) abuse resistant wall board TAG FIRE STC THERMAL DIAGRAM DESCRIPTION WALL ASSEMBLIES N/A R-27 36 218 169 172 169 W1 W2 242 W3 W4 P1 P2 PARTITION ASSEMBLIES Aluminum Panel Assembly - non insulated 3/16" (5mm) Aluminum panel adhered to: 1/2" (13mm) exterior grade plywood 2x3 (38x64mm) horizontal wood furring @ 915mm O/C 2x6 (38x140mm) wood stud @ 610mm O/C R2 R1 216 Varies ROOF ASSEMBLIES W5 196 110 Foundation Wall 110 concrete faced insulation board Waterproof membrane Concrete wall (See Structural) W6 1. 2016.02.26 Issued for Client Review 2. 2016.07.05 Issued for Construction 2016.07.05 1. 2016.02.26 Issued for Client Review 2. 2016.07.05 Issued for Construction 2016.07.05 N/A N/A N/A N/A N/A 36 Plumbing Partition 5/8" (16mm) abuse resistant wallboard 2x8 (38x184mm) wood studs @ 610mm O/C 4" (100mm) acoustic mineral wool 5/8" (16mm) abuse resistant wallboard Partition 5/8" (16mm) abuse resistant wallboard 2x6 (38x140mm) wood studs @ 610mm O/C 5/8" (16mm) abuse resistant wallboard Aluminum Panel Assembly 3/16" (5mm) aluminum panels adhered to: 1/2" (13mm) exterior grade plywood 2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C 3" (78mm) vertical z-girt @ 915mm O/C 2x3 (38x64mm) PT horizontal wood @ 600mm O/C 4" (100mm) rigid insulation Adhered air and vapour barrier 1/2" (13mm) plywood sheathing 2x6 (38x140mm) wood stud at 610mm O/C 4" (100mm) mineral wool batt insulation 5/8" (16mm) abuse resistant wall board N/A R-27 36 Wood Slat Screen 2x3 (38x64mm) vertical fir rough sawn lumber @ 57mm O/C 2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C 2x6 (38x140mm) PT vertical wood stud at 610mm O/C 7/8" (22mm) Acrylite Resist acrylic polymer sheet between studs fastened to: 2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C between studs Truss N/A N/A N/A Glazed wall assemby Sealed glazing unit adhered to: 1/2" (13mm) painted exterior grade plywood 2 1/2" (64mm) rigid insulation 2x4 (38x64mm) PT vertical wood furring to suit Adhered air/vapour membrane 1/2" (13mm) plywood sheathing 2x6 (38x140mm) wood stud at 610mm O/C 4" (100mm) mineral wool batt insulation 5/8" (16mm) abuse resistant Wallboard N/A R-27 36 TAG FIRE STC THERMAL DIAGRAM DESCRIPTION N/A N/A N/A N/A R-20 N/A N/A R-35 N/A N/A N/A N/A Insulated Roof 2 ply modified bitumen roof membrane 3/4" (19mm) exterior grade plywood 7" (178mm) rigid insulation Adhered air/vapour membrane 3/4" (19mm) plywood Wood Truss (see Structural) 5/8" (16mm) GWB Roof 2 ply modified bitumen roof membrane 3/4" (19mm) exterior grade plywood Wood joist (see Structural)

Upload: vukhuong

Post on 13-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

OWNER:

THE CITY OF WINNIPEG185 KING STWINNIPEG, MBR3B 1J1(204) 794-4418(204) 986-4354

PRIME CONSULTANT:

PETER SAMPSON ARCHITECTURE STUDIO INC.707 SARA AVENUEWINNIPEG, MBR3G 0Y8(204) 475-9323

STRUCTURAL CONSULTANT:

WOLFROM ENGINEERING LTD.345 WARDLAW AVENUEWINNIPEG, MBR3L 0L5(204) 452-0041

MECHANICAL & ELECTRICAL CONSULTANTS:

MCW/AGE Consulting Professional Engineers1821 WELLINGTON AVE #210WINNIPEG, MBR3H 0G4(204) 779-7900

LANDSCAPE CONSULTANTS:

PLAIN PROJECTS 562-A ACADEMY ROADWINNIPEG, MBR3N 0E3(204) 930-0727

PROJECT DESCRIPTION

The Crescent Drive Park Pavilion is a fully accessible public facility offering four season washroom and assembly space nestled along a forest edge. The washrooms (men's, women's, and a universal toilet room) and attached mechanical room are separated from a multi-purpose room by a outdoor covered patio. The building is wood framed with a large wood truss structure at the perimeter of the covered patio. The rainscreen siding is of vertical stained douglas fir, with interior siding panels composed of sandblasted aluminum panels. Exterior doors are curtain wall, as is the horizontal mullion SSG glazed window system.  Floors in heated spaces are polished structural slab, while the covered patio and landscape patio are of slab on grade concrete with gravel areas adjacent to the building. Total building area (under roof) is approximately 2000 sq. ft, with 1000 sq. ft being conditioned space. The CDP Pavilion is built on the site of the previous pavilion, since demolished. The landscape patios, cast in place concrete block benches and tables and fire pit are designed for four season outdoor use, concentrating park activity and focus at the pavilion.  Great care must be taken to protect the trees, and a 3 metre radius is required around the trunks from any soil compaction, hoarding, or construction activity.

DRAWING LISTARCHITECTURALA-00 TITLE SHEETA-01 SITE & ROOF PLANA-03 FLOOR PLANA-04 REFLECTED CEILING PLANA-05 ELEVATIONSA-06 BUILDING SECTIONS A-07 WALL SECTIONS & DETAILSA-08 DETAILSA-09 DETAILSA-10 INTERIOR ELEVATIONSA-11 INTERIOR ELEVATIONSSP-1 ARCHITECTURAL SPECIFICATIONSP-2 ARCHITECTURAL SPECIFICATION

LANDSCAPEL001 OUTLINE SPECIFICATIONSL101 MATERIALS PLANL102 LAYOUT PLANL501 DETAILSL502 DETAILS

STRUCTURALS-0 GENERAL NOTESS-1 FOUNDATION & MAIN FLOOR FRAMINGS-1.1 FOUNDATION LAYOUT PLANS-2 ROOF FRAMING PLAN & GIRDER TRUSS DETAILSS-3 SECTIONS & DETAILSS-4 BUILDING SECTIONS & ELEVATIONS

MECHANICALM-0.0 MECHANICAL LEGEND AND DRAWING LISTM-1.1 MAIN FLOOR - PLUMBING RENOVATION PLANM-2.1 MAIN FLOOR - HVAC RENOVATION PLAN M-3.1 MECHANICAL SPECIFICATIONM3.2 MECHANICAL SPECIFICATIONME-1.0 MECHANICAL AND ELECTRICAL DATA SHEETS

ELECTRICALE1.0 ELECTRICAL SYMBOL LEGEND, DRAWING LIST AND SCHEDULESE3.0 ELECTRICAL SPECIFICATIONEP2.0 MAIN FLOOR - POWER AND SYSTEMS LAYOUT

GENERAL NOTES1. All existing dimensions are plus/minus and are to be confirmed by the

General Contractor on site.2. The General Contractor shall verify the location of all site services with

their respective utility companies prior to commencement of work. Coordinate with Contract Administrator and subtrades for service tie-ins.

3. Patch and make good all surfaces affected by installation and construction of adjacent disciplines should any surfaces be damaged through the course of construction and transportation.

4. Clean up all construction debris from the site and repair any damage to the site resulting from construction upon completion of the work.

5. Provide protective site hoarding until occupancy is issued.6. All topographic data provided is approximate and is to be verified prior

to construction.7. Contract Administrator to verify site layout and location prior to

commencement of construction8. General Contractor to obtain all permits9. All dimensions are to gridline or face of finished assembly unless

otherwise noted.

Crescent Drive Park PavilionCrescent Drive Park, Winnipeg, MB

Drawing No.Scale

Drawn By Reviewed By

Date

Drawing

Project

Owner

No. Date Revision Notes

City of Winnipeg

This drawing must not be scaled. The contractors shall verify all dimensions and other data on site prior to commencement of work. Discrepancies, errors, and omissions are to be reported to the Architect prior to proceeding with the Work.

Drawings and specifications as instruments of service are the property of the Architect; the copyright in the same being reserved to him.

No reproduction or revision to these drawings may be made without the permission of the Architect, and when made, must bear his name. All prints to be returned to the Architect upon request.

Crescent Drive Park Pavilion

Title Sheet

A-00MH, DB, MJK PS

As Noted

January 2016

Crescent Drive Park781 Crescent Drive

Project No.1448

psastudio inc. Peter Sampson Architecture Studio Incorporated

707 Sara Avenue R3G 0Y8 Winnipeg, Manitoba [email protected] 204 475 9323

Revision No.0

MIR MirrorMTL MetalMTL DK Exposed metal deckN.I.C. Not in contractO/C On centreO/F Outside faceO/H OverheadO/O Outside to outsideOTA Open to aboveOWSJ Open web steel joistP/A Public addressPL Plastic laminatePNT PaintPRTN PartitionPT Pressure treatedPTL Push to lock buttonPW PlywoodRB Rubber baseRD Roof drainRH Robe hookR/O Rough openingRSB Recessed switch boxRTU Roof top unitRV Relief ventRWL Rain water leaderSB Switch boxSCR ScreenSD Soap dispenserSF StorefrontSG Steel signSIM SimilarSN Sanitary napkin disposalSP Splash padSS Stainless steelST StainSTN StationTG Tempered glassT/O Top ofTP Toilet paper dispenserTPTN Toilet PartitionTYP TypicalU/S UndersideVOS Verify on siteWC WashroomWD WoodWG Wall grilleWP Water proofWR Waste receptacleWW Window WallX Existing

ABBREVIATIONS:ACT Acoustic ceiling tile AFC At finished ceilingAFF At finished floorAH Access hatchALUM AluminumAP Access panelAR Abuse resistantBB Base boardBBH Base board heaterBCS Baby change stationBF Barrier freeB/O Bottom ofBR Back restCA Contract administratorCB Cove baseCIP Cast in placeCJ Control jointCLG CeilingCMU Concrete masonry unitCOL ColumnCONC ConcreteCT Ceramic tileCW Curtain wallC/W Complete withDF Drinking fountainDO Door operatorDN DownEHD Electric hand dryerE/S Each sideEP Electrical panelEPT Epoxy paintFAP Fire annunciator panelFE Fire extinguisherFD Floor drainFH Floor hatchFR Frosted finishFRP Fibre reinforced panelGB Grab barGWB Gypsum wall boardH Recessed HeaterHP Hose bibHM Hollow metalHDM Hydro meterHP Hydro poleHSS Hollow steel sectionI/F Inside faceI/I Inside to insideLF Light fixtureMG Mechanical grille

229

230

230

229229

229

230

230

229

229

229

ASPHALT PATH

SEPTIC LID

0.92

S R

H

H

SR

H

SR

H

S

R

SR

0 30 50 M

CRESCENT

DRIVE

ParkingLot

Shed Constr

uctio

n Ac

cess

Rou

te

CR

ESCEN

T

DR

IVE

RED RIV

ER

Hydrant

Dashed line of appoximate location of demolished pavilion siteBlack outline approximate location of new pavilion

Existing path

Existing DIP pole72359

78529

Approximate loaction of WORK POINT "A1". See A-01.

150188

109

169

TheRussell

Wood Slat Exterior Wall2x3 (38x64mm) vertical fir rough sawn lumber @ 57mm O/C2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C3" (78mm) vertical z-girt @ 915mm O/C2x3 (38x64mm) PT horizontal wood @ 600mm O/C4" (100mm) rigid insulationAdhered air and vapour barrier1/2" (13mm) plywood sheathing2x6 (38x140mm) wood stud at 610mm O/C4" (100mm) mineral wool batt insulation5/8" (16mm) abuse resistant wall board

TAG FIRE STC THERMAL DIAGRAM DESCRIPTION

WALL ASSEMBLIES

N/A R-2736 218

169

172

169

W1

W2

242W3

W4

P1P1

P2

PARTITION ASSEMBLIES

Aluminum Panel Assembly - non insulated3/16" (5mm) Aluminum panel adhered to:1/2" (13mm) exterior grade plywood2x3 (38x64mm) horizontal wood furring @ 915mm O/C2x6 (38x140mm) wood stud @ 610mm O/C

R2

R1

216

Varie

s

ROOF ASSEMBLIES

W5

196

110 Foundation Wall

110 concrete faced insulation boardWaterproof membraneConcrete wall (See Structural)

W6

1. 2016.02.26 Issued for Client Review2. 2016.07.05 Issued for Construction

2016.07.05

1. 2016.02.26 Issued for Client Review2. 2016.07.05 Issued for Construction

2016.07.05

N/A N/AN/A

N/A N/A36

Plumbing Partition5/8" (16mm) abuse resistant wallboard2x8 (38x184mm) wood studs @ 610mm O/C4" (100mm) acoustic mineral wool5/8" (16mm) abuse resistant wallboard

Partition5/8" (16mm) abuse resistant wallboard2x6 (38x140mm) wood studs @ 610mm O/C5/8" (16mm) abuse resistant wallboard

Aluminum Panel Assembly3/16" (5mm) aluminum panels adhered to:1/2" (13mm) exterior grade plywood2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C3" (78mm) vertical z-girt @ 915mm O/C2x3 (38x64mm) PT horizontal wood @ 600mm O/C4" (100mm) rigid insulationAdhered air and vapour barrier1/2" (13mm) plywood sheathing2x6 (38x140mm) wood stud at 610mm O/C4" (100mm) mineral wool batt insulation5/8" (16mm) abuse resistant wall board

N/A R-2736

Wood Slat Screen2x3 (38x64mm) vertical fir rough sawn lumber @ 57mm O/C2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C2x6 (38x140mm) PT vertical wood stud at 610mm O/C7/8" (22mm) Acrylite Resist acrylic polymer sheet between studs fastened to:2x3 (38x64mm) PT horizontal wood furring @ 915mm O/C between studsTruss

N/A N/AN/A

Glazed wall assembySealed glazing unit adhered to:1/2" (13mm) painted exterior grade plywood2 1/2" (64mm) rigid insulation2x4 (38x64mm) PT vertical wood furring to suitAdhered air/vapour membrane1/2" (13mm) plywood sheathing2x6 (38x140mm) wood stud at 610mm O/C4" (100mm) mineral wool batt insulation5/8" (16mm) abuse resistant Wallboard

N/A R-2736

TAG FIRE STC THERMAL DIAGRAM DESCRIPTION

N/A N/AN/A

N/A R-20N/A

N/A R-35N/A

N/A N/AN/A

Insulated Roof2 ply modified bitumen roof membrane3/4" (19mm) exterior grade plywood7" (178mm) rigid insulationAdhered air/vapour membrane3/4" (19mm) plywoodWood Truss (see Structural)5/8" (16mm) GWB

Roof2 ply modified bitumen roof membrane3/4" (19mm) exterior grade plywoodWood joist (see Structural)